REGIONAL MUNICIPALITY OF WOOD BUFFALO WOOD BUFFALO 2012 CAPITAL PROGRAM FMCA: “Future Projects Summit”- March 29, 2012
19

RMWB 2012 Future Projects Summit Presentation

Mar 08, 2016

Download

Documents

Lana Maloney

RMWB 2012 Future Projects Summit Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: RMWB 2012 Future Projects Summit Presentation

REGIONAL MUNICIPALITY OF WOOD BUFFALOWOOD BUFFALO

2012 CAPITAL PROGRAMFMCA: “Future Projects Summit”- March 29, 2012

Page 2: RMWB 2012 Future Projects Summit Presentation

Presentation Summaryy

• Brief Outline of the 2012 Capital Projects Plan

• Overview of future Capital Projects of Interest• Overview of future Capital Projects of Interest

Page 3: RMWB 2012 Future Projects Summit Presentation

2012 CAPITAL PROJECTS2012 CAPITAL PROJECTS

Page 4: RMWB 2012 Future Projects Summit Presentation

2012 Capital Project Tenders44 projects anticipated for tender

Project Categories:• Transportation (New) • Environmental

• Water• Wastewater

• Road Rehabilitation• Facilities• Facilities

Page 5: RMWB 2012 Future Projects Summit Presentation

Wastewater13

Transportation1513

30%15

34%

Water2

4%Road

Rehabilitation11

Facilities3

4%

1125%7%

2012 Capital Projects by Category

Page 6: RMWB 2012 Future Projects Summit Presentation

Urban3636

82%

Rural8

18%

2012 C t ti P j t b R i

18%

2012 Construction Projects by Region

Page 7: RMWB 2012 Future Projects Summit Presentation

Fort McMurray

Fort Chipewyan McMurray

3682%

Chipewyan3

7%

Fort MacKayAnzacConklin

11

2%3

7%2%

2012 Rural Capital Projects

Page 8: RMWB 2012 Future Projects Summit Presentation

TransportationTransportation

• Prairie Loop Boulevard• Fort MacKay Bridge Replacement• Saline Creek Drive and Bridge (Bridge and Road)• Parsons Creek West Access Road

T it H t d B Sh lt /T it H b• Transit Heated Bus Shelter/Transit Hub• Fort Chipewyan Firebag River Bridge Replacement• Fort Chipewyan Richardson River Bridge Replacement• Fort Chipewyan Richardson River Bridge Replacement• Highway 69 Twinning – Phase 2

Page 9: RMWB 2012 Future Projects Summit Presentation

Road RehabilitationRoad Rehabilitation

• Urban Infrastructure Rehabilitation 2011-2013• Franklin Avenue Revitalization

Page 10: RMWB 2012 Future Projects Summit Presentation

Environmental – WaterEnvironmental Water

• Thickwood Reservoir Replacement

Page 11: RMWB 2012 Future Projects Summit Presentation

Environmental – WastewaterEnvironmental Wastewater

• Lift Station Upgrades (South)

A W t t T t t Pl t & Effl t Li• Anzac Wastewater Treatment Plant & Effluent Line

• Septage Receiving Station

• Saline Creek Outfall Sewer to Mills Avenue

• Low Pressure Sewer System for Highway 63 North

• Airport Sewer Construction

Page 12: RMWB 2012 Future Projects Summit Presentation

FacilitiesFacilities

• Urban & Rural Cemetery Development• Anzac Multi-Use Facility and Rural Core Amenities

Page 13: RMWB 2012 Future Projects Summit Presentation

Total Value of Multi-Year Projectsj

Transportation (New) $131 million

Road Rehabilitation $97 million

E i t W t $18 illiEnvironment - Water $18 million

Environmental - Wastewater $131 million

Facilities $27 million

Total $404 million

Page 14: RMWB 2012 Future Projects Summit Presentation

Tender DistributionTotal Value of Multi-Year Projectsj

$107

$79 $100

$120

10

12

llions

osin

g

$42$40

$79

$60

$80

6

8

Mi

ders

Clo

$42

$45$39

$2$24 $2

$1 $20

$40

$60

2

4

6

of T

end

$0

$ $1$0

$0

$20

0

2

No.

14

Page 15: RMWB 2012 Future Projects Summit Presentation

CONTINUING TO PLAN FORCONTINUING TO PLAN FOR OUR FUTURE

Page 16: RMWB 2012 Future Projects Summit Presentation

Oil Sands Outlook

• Oil production is expected to rise from the current 1.8 million pbd to 6 9 million bpd over the next 20 yearsmillion pbd to 6.9 million bpd over the next 20 years.

• It is expected that as many as 53,000 operational jobs could exist in the region. g

• The projected population for 2030 is almost 250,000 people.

16

Page 17: RMWB 2012 Future Projects Summit Presentation

Future Capital Projects (2013-2015)p j ( )

• Lower Townsite Booster Station

U b I f t t R h bilit ti 2013• Urban Infrastructure Rehabilitation – 2013

• Southwest Water Supply Line

• Firehall Construction (Parson’s Creek, Saline Creek, Anzac, Fort MacKay, and Saprae Creek)

Waste ater Treatment Plant Impro ements• Wastewater Treatment Plant Improvements

• Highway 69 / 63 & Mackenzie Boulevard/ HWY 63 Intersection Improvements

17

Intersection Improvements

• South Regional Water Treatment Plant

Page 18: RMWB 2012 Future Projects Summit Presentation

Future Capital Projects (2013-2015)p j ( )

• Thickwood Heights/Timberlea Multi-Use Facility• Conklin Community Centre• Richardson River Bridge Construction• The City Center Catalyst Projects• Green Utilities Project

18

Page 19: RMWB 2012 Future Projects Summit Presentation

Questions?Email: [email protected]

or visitdb ff l bwww.woodbuffalo.ab.ca

for more information.