In-flight Catering Facility at Muscat International Airports Contractors Documentation Review Sheet Alhatmy Engineering Consultancy LLC Ref.: Contract MC13 Contract or GAL Received Package In-flight Catering Ref. No. Response by Interim Design Detailed Design Issued for Construction As Built O & M OTHER Resubmission No Yes Doc No./ Drawing List Title Date Revisi on SE-GAL-STAS-G-3240000-00001-B General Structural Notes 25.03.201 4 B SE-GAL-STAS-G-3240000-00002-B General Structural Details (Sheet 1 of 3) 25.03.201 4 B SE-GAL-STAS-G-3240000-00003-B General Structural Details (Sheet 2 of 3) 25.03.201 4 B SE-GAL-STAS-G-3240000-00004-B General Structural Details (Sheet 3 of 3) 25.03.201 4 B SE-GAL-STAS-U-3360000-00001-B Column axis layout. Key plan 25.03.201 4 B SE-GAL-STAS-U-3360000-00002-B Basement roof beam-slab & plinth layout. Key plan 25.03.201 4 B SE-GAL-STAS-P-3360000-00003-B Basement floor reinf. Detail(Raft pile) Key plan 25.03.201 4 B SE-GAL-STAS-P-3360000-00004-B Ground floor roof beams & slabs layout. Key 25.03.201 B Page 1 of 18
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
In-flight Catering Facility at Muscat International Airports
01 Nominal cove to be mentioned for all structural elements.
02 Schedule of beam and slab to be matched with general details.
03 Nominal cover and all structural level to be mentioned.
04 Nominal cover to be mentioned.
05 Approved subject to satisfactory design calculation.Comments of design calculation to be fulfilled.
06 Approved subject to satisfactory design calculation.Comments of design calculation to be fulfilled.
07 Approved subject to satisfactory design calculation.Comments of design calculation to be fulfilled.
08 Approved subject to satisfactory design calculation.Comments of design calculation to be fulfilled.
09 Approved subject to satisfactory design calculation.Schedule to be matched with general structural detail.Comments of design calculation to be fulfilled.
10 Approved subject to satisfactory design calculation.Schedule to be matched with general structural detail.Comments of design calculation to be fulfilled.
11 Approved subject to satisfactory design calculation.Schedule to be matched with general structural detail.Steel structure connection detail to be provided.
In-flight Catering Facility at Muscat International Airports
12 Approved subject to satisfactory design calculation.Gap of expansion joint to be 20mm to tally the sway calculation.Comments of design calculation to be fulfilled.
13 Approved subject to satisfactory design calculation.Gap of expansion joint to be 20mm to tally the sway calculation.Comments of design calculation to be fulfilled.
14 Approved subject to satisfactory design calculation.Gap of expansion joint to be 20mm to tally the sway calculation.Comments of design calculation to be fulfilled.
15 Approved subject to satisfactory design calculation.Gap of expansion joint to be 20mm to tally the sway calculation.Comments of design calculation to be fulfilled.
16 Approved subject to satisfactory design calculation.Gap of expansion joint to be 20mm to tally the sway calculation.Comments of design calculation to be fulfilled.
17 Approved subject to satisfactory design calculation.Comments of design calculation to be fulfilled.
18 Approved subject to satisfactory design calculation.Waterproofing to be done as detail in tender drawings.Comments of design calculation to be fulfilled.
19 Approved subject to satisfactory design calculation.Instead of indicative length, actual reinforcement length to be provided.Comments of design calculation to be fulfilled.
20 Approved subject to satisfactory design calculation.Instead of indicative length, actual reinforcement length to be provided.
In-flight Catering Facility at Muscat International Airports
21 Approved subject to satisfactory design calculation.Instead of indicative length, actual reinforcement length to be provided.Comments of design calculation to be fulfilled.
22 Approved subject to satisfactory design calculation.Instead of indicative length, actual reinforcement length to be provided.Comments of design calculation to be fulfilled.
