REV DATE DESCRIPTION BY OK’D AP’D PROJECT ARCHITECT SYSTEM SAFETY CHIEF ENGINEER DIRECTOR OF ENGINEERING SCALE:_________________ DATE:_____________ DRAWN :______WW_______ CHECKED BY:___________ SCALE FACTOR:_________ SOUTHEASTERN PENNSYLVANIA TRANSPORTATION AUTHORITY CAPITAL PROJECT CONTROL AND QA/QC 1234 MARKET STREET, 12 TH FLOOR, PHILADELPHIA PA 19107 R7 CHESTNUT HILL EAST RAIL TRANSPORTATION RRD STATION AMENITY PROGRAM COVER SHEET WORK ORDER NO. DRAWING C1 OF 2 SHEET NO. 1 OF 31 DRAWING NO. 60245 REV DRAWING LIST 60245 C1 COVER SHEET 60246 C2 GENERAL NOTES & SCHEDULE 60247 A1 CHESTNUT HILL EAST SITE PLAN 60248 A2 CHE PAINTING AND IMPROVEMENT DETAILS 60249 A3 GRAVERS SITE PLAN 60250 A4 GRAVERS PAINTING AND IMPROVEMENT DETAILS 60251 A5 WYNDMOOR SITE PLAN 60252 A6 WYNDMOOR PAINTING AND IMPROVEMENT DETAILS 60253 A7 WYNDMOOR PAINTING AND IMPROVEMENT DETAILS 60254 A8 WYNDMOOR PAINTING AND IMPROVEMENT DETAILS 60255 A9 MT. AIRY SITE PLAN 60256 A10 MT AIRY PAINTING AND IMPROVEMENT DETAILS 60257 A11 MT AIRY PAINTING AND IMPROVEMENT DETAILS 60258 A12 MT AIRY PAINTING AND IMPROVEMENT DETAILS 60259 A13 SEDGWICK SITE PLAN 60260 A14 SEDGWICK PAINTING AND IMPROVEMENT DETAILS 60261 A15 SEDGWICK PAINTING AND IMPROVEMENT DETAILS 60262 A16 SEDGWICK PAINTING AND IMPROVEMENT DETAILS 60263 A17 STENTON SITE PLAN 60264 A18 STENTON PAINTING AND IMPROVEMENT DETAILS 60265 A19 STENTON PAINTING AND IMPROVEMENT DETAILS 60266 A20 WASHINGTON LANE SITE PLAN 60267 A21 WASHINGTON LANE PAINTING AND IMPROVEMENT DETAILS 60268 A22 WASHINGTON LANE PAINTING AND IMPROVEMENT DETAILS 60269 D1 RAILING DETAILS 60270 D2 SIGN DETAILS 60271 D3 FURNISHINGS DETAILS 60272 SH1 SHELTER NOTES 60273 SH2 SHELTER DETAILS 60274 SH3 SHELTER DETAILS 60275 SH4 SHELTER DETAILS PROJECT LOCATIONS RRD STATION AMENITY PROGRAM R7 – CHESTNUT HILL EAST STATIONS
RRD STATION AMENITY PROGRAM R7 – CHESTNUT HILL EAST STATIONS. DRAWING LIST 60245C1 COVER SHEET 60246C2 GENERAL NOTES & SCHEDULE 60247A1 CHESTNUT HILL EAST SITE PLAN 60248A2 CHE PAINTING AND IMPROVEMENT DETAILS 60249A3 GRAVERS SITE PLAN - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
PAINT OUTER BRIDGE GIRDERS INCLUDING OUTER FACE AND TOP, SIDE AND BOTTOM EDGES PER SPEC SECTION
REMOVE EXISTING SHELTER
PAINT STAIR HANDRAILS (EM)
PAINT HANDRAILS AND SUPPORTS (EM)
REPAIR CORNERS OF BRIDGE ABUTMENTS
SEDGWICK STATIONNOT TO SCALE
SEDGWICK SCOPEINBOUND SIDE1. REPLACE SHELTER WITH NEW SHELTER2. INSTALL FIVE PLATFORM MOUNTED SIGNS 3. REPLACE SIDEWALK 4. INSTALL 2 BICYCLE RACKS5. PAINT STAIR HANDRAIL6. REPLACE SIDEWALK ALONG DEVON STREET (APPROX 500 SQFT
