  • 8/3/2019 Rev.angamnwadi Estimate New Plan Gi Roof 1011 Cement Steel New Rate Wag Roa Check

    1/19

    Estimated Cost 400000.00

    2010-2011AHMEDNAGAR ZILLA PARISHAD AHMEDNAGAR

    Z.P.(P.W.) Sub-Dn. AkoleName of Work :- Construction of AganwadiBuilding______________________Tal. Akole Dist .

    Ahmednager

  • 8/3/2019 Rev.angamnwadi Estimate New Plan Gi Roof 1011 Cement Steel New Rate Wag Roa Check

    2/19

    Sanction estimate No.

    Fund Head

    Major Head

    Minor Head

    Service Head

    Rs.

    Adm. App. Under Adminstrtively Approved by C.E.O.Z.P.Ahmednagar.No. Vide No:- Date

    Executive Engineer Z.P.P.W.North Division AhmednagarDate Date

    Estimate prepared by Shri. J. B. Shinde Jr. Engr.

    Checked by Shri. P. N. Wakchaure, Sect. Engr.

    Authority

    Technical. Sanctioned

    Under No.

    As per Above Sanctioned Adminstrative Approval by

    C.E.O.Z.P.AhmednagarGENERAL DESCRIPTION

    400000.00

    Estimate framed in the office of the Deputy Engineer,Zilla Parishad (P. W.) Sub-Dn.

    Akole and the probable expeses that will be incurred in

    Name of Work :- Construction of Aganwadi Building______________________Tal.

    Akole Dist . Ahmednager

    AHMEDNAGAR ZILLA PARISHAD AHMEDNAGAR

    E S T I M A T E

    N f W k C t ti f A di B ildi T l

  • 8/3/2019 Rev.angamnwadi Estimate New Plan Gi Roof 1011 Cement Steel New Rate Wag Roa Check

    3/19

    1 Rs. 399670.002) Rs. 330.00

    Total Rs. 400000.00

    GrandTotal Rs. Rs. 400000.00

    Say Rs. 400000.00

    Prepared by

    Deputy EngineerZ.P.(P.W.) Sub-Dn. Akole

    Name of Work :- Construction of Aganwadi Building______________________Tal.

    Akole Dist . Ahmednager

    RECAPULATION SHEET

    Work Portion

    Sect. Engr.

    Contegencies

    ENERAL DE RIPTI N

  • 8/3/2019 Rev.angamnwadi Estimate New Plan Gi Roof 1011 Cement Steel New Rate Wag Roa Check

    4/19

    400000.00

    3) Plinth :-Plinth level is proposed 0.60 m from avg. ground

    level.RCC M 15 coping & U.C.R. masonary of 0.45 m thk.in plinth in C.M.

    1:6 is proposed.

    4) Superstructure :- BB masonary using second class burnt bricks

    of 0.23 m thk. In 1:6.

    11) D S R Addopted :- While preparing this estimate rates are taken

    7) Flooring :- Ceramic tiles of approved quality and size, 7 mmthick for flooring & W.C. with glazed tiles.

    8)Internal plaster :- 12mm tk. Singel coat cement plaster with neeru

    finish in C:M 1:4 is proposed.

    9)External plaster :- For external plaster 20mm tk in two coats

    without neeru finish in C:M 1:4 is proposed.10) Painting :- For internal washable oil bound distemper of

    approved colour with two coats of waterproof cement paint is proposed.

    5)Doors & Windows :- For door steel frame of angle 50 x 50 x 6mm

    .and plain planked door shutter W. C. are proposed. For window steelwindow with welded square bars is provided & RCC Jali for WC/Urinal

    6) Roof:- Truss of structural steel with M. S. angel 65mmx65mmx6mm

    Tie Beam & other members of trusses of structural steel with

    50mmx50mmx6mm used. Roofing C.G.I.sheet of 80mm thickness

    (22B.W.G.).is proposed.

    ENERAL DE RIPTI N

    .

    Name of Work :- Construction of Aganwadi Building______________________Tal. Akole

    Dist . Ahmednager

    Type of structure : -Load Bearing structure.

    PROVISIONS MADE IN THE ESTIMATE AS BELOW

    1) Administrative approval :- a) Chief Executive Officer Z . P.Ahmednagar vide order No. Ahmednager Dt.

    / /2011

    2) Foundation :- For foundation P.C.C, 1:4:8 of 0.15 m thk for

    levelling course , UCR Masonary in 1:6 for foundation

    Name of Work : Construction of Aganwadi Building Tal Akole

  • 8/3/2019 Rev.angamnwadi Estimate New Plan Gi Roof 1011 Cement Steel New Rate Wag Roa Check

    5/19

    Qty. Unit Item of work Rate Per Amount

    20.22 CuM Item No. 1:- Excavation for foundation in earth, soil of all

    types, sand, gravel and soft murum, including removingthe excavated material up to a distance of 50 m.beyond

    the building area and stacking and spreading as

    directed, dewatering, preparing the bed for the foundation

    and necessary backfilling, ramming, watering including

    shoring and strutting etc. complete. Spec.No. : Bd.A.1

    Page No. 259 (Lift upto 1.5 m.)

