    APPENDIX B

    GEOTECHNICAL ANALYSIS AND DESIGN

    OF GROUND ANCHORS

    FOR SLOPE STABILIZATION

  • 7/24/2019 round Anchors Final Addendum No2-Appendix B

    2/32

    51-1-10052-031-R2-ABx/wp/ADY 51-1-10052-031B-i

    APPENDIX B

    GEOTECHNICAL ANALYSIS AND DESIGN

    OF GROUND ANCHORS

    FOR SLOPE STABILIZATION

    TABLE OF CONTENTS

    FIGURES

    Calculation Summary (Sheets 1 thru 30)

  • 7/24/2019 round Anchors Final Addendum No2-Appendix B

    3/32

    CALC. NO: 1

    JOB NO: 51-1-10052-031

    PROJECT: White Point Landslide Repair, San Pedro, Los Angeles, CA # SHEETS: 30

    CLIENT: City of Los Angeles SUBJECT:

    Problem:

    General Approach / Assumptions:1.

    2.

    3. Calculate required bonded length of ground anchors using the Post-Tensioning Institute (PTI) procedure.

    4.

    .

    Sources of Data and Equations:1.

    2.

    3

    4

    Post-Tensioning Institute (PTI) (1996), "Recommendations for Prestressed Rock and Soil Anchor".

    Southern California Earthquake Center (2002), "Recommended Procedures for Implementation of DMG Special

    Publication 117: Guidelines for Analyzing and Mitigating Landslide Hazards in California".

    CALCULATION SUMMARY

    Geotechnical analysis and design of ground anchors for slope stabilization.

    Review site topographic and boring location plan, boring logs, and lab test data develop at engineering

    strength parameters for use in analysis.

    Ground Anchors for Slope Stabilization (Draft 100% Submission)

    Calculate allowable soil bearing pressure for concrete bearing elements for ground anchors using Brinch

    Hansen's bearing capacity formula for inclined ground surface.

    Analyze and design ground anchors for slope stabilization using slope stability analysis program "SLOPE-

    W".

    Coduto, D. P. (1994), "Foundation Design: Principles and Practices".

    Shannon and Wilson, Inc (2012), "Final Geotechnical Report, White Point Landslide", August 15, 2012.

    5

    Summary and Conclusions:

    Page No. of sheets1 1

    2 1

    3 1

    4 1

    5 Estimate Anchor Bonded Lengths 1

    6 2

    8 8

    16 4

    20 Seismic Slope Displacement Analysis 3

    23 Strand Anchor Structural System (Catalog Cut) 8

    Preliminary Calc.: x Draft 100% Submission

    Final Calc.: Supercedes Calc. No:

    REV. NO. CALCULATION BY DATE CHECKED BY DATE

    JXM/NXN RTD 2/21/2013

    Shannon and Wilson, Inc (2012), "Final Addendum Geotechnical Report No. 1, White Point Landslide", December 19,

    2012.

    Summary Table - Ultimate Bond Strength between Rock and Grout

    Material Strength Summary

    2/20/2013

    Description

    Conceptual Design - Rock Anchors

    Cover Sheet

    Summary of Results of Slope Stability Analysis

    Slope Stability Analysis using SLOPE-W

    Anchor Bearing Element Design

    Sheet 1 of 30

  • 7/24/2019 round Anchors Final Addendum No2-Appendix B

    4/32

    WHITEPOINTLANDSLIDESTABILIZATION

    TABLE2

    SUMMARYOFRESULTSOFSLOPESTABILITYANALYSIS

    Section Case Number Postt en si on in g S tati c

    H:V Angle of Rows Horizontal Vertical LoadperAnchor(1)

    Factorof YieldAcceleration Max.Equ

    Safety ofSlope,ky(3)

    Acceleratio

    (degrees) (ft) (ft) (kips) (g) (g

    L L' Noslopedewatering/drain pipes(8)

    1.3 0.043 0.1

    Slopedewatering/drain pipes@20ft 1.48 0.055 0.1

    6 0.6"dia.sevenwirestrands,ASTMA416,270ksi 1:1 45 2 20 20 210 1.58 0.063 0.1

    (w/dewatering/drain pipes@20ft) 3 20 20 210 1.64 0.067 0.1

    4 20 20 210 1.70 0.072 0.1

    13 0.6"dia.sevenwirestrands,ASTMA416,270ksi 1:1 45 2 20 20 458 1.72 0.073 0.1

    (w/dewatering/drain pipes@20ft)

    M M' Noslopedewatering/drain pipes(8)

    1.33 0.042 0.1

    Slopedewatering/drain pipes@20ft 1.66 0.068(10)

    0.1

    6 0.6"dia.sevenwirestrands,ASTMA416,270ksi 1:1 45 2 20 20 211 1.75 0.078(10)

    0.1

    (w/dewatering/drain pipes@20ft)

    Notes (1)Loadisassumedtobelessthanorequalto60%oftheanchorultimatecapacity.

