17/11/2015 1 Ministry of Fishery and Mineral Resources, Kiribati Ministry of Land, Kiribati SPC-GSD Request for technical assistance sent to SPC’s Geoscience Division (GSD) by the Kiribati Ministry of Fisheries and Marine Resources Development, Identifying vulnerable low lying areas in planning for future developments.
18

Request for technical assistance sent to SPC’s Geoscience ...gisconference.gsd.spc.int/presentations_2015/Day1/Session_4/... · • 25 hours manual observation • 7 Bench Marks

Nov 07, 2018

Download

Documents

trinhphuc
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Request for technical assistance sent to SPC’s Geoscience ...gisconference.gsd.spc.int/presentations_2015/Day1/Session_4/... · • 25 hours manual observation • 7 Bench Marks

17/11/2015

1

Ministry of Fishery and Mineral Resources, KiribatiMinistry of Land, KiribatiSPC-GSD

• Request for technical assistance sent to SPC’s Geoscience Division (GSD) by the Kiribati Ministry of Fisheries and Marine Resources Development,

• Identifying vulnerable low lying areas in planning for future developments.

Page 2: Request for technical assistance sent to SPC’s Geoscience ...gisconference.gsd.spc.int/presentations_2015/Day1/Session_4/... · • 25 hours manual observation • 7 Bench Marks

17/11/2015

2

1) Collect High Resolution Topography data:

• Establish Common vertical datum to integrate Water level and Topography

data.

• Setting up image reference points (GCPs)

• UAV High-resolution topography mapping

2) Infrastructure mapping

3) Shoreline Change Analysis

4) Extreme Water Level Analysis + SLR Scenarios

5) Wrap data into a GIS package (i.e. Pac-Safe)

Page 3: Request for technical assistance sent to SPC’s Geoscience ...gisconference.gsd.spc.int/presentations_2015/Day1/Session_4/... · • 25 hours manual observation • 7 Bench Marks

17/11/2015

3

• Temporary Tide Gauge:• A minimum of 35 days record• 25 hours manual observation

• 7 Bench Marks• Each BM to be surveyed 2 x 6 hrs

• Common Vertical Datum achieved by Levelling between BM and Tide Gauge

• Using an unmanned aircraft system, TRIMBLE UX5

• UAV flying at 75m above ground with 90% overlap, collecting data at a 2.4cm resolution.

• Ground Control Points minimum of 5 per flight

• Data output using TBC : Ortho-photo, Point clouds and a Digital Surface model (DSM)

Page 4: Request for technical assistance sent to SPC’s Geoscience ...gisconference.gsd.spc.int/presentations_2015/Day1/Session_4/... · • 25 hours manual observation • 7 Bench Marks

17/11/2015

4

Page 5: Request for technical assistance sent to SPC’s Geoscience ...gisconference.gsd.spc.int/presentations_2015/Day1/Session_4/... · • 25 hours manual observation • 7 Bench Marks

17/11/2015

5

• Extent: Kiritimati Urban Centerincluding the villages of:

- Tabwakea- Tenessy- London

Resolution: 1m

Page 6: Request for technical assistance sent to SPC’s Geoscience ...gisconference.gsd.spc.int/presentations_2015/Day1/Session_4/... · • 25 hours manual observation • 7 Bench Marks

17/11/2015

6

RTK Data Collection for Vertical Accuracy TestCoverage includes:

- Roads- clear field (soccer, basket ball fields)- beach profiles- Bush- Urban area (in-between buildings, etc…)

Page 7: Request for technical assistance sent to SPC’s Geoscience ...gisconference.gsd.spc.int/presentations_2015/Day1/Session_4/... · • 25 hours manual observation • 7 Bench Marks

17/11/2015

7

0 0.5 1 1.5 2 2.50

1

2

3

4

5RTK vs UAV − F1

RTK data (m)

UA

V d

ata

(m)

0 0.5 1 1.5 2 2.50

1

2

3

4

5RTK vs UAV − F1 − noRD

RTK data (m)

UA

V d

ata

(m)

0 0.5 1 1.5 2 2.50

1

2

3

4

5RTK vs UAV − F2

RTK data (m)

UA

V d

ata

(m)