    80.90 CuM 1635.50

    D.S.R.Page 6,Item No 1

    9.66 CuM Item No. 2:- Excavation for foundation in hard murum

    including removing the excavated material upto distance

    of 50 metres beyond the building area and stacking and

    spreading as directed, dewatering, prepar-ing the bed for

    the foundation and necessary backfilling, ramming,

    watering including shoring and strutting etc. complete.(

    Lift upto 1.50 m) Spec.No. : Bd.A.2 Page No. 259

    91.98 CuM 888.38

    D.S.R.Page 6,Item No 2

    7.55 CuM Item No. 3:- Providing and laying in situ, cement concrete

    in 1:4:8 of trap/granite/quartzite/gneiss metal for

    foundation and bedding including bailing-out water

    manually, formwork, compacting, covering newly laid

    concrete by gunny bag, plastic or tarpaulin, curing etc.

    complete. (Wooden planks/ shuttering will not beallowed) Spec.No. : Bd.E.1 Page No. 287

    2305.72 CuM 17414.67

    D.S.R.Page 12,Item No 3

    23.22 CuM Item No. 4:- Providing uncoursed rubble masonry of trap/

    granite/ quartzite/ gneiss stones in cement mortar 1:6 in

    foundations and plinth of inner walls/in plinth of external

    walls including bailing-out water manually, striking joints

    on unexposed faces and watering complete.Spec.No. :

    Bd.H.1 Page No. 329

    1459.51 CuM 33895.17

    D.S.R.Page 29,Item No 1

    2.51 CuM Item No. 5:- Providing and casting in situ cement

    concrete of M20 grade of trap granite/quartzite/gneiss

    metal for R.C.C. coping to plinth or parapet and sills of

    doors and windows moulded as per detailed designs and

    drawings or as directed including centering, formwork of

    steel, compaction, covering newly laid concrete by gunnybag, plastic or tarpaulin, finishing the formed surface with

    cement mortar 1:3 of sufficient minimum thickness to

    give a smooth and even surface or roughening if special

    finish is to be provided and curing etc complete

    4748.69 CuM 11898.31

    Name of Work :- Construction of Aganwadi Building______________________Tal. Akole

    Dist . Ahmednager

    ABSTRACT

    Qty Unit Item of work Rate Per Amount

  • 8/3/2019 Rev.angamnwadi Estimate New Plan Gi Roof 1011 Cement Steel New Rate Wag Roa Check

    6/19

    Qty. Unit Item of work Rate Per Amount

    1.29 CuM Item No. 11:-Providing and casting in situ cement

    concrete of M 20 grade of trap granite/quartzite/gneiss

    metal for R.C.C. beams and lintels as per detailed

    designs and drawings or as directed including centering,

    formwork of plywood / steel, compaction, covering newly

    laid concrete by gunny bag, plastic or tarpaulin, finishing

    the formed surface with cement mortar 1:3 of sufficientminimum thickness to give a smooth and even surface or

    roughening if special finish is to be provided and curing

    etc. complete. (Excluding reinforcement. The cement

    mortar 1:3 plaster is con-sidered for rendering uneven

    and honeycombed surface only. Wooden

    planks/shuttering will not be allowed) Spec. No.: Bd.F.6

    Pa e No. 300 /IS 456:2000

    6351.91 CuM 8178.34

    D.S.R.Page 17,Item No 3 0.24 CuM Item No. 12:-Providing and casting in situ cement

    concrete of M20 grade of trap granite/quartzite/gneiss

    metal for R.C.C. chhajja as per detailed designs and

    drawings or as directed including centering, formwork of

    steel, compaction, covering newly laid concrete by gunny

    bag, plastic or tarpaulin, finishing the formed surface with

    cement mortar 1:3 of sufficient minimum thickness to

    give a smooth and even surface or roughening if special

    finish is to be provided and curing etc. complete.

    (Excluding reinforcement. The cement mortar 1:3 plaster

    is considered for rendering uneven and honeycombed

    surface only. Wooden planks/shuttering will not be

    allowed)Spec.No. : Bd.F.9 Page No. 303 /IS 456:2000

    6436.56 CuM 1520.64

    D.S.R.Page 19,Item No 7 15.50 Rm Item No.13:-Providing and fixing factory made precast

    door / window frames of C.C. M-40 grade of section 100

    mm x 60 mm including reinforcement as per I.S.

    6523:1983 with polymeric blocks having screw holding

    capacity of 250 kg / screw fixed in position in R.C.C.

    frame as per requirment and as per specifications without

    fan light including holdfasts, carting and erecting inposition and two coats of oil paints etc. complete.

