    fromRIO TINTO Southern Rhodesia1956-2004

    toRIOZIM LTD

    July 2004

  • 7/22/2019 RioZim EGM 2010

    2/56

    RioZim Rights Issue June 2010RioZim Rights Issue June 2010

    Presentation Outline

    z Brief History

    z Current Operations

    z Growth Projects

    z Application of Rights Issue Fundsz Financial Projections 2010 - 2015

  • 7/22/2019 RioZim EGM 2010

    3/56

    RioZim Rights Issue June 2010RioZim Rights Issue June 2010

    1973:

    Exploration forcoal started inGokwe area

    Mar57:

    Acquiredmining rights atEmpress Nickel

    1985:Refinery re-commissioned

    1982:Empress MineClosed, Rencooffic ially opened.

    1975:

    Renco Minepurchased

    1975:

    Sengwa

    explorationproject halted(Restarted in1985)

    Sep68:Cam MineClosed, EmpressNickel Mineestablished

    1959:

    AcquiredCam & MotorMine at EiffelFlats

    Aug56:

    Rio Tinto(SouthernRhodesia)Incorporated

    1969:

    Tinto Industriesformed

    Riozims History Goes Back Over Half A

    Century Significant Milestones

    1956 1960 1970 19891980

    1982:

    Electric ity SupplyCommissionadvises of shortfallfrom 1988

    Rio Tinto Plc Era

  • 7/22/2019 RioZim EGM 2010

    4/56

    RioZim Rights Issue June 2010RioZim Rights Issue June 2010

    2004:

    Murowa Diamonds restructured toRioZim - 22%,

    Rio Tinto Plc -78%

    2004:

    Restructuring results in conversion of Rio Tinto

    Plcs ordinary shares in the company into onespecial dividend share

    1995:Small Mining Operation atSengwa to supply portion oflocal coal

    1994:

    Mhondoro Platinuminterests sold to BHP/Delta

    1994:

    Tinto Industries disposed of

    In 2004 Rio Tinto Plc Restructured its

    Stake in RioZim - Transformation

    1990

    1997:

    Discovery of Murowa

    Kimberlites by joint ventureCompany between RioTinto PLC and RioZim

    2000

    2004:

    Company name changed to RioZimLimited, a 100% locally owned entity

    3rd Quarter04:

    Murowa Diamonds commenced operations

    2009

    RioZim Era

  • 7/22/2019 RioZim EGM 2010

    5/56

    RioZim Rights Issue June 2010RioZim Rights Issue June 2010

    The Terms of Separation

    z Rio Tinto plc gave up 56% control in Rio Tinto

    Zimbabwe for 28% control in Murowa originallycontrolled via Rio Tinto Zimbabwe

    z Rio Tinto plc retained a special dividend share

    in RioZim Ltd for 10 years to 2014.( No votingrights)

    z Rio Tinto plc retained 50% shareholding in

    Sengwa Coal and 78% shareholding inMurowa following the separation.

    z RioZim became locally owned and controlled

  • 7/22/2019 RioZim EGM 2010

    6/56

    RioZim Rights Issue June 2010RioZim Rights Issue June 2010

    RioZim Ltd SHAREHOLDING

    Summary of Shareholding:

    z RioZim Foundation 20%z Old Mutual Zim 20%

    z Barclays Nominees 13%

    z

    Scaiflow Pvt Ltd 9%z Local Pension Funds 19%

    z Local Nominees 8%

    z Individuals (Zimbabweans) 6%

    z Individual-Non Resident shareholders 5%

  • 7/22/2019 RioZim EGM 2010

    7/56

    RioZim Rights Issue June 2010RioZim Rights Issue June 2010

    OUR VISION, MISSION AND VALUESVision

    To be a large diversified regional company delivering shareholderwealth from natural resources.

