Top Banner
RP 3 Webinar Series: Reliability Overview of the RP 3 Reliability Checklist Thursday, April 17, 2014 1:00pm – 2:00 pm
20

RP 3 Webinar Series: Reliability Overview of the RP 3 Reliability Checklist Thursday, April 17, 2014 1:00pm – 2:00 pm.

Mar 31, 2015

Download

Documents

Ciara Popejoy
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: RP 3 Webinar Series: Reliability Overview of the RP 3 Reliability Checklist Thursday, April 17, 2014 1:00pm – 2:00 pm.

RP3 Webinar Series: Reliability

Overview of the RP3 Reliability Checklist

Thursday, April 17, 20141:00pm – 2:00 pm

Page 2: RP 3 Webinar Series: Reliability Overview of the RP 3 Reliability Checklist Thursday, April 17, 2014 1:00pm – 2:00 pm.

Presenters for this Webinar• Neil James

Manager Distribution Operations, Santee Cooper

• Rick AndersonElectric Systems Engineering Manager, Fayetteville Public Works Commission

Page 3: RP 3 Webinar Series: Reliability Overview of the RP 3 Reliability Checklist Thursday, April 17, 2014 1:00pm – 2:00 pm.

Review Panel• 2 - Large utilities• 2 - Medium utilities• 2 - Small utilities• 1 - JAA/SA• 1 – Reliability Representative• 1 – Safety Representative• 1 – System Improvement Representative• 2 - Human Resources Representatives• 2 - T&D Officers• 2 – Safety Officers• 2 - System Planning Officers

Total = 18 member Review Panel of your peers

Page 4: RP 3 Webinar Series: Reliability Overview of the RP 3 Reliability Checklist Thursday, April 17, 2014 1:00pm – 2:00 pm.

What is RP3?

• Reliable Public Power Provider (RP3) program– Peer-evaluation of your utility’s reliability,

safety, work force development, and system improvement

• Two main goals:1. Help public power perform a utility

operational self-check by benchmarking on a national level

2. National recognition of the excellent service you provide to – customers, your community leaders, state and federal regulatory agencies, and members of Congress

Reliability; 25%

Safety; 25%Work Force De-velopment; 25%

System Im-provement; 25%

Page 5: RP 3 Webinar Series: Reliability Overview of the RP 3 Reliability Checklist Thursday, April 17, 2014 1:00pm – 2:00 pm.

Reliability – 25%

Criteria Area Section Question Subject of Question

Maximum Point

Value

 Reliability 25%

A - Reliability Indices

Collection

A1

Monitoring and Tracking Reliability Data 2

A2Reliability Statistic Tracking

4

B - Reliability Indices Use

B1Use of Service Reliability Indices 4

B2 Reliability Survey 2

C - Mutual Aid C1National Mutual Aid Agreement 3

D - Disaster Plan D1

Disaster Plan4

E - Physical Infrastructure

and Cyber Security

E1Physical Infrastructure Security 3

E2Cyber Security

3

Page 6: RP 3 Webinar Series: Reliability Overview of the RP 3 Reliability Checklist Thursday, April 17, 2014 1:00pm – 2:00 pm.

Application Walkthrough

Page 7: RP 3 Webinar Series: Reliability Overview of the RP 3 Reliability Checklist Thursday, April 17, 2014 1:00pm – 2:00 pm.

Application WalkthroughA – Reliability Indices Collection

1. What method(s) does your utility use to monitor and track reliability data?

Hand calculations – (attach sample) APPA’s eReliability Tracker Program Alternate software program – (attach sample screenshot) Other method

If other, describe in detail the process your utility uses and/or attach a screenshot (attach additional page(s) if more space is needed):

Location of attachment(s): (n/a if no additional information needed)

Page 8: RP 3 Webinar Series: Reliability Overview of the RP 3 Reliability Checklist Thursday, April 17, 2014 1:00pm – 2:00 pm.