    Spec.No.: As directed by Engineer in charge.

    387.89 Rm 6012.26

    D.S.R.Page 74,Item No 1

    1.58 SqM Item No.14:-Providing and fixing mild steel angle frames

    of approved standard rolled section M.S. angle 50mm x

    50mm x 6mm for doors with / without ventilators

    including hold fasts, hinges welded to frames and 2 coats

    of oil paint etc. complete. Additional item. Spec.No. Asdirected by Engineer in charge.

    702.63 SqM 1106.64

    D.S.R.Page 74,Item No 3

    7.88 SqM Item No. 15:-Providing and fixing solid core flush door in

    single leaf 35 mm thick as per detailed drawing approved

    2127.84 SqM 16756.74

    Qty. Unit Item of work Rate Per Amount

  • 8/3/2019 Rev.angamnwadi Estimate New Plan Gi Roof 1011 Cement Steel New Rate Wag Roa Check

    7/19

    Qty. Unit Item of work Rate Per Amount

    99.13 SqM Item No. 21:-Providing and applying two coats of water

    proof cement paint of approved manufacture and of

    approved colour to the plastered surfaces including

    scaffolding if necessary, excluding primer coat cleaning

    and preparing the surface, watering for two days

    complete. (Sample and brand is to be got approved from

    Executive Engineer before use) Spec.No. : Bd.O.8 PageNo. 406

    24.38 SqM 2416.84

    D.S.R.Page 61,Item No 15

    144.23 SqM Item No. 22:- Providing & applying washable oil-bound

    distemper of approved colour and shade to old & new

    surfaces in two coats including scaffolding, preparing the

    surfaces. (excluding the primer coat.) complete. Spec.No.

    : Bd.P.5 Page No. 413

    27.71 SqM 3996.16

    D.S.R.Page 64,Item No 11

    6.00 SqM Item No. 23:- Providing and fixing steel windows of

    various sizes as per de-tailed drawings with welded

    square bars 12 mm at 10 cm centre to centre without hot

    dip zinc coating without/with ventilator including

    fabrication, glazing with non-acetinic/ plain/ obscured

    glass panes of approved type and quality, all fixtures and

    fas-tenings without teak wood boxing, and architravesand finishing with one coat of primer complete. Spec.No.

    : Bd.T.53 Page No. 509

    2704.13 SqM 16224.78

    D.S.R.Page 87,Item No 45

    0.54 SqM Item No. 24:-Providing and fixing in position after

    hoisting, precast 1:2 cement mortar reinforced Jali of

    ____ mm thickness of approved design fixing in cement

    mortar 1:3 and curing complete (including 3mm diametermild steel bar reinforcement).i) 50mm thick Spec.No. :

    Bd.F.19 Page No. 307

    475.44 SqM 256.74

    D.S.R.Page 22,Item No 16

    2.07 SqM Item No. 25:- Providing and fixing white glazed tiles

    200mm. x 100mm. in size and about 5 to 6 mm thick for

    dado and skirting in required position on plaster of 1:4

    cement mortar and neat cement float including filling

    joints with white cement slurry curing and cleaning

    complete. Spec.No. : As directed by Engineer in charge.

    933.10 SqM 1931.51

    D.S.R.Page 49,Item No 36

    41.99 SqM Item No. 26:- Providing and fixing ceramic tiles of

    approved quality and size, 7 mm thick for flooring in

    required position laid on a bed of 1:4 cement mortar

    including cement float, filling joint with white / colourcement slurry, cleaning, curing complete. Additional Item

    Spec. No. : As directed by Engineer in charge.

    824.60 SqM 34625.26

    D.S.R.Page 46,Item No 17

    0 81 SqM Item No 27:- Providing and laying white glazed tiles 887 07 SqM 718 52 Qty. Unit Item of work Rate Per Amount

  • 8/3/2019 Rev.angamnwadi Estimate New Plan Gi Roof 1011 Cement Steel New Rate Wag Roa Check

    8/19

    y

    1.00 No Item No. 33:- Providing and fixing 1st class white glazed

    earthenware "Orissa type" W.C. Pan 600 x 400 mm size

    including `P' or `S' trap UPVC soil and vent pipe upto the

    outside face of the wall, 1:5:10 cement concrete bedding,

    without flushing cistern with flush cock and necessary

    fittings, inlet pipe with stop tap, bracket for fixing the

    cistern, 32 mm dia. UPVC flush pipe with fitting and

    clamps, 20 mm dia. UPVC over flow pipe with mosquito

    proof cou-pling, chain and pulley, painting of the exposed

    pipe and cutting and making good walls and floor, testing

    etc. complete. (Prior approval of sample and brand by

    Ex. Engineer is necessary before use.)Add. Spec.: As

    directed by Enginner incharge

    693.46 No 693.46

    D.S.R.Page 289,Item No 702/441

    4.00 Rm Item No. 34:-Providing and fixing 110 mm diameter,

    UPVC soil/vent/ waste SWR pipe/Rain water pipes of

    required diameter conforming to IS 13592 and IS 4985 to

    with stand 2.5 kg/cm2 including necessary fixtures and

    fittings such as bends, tees, single junction, double and

    joining with rubber and lubricants on wall by means of

    clips or in ground including necessary excavation, layingfilling trench-es, testing etc. complete. Spec.No. : As

    directed by En-gineer in charge.