    MissionTo achieve success through:

    Optimization of existing businessExploration for opportunit iesImplementation of world- classoperating standardsA culture of success

    Recognit ion of our employeesand communit iesHigh standards of HSEmanagementGood corporate governance

    Values

    1. Integrity2. Fairness3. Accountabil ity4. Professionalism5. Transparency

    6. Reliabil ity7. Diligence8. Commitment9. Team Work

  • 7/22/2019 RioZim EGM 2010

    8/56

    RioZim Rights Issue June 2010RioZim Rights Issue June 2010

    ASSET PORTFOLIO

    Ownership

    100%

    50%

    22%

    60%

    MUROWADIAMONDS

    SENGWA

    RIOZIM

    RMENTERPRISES

    RIOZIM

    PROPERTIES

    ALL OTHER

    CLAIMS ANDPROSPECTS

    EMPRESS

    NICKELREFINERY

    RENCO

    MINE

    Ownership

    100%

    50%

    22%

    60%

    MUROWADIAMONDS

    SENGWA

    RIOZIM

    RMENTERPRISES

    RIOZIM

    PROPERTIES

    ALL OTHER

    CLAIMS ANDPROSPECTS

    EMPRESS

    NICKELREFINERY

    RENCO

    MINE

  • 7/22/2019 RioZim EGM 2010

    9/56

    RioZim Rights Issue June 2010RioZim Rights Issue June 2010

    CURRENT AND PROPOSED OPERATIONS

  • 7/22/2019 RioZim EGM 2010

    10/56

    RioZim Rights Issue June 2010RioZim Rights Issue June 2010

    Brief outline of operations

    z Renco Mine

    Started operations in 1982Production peaked in the years 1982 to 2000 at anaverage of 1600 kg per annum.

    To date in excess of 37 tonnes (1,2M oz) of goldproduced

    Production decline started in 2001 declining to750kgs

    2008 production declined to 450 kg

    Potential for growth to 1600 kg stil l existsNeeds investment in development and plantrefurbishment

  • 7/22/2019 RioZim EGM 2010

    11/56

    RioZim Rights Issue June 2010RioZim Rights Issue June 2010

    EMPRESS NICKEL REFINERY

    z Empress Mine life 1968 to 1982

    z Refinery re-opened in 1985 after closure ofEmpress Mine in 1982 as a toll refinerz Toll refines matte from BCL and Tati mines in

    Botswana for life of minez Contract is for 17 400 tonnes matte per annumz Can produce up to 700t nickel and 700t of

    copper per month.z

    Current monthly output around 500t nickel and480t copper due to input supply constraints.z Major constraints have been energy, water and

    oxygen supplies

  • 7/22/2019 RioZim EGM 2010

    12/56

    RioZim Rights Issue June 2010RioZim Rights Issue June 2010

    SENGWA COLLIERY

    z 50 year renewable Special Grant to mine coal.z Granted in 1989z Proven ore reserves of 519 mil lion tonnesz Total reserves exceed 1,3 bill ion tonnesz

    Small scale mining for the local industryparticularly tobacco was stopped in 2008z Output was up to 25 000t per month.z Resource utilisation very poor with a conversion

    to value of 28,5% on a 21m seam.z Resource best used as a thermal fuelz Power station would use up to 100% of the seam

  • 7/22/2019 RioZim EGM 2010

    13/56

    RioZim Rights Issue June 2010RioZim Rights Issue June 2010

    SENGWA COLLIERY

  • 7/22/2019 RioZim EGM 2010

    14/56

    RioZim Rights Issue June 2010RioZim Rights Issue June 2010

    Challenges and Mitigation

    z Power

    z Oxygen Supply

    z Water Supply

    z Skillz Working Capital

  • 7/22/2019 RioZim EGM 2010

    15/56

    RioZim Rights Issue June 2010RioZim Rights Issue June 2010

    Growth Projects Post 2004z Cam & Motor Gold Mine

    z

    Renco Extensionz Darwendale Chrome

    z Murowa Expansion

    z Sengwa Collieryz Sengwa Power Station

    z Chimakasa Nickel

    z Kenilworth Gold Project

    z Prospective Claims

    z

    Prospective EPOs.

