Important Note on ROPMS Presentation • Please use the ROPMS resource center for the final format of the POP & AWP. • The following presentation will give a good overview of the ROPMS concepts and logical framework, however the POP & AWP used do not reflect the final format based on the comments received during the training sessions.
28

ROPMS - Results-Oriented Project Management System

Jan 14, 2015

Download

Business

rexcris

This presentation will give a good overview of the ROPMS concepts and logical framework, however the POP & AWP used do not reflect the final format based on the comments received during the training sessions.
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: ROPMS - Results-Oriented Project Management System

Important Note on ROPMS Presentation

• Please use the ROPMS resource center for the final format of the POP & AWP.

• The following presentation will give a good overview of the ROPMS concepts and logical framework, however the POP & AWP used do not reflect the final format based on the comments received during the training sessions.

Page 2: ROPMS - Results-Oriented Project Management System

UNDP Egypt’s Results-Oriented Project Management System

ROPMS

Page 3: ROPMS - Results-Oriented Project Management System

Introduction

• What is Results-Based Management (RBM): RBM refers to an approach for planning, monitoring and reporting on the results of development projects

If you can measure it you can manage it

Page 4: ROPMS - Results-Oriented Project Management System

Introduction cont’d

• RBM in UNDP is based on 4 main pillars:– Focus for action; – Results;– On-going monitoring and assessment of

performance, integrating lessons learnt into future planning;

– Continuous feedback to improve performance.

Page 5: ROPMS - Results-Oriented Project Management System

Results-Oriented Project Management System

(ROPMS)

• Bringing the RBM concept to the project level, the ROPMS was developed & will be integrated in UNDP’s planning & reporting system:– Collect and process information on the results

emerging from projects.– Manage UNDP projects through continuous

measuring of performance– Gives indications of the policy impact of

UNDP interventions

Page 6: ROPMS - Results-Oriented Project Management System

ROPMS cont’d

• Project Annual Workplan: monitors annual progress of projects

• Project Operations Plan (POP): monitors the impact of UNDP at the country level

ROPMS consists of 2 components:

Page 7: ROPMS - Results-Oriented Project Management System

ROPMS Key Concepts

– Outcomes: intended changes in the

development situation – WHY-– Outputs: completion of Activities – WHAT-– Activities: specific acts – HOW-– Inputs: materials for activities– Indicators: signposts of change– Targets: benchmarks

Page 8: ROPMS - Results-Oriented Project Management System

ROPMSKey concepts cont’d

Outcome Outputs Activities

Increased Women’s literacy in 7 villages in Minia by 25%

3 Public service announcement on female/girls literacy broadcast on local TV & radio

Identify production company

Draft & approve scripts

Negotiate air-time with local TV & radio stations

Page 9: ROPMS - Results-Oriented Project Management System

ROPMSKey concepts cont’d

• The outcome of the project needs to be pitched at the right level.

Project Outcome Indicator

Literacy courses for women using IT

Female illiteracy in target villages reduced

Overall 5% reduction in target villages per year

Birth certificates Improved environment for issuance of birth certificates for girls created in target villages

75% of all newborn girls in target villages receive birth certificates by end of project.

FGM-fee villages Widespread awareness raised of the dangers of FGM among populations of selected villages

10% reduction per year in number of female circumcisions being carried out in target villages

Project level:

Page 10: ROPMS - Results-Oriented Project Management System

ROPMSKey concepts cont’d

•The outcome of the project needs to be pitched at the right level:At the Country level:

UNDP

Projects

Outcome Indicators Outputs

A-Literacy courses

B- Birth Certificates

C- FGM-free villages

Increased awareness of women’s participation in society

1- No. of ministries allocated funds for women specific projects

2- Increase in girls 2nd school enrollment rate

1- Gender budget analysis prepared

2- Literacy CD-ROM distributed & used in Internet Clubs

3- Public campaign on girls rights implemented

Page 11: ROPMS - Results-Oriented Project Management System

Project Operation Plan (POP)

• Provides information on the project and its achievements.

• The timeframe of the POP covers the lifetime of the project

• It is a key tool for monitoring yearly progress towards the achievement of results at the outcome/output levels through the establishment of indicators and annual targets.

• Changes in the POP should be kept to a minimum.

