BACKGROUND
• Addition of District Hydraulic Engineer 2005 – Improved coordination with local governments – Improved understanding of local government’s
drainage issues
• Address concerns for roadway project impacts • Proactive position in regards to drainage
2
Acknowledge • TxDOT roadway projects impact
– Add impervious cover-small part of watershed – Pass development storm water runoff – Found in high urban growth areas – Impacts small watersheds and outfalls
• Lack of adequate outfalls in urban areas Proactive approach -Mitigate TxDOT project’s adverse impacts
3
POSSIBLE IMPACTS
• Increase of discharge • Rise of water surface • Increase of velocities • Change of time of concentration • Perception of impact
“We have never flooded until you changed the roadway.”
4
Detention?
• Do we really need to detain TxDOT’s project’s increase of runoff?
• Is the outfall adequate? • Are there any adverse impacts with increased
discharges contributed by TxDOT’s project?
5
Possible Resources • Flooding History
– Maintenance Foreman – Local floodplain administrator – Various county, city, and river authority watershed
committees and staff
• Mapping Tools • FEMA floodplain maps • Aerials
6
Mapping
City of San Antonio GIS Mapping of Flood and Water Resources Data
7
8
Our Goal
• No significant adverse impact • No additional runoff into undersized
outfalls • Detain within existing right of way
– Detention within the storm sewer – Small ponds within right of way – Pipe arrays
9
Determination of Storage
• Calculate the existing and proposed discharges contributed from TxDOT right of way
• Analyze the outfall • Use FHWA HEC 2, Highway Hydrology, Chapter
8 Detention Pond Analysis and Design • Use FHWA HEC 22, Urban Drainage Design
Manual, Chapter 8 Detention and Retention Facilities
10
Triangular Hydrograph
From HDS-2, Chapter 8
11
Ponds IH 410 at San Pedro
12
13
14
IH 35 and SP 422
15
Small Pond within ROW
16
In-Line Detention
17
Pipe Array
18
DOCUMENTATION
19
20
Stage-Storage
21
Questions?