Estimated Cost 400000.00
2010-2011AHMEDNAGAR ZILLA PARISHAD AHMEDNAGAR
Z.P.(P.W.) Sub-Dn. AkoleName of Work :- Construction of AganwadiBuilding______________________Tal. Akole Dist .
Ahmednager
8/3/2019 Rev.angamnwadi Estimate New Plan Gi Roof 1011 Cement Steel New Rate Wag Roa Check
2/19
Sanction estimate No.
Fund Head
Major Head
Minor Head
Service Head
Rs.
Adm. App. Under Adminstrtively Approved by C.E.O.Z.P.Ahmednagar.No. Vide No:- Date
Executive Engineer Z.P.P.W.North Division AhmednagarDate Date
Estimate prepared by Shri. J. B. Shinde Jr. Engr.
Checked by Shri. P. N. Wakchaure, Sect. Engr.
Authority
Technical. Sanctioned
Under No.
As per Above Sanctioned Adminstrative Approval by
C.E.O.Z.P.AhmednagarGENERAL DESCRIPTION
400000.00
Estimate framed in the office of the Deputy Engineer,Zilla Parishad (P. W.) Sub-Dn.
Akole and the probable expeses that will be incurred in
Name of Work :- Construction of Aganwadi Building______________________Tal.
Akole Dist . Ahmednager
AHMEDNAGAR ZILLA PARISHAD AHMEDNAGAR
E S T I M A T E
N f W k C t ti f A di B ildi T l
8/3/2019 Rev.angamnwadi Estimate New Plan Gi Roof 1011 Cement Steel New Rate Wag Roa Check
3/19
1 Rs. 399670.002) Rs. 330.00
Total Rs. 400000.00
GrandTotal Rs. Rs. 400000.00
Say Rs. 400000.00
Prepared by
Deputy EngineerZ.P.(P.W.) Sub-Dn. Akole
Name of Work :- Construction of Aganwadi Building______________________Tal.
Akole Dist . Ahmednager
RECAPULATION SHEET
Work Portion
Sect. Engr.
Contegencies
ENERAL DE RIPTI N
8/3/2019 Rev.angamnwadi Estimate New Plan Gi Roof 1011 Cement Steel New Rate Wag Roa Check
4/19
400000.00
3) Plinth :-Plinth level is proposed 0.60 m from avg. ground
level.RCC M 15 coping & U.C.R. masonary of 0.45 m thk.in plinth in C.M.
1:6 is proposed.
4) Superstructure :- BB masonary using second class burnt bricks
of 0.23 m thk. In 1:6.
11) D S R Addopted :- While preparing this estimate rates are taken
7) Flooring :- Ceramic tiles of approved quality and size, 7 mmthick for flooring & W.C. with glazed tiles.
8)Internal plaster :- 12mm tk. Singel coat cement plaster with neeru
finish in C:M 1:4 is proposed.
9)External plaster :- For external plaster 20mm tk in two coats
without neeru finish in C:M 1:4 is proposed.10) Painting :- For internal washable oil bound distemper of
approved colour with two coats of waterproof cement paint is proposed.
5)Doors & Windows :- For door steel frame of angle 50 x 50 x 6mm
.and plain planked door shutter W. C. are proposed. For window steelwindow with welded square bars is provided & RCC Jali for WC/Urinal
6) Roof:- Truss of structural steel with M. S. angel 65mmx65mmx6mm
Tie Beam & other members of trusses of structural steel with
50mmx50mmx6mm used. Roofing C.G.I.sheet of 80mm thickness
(22B.W.G.).is proposed.
ENERAL DE RIPTI N
.
Name of Work :- Construction of Aganwadi Building______________________Tal. Akole
Dist . Ahmednager
Type of structure : -Load Bearing structure.
PROVISIONS MADE IN THE ESTIMATE AS BELOW
1) Administrative approval :- a) Chief Executive Officer Z . P.Ahmednagar vide order No. Ahmednager Dt.
/ /2011
2) Foundation :- For foundation P.C.C, 1:4:8 of 0.15 m thk for
levelling course , UCR Masonary in 1:6 for foundation
Name of Work : Construction of Aganwadi Building Tal Akole
8/3/2019 Rev.angamnwadi Estimate New Plan Gi Roof 1011 Cement Steel New Rate Wag Roa Check
5/19
Qty. Unit Item of work Rate Per Amount
20.22 CuM Item No. 1:- Excavation for foundation in earth, soil of all
types, sand, gravel and soft murum, including removingthe excavated material up to a distance of 50 m.beyond
the building area and stacking and spreading as
directed, dewatering, preparing the bed for the foundation
and necessary backfilling, ramming, watering including
shoring and strutting etc. complete. Spec.No. : Bd.A.1
Page No. 259 (Lift upto 1.5 m.)
