Room for the River From flood Resistance to flood Accomodation Renee Jones-Bos Ambassador Dale Morris Sr Economist
57

Room for the River Presentation 2011

May 14, 2015

Download

Technology

NLandUSA

Following on her 'Room for the River' op-ed in the Washington Post, Ambassador Jones-Bos and the Embassy's Water Management specialist Dale Morris delivered a presentation to river and floodplain managers during the conference of the Natural Floodplain Functions Alliance.
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Room for the River Presentation 2011

Room for the River

From flood Resistance to flood Accomodation

Renee Jones-BosAmbassador

Dale MorrisSr Economist

Page 2: Room for the River Presentation 2011

“Make it a Story”

12-04-232

Page 3: Room for the River Presentation 2011

12-04-233

Page 4: Room for the River Presentation 2011

4

The Netherlands: a delta landscape, penetrated by rivers, subject to sea and river flooding

Page 5: Room for the River Presentation 2011

5

1958 flood risk/safety standards established (post ’53 flood)

Page 6: Room for the River Presentation 2011

6

A dangerous, dynamic landscape (or, a hydraulic engineering laboratory)

--security, and economy

-- ~ 17 million people, 16th largest economy, 3rd most densely populated country

-- 60% of people live in, 70% of GDP produced in, areas between 1 and 6.5 meters below mean sea level

--subsiding

--water is our challenge, and our opportunity

Page 7: Room for the River Presentation 2011
Page 8: Room for the River Presentation 2011
Page 9: Room for the River Presentation 2011
Page 10: Room for the River Presentation 2011

Encroachments (1850 – 2000):restriction of discharge capacityloss of flood storage areas

Page 11: Room for the River Presentation 2011

Urban Bottleneck at Arnhem (1830 and 2000)

Page 12: Room for the River Presentation 2011

Loss of room Rhine, Netherlands 1850-2000Available surface area

0

10000

20000

30000

40000

50000

60000

70000

80000

90000

1850

1860

1870

1880

1890

1900

1910

1920

1930

1940

1950

1960

1970

1980

1990

2000

Year

Su

rfac

e ar

ea (

ha)

Page 13: Room for the River Presentation 2011

Room for the River

• Design discharge increase (for 2050), from 15.000 m3/s to 16.000 m3/s, is insufficient, given climate change

• Projected need:18,000 – 20,000 m3/s by 2100; 1995 flood: 12,500 m3/s

• Heightening / reinforcing embankments is costly ($1.7 billion / 2050), and will likely increase overall risk

• From flood resistance to flood accomodation• Reduce projected increase in design discharge levels• Dike heightening only as a last resort• Flood management and spatial quality (enhancing natural and cultural

landscape values); design teams led by local govt.

• RvR began as idea in 1986, gained momentum in 1990s, US projects as inspiration

Page 14: Room for the River Presentation 2011

4.0203 003

Possible measures

13 1216

910

15

14flood level

118

12345678

narrowing of main channellowering of groynedredgingdumping of sedimentpermanent layernatural bankremoving of summer embankmentsecondary channel

910111213141516

lowering of flood plainnature developmentremoving of high-water free areasdike reinforcementdike repositioningretentionobstruction of lateral flowdike raising

7

6 1

2

low water level

253

4

Page 15: Room for the River Presentation 2011

4.0203 003

Possible measures

13 1216

910

15

14flood level

118

12345678

narrowing of main channellowering of groynedredgingdumping of sedimentpermanent layernatural bankremoving of summer embankmentsecondary channel

910111213141516

lowering of flood plainnature developmentremoving of high-water free areasdike reinforcementdike repositioningretentionobstruction of lateral flowdike raising

7

6 1

2

low water level

253

4

Page 16: Room for the River Presentation 2011

Dredging

Page 17: Room for the River Presentation 2011

R 3 29 4 E 0 00 41 9 p

uiterw aardver lagigng

Room forthe Rhine branches

lowering flood plains

Page 18: Room for the River Presentation 2011

Room forthe Rhine branches

lowering flood plains

Page 19: Room for the River Presentation 2011

Elevated area; before removal

Room forthe Rhine branches

Page 20: Room for the River Presentation 2011

Elevated area; after removal

Room forthe Rhine branches

Page 21: Room for the River Presentation 2011

Abutment of a bridge; before removal

Page 22: Room for the River Presentation 2011

Abutment of a bridge; after removal

Page 23: Room for the River Presentation 2011

Dike relocation

Dike relocation (set back)

Page 24: Room for the River Presentation 2011

Lowering of groins

Page 25: Room for the River Presentation 2011

stedelijke knelpunten

R 3 29 4 E 0 00 41 8 m

Removal of local bottlenecks, bypasses

Page 26: Room for the River Presentation 2011

Waal River / Nijmegen Project• River bottleneck, channel restriction from 1500m width to

450 m width

Options:

• Ag / undeveloped land available to north

• Northern river bank land targeted for development

• Key road / rail / harbor infrastructure

12-04-2326

Page 27: Room for the River Presentation 2011

2

1

R 3294 N ijm ege n02

Page 28: Room for the River Presentation 2011
Page 29: Room for the River Presentation 2011
Page 30: Room for the River Presentation 2011

Bypass rejected• Creation of moat fortress unwise• Safety: 1/250 – 1/500 yr event?• Possible future requirement to heighten fortress embankments? • Infra needs substantial (bridges, roads)• Negative impact on farmers / landowners• Taking land out of commerce• Overall Cost