OUTBOUND SIDE AND BRIDGE 1. PAINT STAIR HANDRAIL2. INSTALL FIVE PLATFORM MOUNTED SIGNS3. REMOVE STUMPS4. REPAIR CURB (APPROX 100 LF.)5. PAINT BRIDGE OVER E. MT PLEASANT AVENUE6. REPAIR SIDEWALK ALONG E. MT PLEASANT AVE. (APPROX 500 SQFT)
REPLACE HANDRAIL
INSTALL END OF PLATFORM SIGN ON FENCE
REPAIR AND PAINT DECORATIVE IRON FENCE TO ADJACENT BRIDGE (APPROX 450’)
REPLACE RAILING WITH STANDARD GUARDRAIL
PATCH LANDINGS AND TREADS (TYP FOR ALL OF BOTH STAIRS
GRIND STUMPS TO BELOW GRADE, COVER WITH TOPSOIL AND SEED
SPECIAL NOTE FOR REPAIR OF BRIDGE ABUTMENTS:
A LICENSED ENGINEER MUST DESIGN AND SEAL ALL BRIDGE ABUTMENT REPAIRS. ALL REPAIRS MUST BE EXECUTED UNDER THE ENGINEER’S SUPERVISION.
REPLACE APPROXIMATELY 200SQFT OF SIDEWALK BETWEEN HERE AND THE BRIDGE
PAINT DECORATIVE METAL SECTION (EM)
INSTALL PLATFORM MOUNTED ID SIGNS (2 THIS SIDE)
INSTALL PLATFORM MOUNTED ID SIGNS (3 THIS SIDE)
REMOVE EXISTING HANDRAIL
EXTEND PLATFORM 24” AND INSTALL NEWSPAPER CORRAL
PAINT PREPARATION AND SYSTEMSEGM - EXTERIOR GALVANIZED METAL - REMOVE LOOSE PAINT WITHOUT DAMAGING THE GALVANIZED SURFACE. SPOT PRIME EXPOSED GALVANIZED SURFACES. REMOVE ALL OXIDIZED (CHALKING) PAINT AND SURFACE DIRT. APPLY:
1 COAT COROTHANE I - MIO ALUMINUM PRIMER B65S14
2 COATS HIGH SOLIDS POLYURETHANE B65-300
EM - EXTERIOR METAL - REMOVE ALL SURFACE RUST WITH SANDING. IMMEDIATELY SPOT PRIME WITH METAL PRIMER. REMOVE ALL OXIDIZED (CHALKING) PAINT AND SURFACE DIRT. APPLY:
1 COAT MACROPOXY 646 FAST CURE EPOXY B58-600
2 COATS HIGH SOLIDS POLYURETHANE B65-300
ES – EXTERIOR STONE/ MASONRY – REMOVE ANY LOOSE PAINT. ALERT THE SEPTA PROJECT ENGINEER AT ANY SIGNS OF MOISTURE IN THE STONE WORK. APPLY:
INSTALL THREE PLATFORM MOUNTED SIGNS & FRAMES EACH SIDE
PAINT METAL RAILING AND POSTS (EM)
REPLACE SIDEWALK ENTIRE LENGTH
PAINT RAILING (EM)
PAINT METAL STAIR RAILING (EM)
PAINT BRIDGE ABUTMENTS (ES)
PAINT ENTIRE ABANDONED STAIR HEAD HOUSE STRUCTURE
PATCH VOIDS AND PAINT (ES)
PATCH CONCRETE
PAINT METAL RAILING AND POSTS
STAIRS AT OUTBOUND SIDE OUTBOUND END OUTBOUND SIDE OUTBOUND END
OUTBOUND SIDE OUTBOUND ENDOUTBOUND ENDOUTBOUND SIDE INBOUND END
PAINT OUTER GIRDERS OF BRIDGE
OUTBOUND END
AT STREET ON INBOUND SIDE OUTBOUND ENDINBOUND SIDE INBOUND END OUTBOUND SIDE INBOUND END
REMOVE VEGETATION
PAINT DECORATIVE FENCE (EM)
REMOVE POST & FILL HOLES IN CONCRETE
