CERTIFICATE Certified that the undersigned have proposed the appropriate and need based activities required in the watershed project area with active participation of beneficiaries along with consultation of Watershed Committees(WCs). Approval of watershed project plan and DPR as been obtained from WC, Gram Sabha. The plan and DPR document of IWMP VIII project, at P.S. Atru District Baran is technically sound, viable and appropriate for implementation during the period 2011 - 2016 We recommend this plan be sanctioned and put to implementation. Signature Signature Signature Signature Signature Signature Chairman/ Secretary WC WDT members Junior Engineer P.S.Atru Assistant Engineer & PIA P.S.Atru Project Manager,WCDC Distt.Baran 1 2 3 4
219
Embed
Revised DPR IWMP ATRU VIII - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed...&Loan facility to 130 group BPL Family. Bank loans & Subsidies are provided to BPL selected
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
CERTIFICATE
Certified that the undersigned have proposed the appropriate and need based activities
required in the watershed project area with active participation of beneficiaries along with
consultation of Watershed Committees(WCs). Approval of watershed project plan and DPR as
been obtained from WC, Gram Sabha. The plan and DPR document of IWMP VIII project, at P.S.
Atru District Baran is technically sound, viable and appropriate for implementation during the
period 2011 - 2016
We recommend this plan be sanctioned and put to implementation.
2. Sanction No. & date of Project :AC FS NO.F-18 futHkwl@IWMP/2011-12 4800-5087/5.8.11
3. Macro & Micro Nos :12/1,25,26,27,28,29,30,31.13/1,2,3,4,5.14/1,2,3,4
Deviation from Project Sanctioned :
Items As per Project Sanctioned As proposed in DPR
Project Area 5826. Ha 5826.Ha
Macro/Micro No 12/1,25,26,27,28,29,30,31.13/1,2,3,4,5.1
4/1,2,3,4
12/1,25,26,27,28,29,30,31.13/1,2,3,4,5.1
4/1,2,3,4
Name of Gram
Panchayats
Bamori,Nanawata,Kharkhra shergarh,
Dilod hathi, Ramlothan, Mothpur,
Kerwaliya,
Bamori,Nanawata,Kharkhra
Ramlothan,Mothpur,Kerwaliya,
Name of
Villages
Bamori,dadwara, Kharkhra Ramlothan,
VyasKheri, Banpur, Shergarh,
kasampura,Nanawata,Nayagaon,
Badodeya, Mothpur,
Kerwaliya,Narshingpura,Sarsodeya,
Bamori,dadwara,Kherli Naharia,
Kharkhra Ramlothan,
CharanKheri,VyasKheri,Banpur,
Nanawata,Nayagaon,Badodeya,
Gordi Jhagir,Mothpur,
Kerwaliya,Narshingpura,Sarsodeya,
Project Cost
(Rs in Lakhs)
699.12 Lakhs. 699.12 Lakhs.
DPR NANAWATA ATRU 8 BARAN
Index
S.No Topics Page no.
1 Chapter Introduction.
• Location
• General Features of watershed (Cost and Area details)
• Climatic and Hydrological information
• Other Development Schemes in the project area
• Details of infrastructure in the project areas
• Institutional arrangements (WCDC,PIA,WDT,WC)
2 Chapter Basic Data ,Analysis and Scope
2.1 Demography Details 2.2 Development Indicators 2.3 Land use 2.4 Agriculture status and Productivity Gap Analysis 2.5 Horticulture/Vegetable/Floriculture status 2.6 Land holding pattern 2.7 Livestock status With Per Capita Production 2.8 Fodder status 2.9 Farm Implements 2.10 NREGS Status 2.11 Migration details 2.12 Livelihood Details. 2.13 Existing SHG 2.14 Ground Water details 2.15 Drinking Water Status 2.16 Water use efficiency 2.17 Slope details 2.18 Water Budgeting 2.19 Soil Details 2.20 Soil erosion status
3 Chapter Proposed Development Plan
4 Chapter Activity wise Total Abstract of cost
5 Chapter Annual Action Plan
5.1 Project fund 5.2 Convergence Plan
6 Chapter Project outcomes
7 Technical designs and estimates for proposed activities
8 Enclosures
8 .1 Maps b. Location –District, block, village, watershed location map c. Map of Project with Watershed Boundary demarcation in cadastral map d. Land Use Land Cover map e. Existing water bodies, DLT f. PRA Map (along with photos & paper drawing) g. GIS based intervention map h. Treatment map ie proposed works on revenue map
8.2 Documents of Agreements:
• Proceedings of Gram sabha for EPA approval
• Proceedings of gram sabha Resolution for committee constitution
• Documents related to PRA exercise
• Proceedings of gram sabha for DPR approval
• Proceedings of Panchayat Samiti General body for DPR approval
• Proceedings of Zila Parishad Standing Committee for DPR approval
CHAPTER – I
INTRODUCTION
Location.
IWMP VIII Nanawata Project is located in Atru Block, of Baran district. The project area is between
the latitudes 24O42’30” to 24O50’0” N & longitudes 76O32’0” to 76O39’0”E. It is at a distance of 30
km from its Block head quarters and 61 Km from the district head quarters. There are 16 no. of
habitations in the Project area and other details are given below.
8. Address with contact no., website Panchayat samiti,Atru Mob- 9460033825
9. Telephone 07453-230108
10. Fax N.A.
11. E-mail N.A.
WDT Particulars:
1 2 3 4 5 6 7 8
S.No Name of WDT
member M/F Age Qualification
Experience in
watershed(Yrs)
Description
of
professional
training
Role/
Function
1 Sh.Hukam
Chand Meena
M 31 BE.CIVIL 5 Months Engineering Engineering
2 Sh.Hem Raj
Suman
M 30 B.Sc.(Ag.) 4.0 Years Agriculture Agriculture
3 Sh.Omprakash
Rathor
M 30 B.A.(Sociology),
D.W.S.M.
4.5Years Social
Scientist
Social
Scientist
4 Sh.Vinod
Kumar Meena
M 32 1 Year Diploma
Veterinary.
4.5 Years Veterinary. Veterinary.
Details of Upsamiti Jalgrahan G.P. Mothpur.
S.N. Name of
WCs
Date of Gram
Sabha for WC
Designation Name M/F SC/ST/OBC/Gen
eral Age.
Name of UG/SHG
Educational qualification
1. Mothpur 12-03-12 President
Smt.Guddi Bai w/o Sh.Surajmal F ST
30 Literate
Secretary Sh.Jagdish s/o Sh.Kajodmal M OBC
28 Sr Sec.
Member Sh.Manoj s/o Sh.Bathri Lal M OBC
32 UG B.A.
Smt. Kali bai w/oVeerbhan F OBC
40 UG
Literate
Sh.Nand Kishor s/o Nand Kumar M OBC
35 UG
Middle
Sh.kawarpal s/o Daulatram M ST
50 UG
Literate
Sh.Kajod s/o Panna Lal M OBC
46 UG
Literate
Sh. Mukesh s/o moti Lal M ST
26 UG
Literate
Smt. Jashoda w/o Parmanand F SC
35 SHG
Literate
Smt. Manju Bai w/o Shyam Lal F OBC
25 SHG
Literate
Sh. Manmohan s/o Kajod mal M OBC
25 UG Sr Sec.
Sh.Hansraj s/o Kalyanmal M GEN
42 UG B.A.
Deptt. Representative Sh.V.K.Bhatiya M GEN.
42 Junior Engineer
B.E.(Agriculture)
Details of Upsamiti Jalgrahan G.P. Bamori
S.N. Name of
WCs
Date of Gram
Sabha for WC
Designation Name M/F SC/ST/OBC/Gen
eral Age
Name of UG/SHG
Educational qualification
2. Bamori 22-03-12
President
Sh.Durga Shankar s/o Bheru Lal M SC
26
-
Middle
Secretary
Sh. Dayakrishan s/o Chandar Prakash M GEN
27
- B.A.
Member Smt.Bhuri Bai w/o Ramkishan F ST
30 UG
Literate
Sh.Panchu Lal s/oKaver Lal M SC
60 UG
Un Literate
Smt.Mohani Bai w/o Bhawr Lal F ST
45 UG
Literate
Sh.Chhitar Lal s/o Gyarshiram M ST
55 SHG Primary
Smt.Ram Kavri w/o Ramcharan F SC
45 SHG
Literate
Smt.Girraj Bai w/o Govrdhan Lal F SC
57 SHG
Literate
Smt.Mhantash w/o Omprakash F OBC
42 SHG
Literate
Sh.Aanandi Lal s/o Jhagannath M ST
58 UG Primary
Sh.Ramchandra s/o Mangi Lal M OBC
56 UG
Literate
Sh.Chhitar Lal s/o Shankar Lal M ST
60 UG Primary
Sh.MohanLal s/o Bishan Lal M OBC
40
UG
Un Literate
Deptt. Representative Sh.V.K.Bhatiya M GEN.
42 Junior Engineer
B.E.(Agriculture)
Details of Upsamiti Jalgrahan G.P. Kharkhara Ramlothan
S.N. Name of WCs
Date of Gram Sabha for WC
Designation
Name M/F SC/ST/OBC/Gen
eral Age
Name of UG/SHG
Educational qualification
3. Kharkhara Ramlothan
23-03-12 President
Smt.Kanchan Bai w/o Badhri Lal F SC
58
Literate
Secretary Sh.Rajendra Kumar s/o Kalu Lal M OBC
28 M.A.
Member Smt.Chandrakala Bai w/o Rajaram F OBC
35 UG
Literate
Sh.jodhraj s/o Durga Lal M OBC
40 UG Secondary
Smt. Nihal Bai w/o Ramnivash F OBC
30 UG
Literate
Sh.Rajendra Prasad s/o Kalu Lal M OBC
25 UG B.A.,B.Ed.
Sh.KanheyaLal s/o Prabhu Lal M OBC
60 UG
Literate
Sh.Gajraj s/o Bhimshing M GEN
32 UG Secondary
Sh.Parma Nand s/o Badri Lal M SC
40 UG
Middle
Sh.Hariram s/o Prabhu Lal M OBC
45 SHG Secondary
Smt.Aruna Bai w/o Radheshyam F SC
23 SHG
Literate
Smt.Anokhi Bai w/o Rang Lal F ST
35 SHG B.A
Deptt. Represent
ative Sh.V.K.Bhatiya M GEN.
42 Junior
Engineer B.E.(Agriculture)
Details of Upsamiti Jalgrahan G.P. Kerwaliya
S.N. Name of
WCs
Date of Gram Sabha
for WC Designation Name M/F SC/ST/OBC/Gene
ral Age.
Name of UG/SHG
Educational qualification
4. Kerwaliya 20-03-12
President
Sh.Santhosh Kumar s/o Govinda Lal M SC
27
B.A.
Secretary Sh.Badri Lal s/o Hira Lal M OBC
35 B.A.
Member Sh.Prabhu Lal s/o Kanheya Lal M ST
50 UG
Literate
Smt.Dwarki Bai w/o Danmal F OBC
35 UG
Literate
Sh. Bhawar Lal s/o Ghasi Lal M OBC
38 UG Secondary
Sh.Ramhet s/o Ratan Lal M OBC
48 UG Primary
Sh.Dayaram s/o Jagannath M SC
42 SHG
Literate
Sh. Gyarsi Ram s/o Rampal M ST
28 UG
Middle
Smt.Kamlesh Bai w/o Navalkishor F OBC
33
SHG
Middle
Smt.Kamlesh Bai w/o Hanshraj F OBC
28
SHG Secondary
Sh.Prahlad s/oJaipal M SC
28 UG Primary
Deptt. Representative Sh.V.K.Bhatiya M GEN.
42 Junior Engineer B.E.(Agriculture)
Details of Upsamiti Jalgrahan G.P. Nanawata
S.N.
Name of WCs
Date of Gram
Sabha for WC
Designation
Name M/F SC/ST/OBC/
General Age.
Name of UG/SHG
Educational qualification
5. Nanawata 19-03-12 President
Sh.Dilip Shing s/o Hari Shing M GEN
51 M.A.
Secretary Sh.Ramdayal s/o Bharu Lal M OBC
36 Sr Sec.
Member Smt.Lad Bai w/o Chhitar Lal F ST
54 UG
Un Literate
Sh.Deshraj s/o Ramcharan M ST
25 UG
Middle
Sh.pramod s/o Shivcharan M OBC
24 UG
Middle
Smt.Sushila w/o Jagdish Prasad F ST
28 SHG
Literate
Smt.Sumitra w/o Chotu Lal F OBC
40 SHG Primary
Sh.Ramnivas s/o Chhitar Lal M ST
26 UG
Middle
Sh.Lokendra Shing s/o Jorawar Shing M GEN
37
UG Secondary
Sh.Prabhu Lal s/o Ramchandar M SC
40 UG
Middle
Sh.Bal Shing s/o Rang Lal M ST
42 UG
Un Literate
Sh.Madan Lal s/o Bhimraj M SC
50 SHG
Un Literate
Deptt. Represen
tative Sh.V.K.Bhatiya M GEN.
42 Junior
Engineer B.E.(Agricultu
re)
Problems and scope of improvement in the project area
The socio economic conditions of the area can be improved through increased production which can be achieved through expansion in cultivated
area and productivity enhancement. 1626.736 ha land is arable wasteland and 1193.10 ha is fallow can be brought under cultivation.
1211 ha is only irrigated and with efforts this can be increased to1500 ha. The productivity gap of major crops in the area as compared with
district and with areas in the same agro climatic zones indicate potential to increase the productivity. The demonstration of improved package of
practices, improved varieties, increased irrigation facilities and soil conservation measures under the project can bridge this gap. Due to small
land holdings in the area focus of the project would be on diversification in agriculture (horticulture, vegetables, green houses, Agro forestry,
fodder crops)and diversification in Livelihoods(Agriculture, Animal husbandry, self employment)
46620.50 Quintal fodder scarcity can be met out through Pasture development .Improved animal Husbandry practices can increase the
productivity of livestock. 537 No of persons migrate due to unemployment. This migration can be checked through creation of employment
opportunities in the project area through increase in production and diversification in agriculture and Livelihoods as mentioned above.
Base Line Survey Format for IWMP MIS website Project Name –IWMP-VIII NANAWATA Total Geographical Area of Project (Lakh Hectares) = 0.07910 Treatable Area
Wasteland (Lakh Hectares) 0.0162673 Rainfed Agricultural Land (Lakh Hectares)
0.03245
Total Cropped Area (Lakh Hectares)
0.0405305 Net Sown Area (Lakh Hactares)
0.03245
Total no. of Water Storage Structure
7 Total no. of Water Extracting Units
559
Total storage capacity of water storage structures (cubic meters)
518485
No. of Household SC 489 ST 594
Others 2036
Total Population of the project Area
15042 No. of Household of Landless people
165
Total no. of BPL Household 876
No. of person-days of Seasonal Migration
52315 No. of Marginal Farmer’s Household
537
Depth of Ground Water (meters) below Ground level Pre- monsoon 120 Post-monsoon 110
CHAPTER – II Socio economic Features, Problems and Scope
Table 2.1 Population & Household Details:
Total Population
Male Female Total SC ST
7892 7150 15042 1836 3531
Household Details
BPL household L. Less
Small Farmer
M. Farmer
Total household SC household ST household
876 165 884 537 3119 489 594
Table 2.2 Development indicators
S. No. Development Indicators State Project Area
1 Per capita income (Rs.) 47506 38272
2 Poverty ratio 24.8% 22.1%
3 Literacy (%) 67.06 52.00
4 Sex Ratio 926 905
5 infant mortality rate 55 52
6 Maternal mortality ratio 212 203
The above table indicates poor socio economic conditions.
Table 2.3 Land Use
Land Use Total area in Ha.
Private Panchayat Government Community Total Agriculture Land 4053.05 - - - 4053.05 Temporary fallow 808.05 - - - 806.05 Permanent Fallow 385.05 - - - 385.05 Cultivated Rainfed 3245.00 - - - 3245.00 Cultivated irrigated 1211.00 - - - 1211.00 Net Sown Area 3245.00 -. - - 3245.00 Net Area sown more than once
Write for each crop: The farmers are using Lok-1 ,WH-147 varieties of Wheat, whereas varieties like Raj-3077,Raj-3765 can increase the production. The farmers are using Local varieties of Mustard, whereas varieties like T-59,Pusa Bold,Bio-902 can increase the production.
The farmers are using Local varieties of Coriander, whereas varieties like RCR-41,UP-20,CS-06 can increase the production. The farmers are using Local varieties of Gram, whereas varieties like C-235,Dohad,H-208 can increase the production. The farmers are using Local varieties of Garlic, whereas varieties like Yamuna,Safeda,G-1 can increase the production. The farmers are using Local varieties of Soybean , whereas varieties like JS-335,JS-9305 can increase the production. The farmers are using Local varieties of Maize , whereas varieties like Ganga-2,5,Navjoytican increase the production. The farmers are using Local varieties of Ground Nut , whereas varieties like Chandra can increase the production.