  • 7/22/2019 RioZim EGM 2010

    16/56

    RioZim Rights Issue June 2010RioZim Rights Issue June 2010

    EIFFEL FLATS

    Cam & Motor Gold Project

  • 7/22/2019 RioZim EGM 2010

    17/56

    RioZim Rights Issue June 2010RioZim Rights Issue June 2010

    Underground mine closed in 1968 after

    producing 150 tonnes of gold (biggestproducer in the country)Cut-off grade was 8g/t and gold price was

    $35 / ozFinal mine depth 6000 ft (~1800m)Great potential for significant open pit minewith subsequent underground operationCurrent exploration programme isconfirming the potential for a large low costgold producer

    Cam & Motor Gold Project

  • 7/22/2019 RioZim EGM 2010

    18/56

    RioZim Rights Issue June 2010RioZim Rights Issue June 2010

    Zimbabwe Gold Production(up to 1980)

    020406080

    100120140

    160

    Cam

    &Mot

    or

    Globe&

    Pho

    enix

    Rezen

    deGroup

    Sham

    vaDa

    lny

    Wander

    erGroup

    Lonely

    Mazoe

    Gro

    up

    Golden

    Valley

    Arcturus

    Muriel

    Mine

    Gol

    dproduc

    ed

    (tonnes)

    Cam & Motor Gold Project

  • 7/22/2019 RioZim EGM 2010

    19/56

    RioZim Rights Issue June 2010RioZim Rights Issue June 2010

    Cam & Motor Gold Minez New resource at the Cam & Motor

    z

    Resource defined +10 tonnes (320k oz) gold to a depth of 100mz Potential to increase to 16 t (500k oz) to a depth of 100m

    z Potential exists for resource at greater depth(200m+)

    z Good grade 4g/t

    z

    Open Pit operationz Pilot operation to start in 2011 and full plant 2013

    z To produce 2000 kg (70 000 oz) p.a for 10years+

    z Cost per ounce to be below $600

    z To be funded from internal resources and borrowing

  • 7/22/2019 RioZim EGM 2010

    20/56

    RioZim Rights Issue June 2010RioZim Rights Issue June 2010

    z Motor lode drilled 39 diamond dri ll holes.

    z

    Identif ied 1.35 mill ion tonnes at 4.07 g/t, openpittable down to 100m (5696 kg,177 000 oz)

    z Resource open ended laterally and in depth

    z Cam lode drilled 11 diamond drill holes.

    Identified 490 000 tonnes at 2.97 g/t, openpittable down to 100m (1506 kg,47 000 oz)

    z Resource open ended laterally and in depth

    z Petrol lode Identif ied 709 000 tonnes at 4.04 g/t,open pittable down to 100m (3086 kg, 96 000 oz).

    z Potential for more than 31 tonnes (1 mill ionounces) within 200m from surface

    Cam & Motor Gold Project

  • 7/22/2019 RioZim EGM 2010

    21/56

    RioZim Rights Issue June 2010RioZim Rights Issue June 2010

    Resources As At 1 May 2010Resources As At 1 May 2010

    319 900

    177 154

    95 891

    46 855

    ounces gold

    10 2853.902 552 391GRAND TOTAL

    5 6964.071 353 049MOTOR (MEASURED,INDICATED AND INFERRED)

    3 0864.04709 176PETROL (INFERRED)

    1 5062.97490 166CAM (INFERRED)

    Kg GoldGradeTonnesOREBODY

    Cam & Motor Gold Project

  • 7/22/2019 RioZim EGM 2010

    22/56

    RioZim Rights Issue June 2010RioZim Rights Issue June 2010

    z Mining Special Grant number 1585 issuedon 28 September 2009

    z Key stakeholders engaged (Municipality,ZESA, Ministries, EMA, communities, NGOsetc)

    z Potential for early production using nearbyprocess plant(s) being evaluated.

