ARMY FM 10-542 NAVY NAVSEA SS400-AD-MMO-010 AIR FORCE TO 13C7-51-21 AIRDROP OF SUPPLIES AND EQUIPMENT: RIGGING LOADS FOR SPECIAL OPERATIONS DISTRIBUTION RESTRICTION: Approved for public release; distribution is unlimited. HEADQUARTERS DEPARTMENT OF THE ARMY DEPARTMENT OF THE NAVY DEPARTMENT OF THE AIR FORCE Manual Provided by eMilitary Manuals - http://www.emilitarymanuals.com
15
Embed
Rigging Loads for Special Operations - eMilitary Manuals · rigging loads for special operations ... airdrop of supplies and equipment: rigging loads for special operations paragraph
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Manual Provided by eMilitary Manuals - http://www.emilitarymanuals.com
C3, FM 10-542/NAVSEA SS400-AD-MMO-010TO 13C7-51-21
CHANGE HEADQUARTERSNO 3 DEPARTMENT OF THE ARMY
DEPARTMENT OF THE NAVY DEPARTMENT OF THE AIR FORCE Washington, DC, 2 October 2000
AIRDROP OF SUPPLIES AND EQUIPMENT:
RIGGING LOADS FOR SPECIAL OPERATIONS
This change adds the procedures for rigging the Navy Special Warfare Rigid InflatableBoat for low-velocity airdrop. This change also modifies the procedures for rigging theF470U boat in the A-22 cargo bag for low-velocity airdrop.
FM 10-542/TO 13C7-51-21, 07 October 1987, is changed as follows:
1. New or changed material is identified by a vertical bar in the margin opposite thechanged material.
2. File this transmittal sheet in front of the publication for reference purposes.
3. Remove old pages and insert new pages as indicated below:
Remove pages Insert pagesCover Cover i through vii i through vii1-1 and 1-2 1-1 and 1-2
3-5 and 3-6 3-5 and 3-63-95 and 3-96 3-95 through 3-963-103 and 3-104 3-103 and 3-1043-111 through 3-118 3-111 through 3-1183-129 through 3-134 3-129 through 3-133
5-1 through 5-51 B-1
Glossary-1 Glossary-1References-1 References-1 and References-2
DISTRIBUTION RESTRICTION: Approved for public release; distribution isunlimited.
Manual Provided by eMilitary Manuals - http://www.emilitarymanuals.com
DISTRIBUTION RESTRICTION : Approved for public release; distribution isunlimited.
By Order of the Secretaries of the Army, Navy, and the Air Force:
ERIC K. SHINSEKIGeneral, United States Army Chief of Staff
Official:
JOEL B. HUDSONAdministrative Assistant to the
Secretary of the Army
W.A. WHITLOWMajor General, U S Marine CorpsChief of Naval OperationsDirector, Expeditionary Warfare Division (N75)
LESTER L. LYLES MICHAEL E. RYANGeneral, USAF General, USAFCommander, AFMC Chief of Staff
DISTRIBUTION:
Active Army, Army National Guard, and U.S. Army Reserve: To be distributed inaccordance with the initial distribution number 110924, requirements for FM 10-542.
Manual Provided by eMilitary Manuals - http://www.emilitarymanuals.com
C3, FM 10-542/NAVSEA SS400-AD-MMO-010/TO 13C7-51-21 * FM 10-542/NAVSEA SS400-AD-MMO-010/TO 13C7-51-21
FIELD MANUAL HEADQUARTERSNO 10-542 DEPARTMENT OF THE ARMYNAVAL SEA COMMAND DEPARTMENT OF THE NAVYNO SS400-AD-MMO-010 DEPARTMENT OF THE AIR FORCETECHNICAL ORDER Washington,DC 7 October, 1987NO 13C7-51-21
AIRDROP OF SUPPLIES AND EQUIPMENT:RIGGING LOADS FOR SPECIAL OPERATIONS
Description of Load ................................................................... 3-37 3-48Preparing Platform .................................................................... 3-38 3-49
ii
Manual Provided by eMilitary Manuals - http://www.emilitarymanuals.com
C3, FM 10-542/NAVSEA SS400-AD-MMO-010/TO 13C7-51-21
Paragraph Page
Installing Suspension Slings and Stowing Sandbags ................... 3-39 3-49Placing and Securing Honeycomb Stacks ................................... 3-40 3-49Preparing Boat........................................................................... 3-41 3-51Positioning Boat ........................................................................ 3-42 3-53Preparing and Stowing Outboard Engine and Fuel Tanks ........... 3-43 3-53Stowing Load and Paddles......................................................... 3-44 3-55Installing Load Cover and Tie-down Rings ................................ 3-45 3-57Rigging Boat ............................................................................. 3-46 3-58Marking Rigged Load................................................................ 3-47 3-58Equipment Required.................................................................. 3-48 3-58
Section V RIGGING ZODIAC K50 BOAT
Description of Load ................................................................... 3-49 3-59Preparing Platform .................................................................... 3-50 3-60Installing Suspension Slings and Stowing Sandbags ................... 3-51 3-60Placing and Securing Honeycomb Stacks ................................... 3-52 3-60Preparing Boat........................................................................... 3-53 3-61Positioning Boat ........................................................................ 3-54 3-61Preparing and Stowing Outboard Engine and Fuel Tanks ........... 3-55 3-61Stowing Load and Paddles......................................................... 3-56 3-61Installing Load Cover and Tie-down Rings ................................ 3-57 3-62Rigging Boat ............................................................................. 3-58 3-62Marking Rigged Load................................................................ 3-59 3-62Equipment Required.................................................................. 3-60 3-63
Section VI RIGGING DOUBLE ZODIAC F470U BOATS
Description of Load ................................................................... 3-61 3-64Preparing Platform .................................................................... 3-62 3-64Installing Suspension Slings and Stowing Sandbags ................... 3-63 3-64Placing and Securing Honeycomb Stacks ................................... 3-64 3-64Preparing Boats ......................................................................... 3-65 3-67Positioning First Boat ................................................................ 3-66 3-69Preparing and Stowing Accompanying Load.............................. 3-67 3-69Leveling, Covering, and Lashing First Boat andAccompanying Load.................................................................. 3-68 3-72Placing and Loading Second Boat.............................................. 3-69 3-73Lashing Second Boat to Platform............................................... 3-70 3-74Safetying Suspension Slings ...................................................... 3-71 3-74Stowing Parachutes ................................................................... 3-72 3-75Installing Parachute Release....................................................... 3-73 3-77Marking Rigged Load................................................................ 3-74 3-77Equipment Required.................................................................. 3-75 3-77
iii
Manual Provided by eMilitary Manuals - http://www.emilitarymanuals.com
C3, FM 10-542/NAVSEA SS400-AD-MMO-010/TO 13C7-51-21
Paragraph Page
Section VII RIGGING THE IBS BUNDLEDescription of Load ................................................................... 3-76 3-78Preparing Skid........................................................................... 3-77 3-78Preparing the IBS ...................................................................... 3-78 3-81Preparing Engine and Fuel Tanks............................................... 3-79 3-82Positioning Boat and Engine...................................................... 3-80 3-82Stowing Boat and Paddles.......................................................... 3-81 3-84Lashing the IBS Bundle............................................................. 3-82 3-84Stowing Parachute..................................................................... 3-83 3-86Marking Rigged Load................................................................ 3-84 3-88Equipment Required.................................................................. 3-85 3-89
Section VIII RIGGING ZODIAC F470U BOAT IN A-22 CARGO BAG
Description of Load ................................................................... 3-86 3-90Adapting A-22 Cargo Bag ......................................................... 3-87 3-90Constructing Engine Protection Box .......................................... 3-88 3-92Modifying Type IV Link Assembly for Use withHydraulic Release...................................................................... 3-89 3-97Preparing Skid and A-22 Cargo Bag and Placing Engine Box..... 3-90 3-101Preparing Engine and Securing Engine in Box ........................... 3-91 3-104Preparing Boat and Inflation System .......................................... 3-92 3-109Collapsing and Folding Boat, Completing InflationSystem Connection, and Loading Fuel Tanks ............................. 3-93 3-114Securing A-22 Cargo Bag.......................................................... 3-94 3-121Installing Parachute Release and Parachutes............................... 3-95 3-125Installing Flotation Devices and Chemical Lights....................... 3-96 3-130Marking Rigged Load................................................................ 3-97 3-132Equipment Required.................................................................. 3-98 3-133
CHAPTER 4 RIGGING THE MOBILE OVER SNOW TRANSPORT (MOST)ON A 16-FOOT TYPE V AIRDROP PLATFORM FORLOW-VELOCITY AIRDROP (LVAD)
Description of Load ................................................................... 4-1 4-1Preparing Platform .................................................................... 4-2 4-1Preparing Load .......................................................................... 4-3 4-4Building and Positioning Honeycomb Stacks on Platform .......... 4-4 4-6Positioning Load ....................................................................... 4-5 4-9Lashing Snow Mobiles and Sleds to Platform............................. 4-6 4-10Installing Honeycomb, Release Tray and Load Cover................. 4-7 4-15Installing Suspension Slings, and Deadman's Tie........................ 4-8 4-16Stowing Cargo Parachute........................................................... 4-9 4-17Installing Extraction System ...................................................... 4-10 4-18Installing Parachute Release System .......................................... 4-11 4-19Placing Extraction Parachute ..................................................... 4-12 4-20Installing Provisions for Emergency Restraints .......................... 4-13 4-20Marking Rigged Load................................................................ 4-14 4-20Equipment Required.................................................................. 4-15 4-22
iv
Manual Provided by eMilitary Manuals - http://www.emilitarymanuals.com
C3, FM 10-542/NAVSEA SS400-AD-MMO-010/TO 13C7-51-21
Paragraph Page
CHAPTER 5 RIGGING THE NAVY SPECIAL WARFARERIGID INFLATABLE BOAT