Have 25 year’s experience in planning, design, erection
engineering, specification & analysis of Cable stayed & segmental
bridges and structures. Proficient in computer usage including
application software like RMV8i, ADAPT & SAP, MS Project.
Exposure to CEB-FIP Modal code 1990, British, American &
Indian Standards. Familiar with FIDIC. Has been a lead member of
a team, which worked on Delhi Metro, Chennai Metro and
Bangalore Metro. Have an experience on planning and design of a
Concrete cable stayed bridge, erection engineering and
construction supervision of cable-stayed bridge over Yamuna. Did
project coordination and proof check the design of 480m & 245 m
steel arch bridges and approach viaducts. Currently with SYSTRA
India and working on metro projects.
Synopsis
Trainings
• Training on cable stay technology at VSL Academy Bangkok
• Training on Post tensioning at VSL Academy, Bangkok
• Training on Geometry control of Precast segmental bridges at
Singapore
• Training on Construction equipment's at Switzerland
My Skills
Permanent Works
• Planning & design of Precast segmental post tensioned bridges
• Planning & Design of Balanced Cantilever bridges
• Planning & design of cable supported brides- Cable stayed &
Suspension
• Planning & Design of Steel Bridges
• Cable stay technology
• Post tensioning technology
• Design of Bearings and Articulations
• Instrumentation for Bridges
• Rail & Structure interaction Analysis
My Skills
Temporary Works
• Planning & design of Erection Gantries
• Stability Analysis for Erection Gantries
• Planning & Design of Form travelers & lifting frames
• Planning & Design of formwork and casting cells for
shortline method
My Skills
Construction Engineering
• Stage by Stage Analysis
• Precamber calculations
• Load Transfer Analysis
• Geometry control
• Method Statements & work procedures
My Skills
Management
• Client Management
• Upstream Marketing
• Training & grooming of young engineers
• Preparation of Technical & Financial Proposal
• Project Planning & Management
My Skills
Software
• RM V8i
• Adapt
• SAP2000
• Oasys
• MS Project
Design code & specifications
• Indian Standards,
• Indian Road Congress
• Indian Railway standards
• British Standards BS5400
• American Concrete institute
• Model code 1990
• AASHTO
Experience
Period Firm Position
2013 June- SYSTRA India Technical Manager 1 Year
2013 Jan 2014 June Freyssinet India Technical Manager 1.5 Year
2006 Jan- 2013 Jan Technical Centre VSL Satellite Manager 7.0 Year
2004 Sept -2006 Jan Scot Wilson Consultant 1.5 year
1994 Feb- 2004 Sept COWI-SPAN JV Structural Engineer 9 Years
1989 June-1994 Feb Mahindra Raj Structural Engineer 5 Year
25 Year
Languages
Language Proficiency
Hindi Mother Tongue
English Medium of Education
German Two year Diploma
French One year Certificate
Design Basis for Cable Stayed Concrete Bridge over Yamuna”
for International conference 1999 by Indian Institution of
Bridge Engineers.
“Tolerances in Construction of Concrete Bridges” for
National Seminar 2002 by Indian Concrete Institute.
“Sustainable Transport: the New Burden” for National Seminar
2003 by Indian Concrete Institute.
“Construction of Cable Stayed Concrete Bridge over Yamuna”
for International symposium 2004, Shanghai by IABSE.
“Cable stay technology and its application to Lakadiya bridge
at Bhavnagar Gujrat” for International symposium 2013,
Kolkata by IABSE.
“Continuous Welded Rails & Bridge Interaction Analysis:
State of the Art”.
Publications
Professional Membership
• Indian Road Congress (IRC),
• International Association of Bridge and
Structural engineering (IABSE)
Detailed design of viaduct and stations for section R5 (15.42 km) and 17
stations of Lucknow metro rail project, Airport to Munshi Pulia ( North South
Corridor).
Detailed design of viaduct and stations for section R5 (18.82 km) and 16
stations of Bangalore metro rail project, Phase 2
Project coordination and proof checking of viaduct and stations for Mundka-
Bahadurgarh & Dwarka-Najafgarh elevated lines of Phase III of Delhi Metro
project
Feasibility study for High Speed Rail Project
Delhi to Amritsar
Feasibility study for Light Rail Transit System
for City of Astana, Kazakistan
Feasibility study for Greater Dhaka Urban Transport Project, 25km long
BRT with 10 flyover and 4.5km long elevated road.