23 Approved subject to satisfactory design calculation.Instead of indicative length, actual reinforcement length to be provided.Comments of design calculation to be fulfilled.
24 Approved subject to satisfactory design calculation.Instead of indicative length, actual reinforcement length to be provided.Comments of design calculation to be fulfilled.
25 Approved subject to satisfactory design calculation.Instead of indicative length, actual reinforcement length to be provided.Comments of design calculation to be fulfilled.
26 Approved subject to satisfactory design calculation.Instead of indicative length, actual reinforcement length to be provided.Comments of design calculation to be fulfilled.
27 Approved subject to satisfactory design calculation.Instead of indicative length, actual reinforcement length to be provided.Comments of design calculation to be fulfilled.
28 Approved subject to satisfactory design calculation.Instead of indicative length, actual reinforcement length to be provided.Comments of design calculation to be fulfilled.
29 Approved subject to satisfactory design calculation.
In-flight Catering Facility at Muscat International Airports
Waterproofing to be done as detail in tender drawings.Comments of design calculation to be fulfilled.
30 Approved subject to satisfactory design calculation.Nominal cover to be mentioned.Comments of design calculation to be fulfilled.
31 Approved subject to satisfactory design calculation.Nominal cover to be mentioned.Comments of design calculation to be fulfilled.
32 Approved subject to satisfactory design calculation.Gap of expansion joint to be 20mm to tally the sway calculation.Comments of design calculation to be fulfilled.
33 Approved subject to satisfactory design calculation.Nominal cover to be specified.Comments of design calculation to be fulfilled.
34 Approved subject to satisfactory design calculation.Instead of indicative length, actual reinforcement length to be provided.Comments of design calculation to be fulfilled.
35 Approved subject to satisfactory design calculation.Instead of indicative length, actual reinforcement length to be provided.Comments of design calculation to be fulfilled.
36 Approved subject to satisfactory design calculation.Instead of indicative length, actual reinforcement length to be provided.Comments of design calculation to be fulfilled.
37 Approved subject to satisfactory design calculation.Instead of indicative length, actual reinforcement length to be provided.Comments of design calculation to be fulfilled.
In-flight Catering Facility at Muscat International Airports
38 Approved subject to satisfactory design calculation.Instead of indicative length, actual reinforcement length to be provided.Comments of design calculation to be fulfilled.
39 Approved subject to satisfactory design calculation.Instead of indicative length, actual reinforcement length to be provided.Comments of design calculation to be fulfilled.
40 Approved subject to satisfactory design calculation.Instead of indicative length, actual reinforcement length to be provided.Comments of design calculation to be fulfilled.
41 Approved subject to satisfactory design calculation.Instead of indicative length, actual reinforcement length to be provided.Comments of design calculation to be fulfilled.
42 Approved subject to satisfactory design calculation.Comments of design calculation to be fulfilled.
43 Approved subject to satisfactory design calculation.All invert level to be specified.
44 Approved subject to satisfactory design calculation.Comments of design calculation to be fulfilled.
45 Approved subject to satisfactory design calculation.Sunk depth and position to be matched with actual equipment layout.Gap of expansion joint to be 20mm to tally the sway calculation.Comments of design calculation to be fulfilled.
46 Approved subject to satisfactory design calculation.Sunk depth and position to be matched with actual equipment layout.Gap of expansion joint to be 20mm to tally the sway calculation.Comments of design calculation to be fulfilled.
In-flight Catering Facility at Muscat International Airports
47 Approved subject to satisfactory design calculation.Sunk depth and position to be matched with actual equipment layout.Gap of expansion joint to be 20mm to tally the sway calculation.Comments of design calculation to be fulfilled.
48 Approved subject to satisfactory design calculation.Sunk depth and position to be matched with actual equipment layout.Gap of expansion joint to be 20mm to tally the sway calculation.Comments of design calculation to be fulfilled.