    193.94 Rm 775.78

    D.S.R.Page 120,Item No 54

    1.00 No Item No. 35:- Providing & constructing Brick Masonry

    Inspection Chamber 60cm x 45cm including 1:4:8 cement

    concrete foundation 1:2:4 cement concrete channels half

    round G.S.W.pipes, Brick Masonry, plastering frominside and airtight With R.C.C. raft in B.C. soil area

    including cost of reinforcement. complete.Spec.No. :

    Bd.V.43 Page No. 574

    1758.79 No 1758.79

    D.S.R.Page 122,Item No 61

    1.00 No Item No. 36:- Providing and fixing hume pipe septic tank

    900mm diameter with vent pipe and cap including

    necessary (excluding excavation and laying)Spec.No. :Bd.V.45 Page No. 574

    5403.83 No 5403.83

    D.S.R.Page 124,Item No 77

    0.73 CuM Item No. 37:- Providing and constructing soak pit of

    specified size as per detailed drawing including

    excavation, hollow brick masonry, filling with the brick-

    bats etc. complete. Spec.No. : Bd.V.46 Page No. 576

    502.04 CuM 365.99

    D.S.R.Page 125,Item No 78

    0.54 SqM Item No. 38:- Supplying Informatory sign board in squareor rectangular shape of size made out of 16 gauge (1.6

    mm) thick M.S. sheet including frame of 35x 35 x 3mm

    M.S. angle painted with one coat of Zinc chromate

    stoving primer and two coats of green background white

    2474.72 SqM 1336.35

    Name of Work :- Construction of Aganwadi Building______________________Tal. Akole Dist .

  • 8/3/2019 Rev.angamnwadi Estimate New Plan Gi Roof 1011 Cement Steel New Rate Wag Roa Check

    9/19

    Measurement SheetNo L B D/H Qty Unit

    AC/HF,L=8.10+0.90 2 9.00 0.90 0.60 9.72

    AH/CF/BG,L=5.77-0.90 3 4.87 0.90 0.60 7.89

    DI/EJ,L=2.48-0.90 2 1.58 0.90 0.60 1.71

    Ramp 2 2.00 1.00 0.15 0.60

    Verandha 1 2.00 1.00 0.15 0.30

    Total 20.22 Cum

    AC/HF,L=8.10+0.90 2 9.00 0.90 0.30 4.86

    AH/CF/BG,L=5.77-0.90 3 4.87 0.90 0.30 3.94

    DI/EJ,L=2.48-0.90 2 1.58 0.90 0.30 0.85Total 9.66 Cum

    AC/HF,L=8.10+0.90 2 9.00 0.90 0.15 2.43

    AH/CF/BG,L=5.77-0.90 3 4.87 0.90 0.15 1.97

    DI/EJ,L=2.48-0.90 2 1.58 0.90 0.15 0.43

    Ramp 2 2.00 1.00 0.15 0.60

    Verandha 1 2.00 1.00 0.15 0.30

    Below flooring

    Class Room 1 5.32 5.17 0.05 1.38

    Store 1 1.28 2.03 0.05 0.13

    Kitchen / Toilet block 2 1.57 2.03 0.05 0.32

    Total 7.55 Cum

    For Foundation

    AC/HF,L=8.10+0.60 2 8.70 0.60 0.60 6.26AH/CF/BG,L=5.77-0.60 3 5.17 0.60 0.60 5.58

    DI/EJ,L=2.25-0.60 2 1.88 0.60 0.60 1.35

    For Plinth

    AC/HF,L=8.10+0.45 2 8.55 0.45 0.60 4.62

    AH/CF/BG,L=5.77-0.45 3 5.32 0.45 0.60 4.31

    DI/EJ,L=2.25-0.45 2 2.03 0.45 0.60 1.10

    Total 23.22 Cum

    AC/HF,L=8.10+0.45 2 8.55 0.45 0.15 1.15

    AH/CF/BG,L=5.77-0.45 3 5.32 0.45 0.15 1.08

    DI/EJ,L=2.25-0.45 2 2.03 0.45 0.15 0.27

    Total 2.51 Cum

    Class Room 1 5.32 5.17 0.20 5.50

    Store 1 1.28 2.03 0.20 0.52

    Kitchen / Toilet block 2 1.57 2.03 0.20 1.27

    Ramp 2 2.00 1.00 0.20 0.80

    Verandha 1 2.00 1.00 0.20 0.40

    Total 8 50 Cum

    g g______________________Ahmednager

    Item No. 5:- Providing and casting in situ cement concrete of M20 grade of trap granite/quartzite/gneiss metal for

