    Qatar-Bahrain Causeway Project

    Bridges Middle East Conference 2009

  • 7/29/2019 rickhaggettqatarbahraincausewaymanagement-100913010317-phpapp02

    2/34

    2Introduction

    Bridges in the region

    Qatar-Bahrain Causeway

    (the latest & greatest) Design and construction issues

    Introduction of rail

    Technical challenges

  • 7/29/2019 rickhaggettqatarbahraincausewaymanagement-100913010317-phpapp02

    3/34

    3

    Bridges in the Region

    Bridges Middle East Conference 2009

  • 7/29/2019 rickhaggettqatarbahraincausewaymanagement-100913010317-phpapp02

    4/34

    4Bridges in the Region

    Typically: Water crossings

    Connect population centres

    Access key infrastructure

    Notably: Abu Dhabi

    Dubai

    Bahrain

  • 7/29/2019 rickhaggettqatarbahraincausewaymanagement-100913010317-phpapp02

    5/34

    5Bridges in the Region

    Drivers: Economic growth

    Population growth

    Urban expansion Development of major

    infrastructure

    Increasing traffic

  • 7/29/2019 rickhaggettqatarbahraincausewaymanagement-100913010317-phpapp02

    6/34

    6Bridges in the Region

    Abu Dhabi

    Hodariyat BridgeSaadiyat Island Bridge (Sheikh Khalifa Bridge)

    Sheikh Zayed Bridge

  • 7/29/2019 rickhaggettqatarbahraincausewaymanagement-100913010317-phpapp02

    7/34

    7Bridges in the Region

    Dubai

    Garhoud Bridge Palm Jebel Ali Crescent Bridges

    DubaiMetro

    Sheikh Rashid bin Saeed Crossing (6th Crossing)

    Business Bay Bridge

  • 7/29/2019 rickhaggettqatarbahraincausewaymanagement-100913010317-phpapp02

    8/34

    8Bridges in the Region

    Bahrain

    Sheikh Isa Causeway

    Sheikh Khalifa bin Salman Bridge

  • 7/29/2019 rickhaggettqatarbahraincausewaymanagement-100913010317-phpapp02

    9/34

    9Bridges in the Region

    Sitra Causeway

  • 7/29/2019 rickhaggettqatarbahraincausewaymanagement-100913010317-phpapp02

    10/34

    10Bridges in the Region

    King Fahd Causeway

  • 7/29/2019 rickhaggettqatarbahraincausewaymanagement-100913010317-phpapp02

    11/34

    11

    Qatar-Bahrain Causeway

    Bridges Middle East Conference 2009

  • 7/29/2019 rickhaggettqatarbahraincausewaymanagement-100913010317-phpapp02

    12/34

    12Qatar-Bahrain Causeway

    Project Overview 40km marine causeway 2 lane highway in each direction

    Adjacent high-speed rail facility 2 dredged navigation channels 2 high level arch bridges 23km bridges / viaducts

    17km embankments 2 rest area islands Interchanges, tolling, border facilities

    QBC

    Qatar

    Bahrain

  • 7/29/2019 rickhaggettqatarbahraincausewaymanagement-100913010317-phpapp02

    13/34

    13Qatar-Bahrain Causeway

  • 7/29/2019 rickhaggettqatarbahraincausewaymanagement-100913010317-phpapp02

    14/34

    14

    Design and Construction Issues

    Bridges Middle East Conference 2009

  • 7/29/2019 rickhaggettqatarbahraincausewaymanagement-100913010317-phpapp02

    15/34

    15Design and Construction issues

    Pre-cast solution adopted:

    To limit offshore operations To maintain control over quality & safety

    Design closely linked to construction methods

    Design-Build approach adopted

    Allows fast-tracking of schedule

    Large Marine Site

  • 7/29/2019 rickhaggettqatarbahraincausewaymanagement-100913010317-phpapp02

    16/34

    16Design and Construction issues

    Material: Volumes required

    Need to ensure

    Consistent quality

    Reliability of supply

    High import content

    Marine Borrow Durability considerations

  • 7/29/2019 rickhaggettqatarbahraincausewaymanagement-100913010317-phpapp02

    17/34

    17Design and Construction issues

    Concrete Durability: Options

    Stainless steel

    Corrosion inhibitor

    Coating

    Cathodic Protection

    Extent of splash zone

  • 7/29/2019 rickhaggettqatarbahraincausewaymanagement-100913010317-phpapp02

    18/34

    18Design and Construction issues

    Eurocode:

    One of the first projects to use

    Europe-wide code for bridge design(road/rail) from 2010

    Option of factored loads or 3rd partychecks

    Reliability & Consequence Classes

  • 7/29/2019 rickhaggettqatarbahraincausewaymanagement-100913010317-phpapp02

    19/34

    19Design and Construction issues

    Influenced by:

    Archaeology (Qatar) Competing land use (Bahrain)

    Stakeholder Requirements

    Alignment at Landing Points

  • 7/29/2019 rickhaggettqatarbahraincausewaymanagement-100913010317-phpapp02

    20/34

    20Design and Construction issues

    Qatar Landing Point

  • 7/29/2019 rickhaggettqatarbahraincausewaymanagement-100913010317-phpapp02

    21/34

    21Design and Construction issues

    3 km

  • 7/29/2019 rickhaggettqatarbahraincausewaymanagement-100913010317-phpapp02

    22/34

    22Design and Construction issues

  • 7/29/2019 rickhaggettqatarbahraincausewaymanagement-100913010317-phpapp02

    23/34

    23

    Introduction of Rail

    Bridges Middle East Conference 2009

  • 7/29/2019 rickhaggettqatarbahraincausewaymanagement-100913010317-phpapp02

    24/34

    24Introduction of Rail

    Concept design:

    Road only

    Twin deck viaducts 80 m viaduct spans

    Cable-stay bridges overNavigation Channels

    Introduction of Rail

  • 7/29/2019 rickhaggettqatarbahraincausewaymanagement-100913010317-phpapp02

    25/34

    25Introduction of rail

    Larger vertical and horizontal loads Freight

    Limitation on gradient and horizontal curvature

    High-speed passenger

    Extended Schedule

    Impact of Rail

  • 7/29/2019 rickhaggettqatarbahraincausewaymanagement-100913010317-phpapp02

    26/34

    26Introduction of rail

    Resultant changes to concept design: Vertical and horizontal alignments revised

    Length of viaduct increased

    Stronger, stiffer structures

    Arch bridges replaced cable-stayed

    Closer pier spacing

    Twin road decks combined

    Navigation Channel relocated

  • 7/29/2019 rickhaggettqatarbahraincausewaymanagement-100913010317-phpapp02

    27/34

    27

    Technical Challenges

    Bridges Middle East Conference 2009

  • 7/29/2019 rickhaggettqatarbahraincausewaymanagement-100913010317-phpapp02

    28/34

    28Technical challenges

    Environmental Zero impact on hydraulic flows Extensive baseline measurements

    Ongoing Monitoring

    Constraints on construction methods

  • 7/29/2019 rickhaggettqatarbahraincausewaymanagement-100913010317-phpapp02

    29/34

    29Technical Challenges

    Quality & Safety Remote sites

    Working at height

    Heavy lifts

    24/7 working

    Cost-driven schedule

    Motivating the workforce

  • 7/29/2019 rickhaggettqatarbahraincausewaymanagement-100913010317-phpapp02

    30/34

    30Technical Challenges

    Rail Issues Axle Load

    Speeds

    Height Clearance Emergency Escape

    Maintenance Access

    Bahrain Network

    Qatar Network

    GCC Network

  • 7/29/2019 rickhaggettqatarbahraincausewaymanagement-100913010317-phpapp02

    31/34

    31Technical challenges

    Dredging of Navigation Channels Unsuitable material Creative disposal

    Ship impact on Main Bridges Designed to deflect Seismic resistant Visual Impact Technical challenges

  • 7/29/2019 rickhaggettqatarbahraincausewaymanagement-100913010317-phpapp02

    32/34

    32Technical challenges

    Settlement of Embankments

    Soil improvement & testing

    Deferred rail solution

    Ballasted track

    High Voltage Interconnect

    Three 220 kV circuits Two 400 kV circuits

  • 7/29/2019 rickhaggettqatarbahraincausewaymanagement-100913010317-phpapp02

    33/34

    33Concluding remarks

    Rich heritage of major bridges in the GCC

    The Qatar Bahrain Causeway will enrich this

    heritage First high-speed rail crossing

    Numerous challenges to overcome

    A landmark project for the Region

    In Conclusion

  • 7/29/2019 rickhaggettqatarbahraincausewaymanagement-100913010317-phpapp02

    34/34

    34

    Thank You