Page 12: ROPMS - Results-Oriented Project Management System

POP cont’d• Step-by-step guide to filling-in the POP:

– Step1: Align the project with an SRF-SAS and strategic outcome

Project Operations Plan

Project Number/Title: EGY02/010 Smart Schools Network (SSN)Year: 2002

(1) (2a) (3a) (4a) (5) (6a) (7)SRFStrategic Area of Support (SAS):1.1.1SRF Outcome:Enabling Environment to augment access & use of IT in the Egyptian Society

Indicator Targets:2002-2006 Resp. Targets1 2 3 4 5 met

(2b) (3b) (4b) (6b)Output 1.1:

CommentsProject Outcome

Page 13: ROPMS - Results-Oriented Project Management System

POP cont’d• Step-by-step guide to filling-in the POP:

– Step2: Define a project Outcome

Project Operations Plan

Project Number/Title: EGY02/010 Smart Schools Network (SSN)Year: 2002

(1) (2a) (3a) (4a) (5) (6a) (7)SRFStrategic Area of Support (SAS):1.1.1SRF Outcome:Enabling Environment to augment access & use of IT in the Egyptian Society

Indicator Targets:2002-2006 Resp. Targets1 2 3 4 5 met

(2b) (3b) (4b) (6b)Output 1.1:

CommentsProject Outcome: Support to the modernization of the Egyptian Schooling System through the introduction of IT learning & IT aided learning in schools

Page 14: ROPMS - Results-Oriented Project Management System

POP cont’d• Step-by-step guide to filling-in the POP:

– Step3: Define the project outputs

Project Number/Title: EGY02/010 Smart Schools Network (SSN)Year: 2002

(1) (2a) (3a) (4a) (5) (6a) (7)SRFStrategic Area of Support (SAS):1.1.1SRF Outcome:Enabling Environment to augment access & use of IT in the Egyptian Society

Indicator Targets:2002-2006 Resp. Targets1 2 3 4 5 met

(2b) (3b) (4b) (6b)Output 1.1:

CommentsProject Outcome: Support to the modernization of the Egyptian Schooling System through the introduction of IT learning & IT aided learning in schools

IT learning introduced in 50 schools

Page 15: ROPMS - Results-Oriented Project Management System

POP cont’d• Step-by-step guide to filling-in the POP:

– Step4: Construct measurable indicators & targets (at outcome & output levels)

Project Number/Title: EGY02/010 Smart Schools Network (SSN)Year: 2002

(1) (2a) (3a) (4a) (5) (6a) (7)SRFStrategic Area of Support (SAS):1.1.1SRF Outcome:Enabling Environment to augment access & use of IT in the Egyptian Society

Indicator Targets:2002-2006 Resp. Targets1 2 3 4 5 met

2 8 15 15 10

(2b) (3b) (4b) (6b)Output 1.1:

The number of schools w here IT learning w as introduced

2 8 15 16 10

Commentscourses introduced in the curriculum of 50 schools

Project Outcome: Support to the modernization of the Egyptian Schooling System through the introduction of IT learning & IT aided learning in schools

IT learning introduced in 50 schools

Page 16: ROPMS - Results-Oriented Project Management System

POP cont’d• Step-by-step guide to filling-in the POP:

– Step4: Construct measurable indicators & targets contd.:

• Measuring performance & progress is done through the establishment of planned targets: Determining progress is based on comparing planned targets with actual implementation.

• The number of indicators should be kept at minimum

• Outcome indicators are more difficult to construct, since the outcome is often beyond the control of the project. Outcome indicators need to reflect the end of project status

• Progress towards outcome & output indicators are measured annually over the duration of the project.

Page 17: ROPMS - Results-Oriented Project Management System

POP cont’d• Step-by-step guide to filling-in the POP:

– Step5: Assign a Responsible person or unit

Project Number/Title: EGY02/010 Smart Schools Network (SSN)Year: 2002

(1) (2a) (3a) (4a) (5) (6a) (7)SRFStrategic Area of Support (SAS):1.1.1SRF Outcome:Enabling Environment to augment access & use of IT in the Egyptian Society

Indicator Targets:2002-2006 Resp. Targets1 2 3 4 5 met

2 8 15 15 10 Project staff (dept?)

(2b) (3b) (4b) (6b)Output 1.1:

The number of schools w here IT learning w as introduced

2 8 15 15 10 Project staff (dept?)