80.90 CuM 1635.50
D.S.R.Page 6,Item No 1
9.66 CuM Item No. 2:- Excavation for foundation in hard murum
including removing the excavated material upto distance
of 50 metres beyond the building area and stacking and
spreading as directed, dewatering, prepar-ing the bed for
the foundation and necessary backfilling, ramming,
watering including shoring and strutting etc. complete.(
Lift upto 1.50 m) Spec.No. : Bd.A.2 Page No. 259
91.98 CuM 888.38
D.S.R.Page 6,Item No 2
7.55 CuM Item No. 3:- Providing and laying in situ, cement concrete
in 1:4:8 of trap/granite/quartzite/gneiss metal for
foundation and bedding including bailing-out water
manually, formwork, compacting, covering newly laid
concrete by gunny bag, plastic or tarpaulin, curing etc.
complete. (Wooden planks/ shuttering will not beallowed) Spec.No. : Bd.E.1 Page No. 287
2305.72 CuM 17414.67
D.S.R.Page 12,Item No 3
23.22 CuM Item No. 4:- Providing uncoursed rubble masonry of trap/
granite/ quartzite/ gneiss stones in cement mortar 1:6 in
foundations and plinth of inner walls/in plinth of external
walls including bailing-out water manually, striking joints
on unexposed faces and watering complete.Spec.No. :
Bd.H.1 Page No. 329
1459.51 CuM 33895.17
D.S.R.Page 29,Item No 1
2.51 CuM Item No. 5:- Providing and casting in situ cement
concrete of M20 grade of trap granite/quartzite/gneiss
metal for R.C.C. coping to plinth or parapet and sills of
doors and windows moulded as per detailed designs and
drawings or as directed including centering, formwork of
steel, compaction, covering newly laid concrete by gunnybag, plastic or tarpaulin, finishing the formed surface with
cement mortar 1:3 of sufficient minimum thickness to
give a smooth and even surface or roughening if special
finish is to be provided and curing etc complete
4748.69 CuM 11898.31
Name of Work :- Construction of Aganwadi Building______________________Tal. Akole
Dist . Ahmednager
ABSTRACT
Qty Unit Item of work Rate Per Amount
8/3/2019 Rev.angamnwadi Estimate New Plan Gi Roof 1011 Cement Steel New Rate Wag Roa Check
6/19
Qty. Unit Item of work Rate Per Amount
1.29 CuM Item No. 11:-Providing and casting in situ cement
concrete of M 20 grade of trap granite/quartzite/gneiss
metal for R.C.C. beams and lintels as per detailed
designs and drawings or as directed including centering,
formwork of plywood / steel, compaction, covering newly
laid concrete by gunny bag, plastic or tarpaulin, finishing
the formed surface with cement mortar 1:3 of sufficientminimum thickness to give a smooth and even surface or
roughening if special finish is to be provided and curing
etc. complete. (Excluding reinforcement. The cement
mortar 1:3 plaster is con-sidered for rendering uneven
and honeycombed surface only. Wooden
planks/shuttering will not be allowed) Spec. No.: Bd.F.6
Pa e No. 300 /IS 456:2000
6351.91 CuM 8178.34
D.S.R.Page 17,Item No 3 0.24 CuM Item No. 12:-Providing and casting in situ cement
concrete of M20 grade of trap granite/quartzite/gneiss
metal for R.C.C. chhajja as per detailed designs and
drawings or as directed including centering, formwork of
steel, compaction, covering newly laid concrete by gunny
bag, plastic or tarpaulin, finishing the formed surface with
cement mortar 1:3 of sufficient minimum thickness to
give a smooth and even surface or roughening if special
finish is to be provided and curing etc. complete.
(Excluding reinforcement. The cement mortar 1:3 plaster
is considered for rendering uneven and honeycombed
surface only. Wooden planks/shuttering will not be
allowed)Spec.No. : Bd.F.9 Page No. 303 /IS 456:2000
6436.56 CuM 1520.64
D.S.R.Page 19,Item No 7 15.50 Rm Item No.13:-Providing and fixing factory made precast
door / window frames of C.C. M-40 grade of section 100
mm x 60 mm including reinforcement as per I.S.
6523:1983 with polymeric blocks having screw holding
capacity of 250 kg / screw fixed in position in R.C.C.
frame as per requirment and as per specifications without
fan light including holdfasts, carting and erecting inposition and two coats of oil paints etc. complete.
Spec.No.: As directed by Engineer in charge.
