6/21/2016 1 Resource Intensity Reduction through ZED module in Vendor Cluster Market leader in Furniture Industry with Home, Office & Specialty Furniture Heading for 2200 Cr + Business in 16-17 Unmatched reach. 16 Branches & over 700 Dealers Supported by 5 manufacturing locations and 95 major suppliers One of the largest divisions of Godrej & Boyce 2 Godrej & Boyce – an organization with 119 years of Legacy
13
Embed
Resource Intensity Reduction - · PDF fileEnergy Pledge & Target Setting ... Resource Intensity Reduction Initiatives – Review During MRM ... 1st Prize for Kaizen on Energy
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
6/21/2016
1
Resource Intensity Reductionthrough ZED module in Vendor Cluster
Market leader in
Furniture Industry with Home, Office & Specialty Furniture
Heading for 2200 Cr +
Business in 16-17
Unmatched reach.
16 Branches & over 700 Dealers
Supported by 5
manufacturing locations and 95 major suppliers
One of the largest divisions of
Godrej & Boyce
2
Godrej & Boyce – an organization with 119 years of Legacy
6/21/2016
2
Achieve 35% reduction in specific energy consumption ,50% reduction in specific water consumption ,15% use of renewable energy
Creating a Greener India
Carbon Neutrality, Positive Water Balance, Energy Efficiency & Renewable Energy Use Achieve Zero Waste to landfill
Beyond Sourcing
Good Green Vision
GETTING TOGETHER
LEARNING TOGETHER
ACHIEVING TOGETHER
Cluster Philosophy
6/21/2016
3
Bringing Non competing
Suppliers together
Commitment from Top
Management of Godrej Interio
Training & Guidance by
Expert CII Counsellors.
Periodic shop floor visits
for hand holding
Monthly
Progress review meetings
Rewards &
Recognition
Towards World Class Organisation
Vendor Cluster Journey
Low
Influence
High
Impact
High
Influence
High
Impact
Low
Influence
Low
Impact
High
Influence
Low
ImpactNature of Business
No. of Vendors
Steel Fabrication 24 No.
Wood Working 7 No.
Steel & Wood Working 3 No.
Packaging 3 No.
Sofa Manufacturing 1 No.
Gas springs Mfg 1 No.
Plastic components 1 No.
Bringing non competing suppliers together for cluster
6/21/2016
4
A goal without a plan is just a wish …
Training and Guidance by Experts
Advanced Training on Energy Efficient Systems by CII Expert
Faculties
Awareness on Management of Energy, Water and GHG emissions by
Godrej Interio Team
Basic Training on Resource management by CII Experts
6 Training Programs…17 Suppliers…1500+ Man hours…
6/21/2016
5
Energy Pledge & Target Setting
Parameter FY14-15 FY15-16 FY 16-17 FY 17-19
Energy, Water,
WasteBase line
15 % over
previous year
5 % over
previous year
3 % over
previous year
A Pledge to reduce resource Intensity by 25% in 3 years …
Handholding by Godrej Interio
Addressing entire team by Godrej top management
On site training programs covering all associates of Supplier
Guidance by Godrej top Management during Gemba walk in
MRM
17 Suppliers… 102 handholding visits so far ….
6/21/2016
6
Improvement scope Identified in Hand holding Visit(some Examples)
ResourceAreas Identified For Energy
Saving
Current
StatusTarget Action required to take
Target
Date
Electricity
To Optimize Utilization of
Compressors
112.5
kWh/hr83 kWh/hr
To install Centralized screw
type compressors unit along
with reservoir tank
16.12.15
To utilize waste steam from
Boiler to heat Furnace oil, Thus
eliminating the requirement of
electrical heater
7200 kWh /
Year
1800 kWh /
Year
To provide a steam
recirculating line around the
furnace oil tank to heat the
furnace oil.
