1910.119()
EEIA A C = !
E
8/12/2019 R&T 2009 - Management of Change
5/26
E
8/12/2019 R&T 2009 - Management of Change
6/26
C (C)
: 1910.119()
(1) The employer shall establish and implement
written procedures to manage changes (exceptreplacement in kind) to process chemicals,
technology, equipment, and procedures and
changes to facilities that affect a covered process.
8/12/2019 R&T 2009 - Management of Change
7/26
(IK)
1910.119() IK:
"a replacement which satisfies the design
specification.
IK?
8/12/2019 R&T 2009 - Management of Change
8/26
(IK)
CC G C IK:
8/12/2019 R&T 2009 - Management of Change
9/26
C
I
1910.119.
8/12/2019 R&T 2009 - Management of Change
10/26
A
8/12/2019 R&T 2009 - Management of Change
11/26
HA CH G
C: , , ,
,
, C EIED
8/12/2019 R&T 2009 - Management of Change
12/26
E 1
/ .
C
8/12/2019 R&T 2009 - Management of Change
13/26
E 2 B
ABC
25% .
A C
/
J ,
, , A
8/12/2019 R&T 2009 - Management of Change
14/26
C (C)
: 1910.119()
(2)The procedures shall assure that the following
considerations are addressed prior to any change:
(i) the technical basis for the proposed change;
(ii) impact of the change on safety and health(iii)modifications to operating procedures
(iv) necessary time period for the change and
(v) authorization requirements for the proposed change
8/12/2019 R&T 2009 - Management of Change
15/26
D ( )
, , .
8/12/2019 R&T 2009 - Management of Change
16/26
I
I HA
8/12/2019 R&T 2009 - Management of Change
17/26
D () ?
()
/
I ,
I , !
8/12/2019 R&T 2009 - Management of Change
18/26
8/12/2019 R&T 2009 - Management of Change
19/26
A
A
A
A ( )E C , ,
/ A
C
C (
HA)
C C , ,
8/12/2019 R&T 2009 - Management of Change
20/26
I
(.. )
/
/C
A
!
8/12/2019 R&T 2009 - Management of Change
21/26
C (C)
: 1910.119()
(3) Employees involved in operating a process andmaintenance and contract employees whose jobtasks will be affected by a change in the processshall be informed of, and trained in, the change
prior to start-up of the process or affected part ofthe process.
8/12/2019 R&T 2009 - Management of Change
22/26
: 1910.119()
(4) If a change [in a] covered [process within the scope of] thisparagraph results in a change in the process safetyinformation required by paragraph (d), such information
shall be updated accordingly.
C (C)
8/12/2019 R&T 2009 - Management of Change
23/26
8/12/2019 R&T 2009 - Management of Change
24/26
C C A/
HA
I
C
(.. )
A , ,
C
C
8/12/2019 R&T 2009 - Management of Change
25/26
C HAI C C
C C
A ()
C
&ID, ,
8/12/2019 R&T 2009 - Management of Change
26/26
?