RTF Subcommittee Meeting RTF Technical Support Needs for Small & Rural Utilities October 27, 2010 1
15

RTF Subcommittee Meeting RTF Technical Support Needs for Small Rural Utilities October 27, 2010 1.

Jan 18, 2018

Download

Documents

Godfrey Ford

Revised Project Timeline 3 October 27Subcommittee meeting to discuss revised schedule and overall approach to analyzing the measure data from the PTR and C&RD. October 29All data due to Ecotope (w/ exception of IDEA and maybe PNGC…) November 19Ecotope sends draft list of utilities and proposed interview questions to subcommittee for review December 2/3Subcommittee meeting – list of utilities finalized; discuss interview questions. December 6-10Ecotope to start scheduling interviews December 10Final interview questions December 13 – January 21 Utility interviews February 11Draft report due February 18Subcommittee to provide feedback on draft report February 21-25Subcommittee meeting – presentation on draft report March 1Presentation on draft report to full RTF March 18Final report due
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: RTF Subcommittee Meeting RTF Technical Support Needs for Small  Rural Utilities October 27, 2010 1.

RTF Subcommittee Meeting

RTF Technical Support Needs for Small & Rural Utilities

October 27, 2010

1

Page 2: RTF Subcommittee Meeting RTF Technical Support Needs for Small  Rural Utilities October 27, 2010 1.

Agenda

Introductions Review revised project timeline Analysis methodology Analysis findings Next steps Q&A

2

Page 3: RTF Subcommittee Meeting RTF Technical Support Needs for Small  Rural Utilities October 27, 2010 1.

Revised Project Timeline

3

October 27 Subcommittee meeting to discuss revised schedule and overall approach to analyzing the measure data from the PTR and C&RD.

October 29 All data due to Ecotope (w/ exception of IDEA and maybe PNGC…)

November 19 Ecotope sends draft list of utilities and proposed interview questions to subcommittee for review

December 2/3 Subcommittee meeting – list of utilities finalized; discuss interview questions.

December 6-10

Ecotope to start scheduling interviews

December 10 Final interview questions

December 13 – January 21

Utility interviews

February 11 Draft report due February 18 Subcommittee to provide feedback on draft reportFebruary 21-25

Subcommittee meeting – presentation on draft report

March 1 Presentation on draft report to full RTFMarch 18 Final report due

Page 4: RTF Subcommittee Meeting RTF Technical Support Needs for Small  Rural Utilities October 27, 2010 1.

Interim Analysis Methodology

4

Characterize utilities– Clean/prune data (remove misc. “non-utility” entities)– Small (<15 aMW)– Rural (LDD recipients)– Residential (> 60%)

Use 2007-2010 PTR dataset as base – C&RD to be available for next round– PNGC and IDEA pools to be broken out in next round

Develop measure bins based on PTR categories

Develop high-level summaries of measure implementation behavior

Page 5: RTF Subcommittee Meeting RTF Technical Support Needs for Small  Rural Utilities October 27, 2010 1.

Analysis Categories Renewables Measure Bins

– Commercial Envelope– Commercial Equipment– Commercial Lighting– Commercial Third Party– Residential Appliances– Residential Envelope– Residential HVAC– Residential Water Heating– Low Income Weatherization– Agricultural– Industrial – Utility Systems– Traffic Signals

5

Page 6: RTF Subcommittee Meeting RTF Technical Support Needs for Small  Rural Utilities October 27, 2010 1.

Utility Breakdowns

Small = 41 Rural = 36 Small or rural = 77 Small/rural = 13 Residential = 36 Small/residential = 12 Rural/residential = 16 Small/rural/residential = 6

6

Page 7: RTF Subcommittee Meeting RTF Technical Support Needs for Small  Rural Utilities October 27, 2010 1.

Potential Utility Selection Criteria

Utility characterization breakdowns

Volume of savings

Patterns of measure implementation of various utilities

Residential vs. commercial

Renewables vs. measures

Climate

7

Page 8: RTF Subcommittee Meeting RTF Technical Support Needs for Small  Rural Utilities October 27, 2010 1.

Distribution of Utilities by Load & Customer Base (All Utilities)

8

Page 9: RTF Subcommittee Meeting RTF Technical Support Needs for Small  Rural Utilities October 27, 2010 1.

Overall Distribution of Measures (All Utilities)

9

Page 10: RTF Subcommittee Meeting RTF Technical Support Needs for Small  Rural Utilities October 27, 2010 1.

Overall Distribution of Measures, Not Renewables (All Utilities)

10

Page 11: RTF Subcommittee Meeting RTF Technical Support Needs for Small  Rural Utilities October 27, 2010 1.

Distribution of Measures by Small/Rural

11

Page 12: RTF Subcommittee Meeting RTF Technical Support Needs for Small  Rural Utilities October 27, 2010 1.

Distribution of Measures vs. Renewables by Small/Rural Utilities

12

Page 13: RTF Subcommittee Meeting RTF Technical Support Needs for Small  Rural Utilities October 27, 2010 1.

Next Steps

Incorporate C&RD and individual utilities from PNGC and IDEA

Perform analysis on complete dataset

Take a closer look at individual measures, normalize across utilities for comparative analysis

Refine utility selection criteria

Develop list of recommended utilities

Develop draft survey questions

13

Page 14: RTF Subcommittee Meeting RTF Technical Support Needs for Small  Rural Utilities October 27, 2010 1.

Questions & Answers

14

Page 15: RTF Subcommittee Meeting RTF Technical Support Needs for Small  Rural Utilities October 27, 2010 1.

Ecotope Contact:Poppy Storm, Project Manager

4056 9th Avenue NE − Seattle, Washington, 98105PH: (206) 322-3753, FAX: (206) 325-7270

www.ecotope.com

15