Rob Crandol, P.E. – Statewide Asphalt Program Manager Asphalt Regional Meetings Asphalt Quality Assurance Program
48

Rob Crandol, P.E. – Statewide Asphalt Program Manager Asphalt Regional Meetings Asphalt Quality Assurance Program.

Dec 22, 2015

Download

Documents

Annis Malone
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Rob Crandol, P.E. – Statewide Asphalt Program Manager Asphalt Regional Meetings Asphalt Quality Assurance Program.

Rob Crandol, P.E. – Statewide Asphalt Program Manager Asphalt

Regional Meetings

Asphalt Quality Assurance

Program

Page 2: Rob Crandol, P.E. – Statewide Asphalt Program Manager Asphalt Regional Meetings Asphalt Quality Assurance Program.

2

QUALITY ASSURANCE

PROCESS CONTROL

(QC)

INDEPENDENT ASSURANCE

(IA)ACCEPTANCE

(VST)

Page 3: Rob Crandol, P.E. – Statewide Asphalt Program Manager Asphalt Regional Meetings Asphalt Quality Assurance Program.

Asphalt QA Program

• Contractor – Performs QC

• VDOT – Performs IA & VST• Asphalt Certification schools for contractors,

inspectors and testing personnel.• Plant Certification• Field Certification

Page 4: Rob Crandol, P.E. – Statewide Asphalt Program Manager Asphalt Regional Meetings Asphalt Quality Assurance Program.

Quality Control (QC)

• All activities performed to control the quality of the asphalt mixture during production and placement to fulfill the contractor requirements.

• Section 211• Mix Design• Contractor provides QC testing

• Section 315• Mix Placement• Contractor provides Field Control - Equipment• Density Testing

4

Page 5: Rob Crandol, P.E. – Statewide Asphalt Program Manager Asphalt Regional Meetings Asphalt Quality Assurance Program.

Independent Assurance (IA)

• Activities that are an unbiased and an independent evaluation of all Operations, sampling and testing procedures, and equipment used in the acceptance program.

• VDOT provides IA during production and placement• Inspection – observations• Split sample tests• Evaluations of Technicians

• AASHTO Materials Reference Laboratory

5

Page 6: Rob Crandol, P.E. – Statewide Asphalt Program Manager Asphalt Regional Meetings Asphalt Quality Assurance Program.

Verification Sampling and Testing (VST)

• Validate the quality of the product• Performed by VDOT

• VST should determine if the material is acceptable per specification.

• VDOT uses split samples plus a statistical process of examining Contractor QC test data to verify the accuracy of sampling and testing used in the acceptance decision. • Plant

• VDOT uses independent samples• Field

Page 7: Rob Crandol, P.E. – Statewide Asphalt Program Manager Asphalt Regional Meetings Asphalt Quality Assurance Program.

Mix Design Approval Process

• Contractor submits mix design laboratory data and forms to VDOT for initial approval.

• Limited production - contractor can produce up to 500 tons or one day’s production. Gyratory samples taken and analyzed by both VDOT and Contractor for compliance with Specification requirements and conformance to submitted mix design.

• Full production approval granted after a successful limited production trial.

7

Page 8: Rob Crandol, P.E. – Statewide Asphalt Program Manager Asphalt Regional Meetings Asphalt Quality Assurance Program.

Asphalt Plant Quality Control

Page 9: Rob Crandol, P.E. – Statewide Asphalt Program Manager Asphalt Regional Meetings Asphalt Quality Assurance Program.

Random Truck Sampling

Page 10: Rob Crandol, P.E. – Statewide Asphalt Program Manager Asphalt Regional Meetings Asphalt Quality Assurance Program.

10

Sample Splitting

Page 11: Rob Crandol, P.E. – Statewide Asphalt Program Manager Asphalt Regional Meetings Asphalt Quality Assurance Program.

11

VDOT uses the Contractor’s test data (QC) in the acceptance of plant produced Asphalt mixtures

Asphalt Plant QA

Page 12: Rob Crandol, P.E. – Statewide Asphalt Program Manager Asphalt Regional Meetings Asphalt Quality Assurance Program.

