1 00/2014 River Current Resource Assessment and Characterization Considering Ice Conditions International Conference on Ocean Energy, Halifax, Nova Scotia November 06, 2014 Gilles Boesch, Eng, M.Eng Marie-Hélène Briand, Eng, PhD Vadim Belotserkovsky
17

River Current Resource Assessment and Characterization ...

Jan 02, 2017

Download

Documents

trinhcong
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: River Current Resource Assessment and Characterization ...

1

00/2014

River Current Resource Assessment and Characterization Considering Ice Conditions

International Conference on Ocean Energy, Halifax, Nova Scotia November 06, 2014

Gilles Boesch, Eng, M.Eng Marie-Hélène Briand, Eng, PhD

Vadim Belotserkovsky

Page 2: River Current Resource Assessment and Characterization ...

2

00/2014

Overview

• Background • Part 1: Ice-free aspects

– Reconnaissance Study (Stage 1) – Pre and Full Feasibility Study (Stage 2A and 2B) – Layout Design (Stage 3)

• Part 2: Ice Processes and Impacts on Resource Assessment – Ice characteristics (frazil, ice cover, ice jam…) – Impacts on the Resource for all Stages

Page 3: River Current Resource Assessment and Characterization ...

3

00/2014

Background

• 120 TWh/yr of technically recoverable energy in the continental US1

• 750 GW of total hydrokinetic power in Canada2

• No standards currently exist for River Current Resource Assessments

• Accelerate the development of technical guidelines • Present guidelines using the terminology from IEC62600-201

(“Tidal Energy Resource Assessment and Characterization”) • Integrate aspects related to ice impacts for Northern climate

applications

1 EPRI, Assessment and Mapping of the Riverine Hydrokinetic Resource in the Continental United States 2 NRC, Assessment of Canada’s Hydrokinetic Power Potential

Page 4: River Current Resource Assessment and Characterization ...

4

00/2014

Background

• IEC62600-201 phased approach: – Stage 1 (Reconnaissance Study)

Large scale (River) – Stage 2A and 2B (Feasibility Study)

Medium scale (River section) – Stage 3 (Layout Design Study)

Small scale (Device location)

Page 5: River Current Resource Assessment and Characterization ...

5

00/2014

Phase 1: Reconnaissance study • Assume a cross-sectional shape (trapezoidal) • Continuity and Manning equation • Input: Discharge, slope, river width • Output: Velocity and depth for each section • Available Theoretical Power: • Selection of Potential Sections for further development:

– Technology specific – Generally V > 1.5m/s and Depth > 4m – Other constrains (transmission lines, environmental, constructability etc.) – Impact of ice

PART 1: Ice-free aspects

Page 6: River Current Resource Assessment and Characterization ...

6

00/2014

Phase 1: Reconnaissance study (Validation) • Validation of the simplified methodology based on:

– HEC-Ras (1-D) calibrated model for a major Canadian river – Bathymetry data – Surveyed Manning coefficient

• Source of error from the topographical data and Manning coefficient

• Selection of the best River Sections (Proposed method VS HEC-Ras model with detailed bathymetry) – 50% confirmed by the HEC-Ras model

Page 7: River Current Resource Assessment and Characterization ...

7

00/2014

Stage 2: Pre- and Full Feasibility Study

• When reaches are selected based on Stage 1 results • Field Surveys (for model calibration) :

– Bathymetry – Hydraulic Surveys (Velocity profile, discharge seasonal/yearly variability,

depth etc.) – Ice (frazil, open water, ice cover etc.) – Sediment – Debris (wood, aquatic plants...)

• Numerical models – 2-D: Depth-averaged models (Stage 2A) – 3-D (Stage 2B)

Stone et al, 2007

Page 8: River Current Resource Assessment and Characterization ...

8

00/2014

Stage 3: Layout Design

• Project optimization (type/number of devices, location) • Turbulence considerations (loads on turbines, energy

extraction) • Net Energy Predictions

– Turbine Power Curve – Losses Assessment (wake effects, unavailability, electrical losses etc.)

• Uncertainty Analysis and probability of exceedence (P50, P90, P99)

Page 9: River Current Resource Assessment and Characterization ...

9

00/2014

Ice Processes Review

• Frazil Ice – Supercooled water, very sticky

• Anchor Ice – Frazil sticking to river bed

• Ice Floes – Frazil that becomes buoyant

• Ice Cover – Dynamic (Ice floes jam) or static (low velocity)

• Hanging Dam • Ice Jam

PART 2: Ice processes and impacts on resource assessment

Hanging Dam

Ice cover

Page 10: River Current Resource Assessment and Characterization ...

10

00/2014

Stage 1: Reconnaissance Study

• Frazil – In turbulent supercooled water (-0.01degC) – Very sticky in active mode – Visual Approach (detection of rapids) – High Froude number (high turbulence)

Rapids

Page 11: River Current Resource Assessment and Characterization ...

11

00/2014

Stage 1: Reconnaissance Study

• Ice cover: – Progression

• Critical Froude number = 0.154(1-pj) (Prowse, 1996) • Fr < Frc Ice cover progression • Fr > Frc Underturning of drifting floes

Can create Hanging Dams Open Water with high Froude number upstream Frazil Ice

– Hydraulic Impact:

• Additional roughness • Composite Manning coefficient

Page 12: River Current Resource Assessment and Characterization ...

12

00/2014

Stage 1: Reconnaissance Study

• Hanging Dams – Slow velocity section downstream of Frazil producing area – Leading edge of an ice cover – Preliminary findings:

• Froude gradient along the river

• Ice Jam

– In areas where the ice transport capacity is exceeded – Visual approach (confluence, bending, narrowing, islands…) – Change in slope (from open water reconnaissance study)

Hanging Dams

Page 13: River Current Resource Assessment and Characterization ...

13

00/2014

Stage 2: Pre- and Full Feasibility Study • Field Surveys

– Ice Observations • Cover progression upstream Aerial survey, Satellite Imagery • Ice thickness • Ice jam observations Aerial survey, Satellite Imagery • Frazil ice (underwater rods) • Ice Floe concentration Aerial survey, Satellite Imagery

– Temperature Measurements: • Air Temperature (local weather stations) • Water Temperature (Frazil onset detection) • Degree Day of Freezing (DDF), severity of winter

– Stage and Velocity

Garver, 2007

Page 14: River Current Resource Assessment and Characterization ...

14

00/2014

Stage 2: Pre- and Full Feasibility Study

• Modeling – Only 2D for ice processes – Hydrodynamic Models in Ice Conditions (flow characteristics) – Ice Dynamic Models

Malenchak, 2011

Page 15: River Current Resource Assessment and Characterization ...

15

00/2014

Stage 3: Layout Design

• Avoid areas with frazil, ice jam or hanging dams • Support the additional loads due to ice impacts • Lower availability in ice conditions • Collaborative effort with turbine manufacturer

Page 16: River Current Resource Assessment and Characterization ...

16

00/2014

Conclusion

• Resource Assessment process • Complex in Ice Conditions • Phased approach:

– Early detection of fatal flaws – Easier monitoring planning

• Further Developments: – Validation of Froude number to detect frazil, ice floes or hanging dams – Numerical model validation (ice) – Field surveys – Energy losses due to ice – Ice Mitigation means

Page 17: River Current Resource Assessment and Characterization ...

17

00/2014

Thank you