    z Open pit mine design has started usingconsultants.

    z Drill ing continues

    Cam & Motor Gold Project

  • 7/22/2019 RioZim EGM 2010

    23/56

    RioZim Rights Issue June 2010RioZim Rights Issue June 2010

    RENCO MINE

    Renco Extension

  • 7/22/2019 RioZim EGM 2010

    24/56

    RioZim Rights Issue June 2010RioZim Rights Issue June 2010

    Renco Mine Reserves And ResourcesAs At 1 January 2010

    Kg GoldGradeTonnesMINERAL RESOURCES

    87336,631 316 500Total measured and inferred mineral resources at 31December 2009

    78356.811 149 830Inferred mineral resources as at 31 December 20098985.37167 120

    Measured mineral resources as at 31 December

    2009

    24125.73420 960Proved and Probable Reserves as at 31 December2009

    4926.5475 210Probable ore reserves as at 31 December 2009

    19205.55345 750Proved ore reserves as at 31 December 2009

    Kg GoldGradeTonnesORE RESERVES

    Renco Extension

  • 7/22/2019 RioZim EGM 2010

    25/56

    RioZim Rights Issue June 2010RioZim Rights Issue June 2010

    z

    Current operations inhibited by hyperinflationand gold payment modalities over last 10 years+

    z Plan is to maintain and progressively increase

    current production rates while proving largerresources.

    z Renco resource is capable of expansion laterallyand in depth.

    z Plan is to define adequate resources to supply alarger plant producing >1500 kg per annum fromRenco orebody by 2015

    RENCO MINE RESOURCE DEVELOPMENTRenco Extension

  • 7/22/2019 RioZim EGM 2010

    26/56

    RioZim Rights Issue June 2010RioZim Rights Issue June 2010

    IMPLEMENTATION PLAN

    z Prove more gold resources in lateralextensions to existing areas

    z Prove more gold resources exist at depth.

    z Develop and equip haulages to knownresources in lateral extensions of 450 and510 areas.

    z Design and plan shaft deepening to 270 level(120m below present shaft bottom)

    Renco Extension

  • 7/22/2019 RioZim EGM 2010

    27/56

    RioZim Rights Issue June 2010RioZim Rights Issue June 2010

    Renco Extension

    z 84 000 metres of development overthe next 4 years

    zAreas of development already

    identified

    z To improve both grade and resource

    z Production to stabilise at 1300kg(42 000 oz) per annum

    z Cost per oz to stabilise at US$600

    IMPLEMENTATION PLAN

  • 7/22/2019 RioZim EGM 2010

    28/56

    RioZim Rights Issue June 2010RioZim Rights Issue June 2010

    RENCO BELOW 390LEVEL TARGET

    RENCO EAST

    TARGET

    Renco Extension

  • 7/22/2019 RioZim EGM 2010

    29/56

    RioZim Rights Issue June 2010RioZim Rights Issue June 2010

    DARWENDALE CHROMEPROJECT

    Darwendale Chrome Project

  • 7/22/2019 RioZim EGM 2010

    30/56

    RioZim Rights Issue June 2010RioZim Rights Issue June 2010

    Darwendale Chrome Project

  • 7/22/2019 RioZim EGM 2010

    31/56

    RioZim Rights Issue June 2010RioZim Rights Issue June 2010

    z 1406 claims covering a total of 6742 ha.

    Riozim in JV (60:40) with MaranathaFerrochrome.

    z RioZim has previously producedchromium concentrates from alluvialdeposits along the Great Dyke

    z Chrome seams have been mined forlumpy chrome previously (seams 3 7).

