ROI-ET Green Power Project ROI-ET Green Company Limited
30

ROI-ET Green Power Project - · PDF fileAsh Handling System Plant Overview ระบบปรับสภาพน

Mar 05, 2018

Download

Documents

trinhngoc
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: ROI-ET Green Power Project -  · PDF fileAsh Handling System Plant Overview ระบบปรับสภาพน

ROI-ET Green Power Project

ROI-ET Green Company Limited

Page 2: ROI-ET Green Power Project -  · PDF fileAsh Handling System Plant Overview ระบบปรับสภาพน

Biomass : Organic matters:

Firewood, Rice husk, Bagasse, Woodscrap, Rice straw, Palm shell, Coconut shell, etc. and other agricultural wastes

Animal manure

Waste product form agro-industrial plants

Rubbish

Experience of Rice Husk Power Plant in Thailand

Page 3: ROI-ET Green Power Project -  · PDF fileAsh Handling System Plant Overview ระบบปรับสภาพน

Thailand is mainly an agricultural country :Abundance of agricultural residuals Left over of residual, no value gained Disposal cost

Since 1995, National Energy Policy office (NEPO) :Policy of energy conservationRenewable energy as alternativeFeasibility study

History of Biomass in Thailand

Page 4: ROI-ET Green Power Project -  · PDF fileAsh Handling System Plant Overview ระบบปรับสภาพน

Reduce pollution caused by left over of residuals Reduce Greenhouse effect caused by natural decay (Methane : CH4) and use of fossil fuels as well as utilization of residuals (CO2) Reduce import of fuelReduce electricity total system loss Increase stability of electricity system in area of generation Lower cost of fuel compared with fossil fuelImprove living of people and community

Economics : Local community’s revenueSocial & Cultural : Soil improvement by ash, Environment,

: Residue disposalEducation : Technology & Environmental friendly

Benefits

Page 5: ROI-ET Green Power Project -  · PDF fileAsh Handling System Plant Overview ระบบปรับสภาพน

Higher investment cost of equipment per MW. (>1.2 M. USD)Higher cost of fuel storage and transportationFuel availability is not firm:

SeasonalClimate Export market of main product Government policyUncertain amount of local utilization

Variation of moisture, difficult control combustion Higher corrosion in fuel & ash pathsImplementation of same kind of project in the areaPoor environmental management could cause pollution

Constraints & Threats

Page 6: ROI-ET Green Power Project -  · PDF fileAsh Handling System Plant Overview ระบบปรับสภาพน

• Area, Location : 40 Rai (64,000 m2); Roi-et (510 km from Bangkok)

• Fuel : ~300 Ton/day of rice husk

• Fuel Supply : Rice Mills in the area

• LHV of Fuel : 12.6 MJ/kg (3,000 kcal/kg)

• Water Supply : Chi River, ~13.6 km pipeline

• Connection : 22 kV line PEA

• Installed Capacity : 9.95 MW

• Contracted Capacity with EGAT : 8.8 MW

• Contract period : 21 years

Project OverviewProject Overview

Page 7: ROI-ET Green Power Project -  · PDF fileAsh Handling System Plant Overview ระบบปรับสภาพน

Project Construction Schedule

*A t l COD d l d f h d l d COD d t i i t l i t

1 2 3 4 5 6 7 8 9 10 1 1 1 2 1 3 14 1 5 1 6 1 7 1 8

EPC SigningDateLandfillandReservoir(NonEPC)Pipeline&Rawwaterpump(NonEPC)22Kv.TransmissionLine(NonEPC)CommunicationSystem(NonEPC)EffectiveDate Engineering&DesignProcurement&ManufacturingSite MobilizationPilingConstructionTest&CommissioningCOD*

Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May

October 24,2001

April 23,2003 May 29

Page 8: ROI-ET Green Power Project -  · PDF fileAsh Handling System Plant Overview ระบบปรับสภาพน

ระบบน้ําหลอเย็นCooling Water System

ระบบผลิตกระแสไฟฟาElectricity Generating

Systemระบบผลิตไอน้ําSteam Generating

System

ระบบไฟฟา และระบบควบคุมElectrical &

Control System

ระบบเก็บและลําเลียงเชื้อเพลิง

Fuel Storage & Handling System

ระบบลําเลียงขี้เถาAsh Handling

System

Plant Overview

ระบบปรับสภาพน้าํWater Treatment

System& Waste Water

Treatment System

Page 9: ROI-ET Green Power Project -  · PDF fileAsh Handling System Plant Overview ระบบปรับสภาพน

Overview of Process

Page 10: ROI-ET Green Power Project -  · PDF fileAsh Handling System Plant Overview ระบบปรับสภาพน

Process and Systems

Rice Husk Transportation by Truck to Husk Storage Area

Fuel Storage & Handling System

Page 11: ROI-ET Green Power Project -  · PDF fileAsh Handling System Plant Overview ระบบปรับสภาพน

Process and SystemsFuel Storage & Handling System

New Indoor Storage

Page 12: ROI-ET Green Power Project -  · PDF fileAsh Handling System Plant Overview ระบบปรับสภาพน

