Jan 19, 2015
The Legacy of 1960’s UniversityThe Legacy of 1960 s University Buildings in the 21st Century
k dBackground
• HEI’s have been handling unsatisfactory building stock since the 1960’s.
• Over 40% of university estate in the UK was built• Over 40% of university estate in the UK was built between 1960 and 1979.
• The overarching issue of sustainability is at the forefront of construction.
University of Bristol Students Union
REFURBISH ORREFURBISH OR REBUILD?
Approaching the Problems
• Wide range of problems associated with 1960’s buildings.
• For example:• For example:– Location– widespread asbestos
l i i i– planning restrictions– expenditure/capital lay out– changes in legislation
l k– cost planning risk– possible inflexibility of the original construction
k d lDecision Making Models
AUDE (Association for University Directors of Estates) have proposed two means of option assessment
1 – FILTER TOOL2 – OPTION APPRIASAL MATRIX
Used in conjunction with each other both models canUsed in conjunction with each other both models can be used to facilitate an informed decision.
However their effectiveness may be lost if used inHowever, their effectiveness may be lost if used in isolation.
k d lDecision Making Models
FILTER TOOL • series of flow diagrams under Vision, Social, Economic
and Environmental headings.• Used by University Estates Team as a pre feasibility• Used by University Estates Team as a pre - feasibility
work shop facilitator.
OPTIONS MATRIX TOOL • Offers users a best practice framework for assessing
optionsoptions.• Offers a balanced approach under the headings Vision,
Social, Economic and Environmental . • Allows for the weighting of each category.
f l l kUseful links
• http://www aude ac uk/info-http://www.aude.ac.uk/infocentre/1960s_project
http // hefce ac k/• http://www.hefce.ac.uk/
h d dWhat we did...
h d dWhat we did...
h d dWhat we did...
bere:architects
Constructing Excellence Reading
9th November 2011
Mayville Community Centre Passivhaus retrofit
Justin Bere, bere:architects
www.bere.co.uk
twitter @jbere
bere:architects
(1) Design, funding, tendering & construction
(2) Building performance evaluation
(3) Social impact
bere:architects
(1) Design, funding, tendering & construction
bere:architects
Graph courtesy of Dr Rudolph Plagge, Dresden; the need for retrofit in Germany
Retrofit
ExistingBuildings
NewBuildings
bere:architects Mayville Community Centre; Passivhaus Certified Retrofit, 2010 - 2011
Originally built in the early 1900’s
to house generators for the tram
network, the massively constructed
building became derelict in the late
1960s. It became a community centre
after local residents lobbied Islington
Council for possession of the building
in the 1970s.
1900
bere:architects Mayville Community Centre; Passivhaus Certified Retrofit, 2010 - 2011
The community centre is transferred
to Mildmay Community Partnership.
MCP objectives: “...to develop the
capacity and skills of beneficiaries
in such a way that they are better
able to identify, and help meet their
needs and to participate more fully in
society”.
Energy bills of £10,000 per year
Uncomfortably cold and draughty
Poor internal layout and facilities
2006
bere:architects Mayville Community Centre; Passivhaus Certified Retrofit, 2010 - 2011
Mayville Community Centre
bere:architects aims to put Mayville ‘on the map’ with the first community
based ecological, ultra low energy, Passivhaus conversion in the UK.
But as well as energy saving and ecological features, we are proposing a
distinctive new look for the a truly multi-purpose community centre that will
attract even more people to become involved in the Mayville community
and the MCP and be an exemplar to future community building projects.
We are proposing a community centre that local residents can be proud
of and a building that will serve their needs without wasting financial
resources on large energy bills. Mayville Community Centre will mostly heat
and cool itself, hence “passive”.
Cosy, warm, light and airy. Natural wood creates a healthy and inviting interior.
A good café creates a warm heart to any community centre. Opening out into the south gardens creates opportunities for al-fresco dining
A ventilation unit with heat recovery in the basement provides fresh filtered and pre-warmed air into the centre and extracts stale air from the kitchen and bathrooms. Not only people who suffer from pollen and dust allergies benefit from the system; everyone will enjoy the supply of ample clean fresh air supplied, with heat recovery, day and night.
Native bird species like sparrows and finches will be encouraged by planting and nestboxes
4 evacuated glass tube solar panels provide at least 65% of the centre’s hot water requirements though the year. A ground source heat pump also contributes to the domestic hot water heating when necessary. 76 photovoltaic
panels contribute to the electrical energy demands of the centre.
Meadow and wildflower planting in the southern garden area improves biodiversity. Mown areas provide areas for picnics and outdoor activities
High levels of recycled paper and wood fibre insulation in the roof and walls, combined with improved air-tightness eliminate the need for major heat sources while a comfortable temperature is maintained all year round.
Roof gardens of native planting in lightweight soils help to moderate the microclimate and encourage bio-diversity
High performance triple glazed windows have insulated frames which minimise heat losses. The window’s double seals maintain the high levels of air-tightness.
A basement lightwell with gently stepped planted ‘ampitheatre’ seating lets light into the basement rooms while creating a space for outside performances and education.
bere:architects
2009Planning approval
granted for a plan to
transform the Mayville
Community Centre into
a contemporary facility
which will increase service
provision for one of
London’s most deprived
neighbourhoods and
provide warm and
comfortable interiors with
minimum energy costs for
many years to come.
bere:architects Mayville Community Centre; Passivhaus Certified Retrofit, 2010 - 2011
2009The Passivhaus Planning
Package (PHPP) was
used as an early stage
design tool to evaluate and
communicate the benefits
of opening the building up
to a new south garden.
The low carbon design was
one of the most important
factors in winning funding
support
Passive House Verification
Photo or Drawing
Building: Mildmay Community CentreLocation and Climate: London GB - Manchester
Street: Woodville RoadPostcode/City: N16 8NA
Country: England
Building Type: Community Centre
Home Owner(s) / Client(s): Mildmay Community TrustStreet:
Postcode/City:
Architect: bere:architectsStreet: 73 Poets Road
Postcode/City: N5 2SH
Mechanical System: Alan ClarkeStreet: The Woodlands, Woodland Close, Whitecroft
Postcode/City: GL15 4PL Lydney
Year of Construction: 1880's
Number of Dwelling Units: 1 Interior Temperature: 20.0 °C
Enclosed Volume Ve: 4093.7 m3 Internal Heat Gains: 3.7 W/m2
Number of Occupants: 19.0
Specific Demands with Reference to the Treated Floor Area
Treated Floor Area: 665.0 m2
Applied: Monthly Method PH Certificate: Fulfilled?Applied: Monthly Method PH Certificate: Fulfilled?
Specific Space Heat Demand: 13 kWh/(m2a) 15 kWh/(m2a) Yes
Pressurization Test Result: 0.5 h-1 0.6 h-1 Yes
Specific Primary Energy Demand(DHW, Heating, Cooling, Auxiliary and Household Electricity): 120 kWh/(m2a) 120 kWh/(m2a) Yes
Specific Primary Energy Demand(DHW, Heating and Auxiliary Electricity): 24 kWh/(m2a)
Specific Primary Energy DemandEnergy Conservation by Solar Electricity: 43 kWh/(m2a)
Heating Load: 11 W/m2
Frequency of Overheating: 2 % over 25 °C
Specific Useful Cooling Energy Demand: kWh/(m2a) 15 kWh/(m2a)
Cooling Load: 8 W/m2
We confirm that the values given herein have been Issued on:determined following the PHPP methodology and basedon the characteristic values of the building. The calculations signed: with PHPP are attached to this application.
PHPP 2007, Verification 300mc ph s111021jb Mayville PHPP revised hours of use.xls
bere:architects Mayville Community Centre; Passivhaus Certified Retrofit, 2010 - 2011
35%Increase in usable space
92%Reduction in energy use
bere:architects Mayville Community Centre; Passivhaus Certified Retrofit, 2010 - 2011
2010Fundraising complete
for a pioneering, ultra
low-energy passivhaus
certified retrofit, costing
£2 million including fees.
Funders:
Big Lottery; London
Borough of Islington;
Community Builders
Fund; City Bridge Trust;
Dept. of Energy and
Climate Change via EST
and Carbon Trust.
bere:architects Mayville Community Centre; Passivhaus Certified Retrofit, 2010 - 2011
2010
Occupancy / Internal heat gains:
• Every room accounted for..
• Standing? Sitting? etc
• % of room used?
• by how many people?
• occupancy per m2?
• heat per person?
• hours of occupancy?
Passive House PlanningI N T E R N A L H E A T G A I N S Non-domestic Use
Building: Mildmay Community Centre
Utilisation Pattern: 3.70 W/m² 4.16 W/m² Carefully complete the Electricity Non-Dom worksheet!
Type of Values Used: User Determined: 3.7 W/m² False input
Calculation Persons: 19 P Room Temperature: 20 °C
Internal Heat TF Area: 665 m² Heating Period: 204.5165 d/a Internal Heat Gains Aux. Electricity: 19.6 WColumn Nr.
Persons
Sel
ect
Util
isat
ion
Pat
tern
Sel
ect
Act
ivity
of P
erso
ns Planning with the number of persons or via floor area of utilisation zone
(planning via area only if the occupancy is available for this utilisation pattern).
