Risk Management Application Risk Management Application to Production and Products: to Production and Products: From a pilot project to an From a pilot project to an well well - - established application established application Naples Naples - - 11 11 April April 2008 2008 International Aerospace Quality Group GENERAL ASSEMBLY
15
Embed
Risk Management Application to Production and … Project: Stub Pylon EF2000 STUB Year 2003-2004 NC Management Rework N 3 Scraps N 2 Scraps–RH Year 2001-2003 N 5 Scraps - LH €
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Risk Management Application Risk Management Application to Production and Products: to Production and Products:
From a pilot project to an From a pilot project to an wellwell--established applicationestablished application
NaplesNaples -- 11 11 AprilApril 20082008
International Aerospace Quality GroupGENERAL ASSEMBLY
Nieuport Macchi 10.0001913
Macchi Castoldi 72 1934
Macchi Castoldi 205 1942
MB-326 1960
SF-260 and S-2111997
M-346First Flight :15th July 2004
M-311First Flight :1st June 2005
AleniaAermacchi:A Deep Experience in Military Aviation
20062006+ =20032003
MB3391976
AeniaAermacchi joins the Finmeccanica Group
AERONAUTICSAERONAUTICSAlenia Aeronautica
AleniaAeronavali
AleniaAermacchi
ATR
DEFENCE SYSTEMSDEFENCE SYSTEMSOto Melara
MBDA
WASS
ENERGY TRANSP.ENERGY TRANSP.Ansaldo Breda
Ansaldo Energia
Fata
Ansaldo STS
SPACESPACEThales Alenia Space
Telespazio
HELICOPTERSHELICOPTERSAgustaWestland
DEFENCE ELECTRONICSDEFENCE ELECTRONICSSELEX Sensor and Airborne Systems
Galileo Avionica
SELEX Communications
SELEX Sensor and Airborne Systems U.K.
SELEX Sistemi Integrati
SELEX Service Mangement
DATAMAT
Elsag
Orizzonte
Elettronica
Owned Company
Joint Venture
ATR
SELEX Sensor and Airborne Systems
Orizzonte
Elettronica
MBDA
1.1. 2001: CUSTOMER REQUIREMENTS2001: CUSTOMER REQUIREMENTSA Critical Item Review applied to a production process
• Processes requiring inquiry identified. • Risk associated to process identified.• Identified risks evaluated.• Corrective Actions established.
R.M application for the production process of the acoustic panel for an Airbus A330 nacelle.
• LIUC/AEM academic - Tutor Eng. A.BRUN:R.M application for the production process of a Falcon 900 nacelle panel.
3.3. 20032003--2004: PILOT PROJECT 2004: PILOT PROJECT • Definition of a methodical approach to R.M. in Aermacchi.• Validation of defined method.• Method applied to a PRODUCTION PROCESS.
Risk Management application: History
Pilot Project: Stub Pylon EF2000
WHATWHAT’’SS THE SUBJECT?THE SUBJECT?
EFA 2000: Integrated Tip
Stub Pylon Launcher
WHY THE STUB PYLON?WHY THE STUB PYLON?• Rail Slot:
out of tolerance per dwg
• Boss: thickness oversize
PHASEPHASE
MACHINESMACHINES MATERIALSMATERIALS STAFFSTAFF
SUPPORT TOOLSSUPPORT TOOLS METHODMETHOD TOOLSTOOLS
• International Program for the Certification which the Leading Aerospace Industries and Governments of the Western Countries have adhered to.What is it for?
• The verification that Special Processes and Non Destructive Tests carried out by Aerospace Manufactures are comply with Customer Requirements and International Standards ( AMS-MIL-FED. STANDARD- SAE –ect.).
• Standardize the performance and quality requirements of Special Processes and Non Destructive Examinations.
Why Qualify ?
• As of Today, our customers (es. Airbus, Boeing…) have a mandatory requirement for NADCAP Certification for Special Processes and Non Destructive Examinations of their suppliers.
NADCAP Certification
AC 7118 Composites Audit
Para 6.2.7 - Controlled Contamination Area: “Are Temperature and Humidity continuosly recorded…?”
•Analogic System Recording
•Weekly endurance
•Record analysis and filing data manual
BEFORE AFTER
•Digital System Recording
•Unlimited endurance
•Automatic Record analysis and filing data
•Greater Reliability and Accuracy
NADCAP Certification
Audit Planning
Analysis of Reference Documents (Check List)
NADCAP Audit
Obtainment of NADCAP Certification
NC Management
Establishment of a dedicated Workgroup
Risk ManagementRisk Management
Risk Management Application: A Guarantee for NADCAP Certification
Steps required for NADCAP Certification:
•Planning of Corrective Actions•Predict Investments
•Planning of Corrective Actions•Predict Investments
• “Freeze”, Share and Spread approach method
4 active work groups on 4 4 active work groups on 4 technologiestechnologies
•• Create a Risk Database•Manage transversal risks
Risk Management Application: A Guarantee for NADCAP Certification
Steps required for NADCAP Certification:
Audit Planning
Analysis of Reference Documents (Check List)
NADCAP Audit
Obtainment of NADCAP Certification
NC Management
Establishment of a dedicated Workgroup
Risk ManagementRisk Management
••4 Nadcap 4 Nadcap CertificationsCertifications
Risk Management Application: A Guarantee for NADCAP Certification
• “Freeze”, Share and Spread approach method
4 active work groups on 4 4 active work groups on 4 technologiestechnologies
•• Create a Risk Database•Manage transversal risks
Risk ManagementRisk Management
•Planning of Corrective Actions•Predict Investments
Audit Planning
Analysis of Reference Documents (Check List)
NADCAP Audit
Obtainment of NADCAP Certification
NC Management
Establishment of a dedicated Workgroup
Steps required for NADCAP Certification:
Risk Management is an intuitive application.
It doesn’t need complex TRAINING.
Risk Management is a low cost application.
It doesn’t need COMPLEX software or expensive
INVESTMENT.
Risk Management is a matrix application: EVERYONE can use it.
Risk Management is able to change the COMPANY and PEOPLE.
Conclusion
…. Because the light at the end of the tunnel, could be a train!!