387.89 Rm 6012.26
D.S.R.Page 74,Item No 1
1.58 SqM Item No.14:-Providing and fixing mild steel angle frames
of approved standard rolled section M.S. angle 50mm x
50mm x 6mm for doors with / without ventilators
including hold fasts, hinges welded to frames and 2 coats
of oil paint etc. complete. Additional item. Spec.No. Asdirected by Engineer in charge.
702.63 SqM 1106.64
D.S.R.Page 74,Item No 3
7.88 SqM Item No. 15:-Providing and fixing solid core flush door in
single leaf 35 mm thick as per detailed drawing approved
2127.84 SqM 16756.74
Qty. Unit Item of work Rate Per Amount
8/3/2019 Rev.angamnwadi Estimate New Plan Gi Roof 1011 Cement Steel New Rate Wag Roa Check
7/19
Qty. Unit Item of work Rate Per Amount
99.13 SqM Item No. 21:-Providing and applying two coats of water
proof cement paint of approved manufacture and of
approved colour to the plastered surfaces including
scaffolding if necessary, excluding primer coat cleaning
and preparing the surface, watering for two days
complete. (Sample and brand is to be got approved from
Executive Engineer before use) Spec.No. : Bd.O.8 PageNo. 406
24.38 SqM 2416.84
D.S.R.Page 61,Item No 15
144.23 SqM Item No. 22:- Providing & applying washable oil-bound
distemper of approved colour and shade to old & new
surfaces in two coats including scaffolding, preparing the
surfaces. (excluding the primer coat.) complete. Spec.No.
: Bd.P.5 Page No. 413
27.71 SqM 3996.16
D.S.R.Page 64,Item No 11
6.00 SqM Item No. 23:- Providing and fixing steel windows of
various sizes as per de-tailed drawings with welded
square bars 12 mm at 10 cm centre to centre without hot
dip zinc coating without/with ventilator including
fabrication, glazing with non-acetinic/ plain/ obscured
glass panes of approved type and quality, all fixtures and
fas-tenings without teak wood boxing, and architravesand finishing with one coat of primer complete. Spec.No.
: Bd.T.53 Page No. 509
2704.13 SqM 16224.78
D.S.R.Page 87,Item No 45
0.54 SqM Item No. 24:-Providing and fixing in position after
hoisting, precast 1:2 cement mortar reinforced Jali of
____ mm thickness of approved design fixing in cement
mortar 1:3 and curing complete (including 3mm diametermild steel bar reinforcement).i) 50mm thick Spec.No. :
Bd.F.19 Page No. 307
475.44 SqM 256.74
D.S.R.Page 22,Item No 16
2.07 SqM Item No. 25:- Providing and fixing white glazed tiles
200mm. x 100mm. in size and about 5 to 6 mm thick for
dado and skirting in required position on plaster of 1:4
cement mortar and neat cement float including filling
joints with white cement slurry curing and cleaning
complete. Spec.No. : As directed by Engineer in charge.
933.10 SqM 1931.51
D.S.R.Page 49,Item No 36
41.99 SqM Item No. 26:- Providing and fixing ceramic tiles of
approved quality and size, 7 mm thick for flooring in
required position laid on a bed of 1:4 cement mortar
including cement float, filling joint with white / colourcement slurry, cleaning, curing complete. Additional Item
Spec. No. : As directed by Engineer in charge.
824.60 SqM 34625.26
D.S.R.Page 46,Item No 17
0 81 SqM Item No 27:- Providing and laying white glazed tiles 887 07 SqM 718 52 Qty. Unit Item of work Rate Per Amount
8/3/2019 Rev.angamnwadi Estimate New Plan Gi Roof 1011 Cement Steel New Rate Wag Roa Check
8/19
y
1.00 No Item No. 33:- Providing and fixing 1st class white glazed
earthenware "Orissa type" W.C. Pan 600 x 400 mm size
including `P' or `S' trap UPVC soil and vent pipe upto the
outside face of the wall, 1:5:10 cement concrete bedding,
without flushing cistern with flush cock and necessary
fittings, inlet pipe with stop tap, bracket for fixing the
cistern, 32 mm dia. UPVC flush pipe with fitting and
clamps, 20 mm dia. UPVC over flow pipe with mosquito
proof cou-pling, chain and pulley, painting of the exposed
pipe and cutting and making good walls and floor, testing
etc. complete. (Prior approval of sample and brand by
Ex. Engineer is necessary before use.)Add. Spec.: As
directed by Enginner incharge
693.46 No 693.46
D.S.R.Page 289,Item No 702/441
4.00 Rm Item No. 34:-Providing and fixing 110 mm diameter,
UPVC soil/vent/ waste SWR pipe/Rain water pipes of
required diameter conforming to IS 13592 and IS 4985 to
with stand 2.5 kg/cm2 including necessary fixtures and
fittings such as bends, tees, single junction, double and
joining with rubber and lubricants on wall by means of
clips or in ground including necessary excavation, layingfilling trench-es, testing etc. complete. Spec.No. : As
directed by En-gineer in charge.