49 Approved subject to satisfactory design calculation.Sunk depth and position to be matched with actual equipment layout.Gap of expansion joint to be 20mm to tally the sway calculation.Comments of design calculation to be fulfilled.
50 Approved subject to satisfactory design calculation.Gap of expansion joint to be 20mm to tally the sway calculation.Comments of design calculation to be fulfilled.
51 Approved subject to satisfactory design calculation.Gap of expansion joint to be 20mm to tally the sway calculation.Comments of design calculation to be fulfilled.
52 Approved subject to satisfactory design calculation.Gap of expansion joint to be 20mm to tally the sway calculation.Comments of design calculation to be fulfilled.
53 Approved subject to satisfactory design calculation.Gap of expansion joint to be 20mm to tally the sway calculation.Comments of design calculation to be fulfilled.
54 Approved subject to satisfactory design calculation.Gap of expansion joint to be 20mm to tally the sway calculation.
In-flight Catering Facility at Muscat International Airports
55 Approved subject to satisfactory design calculation.Gap of expansion joint to be 20mm to tally the sway calculation.Comments of design calculation to be fulfilled.
56 Approved subject to satisfactory design calculation.Gap of expansion joint to be 20mm to tally the sway calculation.Comments of design calculation to be fulfilled.
57 Approved subject to satisfactory design calculation.Gap of expansion joint to be 20mm to tally the sway calculation.Comments of design calculation to be fulfilled.
58 Approved subject to satisfactory design calculation.Gap of expansion joint to be 20mm to tally the sway calculation.Comments of design calculation to be fulfilled.
59 Approved subject to satisfactory design calculation.Sunk depth and position to be matched with actual equipment layout.Gap of expansion joint to be 20mm to tally the sway calculation.Comments of design calculation to be fulfilled.
60 Approved subject to satisfactory design calculation.Sunk depth and position to be matched with actual equipment layout.Gap of expansion joint to be 20mm to tally the sway calculation.Comments of design calculation to be fulfilled.
61 Approved subject to satisfactory design calculation.Sunk depth and position to be matched with actual equipment layout.Gap of expansion joint to be 20mm to tally the sway calculation.Comments of design calculation to be fulfilled.
62 Approved subject to satisfactory design calculation.
In-flight Catering Facility at Muscat International Airports
Sunk depth and position to be matched with actual equipment layout.Gap of expansion joint to be 20mm to tally the sway calculation.Comments of design calculation to be fulfilled.
63 Approved subject to satisfactory design calculation.Sunk depth and position to be matched with actual equipment layout.Gap of expansion joint to be 20mm to tally the sway calculation.Comments of design calculation to be fulfilled.
64 Approved subject to satisfactory design calculation.Gap of expansion joint to be 20mm to tally the sway calculation.Comments of design calculation to be fulfilled.
65 Approved subject to satisfactory design calculation.Gap of expansion joint to be 20mm to tally the sway calculation.Comments of design calculation to be fulfilled.
66 Approved subject to satisfactory design calculation.Gap of expansion joint to be 20mm to tally the sway calculation.Comments of design calculation to be fulfilled.
67 Approved subject to satisfactory design calculation.Gap of expansion joint to be 20mm to tally the sway calculation.Comments of design calculation to be fulfilled.
68 Approved subject to satisfactory design calculation.Gap of expansion joint to be 20mm to tally the sway calculation.Comments of design calculation to be fulfilled.
69 Approved subject to satisfactory design calculation.Gap of expansion joint to be 20mm to tally the sway calculation.Comments of design calculation to be fulfilled.
In-flight Catering Facility at Muscat International Airports
Code A Reviewed and/or approved- no comments. Code D Not considered, Re-submitCode B Reviewed and/or approved with Comments Code E Review and/or approval not requiredCode C Reviewed, do not proceed or not approved
All comments are in respect of a review and shall not be deemed an approval unless explicitly and unambiguously expressed as such.
'The Engineer's review/approval shall NOT relieve the Contractor from any obligation or responsibility under the Contract'