    Item No. 6:-Providing dry trap/ granite/ quartzite/ gneiss rubble stone soling 15 cm to 20 cm thick including hand

    Item No. 1:- Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing

    Item No. 2:- Excavation for foundation in hard murum including removing the excavated material upto distance of

    Item No. 3:- Providing and laying in situ, cement concrete in 1:4:8 of trap/granite/quartzite/gneiss metal for

    Item No. 4:- Providing uncoursed rubble masonry of trap/ granite/ quartzite/ gneiss stones in cement mortar 1:6

    No L B D/H Qty Unit

  • 8/3/2019 Rev.angamnwadi Estimate New Plan Gi Roof 1011 Cement Steel New Rate Wag Roa Check

    10/19

    y

    AC/HF,L=8.10+0.23 2 8.33 0.23 2.70 10.35

    AH/CF/BG,L=5.77-0.45 3 5.54 0.23 2.70 10.32

    Gable 2 5.54 0.23 0.50 1.27

    Pillar 8 0.35 0.12 2.70 0.91

    DI/EJ,L=2.25-0.45 2 2.02 0.23 2.70 2.51

    Ramp 2 2.00 0.23(0.23+0.60)/2 0.38

    1 2.00 0.23 0.23 0.11

    Verandha 1 2.00 0.23 0.60 0.28

    4 3.00 0.23

    (1.00+0.3

    0)/21.79

    Vervandies

    AC/CF 2x2 3.16 0.23

    (1.23+0.2

    3)/2 2.12

    BG 2 3.16 0.23 0.35 0.51

    ( +) Sub Total 30.55 Cum

    Deductions

    D 2 1.00 0.23 2.10 0.97

    D1 1 0.75 0.23 2.10 0.36

    OP 2 1.00 0.23 2.10 0.97W 5 1.00 0.23 1.20 1.38

    Lintels AC/HF 2 8.33 0.23 0.15 0.57

    AH/CF/BG 3 5.54 0.23 0.15 0.57

    DI/EJ 2 2.02 0.23 0.15 0.14

    ( -) Sub Total 4.96 Cum

    Total 25.58 Cum

    W.C.

    1 0.90 2.10 1.89

    1 1.20 2.10 2.52

    ( +) Sub Total 4.41 Cum

    Deductions

    D2 1 0.75 2.10 1.58

    ( -) Sub Total 1.58 Cum

    Total 2.84 Sqm

    1 1.245 1.545 0.10 0.19

    Total 0.19 Cum

    Lintels AC/HF 2 8.33 0.23 0.15 0.57AH/CF/BG 3 5.54 0.23 0.15 0.57

    DI/EJ 2 2.02 0.23 0.15 0.14

    Total 1.29 Cum

    Item No. 11:-Providing and casting in situ cement concrete of M 20 grade of trap granite/quartzite/gneiss metal

    for R.C.C. beams and lintels as per detailed designs and drawings or as directed including centering, formwork of

    Item No. 12:-Providing and casting in situ cement concrete of M20 grade of trap granite/quartzite/gneiss metal

    Item No. 8:- Providing Bricks masonry in cement mortar 1:6 using second class burnt bricks in superstructure

    Item No. 9:-Providing Bricks masonry in cement mortar 1:4 using second class burnt bricks in half brick thick

    Item No. 10:-Providing and casting in situ cement concrete of M20 grade of trap granite / quartzite / gneiss metal

    for R.C.C. slabs and landings as per detailed designs and drawings or as directed including centering, formwork

    No L B D/H Qty Unit

  • 8/3/2019 Rev.angamnwadi Estimate New Plan Gi Roof 1011 Cement Steel New Rate Wag Roa Check

