In-flight Catering Facility at Muscat International Airports Contractors Documentation Review Sheet Alhatmy Engineering Consultancy LLC Ref.: Contract MC13 Contract or GAL Received Package In-flight Catering Ref. No. Response by Interim Design Detailed Design Issued for Construction As Built O & M OTHER Resubmission No Yes Doc No./ Drawing List Title Date Revisi on SE-GAL-STAS-G-3240000-00001-B General Structural Notes 25.03.201 4 B SE-GAL-STAS-G-3240000-00002-B General Structural Details (Sheet 1 of 3) 25.03.201 4 B SE-GAL-STAS-G-3240000-00003-B General Structural Details (Sheet 2 of 3) 25.03.201 4 B SE-GAL-STAS-G-3240000-00004-B General Structural Details (Sheet 3 of 3) 25.03.201 4 B SE-GAL-STAS-U-3360000-00001-B Column axis layout. Key plan 25.03.201 4 B SE-GAL-STAS-U-3360000-00002-B Basement roof beam-slab & plinth layout. Key plan 25.03.201 4 B SE-GAL-STAS-P-3360000-00003-B Basement floor reinf. Detail(Raft pile) Key plan 25.03.201 4 B SE-GAL-STAS-P-3360000-00004-B Ground floor roof beams & slabs layout. Key 25.03.201 B Page 1 of 18
18
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Review Sheet 07041402 Rev B

In-flight Catering Facility at Muscat International Airports

Contractors Documentation Review Sheet Alhatmy Engineering Consultancy LLC

Ref.:

Contract MC13 Contractor GAL Received

Package In-flight Catering Ref. No. Response by

Interim Design Detailed Design Issued for Construction As Built O & M OTHER Resubmission No Yes

Doc No./ Drawing List Title Date Revision

SE-GAL-STAS-G-3240000-00001-B General Structural Notes 25.03.2014 B

SE-GAL-STAS-G-3240000-00002-B General Structural Details (Sheet 1 of 3) 25.03.2014 B

SE-GAL-STAS-G-3240000-00003-B General Structural Details (Sheet 2 of 3) 25.03.2014 B

SE-GAL-STAS-G-3240000-00004-B General Structural Details (Sheet 3 of 3) 25.03.2014 B

SE-GAL-STAS-U-3360000-00001-B Column axis layout. Key plan 25.03.2014 B

SE-GAL-STAS-U-3360000-00002-B Basement roof beam-slab & plinth layout. Key plan 25.03.2014 B

SE-GAL-STAS-P-3360000-00003-B Basement floor reinf. Detail(Raft pile) Key plan 25.03.2014 B

SE-GAL-STAS-P-3360000-00004-B Ground floor roof beams & slabs layout. Key plan 25.03.2014 B

SE-GAL-STAS-U-3360000-00005-B Beams & slabs schedule 25.03.2014 B

SE-GAL-STAS-U-3690000-00001-BFoundation Plan & Column Axis Layout (For Gate &Guard Room)

25.03.2014 B

SE-GAL-STAS-U-3690000-00002-C Plinth Beams & Roof Slab Layout (For Gate &Guard Room) 25.03.2014 C

SE-GAL-STSB-P-324B1S0-00006-B Pile Cap Layout (Sheet 1 of 5) 25.03.2014 B

SE-GAL-STSB-P-324B1S1-00007-B Pile Cap Layout (Sheet 2 of 5) 25.03.2014 B

SE-GAL-STSB-P-324B1S2-00008-B Pile Cap Layout (Sheet 3 of 5) 25.03.2014 B

SE-GAL-STSB-P-324B1S3-00009-B Pile Cap Layout (Sheet 4 of 5) 25.03.2014 B

SE-GAL-STSB-P-324B1S4-00010-B Pile Cap Layout (Sheet 5 of 5) 25.03.2014 B

SE-GAL-STSB-P-336B1S0-00001-B Service block, Pile cap layout 25.03.2014 B

Page 1 of 13

Page 2: Review Sheet 07041402 Rev B

In-flight Catering Facility at Muscat International Airports

Contractors Documentation Review Sheet Alhatmy Engineering Consultancy LLC

Ref.:

