Rotork PM Inspection Continuing NMV-83. IT’S OUR RESPONSIBILITY! NUCLEAR SAFETY INDUSTRIAL SAFETY RADIOLOGICAL SAFETY SAFETY CULTURE.

Dec 28, 2015

Download

Documents

Maurice Terry
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Rotork PM Inspection Continuing NMV-83. IT’S OUR RESPONSIBILITY! NUCLEAR SAFETY INDUSTRIAL SAFETY RADIOLOGICAL SAFETY SAFETY CULTURE.

Rotork PM Inspection Rotork PM Inspection

Continuing NMV-83Continuing NMV-83

Page 2: Rotork PM Inspection Continuing NMV-83. IT’S OUR RESPONSIBILITY! NUCLEAR SAFETY INDUSTRIAL SAFETY RADIOLOGICAL SAFETY SAFETY CULTURE.

IT’S OUR RESPONSIBILITY!IT’S OUR RESPONSIBILITY!

NUCLEAR SAFETY

INDUSTRIAL SAFETY

RADIOLOGICAL SAFETY

SAFETY CULTURE

Page 3: Rotork PM Inspection Continuing NMV-83. IT’S OUR RESPONSIBILITY! NUCLEAR SAFETY INDUSTRIAL SAFETY RADIOLOGICAL SAFETY SAFETY CULTURE.
Page 4: Rotork PM Inspection Continuing NMV-83. IT’S OUR RESPONSIBILITY! NUCLEAR SAFETY INDUSTRIAL SAFETY RADIOLOGICAL SAFETY SAFETY CULTURE.

Terminal ObjectiveTerminal Objective

►Given Training Aids and instruction the Valve Services Technician will inspect and set up rotork actuators per instruction as demonstrated by participation in a Lab Practical Exercise.

Page 5: Rotork PM Inspection Continuing NMV-83. IT’S OUR RESPONSIBILITY! NUCLEAR SAFETY INDUSTRIAL SAFETY RADIOLOGICAL SAFETY SAFETY CULTURE.

Conduct Pre-job-briefConduct Pre-job-brief

►What are the critical steps of the task What are the critical steps of the task I’m going to perform?I’m going to perform?

►What’s the worst thing that can What’s the worst thing that can happen and how can I prevent it?happen and how can I prevent it?

►What else could go wrong?What else could go wrong?►What are the safety and / or radiation What are the safety and / or radiation

protection considerations?protection considerations?► Is my training and are my qualification Is my training and are my qualification

up to date.up to date.

Page 6: Rotork PM Inspection Continuing NMV-83. IT’S OUR RESPONSIBILITY! NUCLEAR SAFETY INDUSTRIAL SAFETY RADIOLOGICAL SAFETY SAFETY CULTURE.

Two Minute Drill At The JobTwo Minute Drill At The Job

►Why?Why?

►When?When?

►How?How?

Page 7: Rotork PM Inspection Continuing NMV-83. IT’S OUR RESPONSIBILITY! NUCLEAR SAFETY INDUSTRIAL SAFETY RADIOLOGICAL SAFETY SAFETY CULTURE.

Discuss Set-up ActivitiesDiscuss Set-up Activities

►Verify DCIDVerify DCID►Accept PermitAccept Permit►Obtain Current Lube Points (CPXCOMP)Obtain Current Lube Points (CPXCOMP)►Contact OPS for permission to Contact OPS for permission to

Energize/De-energize the breakerEnergize/De-energize the breaker► Install Jumper & Local Control SwitchInstall Jumper & Local Control Switch

Page 8: Rotork PM Inspection Continuing NMV-83. IT’S OUR RESPONSIBILITY! NUCLEAR SAFETY INDUSTRIAL SAFETY RADIOLOGICAL SAFETY SAFETY CULTURE.

Discuss Stem Cleaning & Discuss Stem Cleaning & LubricationLubrication

►Record As-Found Valve PositionRecord As-Found Valve Position►Clean Anti-Rotation Clean Anti-Rotation ►Clean & Inspect StemClean & Inspect Stem►Rising Rotating Rising Rotating ►Rising Non-RotatingRising Non-Rotating►Return to As-Found PositionReturn to As-Found Position

Page 9: Rotork PM Inspection Continuing NMV-83. IT’S OUR RESPONSIBILITY! NUCLEAR SAFETY INDUSTRIAL SAFETY RADIOLOGICAL SAFETY SAFETY CULTURE.

Visual InspectionVisual Inspection

►Grease / Oil LeaksGrease / Oil Leaks►Crack in the HousingCrack in the Housing►Flex and ConnectorsFlex and Connectors►Fasteners tight and in placeFasteners tight and in place►No distortion, Actuator, Yoke, StemNo distortion, Actuator, Yoke, Stem►Actuator aligned with Stem & PackingActuator aligned with Stem & Packing► Inspect Oil level & take sampleInspect Oil level & take sample

Page 10: Rotork PM Inspection Continuing NMV-83. IT’S OUR RESPONSIBILITY! NUCLEAR SAFETY INDUSTRIAL SAFETY RADIOLOGICAL SAFETY SAFETY CULTURE.

Visual Inspection (continued)Visual Inspection (continued)

► Inspect OilInspect Oil►Metal, Color, Odor, dirt, emulsificationMetal, Color, Odor, dirt, emulsification►Q/QAG Samples to Lube LabQ/QAG Samples to Lube Lab►Non-Q/QAG only suspect samples to Non-Q/QAG only suspect samples to

the lab.the lab.

Page 11: Rotork PM Inspection Continuing NMV-83. IT’S OUR RESPONSIBILITY! NUCLEAR SAFETY INDUSTRIAL SAFETY RADIOLOGICAL SAFETY SAFETY CULTURE.

Electrical InspectionElectrical Inspection

►Limit / Torque SwitchLimit / Torque Switch► Inspect o-ring, presents of oil, moisture Inspect o-ring, presents of oil, moisture

and cleanlinessand cleanliness► Inspect Vendor wiring, terminationsInspect Vendor wiring, terminations►Record Torque Switch settingsRecord Torque Switch settings►Close Torque, Open LimitClose Torque, Open Limit►Open should not be on Boost, if so Open should not be on Boost, if so

contact Team Leadercontact Team Leader

Page 12: Rotork PM Inspection Continuing NMV-83. IT’S OUR RESPONSIBILITY! NUCLEAR SAFETY INDUSTRIAL SAFETY RADIOLOGICAL SAFETY SAFETY CULTURE.

Termination Compartment Termination Compartment InspectionInspection

► Inspect o-ring, presents of oil, moisture, Inspect o-ring, presents of oil, moisture, & cleanliness& cleanliness

► Inspect wiring for brittling, cracking, Inspect wiring for brittling, cracking, damage insulation and terminal damage insulation and terminal integrityintegrity

►Rework if required per 32MT-9ZZ49 Rework if required per 32MT-9ZZ49 Appendix G Cable Repair (You must be Appendix G Cable Repair (You must be Small Termination Qualified)Small Termination Qualified)

►Verify low resistance across Contacts < Verify low resistance across Contacts < = 1 ohm= 1 ohm

Page 13: Rotork PM Inspection Continuing NMV-83. IT’S OUR RESPONSIBILITY! NUCLEAR SAFETY INDUSTRIAL SAFETY RADIOLOGICAL SAFETY SAFETY CULTURE.

Limit Switch AdjustmentLimit Switch Adjustment

►13JFWNHV0103 is wired differently 13JFWNHV0103 is wired differently than standard Rotork Actuators than standard Rotork Actuators Reference 1,2, or 3-E-FWB-003 Reference 1,2, or 3-E-FWB-003 Contact Development for correct Contact Development for correct configurationconfiguration

►Two types of switches A Range and NA Two types of switches A Range and NA

Page 14: Rotork PM Inspection Continuing NMV-83. IT’S OUR RESPONSIBILITY! NUCLEAR SAFETY INDUSTRIAL SAFETY RADIOLOGICAL SAFETY SAFETY CULTURE.

A Range SwitchesA Range Switches

Page 15: Rotork PM Inspection Continuing NMV-83. IT’S OUR RESPONSIBILITY! NUCLEAR SAFETY INDUSTRIAL SAFETY RADIOLOGICAL SAFETY SAFETY CULTURE.

NA Switches NA Switches