07.11.15
To Reduce power consumption
on the skipper machine during
break hours
24000 kWh
/ Year
20400
kWh / Year
(15%
Reduction)
by making operation of dust
collector automatic and
independent of requirement
for manual
15.11.15
ResourceAreas Identified For Energy
Saving
Current
StatusTarget Action required to take
Target
Date
Water
To Reduce water consumption
by utilizing non potable water
generated after purification
from R.O plant
52000 Lit /
Month
Zero
wastage of
non potable
RO water
To provide a tank & pipeline &
connect the waste water
collected to toilet, gum making
and garden
23.10.15
To save water in rinsing process
of pre-treatment.
312.5 KL
/Day
125 KL /
Day
To make arrangement for Water
transfer from tank 2 to tank 1 &
similarly from tank 4 to tank 3
for optimize utilization of water
30.10.15
To use recycled water from ETP
is used for gardening
15000 L /
Day
Zero
wastage of
recycled
water
To provide system to use water
for gardening11.11.15
Improvement scope Identified in Hand holding Visit(some Examples)
6/21/2016
7
ResourceAreas Identified For Energy
Saving
Current
StatusTarget Action required to take
Target
Date
Waste
To change the sheet size for
achieving better optimization
(yield improvement)
8.1 % 5.8 %
To check with supplier and
buy cut to size material to
Reduce scrap %
24.12.15
To check possibility of recycling
of EPS waste generated in the
plant
318 Cubic
feet
Zero waste
of EPS
To Landfill
To find out vendor for
recycling of EPS waste15.10.15
To reuse scrap generated in
process as RM for new product
120 kg /
Month
Zero waste
for some
products
Used 3 ply carton scrap by
sticking 3 strips made it 21
ply to use it as fitment.
15.10.15
Improvement scope Identified in Hand holding Visit(some Examples)
Monthly progress review meetings
Monthly reviews are conducted by rotation with cluster suppliers in
presence of CII Mentor & Godrej Top Management
Suppliers present their ideas and thoughts including those on green
manufacturing.
Supplier’s progress is monitored on Green as well as other initiatives
during these meetings.
6/21/2016
8
Resource Action Decided Target Date Status
Benefit
Achieved /
Year
Remark (unit
saving Annual)
Electricity
1Replaced 30 HP dust collector with Separate Dust Collectors of 10HP &
7.5HP and Only 7.5 HP dust collector used for Night sift.Decd’15 Completed 4,15,800/- 4950 kWh
2 Install VFD with pressure transducer for 30HP compressor. Jan'16Progress as per
plan- -
3Replaced fluorescent lamps of 360 watts (in total) with CFL bulbs. 164
watts ( in total )Dec'15 Completed 2,148/- 252 kWh
Water
1 Recycled water from ETP is used for gardening Nov'15 Completed 12600/- 180 KL
2 Changed the normal water taps with Push type water taps Jan'16 Completed 2100/- 30 KL
3
In pretreatment , Auto valve system for water rinse tanks (no-3, 6 & 7)
i.e. water flow will start automatically only when cage with material is
dipped in tank
Feb’16Progress as per
plan- -
Waste
1 To buy sheet in cut to length form to reduce process scrap Oct’15 Completed 8,73,600 2.72 % waste reduction
2 To purchase material in cut to length strips for all sizes above 150mm Nov'15 Completed 80,000/- 1.9 % waste reduction
3 Recycling of EPS ste generated in our plant Nov’15 Completed 5600/-Recycling of 318 Cubic ft
EPS. Zero Landfill
Red – Crossed Tgt. Date Green – Completed Yellow – Progress as per plan
Resource Intensity Reduction Initiatives – Review During MRM
Energy Conservation53 Projects …Average per project Saving of 23%
Name of the Associate /
VendorTitle of Project
Units Saved
(kWh/month)
Project Specific
Improvement (%)
Khutale Engg Pvt Ltd Installation of solar energy system 6000 100%
Wudhouse Designs Pvt
Ltd
To reduce the electricity consumption by
replacing CFL bulb with LED507 59%
To reduce the electricity consumption by
decentralizing the dust collection system1,523 22%
Corru cartons (I) Pvt ltd
Conversion of 20 tube lights of 36W in to
CFL of 18W94 50%
Replaced asbestos sheets with Transparent
polycarbonate & GICC sheets280 20%
M/s. P. M. ELECTRO-AUTO
PVT. LTD
Optimized Utilization of Compressors by
installing Centralized screw type
compressors unit along with reservoir tank
27 24%
6/21/2016
9
Name of the
Associate / VendorTitle of Project
Units Saved
(KL /month)
Project Specific
Improvement (%)
Corru Cartons (I)
Pvt Ltd
Utilization of non potable water generated after
purification from R.O plant for Gardening and Flushing
purpose.