SE-GAL-STSE-D-3240000-00002-B Typ. RC details of pile cap 25.03.2014 B

SE-GAL-STSE-D-3240000-00003-B Details of Staircase No. -01 (Sheet 1 of 2) 25.03.2014 B

SE-GAL-STSE-D-3240000-00004-B Details of Staircase No. -01 (Sheet 2 of 2) 25.03.2014 B

SE-GAL-STSE-D-3240000-00005-B Details of Staircase No. -02 25.03.2014 B

SE-GAL-STSE-D-3240000-00006-B Details of Staircase No. -03 (Sheet 1 of 2) 25.03.2014 B

SE-GAL-STSE-D-3240000-00007-B Details of Staircase No. -03 (Sheet 2 of 2) 25.03.2014 B

SE-GAL-STSE-D-3240000-00008-B Details of Staircase No. -04 25.03.2014 B

SE-GAL-STSE-D-3240000-00009-B Details of Staircase No. -05 25.03.2014 B

SE-GAL-STSE-D-3240000-00010-B Details of Staircase No. -06 25.03.2014 B

SE-GAL-STSE-D-3240000-00011-B Details of Staircase No. -07 25.03.2014 B

SE-GAL-STSE-D-3240000-00012-B Details of Stair Roof 25.03.2014 B

SE-GAL-STSE-D-3360000-00001-B Typical RC details of Pile cap 25.03.2014 B

SE-GAL-STSE-H-3240000-00001-B Column Schedules & RC wall Details 25.03.2014 B

SE-GAL-STSE-H-3360000-00001-B Column Schedules & Details 25.03.2014 B

SE-GAL-STSF-S-32400S0-00001-B Plinth Beam Layout 25.03.2014 B

SE-GAL-STSE-S-32401S0-00001-B Long Sections of Roof beam 25.03.2014 B

SE-GAL-STSE-U-324ETAE-00001-B External Sections & Details (Sheet 1 of 8) 25.03.2014 B

SE-GAL-STSE-U-324ETAE-00002-B External Sections & Details (Sheet 2 of 8) 25.03.2014 B

SE-GAL-STSE-U-324ETAE-00003-B External Sections & Details (Sheet 3 of 8) 25.03.2014 B

SE-GAL-STSE-U-324ETAE-00004-B External Sections & Details (Sheet 4 of 8) 25.03.2014 B

SE-GAL-STSE-U-324ETAE-00005-B External Sections & Details (Sheet 5 of 8) 25.03.2014 B

SE-GAL-STSE-U-324ETAE-00006-B External Sections & Details (Sheet 6 of 8) 25.03.2014 B

SE-GAL-STSE-U-324ETAE-00007-B External Sections & Details (Sheet 7 of 8) 25.03.2014 B

SE-GAL-STSE-U-324ETAE-00008-B External Sections & Details (Sheet 8 of 8) 25.03.2014 B

Page 3: Review Sheet 07041402 Rev B

In-flight Catering Facility at Muscat International Airports

Contractors Documentation Review Sheet Alhatmy Engineering Consultancy LLC

Ref.:

SE-GAL-STSE-U-324ETAE-00009-B Vacuum Tunnel piling 25.03.2014 B

SE-GAL-STSE-U-324ETAE-00010-B Manhole details 25.03.2014 B

SE-GAL-STSE-U-3360000-00001-B General sections 25.03.2014 B

SE-GAL-STSF-P-324RIS0-00026-B General Arrangement at Roof-1 (Sheet 1 of 5) 25.03.2014 B

SE-GAL-STSF-P-324RIS1-00027-B General Arrangement at Roof-1 (Sheet 2 of 5) 25.03.2014 B

