Page 1: Return Centre Overview - Mys Rd RC

Returns CentreMys Rd RC

Page 2: Return Centre Overview - Mys Rd RC

Vision

Page 3: Return Centre Overview - Mys Rd RC

To drive key performance indicators in strategic, tactical and operational terms for value driven inclusive growth and achieving mission specific objectives to deliver results

for all stakeholders

Page 4: Return Centre Overview - Mys Rd RC

Mission

Page 5: Return Centre Overview - Mys Rd RC

Identify key performance indicatorsDefine Key objectives

Chart the initiativeFollow the pathDeliver results

Page 6: Return Centre Overview - Mys Rd RC

DETAILED PV

INVENTORY

REFINISHING

OUTBOUND

PRIMARY PV

RECEIVING

Team of 150+

Page 7: Return Centre Overview - Mys Rd RC

Inbound Outbound

• Receiving

• Primary PV

• Detailed PV

• Consumable Planning

• Refinishing

• PV Pass Packing

• Put-away

• Picking

• Supplier Return

• Liquidation

• Stock-Take

• FKI Inwards

Page 8: Return Centre Overview - Mys Rd RC

• EKL- FC Reconciliation• Turn around time

• Manpower Productivity

• Received by 4:30pmbut Initial PV not done• Turn around

time• Manpower

Productivity• Bulk Reco

• Turn aroundtime

• Manpower Productivity

• Bulk Reco• Re-invetorization%

• Material Integrity• Stock Take

Accuracy• Manpower

Productivity• Bulk Reco

• Variance Integrity

• Turn around time

• Manpower Productivity• Material Traceability