Commentscourses introduced in the curriculum of 50 schools

Project Outcome: Support to the modernization of the Egyptian Schooling System through the introduction of IT learning & IT aided learning in schools

IT learning introduced in 50 schools

Page 18: ROPMS - Results-Oriented Project Management System

POP cont’d• Step-by-step guide to filling-in the POP:

– Step6: Report on whether targets have been met or not:

Project Number/Title: EGY02/010 Smart Schools Network (SSN)Year: 2002

(1) (2a) (3a) (4a) (5) (6a) (7)SRFStrategic Area of Support (SAS):1.1.1SRF Outcome:Enabling Environment to augment access & use of IT in the Egyptian Society

Indicator Targets:2002-2006 Resp. Targets1 2 3 4 5 met

2 8 15 15 10 Project staff (dept?)

(2b) (3b) (4b) (6b)Output 1.1:

The number of schools w here IT learning w as introduced

2 8 15 15 10 Project staff (dept?)

Tartets met

Commentscourses introduced in the curriculum of 50 schools

Project Outcome: Support to the modernization of the Egyptian Schooling System through the introduction of IT learning & IT aided learning in schools

IT learning introduced in 50 schools

Page 19: ROPMS - Results-Oriented Project Management System

POP cont’d

• Step-by-step guide to filling-in the POP:

– Step6: Report on whether targets have been met contd.

• Columns 1-5 represent the planning dimension of the POP (to be filled-in before the project activities begin).

• In column 6 the project manager is required to report whether targets are met or not.

• The POP requires this to be done yearly

• This annual report on targets is what is used to complete the Country Office ROAR

Page 20: ROPMS - Results-Oriented Project Management System

POP cont’d• Step-by-step guide to filling-in the POP:

– Step7: Comments (this can help to explain facts about the reporting aspects of the POP. At the outcome level this column should be used to mention the role of partners):

Project Number/Title: EGY02/010 Smart Schools Network (SSN)Year: 2002

(1) (2a) (3a) (4a) (5) (6a) (7)SRFStrategic Area of Support (SAS):1.1.1SRF Outcome:Enabling Environment to augment access & use of IT in the Egyptian Society

Indicator Targets:2002-2006 Resp. Targets1 2 3 4 5 met

2 8 15 15 10 Project staff (dept?)

(2b) (3b) (4b) (6b)Output 1.1:

The number of schools w here IT learning w as introduced

2 8 15 15 10 Project staff (dept?)

Tartets met

Commentscourses introduced in the curriculum of 50 schools

Project Outcome: Support to the modernization of the Egyptian Schooling System through the introduction of IT learning & IT aided learning in schools

IT learning introduced in 50 schools

Page 21: ROPMS - Results-Oriented Project Management System

Project Annual Workplan (AWP)

• The timeframe of the AWP is 12 months of a given year (a new AWP needs to be filled-in each year.

• Activities are set and represent the actions to be taken to achieve the annual targets for the planned outputs

• Indicators are set at the activity level to measure progress and performance

Page 22: ROPMS - Results-Oriented Project Management System

AWP cont’d

• Step-by-step guide to filling-in the AWP:

– Step1: Align the project with an SRF-SAS:

Project Number/Title: EGY02/010 Smart Schools Network (SSN)Year: 2002

(A) (B1) (C1) (D1) (E) (F) (G) (H1) (I)SRF Strategic Area of Support (SAS): 1.1.1

Budget (US$)

Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Planned Actual

(C2) (D2) (H2)

Sub activity1.1.1Sub activity1.1.2

Targets met

Comments

Activities:1.1

Indicator Targets:2002 Actual Imp.Output1.1:

(B2)

Page 23: ROPMS - Results-Oriented Project Management System

AWP cont’d

• Step-by-step guide to filling-in the AWP:

– Step2: Define the project output:

Project Number/Title: EGY02/010 Smart Schools Network (SSN)Year: 2002

(A) (B1) (C1) (D1) (E) (F) (G) (H1) (I)SRF Strategic Area of Support (SAS): 1.1.1

Budget (US$)

Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Planned Actual

(C2) (D2) (H2)

Sub activity1.1.1Sub activity1.1.2

(B2)

Targets met

Comments

Activities:1.1

Indicator Targets:2002 Actual Imp.Output1.1:IT learning introduced in 50 schools

Page 24: ROPMS - Results-Oriented Project Management System

AWP cont’d

• Step-by-step guide to filling-in the AWP:

