FR C.1 RESPONSE TO INADEQUATE CORE COOLING Rev. 2*
. _ _
A. PURPOSE
nis procedure provides actions to restore core cooling.
B. SYMPTOMS OR ENTRY CONDITIONS
This procedure is entered fmm F-0.2, CORE COOLING Critical Safety Function Status Tree,on either RED condition.
i
.
Page 1 of 9
80102502N h$000 13PDR ADOCK PDR
1 P,
JUN 3 1988.
NUMBER TIT 12 REY. ISSLTJDATEFR C.1 RESPONSE TO INADEQUATE CORE COOLING Rev.2 ;,
.
I
.J
STEP ACT10N/ EXPECTED RESPONSE RESPONSE NOT OBTAINED-
r 7CAUTION 1 IF THE KW:T LEVEL DECREASES TO LESS THAN 130,D0
GALLONS, THE SI SYSTEM SHOULD BE ALJGNED FOR\
RHR RECIRCULA7 ION USib'G ES 13, TRANSFER TO RHR |RECIRCULATION
J||L
||
1 VERIFY S1 VALVES IN PROPER hiANUALLY ALIGN VALVES AS |Eh1ERGENCY ALIGNhiENT NECESSARY. j2 VERIFY SI FLOW IN ALL TRAINS: START PUbiPS AND ALIGN VALVES
AS NECESSARY.o Check charging pump flow
indicators - TRY TO ESTABLISH ANY OTTIERINDICATE FLOW 111G11 PRESSURE INJECTION
SOURCE OR PATTI:o Check llPSI pump Ah1P meters -
GREATER TliAN 115 AhtPS o Start metering pump and adjust fornuxtmum speed.
o Check LPSIpump AhiPmeters-GREABiR T11AN 60 AhiPS o IJne up for fill headerinjection:
I
a. Open all four loop fill !header hiOVs. !
i
b. Open fill header flow control ;
valve (FH FCV 295) and bypassvalve (Fli htOV 344). |
c. Ensure charging pumps running. i
3 CliECK RCP SUPPORT SYSTEhtS TRY TO ESTABLISil SUPPORTAVAILABIA SYSTEhtS. i
r
o Check Component Cooling Water jSystem -IN SERVICE j
}o Check RCP seal water supply and I
retum system - 1
IN SERVICE
4 CliECK CORE EXIT QQIQ STEP 7. 4
111ERhiOCOUPLES . ILESS T11AN 1200' F !
||
|
Page 2 of 9
JUN 3 1988,
NUMBER Tm2 REV. lSSLTJDATE I
FR C.1 RESPONSE TO INADEQUATE CORE COOLING Rev.2 !*
!
STEP ACT10N/ EXPECTED RESPO!!,E RESPONSE NOT OBTAINED_
5 CHECK RVLIS PLENUMINDICABON:
a. Check indication - a. E increasinJ,GREATER Di&N 15 % IEEN RET JRNIQ Step 1.
,
E NOIincreasing, |DIEN QQIQ Step 6. j
b. RERJRN IQ procedure and Istep in effect !
l
6 CHECK CORE EXIT iMERMOCOUPIES:
a. Check temperature - a. E decreasing,LESS TilAN 700' F TIEN RETURNIQ Step 1.
E EQIdecreasing.TlIEN QQIQ Step 7.
NOTE: THIS PROCEDURE SHOULD BE CONTINUED WHILE I
OBTAINING HYDROGEN SAMPLE IN STEP 7.
i!
7 CIECK CONTAINMENTIIYDROGENCONCENTRADON:
a. Obtain a containment air sam31e
with the Post Accident SampingSystem
b. Check liydrogen concentration - b. Corsult plant engineering staff for |LESS DIAN 6.0 % IN DRY AIR additional recovery actions.
QQIQ Step 8.
i
!
Page 3 of 9,
JUN 31988.
NUMBER TTT12 REV. ISSLTJDATE i
F R.C.1 RESPONSE TO INADEQUATE CORE COOLING Rev. 2.
STEP ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAINTD
ir
j7CAUDON: o MONITOR DWST LEVEL. START MAKEUP TO DWST BEFORE
LEVEL DECREASES TO S4,000 GALLONS. '
o A FAULTED OR RUPTURED SG SHOULD NOT BE USEDIN SUBSEQUENT STEPS UNLESS NO INTACT SG 15A VAILABLE.