    11/19

    Qty Steel Reqd. Kg/cum

    Slab 0.19 75.00 14.43

    Lintels 1.29 75.00 96.57

    Coping 2.51 50.00 125.28

    Chajja 0.24 50.00 11.81

    248.08Total 0.2481 MT

    AC/HF 2 8.33 2.70 44.982

    AH/CF 2 6.00 2.70 32.40

    (1.00+0)/2=0.5 Gable 1/2X2 6.00 1.00 6.00

    Varvandi

    AH/CF Varvandi 2X2 3.00 (2.60)/2 15.60Pillar 8x2 0.12 2.70 5.18

    Ramp 2 2.00 (0+0.60)/2 2.40

    Verandha 1 2.00 0.60 1.20

    ( +) Sub Total 107.77 Sqm

    Deductions

    D 1 1.00 2.10 2.10

    W 5 1.00 1.20 6.00

    V 1 0.60 0.90 0.54( -) Sub Total 8.64 Sqm

    Total 99.13 Sqm

    Classroom

    2 5.54 2.70 29.92

    2 5.39 2.70 29.11

    Gable 4X2 5.39 0.50 21.56Store

    2 1.50 2.70 8.10

    2 2.25 3.00 13.50

    Kitchen

    2 1.79 3.30 11.81

    2 2.25 3.00 13.50

    W. C.

    1 1.79 2.70 4.83

    2 2.25 2.70 12.15

    2 0.90 2.10 3.78

    2 1.20 2.10 5.04

    ( +) Sub Total 153.30 Sqm

    Deductions

    W. C. Dado

    2 0.90 0.60 1.082 1.20 0.60 1.44

    Skirting of room

    Class room 2 5.54 0.15 1.66

    2 5 39 0 15 1 62

    Item No. 16:- Providing and fixing in position TMT steel bar reinforcement of various diameters for R.C.C. pile

    Item No. 17:- Providing internal cement plaster 20mm thick in two coats in cement mortar 1:4 without neeru

    Item No. 18:- Providing internal cement plaster 12mm thick in single coat in cement mortar 1:4 with neeru finish

    No L B D/H Qty Unit

    f

  • 8/3/2019 Rev.angamnwadi Estimate New Plan Gi Roof 1011 Cement Steel New Rate Wag Roa Check

    12/19

    Kitchen

    Platform 1 1.79 0.75 1.34

    Total 1.34 Sqm

    Qty same as Item No. 17 Total 99.13 Sqm

    Qty same as Item No. 18 Total 144.23 Sqm

    W 5 1.00 1.20 6.00

    Total 6.00 Sqm

    V 1 0.60 0.90 0.54

    Total 0.54 Sqm

    W. C.

    2 0.90 0.60 1.08

    2 1.20 0.60 1.44

    Total 2.52 Sqm

    Deduct Door 1 0.75 0.60 0.45

    0.45 Sqm

    A-B 2.07 Sqm

    Class Room 1 5.54 5.39 29.86

    Store 1 1.50 2.25 3.38

    Kitchen / Toilet block 1 1.79 2.25 4.03

    1 0.79 1.30 1.03

    1 1.79 0.95 1.70

    Verandha 1 2.00 1.00 2.00Total 41.99 Sqm

    W.C. 1 0.90 1.20 1.08

    Total 1.08 Sqm

    Deduct W.C.Pan 1 0.60 0.45 0.27

    A-B 0.81 Sqm

    1 6.00 0.60 3.60

    2 8.33 0.60 10.00

    Total 13.60 Sqm

    14 0.23 0.23 0.23 0.74

    Total 0.74 Cum

    2 8.33 3.60 59.98

    Total 59.98 Sqm

    Item No. 22:- Providing & applying washable oil-bound distemper of approved colour and shade to old & new

    Item No. 23:- Providing and fixing steel windows of various sizes as per de-tailed drawings with welded square

    Item No. 24:-Providing and fixing in position after hoisting, precast 1:2 cement mortar reinforced Jali of ____ mm

    Item No. 25:- Providing and fixing white glazed tiles 200mm. x 100mm. in size and about 5 to 6 mm thick for

    Item No. 20:- Providing and fixing black kadappa stone sill steps, 25 mm. thick machine polished, cutting

    Item No. 21:-Providing and applying two coats of water proof cement paint of approved manufacture and of

    Item No. 30:-Providing and fixing corrugated galvanised iron sheets of 0.80mm thickness (22 B.W.G.) for roofing

    with wind ties includin fas-tenin with alvanised iron screw and bolts and lead and bitumen washers as per

    Item No. 26:- Providing and fixing ceramic tiles of approved quality and size, 7 mm thick for flooring in required

    Item No. 27:- Providing and laying white glazed tiles 200mm. x 100mm. in size and 5 mm.to 6 mm. thick for

    floorin in re uired osition laid on bed of 1:4 cement mortar includin neat cement float, fillin oints with white

    Item No. 28:-Providing flush grooved pointing with cement mortar 1:3 for stone masonry work including

    Item No. 29:- Providing and casting in situ cement concrete M-15 /1:2:4 of trap/ granite/ quartzite/ gneiss metal,

    moulded or chamfered as per drawing or as directed including centering, form work, com-pacting, covering newly

    No L B D/H Qty Unit

    S t E

  • 8/3/2019 Rev.angamnwadi Estimate New Plan Gi Roof 1011 Cement Steel New Rate Wag Roa Check

    13/19

    Sect. Engr.

    Name of Work :- Construction of Aganwadi Building______________________Tal. Akole Dist .Ahmednager

  • 8/3/2019 Rev.angamnwadi Estimate New Plan Gi Roof 1011 Cement Steel New Rate Wag Roa Check

    14/19

    Sr. No. Item Total

    /Unit

    Estimate

    Quantity Total Qty

    Sand Metal Rubble

    1 Prov. &

    casting C.C.