Pers./Area (1 / 0)
Num
ber o
f Occ
upan
ts
Floo
r Are
a of
Util
isat
ion
Zone
(m²)
Ave
rage
Occ
upan
cy
(Per
sons
/ m
²)
Hea
t Em
itted
per
Per
son
(W)
Util
isat
ion
Hou
rs p
er Y
ear
[h/a
]
Rel
ativ
e P
rese
nce
Use
d in
Tim
e S
pan
(h/a
)
Ave
rage
Hea
t Em
itted
by
Per
sons
(W)
27 9 18
Persons A 1 Meeting rooms BF 2 > 10 yr., sitting 1 planning with # of persons { 2 }* or { * no standard
value } * 80 * 3120 * 0.40 / 8760 = 23Persons B 2 Music studio BF 3 >10 yr., standing or
light work 1 planning with # of persons { 2 }* or { * no standard
value } * 100 * 2080 * 0.20 / 8760 = 9Persons C 3 Reception GF 2 > 10 yr., sitting 1 planning with # of
persons { 1 }* or { * no standard value } * 80 * 2975 * 0.50 / 8760 = 14
Persons D 4 Kitchen GF 3 >10 yr., standing or light work 1 planning with # of
persons { 1 }* or { * no standard value } * 100 * 1400 * 0.70 / 8760 = 11
Persons E 5 Dining area GF 3 >10 yr., standing or light work 1 planning with # of
persons { 2 }* or { * no standard value } * 100 * 3500 * 0.50 / 8760 = 40
Persons F 6 Workshop GF 2 > 10 yr., sitting 1 planning with # of persons 2 no standard
value80 3500 0.50 8760 32
Persons G 7 Main hall GF 3 >10 yr., standing or light work 1 planning with # of
persons 1 no standard value
100 2800 0.20 8760 6Persons H 8 Workshop/IT 1F 2 > 10 yr., sitting 1 planning with # of
persons 2 no standard value
80 1560 0.70 8760 20Persons I 9 MCP Office 1F 2 > 10 yr., sitting 1 planning with # of
persons 3 no standard value
80 2496 0.70 8760 48Persons J 11 Circulation Area 3 >10 yr., standing or
light work 1 planning with # of persons 1 no standard
value100 4200 0.10 8760 5
Persons K 12 WC and sanitary 3 >10 yr., standing or light work 1 planning with # of
persons { 1 }* or { * no standard value } * 100 * 4200 * 0.10 / 8760 = 5
Persons L 13 Storage 3 >10 yr., standing or light work 1 planning with # of
persons { 1 }* or { * no standard value } * 100 * 5250 * 0.02 / 8760 = 1
Evaporation (person specific) 179 * -15 * 5250 * 0.02 / 8760 = -32
Lighting / Equipment / Aux. Electricity
Use
ful E
nerg
y [k
Wh/
a]
Ava
ilabi
lity
Use
d in
Tim
e P
erio
d (k
h/a)
Ave
rage
Hea
t R
elea
se
Lighting 11827 * 1.00 / 8.76 = 1350Office Applications (Within Therm. Envelope) 8259 * 1.00 / 8.76 = 943Cooking (Within Therm. Envelope) 2625 * 0.50 / 8.76 = 150Dishwashing (Within Therm. Envelope) 1050 * 0.30 / 8.76 = 36Cooling (Within Therm. Envelope) 0 * 1.00 / 8.76 = 0Other (Within Therm. Envelope) 1218 * 1.00 / 8.76 = 139Auxiliary Appliances (See Aux Electricity Worksheet) = 20
Heat Loss Due to Cold Water (calculation from column AJ)
on/o
ff (1
/ 0) Predominant
Utilisation Pattern of Building
(Data transfered from Electricity Non-Dom
worksheet; input kitchen)
Num
ber o
f WC
s (u
ser d
ata)
Num
ber o
f WC
s: U
se
stan
dard
val
ue fo
r sc
hool
s (X
)
Num
ber o
f WC
s (c
alcu
latio
n va
lue)
T:
Col
d W
ater
Te
mp.
- R
oom
Te
mp.
[K]
Occ
upie
d D
ays
per Y
ear [
d/a]
Loss
Day
time
[W]
Loss
Nig
httim
e [W
]
Ava
ilabi
lity
Use
d in
Per
iod
(d/a
)
Ave
rage
Pow
er
Col
d W
ater
2 8
Cold Water Due to Flushing WC 1 4 Kitchen GF 10 10 -8 350 * ( -21 + -32 ) * 1.00 / 365 = -51
Total W 2768Specific Demand W/m² 4.2Heat Available From Internal Sources 205 d/a kWh/(m²a) 20
HPP 2007, IHG Non-Dom 300mc ph s101020rw Mayville PHPP revised.xls
bere:architects Mayville Community Centre; Passivhaus Certified Retrofit, 2010 - 2011
2010
Designing for occupancy
Passive House PlanningBuilding: Mildmay Community Centre U T I L I S A T I O N Non-domestic Use
Latitude [°]: 54
2 3 4 5 6 7 8 9 10 11 15 16 17 18 20 27
Util
isat
ion
Pat
tern
Per
iods
of U
tilis
atio
n an
d O
pera
tion
Beg
in U
tilis
atio
n [h
]
End
Util
isat
ion
[h]
Dai
ly U
tilis
atio
n H
ours
[h/d
]
Ann
ual U
tilis
atio
n D
ays
[d/a
]
Ann
ual U
tilis
atio
n H
ours
[h/a
]
Ann
ual U
tilis
atio
n H
ours
Dur
ing
Day
time
[h/a
]
Ann
ual U
tilis
atio
n H
ours
Dur
ing
Nig
httim
e [h
/a]
Illum
inat
ion
Leve
l [lu
x]
Hei
ght o
f Util
isat
ion
Leve
l (0.
8 or
0.0
m)
Hei
ght o
f Util
isat
ion
Leve
l (0.
8 or
0.0
m)
Rel
ativ
e A
bsen
teei
sm
Par
t Use
Fac
tor o
f Bui
ldin
g O
pera
ting
Per
iod
for
Ligh
ting
Ave
rage
Occ
upan
cy [m
²/Per
s.]
1 Meeting rooms BF 10 20 10 312 3120 2492 628 500 0.8 0.80 0.60 1.02 Music studio BF 14 24 10 208 2080 840 1240 300 0.8 0.80 0.80 1.03 Reception GF 10 18 9 350 2975 2728 247 500 0.8 0.80 0.5 1.04 Kitchen GF 10 14 4 350 1400 1400 0 500 0.8 0.80 0.3 1.05 Dining area GF 11 21 10 350 3500 2464 1036 200 0.8 0.80 0.5 0.76 Workshop GF 10 20 10 350 3500 2795 705 500 0.8 0.80 0.5 1.07 Main hall GF 13 21 8 350 2800 1764 1036 300 0.8 0.80 0.8 0.78 Workshop/IT 1F 10 16 6 260 1560 1550 10 500 0.8 0.80 0.3 1.09 MCP Office 1F 10 18 8 312 2496 2276 220 500 0.8 0.80 0.3 1.0
10 0 0 0 0 0.8011 Circulation Area 9.0 21 12 350 4200 3164 1036 100 0.8 0.80 0.9 1.012 WC and sanitary 9.0 21 12 350 4200 3164 1036 100 0.8 0.80 0.9 1.013 Storage 6.0 21 15 350 5250 3970 1280 100 0.8 0.80 1.0 1.014 0 0 0 0 0.8015 0 0 0 0 0.8016 0 0 0 0 0.8017 0 0 0 0 0.8018 0 0 0 0 0.80
19 0 0 0 0 0.80
20 0 0 0 0 0.80
21 Single Office 7 18 11 250 2750 2543 207 500 0.80 0.80 0.30 0.70 10.00
22 Group Office 7 18 11 250 2750 2543 207 500 0.80 0.80 0.30 0.70
23 Open-Plan Office 7 18 11 250 2750 2543 207 500 0.80 0.80 0.00 1.00 15.0024 Meeting 7 18 11 250 2750 2543 207 500 0.80 0.80 0.50 1.00 2.0025 Counter Area 7 18 11 250 2750 2543 207 200 0.80 0.80 0.00 1.00
26 Retail 8 20 12 300 3600 2999 601 300 0.80 0.80 0.00 1.00 7.00
27 Classroom 8 15 7 200 1400 1398 2 300 0.80 0.80 0.25 0.90 2.00
28 University Auditorium 8 18 10 150 1500 1409 91 500 0.80 0.80 0.25 0.70 0.75
29 Bedroom 0 24 24 365 8760 4407 4353 300 0.80 0.80 0.00 0.50
30 Hotel Room 21 8 11 365 4015 755 3260 200 0.80 0.80 0.25 0.30
31 Canteen 8 15 7 250 1750 1748 2 200 0.80 0.80 0.00 1.00
32 Restaurant 10 0 14 300 4200 2404 1796 200 0.80 0.80 0.00 1.00 1.50
33 Kitchen Non-Residential 10 23 13 300 3900 2404 1496 500 0.80 0.80 0.00 1.00
34 Kitchen, Storage, Preparation 7 23 16 300 3900 2404 1496 300 0.80 0.80 0.50 1.00
35 WC, Sanitary 7 18 11 250 2750 2543 207 200 0.80 0.80 0.90 1.00
36 Other Habitable Rooms 7 18 11 250 2750 2543 207 300 0.80 0.80 0.50 1.00
37 Secondary Areas 7 18 11 250 2750 2543 207 100 0.80 0.80 0.90 1.00
38 Circulation Area 7 18 11 250 2750 2543 207 100 0.00 0.00 0.80 1.00
39 Storage, Services 7 18 11 250 2750 2543 207 100 0.80 0.80 0.98 1.00
40 Server Room 0 24 24 365 8760 4407 4353 500 0.80 0.80 0.50 0.50
41 Workshop 7 16 9 250 2250 2192 58 500 0.80 0.80 0.00 1.00
42 Theater Auditorium 19 23 4 250 1001 55 946 200 0.80 0.80 0.00 1.00
43 Theater Foyer 19 23 4 250 1001 55 946 300 0.80 0.80 0.50 1.00
44 Theater Stage 13 23 10 250 2500 1253 1247 1000 0.80 0.80 0.00 0.60
45 Fair, Congress 13 18 5 150 1350 1260 90 300 0.80 0.80 0.50 1.00
46 Exhibition 10 18 8 250 2001 1850 151 200 0.80 0.80 0.00 1.00
47 Library Reading Room 8 20 12 300 3600 2999 601 500 0.80 0.80 0.00 1.00
48 Open Access Library 8 20 12 300 3600 2999 601 200 0.80 0.80 0.00 1.00
49 Library Repository 8 20 12 300 3600 2999 601 100 0.80 0.80 0.90 1.00
50 Gymnasium 8 23 15 300 4500 3002 1498 300 0.80 0.80 0.30 1.00
51 Parking Garage 7 18 11 250 2750 2543 207 75 0.00 0.00 0.95 1.00