    Darwendale Chrome Project

  • 7/22/2019 RioZim EGM 2010

    32/56

    RioZim Rights Issue June 2010RioZim Rights Issue June 2010

    Darwendale Chromez Alluvial Chrome resource of more than

    20 million tonnes

    z Underground narrow seams provideadditional resource

    z Low cost technology for processingalluvial deposits available

    z Short plant lead times

    z Good prices for concentrates on theinternational market.

    z Plan to produce 30 000 tonnes ofconcentrate per annum from 2012

  • 7/22/2019 RioZim EGM 2010

    33/56

    RioZim Rights Issue June 2010RioZim Rights Issue June 2010

    IMPLEMENTATION PLAN

    z Evaluate and prove alluvial chrome resources bypitting, sampling and metallurgical testwork.

    z Install modular plants capable of treating 300 000tonnes per annum. Each plant will produce about

    30 000 tonnes per annum of concentrates.

    z Evaluate potential for mining of the chrome seamsusing modern equipment and techniques.

    z Evaluate the potential for PGMs in the areacovered by the claims

    Darwendale Chrome Project

  • 7/22/2019 RioZim EGM 2010

    34/56

    RioZim Rights Issue June 2010RioZim Rights Issue June 2010

    Murowa Expansionz Expansion project feasibility

    update 2010/2011z Expansion to 2 million tonnes per

    year

    z Current project not optimum(300k cts pa)

    z

    The expanded project willoptimise the exploitation of theresource.

  • 7/22/2019 RioZim EGM 2010

    35/56

    RioZim Rights Issue June 2010RioZim Rights Issue June 2010

    SENGWA COLLIERY

    Sengwa Colliery ProjectSENGWA COLLIERY

  • 7/22/2019 RioZim EGM 2010

    36/56

    RioZim Rights Issue June 2010RioZim Rights Issue June 2010

    z Special Grant for the supply of coal fuel to apower station since 1989.

    z Proven ore reserves of 519 mill ion tonnesz Total resources amount to 1.3 billion tonnesz Coal most suitable as thermal fuel for a purpose

    built power station on site.z Calorific value 17 20 MJ/kg (as mined)z Ash content 22 - 29%z High ash fusion temperature (>1400C)z Low strip ratioz Low sulphur content (0,4%)

    Sengwa Colliery Project

  • 7/22/2019 RioZim EGM 2010

    37/56

    RioZim Rights Issue June 2010RioZim Rights Issue June 2010

    z Opportunit ies in the SADC power supplymarket abound.

    z Power project (2400 MWe) being pursued,a letter of support from Ministry of Energynow issued.

    z

    Letter of approval and support from theMinistry of Economic Planning andInvestment Promotion

    z Exploration in the northern coal field

    exposed other significant resourcesz Other opportunities for coal usage being

    pursued.

    Sengwa Colliery Project

  • 7/22/2019 RioZim EGM 2010

    38/56

    RioZim Rights Issue June 2010RioZim Rights Issue June 2010

    z Original mine plan and costing done in 1996.

    z Mining methods and equipment havedeveloped since then.

    z Cost of mining coal is a major input into thecost of electrical power.

    z The original mine plan will need to bereviewed and new cost estimates generatedfor the Fuel Purchase Agreement

    z The original Environmental ImpactAssessment and Environmental ManagementPlans will also need to be reviewed.

    Sengwa Colliery Project

  • 7/22/2019 RioZim EGM 2010

    39/56

    RioZim Rights Issue June 2010RioZim Rights Issue June 2010

    Sengwa Power Station

    z Coal resource of 1.3b tonnesz Capable of sustaining 2 or 3 large power stationsz Plan for a 2400MWe power station by 2014z Letters of Support from Government obtainedz An independent consortium formed to promote the

    power station projectz Project feasibil ity update to commence in Q3 2010z Demand for power is huge internally and in SADCz Requires signif icant long term financial outlay

