Mining EngineerNo.4, III Street Extension

Venkatesware NagarThirunagar

Vellore - 632 006Tamil Nadu , India

Phone:91-0416 – 2241580 Mobile:91-09994249366

Email:[email protected]

Page 2: Resume jyothilingam

Qualification

Passed B.E. In Mining Engineering from College Of Engineering, Guindy (Presently Anna University)

Madras university in the Year 1965

Page 3: Resume jyothilingam

Technical Papers presentedPresented the following papers in the international

Cement seminar 1. Development of Mines2. Limestone Scalping3. Mass Blasting4. Lignite driers for the use in cement plants

Page 4: Resume jyothilingam

MembershipHeld the position of Vice Chairman, Tamil Nadu and

Kerala Mine Safety Association As member of Expert Sub- Committee on Raw

Materials, Cement Manufacturers Association of IndiaApproved as Registered Qualified person by Indian

Bureau of Mines, Govt of India, and Nagpur.

Page 5: Resume jyothilingam

WORK EXPERIENCE

Mines Forman in Cowgule & Co Vasco-da-gama, GoaFrom January 1968 to January 1972

Description : During service period I was placed in-charge of the development of three different IRON ORE mines in southern Goa. The average production was 1000 mt per day

Reported to Mine SuperintendentNumber of Persons working : 75

Page 6: Resume jyothilingam

Work Experience ..continuedAssistant Mines Manager

from February 1972 to August 1974Dalmia Cements ( Bharat) Ltd (IRON ORE) Hospet, Bellary Dist., Karnataka.Job Description: During the services at Dalmia Cements. I

was in-charge of section or IRON ORE Mines and erection of Red Oxide plant. The average output was 10,000 T/dy including Overburden employing shovels dumpers and drills

Reported to Mines ManagerNumber of persons working :300

Page 7: Resume jyothilingam

Work Experience ..continuedAssistant Mines ManagerFrom September 1974 to September 1978Description: During the services, initially, I was in charges

for operations of crushers, mining equipments, mining and quality control of mines. I was in charge for the new cement (limestone) project near Cuddappa. I have made all initial works and selection of factory sites, alignment of railway sidings of railway siding, limestone deposits etc.

Reported to PresidentNew Project Development

Page 8: Resume jyothilingam

Work Experience ..continued Mines Superintendent Madras cements Ltd. Ramasamyraja Nagar, Ramnad Dist., Tamil Nadu From October 1978 to April 1982 Job Description: During the course of my service with madras Cements, I had detailed

study of raw material (LIME STONE), Performance of raw mill. and Kiln. I have re-worked the mines raw mill operations. Kiln operations to suit the LIMESTONE and coal. Output of Kiln is increased form 100 to 1275 tones per day. I introduced for first time in India hydraulic excavators (clamshell), 7 ½ c’Yd loaders and high speed wagon drills in the LIMESTONE mines. I developed a new system of beneficiating the LIMESTONE. The system is being adopted by other cement factories. I carried out the biggest LIMESTONE blast of 1, 00,00 tones in one blast. During my Services, I was responsible for erection of secondary LIMESTONE crushers of 350PH and other connected equipments. I was placed additional in charge of new (LIMESTONE) cement project near Vijayawada in Andhra Pradesh. I carried out entire preparatory works including preparation of LIMESTONE surveying, geological mapping, mine planning, factory layout layout drawing, alignment of railways side. I have been looking after the entire liaison work in connection with Power, coal, water, land, limestone and other relevant liaison works and permissions. I have been acting in a capacity of next to General Manger.

Page 9: Resume jyothilingam

Work Experience ..continuedDeputy General Manager (mines)India cements Ltd., Sankari west, Salem Dist., Tamil NaduJob Description: I have been working in the capacity of Dy

General Manger (Mines) amended latter as General Manager. I have been responsible for the entire LIMESTONE MINES factory, crusher, kiln, cement mill, packing house, Mining, labor, cost control, stores, sales and transport. The capacity of the Plant is 1800 tones cement per day and 5000 mt LIMESTONE per day, the total employment is 4500 persons. During the services, I have given a proposal to modify and convert from wet to dry process.

Number of persons working: 3200

Page 10: Resume jyothilingam

Work Experience ..continuedGeneral ManagerNircon Engineers & Consultants, NIRLON Group)

300, Mowbrays road, Madras – 600 018From january 1983 to 1985Description: I was in charge of LIMESTONE Mining &

cement plants in our consultancy company. I was responsible for preparation of lay-out, limestone investigation, detailed project report, lay-out drawing, commissioning and training

Page 11: Resume jyothilingam

Work Experience ..continuedGeneral ManagerMIC Cements Ltd MIC Cements Ltd., Jewargi,

Gulbarga Dist.KarnatakaFrom January 1985 to April 1987Job Description: I was in charge of the entire

LIMESTONE mines and cement plant.Number of persons working : 300

Page 12: Resume jyothilingam

Work Experience ..continuedMines ManagerBalaji Produce Limited , Chikkanayakanhalli,

Tumkur DistDescription : I was incharge of the IRON ORE minesNumber of persons working: 260

Page 13: Resume jyothilingam

Work Experience ..continuedMines ManagerMaris Cements ( P) Ltd,Huliyar,Tumkur Dist.Description: I was in-charge of limestone and IRON

ORE mines.Number of persons reporting: 400

Page 14: Resume jyothilingam

Mining ConsultancyFrom 2007, offering Mining Consultancy ServicesThe services include preparation of mining plans,

sections, reserve estimation, mine management charts, quality control planning, mineral sales planning, inventory planning, mine profitability estimation and finance planning, investment schedule, cash-flow statement and meetings with the government departments.