193.94 Rm 775.78
D.S.R.Page 120,Item No 54
1.00 No Item No. 35:- Providing & constructing Brick Masonry
Inspection Chamber 60cm x 45cm including 1:4:8 cement
concrete foundation 1:2:4 cement concrete channels half
round G.S.W.pipes, Brick Masonry, plastering frominside and airtight With R.C.C. raft in B.C. soil area
including cost of reinforcement. complete.Spec.No. :
Bd.V.43 Page No. 574
1758.79 No 1758.79
D.S.R.Page 122,Item No 61
1.00 No Item No. 36:- Providing and fixing hume pipe septic tank
900mm diameter with vent pipe and cap including
necessary (excluding excavation and laying)Spec.No. :Bd.V.45 Page No. 574
5403.83 No 5403.83
D.S.R.Page 124,Item No 77
0.73 CuM Item No. 37:- Providing and constructing soak pit of
specified size as per detailed drawing including
excavation, hollow brick masonry, filling with the brick-
bats etc. complete. Spec.No. : Bd.V.46 Page No. 576
502.04 CuM 365.99
D.S.R.Page 125,Item No 78
0.54 SqM Item No. 38:- Supplying Informatory sign board in squareor rectangular shape of size made out of 16 gauge (1.6
mm) thick M.S. sheet including frame of 35x 35 x 3mm
M.S. angle painted with one coat of Zinc chromate
stoving primer and two coats of green background white
2474.72 SqM 1336.35
Name of Work :- Construction of Aganwadi Building______________________Tal. Akole Dist .
8/3/2019 Rev.angamnwadi Estimate New Plan Gi Roof 1011 Cement Steel New Rate Wag Roa Check
9/19
Measurement SheetNo L B D/H Qty Unit
AC/HF,L=8.10+0.90 2 9.00 0.90 0.60 9.72
AH/CF/BG,L=5.77-0.90 3 4.87 0.90 0.60 7.89
DI/EJ,L=2.48-0.90 2 1.58 0.90 0.60 1.71
Ramp 2 2.00 1.00 0.15 0.60
Verandha 1 2.00 1.00 0.15 0.30
Total 20.22 Cum
AC/HF,L=8.10+0.90 2 9.00 0.90 0.30 4.86
AH/CF/BG,L=5.77-0.90 3 4.87 0.90 0.30 3.94
DI/EJ,L=2.48-0.90 2 1.58 0.90 0.30 0.85Total 9.66 Cum
AC/HF,L=8.10+0.90 2 9.00 0.90 0.15 2.43
AH/CF/BG,L=5.77-0.90 3 4.87 0.90 0.15 1.97
DI/EJ,L=2.48-0.90 2 1.58 0.90 0.15 0.43
Ramp 2 2.00 1.00 0.15 0.60
Verandha 1 2.00 1.00 0.15 0.30
Below flooring
Class Room 1 5.32 5.17 0.05 1.38
Store 1 1.28 2.03 0.05 0.13
Kitchen / Toilet block 2 1.57 2.03 0.05 0.32
Total 7.55 Cum
For Foundation
AC/HF,L=8.10+0.60 2 8.70 0.60 0.60 6.26AH/CF/BG,L=5.77-0.60 3 5.17 0.60 0.60 5.58
DI/EJ,L=2.25-0.60 2 1.88 0.60 0.60 1.35
For Plinth
AC/HF,L=8.10+0.45 2 8.55 0.45 0.60 4.62
AH/CF/BG,L=5.77-0.45 3 5.32 0.45 0.60 4.31
DI/EJ,L=2.25-0.45 2 2.03 0.45 0.60 1.10
Total 23.22 Cum
AC/HF,L=8.10+0.45 2 8.55 0.45 0.15 1.15
AH/CF/BG,L=5.77-0.45 3 5.32 0.45 0.15 1.08
DI/EJ,L=2.25-0.45 2 2.03 0.45 0.15 0.27
Total 2.51 Cum
Class Room 1 5.32 5.17 0.20 5.50
Store 1 1.28 2.03 0.20 0.52
Kitchen / Toilet block 2 1.57 2.03 0.20 1.27
Ramp 2 2.00 1.00 0.20 0.80