    (+US$3b) syndicated debt and equity

    z RioZim Ltd to be a minority player in the powerstation project

  • 7/22/2019 RioZim EGM 2010

    40/56

    RioZim Rights Issue June 2010RioZim Rights Issue June 2010

    CHIMAKASA NICKEL

    Chimakasa Nickel Project

  • 7/22/2019 RioZim EGM 2010

    41/56

    RioZim Rights Issue June 2010RioZim Rights Issue June 2010

    z Diamond dril ling done in the 1970s

    z Drilling then produced an inferred resourceof 240M tonnes containing 0,27% Ni.(650 000 tonnes nickel in situ)

    z Mineralogical work done at that time

    indicated that the nickel was in magnetiteand not suitable for feed into the nearbyEmpress Nickel Mine operation.

    z Recent geophysical work and diamond

    drilling confirmed the grade and mineralogyof the resource.

    Chimakasa Nickel Project

  • 7/22/2019 RioZim EGM 2010

    42/56

    RioZim Rights Issue June 2010RioZim Rights Issue June 2010

    IMPLEMENTATION PLAN

    z Diamond drilling to increaseknowledge of the resource andprovide sufficient fresh samples for

    metallurgical testwork.z Evaluate potential for other base

    metals and PGMs.z Develop metallurgical process

    flowsheets to produce a ferro-nickelproduct.

    Chimakasa Nickel Project

  • 7/22/2019 RioZim EGM 2010

    43/56

    RioZim Rights Issue June 2010RioZim Rights Issue June 2010

    Kenilworth Gold Project

    KENILWORTH

  • 7/22/2019 RioZim EGM 2010

    44/56

    RioZim Rights Issue June 2010RioZim Rights Issue June 2010

    z Anomalies defined during diamondexploration programme.

    z Site is near the Maligreen Gold Mine.z Geochemical sampling post 2004 confirmed

    a potential gold anomalyz Geophysical reconnaissance in 2009 and

    2010 assisted in defining structures overlainby Kalahari sands.

    z Intention is to enter into a suitable dri llingprogramme to further evaluate the potentialfor economic exploitation.

    Kenilworth Gold Project

  • 7/22/2019 RioZim EGM 2010

    45/56

    RioZim Rights Issue June 2010RioZim Rights Issue June 2010

    Outstanding EPOs

    14400918.10.05CoalMasvingoSpecial Grant 56/05

    450003/10/2006Au & CuHarare40/06

    376652/6/2004

    Au, Cu, Ag, As,

    & MoMasvingo156/04

    614808/12/2005Au, Ni, Cr, PGM

    & CuGweru100/05

    609115/26/2005Au, Ni, Bi & CuMasvingo36/05

    599275/3/2005Au, Ni, Pt & CuGweru31/05

    1540211/19/2004DiamondsGweru286/04

    298809/23/2004Au, Ni, CuHarare248/04

    438334/11/20032/18/2003DiamondsMasvingo10/03

    518995/30/20031/28/2003DiamondsGweru05/03

    367645/2/20038/23/2002DiamondsGweru29/02

    Area(Ha)

    DateGazetted

    DateSubmittedIn Respect Of

    MiningDistrict

    EPO APPLICATIONNo.

  • 7/22/2019 RioZim EGM 2010

    46/56

    RioZim Rights Issue June 2010RioZim Rights Issue June 2010

    Financial Summary

    z Application of Rights Funds

    z Gold Division Turnoverz Gold Production

    z Production Costs

    z

    Group Earnings Summaryz Profit Sensitivity to Gold Price

    z Group Profit Contribution

    z Total Comprehensive Profit attributable toOwners

    z Return to Shareholders

    z Total Equity and Debt

  • 7/22/2019 RioZim EGM 2010

    47/56

    RioZim Rights Issue June 2010RioZim Rights Issue June 2010

    Application of Rights Issue Funds

    Debt repayment 13 800

    Refurbishment 9 000-Renco Gold Mine 4 000-Empress Nickel Refinery 5 000

    Exploration 1 000New projects 14 500

    -Darwendale Chrome 2 500-Sengwa Coal 1 000-Chimakasa 1 000-Cam and Motor 5 000-Kenilworth 1 000