Process and Systems

Husk Conveyor

Fuel Storage & Handling System

Page 13: ROI-ET Green Power Project -  · PDF fileAsh Handling System Plant Overview ระบบปรับสภาพน

Process and Systems

Husk Feeding to Boiler Furnace

Steam Generating SystemSteam Generating System

Page 14: ROI-ET Green Power Project -  · PDF fileAsh Handling System Plant Overview ระบบปรับสภาพน

Process and Systems

Fuel Feeding and Combustion

Steam Generating SystemSteam Generating System

Page 15: ROI-ET Green Power Project -  · PDF fileAsh Handling System Plant Overview ระบบปรับสภาพน

Process and SystemsSteam Generating SystemSteam Generating System

Flame of Combustion

Page 16: ROI-ET Green Power Project -  · PDF fileAsh Handling System Plant Overview ระบบปรับสภาพน

Process and SystemsSteam Generating SystemSteam Generating System

Multi-Cyclone Dust Collectors and Electrostatic Precipitator

Page 17: ROI-ET Green Power Project -  · PDF fileAsh Handling System Plant Overview ระบบปรับสภาพน

Process and SystemsElectricity Electricity Generating SystemGenerating System

Steam Turbine and Coupling Gear

Page 18: ROI-ET Green Power Project -  · PDF fileAsh Handling System Plant Overview ระบบปรับสภาพน

Process and SystemsElectrical and Control Electrical and Control SystemSystem

Central Control Room

Page 19: ROI-ET Green Power Project -  · PDF fileAsh Handling System Plant Overview ระบบปรับสภาพน

Process and SystemsAsh Handling SystemAsh Handling System

Bottom Ash and Dust Conveying Systems

Page 20: ROI-ET Green Power Project -  · PDF fileAsh Handling System Plant Overview ระบบปรับสภาพน

Process and SystemsAsh Handling SystemAsh Handling System

Bottom Ash and Dust Unloading Systems

Page 21: ROI-ET Green Power Project -  · PDF fileAsh Handling System Plant Overview ระบบปรับสภาพน

Process and SystemsCooling Water and Water Treatment SystemCooling Water and Water Treatment System

Water Treatment Plant, Waste Water Treatment Plant and Cooling Tower

Page 22: ROI-ET Green Power Project -  · PDF fileAsh Handling System Plant Overview ระบบปรับสภาพน

For the Reported PeriodDescription Unit

Target ActualStack EmissionNOX ppm 200.00 1.38SO2 ppm 60.00 2.04TSP mg/

m3

320.00 56.71CO ppm 690.00 <1.00CO2 % - 6.70O2 % - 9.40

Emission and Effluent

30.07<40.00ºC- Temperature5.02-NTU- Turbidity

<0.02<3.0mg/1- Chromium0.03<2.0mg/1- Copper

<0.05<0.1mg/1- Lead<0.004<0.03mg/1- Cadmium

<0.01<5.0mg/1- Zinc0.03<5.0mg/1- Manganese

0.5<1.0mg/1- Residual Chlorine1.7<100.00mg/1- Total Kjeldahl

Nitrogen

986.00<3,000.00mg/1- Total Dissolved Solids8.0<50.00mg/1- Suspended Solids

38.8<120.00mg/1- COD<2.00<20.00mg/1- BOD

1,489.00< 2,000.00μs/cm

- Electrical Conductivity8.246.50-8.50-- pH

3,841.0010,058.40m3To Discharge Pond Waste

Water Discharge

Effluent WaterActualTarget

For the Reported PeriodUnitDescription

Page 23: ROI-ET Green Power Project -  · PDF fileAsh Handling System Plant Overview ระบบปรับสภาพน

Power Block

Environment Control

Page 24: ROI-ET Green Power Project -  · PDF fileAsh Handling System Plant Overview ระบบปรับสภาพน

Inside Green Area Landscape

Environment Control

Page 25: ROI-ET Green Power Project -  · PDF fileAsh Handling System Plant Overview ระบบปรับสภาพน

Green Area

Environment Control

Page 26: ROI-ET Green Power Project -  · PDF fileAsh Handling System Plant Overview ระบบปรับสภาพน

UNDP Representatives with Energy for Environment Foundation and Press (December 3, 2003)

Guest VisitsGuest Visits

Page 27: ROI-ET Green Power Project -  · PDF fileAsh Handling System Plant Overview ระบบปรับสภาพน

AwardsAwards

Award of Winner by Department of Alternative Energy Development and Efficiency (DEDE), 2004

Page 28: ROI-ET Green Power Project -  · PDF fileAsh Handling System Plant Overview ระบบปรับสภาพน

Award of Winner by Asean Energy Forum in Philippines (May, 2004)

AwardsAwards

Page 29: ROI-ET Green Power Project -  · PDF fileAsh Handling System Plant Overview ระบบปรับสภาพน

Existing Landscape 2006

Page 30: ROI-ET Green Power Project -  · PDF fileAsh Handling System Plant Overview ระบบปรับสภาพน

THANK YOU