Top Banner
BUrners TRAining CEntre RES G RESIDENTIAL PROJECT ep: Comparison between us & the competitors Definition of the required features target: ‘how to b tep: R&D development target: ‘to be the best’ tep: R&D development target: ‘to be the best’ Definition of the required features target: ‘how to b
15

RES G RESIDENTIAL PROJECT

Jan 16, 2016

Download

Documents

krikor

2 nd step: Definition of the required featurestarget: ‘how to be the best’. 2 nd step: Definition of the required featurestarget: ‘how to be the best’. 3 rd step: R&D developmenttarget: ‘to be the best’. 3 rd step: R&D developmenttarget: ‘to be the best’. - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: RES G  RESIDENTIAL PROJECT

BUrners TRAining CEntre

RES G RESIDENTIAL PROJECT

1st step: Comparison between us & the competitors

2nd step: Definition of the required features target: ‘how to be the best’

3rd step: R&D development target: ‘to be the best’3rd step: R&D development target: ‘to be the best’

2nd step: Definition of the required features target: ‘how to be the best’

Page 2: RES G  RESIDENTIAL PROJECT

BUrners TRAining CEntre

2nd step: Definition of the required features target: ‘how to be the best’

COMBUSTION HEAD

Meku and MAN’s seem to be the only ones technologiesable to achieve RAL UZ 9 performances;

MAN’s head has high resistence Meku has high resistance too; moreover there is a patent (high cost) and some problems on ‘cold’ startings. No flexibility.

Weishaupt is not a LOW NOx burner

BG does not match the new RAL UZ9; BGK has someproblems on commercial boilers

Page 3: RES G  RESIDENTIAL PROJECT

BUrners TRAining CEntre

2nd step: Definition of the required features target: ‘how to be the best’

COMBUSTION HEAD: better than Meku

Increasing the flexibility of application (few models)

Reducing the resistance

Doing something different to be out of the patent

Reliable operation mode

Same or lower emissions

Page 4: RES G  RESIDENTIAL PROJECT

BUrners TRAining CEntre

COMBUSTION HEAD: result

3rd step: R&D development target: ‘to be the best’

Riello design: air staging

An adjustable external re-circulation

keeps low the NOx emissionsFrom the middle

‘swirl’

Around the ‘airnozzle’ (adjustable)

Four small pipesto decrease the resistance

end to complete the combustion

Page 5: RES G  RESIDENTIAL PROJECT

BUrners TRAining CEntre

COMBUSTION HEAD: result

3rd step: R&D development target: ‘to be the best’

RES G XXR BLU 15.4 - 30.8 kWRES G XXR BLU 28 - 43 kWRES G XXR BLU 40.6 - 51.7 kW

…THREE HEAD SIZES: T1; T2; T3===> THREE MODELS:

Page 6: RES G  RESIDENTIAL PROJECT

BUrners TRAining CEntre

COMBUSTION HEAD PERFORMANCES

3rd step: R&D development target: ‘to be the best’

05

101520253035

[m/kWh]

min (15.4) max (30.8)

Capacity [kW]

CO

DIRECTC.CHAMBER

REVERSINGCHAMBER

0

20

40

60

80

100

[m/kWh]

min (15.4) max (30.8)

Capacity [kW]

NOx

DIRECTC.CHAMBER

REVERSINGCHAMBER

T1 HEAD

Page 7: RES G  RESIDENTIAL PROJECT

BUrners TRAining CEntre

COMBUSTION HEAD PERFORMANCES

3rd step: R&D development target: ‘to be the best’

0

5

10

15

20

[m/kWh]

min (28) max (43)

Capacity [kW]

CO

DIRECTC.CHAMBER

REVERSINGCHAMBER

7880828486889092

[m/kWh]

min (28) max (43)

Capacity [kW]

NOx

DIRECTC.CHAMBER

REVERSINGCHAMBER

T2 HEAD

Page 8: RES G  RESIDENTIAL PROJECT

BUrners TRAining CEntre

COMBUSTION HEAD PERFORMANCES

3rd step: R&D development target: ‘to be the best’

0

5

10

15

20

[m/kWh]

min (40.6) max (51.7)

Capacity [kW]

CO

DIRECTC.CHAMBER

REVERSINGCHAMBER

75

80

85

90

95

100

[m/kWh]

min (40.6) max (51.7)

Capacity [kW]

NOx

DIRECTC.CHAMBER

REVERSINGCHAMBER

T3 HEAD

Page 9: RES G  RESIDENTIAL PROJECT

BUrners TRAining CEntre

COMBUSTION HEAD PERFORMANCES

3rd step: R&D development target: ‘to be the best’

T... HEADs

RESISTANCES

0

5

10

15

20

25

30

5 15 25 35 45 55

air flow [m3/h]

[mb

ar]

T1

T2

T3

BG 1

MAN

Page 10: RES G  RESIDENTIAL PROJECT

BUrners TRAining CEntre

VENTILATION

3rd step: R&D development target: ‘to be the best’

NEW PROJECT

Page 11: RES G  RESIDENTIAL PROJECT

BUrners TRAining CEntre

3rd step: R&D development target: ‘to be the best’

0

5

10

15

20

25

30

35

0 10 20 30 40 50 60

[m3/h]

[mb

ar] RES (no

head)

MAN (nohead)

VENTILATION

NEW PROJECT

Page 12: RES G  RESIDENTIAL PROJECT

BUrners TRAining CEntre

3rd step: R&D development target: ‘to be the best’

0

5

10

15

20

25

30

35

0 10 20 30 40 50 60

[m3/h]

[mb

ar] T 1

T 2

T 3

NO HEAD

VENTILATION

NEW PROJECT

Page 13: RES G  RESIDENTIAL PROJECT

BUrners TRAining CEntre

INSIDE NOISE (50 kW: 61,7 dB(A))

0

10

20

30

40

50

60

70

80

20

31,5 50 80 125

200

315

500

800

1250

2000

3150

5000

8000

1250

0

2000

0

frequency [Hz]

dB

3rd step: R&D development target: ‘to be the best’

VENTILATION

Page 14: RES G  RESIDENTIAL PROJECT

BUrners TRAining CEntre

RES G RESIDENTIAL PROJECT3rd step: R&D development target: ‘to be the best’

MAIN COMPONENTS:combustion heads designed by Riello (Patent)new ventilation projectcontrol box 556R SE designed by Riellomotor 150W designed by Riellooil pump designed by Rielloflame sensor QRC by Siemens

1 STRUCTURE; 3 HEADS==> THREE MODELS

RES G XXR BLU 15.4 - 30.8 kW

RES G XXR BLU 28 - 43 kW

RES G XXR BLU 40.6 - 51.7 kW

Page 15: RES G  RESIDENTIAL PROJECT

BUrners TRAining CEntre

1st step: Comparison between us & the competitors

2nd step: Definition of the required features target: ‘how to be the best’

3rd step: R&D development target: ‘to be the best’

RES G RESIDENTIAL PROJECT