12 11 A B C D E 10 9 8 7 6 5 4 3 2 1 A B C D E F G H 12 11 F G 10 9 8 7 6 5 4 3 H 2 1 OUT OF PIT CRUSHING AND CONVEYING (OPCC) SYSTEMS PT ADARO INDONESIA, Tbk Menara Karya, 23rd Floor Jalan H.R. Rasuna Said Block X-5, Kav. 1-2 Jakarta 12950, Indonesia Phone: +6221-521-1265 PROJECT OWNER FLSmidth Indonesia Gedung BRI II, 21st floor, Suite # 2101 Jalan Jendral Sudirman Kav. 44-46 Jakarta 10210, Indonesia Tel +62 21 251 27 38/2739 Fax +62 21 251 27 40 PT WIJAYA KARYA (Persero), Tbk Jl. DI Panjaitan Kav 9 Jakarta 13340 Phone : (62-21) 819 2808, 850 8640, 850 8650 Fax : (62-21) 856 4463, 819 1235 DRAWING NUMBER : CONTRACTOR RIGGING PLAN Modular Overland Conveyor
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
12 11
A
B
C
D
E
10 9 8 7 6 5 4 3 2 1
A
B
C
D
E
F
G
H
12 11
F
G
10 9 8 7 6 5 4 3
H
2 1
OUT OF PIT CRUSHING AND CONVEYING
(OPCC) SYSTEMS
PT ADARO INDONESIA, Tbk
Menara Karya, 23rd Floor
Jalan H.R. Rasuna Said Block X-5, Kav. 1-2
Jakarta 12950, Indonesia
Phone: +6221-521-1265
PROJECT
OWNER
FLSmidth Indonesia
Gedung BRI II, 21st floor, Suite # 2101
Jalan Jendral Sudirman Kav. 44-46
Jakarta 10210, Indonesia
Tel +62 21 251 27 38/2739
Fax +62 21 251 27 40
PT WIJAYA KARYA (Persero), Tbk
Jl. DI Panjaitan Kav 9 Jakarta 13340
Phone : (62-21) 819 2808, 850 8640, 850 8650
Fax : (62-21) 856 4463, 819 1235
DRAWING NUMBER :
CONTRACTOR
RIGGING PLAN
Modular Overland Conveyor
PRELIMINARY INSTALLING MODULAR OVERLAND
CONVEYOR
Document Number Rev. : A
OPCC-90-RIG-0002 07 October 2011
Page 1 of 2
OWNER : PT ADARO INDONESIA
CONTRACTORS : PT WIJAYA KARYA (PERSERO) Tbk
PROJECT NAME : Out of Pit Crushing and Conveyor System
LOCATION : TUTUPAN-KALIMANTAN SELATAN
A 07
October 2011
Issued For Review HaGun SAFETY CM
REV DATE DESCRIPTION
Made By Reviewed
By Approved
By Reviewed
By Approved
By
PT WIJAYA KARYA FLSmidth
PRELIMINARY INSTALLING MODULAR OVERLAND
CONVEYOR
Document Number Rev. : A
OPCC-90-RIG-0002 07 October 2011
Page 2 of 2
TABEL OF COUNTENT
No Chapter Number Title
1 CHAPTER 1 Method Of Work
2 CHAPTER 2 Job Safety Assessment Procedure
3 CHAPTER 3 Safe Work Method Statement
4 CHAPTER 4 Risk Management Safe Work Method Statement (SWMS)
5 CHAPTER 5 Rigging Plan
6 CHAPTER 6 Rigging Tools
7 CHAPTER 7 Critical Lift Worksheet
8 CHAPTER 8 Lift Study
9 CHAPTER 9 Crane Study
10 CHAPTER 10 General Scaffolding Safety Checklist
PRELIMINARY METHOD OF WORK
INSTALLING MODULAR OVERLAND
CONVEYOR
Document Number Rev. : A
OPCC-90-RIG-0003 07 October 2011
Page 1 of 13
CHAPTER 1
PRELIMINARY METHOD OF WORK
INSTALLING MODULAR OVERLAND
CONVEYOR
Document Number Rev. : A
OPCC-90-RIG-0003 07 October 2011
Page 2 of 13
TABLE OF CONTENT
TABLE OF CONTENT ................................................................................................................ 2
1 GENERAL ........................................................................................................................... 4
Warning signage for overhead electrical power to be placed on every mast and gantry.
