Top Banner
Risk analysis – FMEA Workshops
6

Risk analysis – FMEA Workshops. FMEA 1 Simple risk assessment process!! Identifying risk Simple method for grading risk Determines appropriate risk.

Dec 22, 2015

Download

Documents

Gabriel Casey
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Risk analysis – FMEA Workshops. FMEA 1 Simple risk assessment process!!  Identifying risk  Simple method for grading risk  Determines appropriate risk.

Risk analysis – FMEA

Workshops

Page 2: Risk analysis – FMEA Workshops. FMEA 1 Simple risk assessment process!!  Identifying risk  Simple method for grading risk  Determines appropriate risk.

FMEA 1

• Simple risk assessment process!!

Identifying risk

Simple method for grading risk

Determines appropriate risk reduction options

Ultimately assesses risk to patient

• Applications

– Equipment, facilities, products and processes

• Targets areas of concern

Page 3: Risk analysis – FMEA Workshops. FMEA 1 Simple risk assessment process!!  Identifying risk  Simple method for grading risk  Determines appropriate risk.

FMEA 2

1. Severity of Impact Negligible, minor, major, critical

2. Occurrence of problem Frequency Highly unlikely, unlikely, likely, high likely

3. Detection of problem Easy, can be detected, difficult to detect,

undetectable

Page 4: Risk analysis – FMEA Workshops. FMEA 1 Simple risk assessment process!!  Identifying risk  Simple method for grading risk  Determines appropriate risk.

FMEA 3

RPN (Risk Priority Number) calculatedRPN – numeric value to risk potential1. Severity

1-4 (1 is negligible)

2. Occurrence 1-4 (1 is highly unlikely)

3. Detection 1-4 (1 is easily detected)

RPN = S x O x D (1-48)1 – lowest risk to patient / highest GMP compliance

Page 5: Risk analysis – FMEA Workshops. FMEA 1 Simple risk assessment process!!  Identifying risk  Simple method for grading risk  Determines appropriate risk.

FMEA 4 – Risk acceptance

RPN Description Actions required to control process

>35 Intolerable risk Process re-engineeringAdditional testing required

20-34 Unacceptable risk Must be validatedAdditional inspections

5-19 Tolerable risk Justifications requiredEvaluate additional tests

<5 Negligible risk Verification vs validationNo additional requirements

Page 6: Risk analysis – FMEA Workshops. FMEA 1 Simple risk assessment process!!  Identifying risk  Simple method for grading risk  Determines appropriate risk.