Verandha 1 2.00 1.00 0.20 0.40
Total 8 50 Cum
g g______________________Ahmednager
Item No. 5:- Providing and casting in situ cement concrete of M20 grade of trap granite/quartzite/gneiss metal for
Item No. 6:-Providing dry trap/ granite/ quartzite/ gneiss rubble stone soling 15 cm to 20 cm thick including hand
Item No. 1:- Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing
Item No. 2:- Excavation for foundation in hard murum including removing the excavated material upto distance of
Item No. 3:- Providing and laying in situ, cement concrete in 1:4:8 of trap/granite/quartzite/gneiss metal for
Item No. 4:- Providing uncoursed rubble masonry of trap/ granite/ quartzite/ gneiss stones in cement mortar 1:6
No L B D/H Qty Unit
8/3/2019 Rev.angamnwadi Estimate New Plan Gi Roof 1011 Cement Steel New Rate Wag Roa Check
10/19
y
AC/HF,L=8.10+0.23 2 8.33 0.23 2.70 10.35
AH/CF/BG,L=5.77-0.45 3 5.54 0.23 2.70 10.32
Gable 2 5.54 0.23 0.50 1.27
Pillar 8 0.35 0.12 2.70 0.91
DI/EJ,L=2.25-0.45 2 2.02 0.23 2.70 2.51
Ramp 2 2.00 0.23(0.23+0.60)/2 0.38
1 2.00 0.23 0.23 0.11
Verandha 1 2.00 0.23 0.60 0.28
4 3.00 0.23
(1.00+0.3
0)/21.79
Vervandies
AC/CF 2x2 3.16 0.23
(1.23+0.2
3)/2 2.12
BG 2 3.16 0.23 0.35 0.51
( +) Sub Total 30.55 Cum
Deductions
D 2 1.00 0.23 2.10 0.97
D1 1 0.75 0.23 2.10 0.36
OP 2 1.00 0.23 2.10 0.97W 5 1.00 0.23 1.20 1.38
Lintels AC/HF 2 8.33 0.23 0.15 0.57
AH/CF/BG 3 5.54 0.23 0.15 0.57
DI/EJ 2 2.02 0.23 0.15 0.14
( -) Sub Total 4.96 Cum
Total 25.58 Cum
W.C.
1 0.90 2.10 1.89
1 1.20 2.10 2.52
( +) Sub Total 4.41 Cum
Deductions
D2 1 0.75 2.10 1.58
( -) Sub Total 1.58 Cum
Total 2.84 Sqm
1 1.245 1.545 0.10 0.19
Total 0.19 Cum
Lintels AC/HF 2 8.33 0.23 0.15 0.57AH/CF/BG 3 5.54 0.23 0.15 0.57
DI/EJ 2 2.02 0.23 0.15 0.14
Total 1.29 Cum
Item No. 11:-Providing and casting in situ cement concrete of M 20 grade of trap granite/quartzite/gneiss metal
for R.C.C. beams and lintels as per detailed designs and drawings or as directed including centering, formwork of
Item No. 12:-Providing and casting in situ cement concrete of M20 grade of trap granite/quartzite/gneiss metal
Item No. 8:- Providing Bricks masonry in cement mortar 1:6 using second class burnt bricks in superstructure
Item No. 9:-Providing Bricks masonry in cement mortar 1:4 using second class burnt bricks in half brick thick
Item No. 10:-Providing and casting in situ cement concrete of M20 grade of trap granite / quartzite / gneiss metal
for R.C.C. slabs and landings as per detailed designs and drawings or as directed including centering, formwork
No L B D/H Qty Unit
8/3/2019 Rev.angamnwadi Estimate New Plan Gi Roof 1011 Cement Steel New Rate Wag Roa Check