Work method shall be explained to all personnel participating in the task prior to the commencement of the activity, all personnel to sign the Work Method Statement.
Daily Pre-start meetings to be undertaken and recorded.
Daily plant pre-start checklist completed.
All personnel advised of first aid location.
Action during work:
All PPE must be correctly worn at all times.
Work site to be kept clean and tidy at all times.
Safety Pins to be installed on all Quick Hitch attachments.
Regular review and assessment of controls shall be carried out.
Positive communication shall be established with the crane operator using 2-way radios or precise hand signals.
When issued all work to adhere to SCA conditions
Action after works is complete:
All plant to be securely locked up at conclusion of each workday.
All tools and equipment to be cleaned, and securely stored away at conclusion of each workday.
Work area to be kept clean and tidy.
All gates to be locked after all personnel have exited.
Engineering details/certificates authority approval required: Lifting Assembly to be fully certified.
PRELIMINARY
SAFE WORK
METHOD STATEMENT INSTALLING
MODULAR OVERLAND CONVEYOR
Rev. : A
Document Number 07 October 2011
OPCC-90-RIG-0003 Page 4 of 8
Supervision: Foreman, Protection Officer
Permits e.g., confined spaces, hot work etc: Environmental Permits, Cultural Heritage Areas plan.
Plant, equipment & materials to be used and the maintenance checks to be completed: Crawler crane 120 ton, trailers,
Warning signs and control measures: Clear zones are to be established around the crane and where the MODULAR OVERLAND CONVEYOR will be lowered on the piers. All loads are to be lifted and slung by a Qualified Rigger or Dogman. Spotter present when working close to the track (overhead power lines). All lifting equipment must be checked and tagged current. Warning signage for overhead electrical power to be placed on every mast and gantry. Lift plan to be provide before commencement works and approved.
Training and Instruction: All Operators and Riggers must be suitably trained and carryall relevant certificates. Tool Box on Safe Work Method, Daily Pre-start Brief.
Personal protective equipment requirements: PPE according to the Wijaya Karya standard.
Legislation, codes of practice, standards applicable: AS 2550 - 1 Cranes Safe Use General Required AS 2550 - 5 Cranes Safe Use Mobile & Vehicle AS 2550 - 6 Cranes Safe Use - Guided St & Ret App AS 2550 - 10 Cranes Safe Use – EWPs AS 1891 3 Industrial Fall Arrest Devices Crane Book by Crane Vendor
List of attachments (e.g. material safety data sheets, diagrams etc): Lind ores SWMS: Lifting and positioning of MODULAR OVERLAND CONVEYOR units onto that position.
PRELIMINARY
SAFE WORK
METHOD STATEMENT INSTALLING
MODULAR OVERLAND CONVEYOR
Rev. : A
Document Number 07 October 2011
OPCC-90-RIG-0003 Page 5 of 8
How severely could it hurt
someone or how ill could it
make someone?
How likely is it to occur?
