ANALYSIS OF RATES ( Road work )
5/13/2015 9:49
No. Particular Unit Quantity Rate Per Amount
1 Earth work in excavation in ordinary soil
either in embankment or in cutting with an
initial lead of 100 ft. and left of 5 ft. Cft. 1000
Maistry no. 1 no.
Digger no. 7 no.
Worker for carrying no. 7 no.
Sundries L-s L-s
2 Earth work in excavation in soft lateritic,
gravelly or kanker soil either in embankment
or in cutting with an initial lead of 100 ft.and
left of 5 ft. Cft. 1000
Maistry no. 0.5 no.
Digger no. 10 no.
Worker for carrying no. 7 no.
Sundries L-s L-s
3 Earth work in excavation in average lateritic,
gravelly or kanker soil either in embankment
or in cutting with an initial lead of 100 ft. and
lift of 5 ft. Cft. 1000
Maistry no. 0.625 no.
Digger no. 14 no.
Worker for carrying no. 8 no.
Sundries L-s L-s
4 Earth work in excavation in hard latritic,
gravelly or kanker soil either in embankment
-
or in cutting with an initial lead of 100 ft. and
lift of 5 ft. Cft. 1000
Maistry no. 0.75 no.
Digger no. 21 no.
Worker for carrying no. 10 no.
Sundries L-s L-s
5 Excavation in soft rock including carrige of
stone for 50 ft. Cft. 100
Miner no. 1 no.
Workers for carrying no. 4.5 no.
Smiths no. 0.25 no.
Bellow boy no. 0.25 no.
Sundries L-s L-s
6 Excavation in hard rock by blasting
including removing stones. Cft. 100
Blasting powder lbs. 3 lbs.
Charcoal lbs. 10 lbs.
Miners no. 5 no.
Workers no. 5.5 no.
Black smiths no. 0.25 no.
Bellow boy no. 0.5 no.
Hammer man no. 0.5 no.
Sundries L-s L-s
7 Collection of soling stones ( local ) at the
quarry site. Cft. 100
Hammer man no. 1 no.
Workers ( collection and stacking ) no. 5 no.
Sundries L-s L-s
-
8 Collection of soling stones ( kanker ) at the
quarry site. Cft. 100
Hammer man no. 1 no.
Workers ( collection and stacking ) no. 4 no.
Sundries L-s L-s
9 Collection of soling stones (laterite bouldre)
at the quarry site. Cft. 100
Hammer man no. 1 no.
Workers no. 4 no.
Sundries L-s L-s
10 Breaking metal from boulders ( 1-1/2" to 2")
at the quarry site. Cft. 100
Hammer man no. 1 no.
Workers for getting out boulder no. 2 no.
Workers for breaking no. 7 no.
Sundries L-s L-s
11 Collection and conversion of blasted debris
to 6" to 9" soling stones at the quarry site. Cft. 100
Hammer man no. 1 no.
Workers ( collection and stacking ) no. 2 no.
Sundries L-s L-s
12 Collection and conversion of blasted debris
to metal at the quarry site. Cft. 100
Hammer man no. 1.5 no.
Workers ( collection and stacking ) no. 3 no.
Sundries L-s L-s
-
13 Breaking metal ( 2" x 4" ) from boulders at
the quarry site including boxing. Cft. 100
Hammer man no. 2 no.
Workers for boxing no. 1 no.
Sundries L-s L-s
14 Breaking and boxing 1-1/2" to 2" from 2" to
4" metal at the quarry site. Cft. 100
Workers for breaking and boxing no. 2 no.
Sundries L-s L-s
15 Breaking and boxing 1/4" to 3/4" chippings
from 1-1/2" to 2" metal at the quarry site. Cft. 100
Workers for breaking and boxing no. 15 no.
Sundries L-s L-s
16 Breaking 1/4" to 3/4" chipping from 2" to 4"
metal at the quarry site. Cft. 100
Workers for breaking and boxing no. 17 no.
Sundries L-s L-s
17 Collection of kanker or laterite gravel at the
quarry site. Cft. 100
Workers for digging and boxing no. 3 no.
Sundries L-s L-s
18 Collestion of hill gravel at quarry site. Cft. 100
Workers no. 4 no.
Sundries L-s L-s
-
19 Extraction of 1-5"to 2"stone metal including
blasting and breaking to size at the quarry
site. Cft. 100
Blasting powder lbs. 3 lbs.
Charcoal lbs. 10 lbs.
Miners no. 5 no.
Blacksmiths no. 0.25 no.
Bellows boy no. 0.25 no.
Hammer man no. 1 no.
Worker for breaking and stacking no. 11 no.
20 Laterite metal 2-1/2" gauge at quarry site. Cft. 100
Worker for quarrying no. 2 no.
Hammer man no. 1 no.
Worker for breaking and stacking no. 5 no.
21 Extraction of 3/4"to 1"stone metal including
blasting and breaking to size at the quarry
site. Cft. 100
Blasting powder lbs. 3 lbs.
Charcoal lbs. 10 lbs.
