Page 1: Risk, Decline & The Future of Energy - Thorium Energy Alliance

1

Risk, Decline & The Future of Energy

Richard MartinTEAC IVJune 1, 2012

The Thorium Paradigm

Page 2: Risk, Decline & The Future of Energy - Thorium Energy Alliance

2

Return To Gaul

Page 3: Risk, Decline & The Future of Energy - Thorium Energy Alliance

3

Twilight of Empire

Page 4: Risk, Decline & The Future of Energy - Thorium Energy Alliance

4

Hero’s Aelophile

Page 5: Risk, Decline & The Future of Energy - Thorium Energy Alliance

Copyright © 2011 Pike Research 5

Wooden-Headedness

“Pursuit of policy contrary to self-interest”

Page 6: Risk, Decline & The Future of Energy - Thorium Energy Alliance

6

Technology Lock-In

Page 7: Risk, Decline & The Future of Energy - Thorium Energy Alliance

7

The Nature of Disaster

Page 8: Risk, Decline & The Future of Energy - Thorium Energy Alliance

8

Dicing With the Gods

Page 9: Risk, Decline & The Future of Energy - Thorium Energy Alliance

9

The True Risk

Page 10: Risk, Decline & The Future of Energy - Thorium Energy Alliance

10

A Reverse Black Swan

Page 11: Risk, Decline & The Future of Energy - Thorium Energy Alliance

11

Bold Ventures

Page 12: Risk, Decline & The Future of Energy - Thorium Energy Alliance

12

Rebirth of the US Auto Industry

Page 13: Risk, Decline & The Future of Energy - Thorium Energy Alliance

13

A sense of crisisBroad social & national goalsBased on new technologyLimited & conditional government

supportAmerica’s competitive advantages

Lessons for the Energy Industry

Page 14: Risk, Decline & The Future of Energy - Thorium Energy Alliance

14

True Cost of Electricity

Page 15: Risk, Decline & The Future of Energy - Thorium Energy Alliance

15

US Power Demand

4 Million GwH/year – 1000 Gw total capacity

Page 16: Risk, Decline & The Future of Energy - Thorium Energy Alliance

16

The Goals

Build a prototype LFTR within five yearsCommercialize LFTRs starting in 2020LFTRs on line sufficient to supply half of

US electricity demand by 2050500 GW, or 500,000 MW, of clean, low-cost

energy by 2050

Page 17: Risk, Decline & The Future of Energy - Thorium Energy Alliance

17

The Program

• 500 thousand-megawatt nuclear plants, or 2000 250MW LFTRs

• 20 new plants/year 2020-2050, or 80 LFTRs/year

• Four manufacturing plants, each producing 20 reactors/5 plants a year

Page 18: Risk, Decline & The Future of Energy - Thorium Energy Alliance

18

How Much Will It Cost?

Page 19: Risk, Decline & The Future of Energy - Thorium Energy Alliance

19

The Thorium Revival

Page 20: Risk, Decline & The Future of Energy - Thorium Energy Alliance

20

Thank You