11 of 2012 Page 01 of 07 AIRAC AIP SUPPLEMENT Civil Aviation Authority of Nepal AIP Supplement 0 [EFFECTIVE 28 JUNE 2012] RNP AR (Authorization Required) approach procedure at TRIBHUVAN INTERNATIONAL AIRPORT (VNKT) 1. INTRODUCTION 1.1 This RNP AR [RNAV (RNP)] Approach Procedure is designed for VNKT in accordance with the criteria as stipulated in the ICAO PANS-OPS (DOC 8168) Vol. II and ICAO RNP AR Manual (DOC 9905). 1.2 A full arrival, approach and missed approach strategy have been designed for Runway 02 by Quovadis, an Airbus Subsidiary Company whose logo will appear on the STAR and RNP AR Approach Procedure Chart. 1.3 The RNAV (RNP) Instrument Approach Procedure to VNKT is designed to enhance the overall safety of the operation by facilitating the aircraft energy management and to improve the airport access, while taking into account ATC constraints. 2. APPROVED USERS, EQUIPMENT AND OPERATIONS 2.1 For the VNKT RNAV (RNP) Instrument Approach Procedure, the operators shall ensure that they hold the all necessary operational approvals as part of the Operations Specifications of the AOC from its authority including the Baro VNAV Approval in order to conduct the RNAV (RNP) Approach to VNKT. (Ref to ICAO PBN Manual, Doc 9613) 2.2 The operator must have a Special Authorization from its authority in order to use the RNP AR approaches to VNKT. (Ref to EASA AMC 20-26, FAA AC 90-101A or equivalent) TEL: 977-1-4266139 4262518 FAX: 977-1-4262516 AFTN: VNKTYAYX COMM: AIR CIVIL Email: [email protected][email protected]NEPAL AERONAUTICAL INFORMATION SERVICE CIVIL AVIATION AUTHORITY OF NEPAL BABARMAHAL KATHMANDU AIRAC S011/12 03 MAY 2012 This AIP supplement is issued for information, guidance and necessary action. The following RNP AR procedure has been introduced to enhance the operations in Tribhuvan International Airport, Kathmandu, Nepal. It will provide the operators with a trajectory easy to manage together with lower minima. TRI RATNA MANANDHAR DIRECTOR GENERAL CIVIL AVIATION AUTHORITY OF NEPAL
7
Embed
RNP AR (Authorization Required) approach procedure … 2011... · RNP AR (Authorization Required) approach procedure at ... 1. INTRODUCTION 1.1 This RNP AR [RNAV ... ATC shall be
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
11 of 2012 Page 01 of 07
AIRAC AIP SUPPLEMENT
Civil Aviation Authority of Nepal AIP Supplement 0
[EFFECTIVE 28 JUNE 2012]
RNP AR (Authorization Required) approach procedure at
TRIBHUVAN INTERNATIONAL AIRPORT (VNKT)
1. INTRODUCTION
1.1 This RNP AR [RNAV (RNP)] Approach Procedure is designed for VNKT in accordance
with the criteria as stipulated in the ICAO PANS-OPS (DOC 8168) Vol. II and ICAO RNP
AR Manual (DOC 9905).
1.2 A full arrival, approach and missed approach strategy have been designed for Runway
02 by Quovadis, an Airbus Subsidiary Company whose logo will appear on the STAR
and RNP AR Approach Procedure Chart.
1.3 The RNAV (RNP) Instrument Approach Procedure to VNKT is designed to enhance the
overall safety of the operation by facilitating the aircraft energy management and to
improve the airport access, while taking into account ATC constraints.
2. APPROVED USERS, EQUIPMENT AND OPERATIONS
2.1 For the VNKT RNAV (RNP) Instrument Approach Procedure, the operators shall ensure
that they hold the all necessary operational approvals as part of the Operations
Specifications of the AOC from its authority including the Baro VNAV Approval in order
to conduct the RNAV (RNP) Approach to VNKT. (Ref to ICAO PBN Manual, Doc 9613)
2.2 The operator must have a Special Authorization from its authority in order to use
the RNP AR approaches to VNKT. (Ref to EASA AMC 20-26, FAA AC 90-101A or