Miners no. 5 no.
Blacksmiths no. 0.25 no.
Bellows boy no. 0.25 no.
Hammer man no. 1 no.
Worker for breaking and stacking no. 11 no.
22 Extraction of 1/4"to3/4" gauge stone
chipping including blasting and breaking to
size at the quarry site. Cft. 100
Blasting powder lbs. 3 lbs.
Charcoal lbs. 10 lbs.
-
Miners no. 5 no.
Blacksmiths no. 0.25 no.
Bellows boy no. 0.25 no.
Hammer man no. 1 no.
Worker for breaking and stacking no. 16 no.
23 Collection of boulders from river bed for
soling within two furlongs. Cft. 100
Worker for collection and stocking no. 6 no.
24 Breaking metal 1-1/2" to 2" gauge river
shingle within two furlongs. Cft. 100
Worker for colluction no. 3 no.
Worker for breaking and stacking, etc. no. 4 no.
Sundries L-s L-s
25 Colluction of river shingle chippings 1/2" to
3/4" within two furlongs lead. Cft. 100
Worker for colluction no. 4 no.
Worker for breaking and stacking, etc. no. 6 no.
Sundries L-s L-s
26 Breaking brick into 1-1/2" to 2" aggregate. Cft. 100
Jama bricks no. 1000 no.
Worker for breaking and stacking, etc. no. 5 no.
Sundries L-s L-s
27 Colluction of sand within one mile lead. Cft. 100
Bullock cart with driver no. 1 no.
Worker for digging, carrying, loading and
unloading. no. 2 no.
-
Sundries L-s L-s
28 Colluction of gravel within one mile lead. Cft. 100
Bullock cart with driver no. 1 no.
Worker for digging, carrying, loading and
unloading. no. 4 no.
Sundries L-s L-s
29 Working expenses for a steam roller per
day. Day. 1
Lubricating oil, cotton waste, kreosene, L-s L-s
soap, asbestos pacing, etc.
Fire wood Cft. 36 Cft.
Driver no. 1 no.
Fireman no. 1 no.
Night durwan no. 1 no.
Cart for carrying fuel and water no. 2 no.
Repairs to chain and roller L-s L-s
Washing out boiler and cleaning engine L-s L-s
Sundries L-s L-s
30 Working expenses for a motor roller per day Day. 1
Petrol Gal. 0.1667 Gal.
Krosene oil Gal. 6 Gal.
Lubricating oil, cotton waste L-s L-s
Engine driver no. 1 no.
Cleaning and rest L-s L-s
Night durwan no. 1 no.
Water cart no. 1 no.
Sundries L-s L-s
31 Consolidation of 6" soling stone by steam
roller after hand packing. Cft. 1000
-
Steam roller charges Day. 1 Day.
Maistry no. 1 no.
Workers no. 21 no.
Sundries L-s L-s
32 Consolidation of stone metal with steam
including sand blinding ( 4-1/2" coat ). Cft. 1200
Steam roller charges Day. 1 Day.
Sand for blinding Cft. 133 Cft.
Maistry no. 1 no.
Workers no. 14 no.
Sundries L-s L-s
33 Scarifying old metal 2" deep, 12' wide,
screening, respreading and rolling with a
steam roller including sand blinding. Cft. 3300
Steam roller charges Day. 1 Day.
Sand for blinding Cft. 137 Cft.
Maistry no. 1 no.
Workers no. 19 no.
Sundries L-s L-s
34 2"thick hot bitumen grouting blinded with
1/4" to 1/2" stone chippings. Sft. 63360
Bitumen at 100 lb per % Sft. Ton. 32 Ton.
Railway freight on above Ton. 32 Ton.
Carriage to site Ton. 32 Ton.
1/2" to 3/4" chipping site Cft. 4000 Cft.
Wood fuel Cft. 922 Cft.
Labour for brushing old surface,spraying, no. 380 no.
spreading,etc.
Rolling charges steam roller Day. 16 Day.
-
Hire for boiler sprayers, ect. Day. 12 Day.
Wire and bristle brushes L-s L-s
Miscellaneous camber board L-s L-s
35 Hot bitumen surface dressing ( 1st coat )
blinded with 1/4" to 1/2" stone chippings. Sft. 63360
Bitumen at 40Lbs.per % Sft. Tons. 12.79 Tons.
Railway freight on above Tons. 12.79 Tons.
Carriage to site Tons. 12.79 Tons.
1/2" to 3/4" chipping site Cft. 4000 Cft.
Wood fuel Cft. 369 Cft.
Labour for brushing old surface, spraying, no. 380 no.
spreading, etc.
Rolling charges steam roller Day. 16 Day.
Hire for boiler spraier, etc. Day. 12 Day.
Wire and bristle brushes L-s L-s
Miscellanous camber board, etc. L-s L-s
36 Hot bitumen surface dressing ( 2nd coat )
blinded with 1/4" to 1/2" stone chippings. Sft. 63360
Bitumen at 25Lbs.per % Sft. Tons. 8 Tons.