11/19
Qty Steel Reqd. Kg/cum
Slab 0.19 75.00 14.43
Lintels 1.29 75.00 96.57
Coping 2.51 50.00 125.28
Chajja 0.24 50.00 11.81
248.08Total 0.2481 MT
AC/HF 2 8.33 2.70 44.982
AH/CF 2 6.00 2.70 32.40
(1.00+0)/2=0.5 Gable 1/2X2 6.00 1.00 6.00
Varvandi
AH/CF Varvandi 2X2 3.00 (2.60)/2 15.60Pillar 8x2 0.12 2.70 5.18
Ramp 2 2.00 (0+0.60)/2 2.40
Verandha 1 2.00 0.60 1.20
( +) Sub Total 107.77 Sqm
Deductions
D 1 1.00 2.10 2.10
W 5 1.00 1.20 6.00
V 1 0.60 0.90 0.54( -) Sub Total 8.64 Sqm
Total 99.13 Sqm
Classroom
2 5.54 2.70 29.92
2 5.39 2.70 29.11
Gable 4X2 5.39 0.50 21.56Store
2 1.50 2.70 8.10
2 2.25 3.00 13.50
Kitchen
2 1.79 3.30 11.81
2 2.25 3.00 13.50
W. C.
1 1.79 2.70 4.83
2 2.25 2.70 12.15
2 0.90 2.10 3.78
2 1.20 2.10 5.04
( +) Sub Total 153.30 Sqm
Deductions
W. C. Dado
2 0.90 0.60 1.082 1.20 0.60 1.44
Skirting of room
Class room 2 5.54 0.15 1.66
2 5 39 0 15 1 62
Item No. 16:- Providing and fixing in position TMT steel bar reinforcement of various diameters for R.C.C. pile
Item No. 17:- Providing internal cement plaster 20mm thick in two coats in cement mortar 1:4 without neeru
Item No. 18:- Providing internal cement plaster 12mm thick in single coat in cement mortar 1:4 with neeru finish
No L B D/H Qty Unit
f
8/3/2019 Rev.angamnwadi Estimate New Plan Gi Roof 1011 Cement Steel New Rate Wag Roa Check
12/19
Kitchen
Platform 1 1.79 0.75 1.34
Total 1.34 Sqm
Qty same as Item No. 17 Total 99.13 Sqm
Qty same as Item No. 18 Total 144.23 Sqm
W 5 1.00 1.20 6.00
Total 6.00 Sqm
V 1 0.60 0.90 0.54
Total 0.54 Sqm
W. C.
2 0.90 0.60 1.08
2 1.20 0.60 1.44
Total 2.52 Sqm
Deduct Door 1 0.75 0.60 0.45
0.45 Sqm
A-B 2.07 Sqm
Class Room 1 5.54 5.39 29.86
Store 1 1.50 2.25 3.38
Kitchen / Toilet block 1 1.79 2.25 4.03
1 0.79 1.30 1.03
1 1.79 0.95 1.70
Verandha 1 2.00 1.00 2.00Total 41.99 Sqm
W.C. 1 0.90 1.20 1.08
Total 1.08 Sqm
Deduct W.C.Pan 1 0.60 0.45 0.27
A-B 0.81 Sqm
1 6.00 0.60 3.60
2 8.33 0.60 10.00
Total 13.60 Sqm
14 0.23 0.23 0.23 0.74
Total 0.74 Cum
2 8.33 3.60 59.98
Total 59.98 Sqm
Item No. 22:- Providing & applying washable oil-bound distemper of approved colour and shade to old & new
Item No. 23:- Providing and fixing steel windows of various sizes as per de-tailed drawings with welded square
Item No. 24:-Providing and fixing in position after hoisting, precast 1:2 cement mortar reinforced Jali of ____ mm
Item No. 25:- Providing and fixing white glazed tiles 200mm. x 100mm. in size and about 5 to 6 mm thick for
Item No. 20:- Providing and fixing black kadappa stone sill steps, 25 mm. thick machine polished, cutting
Item No. 21:-Providing and applying two coats of water proof cement paint of approved manufacture and of
Item No. 30:-Providing and fixing corrugated galvanised iron sheets of 0.80mm thickness (22 B.W.G.) for roofing
with wind ties includin fas-tenin with alvanised iron screw and bolts and lead and bitumen washers as per
Item No. 26:- Providing and fixing ceramic tiles of approved quality and size, 7 mm thick for flooring in required
Item No. 27:- Providing and laying white glazed tiles 200mm. x 100mm. in size and 5 mm.to 6 mm. thick for
floorin in re uired osition laid on bed of 1:4 cement mortar includin neat cement float, fillin oints with white
Item No. 28:-Providing flush grooved pointing with cement mortar 1:3 for stone masonry work including
Item No. 29:- Providing and casting in situ cement concrete M-15 /1:2:4 of trap/ granite/ quartzite/ gneiss metal,
moulded or chamfered as per drawing or as directed including centering, form work, com-pacting, covering newly
No L B D/H Qty Unit
S t E
8/3/2019 Rev.angamnwadi Estimate New Plan Gi Roof 1011 Cement Steel New Rate Wag Roa Check
13/19
Sect. Engr.
Name of Work :- Construction of Aganwadi Building______________________Tal. Akole Dist .Ahmednager
8/3/2019 Rev.angamnwadi Estimate New Plan Gi Roof 1011 Cement Steel New Rate Wag Roa Check
14/19
Sr. No. Item Total
/Unit
Estimate
Quantity Total Qty
Sand Metal Rubble
1 Prov. &
casting C.C.
