LCLS Linac Review December 2003LCLS Linac Review December 2003 C.E. Rago, SLAC LCLS LinacC.E. Rago, SLAC LCLS Linac
Linac Coherent Light Source Stanford Synchrotron Radiation LaboratoryStanford Linear Accelerator Center
Shortened DLWG
Modify Length of 2 Standard DLWG StructuresModify Length of 2 Standard DLWG StructuresPreviously done for SLC by MFD (Early 80’s)Previously done for SLC by MFD (Early 80’s)
Design and some control documents have been retrieved.Design and some control documents have been retrieved.
Fixtures and setups probably lost.Fixtures and setups probably lost.
Process OutlineProcess OutlineReview, establish, and document RF requirementsReview, establish, and document RF requirements
Identify DLWG to be modified (RF Test)Identify DLWG to be modified (RF Test)
Develop an updated manufacturing planDevelop an updated manufacturing plan
Manufacture, Assemble, Post Process & TestManufacture, Assemble, Post Process & Test
Modify Length of 2 Standard DLWG StructuresModify Length of 2 Standard DLWG StructuresPreviously done for SLC by MFD (Early 80’s)Previously done for SLC by MFD (Early 80’s)
Design and some control documents have been retrieved.Design and some control documents have been retrieved.
Fixtures and setups probably lost.Fixtures and setups probably lost.
Process OutlineProcess OutlineReview, establish, and document RF requirementsReview, establish, and document RF requirements
Identify DLWG to be modified (RF Test)Identify DLWG to be modified (RF Test)
Develop an updated manufacturing planDevelop an updated manufacturing plan
Manufacture, Assemble, Post Process & TestManufacture, Assemble, Post Process & Test
LCLS Linac Review December 2003LCLS Linac Review December 2003 C.E. Rago, SLAC LCLS LinacC.E. Rago, SLAC LCLS Linac