17 75 Seasonal 20-30 Harvesting Crop,Building Construction
0.12
The migration can be check by creation of employment opportunities, enhancing farm level economy, increases the income of the people engaged in animal husbandry by dairy, poultry and marketing and value addition and diversification in livelihoods.
The existing livelihoods Village are given below
Table 2.12 (a)Major activities (On Farm)
Name of activity No of House holds Average annual income per
The efforts for increase in income through off farm activities will be made under livelihood component through assistance to SHG or individuals
Table 2.12(b)Major activities (Off Farm)
Name of activity Households/individuals Average annual income per
Capita in Rs. Artisans 7 41250
Carpenter 17 37450
Blacksmith 5 29550 Leather Craft 23 30625
Porter 32 32425 Mason 75 43750
Others specify (Cycle Repair ,STD,Craft etc)
91 38700
Table 2.13( a ) Status of Existing SHG
S.No Name of SHG Members Activity involved Monthly income
Fund available
Assistance available
Source of assistance
Training received
1 Gyatri 10 Dairy 1000 2100 No - No
2 Geeta 10 Agarbatti 1000 6700 No - No
3 Sunita 10 Tailoring 1000 1100 No - No
4 Puja 10 Dairy 1000 40000 Yes HKGB Bank Yes
5 Pinki 10 Regzine Beg 1000 1700 No - No
6 Kamla 10 Artificial Jwellary
500 10000 Yes SBBJ Bank Yes
7 Santosh 10 Tailoring 500 6200 No - No
8 Vasundhra 10 Regzine Beg 1000 35000 Yes SBBJ Bank Yes
9 krishna 10 Tailoring 250 5000 Yes Co-Oprative
Socaity No
10 Laxmi 10 Tailoring 200 2000 No - No
11 Santosh 10 Tailoring 250 36000 No - No
12 Chotmata 10 Regzine Beg 500 1500 No - No
13 Saveriya 10 Dairy 250 5500 No - No
14 Deepak 10 Tailoring 500 6000 No - No
15 Prayas 10 Tailoring 500 500 No - No
16 Kiran 10 Artificial Jwellary
500 700 No - No
17 Laxmi 10 Regzine Beg 500 3000 No - No
18 Jyoti 10 Tailoring 200 1500 No - No
19 Laxmi 10 Tailoring 200 4000 No - No
20 Reena 10 Dairy 500 4000 No - No
21 Deepak 10 Tailoring 500 1000 No - No
22 Rani 10 Artificial 500 1000 No - No
Jwellary
23 Rukhsar 10 Tailoring 200 8000 No - No
24 Sunita 10 Tailoring 500 4000 No - No
25 Kavita 10 Dairy 500 500 No - No
26 Laxmi 10 Agarbatti 1000 2000 No - No
27 Rukmani 10 Tailoring 1000 2000 No - No
28 Parvati 10 Agarbatti 2000 4000 No - No
29 Shivshankar 10 Dairy 1000 1000 No - No
The table indicates existence of number of groups in the area also these need to be strengthened through trainings and financial assistance II. Technical Features
Table 2.14 Ground Water
S.No Source No. Functional depth
Dry Area irrigated
Water availability(days)
i) Dug wells 245 15-45 Fit 245 - Rain
ii) Shallow tube wells 73 150-250 Fit 59 80 90
iii) Pumping sets 270 - - 624 210
iv) Deep Tube Wells 241 250-700 Fit 90 1248 210
Total 829
Table 2.15 Availability of drinking water
S.No
Name of the village
Drinking water requirement Ltrs/day
Present availability of drinking water Ltrs/day
No. of drinking water sources available
No. functional
No. requires repairs
No. defunctional
1 Mothpur 189360 160956 57 15 42 42
2 Bamori 51120 43452 9 3 6 6
3 Dadwara 18600 15810 5 2 3 3
4 Kherli Nahariya 19840 16864 9 3 6 6
5 Kharkhara Ram. 38360 32606 19 5 14 14
6 Vyas Kheri 11560 9826 9 3 5 5
7 Charn Kheri 20480 17408 7 2 5 5
8 Banpur 14240 12104 6 4 2 2
9 Kerwaliya 48480 41208 11 5 6 6
10 Narshing Pura 50480 42908 10 4 6 6
11 Sarsodiya 12600 10710 3 1 2 2
12 Nanawata 44360 37706 8 4 4 4
13 Nayagaon 34240 29104 4 3 1 1
14 Barodiya 17680 15028 6 4 2 2
15 Gordi Jhagir 30160 25636 7 2 5 5
Table 2.16 Water Use efficiency
Name of major crop
Area (Hectare)
through water saving
devices(Drip/Sprinklers)
through water
conserving agronomic practices#
Any other (pl. specify)
Total
Wheat 6 ha. 155 ha. Nil 161 ha
Mustard Nil 25 ha. Nil 25 ha.
Coriander Nil 50 ha. Nil 50 ha.
Total 6 ha. 230 ha. Nil 236 ha.
• The tables above indicate need for judicious use of available Water.
• Encouraging optimum use of water through installation of sprinklers on every operational wells Table 2.17 Slope details.
Slope of Watershed
S.No. Slope percentage
Area in hectares
1 0 to 3% 5738
2 3 to 8% 88
3 8 to 25%
4 > 25%
As most of the area has slope less than 3% construction of contour bunds can solve the problem of water erosion in agriculture fields and protect
washing of top soil and manures/fertilisers.
Table 2.18 Water Budgeting Good Catchment – Normally a funnel shaped catchment in hilly terrain with less vegetation. Average Catchment – Catchment in the plains where there is no dense growth of vegetation. Bad Catchment – Catchment with dense growth of vegetation & highly permeable top soil & sub soil. Total available runoff(cum) use Stranges table Rain fall 848.30 mm
Type of Catchment
Area in ha. Yield of runoff from catchment per ha.(cum.) use Stranges table
Total Runoff in cum
Good 10 2482.115 24821.15
Average 5800 1861.504 10796723.2
Bad 2100 1241.003 2606106.3
Total 13427650.65
Runoff trapped in existing structures
S.No. Name No. Storage Capacity (cum)
i) WHS(earthen) 29 23925
ii) Khadin/Talab 1 15500
iii) Farm Ponds 0 0
iv) Tanka 0 0
v) Anicuts 6 10800
Total 36 50225
Runoff to beTrapped in proposed structures:
S.No. Name No. Storage Capacity (cum)
i) WHS(earthen) 110 80000
ii) Khadin/Talab 0 0
iii) Farm Ponds 23 82000
iv) Tanka 0 0
v) Anicuts 32 306260
Total 165 468260
Runoff trapped in existing & proposed structures =50225+468260= 518485 cum. % Runoff trapped = total runoff trapped x100/Total available runoff= 3.86 %
Height of all the structures proposed is between 1.0metre to 1.5 metre. There is no structures whose water impounding height is more than 2 metre. Table 2.19 Soil details
Soil Profile
S.No. Major Soil Classes Area in hectares
1 Black Soil 4175
2 Light Yellow Soil 1651
Soil Depth :
B Depth (Cms.) Area in hectares
1 0.00 to 7.50 582
2 7.50 to 45.00 3593
3 > 45.00 1651
C Soil fertility Status Kg/ha Recommended
N 0.438(Very Low) 12.20 P 32.60(Medium) 35.00 K 4.00(Low) 10.00
Micronutrients 0.546
PPM(Medium) 10.00
The analysis of table shows need to improve and maintain soil fertility. Soil health card to every farmer every crop season will be provided, which will include the recommendation for Application micro nutrient and fertilizers Table 2.20 Erosion details
Erosion status in project Area
Cause
Type of
erosion
Area affected
(ha)
Run off(mm/ year)
Average soil loss (Tonnes/ ha/ year)
Water erosion
a Sheet 4021 300 20-30
b Rill 1456 300
c Gully 349 300
Sub-Total 5826
Wind erosion 0
Total for project 5826
The need is:
• To check land degradation • To reduce excessive biotic pressure by containing the number and increase of livestock
• To check cultivation on sloping lands without adequate precautions of soil and water conservation measures
• To discourage cultivation along susceptible nallah beds
• To check Faulty agriculture techniques
• To check Uncontrolled grazing and developed cattle tracks
• To check Deforestation of steep slopes
• To check erosive velocity of runoff, store Runoff, to arrest silt carried by runoff and to recharge Ground Water structures life Earthen check dams, gully plugs, Bank Stabilisation, Loose stone check Dams, Gabions, Earthen embankment (Nadi) and Anicuts would be taken up.
CHAPTER - III Proposed Development Plan: The Activities are indicative addition /deletion in activities will be as per local conditions
A) Preparatory phase activities Capacity Building Trainings and EPA
The IEC activities like Kalajathas, Group meetings, door to door campaign, slogans and wall writings etc. were carried out in all the
habitations of 16 Micro Watershed. A series of meetings were conducted with GP members, community and discussed about the
implementation of IWMP programme. User groups were also formed.
Grama Sabhas were conducted for approval of EPA (Village), for selecting the watershed committee and approval of DPR.
S.no Name of the Gram Panchayat Date on which Gram
Breed Improvment: To ensure Livestock’s Productivity enhancement
A.I. (Convergence with peer department)
Incentive based Mass Castration at Door Step of Scrub Bulls to Check ND Recycling.
Registration of bulls (Convergence with peer department)
Bull / Buck Distribution for NS-.Gir, Murrah And Sirohi /Jamunapari Breed Bulls/ Bucks Should Be Distributed For 3yrs 6 (3 In Each Iwmp Area, Where Ever A.I. Facility Is Not Available Round’s O Clock. On 100% Subsidized Rate To WC.
Financial Incentive to the Inseminator for Calf Borns.
Convergence with peer Department/DAH/Agriculture/ATMA/ Board/ Trust/ Goseva
An Assistance to control Malnutrition: Protein Supplementation
Feed & fodder production enhancement.
ANNUAL ACTION PLAN : PIA will prepare annual action plan in the month of January indicating
outgoing liabilities as well as new projects which they wish to take during next financial years & will
submit to PM(WCDC). These plans will be placed for approval at P.S. (Standing Committee of
Production and Agriculture) & Z.P. (Standing Committee of Production) level every year. While
preparing Annual Action Plan (AAP) if rates of labour or material in DPR increased or decreased
changed rates will be applicable for preparing AAP & the effect of same can be met by converging
Water Harvesting Structure No. 149000 4 5.96 5.96 0 0
Afforestation Ha 101180 37 37.44 37.44 0
Drainage line treatment 0 0 0 0 0
MMS 8M No. 487000 10 48.7 48.7 0 0
MMS 10M No. 529000 8 42.32 42.32 0
MMS 15M No. 600000 9 54 54 0
MMS 20M No. 739000 5 36.95 36.95 0
LSCD No. 4315 80 3.45 3.45 0 0
Retaining wall No. 74000 7 5.18 5.18 0
WHS No. 149000 0 0 0 0
Gully Plugs(ECD) No. 13600 110 14.96 14.96 0
Total (B) 0 511.01 391.51 119.50 0.00
Activity Unit
Unit
Cost
Rs Total
Quantity Total Cost
Cost from Project Fund
Convergence Fund
Beneficiary
Contribution
( C ) Production System (10%) 69.912
( C ) Production System (10%)
Production measures for arable land
20-40% towards project cost
Horticulture plantation ha 12000 28 3.36 3.36 0
Sprinklers and Drip irrigation ha 24000 28 6.72 0 6.72
Floriculture ha 24000 10 2.4 2.4 0
Vegetables 0 0 0 0
Medicinal plants 0 0 0 0
Vermi compost No. 24000 50 12 12 0
Crop Demonstration ha 5000 491 24.55 24.55 0
Animal treatment camp No. 24000 6 1.44 1.44 0
Distridution of Manger No. 2000 950 19 19 0
Establishment of Travis At pashu seva Kendra No. 15000 5 0.75 0.75 0
Incentive for AI and Castration No. 50 789 0.41 0.41 0
Establishment of animal shed with manger No. 24000 25 6.00 6.00 0
Total Production System 76.63 69.91 6.72
.
CHAPTER – VI EXPECTED OUT COMES
1 2 3 4 5 6
S. No. Item Unit of
measurement Pre-project
Status Expected Post-project Status
Remarks
1 Status of water table (Depth to Ground water level)
Meters 110-120 100-110
2 Ground water structures repaired/ rejuvenated
No. 25
3 Quality of drinking water Description Drinkable Good quality of water
4 Availability of drinking water Description 9-11 month 10-12 months 5 Change in irrigated Area Ha 1211.00 1321 6 Change in cropping/ land use pattern Description 7 Area under agricultural crop Ha 4053.05 4163.05 I Area under single crop Ha 3245 3300 Ii Area under double crop Ha 1211 1321 Iii Area under multiple crop Ha - -
8 Change in cultivated Area Ha 808.05 450.00 9 yield of major crops of area
• Membership and other Records, Minutes of Meetings maintained by the SHGs, WCs/
Individual beneficiaries/project-related village and local bodies/PRIs.
• External review missions
• Data maintained by Government department (Revenue, Agriculture, Groundwater, Irrigation,
Animal Husbandry
CHAPTER VII TECHNICAL DESIGNS AND ESTIMATES
Technical designs and estimates for proposed activities.
For Estimates GKN of the districts should be used. For Production System activities, rates provided by the Department is to be used & if not
vailable than rates of Agriculture/Horticulture/ Animal Husbandry should be used.
For Livelihood activities, project norms provided by the Department is to be used & if not available than cost norms of NABARD, NRLM etc can
be used.
PANCHAYAT SAMITI ATRU
Name of Work Construction of Anicut
BASIC DATA 1 Available Crest Length L 10 Meter 2 Total Catchment Area A 400 Hect. 3 Cofficient of Rational Formula C 0.30 4
Cofficient of Discharge for broad crested weir c 1.71 5
Unit weight of masonary s 2.3 Tonnes \ cum
6
Maximum allowable compressive stress in masonary 10 Kg \ sq.cm 7
Maximum allowable tensile stress in masonary 1 Kg \ sq.cm 8 N S L 100 M 9 Height of the Head Wall 1.0 M
10 Depth of Foundation 1.5 M 11 Length of Head Wall Extension Left 3.5 M 12 Length of Head wall extenssion Right 3.5 M
(A) Hydrologic Design
Peak rate of runoff (discharge) The Maximum probable Discharge ( Q ) has been calculated using Dicken formula as under:--
Q = CA3/4
C 11.4 Coefficient
A 4 Sq. Km
Q = 32.244 Cumecs
(B) Hydraulic Design
(i) Head over the crest
Q = c x L x h 3/2
h3/2 = Q / (c xL ) 1.89 meter
So h = 1.53 meter
Say h = 1.60 meter
( ii ) Free board
F = 1.5 hw , Where hw is the height of wave hw = 0.014 (Df)
1/2
Putting Df = 700.00 meter
hw = 0.37
so F= 0.56 meter
Or 0.60 meter
(C) Structural Design
N S L (Bed Level) = 100.00 meter
Ht of structure above N S L ( h ) = = 1.00 meter
Depth of foundation = 1.50 meter
Width of foundation bed = 2.60 meter
Depth of Concrete in foundation = 0.30 meter
Height of Head wall ( h ) = 1.00 meter
F T L = 101.00 meter
M W L = 102.60 meter
T B L = 102.60 meter
Total height =T.B.L. - N.S.L. = = 2.60 meter
Length of Bund = 10 meter
Height of Bund = 1.5 meter
Top Width of Bund (h/3)+1.5 = 2 meter
Bottom Width of Bund (5 x h )+ Tw = 9.5 meter
( i ) Top width of head wall Tw = h / ( s - c )1/2
putting h= 1.60 meter
Specific gravity of the material s= 2.3 for stone masonry in cement mortar
(for partly pervious &permeable foundation bed ) c = 1.00
we get, Tw = 1.40 meter
Or Tw = 1.50 meter
d = h + Fb 2.20
( ii ) Bottom width of head wall Bw = Tw + ( H x 0 .8) (H+h) / (s-c)1/2
Bw = 2.28 Mtr.
Width of Concerete bed (= Bw +0 .30) 2.58 Mtr.
Or 2.60 Mtr.
( iii ) Length of head wall extension = H +d+1
= 4.20 Mtr.
(iv) Height of head wall extention = H +d
= 3.20 Mtr.
(v) Bottom width of head wall extension 0.5(H+h)
= 1.30 Mtr.
