Top Design PriorityTop Design PriorityReroute / Remove S-Band Waveguide & DLWG Structures as per Woodley Reroute / Remove S-Band Waveguide & DLWG Structures as per Woodley NoteNoteEstablish common form for LCLS Functional Assemblies (Installation DWGS)Establish common form for LCLS Functional Assemblies (Installation DWGS)Correct & Update Linac SchematicsCorrect & Update Linac Schematics
Linac Coherent Light Source Stanford Synchrotron Radiation LaboratoryStanford Linear Accelerator Center
Shortened DLWG
Modify Length of 2 Standard DLWG StructuresModify Length of 2 Standard DLWG StructuresPreviously done for SLC by MFD (Early 80’s)Previously done for SLC by MFD (Early 80’s)Design and some control documents have been retrieved.Design and some control documents have been retrieved.Fixtures and setups probably lost.Fixtures and setups probably lost.
Process OutlineProcess OutlineReview, establish, and document RF requirementsReview, establish, and document RF requirementsIdentify DLWG to be modified (RF Test)Identify DLWG to be modified (RF Test)Develop an updated manufacturing planDevelop an updated manufacturing planManufacture, Assemble, Post Process & TestManufacture, Assemble, Post Process & Test
Linac Coherent Light Source Stanford Synchrotron Radiation LaboratoryStanford Linear Accelerator Center
X-Band Compression
Process OutlineProcess OutlineReview, establish, and document RF requirementsReview, establish, and document RF requirementsDevelop a site layoutDevelop a site layout
Identify a surplus 60 cm NLC 20:30 Mv/m Structure. Identify a surplus 60 cm NLC 20:30 Mv/m Structure. Develop an updated Manufacturing/Procurement planDevelop an updated Manufacturing/Procurement planManufacture, Assemble, and Post Process & TestManufacture, Assemble, and Post Process & Test