Very likely Could happen any time
Likely Could happen sometime
Unlikely Could happen but very rarely
Very unlikely Could happen, but probably never will
Kill or cause permanent
disability or ill health 1/H 1/H 1/H 2/M
Long term illness or serious
injury 1/H 1/H 2/M 2/M
Medical attention and
several days off work 1/H 2/M 2/M 3/L
First aid needed 2/M 2/M 3/L 3/L
PRELIMINARY
SAFE WORK
METHOD STATEMENT INSTALLING
MODULAR OVERLAND CONVEYOR
Rev. : A
Document Number 07 October 2011
OPCC-90-RIG-0003 Page 6 of 8
ITEM WHAT ARE THE BASIC STEPS
POTENTIAL HAZARDS
(What may cause an injury/illness to occur)
RISK RANKING 1(H), 2(M), or 3(L)
HAZARD CONTROLS
(What controls can be put in place to prevent an injury/illness)
N.B. Control measures must not raise or create an increased risk
WHO WILL ENSURE THAT THIS IS DONE
1 Daily Pre-Start Safety Brief
Plant in unsafe condition causing slips trips, falls
All work group to be made aware of scope of
works All personal
2 Daily Pre-Start Plant Check Plant failure Ticketed/certified personnel to carry out pre
start check Plant Operators
3 Start up plant Electro
conduction Plant Operators
4 Position Crawler crane 120 ton in accordance with PT Wijaya Karya Safe Work Method Statement
Wika Personnel
5
Load required amount of counter weights onto crawler crane, install and secure weights in accordance with PT Wijaya Karya Safe Work Method Statement
Wika Personnel
6 Check all lifting equipment. Raise crane boom to a safe radius. Check all motions, limits and operation of
Wika Personnel
PRELIMINARY
SAFE WORK
METHOD STATEMENT INSTALLING
MODULAR OVERLAND CONVEYOR
Rev. : A
Document Number 07 October 2011
OPCC-90-RIG-0003 Page 7 of 8
controls in accordance with PT Wijaya Karya Safe Work Method Statement
7 Position elastomeric bearings on new piers (off scaffolding next to blade piers)
Limb injuries
Fall from scaffolding
Ensure appropriate care is taken. Ensure good manual handling techniques are employed and work process communicated to workers.
Ensure workers are wearing safety harnesses attached to horizontal safety bar (edge protection) of scaffold
Wika Personnel
8
Lift MODULAR OVERLAND CONVEYORs, attach specified tag line & static line and place MODULAR OVERLAND CONVEYORs on piers in accordance with PT Wijaya Karya Safe Work Method Statement
Wika Personnel
9 Remove lifting chains from MODULAR OVERLAND CONVEYOR
Fall from MODULAR OVERLAND CONVEYOR
Ensure dogman is wearing safety harness
attached to static line on MODULAR OVERLAND CONVEYOR.
Wika Personnel
10 Repeat steps 7-9 until all 2 MODULAR OVERLAND CONVEYORs have been placed
Wika Personnel
11 Move plant to a designated shutdown area at the conclusion of each work
Collision with personnel,
Ensure appropriate care is taken while operating plant and adequate safety
Operators
PRELIMINARY
SAFE WORK
METHOD STATEMENT INSTALLING
MODULAR OVERLAND CONVEYOR
Rev. : A
Document Number 07 October 2011
OPCC-90-RIG-0003 Page 8 of 8
day structures etc.
Limb injuries
distance is adhered while moving vehicles.
Shutdown plant in accordance with manufacturer's recommendations and/or specifications.
12 Move temporary fencing back to original position
Limb injuries from poor manual handling
Ensure good manual handling techniques
are employed and communicated to all workers
Foreman
PRELIMINARY
RISK MANAGEMENT
SAFE WORK METHOD STATEMENT (SWMS) INSTALLING
MODULAR OVERLAND CONVEYOR
Rev. : A
Document Number 07 October 2011
OPCC-90-RIG-0003 Page 1 of 7
CHAPTER 4
PRELIMINARY
RISK MANAGEMENT
SAFE WORK METHOD STATEMENT (SWMS) INSTALLING
MODULAR OVERLAND CONVEYOR
Rev. : A
Document Number 07 October 2011
OPCC-90-RIG-0003 Page 2 of 7
COMPANY NAME: PROJECT:
Work Activity: Lifting MODULAR OVERLAND CONVEYOR
Principal Contractor: H Gunawan
Developed by:
Approved by:
Position:
Date: SWMS number:
WIKA-OPCC-
RESORCES:
Equipment Used:
Trades Involved: Riggers. Crane Operators Relevant certificates of competency and General Induction certificate. Pink card.
Maintenance checks: Current lifting chain test certificates, all crane log books to be up to date.
Relevant Personnel Protection Equipment required: Hard hats. Steel caped safety boots, Harness with double lanyard, eye and sun protection. High vies clothing or vests, Gloves.