Producer Samples and Tests (QC)

• Perform Gradation and Asphalt Content testing randomly every 500 tons

• Temperature Measurements 1st and 5th load then at least once an hour

• Volumetric SUPERPAVE tests every 1,000 tons• Air Voids (VTM)• Voids in Mineral Aggregate (VMA)• Voids filled with Asphalt (VFA)

• Rice test – Maximum Specific Gravity (Gmm)

12

Page 13: Rob Crandol, P.E. – Statewide Asphalt Program Manager Asphalt Regional Meetings Asphalt Quality Assurance Program.

VDOT Responsibilities, Samples and Tests

• Inspect Plant equipment and lab for compliance with specifications – IA

• Split sample tests for gradation and Asphalt Content are used for system wide IA and VST purposes

• Volumetrics SUPERPAVE tests used for verification purposes.• Air Voids (VTM)• Voids in Mineral Aggregate (VMA)• Voids filled with Asphalt (VFA)

• Rice test – Maximum Specific Gravity (Gmm)

13

Page 14: Rob Crandol, P.E. – Statewide Asphalt Program Manager Asphalt Regional Meetings Asphalt Quality Assurance Program.

14

Independent Assurance

3 3

IA1

3 221 14143214

Lot 2 Lot 3Lot 1 Lot 4

2

IA3IA2IA1 IA4

IA4IA3IA2

Matched Comparison Analysis

4 3 4 2QC

Sample Comparison

IA

Page 15: Rob Crandol, P.E. – Statewide Asphalt Program Manager Asphalt Regional Meetings Asphalt Quality Assurance Program.

15

3 3

IA1

3 221 14143214

Lot 2 Lot 3Lot 1 Lot 4

2

IA3IA2IA1 IA4

IA4IA3IA2

21 213 4 1321 3 4QC

System Comparison

Non Matched ComparisonVST

VST

Page 16: Rob Crandol, P.E. – Statewide Asphalt Program Manager Asphalt Regional Meetings Asphalt Quality Assurance Program.

16

Comparison Reports

4.4 4.6 4.8 5.0 5.2 5.4 5.6

Asphalt Content

f(x) Lab #1 Lab #2

Page 17: Rob Crandol, P.E. – Statewide Asphalt Program Manager Asphalt Regional Meetings Asphalt Quality Assurance Program.

17

Comparison Reports

4.4 4.6 4.8 5.0 5.2 5.6 5.8

Asphalt Content

f(x)

Page 18: Rob Crandol, P.E. – Statewide Asphalt Program Manager Asphalt Regional Meetings Asphalt Quality Assurance Program.

18

Asphalt MITS - PLAID Reports

• Statistical Tests are performed on both Split Comparison and IA Samples.

• Any non comparison must be investigated, resolved and documented.

Page 19: Rob Crandol, P.E. – Statewide Asphalt Program Manager Asphalt Regional Meetings Asphalt Quality Assurance Program.

19

Assessment of Random Samples

Is this random?

Page 20: Rob Crandol, P.E. – Statewide Asphalt Program Manager Asphalt Regional Meetings Asphalt Quality Assurance Program.

20

Summary – Asphalt Plant QA

• Statistics is the tool that VDOT uses to verify the quality of asphalt mixtures.

Page 21: Rob Crandol, P.E. – Statewide Asphalt Program Manager Asphalt Regional Meetings Asphalt Quality Assurance Program.

Asphalt Field

Quality

Assurance

21

Page 22: Rob Crandol, P.E. – Statewide Asphalt Program Manager Asphalt Regional Meetings Asphalt Quality Assurance Program.

Contractor Field QC Testing

• Depth Checks• Cross Slope• Straight Edge Transverse Joints • QC Density testing either by Thin Lift Nuclear

gauge or through cores/plugs• Joint Density

• Test and Test frequency will be determined by Road & Bridge Specifications, Special Provisions or as directed by the Engineer

• Cut plugs for VST at direction of Materials QA technician.