PAINT PREPARATION AND SYSTEMSEGM - EXTERIOR GALVANIZED METAL - REMOVE LOOSE PAINT WITHOUT DAMAGING THE GALVANIZED SURFACE. SPOT PRIME EXPOSED GALVANIZED SURFACES. REMOVE ALL OXIDIZED (CHALKING) PAINT AND SURFACE DIRT. APPLY:
1 COAT COROTHANE I - MIO ALUMINUM PRIMER B65S14
2 COATS HIGH SOLIDS POLYURETHANE B65-300
EM - EXTERIOR METAL - REMOVE ALL SURFACE RUST WITH SANDING. IMMEDIATELY SPOT PRIME WITH METAL PRIMER. REMOVE ALL OXIDIZED (CHALKING) PAINT AND SURFACE DIRT. APPLY:
1 COAT MACROPOXY 646 FAST CURE EPOXY B58-600
2 COATS HIGH SOLIDS POLYURETHANE B65-300
ES – EXTERIOR STONE/ MASONRY – REMOVE ANY LOOSE PAINT. ALERT THE SEPTA PROJECT ENGINEER AT ANY SIGNS OF MOISTURE IN THE STONE WORK. APPLY:
REPLACE W/ SEPTA GUARDRAIL & INTEGRAL END OF PLATFORM SIGN
REMOVE TO SOUND SUBSTRATE AND REPAIR DETERIORATED CONCRETE CORNER OBTAIN ENGINEERS APPROVAL – SEE NOTE ON SITE PLAN
PAINT OUTER BRIDGE GIRDERS
PAINT OUTER BRIDGE GIRDERS
SAWCUT SLAB AND REPLACE LANDING ON STAIR AT IB END OF OB SIDE.
REPLACE RAILING WITH STANDARD GUARDRAIL
REPLACE MISSING CONCRETE AT STAIR AT OB SIDE/OB END
PAINT RAILING (EM)
PAINT ENTIRE ABANDONED STAIR HEAD HOUSE STRUCTURE
STAIRS AT OUTBOUND SIDE INBOUND END
INSTALL GUARDRAIL WITH END OF PLATFORM SIGN FRAME
ATTACH EXISTING RAILING TO NEW GUARDRAIL
OUTBOUND SIDE INBOUND END
OUTBOUND SIDE OUTBOUND END
E INBOUND END
STAIRS AT OUTBOUND SIDE INBOUND END
STAIRS AT OUTBOUND SIDE OUTBOUND END
BRIDGE ABUTMENT ACROSS STREET INBOOUND ENDBRIDGE ABUTMENT ACROSS STREET INBOOUND END
REMOVE BUSHES AND INSTALL 5’-0” WIDE CONCRETE PATH CONNECTION PARKING WITH WALKWAY
REMOVE VEGETATION
REMOVE TO SOUND SUBSTRATE AND REPAIR DETERIORATED CONCRETE CORNER OBTAIN ENGINEERS APPROVAL – SEE NOTE ON SITE PLAN
REMOVE TO SOUND SUBSTRATE AND REPAIR DETERIORATED CONCRETE CORNER OBTAIN ENGINEERS APPROVAL – SEE NOTE ON SITE PLAN
PAINT PREPARATION AND SYSTEMSEGM - EXTERIOR GALVANIZED METAL - REMOVE LOOSE PAINT WITHOUT DAMAGING THE GALVANIZED SURFACE. SPOT PRIME EXPOSED GALVANIZED SURFACES. REMOVE ALL OXIDIZED (CHALKING) PAINT AND SURFACE DIRT. APPLY:
1 COAT COROTHANE I - MIO ALUMINUM PRIMER B65S14
2 COATS HIGH SOLIDS POLYURETHANE B65-300
EM - EXTERIOR METAL - REMOVE ALL SURFACE RUST WITH SANDING. IMMEDIATELY SPOT PRIME WITH METAL PRIMER. REMOVE ALL OXIDIZED (CHALKING) PAINT AND SURFACE DIRT. APPLY:
1 COAT MACROPOXY 646 FAST CURE EPOXY B58-600
2 COATS HIGH SOLIDS POLYURETHANE B65-300
ES – EXTERIOR STONE/ MASONRY – REMOVE ANY LOOSE PAINT. ALERT THE SEPTA PROJECT ENGINEER AT ANY SIGNS OF MOISTURE IN THE STONE WORK. APPLY: