This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
P:\605X\60553307\8. Issued Docs\8.1 Reports\190607 Stages 3b to 3f completion report Revision 1.docx Revision 1 – 07-Jun-2019 Prepared for – Perjuli Developments Limited – Co No.: 1714295
River Terraces
Perjuli Developments Limited
07-Jun-2019
Doc No. Document No
River Terraces Subdivision, Ngaruawahia
Stages 3b - 3f and NZS4404:2010 Schedule 2a Completion Report
AECOM
River Terraces
River Terraces Subdivision, Ngaruawahia – Stages 3b - 3f and NZS4404:2010
Schedule 2a Completion Report
P:\605X\60553307\8. Issued Docs\8.1 Reports\190607 Stages 3b to 3f completion report Revision 1.docx Revision 1 – 07-Jun-2019 Prepared for – Perjuli Developments Limited – Co No.: 1714295
River Terraces Subdivision, Ngaruawahia
Stages 3b - 3f and NZS4404:2010 Schedule 2a Completion Report
Client: Perjuli Developments Limited
Co No.: 1714295
Prepared by
AECOM New Zealand Limited
121 Rostrevor Street, Hamilton 3204, PO Box 434, Waikato MC, Hamilton 3240, New Zealand
T +64 7 834 8980 F +64 7 834 8981 www.aecom.com
In association with
Prepared With
07-Jun-2019
Job No.: 60553307
AECOM in Australia and New Zealand is certified to the latest version of ISO9001, ISO14001, AS/NZS4801 and OHSAS18001.
7.0 Subdivision earthworks 4 7.1 General 4 7.2 Cut to Fill 5 7.3 Placement and compaction 5 7.4 Pavements and trenches 5
8.0 Building and site development recommendations 5 8.1 General 5 8.2 Liquefaction resilience 6 8.3 Foundation recommendations 6 8.4 Site works and retaining walls 8
9.0 Stormwater management assessment 9 9.1 Soakage system requirements 9
Appendix B B Post Construction Site Investigation B
Appendix C C CPT Logs C
Appendix D D Liquefaction Assessment D
Appendix E E Construction records E
Appendix F D Schedule 2A Certificate D
AECOM
River Terraces
River Terraces Subdivision, Ngaruawahia – Stages 3b - 3f and NZS4404:2010
Schedule 2a Completion Report
P:\605X\60553307\8. Issued Docs\8.1 Reports\190607 Stages 3b to 3f completion report Revision 1.docx Revision 1 – 07-Jun-2019 Prepared for – Perjuli Developments Limited – Co No.: 1714295
i
Executive Summary
AECOM New Zealand Limited (AECOM) has been engaged by Perjuli Developments Limited to prepare a geotechnical completion report for The River Terraces Subdivision.
This report summarises the results of geotechnical investigations completed for Stages 3B, 3C, 3D, 3E, and 3F of the subdivision, outlines the earthworks undertaken and provides a preliminary opinion as to the likely geotechnical requirements for building development on the subdivision lots.
Site investigations comprised of Cone Penetrometer Tests (CPT) and hand augers with accompanying in-situ soil strength testing such as Dynamic Cone Penetrometers (DCP) and shear vanes. Ground conditions consisted of topsoil overlying a sand and silt dominated profile with loose to dense granular materials and stiff to hard cohesive materials. Groundwater was not encountered within any investigation location apart from CPT-05r at a depth of 1.9 m.
Earthworks consisting of both cutting and filling have been undertaken across the development. Cuts of up to 4.6 m and filling of up to depths of 3.5 m have created the final subdivision surface.
Due to the potential of perched water tables as evident within CPT-05r, liquefaction risk is higher for properties on the eastern side of the development under ULS seismic loading. Though the subdivision is suitable for development, the summary presented in Table 2 highlights the foundation requirements for each Lot to mitigate the potential liquefaction risk.
AECOM
River Terraces
River Terraces Subdivision, Ngaruawahia – Stages 3b - 3f and NZS4404:2010
Schedule 2a Completion Report
P:\605X\60553307\8. Issued Docs\8.1 Reports\190607 Stages 3b to 3f completion report Revision 1.docx Revision 1 – 07-Jun-2019 Prepared for – Perjuli Developments Limited – Co No.: 1714295
1
1.0 Introduction
AECOM New Zealand Limited (AECOM) has been engaged by Perjuli Developments Limited to prepare a geotechnical completion report for The River Terraces Subdivision.
This report summarises the results of geotechnical investigations completed for Stages 3B, 3C, 3D, 3E, and 3F of the subdivision, outlines the earthworks undertaken and provides a preliminary opinion as to the likely geotechnical requirements for building development on the subdivision lots.
The geotechnical investigations completed at the site, the summary of earthworks carried out and this assessment report, support the attached Statement of Professional Opinion that, subject to the development recommendations contained in this report, Stages 3B, 3C, 3D, 3E, and 3F of the subdivision are suitable for residential building construction (i.e. the NZS 4404:2010 Schedule 2A Certificate).
2.0 Scope of assessment
The scope of this assessment comprised of:
A review of the preliminary geotechnical assessment report, final cut fill plan and construction observation records.
18 hand augered drillholes to a maximum depth of 3m (approximately one auger hole per three lots).
Accompanying in-situ vane shear strength or Dynamic Cone Penetrometer (DCP) tests on each lot to depths of up to 3.0m below ground level.
Seismic assessment based on Cone Penetration Testing (CPT) carried out at as part of the subdivision suitability assessment and additional CPTs carried out across the area.
Assessment and interpretation of the investigation results and a review of any relevant verification testing carried out as part of AECOM’s supervision of bulk earthworks.
3.0 Site description
The River Terraces Subdivision is situated 2.6 km south of Ngaruawahia Township situated between Great South Road and the Waikato River. The subdivision encompasses a land area of approximately 12.4 ha and is bound by the Waikato River to the north and terraces of the Waikato River to the south, east, and west. A south-east to north-west orientated slope bisects the property forming a lower terrace adjacent to the Waikato River. Prior to development, the land use was pastoral farmland.
Stages 3B, 3C, 3D, 3E, and 3F consist of a total of 50 residential lots ranging in size from 524 m² to 792 m², as shown on the attached subdivision plans.
4.0 Geological setting
The subdivision is located in the northern portion of the Hamilton Lowlands, on the south east edge of the Ngaruawahia Township.
The Hamilton lowlands are a fault-bound depression that has been blanketed by alluvial sediment of mainly volcanic origin from the changing path and flooding of the ancestral Waikato River. The major periods of deposition of alluvial sediment were separated by periods of weathering and erosion, resulting in broad alluvial plains with rolling hills elevated above the present surface. The Waikato River has since cut through these alluvial plains entrenching itself into the current channel.
The geological map for Ngaruawahia (Edbrooke, 2005) indicates that the site is underlain by the Hinuera and Taupo Formation alluvial sediments. Taupo Formation deposits are mapped within the lower terrace and Hinuera Formation at the level of Great South Road. An extract of the geological map of the area is included in Appendix 0.
AECOM
River Terraces
River Terraces Subdivision, Ngaruawahia – Stages 3b - 3f and NZS4404:2010
Schedule 2a Completion Report
P:\605X\60553307\8. Issued Docs\8.1 Reports\190607 Stages 3b to 3f completion report Revision 1.docx Revision 1 – 07-Jun-2019 Prepared for – Perjuli Developments Limited – Co No.: 1714295
2
5.0 Geotechnical assessment
5.1 Soil investigation
Site investigations were undertaken by AECOM engineering geologists from 10 October 2018 to 9 May 2019.
Each of the investigation holes was logged in accordance with the New Zealand Geotechnical Society (NZGS) Guidelines for Field Description of Soil and Rock (2005). DCP tests were undertaken using a Scala Penetrometer in accordance with NZS 4402:1986 Test 6.5.2 – Penetration Resistance of a Soil (hand method). A plan showing the location of the investigations is presented in Appendix A.
Logs of the materials encountered in the auger holes along with the soil strength test results are presented in Appendix B.
5.2 Ground conditions
The ground conditions at the investigation locations generally comprise of 0.2 to 0.6 m of topsoil overlying a sand and silt dominated profile. Fill was encountered at various thicknesses from 0.15 to 2.6 m, though construction records show a maximum fill depth of up to 3.4 m. The in-situ materials are consistent with the Taupo and Hinuera Formations, and sand grading was found to be highly variable.
DCP test results range from 3 to 32 blows per 100mm. Typical DCP results range from 2 to 12 blows per 100mm, indicating the granular materials are predominantly loose to dense.
Cohesive materials present were stiff to hard with shear vane results ranging from 87 kPa to over 216 kPa.
Groundwater was not encountered in any of the hand augers at the time of investigation.
5.3 CPT investigation
In addition to CPTs carried out as part of the subdivision suitability assessment, 5 CPTs were undertaken for the design of the retaining wall in stages 3d and f on the 13 March 2018 and an additional 7 CPTs were carried out on the 29 September 2018 throughout Stages 3b to 3f. Testing was supervised by an AECOM engineering geologist. Test locations are presented in Appendix A.
The CPT tests results indicate interbedded sand and silt to a depth of at least 20m below existing ground level. Cohesive soils were encountered in CPT-01(r) to 02(r) to approximately 7.5 m depth. Typical CPT cone resistance readings of between 5 to 10 MPa were recorded across the test locations in sandy layers, while clays and silts had typical readings of less than 2.5 MPa.
The CPT holes typically collapsed dry at depths of between 4.5 and 6.5 m below existing ground level. CPT-05(r) encountered groundwater at a depth of 1.9 m.
The CPT interpretation plots are presented in Appendix C.
5.4 Groundwater
The level of the adjacent Waikato River is at approximately 10 mRL (on average; season variations will apply). The development is at least 6 m higher at >16 mRL. Even though groundwater levels are expected to be low due to the proximity of the river, it was encountered within CPT-05r at a depth of 1.9 m below the existing ground surface in March 2018. Therefore, the groundwater levels at CPT202 and CPT203 have been adjusted to this higher level for the liquefaction analysis to account for any potential variation. Elsewhere, the groundwater level has been inferred at between 5.0 m and 5.6 m below existing ground surface.
6.0 Seismic assessment
An assessment of the susceptibility of the soils seismic response has been carried out for the site based on the results of the in-situ CPT testing carried out across the site. For this assessment, an
AECOM
River Terraces
River Terraces Subdivision, Ngaruawahia – Stages 3b - 3f and NZS4404:2010
Schedule 2a Completion Report
P:\605X\60553307\8. Issued Docs\8.1 Reports\190607 Stages 3b to 3f completion report Revision 1.docx Revision 1 – 07-Jun-2019 Prepared for – Perjuli Developments Limited – Co No.: 1714295
3
earthquake groundwater level ranging from 1.9 to 5.6 m has been adopted based on the water level measured in the CPTs and hand augers.
The assessment methodology and results are summarised in the following sections. Results of the liquefaction assessment are presented in Appendix D.
Testing carried out as part of the resource consent geotechnical assessment and previous completion reports have been used to supplement the testing on the relevant stages. Seven of these tests were undertaken directly on or nearby stages 3B to 3F. Five CPTs were also undertaken as part of the retaining wall design adjacent to Stage 3D. The results of these CPT’s have been used to support the conclusions with regard to liquefaction risk on the assumption that the ground conditions can be expected to be similar.
The findings and recommendations from this assessment have been incorporated into the geotechnical considerations in the attached Schedule 2A Completion Report.
6.1 Seismic hazard
Module 1 of Ministry of Business, Innovation and Employment (MBIE) have partnered with New Zealand Geotechnical Society (NZGS) best practice guidelines recommends using seismic loading determined from the Bridges Manual Third Edition (NZTA, 2014) which references NZS1170.5:2004. The seismic loading inputs are as follows:
Foundation soil classification: Class D – deep or soft soil site.
1000 year return period PGA coefficient (C0,1000): 0.28 (Table 6A.1,NZTA, 2014).
Serviceability limit state (1/25): SLS = 0.05 g Magnitude 5.9
Ultimate limit state (1/500): ULS = 0.22 g Magnitude 5.9
6.2 Results and interpretation
6.2.1 Liquefaction Risk
An assessment of soil seismic behaviour was undertaken using CLiq v.2.0.6.85 developed by GeoLogismiki using the raw data of the CPTs. The CPT analysis was undertaken using the proposed cut/ fill depths at each test location.
At SLS (Serviceability Limit State) loading the results of the liquefaction analysis predict that there is negligible liquefaction and no ground surface settlements.
At ULS (Ultimate Limit State) seismic loading liquefaction and associated settlements have been predicted to occur. Liquefiable material is present throughout the soil profile for most tests though the most critical locations (CPT201 and 202) have a factor of safety (FoS) less than 1 for the majority of the test. As groundwater was encountered at a depth of 1.9 m at CPT-05r a non-liquefiable crust cannot be expected to mitigate ground surface deformations during a seismic event. Estimated ground settlements range from 10 to 260 mm. The estimated results therefore indicate:
Potential for ground surface expressions of liquefaction such as rupture and ejecta (sand boils).
Ground surface settlements can be expected.
The primary risk from liquefaction to all buildings in the development is structural damage due to differential settlements or the development of voids below concrete slabs due to ground settlement and potential lateral displacements. Stages 3B to 3D have a heightened risk of lateral spread under ULS seismic loading (as per the results of CPT-05r, CPT201, and 202). A crude analysis undertaken within CLiq estimated over 2 m of lateral displacements. This was refined using the Youd et al method with results presented below in Section 6.3.
AECOM
River Terraces
River Terraces Subdivision, Ngaruawahia – Stages 3b - 3f and NZS4404:2010
Schedule 2a Completion Report
P:\605X\60553307\8. Issued Docs\8.1 Reports\190607 Stages 3b to 3f completion report Revision 1.docx Revision 1 – 07-Jun-2019 Prepared for – Perjuli Developments Limited – Co No.: 1714295
4
Lots within Stage 3E and 3F are expected to have less ground surface expressions and deformations.
Note: structural damage may also occur due to the shaking during an earthquake.
6.3 Lateral displacements
Due to the close proximity to the banks of the Waikato River a lateral displacements check was undertaken as results calculated within CLiq indicate such movement may occur under ULS loading.
CPT201, 202, and 203 were used to calculate lateral displacements. Other CPT tests were either too shallow or behind the retaining wall adjacent to Lots 128 to 133. The analysis used the Youd, et al (2002) method using the following global parameters:
Moment magnitude: 5.9 (Table C6.1, Bridge Manual 3rd
Ed., 2018)
Earthquake source distance: 30 km
Ground slope: 0%
Height of free face: 7 m
Calculated displacements are shown below in Table 1 and are shown as a range by multiplying the calculated displacements (DH) by a factor of 2 (multiplied by 0.5 and 2). Calculated lateral displacements cause during a seismic event range from 2 to 29 mm for the lower terrace.
Table 1 Calculated lateral displacements (DH) in mm
CPT 2x DH DH 0.5x DH
CPT201 7 3 2
CPT202 32 16 8
CPT203 26 13 6
6.4 Intermediate events
The New Zealand Building Code requires that the structure remains serviceable following an SLS event. A ULS event is required to prevent loss of life and maintain egress from the building; however the building may suffer damage that is irreparable.
It is now recognised that the seismic behaviour of soil is non-linear and damage to foundations can be significant during events that are less than ULS.
The analysis shows that settlements may also affect structures at more frequent earthquakes than the ULS event at a peak ground acceleration of 0.1 g.
7.0 Subdivision earthworks
7.1 General
Earthworks for Stages 3B to 3F consisted of the following:
Creating terraced surface by cutting material from the upper terrace and bulk filling within the lower terrace.
Making cuts for carriageways.
Placement of topsoil across all lots.
Locations and depths of fill placed and cut are shown in cut fill plans presented in Appendix E.
AECOM
River Terraces
River Terraces Subdivision, Ngaruawahia – Stages 3b - 3f and NZS4404:2010
Schedule 2a Completion Report
P:\605X\60553307\8. Issued Docs\8.1 Reports\190607 Stages 3b to 3f completion report Revision 1.docx Revision 1 – 07-Jun-2019 Prepared for – Perjuli Developments Limited – Co No.: 1714295
5
7.2 Cut to Fill
Filling was undertaken using material won from within the subdivision. The earthworks were controlled in accordance with NZS 4431:1989 Code of Practice for Earth Fill for Residential Development and the earthworks specification prepared for the subdivision works.
All vegetation, topsoil, rubbish and near surface organic soils were removed from the areas to be filled prior to the controlled fill being placed.
DCP testing and visual inspection was carried out to confirm suitability of subgrade materials.
Material sourced from site and intended for filling was inspected by AECOM prior to filling commencing. Material considered unsuitable for engineered fill was cut to waste or used for non-engineered/ controlled fill.
No fill testing was undertaken within Stage 3F. Any fill placed here will need to be treated as non-engineered.
7.3 Placement and compaction
Bulk fills were required to be constructed to the following methodology and criteria in accordance with The River Terraces Earthworks Specification – Stage 2 (2017):
The cohesion less fill material (i.e. the sands, and sandy silts) were required to be compacted to a compaction standard 15 blows/300mm using a Dynamic Cone Penetrometer in accordance with NZS4402 Test 6.5.2.
AECOM tested each lift of no more than 1.0m thickness of the cohesionless fill material with a DCP to ensure the layer has been adequately compacted.
The test results indicated the above criteria were not always met and rework was required. Re-testing of failed material was carried out and results are presented. Furthermore, the fill material strength was confirmed during post construction testing (DCP tests) testing. There are some areas within Stage 3 placed fill was deemed to be non-engineered where fill compaction was not tested due to the material suitability.
Test results for the placed fill are presented in Appendix E.
7.4 Pavements and trenches
In addition to the bulk earthworks, AECOM undertook the following inspections and testing.
Road and right-of-way pavements, which was limited to testing of subgrade, compaction testing of subgrade improvement, sub-base and basecourse. Stringing of the pavement layers, pavement shape control, and materials suitability was undertaken by others.
The compaction of utility trench backfill within the road carriageway, in which the stormwater and wastewater, power, water supply and gas services are located.
Inspection of the road and right-of-way stormwater soakage trenches (outside the carriageway).
Separate documentation will be provided by AECOM for the road and right-of-way compaction (including trenches in roads and rows) and the stormwater soakage trenches in roads and right-of-ways.
Footpath and crossing subgrades were tested by others.
8.0 Building and site development recommendations
8.1 General
It is recommended that shallow geotechnical testing be undertaken by a geo-professional as part of the house design/building process on each lot to confirm the general recommendations contained in
AECOM
River Terraces
River Terraces Subdivision, Ngaruawahia – Stages 3b - 3f and NZS4404:2010
Schedule 2a Completion Report
P:\605X\60553307\8. Issued Docs\8.1 Reports\190607 Stages 3b to 3f completion report Revision 1.docx Revision 1 – 07-Jun-2019 Prepared for – Perjuli Developments Limited – Co No.: 1714295
6
this report, and to enable specific foundation recommendations to be provided for building, with consideration to existing and proposed ground levels and foundation bearing levels.
Based on the investigation results and subject to the recommendations in this report, foundations for building development on the lots designed in accordance with NZS 3604:2011 “Timber Framed Buildings” or NZS 4229:1999 “Concrete Masonry Buildings Not Requiring Specific Engineering Design” are likely to be acceptable (subject to the removal of any soft/loose or unsuitable material and topsoil) where no liquefaction resilience is required (refer Section 8.2).
For the purposes of this report a geo-professional is a Chartered Professional Engineer registered with the ‘geotechnical’ practice area, or a Professional Engineering Geologist who is registered with Engineering New Zealand.
8.2 Liquefaction resilience
Based on the AECOM liquefaction assessment, the primary liquefaction risk to buildings in the development is structural damage due to differential settlement or lateral stretch on the lower terrace. The risk varies across the development from very low to high.
To assess if the differential settlement and lateral displacement are acceptable, consideration needs to be given to the proposed structure type, any earthworks as part of the building consent, ease of repairing foundations and the level of acceptable damage i.e. ULS or intermediate event. Resilient foundation designs can be adopted to manage the liquefaction effects identified in our assessment; as such soil liquefaction does not prevent development on the sites.
Therefore, and in line with MBIE recommendations, AECOM recommends that the effects of liquefaction are taken into consideration at building consent stage by a suitably experienced geo-professional (as defined in Section 8.1).
The CPT results obtained as part of this assessment will be available on the New Zealand Geotechnical database so that they can be utilised at building consent stage, however in some circumstances additional site specific testing maybe needed.
8.3 Foundation recommendations
Due to the nature of the placed fill and potential liquefaction ground displacements, the following recommendations for lot foundations are described below in Table 2. These recommendations are subject to site specific ground investigations which may modify the recommendations made in this report. This table does not replace the information obtained through individual lot testing for building consent.
8.3.1 TC2 Foundations
TC (Technical Category) foundations were developed following the Christchurch earthquakes by MBIE to provide engineers a guide to determine the level of site investigations and repair requirements for house foundations within the affected areas.
The purpose of a TC2 foundation is that it will be able to tolerate small ground surface deformations and can are able to be repaired (i.e. relevelled) if the damage is not too large. TC2 foundations are recommended for some lots as liquefaction was predicted as described in Section 6.0. Proposed TC2 foundations include (as described in Canterbury Guidance Part A, MBIE, 2012):
Light construction with timber floors and shallow piles as per NZS 3604 and where ULS bearing capacity is > 300 kPa
Enhanced perimeter foundation wall and shallow piles as per NZS 3604
Raft foundations
Specific engineer design
AECOM
River Terraces
River Terraces Subdivision, Ngaruawahia – Stages 3b - 3f and NZS4404:2010
Schedule 2a Completion Report
P:\605X\60553307\8. Issued Docs\8.1 Reports\190607 Stages 3b to 3f completion report Revision 1.docx Revision 1 – 07-Jun-2019 Prepared for – Perjuli Developments Limited – Co No.: 1714295
7
8.3.2 Lot requirements
Table 2 Lot foundation recommendations
Stage Lot Number
Foundation Type
Engineered, Controlled Fill or Natural
Requirements Depth (m)
3B
155 - 158 TC2 Controlled Removal of controlled fill
0.2 - 0.7
159 TC2 Engineered fill - -
3C
151 - 154 TC2 Engineered fill - -
149 - 150 No restriction Engineered fill - -
146 - 147 No restriction Natural - -
143 - 145 TC2 Engineered fill - -
3D
142 TC2 Engineered fill Removal of loose near surface soils
0.6
141 TC2 / Piled Controlled Placed fill not achieving spec.
Up to 1.9
140 TC2 - Piled in controlled fill
Natural & Controlled - Up to 1.9
137 - 139 No restriction Natural Removal of loose near surface soils
-
132 TC2 Natural & Engineered fill - -
133 TC2 / Piled Controlled fill - Up to 2
134 TC2 / Piled Controlled fill - Up to 3.4
128-129 No restriction Natural - -
130 - 131 TC2 Natural - -
3E
124 - 126 No restriction Natural - -
123 No restriction Controlled fill Removal of loose near surface soils
Up to 0.6
114 No restriction Controlled fill Removal of loose near surface soils
Up to 0.8
111 No restriction Controlled fill Removal of fill on western side of site
Up to 1.2
106 - 110 112, 113
No restriction Engineered Fill - -
3F
118 - 122 No restriction Natural Removal of loose near surface soils
-
117 No restriction Controlled fill Removal of controlled fill
0.3
115 - 116 No restriction Controlled fill Removal of loose near surface soils
Up to 0.8
Lots 133, 134, and 141
Controlled fill was placed on Lots 133, 134, and 141 to depths ranging from 2 to 3.4 m. This will be required to be piled through as no testing or construction observations were undertaken within this area during earthworks. Nearby CPTs (CPT202 and 203) estimate soil liquefaction occurring during a ULS seismic event. Due to this any piles designed for these Lots will need to consider the liquefiable soils.
AECOM
River Terraces
River Terraces Subdivision, Ngaruawahia – Stages 3b - 3f and NZS4404:2010
Schedule 2a Completion Report
P:\605X\60553307\8. Issued Docs\8.1 Reports\190607 Stages 3b to 3f completion report Revision 1.docx Revision 1 – 07-Jun-2019 Prepared for – Perjuli Developments Limited – Co No.: 1714295
8
If this is not considered practical or cost effective then further testing is recommended to confirm the compaction of the fill, remove if not achieving 5 blows per 100 mm of penetration and replace with compacted engineered fill. TC2 foundations will be required due to the proximity of the Waikato River.
8.4 Site works and retaining walls
Some sites have sloping ground and it may be desirable to create level building sites for slab on grade or raft foundations. As site works and retaining walls are building works therefore they will also need to comply with the Building Code during construction and at the completion of construction, regardless of whether a consent is required for those works.
At the time of building consent application a geo-professional (as defined in Section 8.1).should confirm that they have reviewed the proposal and it is in accordance with our preliminary guidelines below or that they have undertaken any specific assessment or design necessary as a result of their review.
Batters less than 1.5m high should be no steeper than 1V:3H and be protected from erosion.
Batters higher than 1.5m or steeper than 1V:3H should be specifically assessed by a geo-professional for stability and erosion.
The proximity of excavations or fills to boundaries is to be sufficiently setback to not affect any existing structure or retaining wall.
Retaining walls supporting driveways, slopes, buildings or other retaining walls should be specifically designed for the appropriate surcharge.
Retaining walls that will retain cut adjacent to a boundary should be engineer designed with reasonable allowance for surcharges from the adjacent property, or sufficiently setback that there will not be any surcharge from the adjacent property.
Soakage systems should be located on the upslope side of the property, with sufficient setback from building and retaining wall foundations, unless as-built downslope site conditions are known and the system is sufficiently setback or deep enough to not affect, any existing retaining walls or batters.
Excavations and retaining walls adjacent to boundaries can result in interaction issues that are not identified until construction, for example a retaining wall is built above or below an existing retaining wall. Both walls may have been suitable on their own, however in combination engineer input would be required. There are several good practices that can be adopted by the various parties that are involved in the building process to minimise interaction issues during construction:
Owners / designers can collaborate and design single boundary walls sufficient for the proposed ground levels on both sides of the boundary. There is likely to be cost savings in this approach.
Council can keep a record of site works proposed on consents that have been submitted or approved, including earthworks and soakage system locations.
Contractors should confirm conditions within the neighbouring sites are in accordance with those described in the geo-professional’s review, prior to commencing any work. If conditions have changed then further engineering advice should be obtained.
AECOM
River Terraces
River Terraces Subdivision, Ngaruawahia – Stages 3b - 3f and NZS4404:2010
Schedule 2a Completion Report
P:\605X\60553307\8. Issued Docs\8.1 Reports\190607 Stages 3b to 3f completion report Revision 1.docx Revision 1 – 07-Jun-2019 Prepared for – Perjuli Developments Limited – Co No.: 1714295
9
9.0 Stormwater management assessment
The soils underlying Stages 3B, 3C, 3D, 3E, and 3F of the subdivision consist mainly of sands and gravelly sands, with varying groundwater levels. Stormwater soakage systems are required for all private lots within this stage.
Catch pits connected to stormwater soakage trenches have been constructed for soakage of stormwater from the roads. The road soakage system has not been designed to accommodate runoff from private lots.
9.1 Soakage system requirements
Site investigation and soakage rates determined from testing across Stage 3 area indicate that installation of a soakage system for primary stormwater management would be appropriate for all lots. The requirements for soakage are as follows:
Specific soakage testing and design will need to be completed at the time of building consent
The systems will need to be designed in accordance with the requirements set out in the Waikato LASS Regional Infrastructure Technical Specifications (RITS) and the Hamilton City Council Three Waters Management Practise Note – HCC 03 Soakage.
Soakage system setbacks shall comply with the requirements of the RITS and/or the Waikato District Plan as applicable.
The design of soakage trenches under driveways shall consider traffic loading and the need to prevent damage to the driveway pavement or the soakage system.
Drainage shall be provided to prevent runoff from private hardstand into the road reserve. For example, a strip drain shall be located along the driveway crossing to capture driveway runoff. All runoff shall drain to the on lot soakage device via a sediment trap to remove large suspended particles and help prevent siltation of the soakage system.
Runoff from storm events with a return period exceeding 10-years shall discharge to the road reserve in a controlled manner in accordance with the requirements of the RITS and the NZ Building Code.
The ability of soakage systems to operate effectively can be compromised when fine soils or leaves clog the soakage surface. It is therefore important that sumps are periodically inspected and collected material removed. It is also important that site runoff during building works and landscaping is prevented from entering the soakage system as this will adversely affect the operation of the soakage system.
AECOM
River Terraces
River Terraces Subdivision, Ngaruawahia – Stages 3b - 3f and NZS4404:2010
Schedule 2a Completion Report
P:\605X\60553307\8. Issued Docs\8.1 Reports\190607 Stages 3b to 3f completion report Revision 1.docx Revision 1 – 07-Jun-2019 Prepared for – Perjuli Developments Limited – Co No.: 1714295
10
10.0 Opinion (Schedule 2A)
Based on the results of the geotechnical investigations and assessments undertaken for this project and subject to the development recommendations contained in this report, all 50 lots on Stages 3B, 3C, 3D, 3E, and 3F of the River Terraces Subdivision site are considered suitable for residential building development as proposed on the subdivision application plan.
The following recommendations are given to guide building development on the River Terraces Stages 3B, 3C, 3D, 3E, and 3F lots:
i. Shallow geotechnical testing of each lot is to be undertaken as part of the house design/building process, by a Chartered Professional Engineer (Geotechnical practice area) or Professional Engineering Geologist registered with Engineering New Zealand, to enable specific foundation recommendations to be provided for each of the lots in the development with consideration to the underlying subgrade strength, groundwater levels and liquefaction resilience, as described in Sections 8.1 and 8.2 of this report.
ii. A Chartered Professional Engineer (Geotechnical practice area) or Professional Engineering Geologist registered with Engineering New Zealand familiar with this report reviews all proposals for earthworks and buildings, as described in Section 8.3 of this report, prior to any works being undertaken on any of the lots.
iii. Excavations to remove the topsoil layer and/or any uncontrolled fill will be required on all lots.
A Statement of Professional Opinion to the suitability of Land for Building Construction (the NZS 4404:2010 Schedule 2A certificate) is presented in Appendix F.
11.0 Limitations
The professional opinion expressed in this report is given to Waikato District Council and Perjuli Developments Limited for their purposes alone on the express condition that it will not be relied upon by any other person and does not remove the necessity for the normal inspection of foundation conditions and excavations at the time of erection of any structures.
Recommendations and opinions obtained in this report are based on a reconnaissance of the site, information from geological maps, hand auger logs and DCP test records. Inferences about the nature and continuity of ground conditions away from investigation locations are made but cannot be guaranteed.
During development of the lots, ground conditions should be examined by a geo-professional competent to judge whether the conditions are compatible with the assumptions made in this report. In all circumstances, if ground conditions differ from those described or assumed to exist, then the matter should be referred back to AECOM.
AECOM
River Terraces
River Terraces Subdivision, Ngaruawahia – Stages 3b - 3f and NZS4404:2010
Schedule 2a Completion Report
P:\605X\60553307\8. Issued Docs\8.1 Reports\190607 Stages 3b to 3f completion report Revision 1.docx Revision 1 – 07-Jun-2019 Prepared for – Perjuli Developments Limited – Co No.: 1714295
11
12.0 References
Burns D. Farquhar, G. Mills, M., Williams, A (editors), 2005. Field Description of Soil and Rock, Guideline for the classification and description of soil and rock for engineering purposes. New Zealand Geotechnical Society.
Edbrooke, S.W. (compiler) 2005. Geology of the Waikato Area. Institute of Geological and Nuclear Sciences 1:250:0000 Geological map 4. 1 sheet + 68p. Lower Hutt, New Zealand: Institute of Geological and Nuclear Sciences Limited.
Land Information New Zealand, 2015, NZTopo50-BD33 Hamilton, edition 1.05.
Ministry of Business, Innovation & Development (MBIE), New Zealand Geotechnical Society (NZGS), March 2016. Earthquake Geotechnical Engineering Practice, Module 1: Overview of the guidelines. ISBN: 978-0-947497-51-4 (online)
Ministry of Business, Innovation & Development (MBIE), New Zealand Geotechnical Society (NZGS), November 2016. Earthquake Geotechnical Engineering Practice, Module 2: Geotechnical investigations for earthquake engineering. ISBN: 978-0-947524-46-3 (online)
Ministry of Business, Innovation & Development (MBIE), New Zealand Geotechnical Society (NZGS), May 2016. Earthquake Geotechnical Engineering Practice, Module 3: Identification, assessment and mitigation of liquefaction hazards. ISBN: 978-0-947497-50-7 (online)
NZS 3604:2011 – Timber Framed Buildings – New Zealand, Standards New Zealand, Wellington
NZS 4229:1999 – Concrete Masonry Buildings Not Requiring Specific Engineering Design – New Zealand, Standards New Zealand, Wellington
NZS 4402:1986 Test 6.5.2 – Penetration Resistance of a Soil (hand method) – New Zealand, Standards New Zealand, Wellington
NZ Transport Agency 2013, Bridge Manual, 3rd Edition. (SP/M/022) Revised September 2014.
AECOM
River Terraces
River Terraces Subdivision, Ngaruawahia – Stages 3b - 3f and NZS4404:2010
Schedule 2a Completion Report
P:\605X\60553307\8. Issued Docs\8.1 Reports\190607 Stages 3b to 3f completion report Revision 1.docx Revision 1 – 07-Jun-2019 Prepared for – Perjuli Developments Limited – Co No.: 1714295
Appendix A
Plans
M
a
t
a
r
i
k
i
T
e
r
r
a
c
e
M
a
ta
rik
i T
e
rra
c
e
M
a
ta
w
h
e
ro
P
la
c
e
M
a
ta
rik
i T
e
rra
c
e
T
e
Ik
a
W
a
y
M
a
t
a
w
h
e
r
o
P
l
a
c
e
Lot 1 DPS 72361
L K McClunie
ALLotMENT 82
SBRS OF NEWCASTLE SOUTH
V A & M P Prendergast
W
A
IK
A
TO
R
IV
E
R
Lot 152
Lot 151
Lot 150
Lot 149
Lot 143
Lot 148
Lot 135
Lot 136
Lot 127
Lot 103
Lot 102
Lot 161
Lot 160
Lot 162
Lot 163
Lot 101
Lot 153
Lot 154
Lot 155
Lot 104
Lot 105
Lot 146
Lot 145
Lot 144
Lot 147
Lot 156
Lot 158
Lot 159
Lot 157
Lot 142
Lot 141
Lot 128
Lot 129
Lot 132
Lot 134
Lot 130
Lot 131
Lot 133
Lot 138
Lot 139
Lot 140
Lot 137
Lot 122
Lot 121
Lot 120
Lot 119
Lot 118
Lot 117
Lot 115
Lot 116
Lot 113
Lot 125
Lot 123
Lot 114
Lot 112
Lot 111
Lot 110
Lot 108
Lot 109
Lot 126
Lot 124
Lot 107
Lot 106
COPYRIGHT: The copyright for the information shown on this plan remains the right of Blue Wallace Surveyors Ltd. It may not be reproduced (wholly or in part), without the prior consent of Blue Wallace Surveyors Ltd.
1) All Areas and dimensions subject to final survey And approval
from the Waikato District Council
Engineering Works
Scheme Plan - Overall
River Terraces Subdivision - Stage 3
Issued for Engineering Approval
12/2017
December 2017
0
1
2
SM
SM
NNR
lethborgn
HA Red
lethborgn
HA Red
lethborgn
HA Red
lethborgn
HA Red
lethborgn
HA Red
lethborgn
HA Red
lethborgn
HA Red
lethborgn
HA Red
lethborgn
HA Red
lethborgn
HA Red
lethborgn
HA Red
lethborgn
HA Red
lethborgn
HA Red
lethborgn
HA Red
lethborgn
HA Red
lethborgn
HA Red
lethborgn
HA Red
lethborgn
HA Red
lethborgn
CPT Yellow
lethborgn
CPT Yellow
lethborgn
CPT Yellow
lethborgn
CPT Yellow
lethborgn
CPT Yellow
lethborgn
CPT Yellow
lethborgn
CPT Yellow
lethborgn
CPT Yellow
lethborgn
CPT Yellow
lethborgn
CPT Yellow
lethborgn
CPT Yellow
lethborgn
Text Box
HA01
lethborgn
Text Box
CPT207
lethborgn
Text Box
HA02
lethborgn
Text Box
HA03
lethborgn
Text Box
CPT206
lethborgn
Text Box
HA04
lethborgn
Text Box
HA05
lethborgn
Text Box
CPT-01r
lethborgn
Text Box
HA06
lethborgn
Text Box
HA07
lethborgn
Text Box
HA08
lethborgn
Text Box
CPT204
lethborgn
Text Box
CPT-02r
lethborgn
Text Box
HA09
lethborgn
Text Box
CPT-03r
lethborgn
CPT Yellow
lethborgn
Text Box
HA10
lethborgn
Text Box
CPT-04r
lethborgn
Text Box
CPT-05r
lethborgn
Text Box
CPT203
lethborgn
Text Box
HA11
lethborgn
Text Box
HA12
lethborgn
Text Box
CPT202
lethborgn
Text Box
HA13
lethborgn
Text Box
HA14
lethborgn
Text Box
CPT205
lethborgn
Text Box
HA15
lethborgn
Text Box
HA16
lethborgn
Text Box
HA17
lethborgn
Text Box
CPT201
lethborgn
Text Box
HA18
Q1a
eQa
Q2aQ1a
eQa
Q2a
Q2a
Q1a
Q1a
eQa
Q1a
eQa
eQaQ1a
Q2a
Q2a - OIS3-OIS2 (LatePleistocene) river deposits
(Hinuera Formation):Cross-bedded pumicesand, silt and gravel
with interbedded peat.
Q1a - OIS1 (Holocene)river deposits (Taupo
Pumice Alluvium):Predominantly pumice sand,
silt and gravel alluviumwith charcoal fragments.
eQa - OIS14+-OIS12 (EarlyPleistocene - Middle
Pleistocene) riverdeposits and ignimbrite:Alluvium dominated byprimary and reworked,non-welded ignimbrite.
Q2a - OIS2 (Late Pleistocene) river deposits:Locally derived
lacustrine mud, silt, gravel and peat.0 100 200 30050
Meters
References
Site Location
9/04/2019 Geological_Location Map TemplateI
Note: Geological boundaries are inferred and may not accurately represent the material found on site.
QMAP WaikatoEdbrooke, S.W. (compiler)Sheet N65 HamiltonKear, D. Schofield J. C. 1965Service Layer Credits: Sources:Esri, HERE, Garmin, Intermap,increment P Corp., GEBCO,USGS, FAO, NPS, NRCAN,GeoBase, IGN, Kadaster NL,Ordnance Survey, Esri Japan,
Lot 10
Stage 2
Lot 149
Lot 143
Lot 148
Lot 135
Lot 136
Lot 127
Lot 105
Lot 146
Lot 145
Lot 144
Lot 147
Lot 142
Lot 141
Lot 128
Lot 129
Lot 132
Lot 134
Lot 130
Lot 131
Lot 133
Lot 138
Lot 139
Lot 140
Lot 137
Lot 122
Lot 121
Lot 120
Lot 119
Lot 118
Lot 117
Lot 115
Lot 116
Lot 113
Lot 125
Lot 123
Lot 114
Lot 112
Lot 111
Lot 110
Lot 108
Lot 109
Lot 126
Lot 124
Lot 107
Surface Analysis: Elevation Ranges
Number
1
2
3
4
5
6
7
8
9
Color
Minimum Elevation
(m)
-2.278
-0.800
-0.500
-0.300
-0.100
0.100
0.200
0.300
0.500
Maximum Elevation
(m)
-0.800
-0.500
-0.300
-0.100
0.100
0.200
0.300
0.500
1.900
COPYRIGHT: The copyright for the information shown on this plan remains the right of Blue Wallace Surveyors Ltd. It may not be reproduced (wholly or in part), without the prior consent of Blue Wallace Surveyors Ltd.
BW Ref.
COPYRIGHT: The copyright for the information shown on this plan remains the right of Blue Wallace Surveyors Ltd. It may not be reproduced (wholly or in part), without the prior consent of Blue Wallace Surveyors Ltd.
COPYRIGHT: The copyright for the information shown on this plan remains the right of Blue Wallace Surveyors Ltd. It may not be reproduced (wholly or in part), without the prior consent of Blue Wallace Surveyors Ltd.
BW Ref.
COPYRIGHT: The copyright for the information shown on this plan remains the right of Blue Wallace Surveyors Ltd. It may not be reproduced (wholly or in part), without the prior consent of Blue Wallace Surveyors Ltd.
Soil and rock descriptions generally as in "Guidelines forthe Field Description of Soil and Rock for EngineeringPurposes" by the NZ Geotechnical Society Inc, December2005.
# / # Vane shear strenght test results given as peak / remoulded shear strengths(kPa). Test as per NZGS Guideline, 2001.# = Vane test performed on core recovered prior to extrusion from core barrel.* = Vane test performed on excavated material of suitable size.
UTP - Unable to penetrate.
Soil and rock decriptions generally as in "Guidelines for the Field Description of Soil and Rock for Engineering Purposes" by the NZ Geotechnical Society Inc, December 2005.
0-11-33-77-17>17
Dynamic Cone(blows / 100mm)
Vane Shear Strength Tests
# / # Vane shear strength test results given as peak / remoulded shear strengths (kPa). Test as per NZGS Guideline, 2001.
UTP - Unable to penetrate
Dynamic Cone Penetrometer (DCP) Test Results
Test recorded as blows per 100mm penertration.
Test Results
Graphic Log (typical symbols) Groundwater Records
Soil Descriptions
0m: Topsoil.
0.3m: Engineered fill.
0.5m: Cross bedded sandand silt.
0m: SILT, trace gravel, trace rootlets; dark brown. Moist;low plasticity; gravel, fine to medium, subrounded.
1.9m: Fine to medium SAND, some silt and minorgravel; brownish orange. Dense; moist; poorly graded.
2.1m: Gravelly fine to coarse SAND; blackish brownand orange. Dense to very dense; moist; well graded;gravel, fine to medium, subangular to subrounded.
2.9m: Fine to coarse SAND, some gravel. Dense; wet;well graded; gravel, fine to medium, subangular tosubrounded.
3
3
4
4
2
2
3
4
7
8
7
4
5
4
3
2
3
2
4
7
15
19
21
16
19
18
14
11
10
9
FIL
LH
INU
ER
A F
OR
MA
TIO
N
155/37
121/34
111/37
HA01 terminated at 3mTarget Depth
Fluid Depth(m)
Casing Depth(m)
FLUID DEPTHS DURING DRILLING
6
1
100
kPa
Project
For explanation of symbols and observations, see key sheet
Inst
rum
enta
tion
Sam
plin
g
40 kP
a
Shear Vane (kPa)Residual - Peak
Dynamic ConePenetrometer
GEOLOGICAL DESCRIPTION
HA01
Hand Held Shear Vane
SOIL PROPERTIESTest Records
10/10/2018
22/05/2019
Riverlinks Subdivision- Stage 3B - 3F
Undertaken on Lot 106/ 107 boundary.No groundwater encountered.*202 kPa is the shear vane limit
LOG OF AUGERHOLE
DR1870: 19mm blade: Calibrated May 2018: Correction Factor = 1.680
Feature Lot 107/ 106
Subordinate MAJOR minor; colour; structure. Strength; moisture condition;grading; bedding; plasticity; sensitivity; major fraction description; subordinatefraction description; minor fraction description etc
Gra
phi
c Lo
g
200
kPa
Client
Finished
Date logged
Vane shear strength per NZGS guideline
Project number 60553307
2
Drilled Depth(m)
Perjuli Developments Limited
Page of1
StartedRemarks
8
Logged
KD
Depth RelatedRemarks(Blows per
100 mm)
Orientation
Checked
RJS
1
2
3
10/10/2018
Weathering, Colour, Fabric, Rock Name, Strength,Discontinuities, Lithological Features (bedding,foliation, mineralogy, cement, etc)D
epth
Elevation
10/10/2018
-90°
Co-ordinates
Date Time
HOLEIDENTIFICATION
Location Great South Road, Ngaruawahia
AU
GE
RH
OLE
LO
G L
OG
S.G
PJ
BA
SE
.GD
T
22/0
5/19
0m: Topsoil.
0.3m: Engineered fill.
1.1m: Cross bedded sandand silt.
0m: SILT, minor sand and minor rootlets; dark brown.Moist; low plasticity. Sand, fine to medium.
0.3m: Fine SAND; light brown. Medium dense; moist;poorly graded.
1.1m: Fine SAND; light brownish grey. Loose; moist;poorly graded.
1.65m: SILT, some sand, minor gravel; brown to lightbrown. Firm to stiff; moist to wet; low plasticity; sand,fine; gravel, fine to medium, subrounded. 1.8m: Shear vane UTP due to gravels. Material felt firm to stiff
within hand auger blade.
2.2m: Shear vane UTP due to gravels. Material felt firm to stiffwithin hand auger blade.
2.55m: Fine to course SAND; grey speckled white andblack. Loose to medium dense; moist to wet; wellgraded.
5
6
2
3
7
6
6
6
6
5
5
2
2
2
1
2
1
2
2
2
3
2
2
2
3
4
4
3
1
3
4
5
4
FIL
LH
INU
ER
A F
OR
MA
TIO
N UTP
UTP
HA02 terminated at 3mTarget Depth
Fluid Depth(m)
Casing Depth(m)
FLUID DEPTHS DURING DRILLING
6
1
100
kPa
Project
For explanation of symbols and observations, see key sheet
Inst
rum
enta
tion
Sam
plin
g
40 kP
a
Shear Vane (kPa)Residual - Peak
Dynamic ConePenetrometer
GEOLOGICAL DESCRIPTION
HA02
Hand Held Shear Vane
SOIL PROPERTIESTest Records
10/10/2018
22/05/2019
Riverlinks Subdivision- Stage 3B - 3F
Undertaken on Lot 109/ 110 boundary.No groundwater encountered.*202 kPa is the shear vane limit
LOG OF AUGERHOLE
DR1870: 19mm blade: Calibrated May 2018: Correction Factor = 1.680
Feature Lot 109/ 110
Subordinate MAJOR minor; colour; structure. Strength; moisture condition;grading; bedding; plasticity; sensitivity; major fraction description; subordinatefraction description; minor fraction description etc
Gra
phi
c Lo
g
200
kPa
Client
Finished
Date logged
Vane shear strength per NZGS guideline
Project number 60553307
2
Drilled Depth(m)
Perjuli Developments Limited
Page of1
StartedRemarks
8
Logged
AH
Depth RelatedRemarks(Blows per
100 mm)
Orientation
Checked
RJS
1
2
3
10/10/2018
Weathering, Colour, Fabric, Rock Name, Strength,Discontinuities, Lithological Features (bedding,foliation, mineralogy, cement, etc)D
epth
Elevation
10/10/2018
-90°
Co-ordinates
Date Time
HOLEIDENTIFICATION
Location Great South Road, Ngaruawahia
AU
GE
RH
OLE
LO
G L
OG
S.G
PJ
BA
SE
.GD
T
22/0
5/19
0m: Topsoil.
0.3m: Fill.
0.45m: Cross bedded sandand silt.
0m: SILT, minor sand, minor rootlets; dark brown. Moist;low plasticity; sand, fine to medium.
0.9m: Fine to coarse SAND, some gravel; brownishorange. Medium dense; moist to wet; well graded;gravel, fine to medium, subrounded.
1m: Silty fine to medium SAND, minor gravel; brownishorange. Loose to medium dense; wet; poorly graded(mainly fine sand); gravel, fine to medium, subroundedto subangular.
1.7m: Fine to coarse SAND, minor gravel; greyishbrown speckled white. Dense; moist to wet; well graded;gravel, fine to medium, subangular to subrounded.
4
5
4
4
3
2
1
2
4
7
2
1
6
7
2
3
7
9
7
10
10
7
10
12
18
12
16
19
17
14
FIL
LH
INU
ER
A F
OR
MA
TIO
N
HA03 terminated at 2.7mUnable to advance due to hole collapse
Fluid Depth(m)
Casing Depth(m)
FLUID DEPTHS DURING DRILLING
6
1
100
kPa
Project
For explanation of symbols and observations, see key sheet
Inst
rum
enta
tion
Sam
plin
g
40 kP
a
Shear Vane (kPa)Residual - Peak
Dynamic ConePenetrometer
GEOLOGICAL DESCRIPTION
HA03
Hand Held Shear Vane
SOIL PROPERTIESTest Records
10/10/2018
22/05/2019
Riverlinks Subdivision- Stage 3B - 3F
Centre of Lot.No groundwater encountered.
LOG OF AUGERHOLE
Feature Lot 112
Subordinate MAJOR minor; colour; structure. Strength; moisture condition;grading; bedding; plasticity; sensitivity; major fraction description; subordinatefraction description; minor fraction description etc
Gra
phi
c Lo
g
200
kPa
Client
Finished
Date logged
Vane shear strength per NZGS guideline
Project number 60553307
2
Drilled Depth(m)
Perjuli Developments Limited
Page of1
StartedRemarks
8
Logged
AH
Depth RelatedRemarks(Blows per
100 mm)
Orientation
Checked
RJS
1
2
3
10/10/2018
Weathering, Colour, Fabric, Rock Name, Strength,Discontinuities, Lithological Features (bedding,foliation, mineralogy, cement, etc)D
epth
Elevation
10/10/2018
-90°
Co-ordinates
Date Time
HOLEIDENTIFICATION
Location Great South Road, Ngaruawahia
AU
GE
RH
OLE
LO
G L
OG
S.G
PJ
BA
SE
.GD
T
22/0
5/19
0m: Topsoil.
0.3m: Engineered fill.
0.5m: Cross bedded sandand silt.
0m: SILT, minor sand, minor rootlets; dark brown. Moist;low plasticity; sand, fine to medium.
0.3m: Silty fine SAND; light grey. Medium dense todense; moist; poorly graded.
0.5m: Fine SAND, minor silt; light brown. Mediumdense; moist; poorly graded.
1.3m: Grey.
1.8m: Sandy SILT; brown. Stiff to very stiff; wet; lowplasticity.
2.6m: SILT, minor fine sand; reddish brown. Very stiff;moist to wet; low plasticity.
5
5
3
4
6
10
6
5
3
3
3
3
3
3
4
3
3
3
2
1
1
2
3
3
4
4
6
6
6
5
FIL
LH
INU
ER
A F
OR
MA
TIO
N
125/15
93/12
139/12
HA04 terminated at 3mTarget Depth
Fluid Depth(m)
Casing Depth(m)
FLUID DEPTHS DURING DRILLING
6
1
100
kPa
Project
For explanation of symbols and observations, see key sheet
Inst
rum
enta
tion
Sam
plin
g
40 kP
a
Shear Vane (kPa)Residual - Peak
Dynamic ConePenetrometer
GEOLOGICAL DESCRIPTION
HA04
Hand Held Shear Vane
SOIL PROPERTIESTest Records
10/10/2018
22/05/2019
Riverlinks Subdivision- Stage 3B - 3F
Centre of Lot.No groundwater encountered.*216 kPa is the shear vane limit
Subordinate MAJOR minor; colour; structure. Strength; moisture condition;grading; bedding; plasticity; sensitivity; major fraction description; subordinatefraction description; minor fraction description etc
Gra
phi
c Lo
g
200
kPa
Client
Finished
Date logged
Vane shear strength per NZGS guideline
Project number 60553307
2
Drilled Depth(m)
Perjuli Developments Limited
Page of1
StartedRemarks
8
Logged
JA
Depth RelatedRemarks(Blows per
100 mm)
Orientation
Checked
RJS
1
2
3
07/05/2019
Weathering, Colour, Fabric, Rock Name, Strength,Discontinuities, Lithological Features (bedding,foliation, mineralogy, cement, etc)D
epth
Elevation
07/05/2019
-90°
Co-ordinates
Date Time
HOLEIDENTIFICATION
Location Great South Road, Ngaruawahia
AU
GE
RH
OLE
LO
G L
OG
S.G
PJ
BA
SE
.GD
T
22/0
5/19
0m: Topsoil.
0.3m: Alluvial sand andgravel.
0m: SILT, trace organics; dark brown. Dry; organics,rootlets.
0.3m: Fine SAND; grey. Dense; dry; poorly graded.
0.6m: Fine to medium SAND; grey. Dense; moist;poorly graded.
1m: Fine to coarse SAND; light greyish brown. Dense;moist; poorly graded.
1.5m: Medium to coarse SAND, some gravel; greyishbrown, mottled orange. Dense; moist; poorly graded;gravel, fine, subrounded to subangular, rhyolitic rockfragments.
2.4m: Gravelly medium to coarse SAND; greyish brown,mottled orange. Dense; moist to wet; poorly graded;gravel, fine, subrounded to subangular, rhyolitic rockfragments.
2.6m: Medium to coarse SAND, some gravel; greyishbrown, mottled orange. Dense; wet; poorly graded;gravel, fine, subrounded to subangular, rhyolitic rockfragments. 2.7 to 2.9m: Orange.
3
3
5
6
8
9
8
8
8
8
7
8
10
9
11
10
11
11
9
9
10
9
9
10
9
10
9
9
7
8
HIN
UE
RA
FO
RM
AT
ION
HA14 terminated at 3mTarget Depth
Fluid Depth(m)
Casing Depth(m)
FLUID DEPTHS DURING DRILLING
6
1
100
kPa
Project
For explanation of symbols and observations, see key sheet
Inst
rum
enta
tion
Sam
plin
g
40 kP
a
Shear Vane (kPa)Residual - Peak
Dynamic ConePenetrometer
GEOLOGICAL DESCRIPTION
HA14
Hand Held Shear Vane
SOIL PROPERTIESTest Records
07/05/2019
22/05/2019
Riverlinks Subdivision- Stage 3B - 3F
Undertaken on southern edge of Lot.No groundwater encountered.
LOG OF AUGERHOLE
Feature Lot 145
Subordinate MAJOR minor; colour; structure. Strength; moisture condition;grading; bedding; plasticity; sensitivity; major fraction description; subordinatefraction description; minor fraction description etc
Gra
phi
c Lo
g
200
kPa
Client
Finished
Date logged
Vane shear strength per NZGS guideline
Project number 60553307
2
Drilled Depth(m)
Perjuli Developments Limited
Page of1
StartedRemarks
8
Logged
JA
Depth RelatedRemarks(Blows per
100 mm)
Orientation
Checked
RJS
1
2
3
07/05/2019
Weathering, Colour, Fabric, Rock Name, Strength,Discontinuities, Lithological Features (bedding,foliation, mineralogy, cement, etc)D
epth
Elevation
07/05/2019
-90°
Co-ordinates
Date Time
HOLEIDENTIFICATION
Location Great South Road, Ngaruawahia
AU
GE
RH
OLE
LO
G L
OG
S.G
PJ
BA
SE
.GD
T
22/0
5/19
0m: Topsoil.
0.3m: Engineered fill.
1m: Alluvial sand and gravel.
0m: SILT, minor sand; dark brown. Moist.
0.3m: Silty fine to medium SAND; brownish grey.Medium dense; moist; well graded.
0.5m: Sandy SILT; brownish grey. Very stiff; moist;sand, fine.
0.8m: Brown; sensitive.
1m: Fine to medium SAND; brownish grey. Dense;moist; poorly graded.
1.4m: Minor gravel, fine to medium, subrounded to subangular, rhyolitic rock fragments.
1.8m: Some silt; no gravel.
2.1m: Very dense.
2.4m: Fine to coarse SAND, minor gravel; reddishbrown. Moist; well graded.
2.9m: Trace silt.
5
5
7
5
6
6
7
7
7
6
8
8
7
12
13
12
13
10
13
14
11
19
21
FIL
LH
INU
ER
A F
OR
MA
TIO
N
116/28
HA15 terminated at 3mTarget Depth
Fluid Depth(m)
Casing Depth(m)
FLUID DEPTHS DURING DRILLING
6
1
100
kPa
Project
For explanation of symbols and observations, see key sheet
Inst
rum
enta
tion
Sam
plin
g
40 kP
a
Shear Vane (kPa)Residual - Peak
Dynamic ConePenetrometer
GEOLOGICAL DESCRIPTION
HA15
Hand Held Shear Vane
SOIL PROPERTIESTest Records
07/05/2019
22/05/2019
Riverlinks Subdivision- Stage 3B - 3F
Centre of Lot. DCP Refusal at 2.3 m depth.No groundwater encountered.*184 kPa is the shear vane limit
LOG OF AUGERHOLE
DR2257: 19mm: blade: Correction Factor = 1.414
Feature Lot 150
Subordinate MAJOR minor; colour; structure. Strength; moisture condition;grading; bedding; plasticity; sensitivity; major fraction description; subordinatefraction description; minor fraction description etc
Gra
phi
c Lo
g
200
kPa
Client
Finished
Date logged
Vane shear strength per NZGS guideline
Project number 60553307
2
Drilled Depth(m)
Perjuli Developments Limited
Page of1
StartedRemarks
8
Logged
KD
Depth RelatedRemarks(Blows per
100 mm)
Orientation
Checked
RJS
1
2
3
07/05/2019
Weathering, Colour, Fabric, Rock Name, Strength,Discontinuities, Lithological Features (bedding,foliation, mineralogy, cement, etc)D
epth
Elevation
07/05/2019
-90°
Co-ordinates
Date Time
HOLEIDENTIFICATION
Location Great South Road, Ngaruawahia
AU
GE
RH
OLE
LO
G L
OG
S.G
PJ
BA
SE
.GD
T
22/0
5/19
0m: Topsoil.
0.3m: Non-engineered fill.
0.7m: Alluvial sand andgravel.
0m: SILT; dark brown. Moist.
0.3m: Silty fine to medium SAND; brownish grey.Medium dense; moist; well graded.
0.4m: Sandy SILT; brownish grey. Very stiff; moist; lowplasticity; moderately sensitive; sand, fine to medium.
0.7m: Fine SAND; yellowish brown. Dense; moist;poorly graded.
1.3m: Fine to medium SAND, minor gravel; brownishorange. Dense; moist; well graded; gravel, fine,subrounded, rhyolitic rock fragments.
1.7m: Some gravel; very dense.
2m: Fine to course SAND, some gravel; brownish grey.Very dense; moist; well graded.
2
5
7
3
3
4
3
8
9
8
10
8
10
11
11
12
9
22
28
27
21
FIL
LH
INU
ER
A F
OR
MA
TIO
N
124/40
110/54
HA16 terminated at 2.8mUnable to advance due to hole collapse
Fluid Depth(m)
Casing Depth(m)
FLUID DEPTHS DURING DRILLING
6
1
100
kPa
Project
For explanation of symbols and observations, see key sheet
Inst
rum
enta
tion
Sam
plin
g
40 kP
a
Shear Vane (kPa)Residual - Peak
Dynamic ConePenetrometer
GEOLOGICAL DESCRIPTION
HA16
Hand Held Shear Vane
SOIL PROPERTIESTest Records
09/05/2019
22/05/2019
Riverlinks Subdivision- Stage 3B - 3F
Centre of Lot. DCP Refusal at 2.1 m depth.No groundwater encountered.*184 kPa is the shear vane limit
Subordinate MAJOR minor; colour; structure. Strength; moisture condition;grading; bedding; plasticity; sensitivity; major fraction description; subordinatefraction description; minor fraction description etc
Gra
phi
c Lo
g
200
kPa
Client
Finished
Date logged
Vane shear strength per NZGS guideline
Project number 60553307
2
Drilled Depth(m)
Perjuli Developments Limited
Page of1
StartedRemarks
8
Logged
KD
Depth RelatedRemarks(Blows per
100 mm)
Orientation
Checked
RJS
1
2
3
09/05/2019
Weathering, Colour, Fabric, Rock Name, Strength,Discontinuities, Lithological Features (bedding,foliation, mineralogy, cement, etc)D
epth
Elevation
09/05/2019
-90°
Co-ordinates
Date Time
HOLEIDENTIFICATION
Location Great South Road, Ngaruawahia
AU
GE
RH
OLE
LO
G L
OG
S.G
PJ
BA
SE
.GD
T
22/0
5/19
0m: Topsoil.
0.25m: Engineered fill.
1.7m: Alluvial sand andgravel.
0m: SILT; dark brown. Moist.
0.25m: Fine SAND, trace silt; light brown. Dense; moist;poorly graded.
0.45m: Fine to medium SAND, trace silt; light brownishgrey. Dense; moist; well graded.
1m: Fine to coarse SAND, trace silt; brown. Dense;moist; gap graded.
1.15m: Medium to coarse SAND, minor gravel; brown.Very dense; moist; well graded; gravel; fine to medium,subangular to subrounded, rhyolitic rock fragments.
1.5m: Coarse SAND, minor gravel; brown and darkbrown. Dense; dry; poorly graded; gravel, fine tomedium, subangular, rhyolitic rock fragments.
1.7m: Fine to coarse SAND, minor gravel; brown andbrownish grey. Dense; moist; well graded; gravel, fine tomedium, subangular to subrounded, rhyolitic rockfragments.
2 to 2.1m: Grey; gravel, rhyolitic rock fragments and pumiceclasts.
2
3
11
12
9
9
9
10
11
11
16
15
23
23
27
27
9
8
8
6
10
11
8
7
8
8
8
7
7
10
FIL
LH
INU
ER
A F
OR
MA
TIO
N
HA18 terminated at 3mTarget Depth
Fluid Depth(m)
Casing Depth(m)
FLUID DEPTHS DURING DRILLING
6
1
100
kPa
Project
For explanation of symbols and observations, see key sheet
Inst
rum
enta
tion
Sam
plin
g
40 kP
a
Shear Vane (kPa)Residual - Peak
Dynamic ConePenetrometer
GEOLOGICAL DESCRIPTION
HA18
Hand Held Shear Vane
SOIL PROPERTIESTest Records
09/05/2019
22/05/2019
Riverlinks Subdivision- Stage 3B - 3F
Centre of Lot.No groundwater encountered.
LOG OF AUGERHOLE
Feature Lot 156
Subordinate MAJOR minor; colour; structure. Strength; moisture condition;grading; bedding; plasticity; sensitivity; major fraction description; subordinatefraction description; minor fraction description etc
Gra
phi
c Lo
g
200
kPa
Client
Finished
Date logged
Vane shear strength per NZGS guideline
Project number 60553307
2
Drilled Depth(m)
Perjuli Developments Limited
Page of1
StartedRemarks
8
Logged
NL
Depth RelatedRemarks(Blows per
100 mm)
Orientation
Checked
RJS
1
2
3
09/05/2019
Weathering, Colour, Fabric, Rock Name, Strength,Discontinuities, Lithological Features (bedding,foliation, mineralogy, cement, etc)D
epth
Elevation
09/05/2019
-90°
Co-ordinates
Date Time
HOLEIDENTIFICATION
Location Great South Road, Ngaruawahia
AU
GE
RH
OLE
LO
G L
OG
S.G
PJ
BA
SE
.GD
T
22/0
5/19
AECOM
River Terraces
River Terraces Subdivision, Ngaruawahia – Stages 3b - 3f and NZS4404:2010
Schedule 2a Completion Report
P:\605X\60553307\8. Issued Docs\8.1 Reports\190607 Stages 3b to 3f completion report Revision 1.docx Revision 1 – 07-Jun-2019 Prepared for – Perjuli Developments Limited – Co No.: 1714295
Appendix C
CPT Logs
This software is licensed to: AECOM CPT name: CPT201 + 0.33 m fill
Cone resistance
HAND AUGER
qt (MPa)2520151050
Dep
th (
m)
15
14.5
14
13.5
13
12.5
12
11.5
11
10.5
10
9.5
9
8.5
8
7.5
7
6.5
6
5.5
5
4.5
4
3.5
3
2.5
2
1.5
1
0.5
0Cone resistance
C P T b a s i c i n t e r p r e t a t i o n p l o t sFriction Ratio
HAND AUGER
Rf (%)6420
Dep
th (
m)
15
14.5
14
13.5
13
12.5
12
11.5
11
10.5
10
9.5
9
8.5
8
7.5
7
6.5
6
5.5
5
4.5
4
3.5
3
2.5
2
1.5
1
0.5
0Friction Ratio Pore pressure
HAND AUGER
u (kPa)100500
Dep
th (
m)
15
14.5
14
13.5
13
12.5
12
11.5
11
10.5
10
9.5
9
8.5
8
7.5
7
6.5
6
5.5
5
4.5
4
3.5
3
2.5
2
1.5
1
0.5
0Pore pressure
Insitu
SBT Plot
Ic(SBT)4321
Dep
th (
m)
15
14.5
14
13.5
13
12.5
12
11.5
11
10.5
10
9.5
9
8.5
8
7.5
7
6.5
6
5.5
5
4.5
4
3.5
3
2.5
2
1.5
1
0.5
0SBT Plot Soil Behaviour Type
HAND AUGER
SBT (Robertson et al. 1986)181614121086420
Dep
th (
m)
15
14.5
14
13.5
13
12.5
12
11.5
11
10.5
10
9.5
9
8.5
8
7.5
7
6.5
6
5.5
5
4.5
4
3.5
3
2.5
2
1.5
1
0.5
0Soil Behaviour Type
Sand & silty sand
Sand & silty sand
Silty sand & sandy silt
Sand & silty sand
Sand & silty sand
Sand & silty sand
CLiq v.2.0.6.85 - CPT Liquefaction Assessment Software - Report created on: 27/03/2019, 11:36:52 a.m. 1Project file: \\nzham1fp001.au.aecomnet.com\projects\605X\60553307\4. Tech work Area\4.3 Engineering\Geotech\Liquefaction\River Terraces_st2 and 3 MASTER.clq
Input parameters and analysis dataAnalysis method:Fines correction method:Points to test:Earthquake magnitude Mw:Peak ground acceleration:Depth to water table (insitu):
B&I (2014)B&I (2014)Based on Ic value5.900.225.00 m
CLiq v.2.0.6.85 - CPT Liquefaction Assessment Software - Report created on: 27/03/2019, 11:36:53 a.m. 2Project file: \\nzham1fp001.au.aecomnet.com\projects\605X\60553307\4. Tech work Area\4.3 Engineering\Geotech\Liquefaction\River Terraces_st2 and 3 MASTER.clq
Input parameters and analysis dataAnalysis method:Fines correction method:Points to test:Earthquake magnitude Mw:Peak ground acceleration:Depth to water table (insitu):
B&I (2014)B&I (2014)Based on Ic value5.900.225.00 m
CLiq v.2.0.6.85 - CPT Liquefaction Assessment Software - Report created on: 27/03/2019, 11:36:54 a.m. 3Project file: \\nzham1fp001.au.aecomnet.com\projects\605X\60553307\4. Tech work Area\4.3 Engineering\Geotech\Liquefaction\River Terraces_st2 and 3 MASTER.clq
Input parameters and analysis dataAnalysis method:Fines correction method:Points to test:Earthquake magnitude Mw:Peak ground acceleration:Depth to water table (insitu):
B&I (2014)B&I (2014)Based on Ic value5.900.225.00 m
CLiq v.2.0.6.85 - CPT Liquefaction Assessment Software - Report created on: 27/03/2019, 11:36:56 a.m. 4Project file: \\nzham1fp001.au.aecomnet.com\projects\605X\60553307\4. Tech work Area\4.3 Engineering\Geotech\Liquefaction\River Terraces_st2 and 3 MASTER.clq
Input parameters and analysis dataAnalysis method:Fines correction method:Points to test:Earthquake magnitude Mw:Peak ground acceleration:Depth to water table (insitu):
B&I (2014)B&I (2014)Based on Ic value5.900.225.00 m
CLiq v.2.0.6.85 - CPT Liquefaction Assessment Software - Report created on: 27/03/2019, 11:36:58 a.m. 5Project file: \\nzham1fp001.au.aecomnet.com\projects\605X\60553307\4. Tech work Area\4.3 Engineering\Geotech\Liquefaction\River Terraces_st2 and 3 MASTER.clq
Input parameters and analysis dataAnalysis method:Fines correction method:Points to test:Earthquake magnitude Mw:Peak ground acceleration:Depth to water table (insitu):
B&I (2014)B&I (2014)Based on Ic value5.900.225.00 m
CLiq v.2.0.6.85 - CPT Liquefaction Assessment Software - Report created on: 27/03/2019, 11:37:00 a.m. 6Project file: \\nzham1fp001.au.aecomnet.com\projects\605X\60553307\4. Tech work Area\4.3 Engineering\Geotech\Liquefaction\River Terraces_st2 and 3 MASTER.clq
Input parameters and analysis dataAnalysis method:Fines correction method:Points to test:Earthquake magnitude Mw:Peak ground acceleration:Depth to water table (insitu):
B&I (2014)B&I (2014)Based on Ic value5.900.225.00 m
CLiq v.2.0.6.85 - CPT Liquefaction Assessment Software - Report created on: 27/03/2019, 11:37:02 a.m. 7Project file: \\nzham1fp001.au.aecomnet.com\projects\605X\60553307\4. Tech work Area\4.3 Engineering\Geotech\Liquefaction\River Terraces_st2 and 3 MASTER.clq
Input parameters and analysis dataAnalysis method:Fines correction method:Points to test:Earthquake magnitude Mw:Peak ground acceleration:Depth to water table (insitu):
B&I (2014)B&I (2014)Based on Ic value5.900.225.00 m
CLiq v.2.0.6.85 - CPT Liquefaction Assessment Software - Report created on: 27/03/2019, 11:37:04 a.m. 8Project file: \\nzham1fp001.au.aecomnet.com\projects\605X\60553307\4. Tech work Area\4.3 Engineering\Geotech\Liquefaction\River Terraces_st2 and 3 MASTER.clq
Input parameters and analysis dataAnalysis method:Fines correction method:Points to test:Earthquake magnitude Mw:Peak ground acceleration:Depth to water table (insitu):
B&I (2014)B&I (2014)Based on Ic value5.900.225.60 m
CLiq v.2.0.6.85 - CPT Liquefaction Assessment Software - Report created on: 27/03/2019, 11:37:06 a.m. 9Project file: \\nzham1fp001.au.aecomnet.com\projects\605X\60553307\4. Tech work Area\4.3 Engineering\Geotech\Liquefaction\River Terraces_st2 and 3 MASTER.clq
Input parameters and analysis dataAnalysis method:Fines correction method:Points to test:Earthquake magnitude Mw:Peak ground acceleration:Depth to water table (insitu):
B&I (2014)B&I (2014)Based on Ic value5.900.225.00 m
CLiq v.2.0.6.85 - CPT Liquefaction Assessment Software - Report created on: 27/03/2019, 11:37:09 a.m. 10Project file: \\nzham1fp001.au.aecomnet.com\projects\605X\60553307\4. Tech work Area\4.3 Engineering\Geotech\Liquefaction\River Terraces_st2 and 3 MASTER.clq
Input parameters and analysis dataAnalysis method:Fines correction method:Points to test:Earthquake magnitude Mw:Peak ground acceleration:Depth to water table (insitu):
B&I (2014)B&I (2014)Based on Ic value5.900.224.60 m
Fill weight:Transition detect. applied:Kσ applied:Clay like behavior applied:Limit depth applied:Limit depth:
N/AYesYesSand & ClayNoN/A
SBT legend1. Sensitive fine grained
2. Organic material
3. Clay to silty clay
4. Clayey silt to siltyclay5. Silty sand to sandy silt
6. Clean sand to silty sand
7. Gravely sand to sand
8. Very stiff sand toclayey sand9. Very stiff fine grained
This software is licensed to: AECOM CPT name: CPT-04(r)
Cone resistance
qt (MPa)20100
Dep
th (
m)
3.4
3.3
3.23.1
3
2.9
2.82.7
2.6
2.5
2.42.3
2.2
2.1
21.9
1.8
1.7
1.6
1.51.4
1.3
1.2
1.11
0.9
0.80.7
0.6
0.5
0.40.3
0.2
0.1
0Cone resistance
C P T b a s i c i n t e r p r e t a t i o n p l o t sFriction Ratio
Rf (%)1086420
Dep
th (
m)
3.4
3.3
3.2
3.13
2.9
2.8
2.7
2.6
2.5
2.4
2.3
2.22.1
2
1.9
1.8
1.7
1.6
1.5
1.4
1.31.2
1.1
1
0.9
0.8
0.7
0.6
0.50.4
0.3
0.2
0.1
Friction Ratio Pore pressure
u (kPa)200-20
Dep
th (
m)
3.4
3.3
3.23.1
3
2.9
2.82.7
2.6
2.5
2.42.3
2.2
2.1
21.9
1.8
1.7
1.6
1.51.4
1.3
1.2
1.11
0.9
0.80.7
0.6
0.5
0.40.3
0.2
0.1
0Pore pressure
Insitu
SBT Plot
Ic(SBT)4321
Dep
th (
m)
3.4
3.3
3.23.1
3
2.9
2.82.7
2.6
2.5
2.42.3
2.2
2.1
21.9
1.8
1.7
1.6
1.51.4
1.3
1.2
1.11
0.9
0.80.7
0.6
0.5
0.40.3
0.2
0.1
0SBT Plot Soil Behaviour Type
SBT (Robertson et al. 1986)181614121086420
Dep
th (
m)
3.4
3.3
3.23.1
3
2.9
2.82.7
2.6
2.5
2.42.3
2.2
2.1
21.9
1.8
1.7
1.6
1.51.4
1.3
1.2
1.11
0.9
0.80.7
0.6
0.5
0.40.3
0.2
0.1
0Soil Behaviour Type
Sensitive fine grainedSilty sand & sandy silt
Sand & silty sand
Silty sand & sandy silt
Sand & silty sand
CLiq v.2.0.6.85 - CPT Liquefaction Assessment Software - Report created on: 27/03/2019, 11:37:12 a.m. 11Project file: \\nzham1fp001.au.aecomnet.com\projects\605X\60553307\4. Tech work Area\4.3 Engineering\Geotech\Liquefaction\River Terraces_st2 and 3 MASTER.clq
Input parameters and analysis dataAnalysis method:Fines correction method:Points to test:Earthquake magnitude Mw:Peak ground acceleration:Depth to water table (insitu):
B&I (2014)B&I (2014)Based on Ic value5.900.220.00 m
Fill weight:Transition detect. applied:Kσ applied:Clay like behavior applied:Limit depth applied:Limit depth:
N/AYesYesSand & ClayNoN/A
SBT legend1. Sensitive fine grained
2. Organic material
3. Clay to silty clay
4. Clayey silt to siltyclay5. Silty sand to sandy silt
6. Clean sand to silty sand
7. Gravely sand to sand
8. Very stiff sand toclayey sand9. Very stiff fine grained
This software is licensed to: AECOM CPT name: CPT-05(r)
Cone resistance
qt (MPa)20151050
Dep
th (
m)
3.63.5
3.43.33.2
3.13
2.92.82.7
2.62.52.4
2.32.22.1
21.9
1.81.71.6
1.51.41.3
1.21.1
1
0.90.80.7
0.60.5
0.40.30.2
0.10
Cone resistance
C P T b a s i c i n t e r p r e t a t i o n p l o t sFriction Ratio
Rf (%)1086420
Dep
th (
m)
3.6
3.53.4
3.33.2
3.13
2.92.8
2.72.62.5
2.42.3
2.22.1
21.9
1.81.7
1.6
1.51.4
1.31.21.1
1
0.90.8
0.70.60.5
0.40.30.20.1
Friction Ratio Pore pressure
u (kPa)100-10-20
Dep
th (
m)
3.63.5
3.43.33.2
3.13
2.92.82.7
2.62.52.4
2.32.22.1
21.9
1.81.71.6
1.51.41.3
1.21.1
1
0.90.80.7
0.60.5
0.40.30.2
0.10
Pore pressure
Insitu
SBT Plot
Ic(SBT)4321
Dep
th (
m)
3.63.5
3.43.33.2
3.13
2.92.82.7
2.62.52.4
2.32.22.1
21.9
1.81.71.6
1.51.41.3
1.21.1
1
0.90.80.7
0.60.5
0.40.30.2
0.10
SBT Plot Soil Behaviour Type
SBT (Robertson et al. 1986)181614121086420
Dep
th (
m)
3.63.5
3.43.33.2
3.13
2.92.82.7
2.62.52.4
2.32.22.1
21.9
1.81.71.6
1.51.41.3
1.21.1
1
0.90.80.7
0.60.5
0.40.30.2
0.10
Soil Behaviour TypeSensitive fine grainedClay & silty clay
ClayClay & silty claySilty sand & sandy silt
Sand & silty sand
Silty sand & sandy silt
Sand & silty sand
Silty sand & sandy silt
Sand & silty sand
Silty sand & sandy silt
Sand & silty sand
CLiq v.2.0.6.85 - CPT Liquefaction Assessment Software - Report created on: 27/03/2019, 11:37:16 a.m. 12Project file: \\nzham1fp001.au.aecomnet.com\projects\605X\60553307\4. Tech work Area\4.3 Engineering\Geotech\Liquefaction\River Terraces_st2 and 3 MASTER.clq
Input parameters and analysis dataAnalysis method:Fines correction method:Points to test:Earthquake magnitude Mw:Peak ground acceleration:Depth to water table (insitu):
B&I (2014)B&I (2014)Based on Ic value5.900.221.90 m
Fill weight:Transition detect. applied:Kσ applied:Clay like behavior applied:Limit depth applied:Limit depth:
N/AYesYesSand & ClayNoN/A
SBT legend1. Sensitive fine grained
2. Organic material
3. Clay to silty clay
4. Clayey silt to siltyclay5. Silty sand to sandy silt
6. Clean sand to silty sand
7. Gravely sand to sand
8. Very stiff sand toclayey sand9. Very stiff fine grained
AECOM
River Terraces
River Terraces Subdivision, Ngaruawahia – Stages 3b - 3f and NZS4404:2010
Schedule 2a Completion Report
P:\605X\60553307\8. Issued Docs\8.1 Reports\190607 Stages 3b to 3f completion report Revision 1.docx Revision 1 – 07-Jun-2019 Prepared for – Perjuli Developments Limited – Co No.: 1714295
Appendix D
Liquefaction Assessment
This software is licensed to: AECOM CPT name: CPT201 + 0.33 m fill
CRR plotFILL
CRR & CSR0.60.40.20
Dep
th (
m)
15
14.5
14
13.5
13
12.5
12
11.5
11
10.5
10
9.5
9
8.5
8
7.5
7
6.5
6
5.5
5
4.5
4
3.5
3
2.5
2
1.5
1
0.5
0CRR plot
During earthq.
L i q u e f a c t i o n a n a l y s i s o v e r a l l p l o t sFS Plot
Factor of safety21.510.50
Dep
th (
m)
15
14.5
14
13.5
13
12.5
12
11.5
11
10.5
10
9.5
9
8.5
8
7.5
7
6.5
6
5.5
5
4.5
4
3.5
3
2.5
2
1.5
1
0.5
0FS Plot
During earthq.
LPI
Liquefaction potential20151050
Dep
th (
m)
15
14.5
14
13.5
13
12.5
12
11.5
11
10.5
10
9.5
9
8.5
8
7.5
7
6.5
6
5.5
5
4.5
4
3.5
3
2.5
2
1.5
1
0.5
0LPI Vertical settlements
FILL
Settlement (cm)2520151050
Dep
th (
m)
15
14.5
14
13.5
13
12.5
12
11.5
11
10.5
10
9.5
9
8.5
8
7.5
7
6.5
6
5.5
5
4.5
4
3.5
3
2.5
2
1.5
1
0.5
0Vertical settlements Lateral displacements
FILL
Displacement (cm)806040200
Dep
th (
m)
15
14.5
14
13.5
13
12.5
12
11.5
11
10.5
10
9.5
9
8.5
8
7.5
7
6.5
6
5.5
5
4.5
4
3.5
3
2.5
2
1.5
1
0.5
0Lateral displacements
CLiq v.2.0.6.85 - CPT Liquefaction Assessment Software - Report created on: 24/05/2019, 2:57:23 p.m. 1Project file: \\nzham1fp001.au.aecomnet.com\projects\605X\60553307\4. Tech work Area\4.3 Engineering\Geotech\Liquefaction\River Terraces_st2 and 3 MASTER.clq
Input parameters and analysis dataAnalysis method:Fines correction method:Points to test:Earthquake magnitude Mw:Peak ground acceleration:Depth to water table (insitu):
B&I (2014)B&I (2014)Based on Ic value5.900.225.00 m
Fill weight:Transition detect. applied:Kσ applied:Clay like behavior applied:Limit depth applied:Limit depth:
18.00 kN/m3
YesYesSands onlyYes15.00 m
F.S. color scheme LPI color schemeAlmost certain it will liquefy
Very likely to liquefy
Liquefaction and no liq. are equally likely
Unlike to liquefy
Almost certain it will not liquefy
Very high risk
High risk
Low risk
This software is licensed to: AECOM CPT name: CPT202 + 0.52 m fill
CRR plotFILL
CRR & CSR0.60.40.20
Dep
th (
m)
15
14.5
14
13.5
13
12.5
12
11.5
11
10.5
10
9.5
9
8.5
8
7.5
7
6.5
6
5.5
5
4.5
4
3.5
3
2.5
2
1.5
1
0.5
CRR plot
During earthq.
L i q u e f a c t i o n a n a l y s i s o v e r a l l p l o t sFS Plot
Factor of safety21.510.50
Dep
th (
m)
15
14.5
14
13.5
13
12.5
12
11.5
11
10.5
10
9.5
9
8.5
8
7.5
7
6.5
6
5.5
5
4.5
4
3.5
3
2.5
2
1.5
1
0.5
FS Plot
During earthq.
LPI
Liquefaction potential20151050
Dep
th (
m)
15
14.5
14
13.5
13
12.5
12
11.5
11
10.5
10
9.5
9
8.5
8
7.5
7
6.5
6
5.5
5
4.5
4
3.5
3
2.5
2
1.5
1
0.5
LPI Vertical settlementsFILL
Settlement (cm)3020100
Dep
th (
m)
15
14.5
14
13.5
13
12.5
12
11.5
11
10.5
10
9.5
9
8.5
8
7.5
7
6.5
6
5.5
5
4.5
4
3.5
3
2.5
2
1.5
1
0.5
Vertical settlements Lateral displacementsFILL
Displacement (cm)3002001000
Dep
th (
m)
15
14.5
14
13.5
13
12.5
12
11.5
11
10.5
10
9.5
9
8.5
8
7.5
7
6.5
6
5.5
5
4.5
4
3.5
3
2.5
2
1.5
1
0.5
Lateral displacements
CLiq v.2.0.6.85 - CPT Liquefaction Assessment Software - Report created on: 24/05/2019, 2:57:24 p.m. 2Project file: \\nzham1fp001.au.aecomnet.com\projects\605X\60553307\4. Tech work Area\4.3 Engineering\Geotech\Liquefaction\River Terraces_st2 and 3 MASTER.clq
Input parameters and analysis dataAnalysis method:Fines correction method:Points to test:Earthquake magnitude Mw:Peak ground acceleration:Depth to water table (insitu):
B&I (2014)B&I (2014)Based on Ic value5.900.225.00 m
Fill weight:Transition detect. applied:Kσ applied:Clay like behavior applied:Limit depth applied:Limit depth:
18.00 kN/m3
YesYesSands onlyYes15.00 m
F.S. color scheme LPI color schemeAlmost certain it will liquefy
Very likely to liquefy
Liquefaction and no liq. are equally likely
Unlike to liquefy
Almost certain it will not liquefy
Very high risk
High risk
Low risk
This software is licensed to: AECOM CPT name: CPT203 + 2.73 m fill
CRR plotFILL
CRR & CSR0.60.40.20
Dep
th (
m)
15
14.5
14
13.5
13
12.5
12
11.5
11
10.5
10
9.5
9
8.5
8
7.5
7
6.5
6
5.5
5
4.5
4
3.5
3
2.5
2
1.5
1
0.5
CRR plot
During earthq.
L i q u e f a c t i o n a n a l y s i s o v e r a l l p l o t sFS Plot
Factor of safety21.510.50
Dep
th (
m)
15
14.5
14
13.5
13
12.5
12
11.5
11
10.5
10
9.5
9
8.5
8
7.5
7
6.5
6
5.5
5
4.5
4
3.5
3
2.5
2
1.5
1
0.5
FS Plot
During earthq.
