Top Banner
MY CAREER THUS FAR...
24

Rodney Wippenaar Pr Eng V1

May 28, 2015

Download

Documents

A photographic slideshow of my CV
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Rodney Wippenaar Pr Eng V1

MY CAREER THUS FAR...

Page 2: Rodney Wippenaar Pr Eng V1
Page 3: Rodney Wippenaar Pr Eng V1
Page 4: Rodney Wippenaar Pr Eng V1

BUILDINGSMiddle East - Bahrain

I was on site on Marina West

project for 8months in Budiya,

Bahrain. It was the biggest

project at the time in Bahrain.

See my CV for more details on

my involvement.

Page 5: Rodney Wippenaar Pr Eng V1
Page 6: Rodney Wippenaar Pr Eng V1

BUILDINGSSaadiyat Island – Abu Dhabi. February 2010 to January 2011

Here again I was on site,

ensuring smooth flow of

construction works. My

relationship building skills also

helped greatly as I was able to

gain the respect of the Abu

Dhabi government inspector.

Before he would often reject

work, causing delays to the

works.

Page 7: Rodney Wippenaar Pr Eng V1
Page 8: Rodney Wippenaar Pr Eng V1

BRIDGESSibaya Interchange

Assisted the Senior Engineer

with the design of this 4 span,

post tensioned bridge over a

National highway in South

Africa, see details in my CV.

Page 9: Rodney Wippenaar Pr Eng V1
Page 10: Rodney Wippenaar Pr Eng V1

BRIDGESResident Engineer

On site for 1 year as Bridge

Superintendent or Resident

Engineer as its known in South

Africa. I personally also

designed the 30m long post-

tensioned beams.

Page 11: Rodney Wippenaar Pr Eng V1
Page 12: Rodney Wippenaar Pr Eng V1
Page 13: Rodney Wippenaar Pr Eng V1

BRIDGESFire Damage Report

I was responsible for compiling

the damage assessment and

repair strategy report for a fire

damaged bridge in Cape town.

Page 14: Rodney Wippenaar Pr Eng V1

BRIDGESConstruction management - Dubai

I spent 7 months on site at the

Nad Al Sheba racecourse

access roads. The project had a

total of 7 bridges and two

separate contractors, Dutco

Beatty Balfour and Afcons.

Page 15: Rodney Wippenaar Pr Eng V1
Page 16: Rodney Wippenaar Pr Eng V1

BRIDGESConstruction management - Dubai

Nad Al Sheba: The Main Bridge

Page 17: Rodney Wippenaar Pr Eng V1
Page 18: Rodney Wippenaar Pr Eng V1

BRIDGESConstruction management - Dubai

Investigating the snapping of

wires during tensioning

operations.

Page 19: Rodney Wippenaar Pr Eng V1

BRIDGESConstruction management - Dubai

The completed VIP bridge.

Page 20: Rodney Wippenaar Pr Eng V1

Construction management – South Africa

Constructing a twin bridge next

to existing one. Piling in

progress, oscillator piles to a

depth of 40m.

Page 21: Rodney Wippenaar Pr Eng V1

Resolving bursting steel – arriving at a practical workable arrangement. This was also checked by calculation.

Page 22: Rodney Wippenaar Pr Eng V1

BRIDGESConstruction management – South Africa

The beams were 33m long and

around 64tons.