LIST THE RELEVANT OHS ACT and REGULATIONS: LIST THE RELEVANT CODES OF PRACTICE APPLICABLE TO YOUR WORK:
AS 2550 - 1 Cranes Safe Use General Required
AS 2550 - 5 Cranes Safe Use Mobile & Vehicle
AS 2550 - 6 Cranes Safe Use - Guided St & Ret App
AS 2550 - 10 Cranes Safe Use – EWPs
AS 1891 3 Industrial Fall Arrest Devices
.
PRELIMINARY
RISK MANAGEMENT
SAFE WORK METHOD STATEMENT (SWMS) INSTALLING
MODULAR OVERLAND CONVEYOR
Rev. : A
Document Number 07 October 2011
OPCC-90-RIG-0003 Page 3 of 7
JOB STEP
Break the job down into Steps (where practical in sequence)
POTENTIAL HAZARDS
Identify the Hazards associated with each step.
Examine each to find possibilities that could lead to an incident involving injury. Equipment damage or environmental harm.
EXISTING CONTROLS
List the existing controls we currently have in place to address the identified hazard for each job step
Conduct a risk assessment utilising the attached Matrix
PR
OB
AB
ILIT
Y
CO
NS
EQ
UE
NC
E
RA
NK
ING
ADDITIONAL CONTROLS
If the risk rating is too high add additional controls and nominate Person/s Responsible.
PERSON/S RESPONSIBLE
Toolbox meeting and signing of JSA in relation to the unloading and positioning of MODULAR OVERLAND CONVEYOR units.
Boom configuration Weight of load being lifted MODULAR OVERLAND CONVEYOR units.
Radius required: 8.00m.
Boom length: 24.4m.
Crawler crane 120 ton
Note; weight of lifting hook, lifting equipment and spreader to be in overall weight.
Not understanding the job in hand
Ensure all personnel involved in the unloading and positioning of MODULAR OVERLAND CONVEYOR understand procedure and sign SWMS
All work to carry out by qualified personnel. No unauthorised personnel permitted in the work area. Wika personnel to clearly identify all potential underground and over head hazards and services in relation to work and access areas of crawler cranes and relevant transport.
Wika personnel
PRELIMINARY
RISK MANAGEMENT
SAFE WORK METHOD STATEMENT (SWMS) INSTALLING
MODULAR OVERLAND CONVEYOR
Rev. : A
Document Number 07 October 2011
OPCC-90-RIG-0003 Page 4 of 7
Use of relevant PPE equipment and up to date Pink card
Equipment failure Personnel injury crushing and pinch points. Back strain, Muscular injuries, and falling objects.
Ensure that all personnel are trained and competent in the relevant use of PPE. Ensure all relevant PPE equipment is used at all times. Harnesses are to be worn and lanyards attached at heights greater than 2m or in the event of no edge protection or risk of falling exists.
PPE required; eye protection, safety boots, sun protection, hard hats, and harness with double layer high vis vests and cover all. All personnel working on ground and round plant or machinery are to wear high vis clothing or vests. All personnel to comply with Pink card induction requirements. Ensure that all WIKA personnel are conversant with WIKA safe working policies
Wika personnel
Establish exclusion zone. Falling objects and protection of site personnel and public.
All loads to be contained within exclusion zone Wika to notify of required exclusion zone and notify site personnel of work activity. Exclusions zones to be barricaded of using appropriate signage & barricading tape to ensure an exclusion zone is set.
No unauthorised access will be permitted into areas during the rigging and de-rigging of the Crawler crane 120 ton. If access is required during the lifting of units, Wika personnel are to be notified of access. All loads are to be slung and directed by a qualified rigger or Dogman.
Wika personnel
Manual handling
Back strain, Muscular injuries
Seek assistance if required,
Ensure that all Wika
Wika personnel
PRELIMINARY
RISK MANAGEMENT
SAFE WORK METHOD STATEMENT (SWMS) INSTALLING
MODULAR OVERLAND CONVEYOR
Rev. : A
Document Number 07 October 2011
OPCC-90-RIG-0003 Page 5 of 7
use correct manual handling techniques.
personnel are conversant with Wika safe working policies.
Organize communication
Communications Failure to understand directions
All two way radios to be tested before starting.
Riggers to carry or have access to fresh battery when required, whistle to be used in the event of radio failure.
