ROCK CLIFF HOMES 332-338 ROBINSON ST. OAKVILLE, ONTARIO OVERALL LANDSCAPE LAYOUT PLAN, NOTES AND DETAILS May 2017 Designed: Date: Scale: Checked: Drawn: drawing: Project no: 2016-14 Drawing no: 1"=5'-0" dob rpr dob L1 of 3 project: by revisions: date item no. PLT15/05/17 LANDSCAPE ARCHITECTS LANDSCAPE DESIGN, CONSULTATION & PROJECT MANAGEMENT DANIEL J. O'BRIEN & associates ltd. 798 BESSBOROUGH DRIVE OSHAWA, ONTARIO L1G 4H2 TEL: 905-985-4466 WEB: www.obrien associates.ca EMAIL: danielobrien associates @ bellnet.ca ROBINSON STREET UNIT #2 UNIT #3 UNIT #4 EXISTING BUILDING EXIST SHED UNIT #1 UNIT #4 EXIST SHED EXISTING TIMBER FENCE TO REMAIN ALONG PROPERTY LINE IN THIS AREA VEHICULAR DRIVEWAY TO BE BRICK PAVING INFILL, SOLDIER COURSE AND BANDING (2'-0" WIDTH) w/ CONCRETE SUB-BASE (SEE DETAIL) MAIN ENTRY LANDING (11'-0"x11'-0") AND MAIN ENTRY WALKWAY (4'-0" WIDTH) TO BE BRICK PAVING w/ CONCRETE SUB-BASE (SEE DETAIL) w/ GARDEN BENCH (TO BE SELECTED) PROPOSED WOOD PRIVACY FENCE (6'-0" HIGH) (SEE DETAIL) PROPOSED WOOD PRIVACY FENCE (6'-0" HIGH) (SEE DETAIL) EXISTING BUILDING PEDESTRIAN ACCESS WALKWAY (6'-0" WIDTH) TO BE BRICK PAVING INFILL, SOLDIER COURSE AND BANDING (2'-0" WIDTH) w/ CONCRETE SUB-BASE (SEE DETAIL) DECORATIVE PEDESTAL AND URN (SEE DETAIL) SQUARE CUT NATURAL STONE STEPPING STONES (2'-0"x3'-0")(TYPICAL) 2'-0" 1'-0" concrete strength to be 20 MPa (95% s.p.d.) native subsoil w/ minimum footing over free draining compacted Continuous poured in place concrete @ 28 days w/ 6% air entrainment (Provide key way) 10M @ 305mm O.C. each way rebar reinforcement (typical) (minimum 40mm clear cover) Steel reinforced poured concrete 6-8% air entrainment wall to be 20 MPa @ 28 days w/ Masonry veneer to match proposed residence (typical) (optional: concrete block) Precast conrete coping 1 1/2" 3 1/4" 1 3/4" (style 'a' - 18 1/2" wide) coping style 'a' enlargement SODDED AREA (TYPICAL) SODDED AREA (TYPICAL) PROPOSED WOOD PRIVACY FENCE (6'-0" HIGH) (SEE DETAIL) MASONRY WALL X-SECTION N.T.S. WROUGHT IRON FENCE X-SECTION SODDED AREA (TYPICAL) WROUGHT IRON FENCE (3'-1" HIGH) w/ TWO (2) PEDETRIAN ENTRY GATES (SEE DETAIL) BRICK PAVING SOLDIER COURSE w/ CONCRETE SUB-BASE)(2'-0" WIDTH)(TYPICAL)(SEE DETAIL) PROPOSED MASONRY WALL (4'-0" HIGH) (32'-6" LENGTH)(SEE DETAIL) General note: pedestrian entry gate to match fence section design be 5/8"x5/8" bars (typical) Decorative metal design to square bar (typical) main rails to be 1"x1" be 2"x2" square bar (typical) Main posts and lower rails to 1295 (4'-3") (typical section) 200 200mm diameter concrete base (1200mm deep) A-320 FRENCH URN B-265 QUEEN ANNE PEDESTAL MANUFACTURER: HADDONSTONE LIMITED (USA EAST OFFICE) 201 HELLER PLACE, BELLMAWR, NEW JERSEY U.S.A. 08031 (TEL) 856-931-7011 (FAX) 856-931-0040 SUPPLIER: BEYOND THE VERANDA 1200 CASTLEFIELD AVENUE TORONTO, ONTARIO M6B 1G2 (TEL) 905-655-9300 (EMAIL) SHOWROOM@ BEYONDTHEVERANDA.COM SITE FURNITURE NOTES:
3
Embed
ROCK CLIFF HOMES 332-338 ROBINSON ST. OAKVILLE, ONTARIO planning/sp-171304301-landsca… · ROCK CLIFF HOMES 332-338 ROBINSON ST. OAKVILLE, ONTARIO Never cut evergreen leader and
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
All areas noted as sodded tohave #1 nursery grown sod w/200mm depth (minimum) topsoil(typical)
All planted areas to have 300mmdepth (minimum) of planting mix,and 100mm depth (minimum) ofblack composted bark mulchby gro-bark limited(note: mulch level to be 100mmabove sod level)
PLANTING NOTES:
SHRUBS X-SECTIONN.T.S.
