08 09 PRESTONS ROAD VX-XX LEGEND: STAGE BOUNDARY STAGE O BOUNDARIES VACUUM MAINS PE100 PN12.5 SDR13.6 90OD 125OD 200OD 250OD 280OD FLOVAC VACUUM INTERFACE VALVE ECCENTRIC REDUCER DIVISION VALVE MAINTENANCE RISER VACUUM SEWER VENT INTAKE PILLAR CONCRETE CAPPING LIFT 160 VEHICLE CROSSING SEE NOTE 6 ROAD T2 ROAD FS1 ROAD FS1 ROAD S2 ROAD T1 ROAD G2 ROAD G3 ROAD N1 119 148 118 159 131 130 129 128 127 126 125 132 133 134 135 136 137 138 169 154 168 167 155 156 166 165 157 158 164 207 208 175 174 145 176 144 177 143 142 178 141 179 147 122 146 120 140 121 153 196 173 172 197 198 171 170 199 189 185 186 187 188 123 124 110 111 112 113 114 115 117 116 160 161 163 162 184 183 182 181 180 152 151 P O O SS3.10 SS3.18 SS3.17 SS3.16 SS3.15 SS3.14 0.7 1.0 Ø RCRRJ CLASS 2 SN8 SN8 300Ø uPVC SN8 MH 3D.1 LL=13.32 IL=12.06(DS) MH 3C.1 LL=13.13 IL=11.87(DS) MH 3A.9 LL=13.25 IL=11.87(DS) SS4.12 SS4.13 SS4.09 SS4.08 SS4.07 SS4.06 SS4.17 SS4.05 SS4.19 SS4.18 SS4.04 SS4.15 SS4.03 0.7 0.8 0.7 1.0 MH 3A.10 LL=13.44 IL=12.12(DS) 225Ø uPVC SN8 300Ø uPVC SN8 525Ø RCRRJ CLASS 2 450Ø RCRRJ CLASS 2 600Ø RCRRJ CLASS 2 600Ø RCRRJ CLASS 2 OUTLET 4A.1 IL=11.02 DS4.01 525Ø RCRR 525Ø RCRRJ CLASS 2 600Ø RCRRJ CLASS 2 600Ø RCRRJ CLASS 2 MH 4A.4 LL=12.89 IL=11.19(DS) MH 4A.6 LL=13.19 IL=11.52(DS) MH 4A.7 LL=13.43 IL=11.80(DS) MH 4A.5 LL=13.13 IL=11.34(DS) MH 4A.2 LL=12.90 IL=11.06(DS) OUTLET 4D.1 LL=11.29 IL=10.46(DS) MH 4D.2 LL=12.88 IL=10.39(DS) MH 4A.8 LL= 13.31 IL=11.99(DS) MH 4A.3 LL=13.02 IL=11.15(DS) MH 4C.1 LL=13.47 IL=12.10(DS) MH 4B.1 LL= 13.08 IL=11.77(DS) 375Ø RCRRJ CLASS 2 SS3.13 SS3.12 DS4.20 675 Ø 675 Ø 450 Ø RCRRJ C2 DS5.11 DS5.10 DS5.06 DS5.01 SS5.08 SS5.09 SS5.04 SS5.07 SS5.02 SS5.03 450 Ø RCRRJ C2 675 Ø DS5.12 OUTLET 5A.1 BUBBLE UP MANHOL IL=10.00 675 Ø 675 Ø 600 Ø 300 Ø MH 5A.3 LL=12.74 IL=10.69(DS) MH 5A.2 LL=12.89 IL=9.92(DS) MH 5A.4 LL=12.74 IL=10.69(DS) MH 5A.5 LL=12.89 IL=10.84(DS) MH 5A.6 LL=13.08 IL=11.05(DS) MH 5A.7 LL=13.04 IL=11.11(DS) MH 5A.8 LL=13.18 IL=11.62(DS) MH 5A.9 1.0 1.3 2.6 0.5 3.1 1.4 1.0 0.9 0.9 0.7 1.3 0.7 0.7 1.0 0.7 0.8 0.7 1.1 0.8 1.0 1.2 1.0 0.8 0.7 RCRRJ C2 RCRRJ C2 RCRRJ C2 RCRRJ C2 RCRRJ C2 RCRRJ C2 uP 1.3 1.5 1.2 1.1 0.7 1.0 1.1 DN110 NOVAFLO DRAINAGE PIPE IN FRONT OF RETAINING WALL 12.90 12.70 12.60 12.70 13.00 12.90 12.90 12.50 12.40 12.50 12.40 12.40 12.80 12.60 13.00 DN300 uPVC SN8 1.2 0.9 4.6 4.8 CLIENT PRESTONS PARK DATE TITLE REVISION DETAILS DATE REV APPROVED CHECKED APPROVED PROJECT DRAWN DESIGNED 235361 PROJECT No. SCALE SIZE DRAWING No. REV A1 0 SCALE 1:500 5 10 20m SHEET LAYOUT: STAGE 1 - SUBSTAGE P STORMWATER AS BUILT LAYOUT PLAN SHEET 2 OF 2 AB-PS-S1-SP-09 4 AS SHOWN AS BUILT J.ANDRELL J.ANDRELL J.TUCKER K.ASHBY K ASHBY 04/11/16 1 04/11/16 AS BUILT K.ASHBY 2 17/11/16 AS BUILT K.ASHBY 3 23/11/16 AS BUILT AND SPREADSHEET UPDATE K ASHBY 4 24/11/16 REISSUE SPREADSHEET UPDATE MH 3A.10 K ASHBY This AS BUILT drawing has been prepared based on Information provided by the contractor "KB Contracting".