22

Page 23: Rob Crandol, P.E. – Statewide Asphalt Program Manager Asphalt Regional Meetings Asphalt Quality Assurance Program.

VDOT Project Staff Responsibilities IA

• Verifies Paving equipment meets specifications• Verifies materials being used are from approved

sources• Take Temperature measurements of AC at least

every hour• Verifies that contractor personnel are performing

QC operations correctly• Verifies Density testing being performed

• Joint Density

23

Page 24: Rob Crandol, P.E. – Statewide Asphalt Program Manager Asphalt Regional Meetings Asphalt Quality Assurance Program.
Page 25: Rob Crandol, P.E. – Statewide Asphalt Program Manager Asphalt Regional Meetings Asphalt Quality Assurance Program.

VDOT/Materials VST and IA

• Perform VST testing on plugs• IA testing

• Verify method of random selection• Marking of test locations• Observe QC testing at control strip• Observe test sections.• Obtain samples of cores from control strip to

reweigh in laboratory.

• Depth Control tests

25

Page 26: Rob Crandol, P.E. – Statewide Asphalt Program Manager Asphalt Regional Meetings Asphalt Quality Assurance Program.

Asphalt DensityVirginia Test Method

VTM-76

• Stratified Random Locations - QC– Control Strip– Test Sections

• Cores for Control Strips - IA– 6 cores for new mixes

• 2 cores per site– 2 cores

Page 27: Rob Crandol, P.E. – Statewide Asphalt Program Manager Asphalt Regional Meetings Asphalt Quality Assurance Program.

STRATIFIED RANDOM LOCATIONS

5000 FEET

1000 ft.

1000 FOOT SECTIONS

TEST SECTION

Page 28: Rob Crandol, P.E. – Statewide Asphalt Program Manager Asphalt Regional Meetings Asphalt Quality Assurance Program.
Page 29: Rob Crandol, P.E. – Statewide Asphalt Program Manager Asphalt Regional Meetings Asphalt Quality Assurance Program.

75 ft.

300 ft.

NUMBER OF PASSES

TARGET DENSITY

ROLLER PATTERN CONTROL STRIP

Page 30: Rob Crandol, P.E. – Statewide Asphalt Program Manager Asphalt Regional Meetings Asphalt Quality Assurance Program.
Page 31: Rob Crandol, P.E. – Statewide Asphalt Program Manager Asphalt Regional Meetings Asphalt Quality Assurance Program.

TEST THREE LOCATIONS

1

2

350 FEET

75 FEET

MARK TEST LOCATIONS

ORIENT GAUGE IN SAME DIRECTION

Page 32: Rob Crandol, P.E. – Statewide Asphalt Program Manager Asphalt Regional Meetings Asphalt Quality Assurance Program.

DENSITY vs NUMBER OF PASSES

NUMBER OF PASSES

1 2 3 4 5 6 7 8

144.0143.0142.0141.1

140.0

138.0137.0

139.0

136.0135.0

DENS I TY

(lb/ft3)

Page 33: Rob Crandol, P.E. – Statewide Asphalt Program Manager Asphalt Regional Meetings Asphalt Quality Assurance Program.

Locations of nuclear readings are marked by contractor.

VTM-76

Page 34: Rob Crandol, P.E. – Statewide Asphalt Program Manager Asphalt Regional Meetings Asphalt Quality Assurance Program.

CONTROL STRIP

300 FEET

TAKE READINGS AT LEAST 1 FOOT FROM EDGE OF PAVEMENT

Using 5 roller passes

2

13

4

5

6

7

8

9

10

Page 35: Rob Crandol, P.E. – Statewide Asphalt Program Manager Asphalt Regional Meetings Asphalt Quality Assurance Program.

Core locations are marked for cutting.

VTM-76

Page 36: Rob Crandol, P.E. – Statewide Asphalt Program Manager Asphalt Regional Meetings Asphalt Quality Assurance Program.
Page 37: Rob Crandol, P.E. – Statewide Asphalt Program Manager Asphalt Regional Meetings Asphalt Quality Assurance Program.

