Qatar-Bahrain Causeway Project
Bridges Middle East Conference 2009
7/29/2019 rickhaggettqatarbahraincausewaymanagement-100913010317-phpapp02
2/34
2Introduction
Bridges in the region
Qatar-Bahrain Causeway
(the latest & greatest) Design and construction issues
Introduction of rail
Technical challenges
7/29/2019 rickhaggettqatarbahraincausewaymanagement-100913010317-phpapp02
3/34
3
Bridges in the Region
Bridges Middle East Conference 2009
7/29/2019 rickhaggettqatarbahraincausewaymanagement-100913010317-phpapp02
4/34
4Bridges in the Region
Typically: Water crossings
Connect population centres
Access key infrastructure
Notably: Abu Dhabi
Dubai
Bahrain
7/29/2019 rickhaggettqatarbahraincausewaymanagement-100913010317-phpapp02
5/34
5Bridges in the Region
Drivers: Economic growth
Population growth
Urban expansion Development of major
infrastructure
Increasing traffic
7/29/2019 rickhaggettqatarbahraincausewaymanagement-100913010317-phpapp02
6/34
6Bridges in the Region
Abu Dhabi
Hodariyat BridgeSaadiyat Island Bridge (Sheikh Khalifa Bridge)
Sheikh Zayed Bridge
7/29/2019 rickhaggettqatarbahraincausewaymanagement-100913010317-phpapp02
7/34
7Bridges in the Region
Dubai
Garhoud Bridge Palm Jebel Ali Crescent Bridges
DubaiMetro
Sheikh Rashid bin Saeed Crossing (6th Crossing)
Business Bay Bridge
7/29/2019 rickhaggettqatarbahraincausewaymanagement-100913010317-phpapp02
8/34
8Bridges in the Region
Bahrain
Sheikh Isa Causeway
Sheikh Khalifa bin Salman Bridge
7/29/2019 rickhaggettqatarbahraincausewaymanagement-100913010317-phpapp02
9/34
9Bridges in the Region
Sitra Causeway
7/29/2019 rickhaggettqatarbahraincausewaymanagement-100913010317-phpapp02
10/34
10Bridges in the Region
King Fahd Causeway
7/29/2019 rickhaggettqatarbahraincausewaymanagement-100913010317-phpapp02
11/34
11
Qatar-Bahrain Causeway
Bridges Middle East Conference 2009
7/29/2019 rickhaggettqatarbahraincausewaymanagement-100913010317-phpapp02
12/34
12Qatar-Bahrain Causeway
Project Overview 40km marine causeway 2 lane highway in each direction
Adjacent high-speed rail facility 2 dredged navigation channels 2 high level arch bridges 23km bridges / viaducts
17km embankments 2 rest area islands Interchanges, tolling, border facilities
QBC
Qatar
Bahrain
7/29/2019 rickhaggettqatarbahraincausewaymanagement-100913010317-phpapp02
13/34
13Qatar-Bahrain Causeway
7/29/2019 rickhaggettqatarbahraincausewaymanagement-100913010317-phpapp02
14/34
14
Design and Construction Issues
Bridges Middle East Conference 2009
7/29/2019 rickhaggettqatarbahraincausewaymanagement-100913010317-phpapp02
15/34
15Design and Construction issues
Pre-cast solution adopted:
To limit offshore operations To maintain control over quality & safety
Design closely linked to construction methods
Design-Build approach adopted
Allows fast-tracking of schedule
Large Marine Site
7/29/2019 rickhaggettqatarbahraincausewaymanagement-100913010317-phpapp02
16/34
16Design and Construction issues
Material: Volumes required
Need to ensure
Consistent quality
Reliability of supply
High import content
Marine Borrow Durability considerations
7/29/2019 rickhaggettqatarbahraincausewaymanagement-100913010317-phpapp02
17/34
17Design and Construction issues
Concrete Durability: Options
Stainless steel
Corrosion inhibitor
Coating
Cathodic Protection
Extent of splash zone
7/29/2019 rickhaggettqatarbahraincausewaymanagement-100913010317-phpapp02
18/34
18Design and Construction issues