1.30
1. HEAD WALL EXTENSION
( a ) Length (as per site condition ) Right side 4.20 meter
Left side 4.20 meter
( b ) Height above crest level =H+fb Right side 3.20 meter
Left side 3.20 meter
( c ) Top width 0.60 meter
( d ) Bottom width 1.88 meter
or 1.90 meter
2. SIDE WALL
( a ) Length = (Bw of Hw + Appron width + 0.45) - 2.1 4.15 meter
or 4.20 meter
( b ) Top width ( minimum ) 0.60 meter
( c ) Bottom width
( at H. W. E. junction ) =0.60+((H+d )x0.40) = = 1.90 meter
( at wing wall junction ) =0.60 + ( 0.40 x 1.5 H ) = 1.50 meter
( d ) Height of side wall
( at H. W. E. junction ) = H + d = 3.20 meter
( at wing wall junction ) = 1.5 x h = 2.40 meter
3. WING WALL
( a ) Length = 2.25 x h = 3.60 meter
( b ) Top width ( minimum ) = 0.60 meter
( c ) Bottom width = 0.60 + (0.4 x (1.5 x h )) = 1.56 meter
( d ) Height of wing wall =1.5 h = = 2.40 meter
4. APRON
Length = crest length = 10.00 meter
Width = H + d = 3.20 meter
Thickness of Apron = = 0.60 meter
(0.30 m c.c.(1:4:8)
+0.23 m RR stone khuranja in CM 1:6
5. TOE WALL
Length = crest length = 10.00 meter
Width = 0.45 meter
Height ( above top of Apron ) = 0.30 meter
6. Depth of foundation = 1.50*0.473(Q/f).33 OR Say = 2.1019 meter
= 2.20 meter
Q = Discharge Cum / Sec 32.24406922
f = silt factor constant 1.2
But as per site condition taken as 1.50 Mtr.
CHECKS FOR AGAINST OVER TURNING , RUPTURE FROM TENSION , SLIDING &
CRUSHING
H = 1.00 meter
h = 1.60 meter
Tw = 1.50 meter
Bw = 2.28 Kg \cum
Specific weight of masonary s = 2300.00 Kg \cum
Specific weight of water w = 1000.00 Kg \cum
Coefficient of uplift c = 0.50
Coefficient of friction f = 0.75
Weight of structure W = W1 + W2
W1 = s x Tw x H = 3450.00 Kg
W2 = s x H( Bw - Tw ) / 2 = 897.40 Kg
W = W1 + W2 = 4347.40 Kg
Water pressure at depth H = P1
P1 = w x h = 1600.00 Kg \ sqm
Water pressure at depth (H+h)=P2
P2= w x ( H + h ) = 2600.00 Kg \ sqm
Net Horizontal water force =
( P1 + P2 ) / 2 x H = 2100.00 Kg \ sqm
Force due to water at the crest
F3 = w x h x Tw = 2400.00 Kg/m
Up lift pressure U1=c x w x (h+H)= 1300.00 Kg/sqm
Up lift Force =U = U1 x Bw / 2 = 1482.23 Kg/m
1. Safty against Over turning
Taking moment of all the forces about the toe of the Structure
Restoring Moment, RM = W1 x(Bw- Tw/2)+W2 x (Bw - Tw ) x 2 / 3 +F3 (Bw - Tw/2)
RM = 9419
Over turning Moment, OM=Fa x H/2 + Fb x H/3 + U x2 Bw/3
Where Fa = P1 x H = 1600
Fb = (P2- P1)/2 x H = 500
OM = 3220
RM / OM = 2.93
It is more than 1.30, so the structure is safe against overturning.
2. Safty against tension at the base
The excess moment , Em=( RM - OM) 6199
Total Vertical Force, V = W + F3 - U= 5265.18
X represents the position of the resultant force from top of the structure.
X = Excess moment / Total vertical force
X = 1.18
Which is more than Bw / 3 = 0.76 of the structure ,
& less than 2Bw/3= 1.52
i.e. Resultant is passing through the middle 1 / 3 of the base so there is no chance of developing any tension in maonary. Hence the structure is safe against Rupture from Tension.
3. Safty against Compression (Crushing)
Ecentricity e = Bw / 2-X
where x =(RM-OM)/ V 1.18
so e = -0.04
Fmax = V(1+6e/Bw)/A = 2082.56
In order to avoid crushing of the masonary at the base Fmax. is maximum compressive stress acting normal to the base of the structure. It is less than the Max.allowable compressive stress for the masonary 20000 Kg / sqm. Hence Safe against Crushing.
4. Safty against sliding
Total Vertical Force, V =W+F3-U= 5265.18
Resisting forces, P = f V + ChA = 3949.79
Sliding forces = Fa + Fb = 2100
Factor of safety for sliding
= Restoring force / Sliding force P/V= 1.88
It is more than 1.3, so the structure is safe against Sliding.
PANCHAYAT SAMITI ATRU
Name of Work Construction of Anicut DETAILED ESTIMATE
S. Particular No. Length Width H / D Qty. unit 1 Excavation for foundation Head wall (over flow sec. ) 1 10.00 2.60 1.50 39.00 cu.m Head wall Ext ( a ) Right side from U \ S 1 4.20 1.90 2.00 15.96 ( b ) Left side from U \ S 1 4.20 1.90 2.00 15.96 Side wall 2 4.20 1.80 1.50 22.68 ,, Wing wall 2 3.60 1.80 2.00 25.92 ,, Toe wall 1 10.00 0.90 0.60 5.40 ,, Apron 1 10.00 3.20 0.60 19.20 ,,
Total Qty. 144.12 cu.m
Hard soil 40 % 57.65 cu.m Ordinary Rock 30 % 43.24 cu.m Hard Rock 30 % 43.24 cu.m
2 C .C . ( 1 : 3 : 6 ) with 20 mm stone crusher broken aggregate in foundation
Head wall (over flow sec. ) 1 10.00 2.60 0.30 7.80 cu.m Head wall Exe.Foundation ( a ) Right side from U \ S 1 4.20 1.90 0.30 2.39 ( b ) Left side from U \ S 1 4.20 1.90 0.30 2.39 Side wall 2 4.20 1.80 0.30 4.54 ,, Wing wall 2 3.60 1.80 0.30 3.89 ,, Toe wall 1 10.00 0.90 0.15 1.35 ,,
Apron 1 10.00 3.20 0.30 9.60
Total Qty. Item -
2 =
31.96 cu.m
3 A R.R.Stone Masonery in cement sand mortar ( 1:6 ) in foundation for
W.H.S Head wall (over flow sec. ) 1 10.00 2.60 1.20 31.20 cu.m Head wall Exe. ( a ) Right side from U \ S 1 4.20 1.90 1.20 9.58 ( b ) Left side from U \ S 1 4.20 1.90 1.20 9.58 Side wall 2 4.20 1.80 1.20 18.14 ,, Wing wall 2 3.60 1.80 1.20 15.55 ,, Toe wall 1 10.00 0.75 0.30 2.25 ,, 1 10.00 0.45 0.15 0.68 Total Item-- 3 A = 86.97 cu.m
3 B R.R.S.M. ( 1:6 ) for super structure above NSL
Head wall (over flow sec. ) 1 10.00 1.94 1.00 19.40 cu.m Head wall Exe.
( a ) Right side from U \ S 1 4.20 1.24 2.20 11.46 ,, ( b ) Left side from U \ S 1 4.20 1.24 2.20 11.46 Side wall 2 4.20 1.33 2.80 31.36 ,, Wing wall 2 3.60 1.08 2.40 18.66 ,, Toe wall 1 10.00 0.45 0.30 1.35 ,,
Total Item - 3 B = 93.69 cu.m
Total Item - 3 A + 3 B = 180.66 cu.m
4
RR stone khuranja in CM 1:6 of 23cm 1 10.00 3.20 32.00 Sqm
5 C . C . Coping in C.M. 1 : 2 : 4
Headwall Crest Head wall ( Nonover flow sec. )U\S 1 10.00 1.50 15.00 cu.m
( a ) Right side from U \ S 1 4.20 0.6 2.52 ,, ( b ) Left side from U \ S 1 4.20 0.6 2.52 ,, Side wall 2 4.20 0.6 5.04 ,,
7 Flush or ruled pointing in CM 1:3 53.48 Sqm 51.00 2727.71 39.10 2091.24 -647.16
8 Earth work for bunds including laying in 15 cm layers
breaking of clods etc complete 0.00
a) In Hard Soil 86.25 Cum 92.00 7935.00 92.00 7935.00 0.00
Total 471654.67 132831.37 299816.60
Add 3% charges for contengencies 14149.64 14149.64
Grand Total 485804.31
say 529000.00
Requirement of Material S.No.
Particular Qty Unit
Cement in
Bags
Sand in
Cum
Stone
Cum
Aggregate 20
mm
Aggregate 12
mm
Qty. Qty. Qty. Qty. Qty.
1 Cement Concrete ( 1 : 3 : 6 )
with 20 mm size stone gritt
for W.H.S
31.96 cum 129.45 13.74 0.00 27.49 0.00
2 R.R.Stone Masonary in
cement sand mortar ( 1:6 ) for W.H.S
180.66 cum 252.02 54.20 198.73 0.00 0.00
3 25 MM thick Cement sand
Plaster in C.M. (1:4)
including curing etc complete
20.50 sqm 4.59 0.66 0.00 0.00 0.00
4 RR stone khuranja in CM 1:6
of 23cm 32.00 sqm 6.72 1.44 8.10 0.00 0.00
5 Cement Concreet Coping in
C.C. 1 : 2 : 4 with stone
crusher broken gritt 12 mm
size including curring etc
complete
33.90 cum 10.58 0.75 0.00 0.00 1.53
6 Flush or ruled poinding in CM
1:3 53.48 sqm 1.50 0.16 0.00 0.00 0.00
Total 404.86 70.94 206.82 27.49 1.53
Cement
(Begs)
Sand
(cum)
Agg. 20 mm
(cum)
TOR Bars
Kgs
405 70.94 27.49 0
PANCHAYAT SAMITI ATRU
Name of Work Construction of Anicut
BASIC DATA 1 Available Crest Length L 8 Meter 2 Total Catchment Area A 300 Hect. 3 Cofficient of Rational Formula C 0.30 4
Cofficient of Discharge for broad crested weir c 1.71 5
Unit weight of masonary s 2.3 Tonnes \ cum
6
Maximum allowable compressive stress in masonary 10 Kg \ sq.cm 7
Maximum allowable tensile stress in masonary 1 Kg \ sq.cm 8 N S L 100 M 9 Height of the Head Wall 1.0 M
10 Depth of Foundation 1.5 M 11 Length of Head Wall Extension Left 3.5 M 12 Length of Head wall extenssion Right 3.5 M
(A) Hydrologic Design
Peak rate of runoff (discharge) The Maximum probable Discharge ( Q ) has been calculated using Dicken formula as under:--
Q = CA3/4
C 11.4 Coefficient
A 3 Sq. Km
Q = 25.986 Cumecs
(B) Hydraulic Design
(i) Head over the crest
Q = c x L x h 3/2
h3/2 = Q / (c xL ) 1.90 meter
So h = 1.53 meter
Say h = 1.60 meter
( ii ) Free board
F = 1.5 hw , Where hw is the height of wave hw = 0.014 (Df)
1/2
Putting Df = 700.00 meter
hw = 0.37
so F= 0.56 meter
Or 0.60 meter
(C) Structural Design
N S L (Bed Level) = 100.00 meter
Ht of structure above N S L ( h ) = = 1.00 meter
Depth of foundation = 1.50 meter
Width of foundation bed = 2.60 meter
Depth of Concrete in foundation = 0.30 meter
Height of Head wall ( h ) = 1.00 meter
F T L = 101.00 meter
M W L = 102.60 meter
T B L = 102.60 meter
Total height =T.B.L. - N.S.L. = = 2.60 meter
Length of Bund = 10 meter
Height of Bund = 1.5 meter
Top Width of Bund (h/3)+1.5 = 2 meter
Bottom Width of Bund (5 x h )+ Tw = 9.5 meter
( i ) Top width of head wall Tw = h / ( s - c )1/2
putting h= 1.60 meter
Specific gravity of the material s= 2.3 for stone masonry in cement mortar (for partly pervious &permeable foundation bed ) c = 1.00
we get, Tw = 1.40 meter
Or Tw = 1.50 meter
d = h + Fb 2.20
( ii ) Bottom width of head wall Bw = Tw + ( H x 0 .8) (H+h) / (s-c)1/2
Bw = 2.28 Mtr.
Width of Concerete bed (= Bw +0 .30) 2.58 Mtr.
Or 2.60 Mtr.
( iii ) Length of head wall extension = H +d+1
= 4.20 Mtr.
(iv) Height of head wall extention = H +d
= 3.20 Mtr.
(v) Bottom width of head wall extension 0.5(H+h)
= 1.30 Mtr.
1.30
1. HEAD WALL EXTENSION
( a ) Length (as per site condition ) Right side 4.20 meter
Left side 4.20 meter
( b ) Height above crest level =H+fb Right side 3.20 meter
Left side 3.20 meter
( c ) Top width 0.60 meter
( d ) Bottom width 1.88 meter
or 1.90 meter
2. SIDE WALL
( a ) Length = (Bw of Hw + Appron width + 0.45) - 2.1 4.15 meter
or 4.20 meter
( b ) Top width ( minimum ) 0.60 meter
( c ) Bottom width
( at H. W. E. junction ) =0.60+((H+d )x0.40) = = 1.90 meter
( at wing wall junction ) =0.60 + ( 0.40 x 1.5 H ) = 1.50 meter
( d ) Height of side wall
( at H. W. E. junction ) = H + d = 3.20 meter
( at wing wall junction ) = 1.5 x h = 2.40 meter
3. WING WALL
( a ) Length = 2.25 x h = 3.60 meter
( b ) Top width ( minimum ) = 0.60 meter
( c ) Bottom width = 0.60 + (0.4 x (1.5 x h ))
= 1.56 meter
( d ) Height of wing wall =1.5 h =
= 2.40 meter
4. APRON
Length = crest length = 8.00 meter
Width = H + d = 3.20 meter
Thickness of Apron = = 0.60 meter
(0.30 m c.c.(1:4:8)
+0.23 m RR stone khuranja in CM 1:6
5. TOE WALL
Length = crest length = 8.00 meter
Width = 0.45 meter
Height ( above top of Apron ) = 0.30 meter
6. Depth of foundation = 1.50*0.473(Q/f).33 OR Say = 1.95744 meter
= 2.00 meter
Q = Discharge Cum / Sec 25.98638045
f = silt factor constant 1.2
But as per site condition taken as 1.50 Mtr.
CHECKS FOR AGAINST OVER TURNING , RUPTURE FROM
TENSION , SLIDING & CRUSHING
H = 1.00 meter
h = 1.60 meter
Tw = 1.50 meter
Bw = 2.28
Kg \cum
Specific weight of masonary s = 2300.00
Kg \cum
Specific weight of water w = 1000.00 Kg \cum
Coefficient of uplift c = 0.50
Coefficient of friction f = 0.75
Weight of structure W = W1 + W2
W1 = s x Tw x H = 3450.00 Kg
W2 = s x H( Bw - Tw ) / 2 = 897.40 Kg
W = W1 + W2 = 4347.40 Kg
Water pressure at depth H = P1
P1 = w x h = 1600.00 Kg \ sqm
Water pressure at depth (H+h)=P2
P2= w x ( H + h ) = 2600.00 Kg \ sqm
Net Horizontal water force =
( P1 + P2 ) / 2 x H = 2100.00 Kg \ sqm
Force due to water at the crest
F3 = w x h x Tw = 2400.00 Kg/m
Up lift pressure U1=c x w x (h+H)= 1300.00 Kg/sqm
Up lift Force =U = U1 x Bw / 2 = 1482.23 Kg/m
1. Safty against Over turning
Taking moment of all the forces about the toe of the Structure
Restoring Moment, RM = W1 x(Bw- Tw/2)+W2 x (Bw - Tw ) x 2 / 3 +F3 (Bw - Tw/2)
RM = 9419
Over turning Moment, OM=Fa x H/2 + Fb x H/3 + U x2 Bw/3
Where Fa = P1 x H = 1600
Fb = (P2- P1)/2 x H = 500
OM = 3220 RM / OM = 2.93
It is more than 1.30, so the structure is safe against overturning.
2. Safty against tension at the base
The excess moment , Em=( RM - OM) 6199
Total Vertical Force, V = W + F3 - U= 5265.18
X represents the position of the resultant force from top of the structure.
X = Excess moment / Total vertical force
X = 1.18
Which is more than Bw / 3 = 0.76 of the structure ,
& less than 2Bw/3= 1.52
i.e. Resultant is passing through the middle 1 / 3 of the base so there is no chance of developing any tension in maonary. Hence the structure is safe against Rupture from Tension.
3. Safty against Compression (Crushing)
Ecentricity e = Bw / 2-X
where x =(RM-OM)/ V 1.18
so e = -0.04
Fmax = V(1+6e/Bw)/A = 2082.56
In order to avoid crushing of the masonary at the base Fmax. is maximum compressive stress acting normal to the base of the structure. It is less than the Max.allowable compressive stress for the masonary 20000 Kg / sqm. Hence Safe against Crushing.