LPI
Liquefaction potential20151050
Dep
th (
m)
15
14.5
14
13.5
13
12.5
12
11.5
11
10.5
10
9.5
9
8.5
8
7.5
7
6.5
6
5.5
5
4.5
4
3.5
3
2.5
2
1.5
1
0.5
LPI Vertical settlementsFILL
Settlement (cm)151050
Dep
th (
m)
15
14.5
14
13.5
13
12.5
12
11.5
11
10.5
10
9.5
9
8.5
8
7.5
7
6.5
6
5.5
5
4.5
4
3.5
3
2.5
2
1.5
1
0.5
Vertical settlements Lateral displacementsFILL
Displacement (cm)2001000
Dep
th (
m)
15
14.5
14
13.5
13
12.5
12
11.5
11
10.5
10
9.5
9
8.5
8
7.5
7
6.5
6
5.5
5
4.5
4
3.5
3
2.5
2
1.5
1
0.5
Lateral displacements
CLiq v.2.0.6.85 - CPT Liquefaction Assessment Software - Report created on: 24/05/2019, 2:57:25 p.m. 3Project file: \\nzham1fp001.au.aecomnet.com\projects\605X\60553307\4. Tech work Area\4.3 Engineering\Geotech\Liquefaction\River Terraces_st2 and 3 MASTER.clq
Input parameters and analysis dataAnalysis method:Fines correction method:Points to test:Earthquake magnitude Mw:Peak ground acceleration:Depth to water table (insitu):
B&I (2014)B&I (2014)Based on Ic value5.900.225.00 m
Fill weight:Transition detect. applied:Kσ applied:Clay like behavior applied:Limit depth applied:Limit depth:
18.00 kN/m3
YesYesSands onlyYes15.00 m
F.S. color scheme LPI color schemeAlmost certain it will liquefy
Very likely to liquefy
Liquefaction and no liq. are equally likely
Unlike to liquefy
Almost certain it will not liquefy
Very high risk
High risk
Low risk
This software is licensed to: AECOM CPT name: CPT205 + 1.17 m fill
CRR plotFILL
CRR & CSR0.60.40.20
Dep
th (
m)
15
14.5
14
13.5
13
12.5
12
11.5
11
10.5
10
9.5
9
8.5
8
7.5
7
6.5
6
5.5
5
4.5
4
3.5
3
2.5
2
1.5
1
0.5
CRR plot
During earthq.
L i q u e f a c t i o n a n a l y s i s o v e r a l l p l o t sFS Plot
Factor of safety21.510.50
Dep
th (
m)
15
14.5
14
13.5
13
12.5
12
11.5
11
10.5
10
9.5
9
8.5
8
7.5
7
6.5
6
5.5
5
4.5
4
3.5
3
2.5
2
1.5
1
0.5
FS Plot
During earthq.
LPI
Liquefaction potential20151050
Dep
th (
m)
15
14.5
14
13.5
13
12.5
12
11.5
11
10.5
10
9.5
9
8.5
8
7.5
7
6.5
6
5.5
5
4.5
4
3.5
3
2.5
2
1.5
1
0.5
LPI Vertical settlementsFILL
Settlement (cm)543210
Dep
th (
m)
15
14.5
14
13.5
13
12.5
12
11.5
11
10.5
10
9.5
9
8.5
8
7.5
7
6.5
6
5.5
5
4.5
4
3.5
3
2.5
2
1.5
1
0.5
Vertical settlements Lateral displacementsFILL
Displacement (cm)1050
Dep
th (
m)
15
14.5
14
13.5
13
12.5
12
11.5
11
10.5
10
9.5
9
8.5
8
7.5
7
6.5
6
5.5
5
4.5
4
3.5
3
2.5
2
1.5
1
0.5
Lateral displacements
CLiq v.2.0.6.85 - CPT Liquefaction Assessment Software - Report created on: 24/05/2019, 2:57:26 p.m. 4Project file: \\nzham1fp001.au.aecomnet.com\projects\605X\60553307\4. Tech work Area\4.3 Engineering\Geotech\Liquefaction\River Terraces_st2 and 3 MASTER.clq
Input parameters and analysis dataAnalysis method:Fines correction method:Points to test:Earthquake magnitude Mw:Peak ground acceleration:Depth to water table (insitu):
B&I (2014)B&I (2014)Based on Ic value5.900.225.00 m
Fill weight:Transition detect. applied:Kσ applied:Clay like behavior applied:Limit depth applied:Limit depth:
18.00 kN/m3
YesYesSands onlyYes15.00 m
F.S. color scheme LPI color schemeAlmost certain it will liquefy
Very likely to liquefy
Liquefaction and no liq. are equally likely
Unlike to liquefy
Almost certain it will not liquefy
Very high risk
High risk
Low risk
This software is licensed to: AECOM CPT name: CPT207 + 0.32 m fill
CRR plotFILL
CRR & CSR0.60.40.20
Dep
th (
m)
15
14.5
14
13.5
13
12.5
12
11.5
11
10.5
10
9.5
9
8.5
8
7.5
7
6.5
6
5.5
5
4.5
4
3.5
3
2.5
2
1.5
1
0.5
CRR plot
During earthq.
L i q u e f a c t i o n a n a l y s i s o v e r a l l p l o t sFS Plot
Factor of safety21.510.50
Dep
th (
m)
15
14.5
14
13.5
13
12.5
12
11.5
11
10.5
10
9.5
9
8.5
8
7.5
7
6.5
6
5.5
5
4.5
4
3.5
3
2.5
2
1.5
1
0.5
FS Plot
During earthq.
LPI
Liquefaction potential20151050
Dep
th (
m)
15
14.5
14
13.5
13
12.5
12
11.5
11
10.5
10
9.5
9
8.5
8
7.5
7
6.5
6
5.5
5
4.5
4
3.5
3
2.5
2
1.5
1
0.5
LPI Vertical settlementsFILL
Settlement (cm)43210
Dep
th (
m)
15
14.5
14
13.5
13
12.5
12
11.5
11
10.5
10
9.5
9
8.5
8
7.5
7
6.5
6
5.5
5
4.5
4
3.5
3
2.5
2
1.5
1
0.5
Vertical settlements Lateral displacementsFILL
Displacement (cm)3210
Dep
th (
m)
15
14.5
14
13.5
13
12.5
12
11.5
11
10.5
10
9.5
9
8.5
8
7.5
7
6.5
6
5.5
5
4.5
4
3.5
3
2.5
2
1.5
1
0.5
Lateral displacements
CLiq v.2.0.6.85 - CPT Liquefaction Assessment Software - Report created on: 24/05/2019, 2:57:27 p.m. 5Project file: \\nzham1fp001.au.aecomnet.com\projects\605X\60553307\4. Tech work Area\4.3 Engineering\Geotech\Liquefaction\River Terraces_st2 and 3 MASTER.clq
Input parameters and analysis dataAnalysis method:Fines correction method:Points to test:Earthquake magnitude Mw:Peak ground acceleration:Depth to water table (insitu):
B&I (2014)B&I (2014)Based on Ic value5.900.225.00 m
Fill weight:Transition detect. applied:Kσ applied:Clay like behavior applied:Limit depth applied:Limit depth:
18.00 kN/m3
YesYesSands onlyYes15.00 m
F.S. color scheme LPI color schemeAlmost certain it will liquefy
Very likely to liquefy
Liquefaction and no liq. are equally likely
Unlike to liquefy
Almost certain it will not liquefy
Very high risk
High risk
Low risk
This software is licensed to: AECOM CPT name: CPT204 - 2.01 m cut
CRR plot
EXCAVATED
CRR & CSR0.60.40.20
Dep
th (
m)
15
14.5
14
13.5
13
12.5
12
11.5
11
10.5
10
9.5
9
8.5
8
7.5
7
6.5
6
5.5
5
4.5
4
3.5
3
2.5
2
1.5
1
0.5
CRR plot
During earthq.
L i q u e f a c t i o n a n a l y s i s o v e r a l l p l o t sFS Plot
Factor of safety21.510.50
Dep
th (
m)
15
14.5
14
13.5
13
12.5
12
11.5
11
10.5
10
9.5
9
8.5
8
7.5
7
6.5
6
5.5
5
4.5
4
3.5
3
2.5
2
1.5
1
0.5
FS Plot
During earthq.
LPI
Liquefaction potential20151050
Dep
th (
m)
15
14.5
14
13.5
13
12.5
12
11.5
11
10.5
10
9.5
9
8.5
8
7.5
7
6.5
6
5.5
5
4.5
4
3.5
3
2.5
2
1.5
1
0.5
LPI Vertical settlements
EXCAVATED
Settlement (cm)43210
Dep
th (
m)
15
14.5
14
13.5
13
12.5
12
11.5
11
10.5
10
9.5
9
8.5
8
7.5
7
6.5
6
5.5
5
4.5
4
3.5
3
2.5
2
1.5
1
0.5
Vertical settlements Lateral displacements
EXCAVATED
Displacement (cm)20151050
Dep
th (
m)
15
14.5
14
13.5
13
12.5
12
11.5
11
10.5
10
9.5
9
8.5
8
7.5
7
6.5
6
5.5
5
4.5
4
3.5
3
2.5
2
1.5
1
0.5
Lateral displacements
CLiq v.2.0.6.85 - CPT Liquefaction Assessment Software - Report created on: 24/05/2019, 2:57:28 p.m. 6Project file: \\nzham1fp001.au.aecomnet.com\projects\605X\60553307\4. Tech work Area\4.3 Engineering\Geotech\Liquefaction\River Terraces_st2 and 3 MASTER.clq
Input parameters and analysis dataAnalysis method:Fines correction method:Points to test:Earthquake magnitude Mw:Peak ground acceleration:Depth to water table (insitu):
B&I (2014)B&I (2014)Based on Ic value5.900.225.00 m
F.S. color scheme LPI color schemeAlmost certain it will liquefy
Very likely to liquefy
Liquefaction and no liq. are equally likely
Unlike to liquefy
Almost certain it will not liquefy
Very high risk
High risk
Low risk
This software is licensed to: AECOM CPT name: CPT206 -0.6 m cut
CRR plot
EXCAVATED
CRR & CSR0.60.40.20
Dep
th (
m)
15
14.5
14
13.5
13
12.5
12
11.5
11
10.5
10
9.5
9
8.5
8
7.5
7
6.5
6
5.5
5
4.5
4
3.5
3
2.5
2
1.5
1
0.5
CRR plot
During earthq.
L i q u e f a c t i o n a n a l y s i s o v e r a l l p l o t sFS Plot
Factor of safety21.510.50
Dep
th (
m)
15
14.5
14
13.5
13
12.5
12
11.5
11
10.5
10
9.5
9
8.5
8
7.5
7
6.5
6
5.5
5
4.5
4
3.5
3
2.5
2
1.5
1
0.5
FS Plot
During earthq.
LPI
Liquefaction potential20151050
Dep
th (
m)
15
14.5
14
13.5
13
12.5
12
11.5
11
10.5
10
9.5
9
8.5
8
7.5
7
6.5
6
5.5
5
4.5
4
3.5
3
2.5
2
1.5
1
0.5
LPI Vertical settlements
EXCAVATED
Settlement (cm)86420
Dep
th (
m)
15
14.5
14
13.5
13
12.5
12
11.5
11
10.5
10
9.5
9
8.5
8
7.5
7
6.5
6
5.5
5
4.5
4
3.5
3
2.5
2
1.5
1
0.5
Vertical settlements Lateral displacements
EXCAVATED
Displacement (cm)20151050
Dep
th (
m)
15
14.5
14
13.5
13
12.5
12
11.5
11
10.5
10
9.5
9
8.5
8
7.5
7
6.5
6
5.5
5
4.5
4
3.5
3
2.5
2
1.5
1
0.5
Lateral displacements
CLiq v.2.0.6.85 - CPT Liquefaction Assessment Software - Report created on: 24/05/2019, 2:57:30 p.m. 7Project file: \\nzham1fp001.au.aecomnet.com\projects\605X\60553307\4. Tech work Area\4.3 Engineering\Geotech\Liquefaction\River Terraces_st2 and 3 MASTER.clq
Input parameters and analysis dataAnalysis method:Fines correction method:Points to test:Earthquake magnitude Mw:Peak ground acceleration:Depth to water table (insitu):
B&I (2014)B&I (2014)Based on Ic value5.900.225.00 m
F.S. color scheme LPI color schemeAlmost certain it will liquefy
Very likely to liquefy
Liquefaction and no liq. are equally likely
Unlike to liquefy
Almost certain it will not liquefy
Very high risk
High risk
Low risk
This software is licensed to: AECOM CPT name: CPT-01(r)
CRR plot
CRR & CSR0.60.40.20
Dep
th (
m)
15
14.5
14
13.5
13
12.5
12
11.5
11
10.5
10
9.5
9
8.5
8
7.5
7
6.5
6
5.5
5
4.5
4
3.5
3
2.5
2
1.5
1
0.5
0CRR plot
During earthq.
L i q u e f a c t i o n a n a l y s i s o v e r a l l p l o t sFS Plot
Factor of safety21.510.50
Dep
th (
m)
15
14.5
14
13.5
13
12.5
12
11.5
11
10.5
10
9.5
9
8.5
8
7.5
7
6.5
6
5.5
5
4.5
4
3.5
3
2.5
2
1.5
1
0.5
0FS Plot
During earthq.
LPI
Liquefaction potential20151050
Dep
th (
m)
15
14.5
14
13.5
13
12.5
12
11.5
11
10.5
10
9.5
9
8.5
8
7.5
7
6.5
6
5.5
5
4.5
4
3.5
3
2.5
2
1.5
1
0.5
0LPI Vertical settlements
Settlement (cm)543210
Dep
th (
m)
15
14.5
14
13.5
13
12.5
12
11.5
11
10.5
10
9.5
9
8.5
8
7.5
7
6.5
6
5.5
5
4.5
4
3.5
3
2.5
2
1.5
1
0.5
0Vertical settlements Lateral displacements
Displacement (cm)0
Dep
th (
m)
15
14.5
14
13.5
13
12.5
12
11.5
11
10.5
10
9.5
9
8.5
8
7.5
7
6.5
6
5.5
5
4.5
4
3.5
3
2.5
2
1.5
1
0.5
0Lateral displacements
CLiq v.2.0.6.85 - CPT Liquefaction Assessment Software - Report created on: 24/05/2019, 2:57:31 p.m. 8Project file: \\nzham1fp001.au.aecomnet.com\projects\605X\60553307\4. Tech work Area\4.3 Engineering\Geotech\Liquefaction\River Terraces_st2 and 3 MASTER.clq
Input parameters and analysis dataAnalysis method:Fines correction method:Points to test:Earthquake magnitude Mw:Peak ground acceleration:Depth to water table (insitu):
B&I (2014)B&I (2014)Based on Ic value5.900.225.60 m
Fill weight:Transition detect. applied:Kσ applied:Clay like behavior applied:Limit depth applied:Limit depth:
N/AYesYesSand & ClayYes15.00 m
F.S. color scheme LPI color schemeAlmost certain it will liquefy
Very likely to liquefy
Liquefaction and no liq. are equally likely
Unlike to liquefy
Almost certain it will not liquefy
Very high risk
High risk
Low risk
This software is licensed to: AECOM CPT name: CPT-02(r)
CRR plot
CRR & CSR0.60.40.20
Dep
th (
m)
15
14.5
14
13.5
13
12.5
12
11.5
11
10.5
10
9.5
9
8.5
8
7.5
7
6.5
6
5.5
5
4.5
4
3.5
3
2.5
2
1.5
1
0.5
0CRR plot
During earthq.
