Top Banner
Robotic Football Project Review Board 3 Team Members: Nathan Rosenbaum, ME Keegan Ross, ME Zachary Myers, EE Joshua Chenault, EE Tyler Hertenstein, Engineering Ed. Advisors: Dr. LeBlanc Dr. Yoder
10

Robotic Football Project Review Board 3 Team Members: Nathan Rosenbaum, ME Keegan Ross, ME Zachary Myers, EE Joshua Chenault, EE Tyler Hertenstein, Engineering.

Jan 04, 2016

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Robotic Football Project Review Board 3 Team Members: Nathan Rosenbaum, ME Keegan Ross, ME Zachary Myers, EE Joshua Chenault, EE Tyler Hertenstein, Engineering.

Robotic Football Project Review Board 3Team Members:Nathan Rosenbaum, ME

Keegan Ross, MEZachary Myers, EEJoshua Chenault, EE

Tyler Hertenstein, Engineering Ed.

Advisors:Dr. LeBlancDr. Yoder

Page 2: Robotic Football Project Review Board 3 Team Members: Nathan Rosenbaum, ME Keegan Ross, ME Zachary Myers, EE Joshua Chenault, EE Tyler Hertenstein, Engineering.

Overview

• Wide Receiver Assembly• Wide Receiver Bluetooth Communication• Pivot and Vision System for WR/QB• Quarterback Assembly• Test Stand Assembly

Page 3: Robotic Football Project Review Board 3 Team Members: Nathan Rosenbaum, ME Keegan Ross, ME Zachary Myers, EE Joshua Chenault, EE Tyler Hertenstein, Engineering.

Wide Receiver Assembly

• Completed– Construction and assembly– Sensor Mast assembled– “RobotCore” implemented

• To be Completed– Soldering final connections– Protective netting– Testing– Pre-game preparations

Page 4: Robotic Football Project Review Board 3 Team Members: Nathan Rosenbaum, ME Keegan Ross, ME Zachary Myers, EE Joshua Chenault, EE Tyler Hertenstein, Engineering.

Wide Receiver Bluetooth Communication

• To be Completed– Parsing data from characters to give proper commands

• LED• Mast Motor control• Manual Override Controls

• Completed– Sending

individual bytes from lower to upper Arduino microcontrollers

Page 5: Robotic Football Project Review Board 3 Team Members: Nathan Rosenbaum, ME Keegan Ross, ME Zachary Myers, EE Joshua Chenault, EE Tyler Hertenstein, Engineering.

Pivot and Vision System for WR/QB

• Completed– Implemented PID controller (QB)– Moving Average filter of last 5 readings

• To be Completed– Manual Override– False Positive Filter– Gain Scheduling– Conversion factor for PID Controller (WR)

Page 6: Robotic Football Project Review Board 3 Team Members: Nathan Rosenbaum, ME Keegan Ross, ME Zachary Myers, EE Joshua Chenault, EE Tyler Hertenstein, Engineering.
Page 7: Robotic Football Project Review Board 3 Team Members: Nathan Rosenbaum, ME Keegan Ross, ME Zachary Myers, EE Joshua Chenault, EE Tyler Hertenstein, Engineering.
Page 8: Robotic Football Project Review Board 3 Team Members: Nathan Rosenbaum, ME Keegan Ross, ME Zachary Myers, EE Joshua Chenault, EE Tyler Hertenstein, Engineering.

Quarterback Assembly

• Completed– CNC cut plastic for lower

assembly– Lower base completed

• To be completed– Pitching system– Upper Platform

Construction– Sensor Mast

Page 9: Robotic Football Project Review Board 3 Team Members: Nathan Rosenbaum, ME Keegan Ross, ME Zachary Myers, EE Joshua Chenault, EE Tyler Hertenstein, Engineering.

Test Stand Assembly

• Completed– Cut Pieces– Machined Components– Frame and swinging arm

assembled

• To be Completed– Sliding Base– Testing– Configuration of swinging

height