4. Safty against sliding
Total Vertical Force, V =W+F3-U= 5265.18
Resisting forces, P = f V + ChA = 3949.79
Sliding forces = Fa + Fb = 2100
Factor of safety for sliding
= Restoring force / Sliding force P/V= 1.88
It is more than 1.3, so the structure is safe against Sliding.
PANCHAYAT SAMITI ATRU
Name of Work Construction of Anicut DETAILED ESTIMATE
S. Particular No. Length Width H / D Qty. unit 1 Excavation for foundation Head wall (over flow sec. ) 1 8.00 2.60 1.50 31.20 cu.m Head wall Ext ( a ) Right side from U \ S 1 4.20 1.90 2.00 15.96 ( b ) Left side from U \ S 1 4.20 1.90 2.00 15.96 Side wall 2 4.20 1.80 1.50 22.68 ,, Wing wall 2 3.60 1.80 2.00 25.92 ,, Toe wall 1 8.00 0.90 0.60 4.32 ,, Apron 1 8.00 3.20 0.60 15.36 ,,
Total Qty. 131.40 cu.m
Hard soil 40 % 52.56 cu.m Ordinary Rock 30 % 39.42 cu.m Hard Rock 30 % 39.42 cu.m
2 C .C . ( 1 : 3 : 6 ) with 20 mm stone crusher broken aggregate in foundation
Head wall (over flow sec. ) 1 8.00 2.60 0.30 6.24 cu.m Head wall Exe.Foundation ( a ) Right side from U \ S 1 4.20 1.90 0.30 2.39 ( b ) Left side from U \ S 1 4.20 1.90 0.30 2.39 Side wall 2 4.20 1.80 0.30 4.54 ,, Wing wall 2 3.60 1.80 0.30 3.89 ,, Toe wall 1 8.00 0.90 0.30 2.16 ,,
Apron 1 8.00 3.20 0.30 7.68
Total Qty. Item -
2 =
29.29 cu.m
3 A R.R.Stone Masonery in cement sand mortar ( 1:6 ) in foundation for
W.H.S Head wall (over flow sec. ) 1 8.00 2.60 1.20 24.96 cu.m Head wall Exe. ( a ) Right side from U \ S 1 4.20 1.90 1.20 9.58 ( b ) Left side from U \ S 1 4.20 1.90 1.20 9.58 Side wall 2 4.20 1.80 1.20 18.14 ,, Wing wall 2 3.60 1.80 1.20 15.55 ,, Toe wall 1 8.00 0.90 0.30 2.16 ,, Total Item-- 3 A = 79.97 cu.m
3 B R.R.S.M. ( 1:6 ) for super structure above NSL Head wall (over flow sec. ) 1 8.00 3.08 1.00 24.64 cu.m
Head wall Exe. ( a ) Right side from U \ S 1 4.20 1.24 3.20 16.67 ,,
( b ) Left side from U \ S 1 4.20 1.24 3.20 16.67
Side wall 2 4.20 1.33 2.80 31.36 ,, Wing wall 2 3.60 1.08 2.40 18.66 ,, Toe wall 1 8.00 0.45 0.30 1.08 ,, Total Item - 3 B = 109.08 cu.m
Total Item - 3 A + 3 B = 189.04 cu.m
4
RR stone khuranja in CM 1:6 of 23cm 1 8.00 3.20 25.60 Sqm
5 C . C . Coping in C.M. 1 : 2 : 4 Headwall Crest
Head wall ( Nonover flow sec. )U\S 1 8.00 1.50 12.00 cu.m ( a ) Right side from U \ S 1 4.20 0.6 2.52 ,,
( b ) Left side from U \ S 1 4.20 0.6 2.52 ,, Side wall 2 4.20 0.6 5.04 ,, Wing wall 2 3.60 0.6 4.32 ,,
Toe wall 1 8.00 0.45 3.60 ,, Total Item :- 5 = 30.00 cu.m
6 25 Cement Plaster in C.M. (1:4)
Head wall (over flow sec. ) U \ S 1 8.00 1.00 8 sq.m Toe wall ( ( 2 x height) + Top ) 1 8.00 1.05 8.40 ,, Total Item:-- 6 = 16.40 sq.m
7 Flush or ruled poinding in CM 1:3
Head wall (over flow sec. ) U \ S 1 8.00 1.27 10.15 sq.m Side wall 2 4.20 2.80 23.52 ,, Wing wall 2 3.60 2.40 17.28 ,, Total Item:-- 7 = 50.95 sq.m
8 Earth work for bunds including laying in 15 cm layers broken of loads etc complete
a) In Hard Soil 1 10 5.75 1.5 86.25 Total Item :- 8 = 86.25 cu.m
PANCHAYAT SAMITI ATRU
Name of Work Construction of Anicut
Abstract of Cost
S.No. Particular Qty Unit Complete Item Labour Charges Material
Charges Rate Amount Rate Amount
1 Excavation for foundation & trench for irrigation works
Hard soil 52.56 Cum 100.00 5256.00 100.00 5256.00 0.00
Ordinary Rock 39.42 Cum 194.00 7647.48 194.00 7647.48 0.00
Hard Rock 39.42 Cum 543.00 21405.06 110.00 4336.20 17068.86
2 Cement Concrete ( 1 :3 : 6 ) with 20 mm size stone broken gritt for W.H.S
29.29 Cum 2642.00 77389.46 343.11 10050.38 66460.33
3 R.R.Stone Masonary in cement sand mortar ( 1:6 ) for W.H.S 189.04 Cum 1763.00 333285.29 418.00 79020.56 220236.73
4 RR stone khuranja in CM 1:6 of 23cm 25.60 Sqm 294.00 7526.40 418.00 10700.80 -4710.40
5 50 mm thick Cement Concreet Coping in 1 : 2 : 4 with stone
crusher broken gritt 12 mm size including curring etc complete 30.00 Sqm 226.00 6780.00 78.80 2364.00 3066.00
6 25 MM thick Cement sand Plaster in C.M. (1:4) including
7 Flush or ruled pointing in CM 1:3 50.95 Sqm 51.00 2598.32 39.10 1992.05 -616.47
8 Earth work for bunds including laying in 15 cm layers breaking
of clods etc complete 0.00
a) In Hard Soil 86.25 Cum 92.00 7935.00 92.00 7935.00 0.00
Total 472496.22 130395.20 302445.92
Add 3% charges for contingencies 14174.89 14174.89
Grand Total 486671.10
say 487000.00
Requirement of Material S.No.
Particular Qty Unit
Cement in
Bags
Sand in
Cum
Stone
Cum
Aggregate 20
mm
Aggregate 12
mm
Qty. Qty. Qty. Qty. Qty.
1 Cement Concrete ( 1 : 3 : 6 )
with 20 mm size stone gritt
for W.H.S
29.29 cum 118.63 12.60 0.00 25.19 0.00
2 R.R.Stone Masonary in
cement sand mortar ( 1:6 ) for W.H.S
189.04 cum 263.72 56.71 207.95 0.00 0.00
3 25 MM thick Cement sand
Plaster in C.M. (1:4)
including curing etc complete
16.40 sqm 3.67 0.52 0.00 0.00 0.00
4 RR stone khuranja in CM 1:6
of 23cm 25.60 sqm 5.38 1.15 6.48 0.00 0.00
5 Cement Concreet Coping in
C.C. 1 : 2 : 4 with stone
crusher broken gritt 12 mm
size including curring etc
complete
30.00 cum 9.36 0.66 0.00 0.00 1.35
6 Flush or ruled poinding in CM
1:3 50.95 sqm 1.43 0.15 0.00 0.00 0.00
Total 402.19 71.80 214.43 25.19 1.35
Cement
(Begs)
Sand
(cum)
Agg. 20 mm
(cum)
TOR Bars
Kgs
402 71.80 25.19 #REF!
PANCHAYAT SAMITI ATRU
Name of Work Construction of Anicut
BASIC DATA 1 Available Crest Length L 15 Meter 2 Total Catchment Area A 600 Hect. 3 Cofficient of Rational Formula C 0.30 4
Cofficient of Discharge for broad crested weir c 1.71 5
Unit weight of masonary s 2.3 Tonnes \ cum
6
Maximum allowable compressive stress in masonary 10 Kg \ sq.cm 7
Maximum allowable tensile stress in masonary 1 Kg \ sq.cm 8 N S L 100 M 9 Height of the Head Wall 1.0 M
10 Depth of Foundation 1.5 M 11 Length of Head Wall Extension Left 3.5 M 12 Length of Head wall extenssion Right 3.5 M
(A) Hydrologic Design
Peak rate of runoff (discharge) The Maximum probable Discharge ( Q ) has been calculated using Dicken formula as under:--
Q = CA3/4
C 11.4 Coefficient
A 6 Sq. Km
Q = 43.704 Cumecs
(B) Hydraulic Design
(i) Head over the crest
Q = c x L x h 3/2
h3/2 = Q / (c xL ) 1.70 meter
So h = 1.43 meter
Say h = 1.50 meter
( ii ) Free board
F = 1.5 hw , Where hw is the height of wave hw = 0.014 (Df)
1/2
Putting Df = 700.00 meter
hw = 0.37
so F= 0.56 meter
Or 0.60 meter
(C) Structural Design
N S L (Bed Level) = 100.00 meter
Ht of structure above N S L ( h ) = = 1.00 meter
Depth of foundation = 1.50 meter
Width of foundation bed = 2.50 meter
Depth of Concrete in foundation = 0.30 meter
Height of Head wall ( h ) = 1.00 meter
F T L = 101.00 meter
M W L = 102.50 meter
T B L = 102.50 meter
Total height =T.B.L. - N.S.L. = = 2.50 meter
Length of Bund = 10 meter
Height of Bund = 1.5 meter
Top Width of Bund (h/3)+1.5 = 2 meter
Bottom Width of Bund (5 x h )+ Tw = 9.5 meter
( i ) Top width of head wall Tw = h / ( s - c )1/2
putting h= 1.50 meter
Specific gravity of the material s= 2.3 for stone masonry in cement mortar (for partly pervious &permeable foundation bed ) c = 1.00
we get, Tw = 1.32 meter
Or Tw = 1.40 meter
d = h + Fb 2.10
( ii ) Bottom width of head wall Bw = Tw + ( H x 0 .8) (H+h) / (s-c)1/2
Bw = 2.19 Mtr.
Width of Concerete bed (= Bw +0 .30) 2.49 Mtr.
Or 2.50 Mtr.
( iii ) Length of head wall extension = H +d+1
= 4.10 Mtr.
(iv) Height of head wall extention = H +d
= 3.10 Mtr.
(v) Bottom width of head wall extension 0.5(H+h)
= 1.25 Mtr.
1.30
1. HEAD WALL EXTENSION
( a ) Length (as per site condition ) Right side 4.10 meter
Left side 4.10 meter
( b ) Height above crest level =H+fb Right side 3.10 meter
Left side 3.10 meter
( c ) Top width 0.60 meter
( d ) Bottom width 1.84 meter
or 1.90 meter
2. SIDE WALL
( a ) Length = (Bw of Hw + Appron width + 0.45) - 2.1 3.95 meter
or 4.00 meter
( b ) Top width ( minimum ) 0.60 meter
( c ) Bottom width
( at H. W. E. junction ) =0.60+((H+d )x0.40) = = 1.80 meter
( at wing wall junction ) =0.60 + ( 0.40 x 1.5 H ) = 1.50 meter
( d ) Height of side wall
( at H. W. E. junction ) = H + d = 3.10 meter
( at wing wall junction ) = 1.5 x h = 2.25 meter
3. WING WALL
( a ) Length = 2.25 x h = 3.38 meter
( b ) Top width ( minimum ) = 0.60 meter
( c ) Bottom width = 0.60 + (0.4 x (1.5 x h ))
= 1.50 meter
( d ) Height of wing wall =1.5 h =
= 2.25 meter
4. APRON
Length = crest length = 15.00 meter
Width = H + d = 3.10 meter
Thickness of Apron = = 0.60 meter
(0.30 m c.c.(1:4:8)
+0.23 m RR stone khuranja in CM 1:6
5. TOE WALL
Length = crest length = 15.00 meter
Width = 0.45 meter
Height ( above top of Apron ) = 0.30 meter
6. Depth of foundation = 1.50*0.473(Q/f).33 OR Say = 2.32377 meter
= 2.40 meter
Q = Discharge Cum / Sec 43.70370833
f = silt factor constant 1.2
But as per site condition taken as 1.50 Mtr.
CHECKS FOR AGAINST OVER TURNING , RUPTURE FROM TENSION , SLIDING &
CRUSHING
H = 1.00 meter
h = 1.50 meter
Tw = 1.40 meter
Bw = 2.19 Kg \cum
Specific weight of masonary s = 2300.00 Kg \cum
Specific weight of water w = 1000.00 Kg \cum
Coefficient of uplift c = 0.50
Coefficient of friction f = 0.75
Weight of structure W = W1 + W2
W1 = s x Tw x H = 3220.00 Kg
W2 = s x H( Bw - Tw ) / 2 = 911.54 Kg
W = W1 + W2 = 4131.54 Kg
Water pressure at depth H = P1
P1 = w x h = 1500.00 Kg \ sqm
Water pressure at depth (H+h)=P2
P2= w x ( H + h ) = 2500.00 Kg \ sqm
Net Horizontal water force =
( P1 + P2 ) / 2 x H = 2000.00 Kg \ sqm
Force due to water at the crest
F3 = w x h x Tw = 2100.00 Kg/m
Up lift pressure U1=c x w x (h+H)= 1250.00 Kg/sqm
Up lift Force =U = U1 x Bw / 2 = 1370.40 Kg/m
1. Safty against Over turning
Taking moment of all the forces about the toe of the Structure
Restoring Moment, RM = W1 x(Bw- Tw/2)+W2 x (Bw - Tw ) x 2 / 3 +F3 (Bw - Tw/2)
RM = 8423
Over turning Moment, OM=Fa x H/2 + Fb x H/3 + U x2 Bw/3
Where Fa = P1 x H = 1500
Fb = (P2- P1)/2 x H = 500
OM = 2920
RM / OM = 2.88
It is more than 1.30, so the structure is safe against overturning.
2. Safty against tension at the base
The excess moment , Em=( RM - OM) 5503
Total Vertical Force, V = W + F3 - U= 4861.14
X represents the position of the resultant force from top of the structure.
X = Excess moment / Total vertical force
X = 1.13 Which is more than Bw / 3 = 0.73 of the structure ,
& less than 2Bw/3= 1.46
i.e. Resultant is passing through the middle 1 / 3 of the base so there is no chance of developing any tension in maonary. Hence the structure is safe against Rupture from Tension.
3. Safty against Compression (Crushing)
Ecentricity e = Bw / 2-X
where x =(RM-OM)/ V 1.13
so e = -0.04
Fmax = V(1+6e/Bw)/A = 2000.73
In order to avoid crushing of the masonary at the base Fmax. is maximum compressive stress acting normal to the base of the structure. It is less than the Max.allowable compressive stress for the masonary 20000 Kg / sqm. Hence Safe against Crushing.
4. Safty against sliding
Total Vertical Force, V =W+F3-U= 4861.14
Resisting forces, P = f V + ChA = 3646.73
Sliding forces = Fa + Fb = 2000
Factor of safety for sliding
= Restoring force / Sliding force P/V= 1.82
It is more than 1.3, so the structure is safe against Sliding.
PANCHAYAT SAMITI ATRU
Name of Work Construction of Anicut DETAILED ESTIMATE
S. Particular
No.
Length Width H / D Qty. unit
1 Excavation for foundation Head wall (over flow sec. ) 1 15.00 2.50 1.50 56.25 cu.m Head wall Ext ( a ) Right side from U \ S 1 4.10 1.90 2.00 15.58 ( b ) Left side from U \ S 1 4.10 1.90 2.00 15.58 Side wall 2 4.00 1.80 1.50 21.60 ,, Wing wall 2 3.38 1.80 2.00 24.30 ,, Toe wall 1 15.00 0.90 0.60 8.10 ,, Apron 1 15.00 3.10 0.60 27.90 ,,
Total Qty.