52 Public Parking Garage 9 0 15 365 5475 3290 2185 75 0.00 0.00 0.80 1.00
PHPP 2007, Use Non-Dom 300mc ph s101020rw Mayville PHPP revised.xls
bere:architects Mayville Community Centre; Passivhaus Certified Retrofit, 2010 - 2011
2010
Daylight hours
Electric lighting hours
Passive House PlanningBuilding: Mildmay Community Centre E L E C T R I C I T Y D E M A N D Non-Domestic Use
Treated Floor Area ATFA: 665.0 m² Window Properties (from Windows worksheet):
Auxiliary Electricity Demand: 2128.0 kWh/a Shading Dirt FactorNon-
Perpendicular Radiation
Glazing Fraction
Primary Energy Factors: North 0.54 0.95 0.85 0.66Electricity: 2.7 kWh/kWh East 0.47 0.65
Gas: 1.1 kWh/kWh South 0.65 0.70
Energy Carrier for DHW: 2.7 kWh/kWh West 0.28 0.60
Solar Fraction of DHW 30%
Marginal Performance Ratio DHW:
Room Geometry: Input of a Typical Room or Room by Room
Lighting / Non-Domestic
Frac
tion
of T
reat
ed
Floo
r Are
a
Roo
m C
ateg
ory
Roo
m C
ateg
ory
Nom
inal
Illu
min
ance
Le
vel
Dev
iatio
n fro
m
Nor
th
Orie
ntat
ion
Ligh
t Tra
nsm
issi
on
Gla
zing
Roo
m D
epth
Roo
m W
idth
Roo
m H
eigh
t
Lint
el H
eigh
t
Win
dow
Wid
th
Day
light
Util
isat
ion
Use
r D
ata:
Inst
alle
d Li
ghtin
g P
ower
Inst
alle
d Li
ghtin
g P
ower
(S
tand
ard)
Ligh
ting
Con
trol
Mot
ion
Det
ecto
r w
ith/w
ithou
t (1/
0)
Util
isat
ion
Hou
rs p
er
Yea
r [h/
a]
Use
r D
eter
min
ed:
Ligh
ting
Full
Load
Hou
rs
Full
Load
Hou
rs o
f Li
ghtin
g
Ele
ctri
city
Dem
and
(kW
h/a)
Spe
c. E
lect
rici
ty
Dem
and
(kW
h/(m
²a))
Pri
mar
y E
nerg
y D
eman
d (k
Wh/
a)
Room / Zone Lux Degrees - m m m m m W/m² W/m² h/a kWh/a
2 15 9
Basement technics 3% 13 Storage 100 6.6 6.6 2.2 Contradiction: Check width and height inputs none 12 12.3 3 1 autarkic, with off-
modeWithMotion 5250 1523.5 372.3 18.7 1005.3
Basement circulation 6% 11 Circulation Area 100 22 North 69% 8.5 4.0 2.2 2.1 3.6 none 27 27.4 3 1 autarkic, with off-mode
WithMotion 4200 1398.2 1528.3 38.3 4126.4
Basement WC 4% 12 WC and sanitary 100 2.0 1.5 2.2 Contradiction: Check width and height inputs none 9 9.4 3 1 autarkic, with off-
modeWithMotion 4200 1410.0 350.9 13.2 947.3
Basement main Hall 12% 1 Meeting rooms BF 500 202 South 69% 6.5 4.2 2.5 2.5 3.6 low 11 10.5 3 1 autarkic, with off-mode
WithMotion 3120 1312.9 1100.5 13.8 2971.4
Basement Music 7% 2 Music studio BF 300 4.5 3.7 2.1 Contradiction: Check width and height inputs none 11 11.2 3 1 autarkic, with off-
modeWithMotion 2080 1408.9 737.3 15.8 1990.8
GF entrance 3% 11 Circulation Area 100 22 North 69% 5.0 4.6 2.4 2.4 4.4 Contradiction: Check width and height inputs low 16 15.8 3 1 autarkic, with off-
modeWithMotion 4200 1315.0 414.4 20.8 1118.8
GF dining 6% 5 Dining area GF 200 202 South 69% 7.6 6.2 2.5 2.4 6.7 Contradiction: Check width and height inputs low 10 9.8 3 1 autarkic, with off-
modeWithMotion 3500 1350.5 525.8 13.2 1419.6
GF reception 2% 3 Reception GF 500 22 North 69% 3.2 2.9 2.4 Contradiction: Check width and height inputs none 11 10.8 3 1 autarkic, with off-
modeWithMotion 2975 1580.0 227.7 17.1 614.7
GF hall 14% 7 Main hall GF 300 22 North 69% 7.9 15.0 3.0 7.5 12.5 Contradiction: Check width and height inputs none 25 24.6 3 1 autarkic, with off-
modeWithMotion 2800 953.8 2186.0 23.5 5902.1
GF kitchen 3% 4 Kitchen GF 500 202 South 69% 3.4 4.0 2.8 2.5 2.4 low 28 27.6 3 1 autarkic, with off-mode
WithMotion 1400 450.0 247.9 12.4 669.3
GF office 8% 6 Workshop GF 500 202 South 69% 3.8 4.2 2.8 2.5 3.6 medium 12 12.3 3 1 autarkic, with off-mode
WithMotion 3500 1320.0 862.0 16.2 2327.5
GF storage 3% 13 Storage 100 2.5 6.1 3.4 Contradiction: Check width and height inputs none 6 6.3 3 1 autarkic, with off-
modeWithMotion 5250 1500.0 189.3 9.5 511.1
GF circulation 5% 11 Circulation Area 100 202 South 69% 2.3 3.3 2.5 2.5 1.3 Contradiction: Check width and height inputs low 25 24.8 3 1 autarkic, with off-
modeWithMotion 4200 1210.0 997.8 30.0 2694.0
GF WC north 1% 12 WC and sanitary 100 22 North 69% 1.5 2.1 2.7 2.4 1.3 good 11 10.9 3 1 autarkic, with off-mode
WithMotion 4200 1160.0 84.4 12.7 227.8
GF WC west 2% 12 WC and sanitary 100 292 West 69% 2.2 2.6 2.9 2.5 1.2 none 5 5.0 3 1 autarkic, with off-mode
WithMotion 4200 1330.0 88.4 6.7 238.8
1F storage 2% 13 Storage 100 2.4 1.3 2.2 Contradiction: Check width and height inputs none 7 6.6 3 1 autarkic, with off-
modeWithMotion 5250 1500.0 130.9 9.8 353.5
1F offices north 3% 9 MCP Office 1F 500 22 North 69% 4.4 3.2 2.5 2.2 2.7 low 14 13.8 3 1 autarkic, with off-mode
WithMotion 2496 1317.0 361.7 18.1 976.5
1F circulation 5% 11 Circulation Area 100 22 North 69% 2.4 4.2 5.0 3.0 2.5 medium 21 21.1 3 1 autarkic, with off-mode
WithMotion 4200 1180.0 827.5 24.9 2234.3
1F WC 1% 12 WC and sanitary 100 202 South 69% 1.9 1.7 2.7 2.3 1.2 good 8 8.5 3 1 autarkic, with off-mode
WithMotion 4200 1170.0 66.0 9.9 178.2
1F IT/meeting rooms 10% 8 Workshop/IT 1F 500 202 South 69% 3.5 4.0 2.7 2.4 2.5 low 16 15.6 3 1 autarkic, with off-mode
WithMotion 1560 510.0 527.5 7.9 1424.3
0.0 3 1 autarkic, with off-mode
WithMotion 0.0
0.0 3 1 autarkic, with off-mode
WithMotion 0.0
Facade with Windows
Inpu
t War
ning
Ligh
ting
Con
trol
HPP 2007, Electricity Non-Dom 300mc ph s101020rw Mayville PHPP revised.xls
bere:architects Mayville Community Centre; Passivhaus Certified Retrofit, 2010 - 2011
2010
Electrical usage
Heat generated
e.g. computers
e.g. kitchen appliances
Office Equipment
Roo
m C
ateg
ory
Roo
m C
ateg
ory
In th
e th
erm
al
enve
lope
? (1
/0)
Exi
stin
g/P
lann
ed?
(1/0
)
Qua
ntity
Pow
er R
atin
g (W
)
Util
isat
ion
Hou
rs
per
Yea
r (h
/a)
rela
tive
abse
ntee
ism
Dur
atio
n of
U
tilis
atio
n in
Ene
rgy
Sav
ing
Mod
e (h
/a)
Use
ful E
nerg
y(k
Wh/
a)
Ele
ctri
city
D
eman
d (k
Wh/
a)
Pri
mar
y E
nerg
y D
eman
d (k
Wh/
a)
2 9 20 18
PC 1 8 Workshop/IT 1F 1 1 * 14 * 80 * ( 1560 * (1- 0.3 ) = 1223 = 1223.0 3302PC in Energy Saving Mode 1 14 * 2.0 * 1560 * 0.3 = 13 = 13.1 35
Monitor 1 8 Workshop/IT 1F 1 1 * 14 * 28 * ( 1560 * (1- 0.3 ) = 428 = 428.1 1156Monitor in Energy Saving Mode 1 14 * 2.0 * 1560 * 0.3 = 13 = 13.1 35
PC 2 3 Reception GF 1 1 * 4 * 80 * ( 2975 * (1- 0.5 ) = 476 = 476.0 1285PC in Energy Saving Mode 1 4 * 2.0 * 2975 * 0.5 = 12 = 11.9 32
Monitor 2 3 Reception GF 1 1 * 4 * 28 * ( 2975 * (1- 0.5 ) = 167 = 166.6 450Monitor in Energy Saving Mode 1 4 * 2.0 * 2975 * 0.5 = 12 = 11.9 32
Copier 3 Reception GF 1 1 * 1 * 400 * ( 2975 - 2678 ) = 119 = 118.8 321Copier in Energy Saving Mode 1 1 * 30 * 2678 = 80 = 80.3 217
Printer 3 Reception GF 1 1 * 1 * 300 * ( 2975 - 2678 ) = 89 = 89.1 241Printer in Energy Saving Mode 1 1 * 2 * 2678 = 5 = 5.4 14
Server 3 Reception GF 1 1 * 1 * 100 * ( 2975 = 298 = 297.5 803Server in Energy Saving Mode 1 1 * 2.0 * ( 8760 - 2975 ) = 12 = 11.6 31
Telephone System 1 1 * 1 * 94 * 8760 = 823 = 823.4 2223Lift 1 1 * 1 * 9000 * 44 = 394 = 394.2 1064
Lift in stand-bye 1 1 * 1 * 90 * 8716 = 784 = 784.4 21180 0.0 0
Music equipment 1 1 1 3000 1060 3180 20h/week 3180.0 8586Dyson on 1 1 1 1600 70 112 0.2h/day 112.0 302
Dyson stand-bye 1 1 1 1 8330 8 23.8h/day 8.3 22Projector 1 1 * 1 * 200 * 50 = 10 = 10.0 27
outside lighting 0 1 * 1 * 1035 * 730 = 755 = 755.5 2040
Kitchen / Aux. Electricity
Roo
m C
ateg
ory
Predominant Utilisation Pattern of
Building
In th
e th
erm
al
enve
lope
? (1
/0)
Exi
stin
g/P
lann
ed?