1:4:8
0.45 0 0.45 7.55 3.40
2 M 20 Slabs 0.45 0 0.00 0.45 0.19 0.09
3 M 20 Beams
&lintels
0.45 0 0.00 0.45 1.29 0.58
4 M 20 Chajja 0.45 0 0.00 0.45 0.24 0.11
5 Prov.Rubble
solling
1.25 1.25 8.50 2.59
6 Filling plinth 1.000 0.00 0.00 1.00 0.00 0.00
7 BB Masonry
in CM 1:6
sup
0.320 0.00 0.00 0.32 25.58 8.19
8 Half brick
thk walls
0.035 0.00 0.00 0.04 2.84 0.10
9 M 15 Coping 0.450 0.00 0.00 0.45 2.51 1.13
10 Sills of
Polished
Kadappa
0.018 0.00 0.00 0.02 2.74 0.05
11 12 mm
internal
plaster 1:4
0.016 0.00 0.00 0.02 144.23 2.31
12 20mm
plaster
0.025 0.00 0.00 0.03 99.13 2.48
13 Polish
Sahabad
flooring
0.046 0.00 0.00 0.05 41.99 1.93
14 Polish
Sahabad
dado
0.031 0.00 0.00 0.03 1.08 0.03
15 white glazed
tiles for dado
0.046 0.00 0.00 0.05 2.52 0.12
Ahmednager
Qty. Reqd.
Royalty Statement
Name of Work :- Construction of Aganwadi Building______________________Tal. AkoleDist Ahmednager
8/3/2019 Rev.angamnwadi Estimate New Plan Gi Roof 1011 Cement Steel New Rate Wag Roa Check
15/19
Sr.
No.
Item of work Qty. Bags Reqd. Per Total Bags
1 Prov. & casting P.C.C. 1:4:8 for foundation. 7.55 3.40 Cum 25.68
2 C.C. M-20 grade of trap metal for R. C. C.Slabs 0.19 7.20 Cum 1.38
3 C.C. M-20 grade of trap metal for R. C. C.beams & lintels 0.24 7.20 Cum 1.70
4 C.C. M-20 grade of trap metal for R. C. C.Chajja 0.24 7.20 Cum 1.70
5 Providing Bricks masonry in C. M. 1:6 superstructure 25.58 1.44 Cum 36.84
6 Bricks masonry in C. M. 1:6 in half B,Thk Wall 2.84 0.22 Cum 0.627 Sills of polished Kadappa 2.74 0.13 Sqm 0.36
8 Cement plaster 12 mm in C. M. 1:4 144.23 0.10 Sqm 14.42
9 20mm plaster externally in C.M.1:4 99.13 0.22 Sqm 21.81
10 Polish Sahabad for flooring 41.99 0.22 Sqm 9.24
11 Polish Sahabad for dado 1.08 0.22 Sqm 0.24
12 White glazed tiles for dado/flooring 2.52 0.22 Sqm 0.55
13 U.C.R. masonry in C.M. 1:6 in foundations and plinth 23.22 1.77 Cum 41.11
14 M20 of trap metal for coping to plinth 2.51 7.20 Cum 18.04
15 Flush grooved pointing C.M. 1:3 for stone masonry 13.60 0.025 Sqm 0.34
Total Qty 174.03
Bags
Deputy Engineer
Z.P.(P.W.) Sub-Dn.Akole
Dist . Ahmednager
Sect. Engr.
CEMENT REQUIREMENT STATEMENT
Name of Work :- Construction of Aganwadi Building______________________Tal. Akole Dist .Ahmednager
8/3/2019 Rev.angamnwadi Estimate New Plan Gi Roof 1011 Cement Steel New Rate Wag Roa Check
16/19
QUARRY CHART
Sr.No Material Quarry Lead in
Km
Lead
Charge
Basic
Lead
Diff in lead
1 Rubble 2.00 152.44 207.23 0.00
2 Sand Akole 20.00 349.33 169.39 179.94
3 Cement Akole 20.00 223.19 108.22 114.97
4 Crush Metal Next toAkole 20.00 349.33 169.39 179.94
5 Steel Akole 20.00 267.82 129.87 137.95
6 Bricks Akole 20.00 573.91 278.28 295.63
Certificate
Certified that the nearest available quarries are provided in the estimate
Deputy Engineer
Sect Engr Z P (P W ) Sub Div Akole
Ahmednager
Certified that the material available in the quarries are of good quality and in sufficient quantity f
the work.