169.31
cu.m
Hard soil 40 % 67.72 cu.m Ordinary Rock 30 % 50.79 cu.m Hard Rock 30 % 50.79 cu.m 2 C .C . ( 1 : 3 : 6 ) with 20 mm stone crusher broken aggregate in
foundation Head wall (over flow sec. ) 1 15.00 2.50 0.30 11.25 cu.m Head wall Exe.Foundation ( a ) Right side from U \ S 1 4.10 1.90 0.30 2.34 ( b ) Left side from U \ S 1 4.10 1.90 0.30 2.34 Side wall 2 4.00 1.80 0.30 4.32 ,, Wing wall 2 3.38 1.80 0.30 3.65 ,, Toe wall 1 15.00 0.90 0.30 4.05 ,,
Apron 1 15.00 3.10 0.30 13.95
Total Qty. Item -
2 =
41.89 cu.m
3 A R.R.Stone Masonery in cement sand mortar ( 1:6 ) in foundation for
W.H.S Head wall (over flow sec. ) 1 15.00 2.50 1.20 45.00 cu.m Head wall Exe. ( a ) Right side from U \ S 1 4.10 1.90 1.20 9.35 ( b ) Left side from U \ S 1 4.10 1.90 1.20 9.35 Side wall 2 4.00 1.80 1.20 17.28 ,, Wing wall 2 3.38 1.80 1.20 14.58 ,, Toe wall 1 15.00 0.90 0.30 4.05 ,,
Total Item-- 3 A = 99.61 cu.m
3 B R.R.S.M. ( 1:6 ) for super structure above NSL Head wall (over flow sec. ) 1 15.00 2.94 1.00 44.14 cu.m Head wall Exe.
( a ) Right side from U \ S 1 4.10 1.22 3.10 15.51 ,, ( b ) Left side from U \ S 1 4.10 1.22 3.10 15.51 Side wall 2 4.00 1.30 2.68 27.82 ,, Wing wall 2 3.38 1.05 2.25 15.95 ,, Toe wall 1 15.00 0.45 0.30 2.03 ,,
Total Item - 3 B = 120.9
4 cu.m
Total Item - 3 A + 3 B =
220.55
cu.m
4
RR stone khuranja in CM 1:6 of 23cm 1 15.00 3.10 46.50 Sqm
5 C . C . Coping in C.M. 1 : 2 : 4
Headwall Crest Head wall ( Nonover flow sec. )U\S 1 15.00 1.40 21.00 cu.m
( a ) Right side from U \ S 1 4.10 0.6 2.46 ,, ( b ) Left side from U \ S 1 4.10 0.6 2.46 ,, Side wall 2 4.00 0.6 4.80 ,,
8 Earth work for bunds including laying in 15 cm layers broken of loads etc complete
a) In Hard Soil 1 10 5.75 1.5 86.25
Total Item :- 8 = 86.25 cu.m
PANCHAYAT SAMITI ATRU
Name of Work Construction of Anicut
Abstract of Cost
S.No. Particular Qty Unit Complete Item Labour Charges Material
Charges Rate Amount Rate Amount
1 Excavation for foundation & trench for irrigation works
Hard soil 67.72 Cum 100.00 6772.40 100.00 6772.40 0.00
Ordinary Rock 50.79 Cum 194.00 9853.84 194.00 9853.84 0.00
Hard Rock 50.79 Cum 543.00 27580.60 110.00 5587.23 21993.37
2 Cement Concrete ( 1 :3 : 6 ) with 20 mm size stone broken gritt
for W.H.S 41.89 Cum 2642.00 110670.74 343.11 14372.53 95041.53
3 R.R.Stone Masonary in cement sand mortar ( 1:6 ) for W.H.S 220.55 Cum 1763.00 388829.56 418.00 92189.88 256940.69
4 RR stone khuranja in CM 1:6 of 23cm 46.50 Sqm 294.00 13671.00 418.00 19437.00 -8556.00
5 50 mm thick Cement Concreet Coping in 1 : 2 : 4 with stone
crusher broken gritt 12 mm size including curring etc complete 41.52 Sqm 226.00 9383.52 78.80 3271.78 4243.34
6 25 MM thick Cement sand Plaster in C.M. (1:4) including curing etc complete
30.75 Sqm 163.00 5012.25 66.63 2048.87 1764.13
7 Flush or ruled pointing in CM 1:3 55.73 Sqm 51.00 2842.14 39.10 2178.97 -674.31
8 Earth work for bunds including laying in 15 cm layers breaking
of clods etc complete 0.00
a) In Hard Soil 86.25 Cum 92.00 7935.00 92.00 7935.00 0.00
Total 582551.05 163647.51 370752.76
Add 3% charges for contengencies 17476.53 17476.53
Grand Total 600027.58
say 600000.00
Requirement of Material S.No.
Particular Qty Unit
Cement in
Bags
Sand in
Cum
Stone
Cum
Aggregate 20
mm
Aggregate 12
mm
Qty. Qty. Qty. Qty. Qty.
1 Cement Concrete ( 1 : 3 : 6 )
with 20 mm size stone gritt
for W.H.S
41.89 cum 169.65 18.01 0.00 36.02 0.00
2 R.R.Stone Masonary in
cement sand mortar ( 1:6 ) for W.H.S
220.55 cum 307.67 66.16 242.60 0.00 0.00
3 25 MM thick Cement sand
Plaster in C.M. (1:4)
including curing etc complete
30.75 sqm 6.89 0.98 0.00 0.00 0.00
4 RR stone khuranja in CM 1:6
of 23cm 46.50 sqm 9.77 2.09 11.76 0.00 0.00
5 Cement Concreet Coping in
C.C. 1 : 2 : 4 with stone
crusher broken gritt 12 mm
size including curring etc
complete
41.52 cum 12.95 0.91 0.00 0.00 1.87
6 Flush or ruled poinding in CM
1:3 55.73 sqm 1.56 0.17 0.00 0.00 0.00
Total 508.49 88.33 254.37 36.02 1.87
Cement
(Begs)
Sand
(cum)
Agg. 20 mm
(cum)
TOR Bars
Kgs
508 88.33 36.02 #REF!
PANCHAYAT SAMITI ATRU
Name of Work Construction of Anicut
BASIC DATA 1 Available Crest Length L 20 Meter 2 Total Catchment Area A 1000 Hect. 3 Cofficient of Rational Formula C 0.30 4
Cofficient of Discharge for broad crested weir c 1.71 5
Unit weight of masonary s 2.3 Tonnes \ cum
6
Maximum allowable compressive stress in masonary 10 Kg \ sq.cm 7
Maximum allowable tensile stress in masonary 1 Kg \ sq.cm 8 N S L 100 M 9 Height of the Head Wall 1.0 M
10 Depth of Foundation 1.5 M 11 Length of Head Wall Extension Left 3.5 M 12 Length of Head wall extenssion Right 3.5 M
(A) Hydrologic Design
Peak rate of runoff (discharge) The Maximum probable Discharge ( Q ) has been calculated using Dicken formula as under:--
Q = CA3/4
C 11.4 Coefficient
A 10 Sq. Km
Q = 64.107 Cumecs
(B) Hydraulic Design
(i) Head over the crest
Q = c x L x h 3/2
h3/2 = Q / (c xL ) 1.87 meter
So h = 1.52 meter
Say h = 1.60 meter
( ii ) Free board
F = 1.5 hw , Where hw is the height of wave hw = 0.014 (Df)
1/2
Putting Df = 700.00 meter
hw = 0.37
so F= 0.56 meter
Or 0.60 meter
(C) Structural Design
N S L (Bed Level) = 100.00 meter
Ht of structure above N S L ( h ) = = 1.00 meter
Depth of foundation = 1.50 meter
Width of foundation bed = 2.60 meter
Depth of Concrete in foundation = 0.30 meter
Height of Head wall ( h ) = 1.00 meter
F T L = 101.00 meter
M W L = 102.60 meter
T B L = 102.60 meter
Total height =T.B.L. - N.S.L. = = 2.60 meter
Length of Bund = 10 meter
Height of Bund = 1.5 meter
Top Width of Bund (h/3)+1.5 = 2 meter
Bottom Width of Bund (5 x h )+ Tw = 9.5 meter
( i ) Top width of head wall Tw = h / ( s - c )1/2
putting h= 1.60 meter
Specific gravity of the material s= 2.3 for stone masonry in cement mortar (for partly pervious &permeable foundation bed ) c = 1.00
we get, Tw = 1.40 meter
Or Tw = 1.50 meter
d = h + Fb 2.20
( ii ) Bottom width of head wall Bw = Tw + ( H x 0 .8) (H+h) / (s-c)1/2
Bw = 2.28 Mtr.
Width of Concerete bed (= Bw +0 .30) 2.58 Mtr.
Or 2.60 Mtr.
( iii ) Length of head wall extension = H +d+1
= 4.20 Mtr.
(iv) Height of head wall extention = H +d
= 3.20 Mtr.
(v) Bottom width of head wall extension 0.5(H+h)
= 1.30 Mtr.
1.30
1. HEAD WALL EXTENSION
( a ) Length (as per site condition ) Right side 4.20 meter
Left side 4.20 meter
( b ) Height above crest level =H+fb Right side 3.20 meter
Left side 3.20 meter
( c ) Top width 0.60 meter
( d ) Bottom width 1.88 meter
or 1.90 meter
2. SIDE WALL
( a ) Length = (Bw of Hw + Appron width + 0.45) - 2.1 4.15 meter
or 4.20 meter
( b ) Top width ( minimum ) 0.60 meter
( c ) Bottom width
( at H. W. E. junction ) =0.60+((H+d )x0.40) = = 1.90 meter
( at wing wall junction ) =0.60 + ( 0.40 x 1.5 H ) = 1.50 meter
( d ) Height of side wall
( at H. W. E. junction ) = H + d = 3.20 meter
( at wing wall junction ) = 1.5 x h = 2.40 meter
3. WING WALL
( a ) Length = 2.25 x h = 3.60 meter
( b ) Top width ( minimum ) = 0.60 meter
( c ) Bottom width = 0.60 + (0.4 x (1.5 x h ))
= 1.56 meter
( d ) Height of wing wall =1.5 h =
= 2.40 meter
4. APRON
Length = crest length = 20.00 meter
Width = H + d = 3.20 meter
Thickness of Apron = = 0.60 meter
(0.30 m c.c.(1:4:8)
+0.23 m RR stone khuranja in CM 1:6
5. TOE WALL
Length = crest length = 20.00 meter
Width = 0.45 meter
Height ( above top of Apron ) = 0.30 meter
6. Depth of foundation = 1.50*0.473(Q/f).33 OR Say = 2.63695 meter
= 2.70 meter
Q = Discharge Cum / Sec 64.10691107
f = silt factor constant 1.2
But as per site condition taken as 1.50 Mtr.
CHECKS FOR AGAINST OVER
TURNING , RUPTURE FROM TENSION ,
SLIDING & CRUSHING
H = 1.00 meter
h = 1.60 meter
Tw = 1.50 meter
Bw = 2.28
Kg \cum
Specific weight of masonary s = 2300.00
Kg \cum
Specific weight of water w = 1000.00 Kg \cum
Coefficient of uplift c = 0.50
Coefficient of friction f = 0.75
Weight of structure W = W1 + W2
W1 = s x Tw x H = 3450.00 Kg
W2 = s x H( Bw - Tw ) / 2 = 897.40 Kg
W = W1 + W2 = 4347.40 Kg
Water pressure at depth H = P1
P1 = w x h = 1600.00 Kg \ sqm
Water pressure at depth (H+h)=P2
P2= w x ( H + h ) = 2600.00 Kg \ sqm
Net Horizontal water force =
( P1 + P2 ) / 2 x H = 2100.00 Kg \ sqm
Force due to water at the crest
F3 = w x h x Tw = 2400.00 Kg/m
Up lift pressure U1=c x w x (h+H)= 1300.00 Kg/sqm
Up lift Force =U = U1 x Bw / 2 = 1482.23 Kg/m
1. Safty against Over turning
Taking moment of all the forces about the toe of the Structure
Restoring Moment, RM = W1 x(Bw- Tw/2)+W2 x (Bw - Tw ) x 2 / 3 +F3 (Bw - Tw/2)
RM = 9419
Over turning Moment, OM=Fa x H/2 + Fb x H/3 + U x2 Bw/3
Where Fa = P1 x H = 1600
Fb = (P2- P1)/2 x H = 500
OM = 3220 RM / OM = 2.93
It is more than 1.30, so the structure is safe against overturning.
2. Safty against tension at the base
The excess moment , Em=( RM - OM) 6199
Total Vertical Force, V = W + F3 - U= 5265.18
X represents the position of the resultant force from top of the structure.
X = Excess moment / Total vertical force
X = 1.18
Which is more than Bw / 3 = 0.76 of the structure ,
& less than 2Bw/3= 1.52
i.e. Resultant is passing through the middle 1 / 3 of the base so there is no chance of developing any tension in maonary. Hence the structure is safe against Rupture from Tension.
3. Safty against Compression (Crushing)
Ecentricity e = Bw / 2-X
where x =(RM-OM)/ V 1.18
so e = -0.04
Fmax = V(1+6e/Bw)/A = 2082.56
In order to avoid crushing of the masonary at the base Fmax. is maximum compressive stress acting normal to the base of the structure. It is less than the Max.allowable compressive stress for the masonary 20000 Kg / sqm. Hence Safe against Crushing.
4. Safty against sliding
Total Vertical Force, V =W+F3-U= 5265.18
Resisting forces, P = f V + ChA = 3949.79
Sliding forces = Fa + Fb = 2100
Factor of safety for sliding
= Restoring force / Sliding force P/V= 1.88
It is more than 1.3, so the structure is safe against Sliding.
PANCHAYAT SAMITI ATRU
Name of Work Construction of Anicut DETAILED ESTIMATE
S. Particular
No.
Length Width H / D Qty. unit
1 Excavation for foundation Head wall (over flow sec. ) 1 20.00 2.60 1.50 78.00 cu.m Head wall Ext ( a ) Right side from U \ S 1 4.20 1.90 2.00 15.96 ( b ) Left side from U \ S 1 4.20 1.90 2.00 15.96 Side wall 2 4.20 1.80 1.50 22.68 ,, Wing wall 2 3.60 1.80 2.00 25.92 ,, Toe wall 1 20.00 0.90 0.60 10.80 ,, Apron 1 20.00 3.20 0.60 38.40 ,,
Total Qty.
207.72
cu.m
Hard soil 40 % 83.09 cu.m Ordinary Rock 30 % 62.32 cu.m Hard Rock 30 % 62.32 cu.m 2 C .C . ( 1 : 3 : 6 ) with 20 mm stone crusher broken aggregate in
foundation Head wall (over flow sec. ) 1 20.00 2.60 0.30 15.60 cu.m Head wall Exe.Foundation ( a ) Right side from U \ S 1 4.20 1.90 0.30 2.39 ( b ) Left side from U \ S 1 4.20 1.90 0.30 2.39 Side wall 2 4.20 1.80 0.30 4.54 ,, Wing wall 2 3.60 1.80 0.30 3.89 ,, Toe wall 1 20.00 0.90 0.30 5.40 ,,
Apron 1 20.00 3.20 0.30 19.20
Total Qty. Item -
2 =
53.41 cu.m
3 A R.R.Stone Masonery in cement sand mortar ( 1:6 ) in foundation for
W.H.S Head wall (over flow sec. ) 1 20.00 2.60 1.20 62.40 cu.m Head wall Exe. ( a ) Right side from U \ S 1 4.20 1.90 1.20 9.58 ( b ) Left side from U \ S 1 4.20 1.90 1.20 9.58 Side wall 2 4.20 1.80 1.20 18.14 ,, Wing wall 2 3.60 1.80 1.20 15.55 ,, Toe wall 1 20.00 0.90 0.30 5.40 ,,
Total Item-- 3 A = 120.6
5 cu.m
3 B R.R.S.M. ( 1:6 ) for super structure above NSL Head wall (over flow sec. ) 1 20.00 3.08 1.00 61.61 cu.m Head wall Exe.
( a ) Right side from U \ S 1 4.20 1.24 3.20 16.67 ,, ( b ) Left side from U \ S 1 4.20 1.24 3.20 16.67 Side wall 2 4.20 1.33 2.80 31.36 ,, Wing wall 2 3.60 1.08 2.40 18.66 ,, Toe wall 1 20.00 0.45 0.30 2.70 ,,
Total Item - 3 B = 147.6
6 cu.m
Total Item - 3 A + 3 B =
268.31
cu.m
4
RR stone khuranja in CM 1:6 of 23cm 1 20.00 3.20 64.00 Sqm
5 C . C . Coping in C.M. 1 : 2 : 4
Headwall Crest Head wall ( Nonover flow sec. )U\S 1 20.00 1.50 30.00 cu.m
( a ) Right side from U \ S 1 4.20 0.6 2.52 ,, ( b ) Left side from U \ S 1 4.20 0.6 2.52 ,, Side wall 2 4.20 0.6 5.04 ,,
7 Flush or ruled pointing in CM 1:3 66.17 Sqm 51.00 3374.61 39.10 2587.20 -800.64
8 Earth work for bunds including laying in 15 cm layers breaking of
clods etc complete 0.00
a) In Hard Soil 86.25 Cum 92.00 7935.00 92.00 7935.00 0.00
Total 717255.30 201946.01 455981.33
Add 3% charges for contengencies 21517.66 21517.66
Grand Total 738772.96
say 739000.00
Requirement of Material S.No.