(1/0
)
Util
isat
ion
Day
s pe
r Y
ear
(d/a
)
Num
ber o
f Mea
ls
per U
tilis
atio
n D
ay
Nor
m
Con
sum
ptio
n
Use
ful E
nerg
y (k
Wh/
a)
Non
-Ele
ctric
Fra
ctio
n
Ele
ctric
Fra
ctio
n
Add
ition
al
Dem
and
Mar
gina
l P
erfo
rman
ce
Rat
io
Sol
ar F
ract
ion
Oth
er P
rim
ary
Ene
rgy
Dem
and
(kW
h/a)
Ele
ctri
city
D
eman
d (k
Wh/
a)
Pri
mar
y E
nerg
y
Dem
and
(kW
h/a)
8
kWh / Meal
Cooking 4 Kitchen GF 1 1 * 350 * 30 * 0.25 = 2625 * 100% = 2625.0 70881 kWh / Cover * 0% = 0 0
Dishwashing 1 1 * 350 * 30 * 0.10 = 1050 * 55% = 577.5 15592 kWh/d * 45% * (1+ 0.30 ) * 1.20 *(1- 0.30 ) = 518 1400
Refrigerating 1 1 365 = 0 * 100% = 0.0 0Coffee machine 1 1 200 0.25 50 * 100% = 50.0 135Gram 210 fridge 1 2 365 0.50 365 * 100% = 365.0 986Gram 210 freezer 1 2 365 1.10 803 * 100% = 803.0 2168
0 * 100% = 0.0 00 * 100% = 0.0 00 * 100% = 0.0 00 * 100% = 0.0 00 * 100% = 0.0 0
Total Auxiliary Electricity 2128.0 5746
Total kWh 614 518 27389 kWh/a 75351 kWh/a
Specific Demand 0.6 0.8 41 kWh/(m²a) 113 kWh/(m²a)
Hot
Wat
er N
on-
Ele
ctric
D
ishw
ashi
ng
27862
2128
HPP 2007, Electricity Non-Dom 300mc ph s101020rw Mayville PHPP revised.xls
bere:architects Mayville Community Centre; Passivhaus Certified Retrofit, 2010 - 2011
2010
Quality Assured Verification
40 different factors
contribute to the
energy in use
and comfort
calculations
Passive House Verification
Photo or Drawing
Building: Mildmay Community CentreLocation and Climate: London GB - Manchester
Street: Woodville RoadPostcode/City: N16 8NA
Country: England
Building Type: Community Centre
Home Owner(s) / Client(s): Mildmay Community TrustStreet:
Postcode/City:
Architect: bere:architectsStreet: 73 Poets Road
Postcode/City: N5 2SH
Mechanical System: Alan ClarkeStreet: The Woodlands, Woodland Close, Whitecroft
Postcode/City: GL15 4PL Lydney
Year of Construction: 1880's
Number of Dwelling Units: 1 Interior Temperature: 20.0 °C
Enclosed Volume Ve: 4093.7 m3 Internal Heat Gains: 3.7 W/m2
Number of Occupants: 19.0
Specific Demands with Reference to the Treated Floor Area
Treated Floor Area: 665.0 m2
Applied: Monthly Method PH Certificate: Fulfilled?Applied: Monthly Method PH Certificate: Fulfilled?
Specific Space Heat Demand: 13 kWh/(m2a) 15 kWh/(m2a) Yes
Pressurization Test Result: 0.5 h-1 0.6 h-1 Yes
Specific Primary Energy Demand(DHW, Heating, Cooling, Auxiliary and Household Electricity): 120 kWh/(m2a) 120 kWh/(m2a) Yes
Specific Primary Energy Demand(DHW, Heating and Auxiliary Electricity): 24 kWh/(m2a)
Specific Primary Energy DemandEnergy Conservation by Solar Electricity: 43 kWh/(m2a)
Heating Load: 11 W/m2
Frequency of Overheating: 2 % over 25 °C
Specific Useful Cooling Energy Demand: kWh/(m2a) 15 kWh/(m2a)
Cooling Load: 8 W/m2
We confirm that the values given herein have been Issued on:determined following the PHPP methodology and basedon the characteristic values of the building. The calculations signed: with PHPP are attached to this application.
PHPP 2007, Verification 300mc ph s111021jb Mayville PHPP revised hours of use.xls
bere:architects Mayville Community Centre; Passivhaus Certified Retrofit, 2010 - 2011
2010Final preparations of tender package.
Architects’ drawings show the line of
airtightness clearly in all drawings.
From stage E, it’s important to have
a sensible construction sequencing
plan so the contractor can access the
air barrier at 1st air test.
bere:architects Mayville Community Centre; Passivhaus Certified Retrofit, 2010 - 2011
2010The contractor demonstrates, in their
proposed programme of works, that
they understand sequencing the
work to facilitate two mid-construction
air tests; (1) after window installation
(2) after M&E installation.
Buxtons were contractually required
to achieve the first air test target of
0.6h-1 at 50pa before continuing. A
visible air barrier at this stage ensures
they can address any problems which
the air tester finds.
Air test result: 0.42 h-1 @50pa
ID Task Name
1 Pre-construction Phase2 Letter of intent (Agreed)3 Contractor lead in/ mobilisation period4 WAC test info issued5 Develop Construction phase Health & Safety Plan6 Develop Construction phase Site waste Management Plan7 Develop Construction phase contract programme8 Site/ services surveys9 Develop information required schedule10 Submit (H,S & E) plans for approval11 Approval issued1213 Construction Phase14 Enabling/ Site Set Up15 Trim/ Tree protection measures16 Temporary compound17 Site Accommodation18 Erect temporary hoarding to neighbouring property19 Substructure20 Setting Out21 Remove existing fencing (inc walls and fence to north garden)22 Remove all kerbs/ trees/ vegatation23 Basement insulation/ land drain24 Topsoil/ footpath strip to perimeter of building25 Reduced level excavation to perimeter (maintain access to building interior)26 Prepare substructure perimeter brickwork27 Apply insulation/ inc working platforms28 Strike working platforms29 Form landrain/ foamed glass insulation30 Backfill with as dug material from lightwell excavation31 Lay/ compact hardcore32 Amphitheatre33 Complete reduce Level Excavation34 Excavate for rain water harvesting tanks (inc earthwork support)35 Install rain water harvesting tanks/ ducts and backfill36 Form outline to batters/ access to basement construction37 Demolition/ Asbestos38 Type 3 asbestos survey39 Strip out all asbestos40 Additional asbestos as per type 3 survey (AI2)41 Remove additional loose furniture/ cooking equipment42 Soft strip43 Demolition - form/ seal up openings (Inc lintels/ steels)/ remove windows/walls/floors etc44 Steelwork - basement thresholds inc concrete45 Steelwork - internal and external balcononies46 Erect birdcage scaffold47 Remove roof (ASBESTOS) coverings/ roof members back to trusses48 Form new internal/ external strip/ pad foundations/ holding down bolts49 Superstructure50 Erect perimeter scaffold/ temporary roof over51 Clean off external walls (vegetation/ M&E equipment etc)52 Erect single storey steelwork53 Prepare walls/ wrap steelbeams etc for insulation54 Brick up upstand walls etc55 Fit windows/ doors/ louvres56 Install external membrane 57 Install insulation system58 Strengthen roof trusses59 Roof carcassing (single storey roof)60 Roof Caracassing (pitched)61 Roof fall arrest sytsem62 Lightning Protection63 Ashphalt (inc insulation)64 Roof Insulation & metal sheet Coverings (inc copings etc)65 Air pressure test - NO166 Weather tight67 Remove temporary roof covering68 Velux roof lights69 Kitchen extract70 Water tight71 Paving72 Solar panel (inc pipe connections)73 Photovoltaic panels (Inc cabling)74 Rain Water Goods75 External venetian blind louvre system76 Install green roof77 Strike Scaffold (progressive to suit works)78 Entrance canopy/ vertical (Cedar) timber lining79 Fit Out & Finishes80 Excavate/ install pump station81 Builders work/ chases etc82 Flexible tanking83 Install glazed screen tracks84 Install floor insulation - basement85 Make good screeds/ Screed floors (50mm, 70mm and unbonded screeds)86 Mechanical First Fix (inc plantroom)87 Electrical First Fix88 Carpenter First Fix89 Fire Stopping/ air tight sealing penetrations (Passivhaus spec)90 Air pressure test no 291 Dry lining to walls92 Ceiling Boarding93 Ceiling & Wall Plastering94 Mist coat95 IPS System - Sanitaryware96 Install glazed screens97 Kitchen Base Units & Cupboards98 Ceramic Tiling99 Mechanical Second Fix
100 Electrical Second Fix101 Electric/ Gas/ Water on102 Carpentry Second Fix (inc doors/ ironmongery etc)103 Decorations104 Vinyl Flooring105 Sanitaryware106 Kitchen fit out & fire curtain107 M&E finals108 Testing & Commissioning109 Junkers timber flooring (or equivalent)110 Acoustic paneling (Hall/ recording studio)111 Fixtures & Fittings112 Carpets113 Inspections & Handover114 Snag/ de-snag115 Air pressure test No 3116 HAND OVER117 EXTERNAL WORKS118 Form crib lock wall and batters (for terracing by others)119 Storm water connections to existing120 Foul Water Drainage to existing121 Grading & Sub-base122 Kerb/ timber edging123 Paving124 External timber decking & handrailing125 Lighting Ducts & Cables126 External Lights & Bollards127 Prep Sub-base/ Tarmac128 Form bin store129 Tarmac 130 Bonded gravel coating131 Reinstate boundary walls/ fencing inc foundations as required132 Place top soil to levels133 Inspections134 HAND OVER135 Clear Site
91%19/04
91%100%
100%50%
100%100%
100%100%100%
5%100%
100%100%100%
100%21%
0%100%
0%0%
0%0%
0%0%
0%0%
0%0%
0%0%
0%0%
0%45%
100%100%
100%100%
100%40%
0%0%
100%0%
0%0%
0%0%
0%0%
0%0%
0%0%
0%0%
0%0%
0%0%
0%22/10
26/100%
0%0%
09/110%
0%0%
0%0%
0%0%
0%0%
0%0%
0%0%
0%0%
0%0%
0%0%07/12
0%0%
0%0%0%
0%0%
0%0%0%
02/020%
0%0%
0%0%
0%0%
0%0%
0%0%
0%0%
14/0330/03
0%0%
0%0%
0%0%
0%0%
0%0%
0%0%
0%0%0%0%
0%30/03
0%
W-4 W-3 W-2 W-1 W1 W2 W3 W4 W5 W6 W7 W8 W9 W10 W11 W12 W13 W14 W15 W16 W17 W18 W19 W20 W21 W22 W23 W24 W25 W26 W27 W28 W29 W30 W31 W32 W33 W34 W35 W36 W37 W38 W39 W40 W41 W42 W43 W44 W45 W46 W4719 A 26 A 03 M 10 M 17 M 24 M 31 M 07 J 14 J 21 J 28 J 05 J 12 J 19 J 26 J 02 A 09 A 16 A 23 A 30 A 06 S 13 S 20 S 27 S 04 O 11 O 18 O 25 O 01 N 08 N 15 N 22 N 29 N 06 D 13 D 20 D 27 D 03 J 10 J 17 J 24 J 31 J 07 F 14 F 21 F 28 F 07 M 14 M 21 M 28 M 04 A
MAYVILLE COMMUNITY CENTRECONTRACT PROGRAMME
PERCENTAGES CHART AS OF 11/6/10
REVISION: Tender (B)REVISED:
Page 1 DRAWN : A FLETCHERTracked:11/8/10
! !