Wika personnel
Establish Crawler crane 120 ton at required radius from centre of rift on head stocks. Crane counters weight radius and clearance. Ground conditions.
Ground failure, Structural failure, and personnel injury. Impact of counter weight resulting in load swing or sling breakage and catastrophic load fall. Crane base tracks sink resulting in uneven lift, load shift and excess boom stress and collapses.
Crane to be set up as per manufactures specifications. Riggers to observe position of boom at all times when working in close proximity to overhead obstructions. Check swing radius and clearances. Ground compaction report to be supplied before the setting up of crawler crane, use steel ground pads under crane tracks.
An audible wind speed indicator is installed to indicate if wind speed is too great to continue lifts safely, Operator to monitor conditions and to notify relevant supervisors. Wika personnel to clearly identify all potential underground and over head hazards and services in relation to work and access areas of crawler cranes and relevant transport.
Wika personnel
Check all lifting gear and relevant equipment on Crawler crane 120 ton required for lift being
Mechanical Failure, Personal injury, sling breaks, load drops, and boom collapses.
All lifting equipment must be checked and tagged current. Any faults must be reported immediately to site supervisor.
Any lifting equipment that has been supplied by other parties is to be compatible for required lifts and to be
Wika personnel
PRELIMINARY
RISK MANAGEMENT
SAFE WORK METHOD STATEMENT (SWMS) INSTALLING
MODULAR OVERLAND CONVEYOR
Rev. : A
Document Number 07 October 2011
OPCC-90-RIG-0003 Page 6 of 7
performed All loads are to slung and directed by a qualified rigger or dogman
of Australian Standards and have required test certificates.
Attach lifting equipment to required lift as per manufactures specified lifting points on MODULAR OVERLAND CONVEYOR.
Structural failure, personnel injury, and inclement weather conditions. Load Falls from height. Lugs on units not suitable to take the weight of the load on the lift being performed.
Ensure all personnel involved in the lifting of the MODULAR OVERLAND CONVEYOR understand the procedure and sign SWMS. Harnesses are to be worn and lanyards attached at heights greater than 2m or in the event of no edge protection or risk of falling exists.
All loads are to be slung and directed by a qualified rigger. All work to be carried out by qualified personnel. No unauthorised personnel permitted in the work area or access onto crane. Lugs on MODULAR OVERLAND CONVEYOR have been engineered to withstand the required weights that are required for the lift being performed
Wika personnel
In the event of any deviation from this Safe Work Method Statement
Stop all work activities Hold a toolbox meeting record and adjust SWMS variations
To be authorised by Wika safety representative
Wika personnel
PRELIMINARY
RISK MANAGEMENT
SAFE WORK METHOD STATEMENT (SWMS) INSTALLING
MODULAR OVERLAND CONVEYOR
Rev. : A
Document Number 07 October 2011
OPCC-90-RIG-0003 Page 7 of 7
THIS SWYIS HAS BEEN DEVELOPED THROUGH CONSULTATIONS WITH LCR EMPLOYEES AND HAS BEEN READ AND UNDERSTOOD
THEN SIGNED BY ALL EMPLOYEES INVOLVED WITH THIS ACTIVITY
NAME SIGNATURE NAME SIGNATURE
.
PERSONNEL QUALIFICATIONS AND EXPERIENCE REQUIRED TO COMPLETE
THE TASK:
SPECIFIC TRAINING REQUIRED TO COMPLETE THIS TASK:
APPROVALS:
REMARK:-. All dimension in millimeters
Gunawan H
SUKMA ARI
HaGun
Hg
12 11
A
B
C
D
E
10 9 8 7 6 5 4 3 2 1
A
B
C
D
E
F
G
H
12 11
F
G
10 9 8 7 6 5 4 3
H
2 1
DWG NO :
A4SIZE REV.