Particular Qty Unit
Cement in
Bags
Sand in
Cum
Stone
Cum
Aggregate 20
mm
Aggregate 12
mm
Qty. Qty. Qty. Qty. Qty.
1 Cement Concrete ( 1 : 3 : 6 )
with 20 mm size stone gritt
for W.H.S
53.41 cum 216.32 22.97 0.00 45.93 0.00
2 R.R.Stone Masonary in
cement sand mortar ( 1:6 ) for W.H.S
268.31 cum 374.29 80.49 295.14 0.00 0.00
3 25 MM thick Cement sand
Plaster in C.M. (1:4)
including curing etc complete
41.00 sqm 9.18 1.31 0.00 0.00 0.00
4 RR stone khuranja in CM 1:6
of 23cm 64.00 sqm 13.44 2.88 16.19 0.00 0.00
5 Cement Concreet Coping in
C.C. 1 : 2 : 4 with stone
crusher broken gritt 12 mm
size including curring etc
complete
53.40 cum 16.66 1.17 0.00 0.00 2.40
6 Flush or ruled poinding in CM
1:3 66.17 sqm 1.85 0.20 0.00 0.00 0.00
Total 631.75 109.03 311.33 45.93 2.40
Cement
(Begs)
Sand
(cum)
Agg. 20 mm
(cum)
TOR Bars
Kgs
632 109.03 45.93 #REF!
PANCHAYAT SAMITI ATRU
Name of Work Construction of Anicut
BASIC DATA 1 Available Crest Length L 10 Meter 2 Total Catchment Area A 400 Hect. 3 Cofficient of Rational Formula C 0.30 4
Cofficient of Discharge for broad crested weir c 1.71 5
Unit weight of masonary s 2.3 Tonnes \ cum
6
Maximum allowable compressive stress in masonary 10 Kg \ sq.cm 7
Maximum allowable tensile stress in masonary 1 Kg \ sq.cm 8 N S L 100 M 9 Height of the Head Wall 1.0 M
10 Depth of Foundation 1.5 M 11 Length of Head Wall Extension Left 3.5 M 12 Length of Head wall extenssion Right 3.5 M
(A) Hydrologic Design
Peak rate of runoff (discharge) The Maximum probable Discharge ( Q ) has been calculated using Dicken formula as under:--
Q = CA3/4
C 11.4 Coefficient
A 4 Sq. Km
Q = 32.244 Cumecs
(B) Hydraulic Design
(i) Head over the crest
Q = c x L x h 3/2
h3/2 = Q / (c xL ) 1.89 meter
So h = 1.53 meter
Say h = 1.60 meter
( ii ) Free board
F = 1.5 hw , Where hw is the height of wave hw = 0.014 (Df)
1/2
Putting Df = 400.00 meter
hw = 0.28
so F= 0.42 meter
Or 0.40 meter
(C) Structural Design
N S L (Bed Level) = 100.00 meter
Ht of structure above N S L ( h ) = = 1.00 meter
Depth of foundation = 1.50 meter
Width of foundation bed = 2.60 meter
Depth of Concrete in foundation = 0.30 meter
Height of Head wall ( h ) = 1.00 meter
F T L = 101.00 meter
M W L = 102.60 meter
T B L = 102.60 meter
Total height =T.B.L. - N.S.L. = = 2.60 meter
Length of Bund = 10 meter
Height of Bund = 1.5 meter
Top Width of Bund (h/3)+1.5 = 2 meter
Bottom Width of Bund (5 x h )+ Tw = 9.5 meter
( i ) Top width of head wall Tw = h / ( s - c )1/2
putting h= 1.60 meter
Specific gravity of the material s= 2.3 for stone masonry in cement mortar (for partly pervious &permeable foundation bed ) c = 1.00
we get, Tw = 1.40 meter
Or Tw = 1.50 meter
d = h + Fb 2.00
( ii ) Bottom width of head wall Bw = Tw + ( H x 0 .8) (H+h) / (s-c)1/2
Bw = 2.28 Mtr.
Width of Concerete bed (= Bw +0 .30) 2.58 Mtr.
Or 2.60 Mtr.
( iii ) Length of head wall extension = H +d+1
= 4.00 Mtr.
(iv) Height of head wall extention = H +d
= 3.00 Mtr.
(v) Bottom width of head wall extension 0.5(H+h)
= 1.30 Mtr.
1.30
1. HEAD WALL EXTENSION
( a ) Length (as per site condition ) Right side 4.00 meter
Left side 4.00 meter
( b ) Height above crest level =H+fb Right side 2.00 meter
Left side 2.00 meter
( c ) Top width 0.60 meter
( d ) Bottom width 1.80 meter
or 1.80 meter
2. SIDE WALL
( a ) Length = (Bw of Hw + Appron width + 0.45) - 2.1 3.95 meter
or 4.00 meter
( b ) Top width ( minimum ) 0.60 meter
( c ) Bottom width
( at H. W. E. junction ) =0.60+((H+d )x0.40) = = 1.80 meter
( at wing wall junction ) =0.60 + ( 0.40 x 1.5 H ) = 1.50 meter
( d ) Height of side wall
( at H. W. E. junction ) = H + d = 3.00 meter
( at wing wall junction ) = 1.5 x h = 2.40 meter
3. WING WALL
( a ) Length = 2.25 x h = 3.60 meter
( b ) Top width ( minimum ) = 0.60 meter
( c ) Bottom width = 0.60 + (0.4 x (1.5 x h ))
= 1.56 meter
( d ) Height of wing wall =1.5 h =
= 2.40 meter
4. APRON
Length = crest length = 10.00 meter
Width = H + d = 3.00 meter
Thickness of Apron = = 0.60 meter
(0.30 m c.c.(1:4:8)
+0.23 m RR stone khuranja in CM 1:6
5. TOE WALL
Length = crest length = 10.00 meter
Width = 0.45 meter
Height ( above top of Apron ) = 0.30 meter
6. Depth of foundation = 1.50*0.473(Q/f).33 OR Say = 2.1019 meter
= 2.20 meter
Q = Discharge Cum / Sec 32.24
f = silt factor constant 1.2
But as per site condition taken as 1.50 Mtr.
CHECKS FOR AGAINST OVER TURNING , RUPTURE FROM TENSION , SLIDING
& CRUSHING
H = 1.00 meter
h = 1.60 meter
Tw = 1.50 meter
Bw = 2.28 Kg \cum
Specific weight of masonary s = 2300.00 Kg \cum
Specific weight of water w = 1000.00 Kg \cum
Coefficient of uplift c = 0.50
Coefficient of friction f = 0.75
Weight of structure W = W1 + W2
W1 = s x Tw x H = 3450.00 Kg
W2 = s x H( Bw - Tw ) / 2 = 897.40 Kg
W = W1 + W2 = 4347.40 Kg
Water pressure at depth H = P1
P1 = w x h = 1600.00 Kg \ sqm
Water pressure at depth (H+h)=P2
P2= w x ( H + h ) = 2600.00 Kg \ sqm
Net Horizontal water force =
( P1 + P2 ) / 2 x H = 2100.00 Kg \ sqm
Force due to water at the crest
F3 = w x h x Tw = 2400.00 Kg/m
Up lift pressure U1=c x w x (h+H)= 1300.00 Kg/sqm
Up lift Force =U = U1 x Bw / 2 = 1482.23 Kg/m
1. Safty against Over turning
Taking moment of all the forces about the toe of the Structure
Restoring Moment, RM = W1 x(Bw- Tw/2)+W2 x (Bw - Tw ) x 2 / 3 +F3 (Bw - Tw/2)
RM = 9419
Over turning Moment, OM=Fa x H/2 + Fb x H/3 + U x2 Bw/3
Where Fa = P1 x H = 1600
Fb = (P2- P1)/2 x H = 500
OM = 3220
RM / OM = 2.93
It is more than 1.30, so the structure is safe against overturning.
2. Safty against tension at the base
The excess moment , Em=( RM - OM) 6199
Total Vertical Force, V = W + F3 - U= 5265.18
X represents the position of the resultant force from top of the structure.
X = Excess moment / Total vertical force
X = 1.18 Which is more than Bw / 3 = 0.76 of the structure ,
& less than 2Bw/3= 1.52
i.e. Resultant is passing through the middle 1 / 3 of the base so there is no chance of developing any tension in maonary. Hence the structure is safe against Rupture from Tension.
3. Safty against Compression (Crushing)
Ecentricity e = Bw / 2-X
where x =(RM-OM)/ V 1.18
so e = -0.04
Fmax = V(1+6e/Bw)/A = 2082.56
In order to avoid crushing of the masonary at the base Fmax. is maximum compressive stress acting normal to the base of the structure. It is less than the Max.allowable compressive stress for the masonary 20000 Kg / sqm. Hence Safe against Crushing.
4. Safty against sliding
Total Vertical Force, V =W+F3-U= 5265.18
Resisting forces, P = f V + ChA = 3949.79
Sliding forces = Fa + Fb = 2100
Factor of safety for sliding
= Restoring force / Sliding force P/V= 1.88
It is more than 1.3, so the structure is safe against Sliding.
PANCHAYAT SAMITI ATRU
Name of Work Construction of Anicut DETAILED ESTIMATE
S. Particular
No.
Length Width H / D Qty. unit
1 Excavation for foundation Head wall (over flow sec. ) 1 10.00 2.60 1.50 39.00 cu.m Head wall Ext ( a ) Right side from U \ S 1 4.00 1.80 2.00 14.40 ( b ) Left side from U \ S 1 4.00 1.80 2.00 14.40 Side wall 2 4.00 1.80 1.50 21.60 ,, Wing wall 2 3.60 1.80 2.00 25.92 ,, Toe wall 1 10.00 0.90 0.60 5.40 ,, Apron 1 10.00 3.00 0.60 18.00 ,,
Total Qty.
138.72
cu.m
Hard soil 40 % 55.49 cu.m Ordinary Rock 30 % 41.62 cu.m Hard Rock 30 % 41.62 cu.m 2 C .C . ( 1 : 3 : 6 ) with 20 mm stone crusher broken aggregate in
foundation Head wall (over flow sec. ) 1 10.00 2.60 0.30 7.80 cu.m Head wall Exe.Foundation ( a ) Right side from U \ S 1 4.00 1.80 0.30 2.16 ( b ) Left side from U \ S 1 4.00 1.80 0.30 2.16 Side wall 2 4.00 1.80 0.30 4.32 ,, Wing wall 2 3.60 1.80 0.30 3.89 ,, Toe wall 1 10.00 0.90 0.15 1.35 ,,
Apron 1 10.00 3.00 0.30 9.00
Total Qty. Item -
2 =
30.68 cu.m
3 A R.R.Stone Masonery in cement sand mortar ( 1:6 ) in foundation for
W.H.S Head wall (over flow sec. ) 1 10.00 2.60 1.20 31.20 cu.m Head wall Exe. ( a ) Right side from U \ S 1 4.00 1.80 1.20 8.64 ( b ) Left side from U \ S 1 4.00 1.80 1.20 8.64 Side wall 2 4.00 1.80 1.20 17.28 ,, Wing wall 2 3.60 1.80 1.20 15.55 ,, Toe wall 1 10.00 0.75 0.30 2.25 ,, 1 10.00 0.45 0.15 0.68
Total Item-- 3 A = 84.24 cu.m
3 B R.R.S.M. ( 1:6 ) for super structure above NSL
Head wall (over flow sec. ) 1 10.00 1.94 1.00 19.40 cu.m
Head wall Exe. ( a ) Right side from U \ S 1 4.00 1.20 2.00 9.60 ,, ( b ) Left side from U \ S 1 4.00 1.20 2.00 9.60 Side wall 2 4.00 1.30 2.70 28.08 ,, Wing wall 2 3.60 1.08 2.40 18.66 ,, Toe wall 1 10.00 0.45 0.30 1.35 ,,
Total Item - 3 B = 86.69 cu.m
Total Item - 3 A + 3 B =
170.93
cu.m
4
RR stone khuranja in CM 1:6 of 23cm 1 10.00 3.00 30.00 Sqm
5 C . C . Coping in C.M. 1 : 2 : 4 Headwall Crest
Head wall ( Nonover flow sec. )U\S 1 10.00 1.50 15.00 cu.m ( a ) Right side from U \ S 1 4.00 0.6 2.40 ,, ( b ) Left side from U \ S 1 4.00 0.6 2.40 ,,
7 Flush or ruled pointing in CM 1:3 51.56 Sqm 51.00 2629.79 39.10 2016.17 -623.93
8 Earth work for bunds including laying in 15 cm layers breaking of
clods etc complete 0.00
a) In Hard Soil 86.25 Cum 92.00 7935.00 92.00 7935.00 0.00
Total 448901.90 126665.80 285207.21
Add 3% charges for contengencies 13467.06 13467.06
Grand Total 462368.96
say 4.63
Requirement of Material S.No.
Particular Qty Unit
Cement in
Bags
Sand in
Cum
Stone
Cum
Aggregate 20
mm
Aggregate 12
mm
Qty. Qty. Qty. Qty. Qty.
1 Cement Concrete ( 1 : 3 : 6 )
with 20 mm size stone gritt
for W.H.S
30.68 cum 124.25 13.19 0.00 26.38 0.00
2 R.R.Stone Masonary in
cement sand mortar ( 1:6 ) for
W.H.S
170.93 cum 238.45 51.28 188.02 0.00 0.00
3 25 MM thick Cement sand
Plaster in C.M. (1:4)
including curing etc complete
20.50 sqm 4.59 0.66 0.00 0.00 0.00
4 RR stone khuranja in CM 1:6 of 23cm
30.00 sqm 6.30 1.35 7.59 0.00 0.00
5 Cement Concreet Coping in C.C. 1 : 2 : 4 with stone
crusher broken gritt 12 mm size including curring etc
complete
33.42 cum 10.43 0.74 0.00 0.00 1.50
6 Flush or ruled poinding in CM
1:3 51.56 sqm 1.44 0.15 0.00 0.00 0.00
Total 385.46 67.37 195.61 26.38 1.50
Cement
(Begs)
Sand
(cum)
Agg. 20 mm
(cum)
TOR Bars
Kgs
385 67.37 26.38 0
PANCHAYAT SAMITI ATRU
Name of Work Construction of Anicut
BASIC DATA 1 Available Crest Length L 8 Meter 2 Total Catchment Area A 300 Hect. 3 Cofficient of Rational Formula C 0.30 4
Cofficient of Discharge for broad crested weir c 1.71 5
Unit weight of masonary s 2.3 Tonnes \ cum
6
Maximum allowable compressive stress in masonary 10 Kg \ sq.cm 7
Maximum allowable tensile stress in masonary 1 Kg \ sq.cm 8 N S L 100 M 9 Height of the Head Wall 1.0 M
10 Depth of Foundation 1.5 M 11 Length of Head Wall Extension Left 3.5 M 12 Length of Head wall extenssion Right 3.5 M
(A) Hydrologic Design
Peak rate of runoff (discharge) The Maximum probable Discharge ( Q ) has been calculated using Dicken formula as under:--
Q = CA3/4
C 11.4 Coefficient
A 3 Sq. Km
Q = 25.986 Cumecs
(B) Hydraulic Design
(i) Head over the crest
Q = c x L x h 3/2
h3/2 = Q / (c xL ) 1.90 meter
So h = 1.53 meter
Say h = 1.60 meter
( ii ) Free board
F = 1.5 hw , Where hw is the height of wave hw = 0.014 (Df)
1/2
Putting Df = 400.00 meter
hw = 0.28
so F= 0.42 meter
Or 0.40 meter
(C) Structural Design
N S L (Bed Level) = 100.00 meter
Ht of structure above N S L ( h ) = = 1.00 meter
Depth of foundation = 1.50 meter
Width of foundation bed = 2.60 meter
Depth of Concrete in foundation = 0.30 meter
Height of Head wall ( h ) = 1.00 meter
F T L = 101.00 meter
M W L = 102.60 meter
T B L = 102.60 meter
Total height =T.B.L. - N.S.L. = = 2.60 meter
Length of Bund = 10 meter
Height of Bund = 1.5 meter
Top Width of Bund (h/3)+1.5 = 2 meter
Bottom Width of Bund (5 x h )+ Tw = 9.5 meter
( i ) Top width of head wall Tw = h / ( s - c )1/2
putting h= 1.60 meter
Specific gravity of the material s= 2.3 for stone masonry in cement mortar (for partly pervious &permeable foundation bed ) c = 1.00
we get, Tw = 1.40 meter
Or Tw = 1.50 meter
d = h + Fb 2.00
( ii ) Bottom width of head wall Bw = Tw + ( H x 0 .8) (H+h) / (s-c)1/2
Bw = 2.28 Mtr.
Width of Concerete bed (= Bw +0 .30) 2.58 Mtr.
Or 2.60 Mtr.