52 100%
Khutale Engg Pvt Ltd Usage of recycled water from ETP for gardening . 15 100%
Silver Techno Mech
Pvt Ltd
Water saving in rinsing process of pre-treatment by
making arrangement for Water transfer from tank 2 to
tank 1 & similarly from tank 4 to tank 3 to optimize
utilization of water
196 63%
P M Electro-Auto
Pvt Ltd
Installation of Sludge separator unit & Drip drop
addition system in pre-treatment process to reduce
water changeover frequency.
23 28%
Shreeji Industries
Harvested
1,25,000Liters of
water in last 2
years
U.G. Tank
25K ltrs
Water Conservation17 Projects …Average per project Saving of 37%
Name of the
Associate / VendorTitle of Project
Units Saved
(Units /month)
Project Specific
Improvement (%)
Silver Techno Mech
Pvt Ltd
To maintain even temperature in oven at all points by
changing position of louvers (Saving of LPG) 876 kg / month 13%
P M Electro-Auto Pvt
Ltd, Nashik
Gas saving by blocking first two louvers in dry off
oven to reduce heat loss338 kg / month 3.21%
P M Electro-Auto Pvt
Ltd, Palghar
To use residual LPG in the cylinder by installing Liquid
Take Off System7.2 Kg / month 0.05%
Fuel Conservation23 Projects …Average per project saving of 7%
6/21/2016
10
Name of the
Associate / VendorTitle of Project
Units Saved
(Units /month)
Project Specific
Improvement (%)
Corru Cartons (I)
Pvt LtdRecycling of thermocole waste generated in the plant 318 Cu.ft/ month 100%
Corru Cartons (I)
Pvt LtdTo reuse in-process scrap as RM for new product 120 kg / month 100%
Khutale Engg
Pvt Ltd
Procurement of cut to length steel (RM) for better
optimization2240 Kg / month 26%
Carefine Woodworks
Pvt Ltd
Material Size optimization (wooden boards) from size
8X6 & 9X6 to size 7X6 & 9X5.
Product mix production planning for better material
utilization
2342 kg / month 25.3%
Waste Reduction50 Projects …Average per project Saving of 12%
Guidelines for Weighted Average
For Powder coating
Suppliers
For Other
Suppliers
Resource Weight age Weight age
Electricity 30 % 40 %
Water 30 % 20 %
Wastage 20 % 40 %
Fuel 20 % N/A
Overall Resource Intensity Reduction of 13.65 % …
Resource intensive Suppliers
Weighted Average
Reduction in
Resource Intensity
Khutale Engg Pvt Ltd 41.90%
Wudhouse Designs Pvt Ltd 24.90%
Jay Industries 15.30%
P M Electro auto Pvt Ltd, Palghar 14.85%
Carefine Woodworks Pvt Ltd 13.40%
P M Electro auto Pvt Ltd, nasik 12.11%
Overall Average Reduction 13.65%
6/21/2016
11
Recognitions for Green initiatives at Interio annual Supplier’s meet
M/s P M Electro Auto’s significant contribution towards Interio’s BIFMA
Gold certification
M/s Vishwadeep for innovative use of Bio-Fuel
M/s Zenith Metaplast for tree plantation program
Awards at National cluster for Green initiatives
1st Prize for Case Study on resource conservation
M/s MechTech
1st Prize for Kaizen on material conservation
M/s V K Fabricators
1st Prize for Kaizen on Energy conservation
M/s PM Electro Auto
6/21/2016
12
Lesson from the Corn Farmer …
6/21/2016
Sharing of Good Practices with the Industry
M/s Vishwadeepsharing innovative use of Bio-Fuel and