CONIFEROUS TREEX-SECTION
N.T.S.
ROCK CLIFF HOMES
332-338 ROBINSON ST.
OAKVILLE, ONTARIO
Never cut evergreen leader and prune balanceof tree only if approved by landscapearchitect.
Support tree with three (3) steel t-bars,50x50x6mm, and minimum 2438mm long.Secure trunk with No.11 galvanized wireencased in 25mm diameter new black rubberhose (remove at end of warranty period).
Tree must be dense and full with completebranch development, vigorous foliage and aform which is satisfactory to the landscapearchitect.
Construct 100mm topsoil saucer at tree baseand mulch with 75mm of fine shredded pinebark by gro-bark ltd.
Cut and remove burlap from top 1/3 of ball.
Planting soil mixture as per municipal designcriteria. Existing soil to be removed from site,not to be used in planting process.Planting soil mixture:(a) 5 parts dark loam(b) 2 parts composted cow manure(c) 1 part peat moss(d) 1 part beach washed sand(e) 0.58 kilos bonemeal 2-22-0/m3
Set tree 50mm higher than adjacent finishedgrade to allow for settlement.
Firmly compact backfilled soil to prevent airpockets.
Scarify surface of compacted subsoil prior toplanting.
Fill bottom of tree pit with 150mm minimum of20mm clear crushed stone.
300 300
300 300
150 150
Balled &Burlapped
BareRoot
Remove burlap from top third of ball.
maintain original grade of shrub base afterplanting.
100mm saucer with 100mm of fine shreddedpine bark by gro-bark ltd.
Prepared planting soil mixture as specified.
50mm Top soil tamped to prevent settlement.
Prepared planting soil mixture as specified.
maintain original grade of shrub base afterplanting.
100mm saucer with 100mm of fine shreddedpine bark by gro-bark ltd.
Notes:1. All root balls removed from containers to scarified prior to setting in ground.2. Remove all broken, diseased or weak branches.3. Thin branches and twigs by 1/3 retaining normal shrub shape.4. Prune so as to leave as little stubs as possible.
AA CERCIDIPHYLLUM JAPONICUM 'RED FOX' RED FOX KATSURA TREE 50mm CAL6
CORNUS FLORIDA RUBRA PINK DOGWOOD 60mm CAL1
DA
EA
VISION IN PINK ASTILBEASTILBE 'VISION IN PINK' 2 YR CONTAINER GROWN36
HEDRA HELIX 'BALTICA' BALTIC IVY 15cm POT246
(30" CROWN)(STANDARD)
THUJA OCCIDENTALLIS 'NIGRA' BLACK CEDAR 240cm HT90BB
EXIS
TIN
GB
UIL
DIN
G
300
General Notes:
1. Fence to be pressure treated spruce2. In areas where fence is to be erected on fill, compaction to be 95% s.p.d.3. All hardware to be hot dipped galvanized
1/2"x2 3/4" cap w/1/4" chamfer
custom post top
300 diameter poured concretefoundation (20MPa @28 days)(Top of footing to be 250mm below grade)(1200mm depth)
Prune branches so as to retain natural formof tree. Never cut leader. Paint all cuts over25mm diameter with approved tree paint.
Support tree with two (2) steel t-bars,50x50x6mm, and minimum 2438mm long.Secure trunk with No.11 galvanized wireencased in 10mm diameter new black rubberhose (remove at end of warranty period).