SCALE
REV. DATE DESCRIPTION APRDCHKDDRAWN BP APRDDATE DATE DATE DATE
REVISIONS
REFERENCEDRAWINGS
For Information For Review For Approval For Release For As-Built
Approval or review hereunder shall not be construed to relieve Vendor / Subcontractor of hisresponsibilities and liability under the Contract
C: ACCEPTED WITHOUT COMMENTSB: ACCEPTED WITH COMMENTSA: DOCUMENT TO BE REVISED AND REISSUED
CORE
LIFECYCLE CODE : A OR B
RESULT CODE : C, B, A
NEXT STATUS : FA, FR, RE, AB
RESUBMISSION DATE :
NEXT SUBMISSION DATE:
ISSUE PURPOSE :
EQUIP ITEM NO :NON
REVIEW DATE :
RESPONSIBLE DEPT. / PERSON :
ENGINEER
APPROVED
CHECKED
DRAWN
SIGN.INITIALSDATE
FILE NAME:
PAGE
TYPEDETAIL
AREA
NOTES:
OWNER
DWG NO. TITLE
CONTRACTOR
OPCC-90-RIG-0005
1:75
00
: / 11
: MODULAR OVERLAND CONVEYOR
: RIGGING PLAN
: OUT OF PIT CRUSHING AND CONVEYING
03
REMARK:-. All dimension in millimeters
Gunawan H
SUKMA ARI
HaGun
Hg
12 11
A
B
C
D
E
10 9 8 7 6 5 4 3 2 1
A
B
C
D
E
F
G
H
12 11
F
G
10 9 8 7 6 5 4 3
H
2 1
DWG NO :
A4SIZE REV.
SCALE
REV. DATE DESCRIPTION APRDCHKDDRAWN BP APRDDATE DATE DATE DATE
REVISIONS
REFERENCEDRAWINGS
For Information For Review For Approval For Release For As-Built
Approval or review hereunder shall not be construed to relieve Vendor / Subcontractor of hisresponsibilities and liability under the Contract
C: ACCEPTED WITHOUT COMMENTSB: ACCEPTED WITH COMMENTSA: DOCUMENT TO BE REVISED AND REISSUED
CORE
LIFECYCLE CODE : A OR B
RESULT CODE : C, B, A
NEXT STATUS : FA, FR, RE, AB
RESUBMISSION DATE :
NEXT SUBMISSION DATE:
ISSUE PURPOSE :
EQUIP ITEM NO :NON
REVIEW DATE :
RESPONSIBLE DEPT. / PERSON :
ENGINEER
APPROVED
CHECKED
DRAWN
SIGN.INITIALSDATE
FILE NAME:
PAGE
TYPEDETAIL
AREA
NOTES:
OWNER
DWG NO. TITLE
CONTRACTOR
OPCC-90-RIG-0005
1:75
00
: / 11
: MODULAR OVERLAND CONVEYOR
: RIGGING PLAN
: OUT OF PIT CRUSHING AND CONVEYING
03
REMARK:-. All dimension in millimeters
Gunawan H
SUKMA ARI
HaGun
Hg
12 11
A
B
C
D
E
10 9 8 7 6 5 4 3 2 1
A
B
C
D
E
F
G
H
12 11
F
G
10 9 8 7 6 5 4 3
H
2 1
DWG NO :
A4SIZE REV.
SCALE
REV. DATE DESCRIPTION APRDCHKDDRAWN BP APRDDATE DATE DATE DATE
REVISIONS
REFERENCEDRAWINGS
For Information For Review For Approval For Release For As-Built
Approval or review hereunder shall not be construed to relieve Vendor / Subcontractor of hisresponsibilities and liability under the Contract
C: ACCEPTED WITHOUT COMMENTSB: ACCEPTED WITH COMMENTSA: DOCUMENT TO BE REVISED AND REISSUED
CORE
LIFECYCLE CODE : A OR B
RESULT CODE : C, B, A
NEXT STATUS : FA, FR, RE, AB
RESUBMISSION DATE :
NEXT SUBMISSION DATE:
ISSUE PURPOSE :
EQUIP ITEM NO :NON
REVIEW DATE :
RESPONSIBLE DEPT. / PERSON :
ENGINEER
APPROVED
CHECKED
DRAWN
SIGN.INITIALSDATE
FILE NAME:
PAGE
TYPEDETAIL
AREA
NOTES:
OWNER
DWG NO. TITLE
CONTRACTOR
OPCC-90-RIG-0005
1:75
00
: / 11
: MODULAR OVERLAND CONVEYOR
: RIGGING PLAN
: OUT OF PIT CRUSHING AND CONVEYING
03
REMARK:-. All dimension in millimeters
Gunawan H
SUKMA ARI
HaGun
Hg
12 11
A
B
C
D
E
10 9 8 7 6 5 4 3 2 1
A
B
C
D
E
F
G
H
12 11
F
G
10 9 8 7 6 5 4 3
H
2 1
DWG NO :
A4SIZE REV.