0 0.5 1 1.5 2 2.50

1

2

3

4

5RTK vs UAV − F2 − noRD

RTK data (m)

UA

V d

ata

(m)

Page 8: Request for technical assistance sent to SPC’s Geoscience ...gisconference.gsd.spc.int/presentations_2015/Day1/Session_4/... · • 25 hours manual observation • 7 Bench Marks

17/11/2015

8

0 0.2 0.4 0.6 0.8 1 1.2 1.40

10

20

30

40

50

60

70RTK vs UAV − F1 − noRD

RTK data (m)

UA

V d

ata

(m)

0 0.2 0.4 0.6 0.8 1 1.2 1.40

10

20

30

40

50

60RTK vs UAV − F2 − noRD

RTK data (m)

UA

V d

ata

(m)

Abs( RTK Height –UAV Height)

Abs( RTK Height –UAV Height)

Based on the 41 years ofwater level record from theNOAA tide gauge, Kiritimati

Page 9: Request for technical assistance sent to SPC’s Geoscience ...gisconference.gsd.spc.int/presentations_2015/Day1/Session_4/... · • 25 hours manual observation • 7 Bench Marks

17/11/2015

9

1 Yrs RP 20 Yrs RP10 Yrs RP 50 Yrs RP 100 Yrs RP

20902015 2030 20702050

RCP8.5RCP2.6 RCP6RCP4.5

A total of 85 Scenarios of Large to Extreme water level

Page 10: Request for technical assistance sent to SPC’s Geoscience ...gisconference.gsd.spc.int/presentations_2015/Day1/Session_4/... · • 25 hours manual observation • 7 Bench Marks

17/11/2015

10

HAZARD + EXPOSURE

RISK

Page 11: Request for technical assistance sent to SPC’s Geoscience ...gisconference.gsd.spc.int/presentations_2015/Day1/Session_4/... · • 25 hours manual observation • 7 Bench Marks

17/11/2015

11

• Include Population as Exposure data• Include SetBack Zone Layer

• Keep progressing on PACSAFE

• Critical Issue with Tide Gauge Reference Datum.

• Hazard layer do not consider shoreline response from SLR.

• PHASE 2 – Bathymetry Mapping, Wave Inundation Modeling.

Page 12: Request for technical assistance sent to SPC’s Geoscience ...gisconference.gsd.spc.int/presentations_2015/Day1/Session_4/... · • 25 hours manual observation • 7 Bench Marks

17/11/2015

12

Other Tasks: Shoreline Change Analysis

Page 13: Request for technical assistance sent to SPC’s Geoscience ...gisconference.gsd.spc.int/presentations_2015/Day1/Session_4/... · • 25 hours manual observation • 7 Bench Marks

17/11/2015

13

Other Tasks: Surveying all existing BMs from

Tabwakea to London

Other Tasks: UAV Pilot Training

Page 14: Request for technical assistance sent to SPC’s Geoscience ...gisconference.gsd.spc.int/presentations_2015/Day1/Session_4/... · • 25 hours manual observation • 7 Bench Marks

17/11/2015

14

Page 15: Request for technical assistance sent to SPC’s Geoscience ...gisconference.gsd.spc.int/presentations_2015/Day1/Session_4/... · • 25 hours manual observation • 7 Bench Marks

17/11/2015

15

Tide Gauge

Page 16: Request for technical assistance sent to SPC’s Geoscience ...gisconference.gsd.spc.int/presentations_2015/Day1/Session_4/... · • 25 hours manual observation • 7 Bench Marks

17/11/2015

16

Page 17: Request for technical assistance sent to SPC’s Geoscience ...gisconference.gsd.spc.int/presentations_2015/Day1/Session_4/... · • 25 hours manual observation • 7 Bench Marks

17/11/2015

17

• Established a control network for London • 6 new BM observed twice for 6 hours • Data send to AUSPOS Online Processing Service. • BM used to collect Ground Control Point for flights and for RTK

survey.• RTK points collected is further used to verify accuracy of cloud

points produced by photogrammetry.

Page 18: Request for technical assistance sent to SPC’s Geoscience ...gisconference.gsd.spc.int/presentations_2015/Day1/Session_4/... · • 25 hours manual observation • 7 Bench Marks

17/11/2015

18

GCP