Application Walkthrough

If other, please describe the index your utility uses:

Location of attachment(s): (n/a if no additional information needed)

Index

Value of Index

Units Associated with Index

Utility Goal/Target

EXAMPLE SAIDI 102.52 minutes 120 minutes

SAIDI minutes

CAIDI minutes

ASAI %

MAIFI interruptions

SAIFI interruptions

OTHER

2. Use check boxes below to indicate each reliability statistic tracked by your utility and provide the most recent year’s calculation (January 1, 2013 – December 31, 2013). Please list the preferred time period of measure for each index below. If your utility uses a different time period or method of calculating the index, explain in the area below. Refer to the Institute of Electrical and Electronics Engineers (IEEE) 1366 standard for more information on reliability statistics. Also indicate your organization’s goals/targets for each tracked index:

Page 9: RP 3 Webinar Series: Reliability Overview of the RP 3 Reliability Checklist Thursday, April 17, 2014 1:00pm – 2:00 pm.

Application WalkthroughB – Reliability Indices Use

1. Does your utility use service reliability indices to maintain and improve utility operations?

Yes No

If yes, how is your utility using service reliability indices to improve the system?

NOTE: Leading practice is to use at least four of the methods listed below.

Check all that apply: Worst performing circuit identification Vegetation management (e.g., tree trimming) Install covered wire Distribution circuit inspection program Convert overhead to underground Install lightning arresters Install animal/squirrel guards Perform thermographic circuit inspections Perform transformer load management Economic development Send indices to Public Utilities Commission/City Council/Governing Board Produce publicly available report Underground cable replacements/injections and testing Other (please describe):

Page 10: RP 3 Webinar Series: Reliability Overview of the RP 3 Reliability Checklist Thursday, April 17, 2014 1:00pm – 2:00 pm.

Application Walkthrough

1. Does your utility participate in a reliability survey or service to benchmark reliability indices?

Yes No

If yes, identify the type of reliability survey your utility participates in (check all that apply):

Our utility participates in APPA’s biennial Distribution System Reliability & Operations Survey.

Our utility participates in a survey other than APPA’s, and we have included our survey form as an attachment.

Our utility uses APPA’s eReliability tracking program

Location of attachment(s): (n/a if no additional information needed)

Page 11: RP 3 Webinar Series: Reliability Overview of the RP 3 Reliability Checklist Thursday, April 17, 2014 1:00pm – 2:00 pm.

Application WalkthroughC – Mutual Aid

1. Does your utility participate in a national mutual aid agreement?

Yes, our utility has a signed APPA national mutual aid agreement on file with APPA OR we have attached a signed APPA national mutual aid agreement in this application.1

No, our utility only participates in our state/joint action agency/regional mutual aid program and has provided a copy of our agreement.

Check all that apply:

State Regional Other:

No, our utility does not participate in a mutual aid agreement.

Other

If other, explain and attach documentation (attach additional page(s) if more space is needed):

Location of attachment(s): (n/a if no additional information needed)

1 Copy of APPA Mutual Aid Agreement form is included in RP3 Application materials.

Page 12: RP 3 Webinar Series: Reliability Overview of the RP 3 Reliability Checklist Thursday, April 17, 2014 1:00pm – 2:00 pm.

Application WalkthroughD – Disaster Plan

1. Does your utility have a disaster plan, or does your city have a disaster plan which includes an electric utility specific section? Disaster plans should include detailed information on how utility personnel should proceed in a disaster.

Yes No We are in the process of developing a plan

If yes, please indicate below when your utility’s disaster plan was last revised or reviewed. A utility should review or revise their disaster plan on an annual basis.

0-1 years ago 1-3 years ago Over 3 years ago

If yes or in development, attach an executive summary, table of contents, or the completed portions of the draft from your utility’s disaster plan.

Location of attachment(s): (n/a if no additional information needed)

Page 13: RP 3 Webinar Series: Reliability Overview of the RP 3 Reliability Checklist Thursday, April 17, 2014 1:00pm – 2:00 pm.