    1:4:8

    0.45 0 0.45 7.55 3.40

    2 M 20 Slabs 0.45 0 0.00 0.45 0.19 0.09

    3 M 20 Beams

    &lintels

    0.45 0 0.00 0.45 1.29 0.58

    4 M 20 Chajja 0.45 0 0.00 0.45 0.24 0.11

    5 Prov.Rubble

    solling

    1.25 1.25 8.50 2.59

    6 Filling plinth 1.000 0.00 0.00 1.00 0.00 0.00

    7 BB Masonry

    in CM 1:6

    sup

    0.320 0.00 0.00 0.32 25.58 8.19

    8 Half brick

    thk walls

    0.035 0.00 0.00 0.04 2.84 0.10

    9 M 15 Coping 0.450 0.00 0.00 0.45 2.51 1.13

    10 Sills of

    Polished

    Kadappa

    0.018 0.00 0.00 0.02 2.74 0.05

    11 12 mm

    internal

    plaster 1:4

    0.016 0.00 0.00 0.02 144.23 2.31

    12 20mm

    plaster

    0.025 0.00 0.00 0.03 99.13 2.48

    13 Polish

    Sahabad

    flooring

    0.046 0.00 0.00 0.05 41.99 1.93

    14 Polish

    Sahabad

    dado

    0.031 0.00 0.00 0.03 1.08 0.03

    15 white glazed

    tiles for dado

    0.046 0.00 0.00 0.05 2.52 0.12

    Ahmednager

    Qty. Reqd.

    Royalty Statement

    Name of Work :- Construction of Aganwadi Building______________________Tal. AkoleDist Ahmednager

  • 8/3/2019 Rev.angamnwadi Estimate New Plan Gi Roof 1011 Cement Steel New Rate Wag Roa Check

    15/19

    Sr.

    No.

    Item of work Qty. Bags Reqd. Per Total Bags

    1 Prov. & casting P.C.C. 1:4:8 for foundation. 7.55 3.40 Cum 25.68

    2 C.C. M-20 grade of trap metal for R. C. C.Slabs 0.19 7.20 Cum 1.38

    3 C.C. M-20 grade of trap metal for R. C. C.beams & lintels 0.24 7.20 Cum 1.70

    4 C.C. M-20 grade of trap metal for R. C. C.Chajja 0.24 7.20 Cum 1.70

    5 Providing Bricks masonry in C. M. 1:6 superstructure 25.58 1.44 Cum 36.84

    6 Bricks masonry in C. M. 1:6 in half B,Thk Wall 2.84 0.22 Cum 0.627 Sills of polished Kadappa 2.74 0.13 Sqm 0.36

    8 Cement plaster 12 mm in C. M. 1:4 144.23 0.10 Sqm 14.42

    9 20mm plaster externally in C.M.1:4 99.13 0.22 Sqm 21.81

    10 Polish Sahabad for flooring 41.99 0.22 Sqm 9.24

    11 Polish Sahabad for dado 1.08 0.22 Sqm 0.24

    12 White glazed tiles for dado/flooring 2.52 0.22 Sqm 0.55

    13 U.C.R. masonry in C.M. 1:6 in foundations and plinth 23.22 1.77 Cum 41.11

    14 M20 of trap metal for coping to plinth 2.51 7.20 Cum 18.04

    15 Flush grooved pointing C.M. 1:3 for stone masonry 13.60 0.025 Sqm 0.34

    Total Qty 174.03

    Bags

    Deputy Engineer

    Z.P.(P.W.) Sub-Dn.Akole

    Dist . Ahmednager

    Sect. Engr.

    CEMENT REQUIREMENT STATEMENT

    Name of Work :- Construction of Aganwadi Building______________________Tal. Akole Dist .Ahmednager

  • 8/3/2019 Rev.angamnwadi Estimate New Plan Gi Roof 1011 Cement Steel New Rate Wag Roa Check

    16/19

    QUARRY CHART

    Sr.No Material Quarry Lead in

    Km

    Lead

    Charge

    Basic

    Lead

    Diff in lead

    1 Rubble 2.00 152.44 207.23 0.00

    2 Sand Akole 20.00 349.33 169.39 179.94

    3 Cement Akole 20.00 223.19 108.22 114.97

    4 Crush Metal Next toAkole 20.00 349.33 169.39 179.94

    5 Steel Akole 20.00 267.82 129.87 137.95

    6 Bricks Akole 20.00 573.91 278.28 295.63

    Certificate

    Certified that the nearest available quarries are provided in the estimate

    Deputy Engineer

    Sect Engr Z P (P W ) Sub Div Akole

    Ahmednager

    Certified that the material available in the quarries are of good quality and in sufficient quantity f

    the work.