bere:architects Mayville Community Centre; Passivhaus Certified Retrofit, 2010 - 2011
2010Work commences with external
excavations & basement tanking
bere:architects Mayville Community Centre; Passivhaus Certified Retrofit, 2010 - 2011
2010External basement insulation:
200mm extruded polystyrene insulation
bere:architects Mayville Community Centre; Passivhaus Certified Retrofit, 2010 - 2011
2011External wall insulation:
300mm expanded polystyrene insulation
glued and mechanically fixed over airtight
parge coat
bere:architects Mayville Community Centre; Passivhaus Certified Retrofit, 2010 - 2011
2011Preparing the existing roof trusses
for new roof covering - Buxtons site
manager attending to air tightness
details before fixing purlins
bere:architects Mayville Community Centre; Passivhaus Certified Retrofit, 2010 - 2011
2011Roof insulation installer workmanship issue!
Thermal imaging lessons from another project
After insulation was refitted correctly, zinc roof covering is installed:
bere:architects Mayville Community Centre; Passivhaus Certified Retrofit, 2010 - 2011
2011Installing rooflights without cold
bridging:
(1) Velux windows with insulation kits.
(2) Fixed rooflights on Foamglas
bere:architects Mayville Community Centre; Passivhaus Certified Retrofit, 2010 - 2011
2011Rooflights without cold bridging:
Thermal isolation detail using Foamglas
bere:architects Mayville Community Centre; Passivhaus Certified Retrofit, 2010 - 2011
2011Installing windows in the zone of
insulation, avoiding cold bridging
Retractable blinds for summer shading
bere:architects Mayville Community Centre; Passivhaus Certified Retrofit, 2010 - 2011
2011Training the site carpenters in the
passivhaus method of fitting of
windows
Making ‘rabbit ears’
bere:architects Mayville Community Centre; Passivhaus Certified Retrofit, 2010 - 2011
2011Inflatable window bags
German headless screws
Screws do not require plugs
Suspend the window without distortion
bere:architects Mayville Community Centre; Passivhaus Certified Retrofit, 2010 - 2011
2011Line of airtightness maintained by
correctly folded tapes to form a good
quality connection between windows and
parge coat on walls. Cill tapes are fixed
separately. EPS insulation will follow, with
deep window cills and insulation part-
covering the window frames. Non-opening
windows are fixed by means of metal tabs.
bere:architects Mayville Community Centre; Passivhaus Certified Retrofit, 2010 - 2011
2011Foamglas for parapet walls without cold bridging:
bere:architects Mayville Community Centre; Passivhaus Certified Retrofit, 2010 - 2011
2011Schock thermal isolators against
cold bridging, located in line of floor
insulation.
Avoiding cold bridging
Avoiding condensation
Avoiding mould growth
Protecting healthy air quality
bere:architects Mayville Community Centre; Passivhaus Certified Retrofit, 2010 - 2011
2011Insulating outside foundations
Insulating inside existing slab
bere:architects Mayville Community Centre; Passivhaus Certified Retrofit, 2010 - 2011
Oct 2011The Mayville Community Centre is the first non-domestic certified Passivhaus retrofit in the UK
bere:architects Mayville Community Centre; Passivhaus Certified Retrofit, 2010 - 2011
2011Approaching completion....
bere:architects Mayville Community Centre; Passivhaus Certified Retrofit, 2010 - 2011
2010
bere:architects
(2) Building performance evaluation (Funded by the Technology Strategy Board)
bere:architects
Four projects included within BPE Programme
Larch House code 6 zero carbon passivhaus
Ranulf Road passivhaus
Lime House code 5 passivhaus
Mayville passivhaus retrofit
bere:architects
Objectives
• To find out if this low energy, all-electric Passivhaus can
achieve its 90% target energy reductions in practice.
• Detailed in-use monitoring to understand any differences
between the design performance and in-use performance.
• To investigate the impact of unregulated emissions.
• Fabric performance testing
• Performance of renewable energy technologies
• Air quality testing
• Investigate occupant comfort
• Develop a methodology for fine-tuning a building
In the UK there is often a three-fold difference between
calculated and actual energy consumption.
bere:architects
Method
Funding
Technology Strategy Board Building Performance Evaluation (BPE)
Non-domestic Project - Mayville
Working with Rod Bunn of BSRIA; a TSB Technical Evaluator.
Method
Installing just 10 data loggers to establish the big picture and then
focus on any issues as they are revealed; only installing equipment
as necessary to find answers to problems.
1st of September 2011
The monitoring started
bere:architects Mayville Community Centre; Passivhaus Certified Retrofit, 2010 - 2011
bere:architects
Energy Calculations - Mayville
Existing building total energy demand - 581 kWh/m2 per annum
As designed total energy demand - 42.5 kWh/m2 per annum
= 92% reduction (figures based on net energy usage)
PV generation - 21.7 kWh/m2 per annum
Existing building emissions rate - 110 kgCO2/m2 per annum
As designed building emissions rate - 13.7 kgCO2/m2 per annum
= 87.5 % improvement
Target emissions rate - 18 kgCO2/m2 per annum (using SBEM)
Total energy bills existing £10,000Total as designed energy bills £800
Picture taking your lunch break in the Olympic Park – using the Aquatics Centre or the Velodrome, nipping to the shops of Westfield Stratford City or enjoying your sandwich by the river.
The Park will be an exciting place that works in every sense, delivering new homes, local jobs and long-term opportunities, all linked to the rest of this global city.
– 11 schools and nurseries – 3 health centres
The neighbourhoods of the Queen Elizabeth Olympic Park will provide residents with a range of homes in an exceptional location that will become one of London’s most celebrated places over the next ten years.
Importantly, these neighbourhoods will include vital community facilities such as schools, shops, places to relax, play and exercise as well as faith, health and community centres – all within easy walking distance.
The stated need from local residents is for real jobs and opportunities to build careers across a range of business sectors.
The Park and its key employment hubs will start to address this need by creating 8-10,000 jobs located in inspiring modern workspaces within an inviting parkland setting.
Imagine being able to walk or cycle for a few minutes to reach your new office, in the shadow of some of London’s best-known buildings, including the 115m ArcelorMittal Orbit.
COMMUNITIES THAT wORK AND GROw
Three key employment hubs
bere:architects
Performance evaluation
Flow meters were installed on to pipework as part of the main
contract to make setting up monitoring easier.
Sub-metering is extensive but not over-complicated. There are
submeters serving the ground floor and basement lighting, and
the first floor lighting. The photovoltaics, air handling unit, heat
pump compressor, top-up immersion heater for the heat pump,
rainwater and sewage pumps also have sub-meters.
There is no on-site premises management, so the user controls
have been deigned to be intuitive to use and need to be clearly
labelled.
User GuideMayville Community Centre
Alan Clarke (Energy Consultant and Building Services Engineer) Tel: 01594 563356 E-mail: [email protected]
bere:architects (Passivhaus Specialists)Tel: 020 7359 4503 E-mail: [email protected]
or For further information about these features:
Larch & Lime Houses
Larch & Lime Houses
Larch & Lime Houses
Larch & Lime Houses
1 Heat recovery ventilation unit
4 Heat recovery ventilation control panel
5 External blinds control (for summer cooling)
12 Fire alarm control
7 Timer for ventilation
10 Hot water storage
11 Hot water from the sun
6 Night cooling
8 CO2 Sensor for main hall ventilation
9 Radiators and thermostatic valves
2 Fresh air vents
3 Extract air vents
13 Lighting control
14 Heat pump
15 Rain water (grey water)
16 Electrical sub metering
The term passivhaus refers to an advanced low energy construction standard for buildings, which have excellent comfort conditions in both winter and summer. They typically achieve a heating saving of 90% compared to existing housing. Passivhaus buildings are easy to live in and require little maintenance, but they do have some important
features, which are explained in this guide. The features are simple to operate, but a full understanding will help you get the lowest energy consumption and best comfort. This guide has been design by Alan Clarke and bere:architects for you (the user) to understand how a passivhaus works and how to operate the controls in this house.
