1 RICHARD YEMM Chief Technology Officer Pelamis Wave Power Ltd. Stanford School of Engineering May 4 2009
31

RICHARD YEMM Chief Technology Officer Pelamis Wave Power Ltd.

Jan 01, 2017

Download

Documents

vutu
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: RICHARD YEMM Chief Technology Officer Pelamis Wave Power Ltd.

1

RICHARD YEMM

Chief Technology Officer

Pelamis Wave Power Ltd.

Stanford School of Engineering

May 4 2009

Page 2: RICHARD YEMM Chief Technology Officer Pelamis Wave Power Ltd.

2

Cost reduction – the development cycleWave Energy – why?

• Resource is enormous

• Most ‘dense’ renewable resource

• ‘Out of sight & out of mind’

• Renewables needs ‘options’…

• Dependable & forecastable

• Aggregation with wind => good

Major energy source & industrial opportunity

Page 3: RICHARD YEMM Chief Technology Officer Pelamis Wave Power Ltd.

3

Cost reduction – the development cyclePELAMIS – Business Overview

Electricity Markets

Pelamis Wave Power

Pelamis assembly, installation,

operation & maintenance

Component Suppliers, Sub-

contractors and Fabricators

Power Generation Projects

Project

Development

Technology provider

Model adopted across power sector

Proven through wind industry success

Industry standard model

Incorporated January 1998

Private - UK Limited Company

Currently 78 staff

~$0.75m seed from ‘friends & family’, Angel

~$12.5m first stage VC 2002

~$60m since in 3 rounds

2 commercial contracts to date, ~$15m

Business & finance

Proven, accepted, financeable business model…

Page 4: RICHARD YEMM Chief Technology Officer Pelamis Wave Power Ltd.

4

Pelamis WEC technology - USPs

Breakthrough technology with unique competitive advantages

Forecastable output

Negligible visual intrusion

Minimal environmental impact

Minimum on-site construction work

Off-site maintenance

Offshore deployment

Non-site specific

Inherent survivability - CRITICAL

3 x power/tonne of competitors

Available technology

Designed to DNV standards

Patented core technology, all key know-how in-house

Acknowledged market leader

Page 5: RICHARD YEMM Chief Technology Officer Pelamis Wave Power Ltd.

5

Wave Energy – where have we got to?

• We have come a long way in 11 years…!!!

• Significant Venture Capital now engaged in sector

• We are at the stage of proving-out the technology:

– Prototype and now pre-commercial machines

– Manufacturing and supply chain development

– Project infrastructure

– Operational procedures

• We are putting in place industry design, performance & operational standards and best practices

• We have gained credibility, and the interest of energy sector

But… we have not proven full commercial operation yet

Page 6: RICHARD YEMM Chief Technology Officer Pelamis Wave Power Ltd.

6

FROM THIS….

Page 7: RICHARD YEMM Chief Technology Officer Pelamis Wave Power Ltd.

7Commercial in ConfidenceCommercial in Confidence

TO THIS….

Page 8: RICHARD YEMM Chief Technology Officer Pelamis Wave Power Ltd.

8Commercial in ConfidenceCommercial in Confidence

Page 9: RICHARD YEMM Chief Technology Officer Pelamis Wave Power Ltd.

9Commercial in Confidence

Page 10: RICHARD YEMM Chief Technology Officer Pelamis Wave Power Ltd.

10Commercial in ConfidenceCommercial in Confidence

Page 11: RICHARD YEMM Chief Technology Officer Pelamis Wave Power Ltd.

11Commercial in ConfidenceCommercial in Confidence

Page 12: RICHARD YEMM Chief Technology Officer Pelamis Wave Power Ltd.

12Commercial in ConfidenceCommercial in Confidence

Page 13: RICHARD YEMM Chief Technology Officer Pelamis Wave Power Ltd.

13Commercial in ConfidenceCommercial in Confidence

Page 14: RICHARD YEMM Chief Technology Officer Pelamis Wave Power Ltd.

14Commercial in ConfidenceCommercial in Confidence

Page 15: RICHARD YEMM Chief Technology Officer Pelamis Wave Power Ltd.

15

Page 16: RICHARD YEMM Chief Technology Officer Pelamis Wave Power Ltd.

16

Page 17: RICHARD YEMM Chief Technology Officer Pelamis Wave Power Ltd.

17Commercial in ConfidenceCommercial in Confidence

Page 18: RICHARD YEMM Chief Technology Officer Pelamis Wave Power Ltd.

18Commercial in Confidence

Page 19: RICHARD YEMM Chief Technology Officer Pelamis Wave Power Ltd.

19Commercial in Confidence

Page 20: RICHARD YEMM Chief Technology Officer Pelamis Wave Power Ltd.

20Commercial in ConfidenceCommercial in Confidence

Page 21: RICHARD YEMM Chief Technology Officer Pelamis Wave Power Ltd.