SE-GAL-STSF-P-324RIS2-00028-B General Arrangement at Roof-1 (Sheet 3 of 5) 25.03.2014 B

SE-GAL-STSF-P-324RIS3-00029-B General Arrangement at Roof-1 (Sheet 4 of 5) 25.03.2014 B

SE-GAL-STSF-P-324RIS4-00030-B General Arrangement at Roof-1 (Sheet 5 of 5) 25.03.2014 B

SE-GAL-STSF-P-324R2S0-00031-B General Arrangement at Roof-2 25.03.2014 B

SE-GAL-STSF-P-324R2S1-00032-B General Arrangement at Roof-2 (Sheet 1 of 3) 25.03.2014 B

SE-GAL-STSF-P-324R2S3-00033-B General Arrangement at Roof-2 (Sheet 2 of 3) 25.03.2014 B

SE-GAL-STSF-P-324R2S4-00034-B General Arrangement at Roof-2 (Sheet 3 of 3) 25.03.2014 B

SE-GAL-STSF-P-32400S0-00016-B Plinth Beam Layout (Sheet 1 of 5) 25.03.2014 B

SE-GAL-STSF-P-32400S1-00017-B Plinth Beam Layout (Sheet 2 of 5) 25.03.2014 B

SE-GAL-STSF-P-32400S2-00018-B Plinth Beam Layout (Sheet 3 of 5) 25.03.2014 B

SE-GAL-STSF-P-32400S3-00019-B Plinth Beam Layout (Sheet 4 of 5) 25.03.2014 B

SE-GAL-STSF-P-32400S4-00020-B Plinth Beam Layout (Sheet 5 of 5) 25.03.2014 B

SE-GAL-STSF-P-32401S0-000021-B General Arrangement at First Floor Level (Sheet 1 of 5) 25.03.2014 B

SE-GAL-STSF-P-32401S1-000022-B General Arrangement at First Floor Level (Sheet 2 of 5) 25.03.2014 B

SE-GAL-STSF-P-32401S2-000023-B General Arrangement at First Floor Level (Sheet 3 of 5) 25.03.2014 B

SE-GAL-STSF-P-32401S3-000024-B General Arrangement at First Floor Level (Sheet 4 of 5) 25.03.2014 B

SE-GAL-STSF-P-32401S4-000025-B General Arrangement at First Floor Level (Sheet 5 of 5) 25.03.2014 B

SE-GAL-STSF-S-324R3S0-00001-A General Arrangement at Roof-3 25.03.2014 B

SE-GAL-STSP-P-324B1S0-00011-C Column Axis Layout (Sheet 1 of 5) 25.03.2014 C

Page 4: Review Sheet 07041402 Rev B

In-flight Catering Facility at Muscat International Airports

Contractors Documentation Review Sheet Alhatmy Engineering Consultancy LLC

Ref.:

SE-GAL-STSP-P-324B1S1-00012-C Column Axis Layout (Sheet 2 of 5) 25.03.2014 C

SE-GAL-STSP-P-324B1S2-00013-C Column Axis Layout (Sheet 3 of 5) 25.03.2014 C

SE-GAL-STSP-P-324B1S3-00014-C Column Axis Layout (Sheet 4 of 5) 25.03.2014 C

SE-GAL-STSP-P-324B1S4-00015-C Column Axis Layout (Sheet 5 of 5) 25.03.2014 C

Page 5: Review Sheet 07041402 Rev B

In-flight Catering Facility at Muscat International Airports

Contractors Documentation Review Sheet Alhatmy Engineering Consultancy LLC

Ref.:

DisciplineRef. No.