L J
8 CIIECK INTACT SG LEVELS:
a. Check wide range levels - a. Increase total AUX feedwater flowGREATER DIAN 63 % to restore wide range level in at least(67 % FOR ADVERSE one SG to greater than 63 %CONTAINMENT) (67 % for adverse containment).
IE total AUX feedwater flow isless than 320 GPM,IHEN 00IQ Step 16OBSERVE NOTE PRIORTO STEP 16.
b. Control AUX feedwater flow to ,
maintain wide range levels between63 % and 69 %
|!(67 % and 69 % for adversecontamment)
9 CIIECK RCS VENT AND || DRAIN PAniS CLOSED:
ii
a. Check power to PRZR PORY a. Restore power to PRZR PORVblock valves - block valves.AVAIIABIE
i
i
b. Check PRZR PORVs CLOSED b. Manually close PRZR PORVs. |IE any PORV can b'QI be closed,
111EN nunually close its block valve. |c. Check other RCS vent paths - c. Manually OR locally close any open I
CLOSED RCS vent paths.
d. Check drain header ISOLATED d. Close all four loop drainheader MOVs.
e. Checkletdown ISOLA 11ID e. Close letdown isolation valvell>MOV 200
Page 4 of 9
JUN 31988'
---
NUMBER TT!12 REV. ISSUE /DATEFR C.1 RESPONSE TO INADEQUATE CORE COOLING Rev.2
i
S17.P ACT10N/ EXPECTED RESPONSE RESM)NSE NOT OBTAINED ;
NOTE: PARTIAL UNCOVER)NG OF SG TUBES IS ACCEPTABLE IN THEFOLLOWING STEPS.
10 DEPRESSURIZE ALL INTACT SGsAT MAXIMUM RATE: f
Ia. Dump steam to condenser at a. Dump steam at maximum rate I
maximum rate using the fo!!owing:;
o Atmospheric vent valve. i
o Terry Turbine steam supply valves.'
b. Check SG pressures DECREASING b. E b'QI dec:-asing,,
111EN QQIQ Step 16OBSERVE NOTE PRIOR ;
TO STEP 16.'
11 CliECK IF RCPs SilOULD BESTOPPED:
a. Check at least two hot leg a. E RCS hot leg temperatunstemperatuns - decreasing,LESS T11AN 350' F TilEN RETURMIQ Step 8,
|E b'QIdecreasing,IliEN GQIQ Step 16.,
OBSERVE NOTE PRIORTO STEP 16. !
b. Stop all RCPs
12 DEPRESSURIZE ALLINTACT SGsTO 50 PSIO:
a. Dump steam to condenser at a.Du steam at ma.dm m ratema.dmum rase usin the following:
o Atmos >heric vent valve.o Terry Tuttine steam supply valves.
,
| Page 5 of 9,
. .. _- . - _ . - - .- ---- .
_ _ _ _ _ _ - _ _ _ _ _ _ __
ww.. o 4J0o.
NUMBER TTI12 REV. ISSt'E/DA1T.FR.C.1 RESPONSE TO INADEQUATE CORE COOLIhu Rev.2
STEP ACTION / EXPECTED RESPONSE RESPONSE NOT OBTALNED
13 VERIFY SI FLOW: CONTINUE EFFORTS TO ESTABLISHSI FLOW,
'
o Cherv kWSTlevel DECREASING'mY TO ESTABLISH ANY OTTIER
% IIIGH PRESSURE INJECTION PAT 1{.
o Check charging line flow IE CORE EXITTIIERMOCOUPLESIndicators INDICATE FLOW LESS TliE 1200* F.
TIIEN RERJRNIQ STEP 12.%lE b'M LESS THAN 1200' F.
o Check HPSI pump AMPS - THEN QQIQ STEP 16,GREATER T11AN 115 AMPS OBSERVE NOTE PRIOR TO ST11P 16.
3o Check LPSI pump AMPS - -
GREATER 1TIAN 60 AMPS
14 CIIECK CORE COOLING:
a. Check core exit thermocouples - a. QQIQ Step 16 OBSERVE NOT2LESS TRAN 1200' F PRIOR TO STEP 16.
b. Check at least two hot leg b. RETURNIQ Step 12.,
Lb 350'F'
c. Check RVLIS slenum indication - c. RETURNIQ Step 12.GREATER H AN 15 % i
i
15 QQIQ E 1,LOSS OF REACIOR OR SECONDARYCOOLANT, S'17.P 12