SCALE
REV. DATE DESCRIPTION APRDCHKDDRAWN BP APRDDATE DATE DATE DATE
REVISIONS
REFERENCEDRAWINGS
For Information For Review For Approval For Release For As-Built
Approval or review hereunder shall not be construed to relieve Vendor / Subcontractor of hisresponsibilities and liability under the Contract
C: ACCEPTED WITHOUT COMMENTSB: ACCEPTED WITH COMMENTSA: DOCUMENT TO BE REVISED AND REISSUED
CORE
LIFECYCLE CODE : A OR B
RESULT CODE : C, B, A
NEXT STATUS : FA, FR, RE, AB
RESUBMISSION DATE :
NEXT SUBMISSION DATE:
ISSUE PURPOSE :
EQUIP ITEM NO :NON
REVIEW DATE :
RESPONSIBLE DEPT. / PERSON :
ENGINEER
APPROVED
CHECKED
DRAWN
SIGN.INITIALSDATE
FILE NAME:
PAGE
TYPEDETAIL
AREA
NOTES:
OWNER
DWG NO. TITLE
CONTRACTOR
OPCC-90-RIG-0005
1:75
00
: / 11
: MODULAR OVERLAND CONVEYOR
: RIGGING PLAN
: OUT OF PIT CRUSHING AND CONVEYING
03
REMARK:-. All dimension in millimeters
Gunawan H
SUKMA ARI
HaGun
Hg
12 11
A
B
C
D
E
10 9 8 7 6 5 4 3 2 1
A
B
C
D
E
F
G
H
12 11
F
G
10 9 8 7 6 5 4 3
H
2 1
DWG NO :
A4SIZE REV.
SCALE
REV. DATE DESCRIPTION APRDCHKDDRAWN BP APRDDATE DATE DATE DATE
REVISIONS
REFERENCEDRAWINGS
For Information For Review For Approval For Release For As-Built
Approval or review hereunder shall not be construed to relieve Vendor / Subcontractor of hisresponsibilities and liability under the Contract
C: ACCEPTED WITHOUT COMMENTSB: ACCEPTED WITH COMMENTSA: DOCUMENT TO BE REVISED AND REISSUED
CORE
LIFECYCLE CODE : A OR B
RESULT CODE : C, B, A
NEXT STATUS : FA, FR, RE, AB
RESUBMISSION DATE :
NEXT SUBMISSION DATE:
ISSUE PURPOSE :
EQUIP ITEM NO :NON
REVIEW DATE :
RESPONSIBLE DEPT. / PERSON :
ENGINEER
APPROVED
CHECKED
DRAWN
SIGN.INITIALSDATE
FILE NAME:
PAGE
TYPEDETAIL
AREA
NOTES:
OWNER
DWG NO. TITLE
CONTRACTOR
OPCC-90-RIG-0005
1:75
00
: / 11
: MODULAR OVERLAND CONVEYOR
: RIGGING PLAN
: OUT OF PIT CRUSHING AND CONVEYING
03
REMARK:-. All dimension in millimeters
Gunawan H
SUKMA ARI
HaGun
Hg
12 11
A
B
C
D
E
10 9 8 7 6 5 4 3 2 1
A
B
C
D
E
F
G
H
12 11
F
G
10 9 8 7 6 5 4 3
H
2 1
DWG NO :
A4SIZE REV.