( iii ) Length of head wall extension = H +d+1
= 4.00 Mtr.
(iv) Height of head wall extention = H +d
= 3.00 Mtr.
(v) Bottom width of head wall extension 0.5(H+h)
= 1.30 Mtr.
1.30
1. HEAD WALL EXTENSION
( a ) Length (as per site condition ) Right side 4.00 meter
Left side 4.00 meter
( b ) Height above crest level =H+fb Right side 2.00 meter
Left side 2.00 meter
( c ) Top width 0.60 meter
( d ) Bottom width 1.80 meter
or 1.80 meter
2. SIDE WALL
( a ) Length = (Bw of Hw + Appron width + 0.45) - 2.1 3.95 meter
or 4.00 meter
( b ) Top width ( minimum ) 0.60 meter
( c ) Bottom width
( at H. W. E. junction ) =0.60+((H+d )x0.40) = = 1.80 meter
( at wing wall junction ) =0.60 + ( 0.40 x 1.5 H ) = 1.50 meter
( d ) Height of side wall
( at H. W. E. junction ) = H + d = 3.00 meter
( at wing wall junction ) = 1.5 x h = 2.40 meter
3. WING WALL
( a ) Length = 2.25 x h = 3.60 meter
( b ) Top width ( minimum ) = 0.60 meter
( c ) Bottom width = 0.60 + (0.4 x (1.5 x h ))
= 1.56 meter
( d ) Height of wing wall =1.5 h =
= 2.40 meter
4. APRON
Length = crest length = 8.00 meter
Width = H + d = 3.00 meter
Thickness of Apron = = 0.60 meter
(0.30 m c.c.(1:4:8)
+0.23 m RR stone khuranja in CM 1:6
5. TOE WALL
Length = crest length = 8.00 meter
Width = 0.45 meter
Height ( above top of Apron ) = 0.30 meter
6. Depth of foundation = 1.50*0.473(Q/f).33 OR Say = 1.95744 meter
= 2.00 meter
Q = Discharge Cum / Sec 25.98638045
f = silt factor constant 1.2
But as per site condition taken as 1.50 Mtr.
CHECKS FOR AGAINST OVER TURNING , RUPTURE FROM
TENSION , SLIDING & CRUSHING
H = 1.00 meter
h = 1.60 meter
Tw = 1.50 meter
Bw = 2.28
Kg \cum
Specific weight of masonary s = 2300.00
Kg \cum
Specific weight of water w = 1000.00 Kg \cum
Coefficient of uplift c = 0.50
Coefficient of friction f = 0.75
Weight of structure W = W1 + W2
W1 = s x Tw x H = 3450.00 Kg
W2 = s x H( Bw - Tw ) / 2 = 897.40 Kg
W = W1 + W2 = 4347.40 Kg
Water pressure at depth H = P1
P1 = w x h = 1600.00 Kg \ sqm
Water pressure at depth (H+h)=P2
P2= w x ( H + h ) = 2600.00 Kg \ sqm
Net Horizontal water force =
( P1 + P2 ) / 2 x H = 2100.00 Kg \ sqm
Force due to water at the crest
F3 = w x h x Tw = 2400.00 Kg/m
Up lift pressure U1=c x w x (h+H)= 1300.00 Kg/sqm
Up lift Force =U = U1 x Bw / 2 = 1482.23 Kg/m
1. Safty against Over turning
Taking moment of all the forces about the toe of the Structure
Restoring Moment, RM = W1 x(Bw- Tw/2)+W2 x (Bw - Tw ) x 2 / 3 +F3 (Bw - Tw/2)
RM = 9419
Over turning Moment, OM=Fa x H/2 + Fb x H/3 + U x2 Bw/3
Where Fa = P1 x H = 1600
Fb = (P2- P1)/2 x H = 500
OM = 3220 RM / OM = 2.93
It is more than 1.30, so the structure is safe against overturning.
2. Safty against tension at the base
The excess moment , Em=( RM - OM) 6199
Total Vertical Force, V = W + F3 - U= 5265.18
X represents the position of the resultant force from top of the structure.
X = Excess moment / Total vertical force
X = 1.18
Which is more than Bw / 3 = 0.76 of the structure ,
& less than 2Bw/3= 1.52
i.e. Resultant is passing through the middle 1 / 3 of the base so there is no chance of developing any tension in maonary. Hence the structure is safe against Rupture from Tension.
3. Safty against Compression (Crushing)
Ecentricity e = Bw / 2-X
where x =(RM-OM)/ V 1.18
so e = -0.04
Fmax = V(1+6e/Bw)/A = 2082.56
In order to avoid crushing of the masonary at the base Fmax. is maximum compressive stress acting normal to the base of the structure. It is less than the Max.allowable compressive stress for the masonary 20000 Kg / sqm. Hence Safe against Crushing.
4. Safty against sliding
Total Vertical Force, V =W+F3-U= 5265.18
Resisting forces, P = f V + ChA = 3949.79
Sliding forces = Fa + Fb = 2100
Factor of safety for sliding
= Restoring force / Sliding force P/V= 1.88
It is more than 1.3, so the structure is safe against Sliding.
PANCHAYAT SAMITI ATRU
Name of Work Construction of Anicut DETAILED ESTIMATE
S. Particular
No.
Length Width H / D Qty. unit
1 Excavation for foundation Head wall (over flow sec. ) 1 8.00 2.60 1.50 31.20 cu.m Head wall Ext ( a ) Right side from U \ S 1 4.00 1.80 2.00 14.40 ( b ) Left side from U \ S 1 4.00 1.80 2.00 14.40 Side wall 2 4.00 1.80 1.50 21.60 ,, Wing wall 2 3.60 1.80 2.00 25.92 ,, Toe wall 1 8.00 0.90 0.60 4.32 ,, Apron 1 8.00 3.00 0.60 14.40 ,,
Total Qty.
126.24
cu.m
Hard soil 40 % 50.50 cu.m Ordinary Rock 30 % 37.87 cu.m Hard Rock 30 % 37.87 cu.m 2 C .C . ( 1 : 3 : 6 ) with 20 mm stone crusher broken aggregate in
foundation Head wall (over flow sec. ) 1 8.00 2.60 0.30 6.24 cu.m Head wall Exe.Foundation ( a ) Right side from U \ S 1 4.00 1.80 0.30 2.16 ( b ) Left side from U \ S 1 4.00 1.80 0.30 2.16 Side wall 2 4.00 1.80 0.30 4.32 ,, Wing wall 2 3.60 1.80 0.30 3.89 ,, Toe wall 1 8.00 0.90 0.30 2.16 ,,
Apron 1 8.00 3.00 0.15 3.60
Total Qty. Item -
2 =
24.53 cu.m
3 A R.R.Stone Masonery in cement sand mortar ( 1:6 ) in foundation for
W.H.S Head wall (over flow sec. ) 1 8.00 2.60 1.20 24.96 cu.m Head wall Exe. ( a ) Right side from U \ S 1 4.00 1.80 1.20 8.64 ( b ) Left side from U \ S 1 4.00 1.80 1.20 8.64 Side wall 2 4.00 1.80 1.20 17.28 ,, Wing wall 2 3.60 1.80 1.20 15.55 ,, Toe wall 1 8.00 0.75 0.30 1.80 ,, 1 8.00 0.60 0.15 0.72
Total Item-- 3 A = 77.59 cu.m
3 B R.R.S.M. ( 1:6 ) for super structure above NSL
Head wall (over flow sec. ) 1 8.00 1.94 1.00 15.52 cu.m
Head wall Exe. ( a ) Right side from U \ S 1 4.00 1.20 2.00 9.60 ,, ( b ) Left side from U \ S 1 4.00 1.20 2.00 9.60 Side wall 2 4.00 1.30 2.70 28.08 ,, Wing wall 2 3.60 1.08 2.40 18.66 ,, Toe wall 1 8.00 0.45 0.30 1.08 ,,
Total Item - 3 B = 82.54 cu.m
Total Item - 3 A + 3 B =
160.14
cu.m
4
RR stone khuranja in CM 1:6 of 23cm 1 8.00 3.00 24.00 Sqm
5 C . C . Coping in C.M. 1 : 2 : 4 Headwall Crest
Head wall ( Nonover flow sec. )U\S 1 8.00 1.50 12.00 cu.m ( a ) Right side from U \ S 1 4.00 0.6 2.40 ,, ( b ) Left side from U \ S 1 4.00 0.6 2.40 ,,
7 Flush or ruled pointing in CM 1:3 49.03 Sqm 51.00 2500.40 39.10 1916.98 -593.23
8 Earth work for bunds including laying in 15 cm layers breaking of
clods etc complete 0.00
a) In Hard Soil 86.25 Cum 92.00 7935.00 92.00 7935.00 0.00
Total 406919.79 115218.14 257556.70
Add 3% charges for contengencies 12207.59 12207.59
Grand Total 419127.38
say 4.20
Requirement of Material S.No.
Particular Qty Unit
Cement in
Bags
Sand in
Cum
Stone
Cum
Aggregate 20
mm
Aggregate 12
mm
Qty. Qty. Qty. Qty. Qty.
1 Cement Concrete ( 1 : 3 : 6 )
with 20 mm size stone gritt
for W.H.S
24.53 cum 99.34 10.55 0.00 21.09 0.00
2 R.R.Stone Masonary in
cement sand mortar ( 1:6 ) for
W.H.S
160.14 cum 223.39 48.04 176.15 0.00 0.00
3 25 MM thick Cement sand
Plaster in C.M. (1:4)
including curing etc complete
16.40 sqm 3.67 0.52 0.00 0.00 0.00
4 RR stone khuranja in CM 1:6 of 23cm
24.00 sqm 5.04 1.08 6.07 0.00 0.00
5 Cement Concreet Coping in C.C. 1 : 2 : 4 with stone
crusher broken gritt 12 mm size including curring etc
complete
29.52 cum 9.21 0.65 0.00 0.00 1.33
6 Flush or ruled poinding in CM
1:3 49.03 sqm 1.37 0.15 0.00 0.00 0.00
Total 342.02 60.99 182.22 21.09 1.33
Cement
(Begs)
Sand
(cum)
Agg. 20 mm
(cum)
TOR Bars
Kgs
342 60.99 21.09 #REF!
PANCHAYAT SAMITI ATRU
Name of Work Construction of Anicut
BASIC DATA 1 Available Crest Length L 15 Meter 2 Total Catchment Area A 600 Hect. 3 Cofficient of Rational Formula C 0.30 4
Cofficient of Discharge for broad crested weir c 1.71 5
Unit weight of masonary s 2.3 Tonnes \ cum
6
Maximum allowable compressive stress in masonary 10 Kg \ sq.cm 7
Maximum allowable tensile stress in masonary 1 Kg \ sq.cm 8 N S L 100 M 9 Height of the Head Wall 1.0 M
10 Depth of Foundation 1.5 M 11 Length of Head Wall Extension Left 3.5 M 12 Length of Head wall extenssion Right 3.5 M
(A) Hydrologic Design
Peak rate of runoff (discharge) The Maximum probable Discharge ( Q ) has been calculated using Dicken formula as under:--
Q = CA3/4
C 11.4 Coefficient
A 6 Sq. Km
Q = 43.704 Cumecs
(B) Hydraulic Design
(i) Head over the crest
Q = c x L x h 3/2
h3/2 = Q / (c xL ) 1.70 meter
So h = 1.43 meter
Say h = 1.50 meter
( ii ) Free board
F = 1.5 hw , Where hw is the height of wave hw = 0.014 (Df)
1/2
Putting Df = 400.00 meter
hw = 0.28
so F= 0.42 meter
Or 0.40 meter
(C) Structural Design
N S L (Bed Level) = 100.00 meter
Ht of structure above N S L ( h ) = = 1.00 meter
Depth of foundation = 1.50 meter
Width of foundation bed = 2.50 meter
Depth of Concrete in foundation = 0.30 meter
Height of Head wall ( h ) = 1.00 meter
F T L = 101.00 meter
M W L = 102.50 meter
T B L = 102.50 meter
Total height =T.B.L. - N.S.L. = = 2.50 meter
Length of Bund = 10 meter
Height of Bund = 1.5 meter
Top Width of Bund (h/3)+1.5 = 2 meter
Bottom Width of Bund (5 x h )+ Tw = 9.5 meter
( i ) Top width of head wall Tw = h / ( s - c )1/2
putting h= 1.50 meter
Specific gravity of the material s= 2.3 for stone masonry in cement mortar (for partly pervious &permeable foundation bed ) c = 1.00
we get, Tw = 1.32 meter
Or Tw = 1.40 meter
d = h + Fb 1.90
( ii ) Bottom width of head wall Bw = Tw + ( H x 0 .8) (H+h) / (s-c)1/2
Bw = 2.19 Mtr.
Width of Concerete bed (= Bw +0 .30) 2.49 Mtr.
Or 2.50 Mtr.
( iii ) Length of head wall extension = H +d+1
= 3.90 Mtr.
(iv) Height of head wall extention = H +d
= 2.90 Mtr.
(v) Bottom width of head wall extension 0.5(H+h)
= 1.25 Mtr.
1.30
1. HEAD WALL EXTENSION
( a ) Length (as per site condition ) Right side 3.90 meter
Left side 3.90 meter
( b ) Height above crest level =H+fb Right side 1.90 meter
Left side 1.90 meter
( c ) Top width 0.60 meter
( d ) Bottom width 1.76 meter
or 1.80 meter
2. SIDE WALL
( a ) Length = (Bw of Hw + Appron width + 0.45) - 2.1 3.75 meter
or 3.80 meter
( b ) Top width ( minimum ) 0.60 meter
( c ) Bottom width
( at H. W. E. junction ) =0.60+((H+d )x0.40) = = 1.80 meter
( at wing wall junction ) =0.60 + ( 0.40 x 1.5 H ) = 1.50 meter
( d ) Height of side wall
( at H. W. E. junction ) = H + d = 2.90 meter
( at wing wall junction ) = 1.5 x h = 2.25 meter
3. WING WALL
( a ) Length = 2.25 x h = 3.38 meter
( b ) Top width ( minimum ) = 0.60 meter
( c ) Bottom width = 0.60 + (0.4 x (1.5 x h ))
= 1.50 meter
( d ) Height of wing wall =1.5 h =
= 2.25 meter
4. APRON
Length = crest length = 15.00 meter
Width = H + d = 2.90 meter
Thickness of Apron = = 0.60 meter
(0.30 m c.c.(1:4:8)
+0.23 m RR stone khuranja in CM 1:6
5. TOE WALL
Length = crest length = 15.00 meter
Width = 0.45 meter
Height ( above top of Apron ) = 0.30 meter
6. Depth of foundation = 1.50*0.473(Q/f).33 OR Say = 2.32377 meter
= 2.40 meter
Q = Discharge Cum / Sec 43.70370833
f = silt factor constant 1.2
But as per site condition taken as 1.50 Mtr.
CHECKS FOR AGAINST OVER
TURNING , RUPTURE FROM
TENSION , SLIDING & CRUSHING
H = 1.00 meter
h = 1.50 meter
Tw = 1.40 meter
Bw = 2.19 Kg \cum
Specific weight of masonary s = 2300.00 Kg \cum
Specific weight of water w = 1000.00
Kg \cum
Coefficient of uplift c = 0.50
Coefficient of friction f = 0.75
Weight of structure W = W1 + W2
W1 = s x Tw x H = 3220.00 Kg
W2 = s x H( Bw - Tw ) / 2 = 911.54 Kg
W = W1 + W2 = 4131.54 Kg
Water pressure at depth H = P1
P1 = w x h = 1500.00 Kg \ sqm
Water pressure at depth (H+h)=P2
P2= w x ( H + h ) = 2500.00 Kg \ sqm
Net Horizontal water force =
( P1 + P2 ) / 2 x H = 2000.00 Kg \ sqm
Force due to water at the crest
F3 = w x h x Tw = 2100.00 Kg/m
Up lift pressure U1=c x w x (h+H)= 1250.00 Kg/sqm
Up lift Force =U = U1 x Bw / 2 = 1370.40 Kg/m
1. Safty against Over turning
Taking moment of all the forces about the toe of the Structure
Restoring Moment, RM = W1 x(Bw- Tw/2)+W2 x (Bw - Tw ) x 2 / 3 +F3 (Bw - Tw/2)
RM = 8423
Over turning Moment, OM=Fa x H/2 + Fb x H/3 + U x2 Bw/3
Where Fa = P1 x H = 1500
Fb = (P2- P1)/2 x H = 500
OM = 2920 RM / OM = 2.88
It is more than 1.30, so the structure is safe against overturning.
2. Safty against tension at the base
The excess moment , Em=( RM - OM) 5503
Total Vertical Force, V = W + F3 - U= 4861.14
X represents the position of the resultant force from top of the structure.