Certified that the rates adopted in the estimate are from P.W.D. D.S.R. for the year 2010-2011
8/3/2019 Rev.angamnwadi Estimate New Plan Gi Roof 1011 Cement Steel New Rate Wag Roa Check
17/19
Sr.No
.
Item of Work DSR P. No /Item No
Basic Rate Lead Charges TotalRate
cement diff rs.77.00/bagSand Cement Metal, Cr.
Metal Steel
AddQC
Charge
TotalDerived
Rate
1F
8/3/2019 Rev.angamnwadi Estimate New Plan Gi Roof 1011 Cement Steel New Rate Wag Roa Check
18/19
rubbl
e
0.00
179.94 114.97 Cr.
met
179.94
Steel 137.95Brick 295.63
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Qty req Amt
.
77.00Metal, Steel Charge
s 0.50%
Rate
22 Washable oil bound distemper D.S.R.Page
64,Item No 25.00 25.00 0.00 25.00
23 Fixing Steel Windows D.S.R.Page
87,Item No 2440.00 2440.00 0.00 2440.00 2
24 Precast reinforced Jali 50mm D.S.R.Page
22,Item No 429.00 429.00 0.00 429.00
25 White glazed tiles for dado D.S.R.Page
49,Item No 819.00 0.031 5.58 0.210 1.21 0.21 16.17 841.96 0.00 841.96
26 Ceramic tiles of approved quality
and size, 7 mm thick for flooring
D.S.R.Page
46,Item No 714.00 0.046 8.28 0.220 1.26 0.22 16.94 740.48 3.57 744.05
27 White Glazed flooring D.S.R.Page
45,Item No 777.00 0.012 2.159 0.210 1.21 0.21 16.17 796.54 3.89 800.42
28 Flush grooved pointing to UCR
1:3
D.S.R.Page
40,Item No 40.00 0.003 0.540 0.025 0.14 0.03 1.93 42.61 0.20 42.81
29 M20 Bed Blocks D.S.R.Page
13,Item No 2953.00 2953.00 14.77 2967.77 2
30 CGI sheet for roofing 22 BWG D.S.R.Page
68,Item No 483.00 483.00 0.00 483.00
31 CGI sheet over ridge 22 BWG D.S.R.Page
68,Item No 360.00 360.00 0.00 360.00
32 Structural Steel work D.S.R.Page
9,Item No 4 68334.00 68334.00 0.00 68334.00 6
33 Earthenware "orissa type" W.C.
pan 600 x 400 without flush 806wt
468
D.S.R.Page
289,Item No
702/441600.00 0.028 5.038 0.25 1.44 0.25 19.25 625.73 0.00 625.73
34 110 mm UPVC vent pipe D.S.R.Page120,Item No
54
175.00 175.00 0.00 175.00
35 Inspection Chamber 60x45cm D.S.R.Page
122,Item No
61
1587.00 1587.00 0.00 1587.00 1
36 Hume pipe septic tank D.S.R.Page
124,Item No
77
4876.00 4876.00 0.00 4876.00 4
37 Providing soak pit D.S.R.Page
125,Item No
78
453.00 453.00 0.00 453.00
38 Informatory sign board D.S.R.Page254,Item No
22
2233.00 2233.00 0.00 2233.00 2
39 Fixing information board D.S.R.Page
255,Item No
26
551.00 551.00 0.00 551.00
40 Photo raph 273/55 ii 56.00 56.00 0.00 56.00
Sect. En r.Z.P. (P.W.) Sub- Div Akole
Deput En ineer
Name of Work :- Construction of Aganwadi Building______________________Tal.Akole Dist . Ahmednager
8/3/2019 Rev.angamnwadi Estimate New Plan Gi Roof 1011 Cement Steel New Rate Wag Roa Check
19/19
Item no 16:
Basic Rate as per DSR 2010-11 Rs 47700.00 Per MT
Deduct Material Cost Rs 34400.00 Per MT
Net Cost of Labour Rs 13300.00 Per MT
Add Revise Material Cost 1.4.11 Rs 40500.00 Per MT
Hence new Rate Rs 53800.00 Per MT
Add 10 % Overhead charges
53800.00
47700.00
6100.00
0.10 610.00 Per MT
Hence new Rate Rs 54410.00 Per MT
Prepared by me
Deputy EngineerSect Engr Z P (PW) Sub Dn Akole
g
Rate Analysis
Providing and fixing in position TMT steel bar reinforcementof various diameters
for R.C.C.pile caps, footing, foundations, slabs, beams, lintels, columns canopies,staircase, newels, chajjas, pardis copings, fins, arches, etc as per detailed design,
dra