Eurocode:
One of the first projects to use
Europe-wide code for bridge design(road/rail) from 2010
Option of factored loads or 3rd partychecks
Reliability & Consequence Classes
7/29/2019 rickhaggettqatarbahraincausewaymanagement-100913010317-phpapp02
19/34
19Design and Construction issues
Influenced by:
Archaeology (Qatar) Competing land use (Bahrain)
Stakeholder Requirements
Alignment at Landing Points
7/29/2019 rickhaggettqatarbahraincausewaymanagement-100913010317-phpapp02
20/34
20Design and Construction issues
Qatar Landing Point
7/29/2019 rickhaggettqatarbahraincausewaymanagement-100913010317-phpapp02
21/34
21Design and Construction issues
3 km
7/29/2019 rickhaggettqatarbahraincausewaymanagement-100913010317-phpapp02
22/34
22Design and Construction issues
7/29/2019 rickhaggettqatarbahraincausewaymanagement-100913010317-phpapp02
23/34
23
Introduction of Rail
Bridges Middle East Conference 2009
7/29/2019 rickhaggettqatarbahraincausewaymanagement-100913010317-phpapp02
24/34
24Introduction of Rail
Concept design:
Road only
Twin deck viaducts 80 m viaduct spans
Cable-stay bridges overNavigation Channels
Introduction of Rail
7/29/2019 rickhaggettqatarbahraincausewaymanagement-100913010317-phpapp02
25/34
25Introduction of rail
Larger vertical and horizontal loads Freight
Limitation on gradient and horizontal curvature
High-speed passenger
Extended Schedule
Impact of Rail
7/29/2019 rickhaggettqatarbahraincausewaymanagement-100913010317-phpapp02
26/34
26Introduction of rail
Resultant changes to concept design: Vertical and horizontal alignments revised
Length of viaduct increased
Stronger, stiffer structures
Arch bridges replaced cable-stayed
Closer pier spacing
Twin road decks combined
Navigation Channel relocated
7/29/2019 rickhaggettqatarbahraincausewaymanagement-100913010317-phpapp02
27/34
27
Technical Challenges
Bridges Middle East Conference 2009
7/29/2019 rickhaggettqatarbahraincausewaymanagement-100913010317-phpapp02
28/34
28Technical challenges
Environmental Zero impact on hydraulic flows Extensive baseline measurements
Ongoing Monitoring
Constraints on construction methods
7/29/2019 rickhaggettqatarbahraincausewaymanagement-100913010317-phpapp02
29/34
29Technical Challenges
Quality & Safety Remote sites
Working at height
Heavy lifts
24/7 working
Cost-driven schedule
Motivating the workforce
7/29/2019 rickhaggettqatarbahraincausewaymanagement-100913010317-phpapp02
30/34
30Technical Challenges
Rail Issues Axle Load
Speeds
Height Clearance Emergency Escape
Maintenance Access
Bahrain Network
Qatar Network
GCC Network
7/29/2019 rickhaggettqatarbahraincausewaymanagement-100913010317-phpapp02
31/34
31Technical challenges
Dredging of Navigation Channels Unsuitable material Creative disposal
Ship impact on Main Bridges Designed to deflect Seismic resistant Visual Impact Technical challenges
7/29/2019 rickhaggettqatarbahraincausewaymanagement-100913010317-phpapp02
32/34
32Technical challenges
Settlement of Embankments
Soil improvement & testing
Deferred rail solution
Ballasted track
High Voltage Interconnect
Three 220 kV circuits Two 400 kV circuits
7/29/2019 rickhaggettqatarbahraincausewaymanagement-100913010317-phpapp02
33/34
33Concluding remarks
Rich heritage of major bridges in the GCC
The Qatar Bahrain Causeway will enrich this
heritage First high-speed rail crossing
Numerous challenges to overcome
A landmark project for the Region
In Conclusion