21Commercial in ConfidenceCommercial in Confidence

Page 22: RICHARD YEMM Chief Technology Officer Pelamis Wave Power Ltd.

22Commercial in ConfidenceCommercial in Confidence

Page 23: RICHARD YEMM Chief Technology Officer Pelamis Wave Power Ltd.

23

PELAMIS - Status

• ‘P2’, second-generation machine currently in build:

– Range of advances & improvements from R&D plus experience

– Approaching double annual yield for similar cost

– First machine currently being built under contract to E.on, launch

schedule for Q2 2010

CONCLUSION: First technology-cycle complete, P2 will be platform

for commercial roll-out

• ‘P1’, first generation technology demonstrated:

– 4 x 750kW machines built/installed

– All related wave farm infrastructure, operational procedures,

SCADA systems etc proven

– P1 machines have some limitations in terms of performance &

reliability

– ‘First-of-kind’ project costs fully defined

– Lessons learnt captured & fed into onward programme

Page 24: RICHARD YEMM Chief Technology Officer Pelamis Wave Power Ltd.

24

Cost reduction – the development cycle

Cumulative capacity

Conceptual phase

First-of-a-kind

Capital cost

Normal learning curve Extended learning

Rapid

learning

Cumulative capacity

Conceptual phase

First-of-a-kind

Capital cost

Normal learning curve Extended learning

Rapid

learning

Cumulative finance

Investment risk

Current focus

Wave Energy – costs

Page 25: RICHARD YEMM Chief Technology Officer Pelamis Wave Power Ltd.

25

Cost reduction – the development cycleWave Energy – parallels with wind

… and NOW

The wind industry….. 1980s

- Fully converged & consolidated…

- Into mainstream global roll-out

- Delivered by solid policy actions in EU

Page 26: RICHARD YEMM Chief Technology Officer Pelamis Wave Power Ltd.

26

Cost reduction – the development cycleWave Energy – costs & cost reduction

Wave

Page 27: RICHARD YEMM Chief Technology Officer Pelamis Wave Power Ltd.

27

Status of Markets – EUROPE

• Many initiatives have come through specific lobbying at

National level

• Scotland has led this with:– Saltire prize – (c.f. ‘X Prize’), ~$15m for first commercial demonstration

project

– EMEC test centre – 4 berth all inclusive test site for prototypes

– WATES grant scheme – 40% grant plus 5 years of revenue support at

15$c/kWh for prototype & pilot demos

– Feeder market support – 35-40$c per kWh for pre-commercial/commercial

projects

– Planning & regulatory framework - First Marine SEA, spatial planning etc

– Licencing – first managed sea bed licencing programme in process

• Attractive schemes also in Portugal, Ireland etc

• R&D support from European Union

• Many other countries assessing options

CONCLUSION: EUROPE IS LEADING WITH POLICY & ACTIVITY

Page 28: RICHARD YEMM Chief Technology Officer Pelamis Wave Power Ltd.

28

Status of Markets – UNITED STATES

• Lots if interest, enthusiasm & activity in various States

• West Coast leading as resource & renewables focus higher

• Wave energy eligible for tax credit, levels & timescale

insufficient

• Initial permitting requests/exercises in process – complex

• Various RFPs & grants schemes at Federal (+1 State) level

• Various companies active in US

CONCLUSION: COORDINATED ACTION WITHIN US ESSENTIAL

TO MOVE FORWARD STRONGLY

• At a state level (CA,OR, WA) there are significant individual

programmes & initiatives, but little sign of a holistic

coordinated plan so far

• Little concerted or coordinated action at a Federal level, there

is a need to move to push this up the policy priority list

Page 29: RICHARD YEMM Chief Technology Officer Pelamis Wave Power Ltd.

29

What are Key Industry Issues?

• Stepping to the next level of funding for technologies &

projects…

– Private Investment

– Grants

– Feeder markets

• Key issues – scale of finance required, perceived risks &

time to return

• Achieving industry convergence/consolidation

• Absence of clear National & Regional objectives & targets

• Poor industry coordination in some areas

CONCLUSION: UNLOCKING FINANCE KEY TO SECTOR SUCCESS

Page 30: RICHARD YEMM Chief Technology Officer Pelamis Wave Power Ltd.

30

What should Industry & Government do?

• Significantly raise the profile of the sector in forward thinking to enhance investor & customer confidence

• Move strongly to drive technology demonstration, refinement and early roll-out in key first-mover markets:– Address sector risk profile efficiently

– Learning from / mirroring experience of wind, oil & gas industries and other heavy industrial technologies

– Build solid domestic technology and industry base(s) in first mover markets before taking technology global

• Move strongly to lobby for holistic policy initiatives at US Federal level to provide solid and consistent investment, development and deployment platform

Above all else: CREATE A SOLID PLATFORM FOR

PRIVATE SECTOR TO DELIVER!

Page 31: RICHARD YEMM Chief Technology Officer Pelamis Wave Power Ltd.

31

www.pelamiswave.com

RICHARD YEMM

May 2009