Comments Commentsincorporated

by Contractor

Discipline Yes/No

01 Nominal cove to be mentioned for all structural elements.

02 Schedule of beam and slab to be matched with general details.

03 Nominal cover and all structural level to be mentioned.

04 Nominal cover to be mentioned.

05 Approved subject to satisfactory design calculation.Comments of design calculation to be fulfilled.

06 Approved subject to satisfactory design calculation.Comments of design calculation to be fulfilled.

07 Approved subject to satisfactory design calculation.Comments of design calculation to be fulfilled.

08 Approved subject to satisfactory design calculation.Comments of design calculation to be fulfilled.

09 Approved subject to satisfactory design calculation.Schedule to be matched with general structural detail.Comments of design calculation to be fulfilled.

10 Approved subject to satisfactory design calculation.Schedule to be matched with general structural detail.Comments of design calculation to be fulfilled.

11 Approved subject to satisfactory design calculation.Schedule to be matched with general structural detail.Steel structure connection detail to be provided.

Page 6: Review Sheet 07041402 Rev B

In-flight Catering Facility at Muscat International Airports

Contractors Documentation Review Sheet Alhatmy Engineering Consultancy LLC

Ref.:

Comments of design calculation to be fulfilled.

12 Approved subject to satisfactory design calculation.Gap of expansion joint to be 20mm to tally the sway calculation.Comments of design calculation to be fulfilled.

13 Approved subject to satisfactory design calculation.Gap of expansion joint to be 20mm to tally the sway calculation.Comments of design calculation to be fulfilled.

14 Approved subject to satisfactory design calculation.Gap of expansion joint to be 20mm to tally the sway calculation.Comments of design calculation to be fulfilled.

15 Approved subject to satisfactory design calculation.Gap of expansion joint to be 20mm to tally the sway calculation.Comments of design calculation to be fulfilled.

16 Approved subject to satisfactory design calculation.Gap of expansion joint to be 20mm to tally the sway calculation.Comments of design calculation to be fulfilled.

17 Approved subject to satisfactory design calculation.Comments of design calculation to be fulfilled.

18 Approved subject to satisfactory design calculation.Waterproofing to be done as detail in tender drawings.Comments of design calculation to be fulfilled.

19 Approved subject to satisfactory design calculation.Instead of indicative length, actual reinforcement length to be provided.Comments of design calculation to be fulfilled.

20 Approved subject to satisfactory design calculation.Instead of indicative length, actual reinforcement length to be provided.

Page 7: Review Sheet 07041402 Rev B

In-flight Catering Facility at Muscat International Airports

Contractors Documentation Review Sheet Alhatmy Engineering Consultancy LLC

Ref.:

Comments of design calculation to be fulfilled.

21 Approved subject to satisfactory design calculation.Instead of indicative length, actual reinforcement length to be provided.Comments of design calculation to be fulfilled.

22 Approved subject to satisfactory design calculation.Instead of indicative length, actual reinforcement length to be provided.Comments of design calculation to be fulfilled.

23 Approved subject to satisfactory design calculation.Instead of indicative length, actual reinforcement length to be provided.Comments of design calculation to be fulfilled.

24 Approved subject to satisfactory design calculation.Instead of indicative length, actual reinforcement length to be provided.Comments of design calculation to be fulfilled.

25 Approved subject to satisfactory design calculation.Instead of indicative length, actual reinforcement length to be provided.Comments of design calculation to be fulfilled.

26 Approved subject to satisfactory design calculation.Instead of indicative length, actual reinforcement length to be provided.Comments of design calculation to be fulfilled.

27 Approved subject to satisfactory design calculation.Instead of indicative length, actual reinforcement length to be provided.Comments of design calculation to be fulfilled.

28 Approved subject to satisfactory design calculation.Instead of indicative length, actual reinforcement length to be provided.Comments of design calculation to be fulfilled.

29 Approved subject to satisfactory design calculation.

Page 8: Review Sheet 07041402 Rev B

In-flight Catering Facility at Muscat International Airports

Contractors Documentation Review Sheet Alhatmy Engineering Consultancy LLC

Ref.:

Waterproofing to be done as detail in tender drawings.Comments of design calculation to be fulfilled.