Application WalkthroughE – Physical Infrastructure and Cyber Security

1. Has your city/utility addressed physical infrastructure security needs for your system?

Yes No

If yes, check the boxes below to indicate what protective measures your utility has taken in the area of physical infrastructure security. Check all that apply:

Fences Surveillance Locks Patrols Controlled/monitored access to substations or other secure areas (data

cards, RFID system, ID cards, etc.) Background checks Security awareness and training for employees Identified assets requiring enhanced security Other

If other, describe the process your utility uses (Attach additional page(s) if more space is needed):

Location of attachment(s): (n/a if no additional information needed)

Page 14: RP 3 Webinar Series: Reliability Overview of the RP 3 Reliability Checklist Thursday, April 17, 2014 1:00pm – 2:00 pm.

Application Walkthrough1. Cyber Security

a. Has your utility developed a formal cyber security policy for the organization?

Yes No

If yes, please check the boxes below to indicate the areas the policy addresses. Check all that apply:

Use of passwords and changing default passwords System monitoring and access control Encryption Restricting foreign devise use (e.g., non-company owned USB) Secure communications paths Firewalls Other

If other, describe the process your utility uses (Attach additional page(s) if more space is needed):

Location of attachment(s): (n/a if no additional information needed)

Page 15: RP 3 Webinar Series: Reliability Overview of the RP 3 Reliability Checklist Thursday, April 17, 2014 1:00pm – 2:00 pm.

Application Walkthrougha. Does your utility require cyber security awareness training for employees?

Yes No

b. Does your utility conduct periodic cyber security assessments of its system? This

assessment would involve looking at security gaps in network-connected devices.

Yes No

If yes, what is the schedule for assessments of your system? A utility should conduct these assessments annually and when new systems are implemented. Check all that apply:

Every year (annually) Every 1-3 years. When new systems are implemented Other (please explain):

Location of attachment(s): (n/a if no additional information needed)

Page 16: RP 3 Webinar Series: Reliability Overview of the RP 3 Reliability Checklist Thursday, April 17, 2014 1:00pm – 2:00 pm.

Review & Application Process

Applications due: September 30, 2014

• Preliminary check by APPA Staff: October 2014• Review Panel Taskforce: mid October 2014• Request for clarification/information is sent to applicants:

November 2014• Final Review: December 2014• Applicants receive notification of their application’s outcome:

January/February 2015• Official award/announcement: APPA’s Engineering and Operations

Conference in Sacramento, May 17-20, 2015

Page 17: RP 3 Webinar Series: Reliability Overview of the RP 3 Reliability Checklist Thursday, April 17, 2014 1:00pm – 2:00 pm.

Where to start:1. Download the Application Packet

Visit PublicPower.org/RP3 and click on Application

2. Read the RP3 Application GuideAll forms, checklists, and RP3 questions are explained

3. Assign one point person that will compile the final submission

4. Complete checklists- Small utility may ask for help on specific sections from state

association or joint action agency- Large utility may divide the sections among different departments

5. Review final checklists and all forms and Submit

Page 18: RP 3 Webinar Series: Reliability Overview of the RP 3 Reliability Checklist Thursday, April 17, 2014 1:00pm – 2:00 pm.

RP3 References

• Visit PublicPower.org/RP3• Call/email other RP3 designated utilities

Preview their application or just ask general questions (full list of designees is on the website)

• Email your questions to [email protected]• Call us: 202/467-2900, Engineering Services

– Webinars are recorded and can be accessed online

Page 19: RP 3 Webinar Series: Reliability Overview of the RP 3 Reliability Checklist Thursday, April 17, 2014 1:00pm – 2:00 pm.

Safety Checklist

Friday, April 25

1-2 p.m. EST

Next RP3 Webinar

Page 20: RP 3 Webinar Series: Reliability Overview of the RP 3 Reliability Checklist Thursday, April 17, 2014 1:00pm – 2:00 pm.

Questions?