Each feature is labelled on the drawings below, highlighting their locations and briefly explaining how to operate them in the corresponding text. Please take the time to read this guide and familiarise yourself with the controls.
This building is a Retro-fit Passivhaus.
1
716
1514
1210
46 6
6
5 5
5Multi-purpose
Meetingplace Hall
Store
Office space
Office spaceKitchen
Dining area
Foyer
Reception
Void
IT Suite
Green Roof
Terrace Garden
Existing Building
Solar Panels
Roof light
Hall
StudioMulti-purpose
MPC Office
Walkway
Therapy Room
Therapy Room
Lift
Lobb
y
Garden
Studio
Lift
Stu
dio
Lobb
y
WCStore
Dis WC
Delivered with ‘Details form passive Houses’ by IBO Book
The heat recovery ventilation unit keeps the air fresh and pre-warmed in winter, using these fresh air vents.
Ground floor plan First floor plan Section B-B Lower Ground floor plan
Provides continuous fresh air to the community centre, and saves heat from WCs and kitchens to warm fresh air for the office, main hall, dining room IT suite etc. The system saves about 10 times more energy than it uses! It is located in the plant room. The filter needs changing every 3 months in london air.
33
3
3
3
2 2 2
2
32
8
These vents remove possible stale and damp air from the kitchen, main hall and WC’s. The ventilation runs 7am - 7pm. The extract air vent filter in the kitchen needs to be vacuumed about every 3 months depending on how much cooking is done.
To control air flow. this should not be altered under any circumstance
Currently set to run ventilation from 7am - 7pm, 7 days a week
To provide heat for domestic hot water tank and heating tank.
These dimmer switches provide a choice of light levels in some rooms. However dimmable lighting was removed from some spaces to save capital costs.
Pump to recycle rainwater for WCs. 6500 litres of water is saved under the south garden for WCs. An additional 5000 litres of water is saved for the garden.
These submeters can be illuminated by pressing a button on the face. We are measuring data every monday for research purposes.
For bathroom + kitchen use
A smaller Tank for radiator use
Due to the large air volume in the main hall, it is only necessary to add fresh air when larger groups of people raise the CO2 level to around 1000ppm
This is the central fire alarm control, located in the entrance hall.
To keep cool in the summer take advantage of colder night time temperatures outside by leaving the windows open in the “tilt” position overnight (subject to site security). If it’s hotter outside in the day you can shut the windows and external blinds.
Simple, easily understood thermostatic radiator valves give individuals control of their space temperatures
A solar themal vacuum tube panel supplies 60-80% of the annual hot water usage. In winter the panel can heat the bottom half of the tank and the boiler is used to top up the temperature. This means there is always hot water available in the tank even on a cloudy day.
In summer the outside blinds minimise solar gains from the sun. These are manually controlled by the centre manager from reception.
Hot water is always ready in the tank this is due to the tank being very well insulated so that the water will not cool down overnight.
User GuideMayville Community Centre
Alan Clarke (Energy Consultant and Building Services Engineer) Tel: 01594 563356 E-mail: [email protected]
bere:architects (Passivhaus Specialists)Tel: 020 7359 4503 E-mail: [email protected]
or For further information about these features:
Larch & Lime Houses
Larch & Lime Houses
Larch & Lime Houses
Larch & Lime Houses
1 Heat recovery ventilation unit
4 Heat recovery ventilation control panel
5 External blinds control (for summer cooling)
12 Fire alarm control
7 Timer for ventilation
10 Hot water storage
11 Hot water from the sun
6 Night cooling
8 CO2 Sensor for main hall ventilation
9 Radiators and thermostatic valves
2 Fresh air vents
3 Extract air vents
13 Lighting control
14 Heat pump
15 Rain water (grey water)
16 Electrical sub metering
The term passivhaus refers to an advanced low energy construction standard for buildings, which have excellent comfort conditions in both winter and summer. They typically achieve a heating saving of 90% compared to existing housing. Passivhaus buildings are easy to live in and require little maintenance, but they do have some important
features, which are explained in this guide. The features are simple to operate, but a full understanding will help you get the lowest energy consumption and best comfort. This guide has been design by Alan Clarke and bere:architects for you (the user) to understand how a passivhaus works and how to operate the controls in this house.
Each feature is labelled on the drawings below, highlighting their locations and briefly explaining how to operate them in the corresponding text. Please take the time to read this guide and familiarise yourself with the controls.
This building is a Retro-fit Passivhaus.
1
716
1514
1210
46 6
6
5 5
5Multi-purpose
Meetingplace Hall
Store
Office space
Office spaceKitchen
Dining area
Foyer
Reception
Void
IT Suite
Green Roof
Terrace Garden
Existing Building
Solar Panels
Roof light
Hall
StudioMulti-purpose
MPC Office
Walkway
Therapy Room
Therapy Room
Lift
Lobb
y
Garden
Studio
Lift
Stu
dio
Lobb
y
WCStore
Dis WC
Delivered with ‘Details form passive Houses’ by IBO Book
The heat recovery ventilation unit keeps the air fresh and pre-warmed in winter, using these fresh air vents.
Ground floor plan First floor plan Section B-B Lower Ground floor plan
Provides continuous fresh air to the community centre, and saves heat from WCs and kitchens to warm fresh air for the office, main hall, dining room IT suite etc. The system saves about 10 times more energy than it uses! It is located in the plant room. The filter needs changing every 3 months in london air.
33
3
3
3
2 2 2
2
32
8
These vents remove possible stale and damp air from the kitchen, main hall and WC’s. The ventilation runs 7am - 7pm. The extract air vent filter in the kitchen needs to be vacuumed about every 3 months depending on how much cooking is done.
To control air flow. this should not be altered under any circumstance
Currently set to run ventilation from 7am - 7pm, 7 days a week
To provide heat for domestic hot water tank and heating tank.
These dimmer switches provide a choice of light levels in some rooms. However dimmable lighting was removed from some spaces to save capital costs.
Pump to recycle rainwater for WCs. 6500 litres of water is saved under the south garden for WCs. An additional 5000 litres of water is saved for the garden.
These submeters can be illuminated by pressing a button on the face. We are measuring data every monday for research purposes.
For bathroom + kitchen use
A smaller Tank for radiator use
Due to the large air volume in the main hall, it is only necessary to add fresh air when larger groups of people raise the CO2 level to around 1000ppm
This is the central fire alarm control, located in the entrance hall.
To keep cool in the summer take advantage of colder night time temperatures outside by leaving the windows open in the “tilt” position overnight (subject to site security). If it’s hotter outside in the day you can shut the windows and external blinds.
Simple, easily understood thermostatic radiator valves give individuals control of their space temperatures
A solar themal vacuum tube panel supplies 60-80% of the annual hot water usage. In winter the panel can heat the bottom half of the tank and the boiler is used to top up the temperature. This means there is always hot water available in the tank even on a cloudy day.
In summer the outside blinds minimise solar gains from the sun. These are manually controlled by the centre manager from reception.
Hot water is always ready in the tank this is due to the tank being very well insulated so that the water will not cool down overnight.
bere:architects
User GuideMayville Community Centre
Alan Clarke (Energy Consultant and Building Services Engineer) Tel: 01594 563356 E-mail: [email protected]
bere:architects (Passivhaus Specialists)Tel: 020 7359 4503 E-mail: [email protected]
or For further information about these features:
Larch & Lime Houses
Larch & Lime Houses
Larch & Lime Houses
Larch & Lime Houses
1 Heat recovery ventilation unit
4 Heat recovery ventilation control panel
5 External blinds control (for summer cooling)
12 Fire alarm control
7 Timer for ventilation
10 Hot water storage
11 Hot water from the sun
6 Night cooling
8 CO2 Sensor for main hall ventilation
9 Radiators and thermostatic valves
2 Fresh air vents
3 Extract air vents
13 Lighting control
14 Heat pump
15 Rain water (grey water)
16 Electrical sub metering
The term passivhaus refers to an advanced low energy construction standard for buildings, which have excellent comfort conditions in both winter and summer. They typically achieve a heating saving of 90% compared to existing housing. Passivhaus buildings are easy to live in and require little maintenance, but they do have some important
features, which are explained in this guide. The features are simple to operate, but a full understanding will help you get the lowest energy consumption and best comfort. This guide has been design by Alan Clarke and bere:architects for you (the user) to understand how a passivhaus works and how to operate the controls in this house.
Each feature is labelled on the drawings below, highlighting their locations and briefly explaining how to operate them in the corresponding text. Please take the time to read this guide and familiarise yourself with the controls.
This building is a Retro-fit Passivhaus.
1
716
1514
1210
46 6
6
5 5
5Multi-purpose
Meetingplace Hall
Store
Office space
Office spaceKitchen
Dining area
Foyer
Reception
Void
IT Suite
Green Roof
Terrace Garden
Existing Building
Solar Panels
Roof light
Hall
StudioMulti-purpose
MPC Office
Walkway
Therapy Room
Therapy Room
Lift
Lobb
y
Garden
Studio
Lift
Stu
dio
Lobb
y
WCStore
Dis WC
Delivered with ‘Details form passive Houses’ by IBO Book
The heat recovery ventilation unit keeps the air fresh and pre-warmed in winter, using these fresh air vents.
Ground floor plan First floor plan Section B-B Lower Ground floor plan
Provides continuous fresh air to the community centre, and saves heat from WCs and kitchens to warm fresh air for the office, main hall, dining room IT suite etc. The system saves about 10 times more energy than it uses! It is located in the plant room. The filter needs changing every 3 months in london air.
