Top Banner
Resources WG Update PRAGMA 10 QuickTime™ and a TIFF (Uncompressed) decompre are needed to see this pic
7

Resources WG Update PRAGMA 10. Interoperability PRAGMA TG (ANL) Moving onto EGEE GGF GIN group Trust Enabled by APGrid PMA.

Mar 27, 2015

Download

Documents

Xavier Beach
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Resources WG Update PRAGMA 10. Interoperability PRAGMA TG (ANL) Moving onto EGEE GGF GIN group Trust Enabled by APGrid PMA.

Resources WG Update

PRAGMA 10

QuickTime™ and aTIFF (Uncompressed) decompressor

are needed to see this picture.

Page 2: Resources WG Update PRAGMA 10. Interoperability PRAGMA TG (ANL) Moving onto EGEE GGF GIN group Trust Enabled by APGrid PMA.

Interoperability PRAGMA <-> TG (ANL) Moving onto EGEE GGF GIN group Trust Enabled by APGrid PMA

QuickTime™ and aTIFF (Uncompressed) decompressor

are needed to see this picture.

Page 3: Resources WG Update PRAGMA 10. Interoperability PRAGMA TG (ANL) Moving onto EGEE GGF GIN group Trust Enabled by APGrid PMA.

CCGrid ‘06 Paper

Page 4: Resources WG Update PRAGMA 10. Interoperability PRAGMA TG (ANL) Moving onto EGEE GGF GIN group Trust Enabled by APGrid PMA.

Sage Tile-Display Walls Created by EVL (UIC) Joint EVL-UCSD effort

Integration into Rocks CalIT / OptIPuter users Software released for

others CNIC Osaka AIST KISTI Others…

QuickTime™ and aTIFF (Uncompressed) decompressor

are needed to see this picture.

QuickTime™ and aTIFF (Uncompressed) decompressor

are needed to see this picture.

Page 5: Resources WG Update PRAGMA 10. Interoperability PRAGMA TG (ANL) Moving onto EGEE GGF GIN group Trust Enabled by APGrid PMA.

Breakout Session Agenda

Today (90 min) Routine Use

Experiments (20 min)

CA (10 min)

Migration to GT4 (15 min)

PlanetLab (20 min)

Sage / Viz Clusters (5 min)

Tomorrow (60 min) Paired with Data WG Time for Open

Discussion

Page 6: Resources WG Update PRAGMA 10. Interoperability PRAGMA TG (ANL) Moving onto EGEE GGF GIN group Trust Enabled by APGrid PMA.

Unofficial Trip Wed (all day)

8:00am - 5:20pm $139 (AUS)

Making reservations today

See me or Teri by 1:00pm today if you would like to attend

This is similar to the trip happening on Fri.

QuickTime™ and aTIFF (Uncompressed) decompressor

are needed to see this picture.

QuickTime™ and aTIFF (Uncompressed) decompressor

are needed to see this picture.

QuickTime™ and aTIFF (Uncompressed) decompressor

are needed to see this picture.

Page 7: Resources WG Update PRAGMA 10. Interoperability PRAGMA TG (ANL) Moving onto EGEE GGF GIN group Trust Enabled by APGrid PMA.

Highlights of Breakout Session SCMSWeb

Moving to GLUE schema Long term development (6-12 mo)

Gfarm Next routine use app will be installed in Gfarm Gfarm is becoming a universal requirement “Community Software Area” from TG?

GT4 Usage Statistics Non-issue, we all know

PRAGMA CA Expected operational by next meeting