7/28/2019 RLR Hanson 041013
1/35
Red Lake River WatershedRestoration and Protection Project
April 2013
Stakeholders U date Meetin
7/28/2019 RLR Hanson 041013
2/35
Red Lake River
-
7/28/2019 RLR Hanson 041013
3/35
7/28/2019 RLR Hanson 041013
4/35
Im ortance of the Red Lake River
7/28/2019 RLR Hanson 041013
5/35
History of Red Lake River Waterua ty Montor ng
RLWD Soil andWater Conservation
Districts, International Water Institute, RiverWatch USGS Red Lake DNR MPCA
7/28/2019 RLR Hanson 041013
6/35
Red Lake River WRAP Project
$150,000+ for Phase I$100,000 for Phase II$100,000 for the developmentof a HSPF Model of theWatershed$86,514 Surface Water
Assessment Grant
7/28/2019 RLR Hanson 041013
7/35
7/28/2019 RLR Hanson 041013
8/35
Assessment of Water Qualit Data
7/28/2019 RLR Hanson 041013
9/35
Water Qualit Monitorin SurfaceWater
7/28/2019 RLR Hanson 041013
10/35
Continuous Water QualityMonitoring
7/28/2019 RLR Hanson 041013
11/35
Continuous Water QualityMonitoring
KrippleCreek
7/28/2019 RLR Hanson 041013
12/35
Continuous Water Quality Monitoring
Burnham Creek
7/28/2019 RLR Hanson 041013
13/35
Continuous Water Quality Monitoring
Black River
7/28/2019 RLR Hanson 041013
14/35
Continuous Water Quality Monitoring
GentillyCreek
7/28/2019 RLR Hanson 041013
15/35
Stage and Flow Monitoring
7/28/2019 RLR Hanson 041013
16/35
Biological Monitoring
7/28/2019 RLR Hanson 041013
17/35
7/28/2019 RLR Hanson 041013
18/35
7/28/2019 RLR Hanson 041013
19/35
Species Presence
29 8
197
16
10
101
7/28/2019 RLR Hanson 041013
20/35
Stream Channel Stability
Assessment (Geomorphology)
7/28/2019 RLR Hanson 041013
21/35
7/28/2019 RLR Hanson 041013
22/35
7/28/2019 RLR Hanson 041013
23/35
Lori Clark of RMB Environmental
Laboratories, has been hired as asubcontractor
Expansion of public outreach and
7/28/2019 RLR Hanson 041013
24/35
LIDAR Terrain Analysis
ream ower n ex eveopmen
7/28/2019 RLR Hanson 041013
25/35
LIDAR Terrain Analysis
ream ower n ex eveopmen
7/28/2019 RLR Hanson 041013
26/35
LIDAR Terrain Analysis
ream ower n ex eveopmen
7/28/2019 RLR Hanson 041013
27/35
LIDAR Terrain AnalysisStream Power Index Development
7/28/2019 RLR Hanson 041013
28/35
Water Qualit Modelin - SWAT SWAT Com leted
7/28/2019 RLR Hanson 041013
29/35
HSPF Modeling
7/28/2019 RLR Hanson 041013
30/35
Restoration Plans
ro ec on ans TMDL restoration re ort for each
impairment that isverifieddiscovered from availablemonitoring data
reaches that arent impaired.
sources that we find whether there is anofficial TMDL or no
7/28/2019 RLR Hanson 041013
31/35
Addresses Point and Nonpoint
Equation Expressed in pounds, tons , or number
of organisms
Regulatory teeth of the programlimited to MPCA ermittin rocesses
7/28/2019 RLR Hanson 041013
32/35
Wastewater treatment facilities
Stormwater permits Special conditions in stormwaterpermits (BMPs)
Desi nated MS4 Cit StormwaterPermitting
7/28/2019 RLR Hanson 041013
33/35
Re uiredb theUnitedStates
Environmental Protection Agency
established in Minnesota State statutes.
reams assesse w oca co ec edata
Lots of money involved in theestablishment of TMDLs and carrying-out mpementaton pans
7/28/2019 RLR Hanson 041013
34/35
Restoration Funding for Projects
Example: Lower Otter Tail Turbidity TMDL
,
>$1,000,000 in total funding
7/28/2019 RLR Hanson 041013
35/35
2013 Plans
FinishPhaseI startPhaseII
Finish SWAG Sampling ssove ox en o ers n e
Upper Red Lake River, JD60, CD96,an rowns ree or r ppe ree
Flow Measurements
Follow-up geomorphology work