    (2) "RecommnededProceduresforImplementationofDMGSpacialPublication117:Guidelines forAnalyzingandMitigatingLandslideHazardsinCalifornia"bytheSouternCaliforniaEarthqua

    (3)Thegroundaccelerationthatcausestheslopetoyieldorhaveafactorofsafetyofunityagainstslopefailure.

    (4)Groundaccelerationdemand

    (5)AllowabledisplacementrecommendedfromDMGSpecialPublication117.

    (6)1cm=0.4inch;1inch=2.54cm.

    (7)SlopedisplacementisestimatedusingBrayetal(1998)asrecommendedinDMGSpecialPublication117.

    (8)

    Hydrostatic

    pressure

    is

    at

    30

    percent

    of

    the

    height

    of

    the

    near

    vertical

    tension

    cracks.(9)GLEmethodisusedtocomputethefactorofsafetyagainstslopefailureunlessnoted.

    (10)JanbumethodisusedinlieuofGLEmethodduetononconvergentsolution.

    RockAnchor Slope

    Inclination Spacing

    4/16/2013

  • 7/24/2019 round Anchors Final Addendum No2-Appendix B

    5/32

    Sheet 3 of 30

  • 7/24/2019 round Anchors Final Addendum No2-Appendix B

    6/32

    Sheet 4 of 30

  • 7/24/2019 round Anchors Final Addendum No2-Appendix B

    7/32

    Sheet 5 of 30

  • 7/24/2019 round Anchors Final Addendum No2-Appendix B

    8/32

    Sheet 6 of 30

  • 7/24/2019 round Anchors Final Addendum No2-Appendix B

    9/32

    Sheet 7 of 30

  • 7/24/2019 round Anchors Final Addendum No2-Appendix B

    10/32

    Sheet 8 of 30

  • 7/24/2019 round Anchors Final Addendum No2-Appendix B

    11/32

    Sheet 9 of 30

  • 7/24/2019 round Anchors Final Addendum No2-Appendix B

    12/32

    Sheet 10 of 30

  • 7/24/2019 round Anchors Final Addendum No2-Appendix B

    13/32

    Sheet 11 of 30

  • 7/24/2019 round Anchors Final Addendum No2-Appendix B

    14/32

    Sheet 12 of 30

  • 7/24/2019 round Anchors Final Addendum No2-Appendix B

    15/32

    Sheet 13 of 30

  • 7/24/2019 round Anchors Final Addendum No2-Appendix B

    16/32

    Sheet 14 of 30

  • 7/24/2019 round Anchors Final Addendum No2-Appendix B

    17/32

    Sheet 15 of 30

  • 7/24/2019 round Anchors Final Addendum No2-Appendix B

    18/32

    Sheet 16 of 30

  • 7/24/2019 round Anchors Final Addendum No2-Appendix B

    19/32

    Sheet 17 of 30

  • 7/24/2019 round Anchors Final Addendum No2-Appendix B

    20/32

    Sheet 18 of 30

  • 7/24/2019 round Anchors Final Addendum No2-Appendix B

    21/32

    Sheet 19 of 30

  • 7/24/2019 round Anchors Final Addendum No2-Appendix B

    22/32

    Sheet 20 of 30

  • 7/24/2019 round Anchors Final Addendum No2-Appendix B

    23/32

    Sheet 21 of 30

  • 7/24/2019 round Anchors Final Addendum No2-Appendix B

    24/32

    Sheet 22 of 30

  • 7/24/2019 round Anchors Final Addendum No2-Appendix B

    25/32

    Sheet 23 of 30

  • 7/24/2019 round Anchors Final Addendum No2-Appendix B

    26/32

    Sheet 24 of 30

  • 7/24/2019 round Anchors Final Addendum No2-Appendix B

    27/32

    Sheet 25 of 30

  • 7/24/2019 round Anchors Final Addendum No2-Appendix B

    28/32

    Sheet 26 of 30

  • 7/24/2019 round Anchors Final Addendum No2-Appendix B

    29/32

    Sheet 27 of 30

  • 7/24/2019 round Anchors Final Addendum No2-Appendix B

    30/32

    Sheet 28 of 30

  • 7/24/2019 round Anchors Final Addendum No2-Appendix B

    31/32

    Sheet 29 of 30

  • 7/24/2019 round Anchors Final Addendum No2-Appendix B

    32/32

    Sheet 30 of 30