Ropemaker Place Investors Report IR06 May 2018
Ropemaker PlaceInvestors Report
IR06 May 2018
Schedule of AccommodationInternal sub-division with non-loadbearing partitions
Ground Floor4 retail units - Total floor area 1,025m2
First Floor6 no. 1 Bed & 6 no. 2 Bed Apts (Total 12) - Total floor area 634m2
Second Floor6 no. 1 Bed & 6 no. 2 Bed Apts (Total 12) - Total floor area 634m2
Third Floor6 no. 1 Bed & 6 no. 2 Bed Apts (Total 12) - Total floor area 634m2
Fourth Floor6 no. 1 Bed & 6 no. 2 Bed Apts (Total 12) - Total floor area 634m2
Fifth Floor6 no. 1 Bed & 4 no. 2 Bed Apts (Total 10) - Total floor area 512m2
Sixth Floor6 no. 1 Bed & 3 no. 2 Bed Apts (Total 9) - Total floor area 447m2
Seventh Floor5 no. 1 Bed & 2 no. 2 Bed Apts (Total 7) - Total floor area 351m2
Ropemaker Place 74 Luxury Apartments
89-99 Renshaw Street, Liverpool L1 2SP
The eight storey new build development generally comprises:
• Demolition of adjoining structures, perimeter walls and site clearance
• Excavation and formation of new foundations
• Below and above ground drainage
• New ground supported and part suspended concrete floor slab
• Eight storey steel frame structure
• External brick envelope
• Suspended metaldeck and concrete floors
• Flat roof structures and finishes
• Aluminium curtain walling, external windows and doors and shopfronts
• External balconies and balustrades
• Internal sub-division of retail units and apartments with non-loadbearing block and stud partitions
• Installation of plumbing services and mechanical services
• Installation of electrical services
• Installation of new lift car access
• Installation of kitchen and sanitary fittings
• New internal finishes, joinery fittings and decorations
New Build Development to Create 74 Residential Apartments & 4 Retail Units
89-99 Renshaw Street, Liverpool L1 2SP
Building StructureRopemaker Place, 89-99 Renshaw Street, Liverpool
New Build Development
Site investigations
Site compound and temporary supplies
Demolition and site clearance
Ground fill to existing basements
Strengthening support to adjacent buildings
Underpinning adjacent structures
Concrete pad foundations & ground beams
Concrete strip footings
Steel reinforcement concrete slab
Floor slab construction
Steel Frame Structure
Upper suspended steel floor structure
Concrete pour Upper suspended floor structure
Internal staircase structure
Sub-structure Masonry walls
Fire coating steel framework
Structural framework forming external walls
Timber flat roof structure
100% complete
100% complete
100% complete
100% complete
100% complete
100% complete
100% complete
100% complete
95% complete
85% complete
100% complete
100% complete
100% complete
100% complete
90% complete
70% complete
8% complete
10% complete
Sub-Structure & Super-Structure Construction Progress
M A Y 2 0 1 8
Building frame structure, front elevation view from Berry Street
Building frame structure, front elevation
Sub-Structure & Super-Structure Progress
M A Y 2 0 1 8
Building frame structure, front elevation view from Renshaw Street
Building frame structure, side elevation view from Oldham Street
Sub-Structure & Super-Structure Progress
M A Y 2 0 1 8
Concrete Ground floor slab installed Concrete Ground floor slab installed
Sub-Structure & Super-Structure Progress
M A Y 2 0 1 8
Underground drainage pipework Steel reinforcement and preparation ground floor slab structure
Sub-Structure & Super-Structure Progress
M A Y 2 0 1 8
Concrete screed laid to form stairwell landings
Concrete screed laid to form stairwell landings
Sub-Structure & Super-Structure Progress
M A Y 2 0 1 8
Protective fire resistant paint coatings being applied to steel frame structure
Protective fire resistant paint coatings being applied to steel frame structure
Sub-Structure & Super-Structure Progress
M A Y 2 0 1 8
Sub-Structure & Super-Structure Progress
M A Y 2 0 1 8
Steel structure framework commenced forming external walls
Steel structure framework commenced forming external walls
Timber flat roof structure commenced Timber flat roof structure commenced
Sub-Structure & Super-Structure Progress
M A Y 2 0 1 8
T O F I N D O U T M O R E A B O U T
Reliance House20 Water Street, Liverpool
P L E A S E C O N T A C T
W W W . L E G A C I E . C O . U K
By Appointment Only
Unit 4 Connect Business Village
Liverpool, L5 9PR
+44 (0) 151 207 9990