RtII Documentation System Attendance Support
Apr 01, 2015
RtII Documentation System
Attendance Support
Procedures to Enter Attendance Plan Tasks / Progress Monitoring Closing Plans
Agenda
Schoolnet Toolbar
All Group Plans start from the Classrooms module
All other interventions tasks use the Interventions module;View plans,Edit plans,Complete tasks, etc
Plan Creator – The user who opens the plan online Case manager – The user assigned to manage the plan; the
owner of the plan (the Plan Creator is set as the default) RtI Coordinator – The RtII Champion Team member – Any teacher that needs to be part of the
group plan; allowed to view plan Intervention provider – The team member that provides
the intervention to the group; allowed to enter intervention data
Progress Monitor – The team member that evaluates the success of the intervention provided to the group; allowed to enter Progress monitor information
Roles
Identify Attendance Need Team Setup Group Plan of 1 Complete Task / Progress Monitoring Plan Maintenance
RtII Process
Attendance Reports Using Classroom Data Using Schoolnet Data
Reports
Identify Need
Interventions are separated by where they are delivered; not all interventions need to be selected
Classroom based – delivered by the teacher School Based – delivered by school staff Community Based – delivered by community
organization
Interventions
Creating Level 2/3 Group Plans From the “Classrooms” module, choose the
Student Analysis tab. From the list of reports, Early Warning Indicator (EWI)
RtII Plan
Use the list of students identified for intervention(s) Click the check box of the student to be
assigned to the intervention plan Click the “Assign Interventions” Button (top or
bottom of list)
RtII Plan
First select your students using the check boxes, then click “Assign Interventions”
RtII – Team Setup•Provide “Group Plan” nameStaffLastName_Intervention_Subject/Period_RtII Level
•Verify students for plan•Select “Areas of Eligibility”
•The plan creator is the default Case Manager. Do not change this. To select a different case manager, use a different plan creator.•Choose team members.•Add Team Members.
s
RtII – Attendance Plan Setup
Select Progress Monitor for the Plan
Expand Area of Concern with the “+”
RtII – Attendance Plan Setup
Select InterventionSelect Intervention ProviderIf applicable, Select Intervention Due Date
RtII – Attendance Plan Setup
•Final review of the intervention(s)•Review Attendance of team during the plan setup.•ACTIVATE PLAN
RtII – Task / Progress Monitoring
•Click on the Interventions module•Choose My Tasks•Choose a task to complete•Enter intervention data•Click Complete Task
RtII – Task / Progress Monitoring
•Select the upcoming Monitoring task
•Evaluate the success of the intervention
•Click Complete task
RtII – Close Plan
To Close a Plan –•View a Plan•Discontinue interventions•Select Close Plan•Provide a reason for both the intervention and plan
Currently, we do not have this functioning as expected. We are working with our vendor to have the reporting of the student plans ready for Court referrals.
Truancy Elimination Plan
Champion Dashboard
Students who are eligible for individual plans and their triggers
Behavioral health plan without a trigger
Principal Dashboard
Monitor staff with overdue tasks
Track progress of plan entry
Schoolnet will upgrade the Interventions module on a regular basis: To better suit the needs of the district To accommodate user suggestions
Possible future enhancements: Improved graphs, parent access, better reports
RtII - IMS
Fran Newberg – Deputy Chief – Accountability and Educational Technology (fnewberg)
Schoolnet Help Desk 1 866 PHILA-HELP (1 866 744 5243) Email [email protected]
Schoolnet Roles and Access [email protected]
Robert Karl [email protected]
Jan Tong [email protected]
Donna Heckscher [email protected]
Contact Information
Guided PracticeTraining Site
http://training.schoolnet.com
Assign User Names, Passwords, Roles