33
3
3
3
2 2 2
2
32
8
These vents remove possible stale and damp air from the kitchen, main hall and WC’s. The ventilation runs 7am - 7pm. The extract air vent filter in the kitchen needs to be vacuumed about every 3 months depending on how much cooking is done.
To control air flow. this should not be altered under any circumstance
Currently set to run ventilation from 7am - 7pm, 7 days a week
To provide heat for domestic hot water tank and heating tank.
These dimmer switches provide a choice of light levels in some rooms. However dimmable lighting was removed from some spaces to save capital costs.
Pump to recycle rainwater for WCs. 6500 litres of water is saved under the south garden for WCs. An additional 5000 litres of water is saved for the garden.
These submeters can be illuminated by pressing a button on the face. We are measuring data every monday for research purposes.
For bathroom + kitchen use
A smaller Tank for radiator use
Due to the large air volume in the main hall, it is only necessary to add fresh air when larger groups of people raise the CO2 level to around 1000ppm
This is the central fire alarm control, located in the entrance hall.
To keep cool in the summer take advantage of colder night time temperatures outside by leaving the windows open in the “tilt” position overnight (subject to site security). If it’s hotter outside in the day you can shut the windows and external blinds.
Simple, easily understood thermostatic radiator valves give individuals control of their space temperatures
A solar themal vacuum tube panel supplies 60-80% of the annual hot water usage. In winter the panel can heat the bottom half of the tank and the boiler is used to top up the temperature. This means there is always hot water available in the tank even on a cloudy day.
In summer the outside blinds minimise solar gains from the sun. These are manually controlled by the centre manager from reception.
Hot water is always ready in the tank this is due to the tank being very well insulated so that the water will not cool down overnight.
bere:architects
1st Stage Design Review
Site walk through
Review of drawings
SAP/PHPP review
Interviews
• Client representatives
• Architects
• Energy Consultants
• Contractors
bere:architects
1st Stage Design Review
Interventions and Investigations to date - Lighting
Lux levels will initially be set to a low threshold before lighting
comes on.
Through discussion with occupants the control will provide
the minimum amount required rather than flooding the building
with light when it is not required (controls were set up with
switch on/ switch off plus off with light and motion sensors)
bere:architects
Passive House PlanningBuilding: Mildmay Community Centre U T I L I S A T I O N Non-domestic Use
Latitude [°]: 54
2 3 4 5 6 7 8 9 10 11 15 16 17 18 20 27
Util
isat
ion
Pat
tern
Per
iods
of U
tilis
atio
n an
d O
pera
tion
Beg
in U
tilis
atio
n [h
]
End
Util
isat
ion
[h]
Dai
ly U
tilis
atio
n H
ours
[h/d
]
Ann
ual U
tilis
atio
n D
ays
[d/a
]
Ann
ual U
tilis
atio
n H
ours
[h/a
]
Ann
ual U
tilis
atio
n H
ours
Dur
ing
Day
time
[h/a
]
Ann
ual U
tilis
atio
n H
ours
Dur
ing
Nig
httim
e [h
/a]
Illum
inat
ion
Leve
l [lu
x]
Hei
ght o
f Util
isat
ion
Leve
l (0.
8 or
0.0
m)
Hei
ght o
f Util
isat
ion
Leve
l (0.
8 or
0.0
m)
Rel
ativ
e A
bsen
teei
sm
Par
t Use
Fac
tor o
f Bui
ldin
g O
pera
ting
Per
iod
for
Ligh
ting
Ave
rage
Occ
upan
cy [m
²/Per
s.]
1 Meeting rooms BF 10 20 10 312 3120 2492 628 500 0.8 0.80 0.60 1.02 Music studio BF 14 24 10 208 2080 840 1240 300 0.8 0.80 0.80 1.03 Reception GF 10 18 9 350 2975 2728 247 500 0.8 0.80 0.5 1.04 Kitchen GF 10 14 4 350 1400 1400 0 500 0.8 0.80 0.3 1.05 Dining area GF 11 21 10 350 3500 2464 1036 200 0.8 0.80 0.5 0.76 Workshop GF 10 20 10 350 3500 2795 705 500 0.8 0.80 0.5 1.07 Main hall GF 13 21 8 350 2800 1764 1036 300 0.8 0.80 0.8 0.78 Workshop/IT 1F 10 16 6 260 1560 1550 10 500 0.8 0.80 0.3 1.09 MCP Office 1F 10 18 8 312 2496 2276 220 500 0.8 0.80 0.3 1.0
10 0 0 0 0 0.8011 Circulation Area 9.0 21 12 350 4200 3164 1036 100 0.8 0.80 0.9 1.012 WC and sanitary 9.0 21 12 350 4200 3164 1036 100 0.8 0.80 0.9 1.013 Storage 6.0 21 15 350 5250 3970 1280 100 0.8 0.80 1.0 1.014 0 0 0 0 0.8015 0 0 0 0 0.8016 0 0 0 0 0.8017 0 0 0 0 0.8018 0 0 0 0 0.80
19 0 0 0 0 0.80
20 0 0 0 0 0.80
21 Single Office 7 18 11 250 2750 2543 207 500 0.80 0.80 0.30 0.70 10.00
22 Group Office 7 18 11 250 2750 2543 207 500 0.80 0.80 0.30 0.70
23 Open-Plan Office 7 18 11 250 2750 2543 207 500 0.80 0.80 0.00 1.00 15.0024 Meeting 7 18 11 250 2750 2543 207 500 0.80 0.80 0.50 1.00 2.0025 Counter Area 7 18 11 250 2750 2543 207 200 0.80 0.80 0.00 1.00
26 Retail 8 20 12 300 3600 2999 601 300 0.80 0.80 0.00 1.00 7.00
27 Classroom 8 15 7 200 1400 1398 2 300 0.80 0.80 0.25 0.90 2.00
28 University Auditorium 8 18 10 150 1500 1409 91 500 0.80 0.80 0.25 0.70 0.75
29 Bedroom 0 24 24 365 8760 4407 4353 300 0.80 0.80 0.00 0.50
30 Hotel Room 21 8 11 365 4015 755 3260 200 0.80 0.80 0.25 0.30
31 Canteen 8 15 7 250 1750 1748 2 200 0.80 0.80 0.00 1.00
32 Restaurant 10 0 14 300 4200 2404 1796 200 0.80 0.80 0.00 1.00 1.50
33 Kitchen Non-Residential 10 23 13 300 3900 2404 1496 500 0.80 0.80 0.00 1.00
34 Kitchen, Storage, Preparation 7 23 16 300 3900 2404 1496 300 0.80 0.80 0.50 1.00
35 WC, Sanitary 7 18 11 250 2750 2543 207 200 0.80 0.80 0.90 1.00
36 Other Habitable Rooms 7 18 11 250 2750 2543 207 300 0.80 0.80 0.50 1.00
37 Secondary Areas 7 18 11 250 2750 2543 207 100 0.80 0.80 0.90 1.00
38 Circulation Area 7 18 11 250 2750 2543 207 100 0.00 0.00 0.80 1.00
39 Storage, Services 7 18 11 250 2750 2543 207 100 0.80 0.80 0.98 1.00
40 Server Room 0 24 24 365 8760 4407 4353 500 0.80 0.80 0.50 0.50
41 Workshop 7 16 9 250 2250 2192 58 500 0.80 0.80 0.00 1.00
42 Theater Auditorium 19 23 4 250 1001 55 946 200 0.80 0.80 0.00 1.00
43 Theater Foyer 19 23 4 250 1001 55 946 300 0.80 0.80 0.50 1.00
44 Theater Stage 13 23 10 250 2500 1253 1247 1000 0.80 0.80 0.00 0.60
45 Fair, Congress 13 18 5 150 1350 1260 90 300 0.80 0.80 0.50 1.00
46 Exhibition 10 18 8 250 2001 1850 151 200 0.80 0.80 0.00 1.00
47 Library Reading Room 8 20 12 300 3600 2999 601 500 0.80 0.80 0.00 1.00
48 Open Access Library 8 20 12 300 3600 2999 601 200 0.80 0.80 0.00 1.00
49 Library Repository 8 20 12 300 3600 2999 601 100 0.80 0.80 0.90 1.00
50 Gymnasium 8 23 15 300 4500 3002 1498 300 0.80 0.80 0.30 1.00
51 Parking Garage 7 18 11 250 2750 2543 207 75 0.00 0.00 0.95 1.00
52 Public Parking Garage 9 0 15 365 5475 3290 2185 75 0.00 0.00 0.80 1.00
PHPP 2007, Use Non-Dom 300mc ph s101020rw Mayville PHPP revised.xls
1st Stage Design Review
Interventions and Investigations to date - HRV
The heat recovery ventilation is set to run from 7am to 7pm.
It does not run through the night in order to save electricity.
Separating the heat from the air allows the ventilation to be
switched off at night.
The intention is to monitor occupancy hours through the early
occupancy stage and adjust hours of operation of ventilation as
required.
Occupancy data will also be fed into the PHPP and reviewed.
bere:architects
2nd Stage Fabric tests
In Situ U-Values
Thermography
Thermal Bridge Analysis
Air Pressure testing
Tracer gas (optional)
7
2.2.2 Air Infiltration A CO2 decay test was carried out to measure the air infiltration rate during the co-heating test. The method involves monitoring the decay of the internal CO2 concentration following an injection of the tracer gas. A CO2 canister, acting as the source, was located by one of the ground floor mixing fans and set for a daily, 15 min timed release of CO2 . This is achieved through the canisters governor and a mains plug-in timer. The tracer gas is placed in front of a fan to encourage mixing and allowed internal concentrations of CO2 reached levels of 1000-1200ppm. CO2 sensors located on the ground and first floors can then track the decay in internal levels of CO2 and hence calculate the air infiltration rate.
Figure 6: (Right) CO2 canister and mixing fan
2.2.3 Heat Flux Measurements Heat flux sensors were placed on the interior wall and floor to measure the heat flux through the fabric and therefore measure the respective u-values. The sensors, attached with thermal paste, leave lasting marks and therefore could only be located in a cupboard beneath the stairs. This meant that u-value measurements from the heat flux sensors could only be taken for the floor slab and for the ground floor wall.