Design and construction engineering for a cable stayed bridge at
Bhavanagar, Gujrat
Planning and design of permanent work, enabling works including overhead Erection
Gantry, construction engineering, for 9.5 km long segmental elevated Expressway,
Bangalore.
Planning and design of permanent work, enabling works including overhead Erection
Gantry, construction engineering, for 9.5 km long segmental elevated Expressway,
Bangalore.
Planning and design of permanent work, enabling works including overhead Erection
Gantry, construction engineering, for 9.5 km long segmental elevated Expressway,
Bangalore.
Planning and design of permanent work, enabling works including overhead Erection
Gantry, construction engineering, for 9.5 km long segmental elevated Expressway,
Bangalore.
Planning and design of permanent work, enabling works including overhead Erection
Gantry, construction engineering, for 9.5 km long segmental elevated Expressway,
Bangalore.
Planning and design of permanent work, enabling works including overhead Erection
Gantry, construction engineering, for 4.5 km long segmental elevated Expressway, at
Neelamagla, Bangalore.
Planning and design of permanent & enabling works including overhead Erection
Gantry, construction engineering, for 4.5 km long segmental elevated metro viaduct,
Chennai.
Planning and design of permanent & enabling works including overhead Erection
Gantry, construction engineering, for Worli Bandra Bridge at Mumbai.
Planning, design and Construction engineering for pylon and bridge deck,
stay cable fabrication and installation method for Keppel stay cable
bridge, Singapore built by segmental method of construction.
Planning, design of permanent work & Construction engineering for pylon and bridge
deck, stay cable fabrication and installation method for Metro Bridge at Moolchand,
New Delhi built by segmental method of construction
Planning, Design of permanent work & Formtravelers for Gateway Bridge,
Australia, with statical system of 162m+260m+162m built by FCM method of
construction.
Planning, design of Permanent work, construction engineering &
Design of Formtravelers for Veracruzana in Mexico built by
segmental method of construction.
Planning and design of permanent work, construction engineering &enabling works including under slung Erection Gantry for Gauteng
rapid link ,South Africa built by segmental method of construction.
Planning and design of permanent work, construction engineering &enabling works including under slung Erection Gantry for Gauteng
rapid link ,South Africa built by segmental method of construction.
Planning, design & Construction engineering for continuous
balanced cantilever bridge at Suramadu, Malaysia,
Planning and construction engineering for 300m span suspension bridge
across river Subhansiri, Assam.
Planning & Designed continuous elevated urban structures at 3
intersections at Chennai.
Planned & designed bridges with curved and continuous spans on pile
foundation, on NH-54 in Assam , with segmental method of construction.
Did project coordination and proof check the design of 480m & 245 m steel
arch bridges over Chenab and Anjikhand and approach viaducts for Northern
Railway India.
Lead a team that designed Elevated track & a station of Delhi Metro of
Phase 1.
Planned & designed 300m to 3000m long bridges with continuous spans on
pile foundation, across rivers on National Highways in India.
Prepared Conditions of Contract & Technical specifications for Major bridges.
Prepared successful Technical/Financial proposals for bidding.
Has been a part of a team that designed a cable-
stayed bridge across river Yamuna, Allahabad.
Has been a part of a team that designed a cable-stayed bridge across river
Yamuna, Allahabad.
Designed and Supervised, erection and tensioning of stay cables, form traveler
operation, and deck construction of a cable stayed bridge across river Yamuna,
Allahabad and adjoining viaducts with Well & pile foundations.
Designed and Supervised, erection and tensioning of stay cables, form traveler
operation, and deck construction of a cable stayed bridge across river Yamuna,
Allahabad and adjoining viaducts with Well & pile foundations.
Planning and design of permanent work, enabling works including overhead Erection
Gantry, construction engineering for airport link metro, Bangkok.
Planning & construction engineering for erection
of roof of Jawarlal Nehru stadium, new Delhi.
My strengths & Weakness
• Adaptability
• Positive attitude
• Persistence
• Self motivated
• Honest
• Trust people quickly
• Can not say no, when someone ask for help
• Take decisions quickly
• Bit lazy about which I am not interested
I wish to promote Sustainable development and to incorporate
Environmental objectives into design, planning, construction and
operational criteria. To educate self and fellow workers on these issues
and to freely transfer this knowledge to society