    Certified that the rates adopted in the estimate are from P.W.D. D.S.R. for the year 2010-2011

  • 8/3/2019 Rev.angamnwadi Estimate New Plan Gi Roof 1011 Cement Steel New Rate Wag Roa Check

    17/19

    Sr.No

    .

    Item of Work DSR P. No /Item No

    Basic Rate Lead Charges TotalRate

    cement diff rs.77.00/bagSand Cement Metal, Cr.

    Metal Steel

    AddQC

    Charge

    TotalDerived

    Rate

    1F

  • 8/3/2019 Rev.angamnwadi Estimate New Plan Gi Roof 1011 Cement Steel New Rate Wag Roa Check

    18/19

    rubbl

    e

    0.00

    179.94 114.97 Cr.

    met

    179.94

    Steel 137.95Brick 295.63

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

    Qty req Amt

    .

    77.00Metal, Steel Charge

    s 0.50%

    Rate

    22 Washable oil bound distemper D.S.R.Page

    64,Item No 25.00 25.00 0.00 25.00

    23 Fixing Steel Windows D.S.R.Page

    87,Item No 2440.00 2440.00 0.00 2440.00 2

    24 Precast reinforced Jali 50mm D.S.R.Page

    22,Item No 429.00 429.00 0.00 429.00

    25 White glazed tiles for dado D.S.R.Page

    49,Item No 819.00 0.031 5.58 0.210 1.21 0.21 16.17 841.96 0.00 841.96

    26 Ceramic tiles of approved quality

    and size, 7 mm thick for flooring

    D.S.R.Page

    46,Item No 714.00 0.046 8.28 0.220 1.26 0.22 16.94 740.48 3.57 744.05

    27 White Glazed flooring D.S.R.Page

    45,Item No 777.00 0.012 2.159 0.210 1.21 0.21 16.17 796.54 3.89 800.42

    28 Flush grooved pointing to UCR

    1:3

    D.S.R.Page

    40,Item No 40.00 0.003 0.540 0.025 0.14 0.03 1.93 42.61 0.20 42.81

    29 M20 Bed Blocks D.S.R.Page

    13,Item No 2953.00 2953.00 14.77 2967.77 2

    30 CGI sheet for roofing 22 BWG D.S.R.Page

    68,Item No 483.00 483.00 0.00 483.00

    31 CGI sheet over ridge 22 BWG D.S.R.Page

    68,Item No 360.00 360.00 0.00 360.00

    32 Structural Steel work D.S.R.Page

    9,Item No 4 68334.00 68334.00 0.00 68334.00 6

    33 Earthenware "orissa type" W.C.

    pan 600 x 400 without flush 806wt

    468

    D.S.R.Page

    289,Item No

    702/441600.00 0.028 5.038 0.25 1.44 0.25 19.25 625.73 0.00 625.73

    34 110 mm UPVC vent pipe D.S.R.Page120,Item No

    54

    175.00 175.00 0.00 175.00

    35 Inspection Chamber 60x45cm D.S.R.Page

    122,Item No

    61

    1587.00 1587.00 0.00 1587.00 1

    36 Hume pipe septic tank D.S.R.Page

    124,Item No

    77

    4876.00 4876.00 0.00 4876.00 4

    37 Providing soak pit D.S.R.Page

    125,Item No

    78

    453.00 453.00 0.00 453.00

    38 Informatory sign board D.S.R.Page254,Item No

    22

    2233.00 2233.00 0.00 2233.00 2

    39 Fixing information board D.S.R.Page

    255,Item No

    26

    551.00 551.00 0.00 551.00

    40 Photo raph 273/55 ii 56.00 56.00 0.00 56.00

    Sect. En r.Z.P. (P.W.) Sub- Div Akole

    Deput En ineer

    Name of Work :- Construction of Aganwadi Building______________________Tal.Akole Dist . Ahmednager

  • 8/3/2019 Rev.angamnwadi Estimate New Plan Gi Roof 1011 Cement Steel New Rate Wag Roa Check

    19/19

    Item no 16:

    Basic Rate as per DSR 2010-11 Rs 47700.00 Per MT

    Deduct Material Cost Rs 34400.00 Per MT

    Net Cost of Labour Rs 13300.00 Per MT

    Add Revise Material Cost 1.4.11 Rs 40500.00 Per MT

    Hence new Rate Rs 53800.00 Per MT

    Add 10 % Overhead charges

    53800.00

    47700.00

    6100.00

    0.10 610.00 Per MT

    Hence new Rate Rs 54410.00 Per MT

    Prepared by me

    Deputy EngineerSect Engr Z P (PW) Sub Dn Akole

    g

    Rate Analysis

    Providing and fixing in position TMT steel bar reinforcementof various diameters

    for R.C.C.pile caps, footing, foundations, slabs, beams, lintels, columns canopies,staircase, newels, chajjas, pardis copings, fins, arches, etc as per detailed design,

    dra