RMMC Vision 2020 Weekly Update Pleiades Building Project December 8, 2014 WHAT’S BEEN DONE BUILDING PROJECT • Pleiades Spring was measured at 4.2 gpm on 12/3, meaning we’re pumping about 6,000 gallons per day. Installed a backup pump ready to take over automatically if necessary, and are working on an alarm system to help monitor the pumping. • Dug and poured three concrete piers for the big deck and the residence airlock on 12/4, in spite of 30” of frost. • Windows and doors have been delivered. • Moved the five 1100 gallon water tanks into the crawlspace. • Installed the old Pleiades furnace as a construction heater for the building, with Brian Leatherman’s assistance. • Installed fascia and roof edge support on the north end gable, and began work on the corbel beams. KITCHEN / HK / OFFICE / MAINTENANCE • 47 meals served for volunteers WHO’S BEEN HELPING BUILDING PROJECT • Sam Hershberger • Matt Layman • Brian Leatherman • Harlow Schmidt • Leon Stutzman • Ardell Swartzendruber • Lyonell Unruh • Ron Weaver • Roger White WHAT NEEDS DOING BUILDING PROJECT • Install exterior foam insulation and OSB stucco backing KITCHEN / HK / OFFICE / MAINTENANCE • Meals for volunteers • Volunteers help for weekend retreats and guest groups: Dec 27 - Wedding Dec 28-30 - Youth Group Jan 16-18 - Scrapbook Retreat Jan 23-25 - Jr High Snow Camp Feb 13-15 - Sr High Snow Camp I Feb 27-Mar 1 - Men’s Retreat Mar 6-8 - FMC Denver Venture Club and Pine Creek Girls Soccer Team Mar 13-15 - Sr High Snow Camp II