L i q u e f a c t i o n a n a l y s i s o v e r a l l p l o t sFS Plot
Factor of safety21.510.50
Dep
th (
m)
15
14.5
14
13.5
13
12.5
12
11.5
11
10.5
10
9.5
9
8.5
8
7.5
7
6.5
6
5.5
5
4.5
4
3.5
3
2.5
2
1.5
1
0.5
0FS Plot
During earthq.
LPI
Liquefaction potential20151050
Dep
th (
m)
15
14.5
14
13.5
13
12.5
12
11.5
11
10.5
10
9.5
9
8.5
8
7.5
7
6.5
6
5.5
5
4.5
4
3.5
3
2.5
2
1.5
1
0.5
0LPI Vertical settlements
Settlement (cm)21.510.50
Dep
th (
m)
15
14.5
14
13.5
13
12.5
12
11.5
11
10.5
10
9.5
9
8.5
8
7.5
7
6.5
6
5.5
5
4.5
4
3.5
3
2.5
2
1.5
1
0.5
0Vertical settlements Lateral displacements
Displacement (cm)0
Dep
th (
m)
15
14.5
14
13.5
13
12.5
12
11.5
11
10.5
10
9.5
9
8.5
8
7.5
7
6.5
6
5.5
5
4.5
4
3.5
3
2.5
2
1.5
1
0.5
0Lateral displacements
CLiq v.2.0.6.85 - CPT Liquefaction Assessment Software - Report created on: 24/05/2019, 2:57:33 p.m. 9Project file: \\nzham1fp001.au.aecomnet.com\projects\605X\60553307\4. Tech work Area\4.3 Engineering\Geotech\Liquefaction\River Terraces_st2 and 3 MASTER.clq
Input parameters and analysis dataAnalysis method:Fines correction method:Points to test:Earthquake magnitude Mw:Peak ground acceleration:Depth to water table (insitu):
B&I (2014)B&I (2014)Based on Ic value5.900.225.00 m
Fill weight:Transition detect. applied:Kσ applied:Clay like behavior applied:Limit depth applied:Limit depth:
N/AYesYesSand & ClayYes15.00 m
F.S. color scheme LPI color schemeAlmost certain it will liquefy
Very likely to liquefy
Liquefaction and no liq. are equally likely
Unlike to liquefy
Almost certain it will not liquefy
Very high risk
High risk
Low risk
This software is licensed to: AECOM CPT name: CPT-04(r)
CRR plot
CRR & CSR0.60.40.20
Dep
th (
m)
3.4
3.3
3.23.1
3
2.9
2.82.7
2.6
2.5
2.4
2.32.2
2.1
2
1.91.8
1.7
1.6
1.51.4
1.3
1.2
1.11
0.9
0.80.7
0.6
0.5
0.40.3
0.2
0.1
0CRR plot
During earthq.
L i q u e f a c t i o n a n a l y s i s o v e r a l l p l o t sFS Plot
Factor of safety21.510.50
Dep
th (
m)
3.4
3.3
3.23.1
3
2.9
2.82.7
2.6
2.5
2.4
2.32.2
2.1
2
1.91.8
1.7
1.6
1.51.4
1.3
1.2
1.11
0.9
0.80.7
0.6
0.5
0.40.3
0.2
0.1
0FS Plot
During earthq.
LPI
Liquefaction potential20151050
Dep
th (
m)
3.4
3.3
3.23.1
3
2.9
2.82.7
2.6
2.5
2.4
2.32.2
2.1
2
1.91.8
1.7
1.6
1.51.4
1.3
1.2
1.11
0.9
0.80.7
0.6
0.5
0.40.3
0.2
0.1
0LPI Vertical settlements
Settlement (cm)0.40.30.20.10
Dep
th (
m)
3.4
3.33.2
3.1
3
2.92.8
2.7
2.62.5
2.4
2.32.2
2.1
2
1.91.8
1.7
1.6
1.5
1.4
1.31.2
1.1
1
0.90.8
0.7
0.60.5
0.4
0.3
0.2
0.1
0Vertical settlements Lateral displacements
Displacement (cm)0
Dep
th (
m)
3.4
3.3
3.23.1
3
2.9
2.82.7
2.6
2.5
2.4
2.32.2
2.1
2
1.91.8
1.7
1.6
1.51.4
1.3
1.2
1.11
0.9
0.80.7
0.6
0.5
0.40.3
0.2
0.1
0Lateral displacements
CLiq v.2.0.6.85 - CPT Liquefaction Assessment Software - Report created on: 24/05/2019, 2:57:34 p.m. 10Project file: \\nzham1fp001.au.aecomnet.com\projects\605X\60553307\4. Tech work Area\4.3 Engineering\Geotech\Liquefaction\River Terraces_st2 and 3 MASTER.clq
Input parameters and analysis dataAnalysis method:Fines correction method:Points to test:Earthquake magnitude Mw:Peak ground acceleration:Depth to water table (insitu):
B&I (2014)B&I (2014)Based on Ic value5.900.221.90 m
Fill weight:Transition detect. applied:Kσ applied:Clay like behavior applied:Limit depth applied:Limit depth:
N/AYesYesSand & ClayNoN/A
F.S. color scheme LPI color schemeAlmost certain it will liquefy
Very likely to liquefy
Liquefaction and no liq. are equally likely
Unlike to liquefy
Almost certain it will not liquefy
Very high risk
High risk
Low risk
This software is licensed to: AECOM CPT name: CPT-05(r)
CRR plot
CRR & CSR0.60.40.20
Dep
th (
m)
3.63.5
3.43.33.2
3.13
2.92.82.7
2.62.52.4
2.32.22.1
21.9
1.81.71.6
1.51.41.3
1.21.1
1
0.90.80.7
0.60.50.40.30.2
0.10
CRR plot
During earthq.
L i q u e f a c t i o n a n a l y s i s o v e r a l l p l o t sFS Plot
Factor of safety21.510.50
Dep
th (
m)
3.63.5
3.43.33.2
3.13
2.92.82.7
2.62.52.4
2.32.22.1
21.9
1.81.71.6
1.51.41.3
1.21.1
1
0.90.80.7
0.60.50.40.30.2
0.10
FS Plot
During earthq.
LPI
Liquefaction potential20151050
Dep
th (
m)
3.63.5
3.43.33.2
3.13
2.92.82.7
2.62.52.4
2.32.22.1
21.9
1.81.71.6
1.51.41.3
1.21.1
1
0.90.80.7
0.60.50.40.30.2
0.10
LPI Vertical settlements
Settlement (cm)0.150.10.050
Dep
th (
m)
3.63.5
3.43.33.23.1
3
2.92.82.72.62.52.4
2.32.22.1
21.9
1.81.71.6
1.51.41.3
1.21.1
10.90.80.70.60.50.40.30.20.1
0Vertical settlements Lateral displacements
Displacement (cm)0
Dep
th (
m)
3.63.5
3.43.33.2
3.13
2.92.82.7
2.62.52.4
2.32.22.1
21.9
1.81.71.6
1.51.41.3
1.21.1
1
0.90.80.7
0.60.50.40.30.2
0.10
Lateral displacements
CLiq v.2.0.6.85 - CPT Liquefaction Assessment Software - Report created on: 24/05/2019, 2:57:37 p.m. 11Project file: \\nzham1fp001.au.aecomnet.com\projects\605X\60553307\4. Tech work Area\4.3 Engineering\Geotech\Liquefaction\River Terraces_st2 and 3 MASTER.clq
Input parameters and analysis dataAnalysis method:Fines correction method:Points to test:Earthquake magnitude Mw:Peak ground acceleration:Depth to water table (insitu):
B&I (2014)B&I (2014)Based on Ic value5.900.221.90 m
LSN color schemeSevere damageMajor expression of liquefactionModerate to severe exp. of liquefactionModerate expression of liquefactionMinor expression of liquefactionLittle to no expression of liquefaction
0.00% moderate to major liquefaction
3.13% major liquefaction
0.00% severe liquefaction
CLiq v.2.0.6.85 - CPT Liquefaction Assessment Software 1Project file: \\nzham1fp001.au.aecomnet.com\projects\605X\60553307\4. Tech work Area\4.3 Engineering\Geotech\Liquefaction\River Terraces_st2 and 3 MASTER.clq
C PT201 + 0.33 m fill copyC PT202 + 0.52 m fill copyC PT203 + 2.73 m fill copyC PT205 + 1.17 m fill copyC PT207 + 0.32 m fill copyC PT204 - 2.01 m cut copyC PT206 -0.6 m cut copyC PT-01(r) copyC PT-02(r) copyC PT-04(r) copyC PT-05(r) copy
Settlements vs PGA
:: CPT main liquefaction parameters details ::
GWT in situ(m)
CPT Name EarthquakeMag.
GWT earthq.(m)
Assesment method
AECOM
River Terraces
River Terraces Subdivision, Ngaruawahia – Stages 3b - 3f and NZS4404:2010
Schedule 2a Completion Report
P:\605X\60553307\8. Issued Docs\8.1 Reports\190607 Stages 3b to 3f completion report Revision 1.docx Revision 1 – 07-Jun-2019 Prepared for – Perjuli Developments Limited – Co No.: 1714295
D-1
Appendix D Liquefaction Assessment Table 3 General performance levels of liquefied deposits (Reproduced from Table 5.1 in Module 3)
Table 4 Summary of performance level from liquefaction results
1 CPT203 is designated L3 with lateral displacements taken into account.
2 CPT-04(r) and 05(r) had test depths of 3.4 and 3.6 respectively and therefore the liquefaction risks are likely to be understated.
CPT Vertical settlement (mm)
LPI LSN Performance Level
Effect
CPT201 260 9 25 L4 Severe
CPT202 330 19 42 L4 Severe
CPT203 180 8 23 L3 High1
CPT204 40 2 5 L2 Moderate
CPT205 60 1 5 L2 Moderate
CPT206 80 2 7 L2 Moderate
CPT207 50 1 8 L2 Moderate
CPT-01(r) 60 2 6 L2 Moderate
CPT-02(r) 30 1 3 L2 Moderate
CPT-03(r) 10 1 2 L2 Moderate
CPT-04(r) 10 0 2 L1 Mild2
CPT-05(r) 10 0 1 L1 Mild2
AECOM
River Terraces
River Terraces Subdivision, Ngaruawahia – Stages 3b - 3f and NZS4404:2010
Schedule 2a Completion Report
P:\605X\60553307\8. Issued Docs\8.1 Reports\190607 Stages 3b to 3f completion report Revision 1.docx Revision 1 – 07-Jun-2019 Prepared for – Perjuli Developments Limited – Co No.: 1714295
I, Russell Allison Of AECOM New Zealand Ltd, PO Box 434, Hamilton
(Full Name)
Hereby confirm that:
1. I am a geo-professional as defined in section 1.2.2 of NZS 4404:2010 working for AECOM New Zealand Ltd. AECOM was retained by the developer as the geo-professional on the above development.
2. The extent of inspections during construction and the results of all tests and/or re-evaluations carried out by AECOM are as described in the geotechnical completion report dated 28 May 2019.
3. In my professional opinion, not to be construed as a guarantee, I consider that:
(a) The original ground not affected by filling is suitable for the erection of buildings designed according to NZS 3604 provided that:
i. Shallow geotechnical testing of each lot is to be undertaken as part of the house design/building process, by a Chartered Professional Engineer (Geotechnical practice area) or Professional Engineering Geologist registered with Engineering New Zealand, to enable specific foundation recommendations to be provided for each of the lots in the development with consideration to the underlying subgrade strength, groundwater levels and liquefaction resilience, as described in Sections 8.1 and 8.2 of the geotechnical completion report dated 28 May 2019.
ii. A Chartered Professional Engineer (Geotechnical practice area) or Professional Engineering Geologist registered with Engineering New Zealand familiar with this report reviews all proposals for earthworks and buildings, as described in Section 8.3 and 8.4 geotechnical completion report dated 28 May 2019, prior to any works being undertaken on any of the lots.
iii. Excavations to remove the topsoil layer and/or any uncontrolled fill will be required on all lots.
(b) Subject to 3(a) of this schedule, the filled ground is suitable for the erection of buildings designed according to NZS 3604 provided that:
i. Shallow geotechnical testing of each lot is to be undertaken as part of the house design/building process, by a Chartered Professional Engineer (Geotechnical practice area) or Professional Engineering Geologist registered with Engineering New Zealand, to enable specific foundation recommendations to be provided for each of the lots in the development with consideration to the underlying subgrade strength, groundwater
AECOM
River Terraces
River Terraces Subdivision, Ngaruawahia – Stages 3b - 3f and NZS4404:2010
Schedule 2a Completion Report
P:\605X\60553307\8. Issued Docs\8.1 Reports\190607 Stages 3b to 3f completion report Revision 1.docx Revision 1 – 07-Jun-2019 Prepared for – Perjuli Developments Limited – Co No.: 1714295
levels and liquefaction resilience, as described in Sections 8.1 and 8.2 of the geotechnical completion report dated 28 May 2019
ii. A Chartered Professional Engineer (Geotechnical practice area) or Professional Engineering Geologist registered with Engineering New Zealand familiar with this report reviews all proposals for earthworks and buildings, as described in Section 8.3 and 8.4 of the geotechnical completion report dated 28 May 2019, prior to any works being undertaken on any of the lots.
iii. Excavations to remove the topsoil layer and/or any uncontrolled fill will be required on all lots.
(c) The original ground not affected by filling and the filled ground is not subject to erosion, subsidence or slippage in accordance with the provisions of section 106 of the Resource Management Act 1991 provided that:
i. All stormwater discharges are to be managed on each lot using an on-site soakage system
4. This professional opinion is furnished to the TA and the developer for their purposes alone on the express condition that it will not be relied upon by any other person and does not remove the necessity for the normal inspection of foundation conditions at the time of erection of any building.
5. This certificate shall be read in conjunction with my geotechnical report referred to in clause 2 above and shall not be copied or reproduced except in conjunction with the full geotechnical completion report.