Wrap tree stem with approved tree wrap fromtop of ball to 300mm above first branch.
Place a 100mm diameter plastic flexpipecollar 300mm long after tree has beenwrapped.
Construct 100mm topsoil saucer at tree baseand mulch with 100mm of fine shredded pinebark by gro-bark ltd.
Cut and remove burlap from top 1/3 of ball,wire basket to be cut randomly (750mmdiameter minimum root ball w/ depth =2/3diameter.
Fertilizer capsules-agriform-analysis 20-15-521 gram tablets will be deposited at the rateof 1 capsule/cm of trunk diameter.
Planting soil mixture as per municipal designcriteria. Existing soil to be removed from site,not to be used in planting process.Planting soil mixture:(a) 5 parts dark loam(b) 2 parts composted cow manure(c) 1 part peat moss(d) 1 part beach washed sand(e) 0.58 kilos bonemeal 2-22-0/m3
Set tree 50mm higher than adjacent finishedgrade to allow for settlement.
Firmly compact backfilled soil to prevent airpockets.
Scarify surface of compacted subsoil prior toplanting.
80mm mound.
150
300 300
3AA
TREE CANOPY CALCULATION CHART
1
EXISTING TREES
TR9 SUGAR MAPLE
SUBTOTAL OF EXISTING OFF SITE TREE CROWN AREA
TOTAL OF EXISTING TREE CROWN AREA 120.67 M2
SUBTOTAL OF EXISTING ON SITE TREE CROWN AREA
SUBTOTAL OF EXISTING ON SITE TREE (BONUS FACTOR OF 1.5)
000.00 M2
000.00 M2
120.67 M2
EXISTING TREES
TOTAL # OF TREES (PROPOSED & EX) TOTAL CANOPY AREA (M2)13 147.47 M2
KEY COMMON NAME SOIL VOLUMEPER TREE (M3)
CROWN AREAPER TREE (M2)
CANOPY AREASUB-TOTAL (M2)
# OFTREES
LARGE STATURE TREES (14.0m+ SPREAD)
MEDIUM STATURE TREES (10.0-13.0m SPREAD)
TREESPACING
SMALL STATURE TREES (3.0-9.0m SPREAD)
000.0 M2
SUBTOTAL OF PROPOSED TREE CANOPY AREA 49.00 M2
PROPOSED ACTUAL ON SITE TREE CANOPY AREA (EXCLUDING CANOPY OVERLAP AREA)
PROPOSED ACTUAL OFF SITE TREE CANOPY AREA (EXCLUDING CANOPY OVERLAP AREA)
PROPOSED ACTUAL TOTAL TREE CANOPY AREA (EXCLUDING CANOPY OVERLAP AREA) 26.80 M2
26.80 M2
00.0 M2
000.0M2
CANOPY SUMMARY
SITE AREA
SITE CANOPY COVER
LAND USE CANOPY COVER TARGET
800.97 M2
18.41% (147.47 M2)
20.00 % (160.19 M2)
1TR10 BLACK WALNUT
1TR12 NORWAY MAPLE
1TR14 MANITOBA MAPLE
1TR15 BLACK WALNUT
30.0 M36 3.35MAA
AB
RED FOX KATSURA TREE
30.0 M31 N/APINK DOGWOOD 7.0 M2 7.0 M2
7.0 M2 42.0 M2
1TR17 THORNLESS HONEYLOCUST
1"=5'-0"
BRICK PAVING(w/ CONCRETE
SUB-BASE)X-SECTION
N.T.S.
by alliance (typical)fill joints w/ gator super sand
Rigid insulation (50mm)
Granular 'A' compacted to 98% s.p.d.
125mm concrete base to be 25MPa at
1800mm o.c., expansion joints @
conditions (to be determined) vary depending on site soilNote: Granular base depth may
Depth from approved subgrade tobottom of granular 'A'
Granular 'B' compacted to 98% s.p.d.
5400mm o.c.)(or as specified)
150x150mm grid of wire mesh(19mm deep control joints @
28 days w/ 6-8% air entrainment and
gator super sand by alliancelevelling course (20mm depth) of
Brickstop reversible edging(standard installation) by unilockto be placed along all brick edges