Cores are cut …

VTM-76

Page 38: Rob Crandol, P.E. – Statewide Asphalt Program Manager Asphalt Regional Meetings Asphalt Quality Assurance Program.

…and carefully removed.

VTM-76

Page 39: Rob Crandol, P.E. – Statewide Asphalt Program Manager Asphalt Regional Meetings Asphalt Quality Assurance Program.
Page 40: Rob Crandol, P.E. – Statewide Asphalt Program Manager Asphalt Regional Meetings Asphalt Quality Assurance Program.

MINIMUM DENSITY REQUIREMENT

(Bulk Specific Gravity / Max Specific Gravity) * 100

(Table III-3)

Page 41: Rob Crandol, P.E. – Statewide Asphalt Program Manager Asphalt Regional Meetings Asphalt Quality Assurance Program.

TABLE III-3 Density Requirements

Mixture Type Min. ControlStrip Density (%)

SM-9.5A, 12.5A 92.5

SM-9.5D, 12.5D 92.2

SM-9.5E, 12.5E 92.2

IM-19.0A 92.2

IM-19.0D 92.2

 BM-25.0  92.2

 

Note: The control strip density requirement is the percentage of theoretical maximum density at the job-mix formula as determined by Superpave Mix Design.

Page 42: Rob Crandol, P.E. – Statewide Asphalt Program Manager Asphalt Regional Meetings Asphalt Quality Assurance Program.

Calibrated

Same gauge used at Control Strip

Nuclear Gauge

Page 43: Rob Crandol, P.E. – Statewide Asphalt Program Manager Asphalt Regional Meetings Asphalt Quality Assurance Program.

QC Density Test Section

5000 FEET

TAKE READINGS AT LEAST 1 FOOT FROM EDGE OF PAVEMENT

Average of 10 readings (98 – 102% of control strip)

Density Readings 4 or 6 inches from the Joint

2

1 3

4

5

6

7

8

9

10

3 J

3 J

2 J

1 J

1 J

2 J

9 J 10 J

10 J9 J

8 J7 J6 J5 J

5 J4 J 7 J 8 J6 J

4 J

Page 44: Rob Crandol, P.E. – Statewide Asphalt Program Manager Asphalt Regional Meetings Asphalt Quality Assurance Program.

QC Density Test Section

5000 FEET

TAKE READINGS AT LEAST 1 FOOT FROM EDGE OF PAVEMENT

Average of 10 readings (98 – 102% of control strip)

Density Readings 4 or 6 inches from the Joint

2

1 3

4

5

6

7

8

9

10

3 J1 J 2 J 10 J9 J5 J4 J 7 J 8 J6 J

Page 45: Rob Crandol, P.E. – Statewide Asphalt Program Manager Asphalt Regional Meetings Asphalt Quality Assurance Program.

Lot 2

Contractor must cut 2 cores for VST at the direction of VDOT

Lot 5Lot 1 Lot 3 Lot 4

Select one Test Section for VST

Page 46: Rob Crandol, P.E. – Statewide Asphalt Program Manager Asphalt Regional Meetings Asphalt Quality Assurance Program.

VST Density Test Section

5000 FEET

CUT 2 CORES

Referee Procedure - Cut 3 more Cores

use average of all 5 for final decision

2

13

4

5

6

7

8

9

10VST

VST

R-VSTR-VST

R-VST

Page 47: Rob Crandol, P.E. – Statewide Asphalt Program Manager Asphalt Regional Meetings Asphalt Quality Assurance Program.

Lot 16Lot 15

Failing

AfterPreceding

Lot 14 Lot 17Lot 13

Determine Limits

Page 48: Rob Crandol, P.E. – Statewide Asphalt Program Manager Asphalt Regional Meetings Asphalt Quality Assurance Program.

Rob Crandol, P.E. – Statewide Asphalt Program Manager Asphalt

Regional Meetings

Asphalt Quality Assurance

Program