SCALE
REV. DATE DESCRIPTION APRDCHKDDRAWN BP APRDDATE DATE DATE DATE
REVISIONS
REFERENCEDRAWINGS
For Information For Review For Approval For Release For As-Built
Approval or review hereunder shall not be construed to relieve Vendor / Subcontractor of hisresponsibilities and liability under the Contract
C: ACCEPTED WITHOUT COMMENTSB: ACCEPTED WITH COMMENTSA: DOCUMENT TO BE REVISED AND REISSUED
CORE
LIFECYCLE CODE : A OR B
RESULT CODE : C, B, A
NEXT STATUS : FA, FR, RE, AB
RESUBMISSION DATE :
NEXT SUBMISSION DATE:
ISSUE PURPOSE :
EQUIP ITEM NO :NON
REVIEW DATE :
RESPONSIBLE DEPT. / PERSON :
ENGINEER
APPROVED
CHECKED
DRAWN
SIGN.INITIALSDATE
FILE NAME:
PAGE
TYPEDETAIL
AREA
NOTES:
OWNER
DWG NO. TITLE
CONTRACTOR
OPCC-90-RIG-0005
1:75
00
: / 11
: MODULAR OVERLAND CONVEYOR
: RIGGING PLAN
: OUT OF PIT CRUSHING AND CONVEYING
03
PRELIMINARY RIGGING TOOLS
INSTALLING MODULAR OVERLAND
CONVEYOR
Document Number Rev. : A
OPCC-90-RIG-0003 07 October 2011
Page 1 of 4
CHAPTER 6
PRELIMINARY RIGGING TOOLS
INSTALLING MODULAR OVERLAND
CONVEYOR
Document Number Rev. : A
OPCC-90-RIG-0003 07 October 2011
Page 2 of 4
TABLE OF CONTENT
TABLE OF CONTENT ................................................................................................................ 2
1 WORKING LOAD LIMIT - 1770 GRADE W.R.C. ................................................................. 3
15 Trades using the scaffolding: ............................................................................................ 8
PRELIMINARY
GENERAL SCAFFOLDING SAFETY CHECKLIST FOR
INSTALLING MODULAR OVERLAND
CONVEYOR
Document Number Rev. : A
OPCC-90-RIG-0003 07 October 2011
Page 3 of 8
General scaffolding safety checklist
Site address: yes no n/a
1 Documentation:
Is a hand over certificate available on site or such things as scaffolding tag
Has steel wire mesh/ shade cloth or containment sheeting been provided where members of the public exposed to a risk of falling materials from the scaffolding
Has steel wire mesh/ shade cloth or containment sheeting been provided
where workers are exposed to a risk of falling materials from the scaffolding
Where the working platform is less than 4m was it erected by a competent person
Are procedures in place to inspect scaffolding every 30 days
System in place to inspect the scaffolding after trades have used it e.g. form workers, concreters, bricklayers, tillers
Is a work method statement or appropriate documentation available for the management of scaffolding on site once erected
Is there a system in place to prevent damage from loads suspended from a crane and is it recorded in SWMS
Have trades been inducted on the safe use of the scaffolding
2 Supporting structure:
Is the supporting structure in good condition and adequate strength/has it been assessed by a competent person/ engineers certificate obtained
Is there a risk of the supporting structure being overloaded from other sources adequately controlled
3 Foundation:
Scaffolding erected on suitable foundation/footings e.g. not adjacent to trenches, excavation, underground services, soft ground
Base plates used are a minimum 100mm x 100mm and 6mm thick
PRELIMINARY
GENERAL SCAFFOLDING SAFETY CHECKLIST FOR
INSTALLING MODULAR OVERLAND
CONVEYOR
Document Number Rev. : A
OPCC-90-RIG-0003 07 October 2011
Page 4 of 8
General scaffolding safety checklist
Site address: yes no n/a
If on soft ground are sole boards being used to distribute the load evenly e.g. unstable ground, gaps
Are the sole boards continuous and where ever possible support 2 standards. and a minimum 220mm wide
Are the sole boards a minimum 220mm wide
Is packing used under sole boards suitable e.g. hard wood
Screw Jacks not to extend more than 600 mm or as per manufacturers requirements
4 Openings in scaffolding e.g. driveways:
System in place to prevent scaffolding being struck by vehicles and or plant e.g. concrete blocks, guards, fenders, traffic management