Railway freight on above Tons. 8 Tons.
Carriage to site Tons. 8 Tons.
1/2" to 3/4" chipping site Cft. 2650 Cft.
Wood fuel Cft. 230 Cft.
Labour for brushing old surface, spraying, no. 320 no.
spreading, etc.
Rolling charges steam roller Day. 16 Day.
Hire for boiler spraier, etc. Day. 12 Day.
Wire and bristle brushes L-s L-s
Miscellanous camber board, etc. L-s L-s
37 1" ( Consolidated tuicrness ) premix carpet. Sft. 63360
-
Labour for brushing road surface no. 330 no.
Printing coat.
Bitumen at 20 lbs.per % Sft. Tons. 6.4 Tons.
Main carpet.
1/2" to 3/4" stone 3400 Cft. Cft. 5100 Cft.
3/8" to 1/2" stone 1700 Cft.
Bitumen at 4 lbs.per Cft. Tons. 10.29 Tons.
Sand at 5% of stone Cft. 255 Cft.
Bitumen for sand at 0.25 lbs.per Cft. Tons. 0.03 Tons.
Wearing Course.
1/4" to 1/2" chips at 3 Cft.per 100 Sft. Cft. 1900 Cft.
1/8" to 1/4" Chips
Bitumen at 35 lbs.per % Sft. Tons. 11.19 Tons.
Sand for final coat at 2 Cft.per % Sft. Cft. 1300 Cft.
Railway freight for bitumen Tons. 27.91 Tons.
Carriage to site Tons. 27.91 Tons.
Wood fire Cft. 804 Cft.
Labour for spreading, spraying, etc. no. 500 no.
Road roller charges M. Coat Day. 16 Day.
Road roller charges W. Coat Day. 4 Day.
Hire for boiler, etc. Day. 16 Day.
Wire and bristle brushes L-s L-s
Miscellaneous, tools & plant, camber board L-s L-s
38 2" ( Consolidated tuicrness ) premix carpet. Sft. 63360
Labour for brushing road surface no. 300 no.
Main carpet.
1" to 1-1/4" stone 7670 Cft. Cft. 11500 Cft.
1/4" to 3/4" stone 3830 Cft.
Bitumen at 3 lbs.per Cft. Tons. 20.31 Tons.
Sand at 5% of stone Cft. 575 Cft.
-
Bitumen for sand at 0.25 lbs.per Cft. Tons. 0.07 Tons.
Topping course.
1/2" to 3/4" chipping at 4.5 Cft.per 100 Sft. Cft. 3200
1/4" to 1/2" chipping bitumen at 4lb.per Cft. Tons. 6.45
Wearing Course.
1/4" to 1/2" chips at 4.5Cft.per 100 Sft. Cft. 2900 Cft.
1/8" to 1/4" Chips
Bitumen at 25 lbs.per % Sft. Tons. 8 Tons.
Sand for final coat at 2 Cft.per % Sft. Cft. 1300 Cft.
Railway freight for bitumen Tons. 34.83 Tons.
Carriage to site Tons. 34.83 Tons.
Wood fire Cft. 1065 Cft.
Labour for spreading, spraying, etc. no. 1000 no.
Road roller charges M. Coat Day. 25 Day.
Road roller charges W. Coat Day. 4 Day.
Hire for boiler, etc. Day. 25 Day.
Wire and bristle brushes L-s L-s
Miscellaneous, tools & plant, camber board L-s L-s
39 Liquid seal coat 1 mile x 12' = 63360 Sft. Sft. 63360
Bitumen for liquid seal coat at 1/4 Gal.per Tons. 9.25 Tons.
Sq. yard at 215 gallons a tons.1760 gallons
and wastage.
Freight on bitumen Tons. 9.25 Tons.
Carriage on bitumen Tons. 9.25 Tons.
Wood fuel for heating bitumen Cft. 267 Cft.
Labour for spraying no. 90 no.
3/8" grit or coarse sand for binding Cft. 1800 Cft.
Labour for spreading sand no. 40 no.
Steam road roller charges Day. 10 Day.
hire for boiler for heating bitumen Day. 6 Day.
Incidental charges such as L-s L-s
brushes,pouring can, oil , etc.
-
Remark
m 1cum 100 cum
28.31685 1 100
1 0.035315 3.531466
Task=140 Cft. 7 0.247203 24.72026
for 1 Digger. 7 0.247203 24.72026
Task=100 Cft.
for 1 Digger.
m 1cum 100 cum
28.31685 1 100
0.625 0.022072 2.207166
14 0.494405 49.44053
8 0.282517 28.25173
-
plain section
only ( outter in
hill section =
70 Cft. )
-
wood fuel req-
uired for a ste-
am roller for 1
day work is1/6
fathom or 36
Cft.=10Cwt.
1120 lb. If coal
is used 5Cwt.
or 560 lb. Is
necessary.
-
13%Wastage
13%Wastage
-
13%Wastage
13%Wastage
13%Wastage
13%Wastage
13%Wastage
-
13%Wastage
13%Wastage
13%Wastage