X = Excess moment / Total vertical force
X = 1.13
Which is more than Bw / 3 = 0.73 of the structure ,
& less than 2Bw/3= 1.46
i.e. Resultant is passing through the middle 1 / 3 of the base so there is no chance of developing any tension in maonary. Hence the structure is safe against Rupture from Tension.
3. Safty against Compression (Crushing)
Ecentricity e = Bw / 2-X
where x =(RM-OM)/ V 1.13
so e = -0.04
Fmax = V(1+6e/Bw)/A = 2000.73
In order to avoid crushing of the masonary at the base Fmax. is maximum compressive stress acting normal to the base of the structure. It is less than the Max.allowable compressive stress for the masonary 20000 Kg / sqm. Hence Safe against Crushing.
4. Safty against sliding
Total Vertical Force, V =W+F3-U= 4861.14
Resisting forces, P = f V + ChA = 3646.73
Sliding forces = Fa + Fb = 2000
Factor of safety for sliding
= Restoring force / Sliding force P/V= 1.82
It is more than 1.3, so the structure is safe against Sliding.
PANCHAYAT SAMITI ATRU
Name of Work Construction of Anicut DETAILED ESTIMATE
S. Particular
No.
Length Width H / D Qty. unit
1 Excavation for foundation Head wall (over flow sec. ) 1 15.00 2.50 1.50 56.25 cu.m Head wall Ext ( a ) Right side from U \ S 1 3.90 1.80 2.00 14.04 ( b ) Left side from U \ S 1 3.90 1.80 2.00 14.04 Side wall 2 3.80 1.80 1.50 20.52 ,, Wing wall 2 3.38 1.80 2.00 24.30 ,, Toe wall 1 15.00 0.90 0.60 8.10 ,, Apron 1 15.00 2.90 0.60 26.10 ,,
Total Qty.
163.35
cu.m
Hard soil 40 % 65.34 cu.m Ordinary Rock 30 % 49.01 cu.m Hard Rock 30 % 49.01 cu.m 2 C .C . ( 1 : 3 : 6 ) with 20 mm stone crusher broken aggregate in
foundation Head wall (over flow sec. ) 1 15.00 2.50 0.30 11.25 cu.m Head wall Exe.Foundation ( a ) Right side from U \ S 1 3.90 1.80 0.30 2.11 ( b ) Left side from U \ S 1 3.90 1.80 0.30 2.11 Side wall 2 3.80 1.80 0.30 4.10 ,, Wing wall 2 3.38 1.80 0.30 3.65 ,, Toe wall 1 15.00 0.90 0.15 2.03 ,,
Apron 1 15.00 2.90 0.30 13.05
Total Qty. Item -
2 =
38.29 cu.m
3 A R.R.Stone Masonery in cement sand mortar ( 1:6 ) in foundation for
W.H.S Head wall (over flow sec. ) 1 15.00 2.50 1.20 45.00 cu.m Head wall Exe. ( a ) Right side from U \ S 1 3.90 1.80 1.20 8.42 ( b ) Left side from U \ S 1 3.90 1.80 1.20 8.42 Side wall 2 3.80 1.80 1.20 16.42 ,, Wing wall 2 3.38 1.80 1.20 14.58 ,, Toe wall 1 15.00 0.75 0.30 3.38 ,, Toe wall 1 15.00 0.60 0.15 1.35 ,,
Total Item-- 3 A = 97.57 cu.m
3 B R.R.S.M. ( 1:6 ) for super structure above NSL
Head wall (over flow sec. ) 1 15.00 1.85 1.00 27.69 cu.m
Head wall Exe. ( a ) Right side from U \ S 1 3.90 1.18 1.90 8.74 ,, ( b ) Left side from U \ S 1 3.90 1.18 1.90 8.74 Side wall 2 3.80 1.30 2.58 25.44 ,, Wing wall 2 3.38 1.05 2.25 15.95 ,, Toe wall 1 15.00 0.45 0.30 2.03 ,,
Total Item - 3 B = 88.60 cu.m
Total Item - 3 A + 3 B =
186.16
cu.m
4
RR stone khuranja in CM 1:6 of 23cm 1 15.00 2.90 43.50 Sqm
5 C . C . Coping in C.M. 1 : 2 : 4 Headwall Crest
Head wall ( Nonover flow sec. )U\S 1 15.00 1.40 21.00 cu.m ( a ) Right side from U \ S 1 3.90 0.6 2.34 ,, ( b ) Left side from U \ S 1 3.90 0.6 2.34 ,,
7 Flush or ruled pointing in CM 1:3 53.90 Sqm 51.00 2748.81 39.10 2107.42 -652.17
8 Earth work for bunds including laying in 15 cm layers breaking of clods etc complete
0.00
a) In Hard Soil 86.25 Cum 92.00 7935.00 92.00 7935.00 0.00
Total 509770.08 145892.75 322269.56
Add 3% charges for contengencies 15293.10 15293.10
Grand Total 525063.18
say 5.26
Requirement of Material S.No.
Particular Qty Unit
Cement in
Bags
Sand in
Cum
Stone
Cum
Aggregate 20
mm
Aggregate 12
mm
Qty. Qty. Qty. Qty. Qty.
1 Cement Concrete ( 1 : 3 : 6 )
with 20 mm size stone gritt
for W.H.S
38.29 cum 155.06 16.46 0.00 32.93 0.00
2 R.R.Stone Masonary in
cement sand mortar ( 1:6 ) for
W.H.S
186.16 cum 259.70 55.85 204.78 0.00 0.00
3 25 MM thick Cement sand
Plaster in C.M. (1:4)
including curing etc complete
30.75 sqm 6.89 0.98 0.00 0.00 0.00
4 RR stone khuranja in CM 1:6
of 23cm 43.50 sqm 9.14 1.96 11.01 0.00 0.00
5 Cement Concreet Coping in
C.C. 1 : 2 : 4 with stone crusher broken gritt 12 mm
size including curring etc
complete
41.04 cum 12.80 0.90 0.00 0.00 1.85
6 Flush or ruled poinding in CM
1:3 53.90 sqm 1.51 0.16 0.00 0.00 0.00
Total 445.09 76.32 215.79 32.93 1.85
Cement
(Begs)
Sand
(cum)
Agg. 20 mm
(cum)
TOR Bars
Kgs
445 76.32 32.93 #REF!
PANCHAYAT SAMITI ATRU
Name of Work Construction of Anicut
BASIC DATA 1 Available Crest Length L 20 Meter 2 Total Catchment Area A 1000 Hect. 3 Cofficient of Rational Formula C 0.30 4
Cofficient of Discharge for broad crested weir c 1.71 5
Unit weight of masonary s 2.3 Tonnes \ cum
6
Maximum allowable compressive stress in masonary 10 Kg \ sq.cm 7
Maximum allowable tensile stress in masonary 1 Kg \ sq.cm 8 N S L 100 M 9 Height of the Head Wall 1.0 M
10 Depth of Foundation 1.5 M 11 Length of Head Wall Extension Left 3.5 M 12 Length of Head wall extenssion Right 3.5 M
(A) Hydrologic Design
Peak rate of runoff (discharge) The Maximum probable Discharge ( Q ) has been calculated using Dicken formula as under:--
Q = CA3/4
C 11.4 Coefficient
A 10 Sq. Km
Q = 64.107 Cumecs
(B) Hydraulic Design
(i) Head over the crest
Q = c x L x h 3/2
h3/2 = Q / (c xL ) 1.87 meter
So h = 1.52 meter
Say h = 1.60 meter
( ii ) Free board
F = 1.5 hw , Where hw is the height of wave hw = 0.014 (Df)
1/2
Putting Df = 400.00 meter
hw = 0.28
so F= 0.42 meter
Or 0.40 meter
(C) Structural Design
N S L (Bed Level) = 100.00 meter
Ht of structure above N S L ( h ) = = 1.00 meter
Depth of foundation = 1.50 meter
Width of foundation bed = 2.60 meter
Depth of Concrete in foundation = 0.30 meter
Height of Head wall ( h ) = 1.00 meter
F T L = 101.00 meter
M W L = 102.60 meter
T B L = 102.60 meter
Total height =T.B.L. - N.S.L. = = 2.60 meter
Length of Bund = 10 meter
Height of Bund = 1.5 meter
Top Width of Bund (h/3)+1.5 = 2 meter
Bottom Width of Bund (5 x h )+ Tw = 9.5 meter
( i ) Top width of head wall Tw = h / ( s - c )1/2
putting h= 1.60 meter
Specific gravity of the material s= 2.3 for stone masonry in cement mortar (for partly pervious &permeable foundation bed ) c = 1.00
we get, Tw = 1.40 meter
Or Tw = 1.50 meter
d = h + Fb 2.00
( ii ) Bottom width of head wall Bw = Tw + ( H x 0 .8) (H+h) / (s-c)1/2
Bw = 2.28 Mtr.
Width of Concerete bed (= Bw +0 .30) 2.58 Mtr.
Or 2.60 Mtr.
( iii ) Length of head wall extension = H +d+1
= 4.00 Mtr.
(iv) Height of head wall extention = H +d
= 3.00 Mtr.
(v) Bottom width of head wall extension 0.5(H+h)
= 1.30 Mtr.
1.30
1. HEAD WALL EXTENSION
( a ) Length (as per site condition ) Right side 4.00 meter
Left side 4.00 meter
( b ) Height above crest level =H+fb Right side 2.00 meter
Left side 2.00 meter
( c ) Top width 0.60 meter
( d ) Bottom width 1.80 meter
or 1.80 meter
2. SIDE WALL
( a ) Length = (Bw of Hw + Appron width + 0.45) - 2.1 3.95 meter
or 4.00 meter
( b ) Top width ( minimum ) 0.60 meter
( c ) Bottom width
( at H. W. E. junction ) =0.60+((H+d )x0.40) = = 1.80 meter
( at wing wall junction ) =0.60 + ( 0.40 x 1.5 H ) = 1.50 meter
( d ) Height of side wall
( at H. W. E. junction ) = H + d = 3.00 meter
( at wing wall junction ) = 1.5 x h = 2.40 meter
3. WING WALL
( a ) Length = 2.25 x h = 3.60 meter
( b ) Top width ( minimum ) = 0.60 meter
( c ) Bottom width = 0.60 + (0.4 x (1.5 x h ))
= 1.56 meter
( d ) Height of wing wall =1.5 h =
= 2.40 meter
4. APRON
Length = crest length = 20.00 meter
Width = H + d = 3.00 meter
Thickness of Apron = = 0.60 meter
(0.30 m c.c.(1:4:8)
+0.23 m RR stone khuranja in CM 1:6
5. TOE WALL
Length = crest length = 20.00 meter
Width = 0.45 meter
Height ( above top of Apron ) = 0.30 meter
6. Depth of foundation = 1.50*0.473(Q/f).33 OR Say = 2.63695 meter
= 2.70 meter
Q = Discharge Cum / Sec 64.10691107
f = silt factor constant 1.2
But as per site condition taken as 1.50 Mtr.
CHECKS FOR AGAINST OVER
TURNING , RUPTURE FROM TENSION ,
SLIDING & CRUSHING
H = 1.00 meter
h = 1.60 meter
Tw = 1.50 meter
Bw = 2.28 Kg \cum
Specific weight of masonary s = 2300.00 Kg \cum
Specific weight of water w = 1000.00
Kg \cum
Coefficient of uplift c = 0.50
Coefficient of friction f = 0.75
Weight of structure W = W1 + W2
W1 = s x Tw x H = 3450.00 Kg
W2 = s x H( Bw - Tw ) / 2 = 897.40 Kg
W = W1 + W2 = 4347.40 Kg
Water pressure at depth H = P1
P1 = w x h = 1600.00 Kg \ sqm
Water pressure at depth (H+h)=P2
P2= w x ( H + h ) = 2600.00 Kg \ sqm
Net Horizontal water force =
( P1 + P2 ) / 2 x H = 2100.00 Kg \ sqm
Force due to water at the crest
F3 = w x h x Tw = 2400.00 Kg/m
Up lift pressure U1=c x w x (h+H)= 1300.00 Kg/sqm
Up lift Force =U = U1 x Bw / 2 = 1482.23 Kg/m
1. Safty against Over turning
Taking moment of all the forces about the toe of the Structure
Restoring Moment, RM = W1 x(Bw- Tw/2)+W2 x (Bw - Tw ) x 2 / 3 +F3 (Bw - Tw/2)
RM = 9419
Over turning Moment, OM=Fa x H/2 + Fb x H/3 + U x2 Bw/3
Where Fa = P1 x H = 1600
Fb = (P2- P1)/2 x H = 500
OM = 3220 RM / OM = 2.93
It is more than 1.30, so the structure is safe against overturning.
2. Safty against tension at the base
The excess moment , Em=( RM - OM) 6199
Total Vertical Force, V = W + F3 - U= 5265.18
X represents the position of the resultant force from top of the structure.
X = Excess moment / Total vertical force
X = 1.18
Which is more than Bw / 3 = 0.76 of the structure ,
& less than 2Bw/3= 1.52
i.e. Resultant is passing through the middle 1 / 3 of the base so there is no chance of developing any tension in maonary. Hence the structure is safe against Rupture from Tension.
3. Safty against Compression (Crushing)
Ecentricity e = Bw / 2-X
where x =(RM-OM)/ V 1.18
so e = -0.04
Fmax = V(1+6e/Bw)/A = 2082.56
In order to avoid crushing of the masonary at the base Fmax. is maximum compressive stress acting normal to the base of the structure. It is less than the Max.allowable compressive stress for the masonary 20000 Kg / sqm. Hence Safe against Crushing.
4. Safty against sliding
Total Vertical Force, V =W+F3-U= 5265.18
Resisting forces, P = f V + ChA = 3949.79
Sliding forces = Fa + Fb = 2100
Factor of safety for sliding
= Restoring force / Sliding force P/V= 1.88
It is more than 1.3, so the structure is safe against Sliding.
PANCHAYAT SAMITI ATRU
Name of Work Construction of Anicut DETAILED ESTIMATE
S. Particular
No.
Length Width H / D Qty. unit
1 Excavation for foundation Head wall (over flow sec. ) 1 20.00 2.60 1.50 78.00 cu.m Head wall Ext ( a ) Right side from U \ S 1 4.00 1.80 2.00 14.40 ( b ) Left side from U \ S 1 4.00 1.80 2.00 14.40 Side wall 2 4.00 1.80 1.50 21.60 ,, Wing wall 2 3.60 1.80 2.00 25.92 ,, Toe wall 1 20.00 0.90 0.60 10.80 ,, Apron 1 20.00 3.00 0.60 36.00 ,,
Total Qty.
201.12
cu.m
Hard soil 40 % 80.45 cu.m Ordinary Rock 30 % 60.34 cu.m Hard Rock 30 % 60.34 cu.m 2 C .C . ( 1 : 3 : 6 ) with 20 mm stone crusher broken aggregate in
foundation Head wall (over flow sec. ) 1 20.00 2.60 0.30 15.60 cu.m Head wall Exe.Foundation ( a ) Right side from U \ S 1 4.00 1.80 0.30 2.16 ( b ) Left side from U \ S 1 4.00 1.80 0.30 2.16 Side wall 2 4.00 1.80 0.30 4.32 ,, Wing wall 2 3.60 1.80 0.30 3.89 ,, Toe wall 1 20.00 0.90 0.15 2.70 ,,
Apron 1 20.00 3.00 0.30 18.00
Total Qty. Item -
2 =
48.83 cu.m
3 A R.R.Stone Masonery in cement sand mortar ( 1:6 ) in foundation for
W.H.S Head wall (over flow sec. ) 1 20.00 2.60 1.20 62.40 cu.m Head wall Exe. ( a ) Right side from U \ S 1 4.00 1.80 1.20 8.64 ( b ) Left side from U \ S 1 4.00 1.80 1.20 8.64 Side wall 2 4.00 1.80 1.20 17.28 ,, Wing wall 2 3.60 1.80 1.20 15.55 ,, Toe wall 1 20.00 0.75 0.30 4.50 ,, 1 20.00 0.60 0.15 1.80 ,,
Total Item-- 3 A = 118.8
1 cu.m
3 B R.R.S.M. ( 1:6 ) for super structure above NSL
Head wall (over flow sec. ) 1 20.00 1.94 1.00 38.80 cu.m
Head wall Exe. ( a ) Right side from U \ S 1 4.00 1.20 2.00 9.60 ,, ( b ) Left side from U \ S 1 4.00 1.20 2.00 9.60 Side wall 2 4.00 1.30 2.70 28.08 ,, Wing wall 2 3.60 1.08 2.40 18.66 ,, Toe wall 1 20.00 0.45 0.30 2.70 ,,
Total Item - 3 B = 107.4
5 cu.m
Total Item - 3 A + 3 B =
226.26
cu.m
4
RR stone khuranja in CM 1:6 of 23cm 1 20.00 3.00 60.00 Sqm
5 C . C . Coping in C.M. 1 : 2 : 4 Headwall Crest