30 Approved subject to satisfactory design calculation.Nominal cover to be mentioned.Comments of design calculation to be fulfilled.

31 Approved subject to satisfactory design calculation.Nominal cover to be mentioned.Comments of design calculation to be fulfilled.

32 Approved subject to satisfactory design calculation.Gap of expansion joint to be 20mm to tally the sway calculation.Comments of design calculation to be fulfilled.

33 Approved subject to satisfactory design calculation.Nominal cover to be specified.Comments of design calculation to be fulfilled.

34 Approved subject to satisfactory design calculation.Instead of indicative length, actual reinforcement length to be provided.Comments of design calculation to be fulfilled.

35 Approved subject to satisfactory design calculation.Instead of indicative length, actual reinforcement length to be provided.Comments of design calculation to be fulfilled.

36 Approved subject to satisfactory design calculation.Instead of indicative length, actual reinforcement length to be provided.Comments of design calculation to be fulfilled.

37 Approved subject to satisfactory design calculation.Instead of indicative length, actual reinforcement length to be provided.Comments of design calculation to be fulfilled.

Page 9: Review Sheet 07041402 Rev B

In-flight Catering Facility at Muscat International Airports

Contractors Documentation Review Sheet Alhatmy Engineering Consultancy LLC

Ref.:

38 Approved subject to satisfactory design calculation.Instead of indicative length, actual reinforcement length to be provided.Comments of design calculation to be fulfilled.

39 Approved subject to satisfactory design calculation.Instead of indicative length, actual reinforcement length to be provided.Comments of design calculation to be fulfilled.

40 Approved subject to satisfactory design calculation.Instead of indicative length, actual reinforcement length to be provided.Comments of design calculation to be fulfilled.

41 Approved subject to satisfactory design calculation.Instead of indicative length, actual reinforcement length to be provided.Comments of design calculation to be fulfilled.

42 Approved subject to satisfactory design calculation.Comments of design calculation to be fulfilled.

43 Approved subject to satisfactory design calculation.All invert level to be specified.

44 Approved subject to satisfactory design calculation.Comments of design calculation to be fulfilled.

45 Approved subject to satisfactory design calculation.Sunk depth and position to be matched with actual equipment layout.Gap of expansion joint to be 20mm to tally the sway calculation.Comments of design calculation to be fulfilled.

46 Approved subject to satisfactory design calculation.Sunk depth and position to be matched with actual equipment layout.Gap of expansion joint to be 20mm to tally the sway calculation.Comments of design calculation to be fulfilled.

Page 10: Review Sheet 07041402 Rev B

In-flight Catering Facility at Muscat International Airports

Contractors Documentation Review Sheet Alhatmy Engineering Consultancy LLC

Ref.:

47 Approved subject to satisfactory design calculation.Sunk depth and position to be matched with actual equipment layout.Gap of expansion joint to be 20mm to tally the sway calculation.Comments of design calculation to be fulfilled.

48 Approved subject to satisfactory design calculation.Sunk depth and position to be matched with actual equipment layout.Gap of expansion joint to be 20mm to tally the sway calculation.Comments of design calculation to be fulfilled.

49 Approved subject to satisfactory design calculation.Sunk depth and position to be matched with actual equipment layout.Gap of expansion joint to be 20mm to tally the sway calculation.Comments of design calculation to be fulfilled.

50 Approved subject to satisfactory design calculation.Gap of expansion joint to be 20mm to tally the sway calculation.Comments of design calculation to be fulfilled.

51 Approved subject to satisfactory design calculation.Gap of expansion joint to be 20mm to tally the sway calculation.Comments of design calculation to be fulfilled.

52 Approved subject to satisfactory design calculation.Gap of expansion joint to be 20mm to tally the sway calculation.Comments of design calculation to be fulfilled.