12-04-2330

Page 31: Room for the River Presentation 2011

Dike set-back strategy: safety, increased storage / flow capacity, and new land opportunities

12-04-2331

Page 32: Room for the River Presentation 2011

Before / After (impression)

12-04-2332

Page 33: Room for the River Presentation 2011

New spatial quality, commercial/residential development

Gemeente Nijmegen en RWS-DON

Page 34: Room for the River Presentation 2011

Planning 2006 – 2011, implementation 2013 – 2016Cost: $400 million

12-04-2334

Page 35: Room for the River Presentation 2011

Noordwaard Polder

12-04-2335

Page 36: Room for the River Presentation 2011

12-04-2336

Page 37: Room for the River Presentation 2011

Depoldering Noordwaard (11,000 square acres)• Goals:

• Lower water level +/- 30 cm @ Gorinchem

• Improve spatial quality of area• Restore coherence of environment• Enable current residents to maintain

residence, if desired• Maintenance of farming occupation

(either within polder or elsewhere)

• Impacts:

• Overflow area will flood 1-5 x year

Nearby areas 1 x in 25 years

Fort Steurgart remains protected• Most residences will now be “outside

the dikes”, on raised mounds• Flood levels no higher than 1 meter in

residences• New park / recreation / tourism

opportunities • Remains accessible to all users• Surprise! Reduce flood risk at

Dordrecht (90 cm)

Page 38: Room for the River Presentation 2011

Depoldering, the plan3

river MeuseTo the sea

river Merwede

Bottleneck Gorinchem

Page 39: Room for the River Presentation 2011

First sketches3

normal watercondition

Page 40: Room for the River Presentation 2011

3

‘2 weeks a year’ condition

First sketches

Page 41: Room for the River Presentation 2011

3

‘1/100, 1/1000 year’ condition

First sketches

Page 42: Room for the River Presentation 2011

spatial design3

Page 43: Room for the River Presentation 2011

waterdynamic3

Page 44: Room for the River Presentation 2011

3waterdynamic

Page 45: Room for the River Presentation 2011

3waterdynamic

Page 46: Room for the River Presentation 2011

3waterdynamic

Page 47: Room for the River Presentation 2011

3waterdynamic

Page 48: Room for the River Presentation 2011

3waterdynamic

Page 49: Room for the River Presentation 2011

12-04-2349

Page 50: Room for the River Presentation 2011

Depoldering Noordwaard (11,000 square acres)• Goals:

• Lower water level +/- 30 cm @ Gorinchem

• Improve spatial quality of area• Restore coherence of environment• Enable current residents to maintain

residence, if desired• Maintenance of farming occupation

(either within polder or elsewhere)

• Impacts:

• Overflow area will flood 1-5 x year

Nearby areas 1 x in 25 years

Fort Steurgart remains protected• Most residences will now be “outside

the dikes”, on raised mounds• Flood levels no higher than 1 meter in

residences• New park / recreation / tourism

opportunities • Remains accessible to all users• Surprise! Reduce flood risk at

Dordrecht (90 cm)

Page 51: Room for the River Presentation 2011

The Room for the River Planning Toolkit• Large amounts of river data collected and put inside the “black box”

• Field of play: hundreds of kilometers of river reaches

• Data was smoothed/made consistent, and toolkit model was to generate local and system-wide impacts

• 700 possible measures/actions (type and scope) identified by experts/stakeholders; each individually modelled

• A-ha! Many alternative strategies are conceivable for improving flood protection for the medium term

Page 52: Room for the River Presentation 2011

Hydraulic effects: it’s like a serious game

Page 53: Room for the River Presentation 2011

What makes/made the Planning Kit a useful tool?

• forms a common knowledge base• supports and facilitates learning, rivers form a system• enlarges knowledge of local, regional river management • people can check the relevance of their own ideas about flood

management• sense of empowerment: users understand process and science

• simple to use• complete overview of measures• easy to distribute among stakeholders

Page 54: Room for the River Presentation 2011
Page 55: Room for the River Presentation 2011

Room for the River today

700 potential projects identified, 39 selected, 35 being implemented

urban, agricultural/rural, wetland restoration

2,3 billion euro budget ($3 billion)

Implementation 2009-2015: money is committed, not subject to annual appropriations cycle, this yields certainty and cost savings

Oversight team coordinates feedback / experience between projects

Info: www.ruimtevoorderivier.nl/meta-navigatie/english

Page 56: Room for the River Presentation 2011

Lessons• Retain, Store, Discharge• Emergencies (national, local) yield opportunities; “strike while

the iron is hot,” acknowledge implementation takes time• Combining protection and spatial quality creates broader public

support for measures: environmental, economic, safety“And…and” not “either…or”

• Transparency and directness about goals, ackowledge trade-offs at beginning of process

• Allow local stakeholders to guide (many partners)• Offer many possible options• More time in awareness / planning yields better, quicker

implementation• Toolkit is key to create shared knowledge• Steady, reliable, dedicated project funding lowers overall costs

12-04-2356

Page 57: Room for the River Presentation 2011

Contact @ Royal Netherlands Embassy

Ambassador Renee Jones-Bos

202 274 2501

[email protected]

Dale Morris

202 274 2618

[email protected]

Thanks to:

Deltares, Rijkswaterstaat, Robbert de Koning, Jos Dijkman, Twynstra-Gudde, Netherlands Association of Waterboards, Province of North Brabant