    -Renco exploration 4 000Transaction costs 1 700Total 40 000

  • 7/22/2019 RioZim EGM 2010

    48/56

    RioZim Rights Issue June 2010RioZim Rights Issue June 2010

    24

    28

    32

    36 37 36

    0

    12 11

    61 61 61

    24

    40

    43

    97 98 97

    0

    20

    40

    60

    80

    100

    120

    2010 2011 2012 2013 2014 2015

    US$million

    Renco

    Cam & Motor

    Total

    Gold Division Turnover

  • 7/22/2019 RioZim EGM 2010

    49/56

    RioZim Rights Issue June 2010RioZim Rights Issue June 2010

    Gold Production Oz

    24664

    31000

    37000

    42091 42091 42091

    0

    13000 13000

    69816 69816 69816

    24664

    44000

    50000

    111907 111907 111907

    0

    20000

    40000

    60000

    80000

    100000

    120000

    2010 2011 2012 2013 2014 2015

    oz

    Renco

    Cam & Motor

    Total

  • 7/22/2019 RioZim EGM 2010

    50/56

    RioZim Rights Issue June 2010RioZim Rights Issue June 2010

    914

    741

    627

    579 579 591

    0

    843 843

    579 579 591

    1027

    950

    900 900 900 900

    0

    200

    400

    600

    800

    1000

    1200

    2010 2011 2012 2013 2014 2015

    US

    $

    Renco

    Cam & Motor

    Gold Price/oz.

    Production Cost/Oz Vs Selling Price/Oz

  • 7/22/2019 RioZim EGM 2010

    51/56

    RioZim Rights Issue June 2010RioZim Rights Issue June 2010

    0.5

    5

    8

    32

    16

    22

    1918

    01

    34

    17

    30

    32

    56

    0

    10

    20

    30

    40

    50

    60

    2010 2011 2012 2013

    $millions

    Gold Divis ion

    Base Metals

    Chrome

    Total

    Group Earnings Summary

  • 7/22/2019 RioZim EGM 2010

    52/56

    RioZim Rights Issue June 2010RioZim Rights Issue June 2010

    Profit Sensitivity to Gold Price

    0

    45

    10 10 10

    0

    89

    20 20 20

    0

    5

    10

    15

    20

    25

    2010 2011 2012 2013 2014 2015

    US$million

    10%

    20%

  • 7/22/2019 RioZim EGM 2010

    53/56

    RioZim Rights Issue June 2010RioZim Rights Issue June 2010

    Group Profit Contribution

    0.5

    5

    8

    32 3130

    16

    22

    1918

    17 17

    01

    34

    5 5

    0

    2 2 2

    11 11

    17

    3032

    56

    6463

    0

    10

    20

    30

    40

    50

    60

    70

    2010 2011 2012 2013 2014 2015

    US$m

    illions

    Gold Division

    Base Metals

    ChromeMurowa Diamonds

    Total

    Total Comprehensive Profit

  • 7/22/2019 RioZim EGM 2010

    54/56

    RioZim Rights Issue June 2010RioZim Rights Issue June 2010

    Total Comprehensive Profit

    Attributable To Owners

    4

    12

    10

    33

    44 44

    0

    5

    10

    15

    20

    25

    30

    35

    40

    45

    50

    2010 2011 2012 2013 2014 2015

    US$m

    illion

    TCPAO

  • 7/22/2019 RioZim EGM 2010

    55/56

    RioZim Rights Issue June 2010RioZim Rights Issue June 2010

    Equity & Debt profile 2010-2015

    -100

    -50

    0

    50

    100

    150

    200

    2010 2011 2012 2013 2014 2015

    US$millio

    ns

    RioZim Shareholders

    Outside ShareholdersDeferr ed Tax & LTPs

    Exter nal Debt

  • 7/22/2019 RioZim EGM 2010

    56/56

    RioZim Rights Issue June 2010RioZim Rights Issue June 2010

    The End