Figure 7: Heat flux sensors on ground floor wall and slab
Heat Flux Sensors
19
3.3 Heat Flux Results The flux measured on the ground floor slab and ground floor exterior wall is shown in the table below. The ground floor slab is adjoining to the earth beneath itself, not the external air. The ΔT here is therefore derived from a predicted ground temperature for April-‐March (10oC), not the measured external air as in the case of the wall.
PHPP [W/m2K]
Measured [W/m2K]
Lower Wall 0.122 0.102 ± 0.017 Ground Floor Slab 0.103 0.099 ± 0.013 Table 3: Designed and measured u-‐values
Figure 15: Thermal image of location of heat flux sensors, showing uniform wall and floor
bere:architects
Air infiltration loss testsCamden Passivhaus
Air test 0.44 CO2 Decay 0.38
CO2 calculations suggest Passivhaus is performing at least to airtest
Larch House
Air test 0.21 CO2 Decay 0.194
CO2 calculations suggest Passivhaus is performing at least to airtest
Lime House
Air test 0.43 CO2 Decay 0.248
CO2 calculations suggest Passivhaus is performing considerably better than airtest
Mayville
Air test 0.42 CO2 Decay tbc
bere:architects
3rd Stage Performance Monitoring
Review commissioning records, and identify need for fine-tuning and seasonal re-commissioning
Nov’11 to Feb’12 - manual meter monitoring Stage A TM22
Installation of additional energy monitoring kit, as required
Monitor initial energy consumption to April’12, to Stage B TM22
Installation of monitoring sensors and loggers if necessary
Continuation of energy monitoring to October 2012 to Stage C TM22
Continuation of energy monitoring to October 2013 (second full year) to Stage C TM22
TM 22 main results page
bere:architects
Building user survey
bere:architects
• Energy savings in existing buildings are easily achieved using PHPP
• Refurbishment is the perfect opportunity to reduce energy consumption
• We can get the biggest energy reductions by concentrating on fabric first to
hold on to the winter warmth inside the building
• We should make use of triple glazing to benefit from solar gains whenever
available in winter - and for comfort
• We should minimise draughts to save heat and improving comfort
• We should minimise cold bridging to avoid unhealthy condensation
• In summer ventilate by simply opening windows, preferably at night,
benefitting from a little thermal mass to help cooling
• Ideally use some retractable shading on large south areas of glazing
• We should ventilate in winter in a controlled fashion with heat recovery so that
heat isn’t thrown away
Interim conclusions
bere:architects
Knowledge transfer
The results of the BPE study will be uploaded to the EST repository,
where it will be available for research purposes.
BSRIA will publish conclusions in DELTA T, using the project to produce
reporting templates applicable to all TSB funded BPE projects.
The lessons learnt are expected to be relevant to a wide range of solid
wall buildings across the UK in need of retrofit.
bere:architects
(3) The social impact
bere:architects
Social Impact
The Passivhaus approach, of a building looking after
its occupants; a community centre looking after its
community.
bere:architects
Social Impact
bere:architects
Thank you
Justin Bere, bere:architects
www.bere.co.uk
twitter @jbere
The Green Deal A Good Deal for Construction?
Constructing Excellence, Berkshire9 November 20119 November 2011
Richard WadePartner, Head of Construction
Attitudes (1)C t ti I d t CIOB S “Th GConstruction Industry – CIOB Survey; “The Green Perspective”
Sample of 847 construction industry professionals (company directors and management)98% id i d t h l t l i l ti t 98% consider industry has role to play in solution to climate change; 54% consider industry participation in reducing CO2 levels as “vital”educ g CO e e s as a
Current UK building regulations do not go far enough to create energy efficient buildings (66.6%)
Demand for energy efficient buildings on increase (73%) Green building is the future for construction (94.6%) Lack of financial incentives and client demand holding
back zero carbon construction (44.9%)
Attitudes (2) Government/EU Targets
Rio Kyoto and the IPCCRio, Kyoto and the IPCC
“20-20-20 Agreement”
Reduction in CO2 emissions from 1990 levels by 80% by 2050
Greater use of renewable power, energy efficiency and capping carbon emissions by use of budgets every 5 yearsy g y y
Climate Change Act 2008 (1)Climate Change Act 2008 (1)
Royal assent/commencement 26 November 2008
Requires: Requires:-– a 34% cut in 1990 greenhouse gas emissions by 2020, and– at least an 80% cut in emissions by 2050y
“enhances the UK's ability to adapt to the impact of climate h ” (DEFRA)change” (DEFRA)
Climate Change Act 2008 (2)Climate Change Act 2008 (2)
Establishes – UK wide climate change risk assessment every five years; – national adaptation programme;
Government power to require ’bodies with functions of a– Government power to require bodies with functions of a public nature’ and ‘statutory undertakers’ (companies like water and energy utilities) to report on:- h th h d th i k f li t h t how they have assessed the risks of climate change to
their work; and what they are doing to address these risks;
Primarily aimed at meeting emissions target and tackling domestic waste
UK G t Obj tiUK Government Objectives
to “drive down demand [for energy across the economy] to drive down demand [for energy across the economy], increase efficiency and reduce wasted energy”
to “reduce energy use by households, businesses and the public sector and to help protect the fuel poor”
to reform the electricity market to encourage low carbon investment
to build renewable energy systems across the UK to ensure that at least 15% of energy comes from renewable sources by 2020
DECC B i Pl 2011 2015DECC Business Plan 2011-2015
to establish low carbon technologies including renewable power
a new generation of nuclear power
clean fossil fuels using carbon capture and storage clean fossil fuels using carbon capture and storage
The Green DealThe Green Deal
– Energy Act – introduced 8 December 2010; became law gy ;(royal assent) 18 October 2011
– Coalition’s flagship initiative for improving energy efficiency of buildings removing upfront costof buildings, removing upfront cost
– Intended to “revolutionise … energy efficiency of British properties”p p
– 25% of UK’s carbon emissions comes from the energy used to heat homes
– Around 50% more energy is used to heat and power homes than is used to power UK industry “C ll f E id ” l h d i M h l d– “Call for Evidence” – launched in March; now closed
– Focus on small scale projects
The Energy Act – key elements
– Remove the upfront cost of energy efficiency measures making expensive home improvement affordable
– Work to be repaid over time through a charge on the home’s energy bill (information on bill to be clearer)
– Repayments must obey “golden rule”, namely that charge is p y y g y gno more than the expected savings
– Consumer protection “at the heart of the Green Deal”; all Green Deal participants (installers) to carry “quality mark” p p ( ) y q y
– Extra financial help to be provided for most vulnerable/ hardest to treat homesImprove at least 682 000 privately rented homes; from April– Improve at least 682,000 privately rented homes; from April 2018 it will be unlawful to rent out a house or business premise which has less than an “E” energy efficiency ratingfacilitates the roll out of smart meters– facilitates the roll-out of smart meters
Implementation – proposed timetablep p p
N f l lt ti d l i l ti– Now : formal consultation on secondary legislation
Early 2012: secondary legislation laid before– Early 2012: secondary legislation laid before Parliament
– Spring 2012: detailed industry guidance prepared
– Autumn 2012: first Green Deals appear
The Green Deal
– “When it’s introduced, the Green Deal will be as easy as ABC by making work affordable, providing bespoke independent advice and choice in the market from well-known and trusted high street names”known and trusted high street names
(Chris Huhne, Climate Change Secretary)
“ h G D l ill b i b i– “the Green Deal will be a massive business opportunity. It’s expected to attract capital investment of up to £15 billion in the residential sector alone by theof up to £15 billion in the residential sector alone by the end of this decade and at its peak, the Green Deal could support around 250,000 jobs”
(G C C )(Greg Barker, Climate Change Minister)
G D l FiGreen Deal Finance
“Pay as you save” principlePay as you save principle
The Golden Rule:-
– for accessing the Green Deal Finance - the cost of the improvement works should not exceed the expect savings; and
– the length of time to pay back the cost of the measure should not exceed the lifetime of the measure itself
Typically owners should be able to be more energy efficient at no additional cost; in addition the consumer will be offered ;advice to further reduce their energy consumption
G D l Fi li ibilit it iGreen Deal Finance – eligibility criteria
Step 1: proposed measure must be ‘eligible’ for finance under Green Deal
Step 2; measure must be ‘suitable for the property’ as determined by Green Deal Assessor
Step 3; measure must meet the Golden Rule
(See DECC publication “What measures does the Green Deal cover?”, June 2011)
G D l Fi th i d d lGreen Deal Finance – the envisaged model
Assessment undertaken by a qualified Green Deal Assessor Assessment undertaken by a qualified Green Deal Assessor which makes recommendations as to potential areas of improvement
Approved Green Deal Provider to evaluate package of measures recommended and make an offer (the “charge”) which is based on estimated energy savings to result from measures/likely cost of installation (including finance)
Charge to be attached to energy meters at property and shows the length of the repayment period
G D l Fi dditi l ttGreen Deal Finance – additional matters
Owners and tenants eligible for Green Deal Finance withOwners and tenants eligible for Green Deal Finance with consent from all parties that have an interest in the property (including energy bill payer!)
Not a traditional loan or finance but likely to count as a fixed term credit arrangement (regulated by the Consumer Credit Act 1974)
Therefore Green Deal Providers will need Consumer Credit Licence before they can operate
The presence of a Green Deal Finance scheme must be disclosed to any future occupier of the property, such as a tenant or ownertenant or owner
F d I T iff (FIT )Feed-In Tariffs (FITs)
Currently Under ReviewCurrently Under Review
Government-backed measure encouraging production of renewable electricityelectricity
3 ways that the Tariffs helps generation of revenue your energy production:-– Generation Tariff: fixed income for every kilowatt hour of electricity
you generated and used– Export Tariff: additional fixed income for every kilowatt hour of
electricity generated and sold back to the grid.– Purchase of reduced quantity of electricity from supplierPurchase of reduced quantity of electricity from supplier
http://www.fitariffs.co.uk
The Green Deal A Good Deal for Construction?
Constructing Excellence, Berkshire9 November 20119 November 2011
Richard WadePartner, Head of Construction