53 Approved subject to satisfactory design calculation.Gap of expansion joint to be 20mm to tally the sway calculation.Comments of design calculation to be fulfilled.

54 Approved subject to satisfactory design calculation.Gap of expansion joint to be 20mm to tally the sway calculation.

Page 11: Review Sheet 07041402 Rev B

In-flight Catering Facility at Muscat International Airports

Contractors Documentation Review Sheet Alhatmy Engineering Consultancy LLC

Ref.:

Comments of design calculation to be fulfilled.

55 Approved subject to satisfactory design calculation.Gap of expansion joint to be 20mm to tally the sway calculation.Comments of design calculation to be fulfilled.

56 Approved subject to satisfactory design calculation.Gap of expansion joint to be 20mm to tally the sway calculation.Comments of design calculation to be fulfilled.

57 Approved subject to satisfactory design calculation.Gap of expansion joint to be 20mm to tally the sway calculation.Comments of design calculation to be fulfilled.

58 Approved subject to satisfactory design calculation.Gap of expansion joint to be 20mm to tally the sway calculation.Comments of design calculation to be fulfilled.

59 Approved subject to satisfactory design calculation.Sunk depth and position to be matched with actual equipment layout.Gap of expansion joint to be 20mm to tally the sway calculation.Comments of design calculation to be fulfilled.

60 Approved subject to satisfactory design calculation.Sunk depth and position to be matched with actual equipment layout.Gap of expansion joint to be 20mm to tally the sway calculation.Comments of design calculation to be fulfilled.

61 Approved subject to satisfactory design calculation.Sunk depth and position to be matched with actual equipment layout.Gap of expansion joint to be 20mm to tally the sway calculation.Comments of design calculation to be fulfilled.

62 Approved subject to satisfactory design calculation.

Page 12: Review Sheet 07041402 Rev B

In-flight Catering Facility at Muscat International Airports

Contractors Documentation Review Sheet Alhatmy Engineering Consultancy LLC

Ref.:

Sunk depth and position to be matched with actual equipment layout.Gap of expansion joint to be 20mm to tally the sway calculation.Comments of design calculation to be fulfilled.

63 Approved subject to satisfactory design calculation.Sunk depth and position to be matched with actual equipment layout.Gap of expansion joint to be 20mm to tally the sway calculation.Comments of design calculation to be fulfilled.

64 Approved subject to satisfactory design calculation.Gap of expansion joint to be 20mm to tally the sway calculation.Comments of design calculation to be fulfilled.

65 Approved subject to satisfactory design calculation.Gap of expansion joint to be 20mm to tally the sway calculation.Comments of design calculation to be fulfilled.

66 Approved subject to satisfactory design calculation.Gap of expansion joint to be 20mm to tally the sway calculation.Comments of design calculation to be fulfilled.

67 Approved subject to satisfactory design calculation.Gap of expansion joint to be 20mm to tally the sway calculation.Comments of design calculation to be fulfilled.

68 Approved subject to satisfactory design calculation.Gap of expansion joint to be 20mm to tally the sway calculation.Comments of design calculation to be fulfilled.

69 Approved subject to satisfactory design calculation.Gap of expansion joint to be 20mm to tally the sway calculation.Comments of design calculation to be fulfilled.

Page 13: Review Sheet 07041402 Rev B

In-flight Catering Facility at Muscat International Airports

Contractors Documentation Review Sheet Alhatmy Engineering Consultancy LLC

Ref.:

Reviewed by (DL)/signature Review Code

Code A Reviewed and/or approved- no comments. Code D Not considered, Re-submitCode B Reviewed and/or approved with Comments Code E Review and/or approval not requiredCode C Reviewed, do not proceed or not approved

All comments are in respect of a review and shall not be deemed an approval unless explicitly and unambiguously expressed as such.

'The Engineer's review/approval shall NOT relieve the Contractor from any obligation or responsibility under the Contract'