– Step3: Describe planned activities for each output:

Project Number/Title: EGY02/010 Smart Schools Network (SSN)Year: 2002

(A) (B1) (C1) (D1) (E) (F) (G) (H1) (I)SRF Strategic Area of Support (SAS): 1.1.1

Budget (US$)

Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Planned Actual

(C2) (D2) (H2)

Sub activity1.1.1: Staff hirringSub activity1.1.2: Project WorkplanSub activity 1.1.3: Research and studies

(B2)

Targets met

Comments

Activities:1.1: Initialization phase

Indicator Targets:2002 Actual Imp.Output1.1:IT learning introduced in 50 schools

Page 25: ROPMS - Results-Oriented Project Management System

AWP cont’d

• Step-by-step guide to filling-in the AWP:

– Step4: Construct measurable indicators and make quarterly targets:

Project Number/Title: EGY02/010 Smart Schools Network (SSN)

(C1) (D1) (E) (F) (G) (H1) (I)

Budget (US$)

Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Planned Actual

(C2) (D2) (H2)

10 staff hired 10w orkplan available 1st draft f inal

draftR&S report on smart schools status available

status review

analysis report

draft report

final findings

Targets met

CommentsIndicator Targets:2002 Actual Imp.

Start-up activities on time

x

Page 26: ROPMS - Results-Oriented Project Management System

AWP cont’d

• Step-by-step guide to filling-in the AWP:

– Step5: Plan and report on expenditures:

Project Number/Title: EGY02/010 Smart Schools Network (SSN)Year: 2002

(A) (B1) (C1) (D1) (E) (F)SRF Strategic Area of Support (SAS): 1.1.1

Budget (US$)

Planned

Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 $ 6,000

(C2) (D2)

Sub activity1.1.1: Staff hirring 10 staff hired 10 $ 1,000 Sub activity1.1.2: Project Workplan w orkplan available 1st draft f inal draft $ 0

Sub activity 1.1.3: Research and studies R&S report on smart schools status available

status review

analysis report

draft report

final findings

$ 5,000

Activities:1.1: Initialization phase Start-up activities on time

(B2)

x

Indicator Targets:2002 Actual Imp.Output1.1:IT learning introduced in 50 schools

$ 6,000

Page 27: ROPMS - Results-Oriented Project Management System

AWP cont’d

• Step-by-step guide to filling-in the AWP:

– Step6: Report on targets:

Project Number/Title: EGY02/010 Smart Schools Network (SSN)Year: 2002

(A) (B1) (C1) (D1) (E) (F) (G)SRF Strategic Area of Support (SAS): 1.1.1

Budget (US$)

Planned Actual

Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 $ 6,000 $ 6,500

(C2) (D2)

Sub activity1.1.1: Staff hirring 10 staff hired 10 $ 1,000 $ 2,000 Sub activity1.1.2: Project Workplan w orkplan available 1st draft f inal draft $ 0 $ 0

Sub activity 1.1.3: Research and studies R&S report on smart schools status available

status review

analysis report

draft report

final findings

$ 5,000 $ 4,500

Activities:1.1: Initialization phase Start-up activities on time

(B2)

x

Indicator Targets:2002 Actual Imp.Output1.1:IT learning introduced in 50 schools

$ 6,000 $ 6,500

Page 28: ROPMS - Results-Oriented Project Management System

AWP cont’d

• Step-by-step guide to filling-in the AWP:

– Step7: Comments:

Project Number/Title: EGY02/010 Smart Schools Network (SSN)Year: 2002

(A) (B1) (C1) (D1) (E) (F) (G)SRF Strategic Area of Support (SAS): 1.1.1

Budget (US$)

Planned Actual

Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 $ 6,000 $ 6,500

(C2) (D2)

Sub activity1.1.1: Staff hirring 10 staff hired 10 $ 1,000 $ 2,000 Sub activity1.1.2: Project Workplan w orkplan available 1st draft f inal

draft$ 0 $ 0

Sub activity 1.1.3: Research and studies R&S report on smart schools status available

status review

analysis report

draft report

final findings

$ 5,000 $ 4,500

Activities:1.1: Initialization phase Start-up activities on time

(B2)

x

Indicator Targets:2002 Actual Imp.Output1.1:IT learning introduced in 50 schools

$ 6,000 $ 6,500