INTERPRETED HYDROGEOLOGICAL SETTING - EES SUMMARY REPORT
14 April 2016 Report No. 1525532-220-R-Rev1
Report Signature Page
GOLDER ASSOCIATES PTY LTD
Irena Krusic-Hrustanpasic Principal
IKH-FMC/IKH-JMM-SB/ikh-fmc
A.B.N. 64 006 107 857 Golder, Golder Associates and the GA globe design are trademarks of Golder Associates Corporation.
LEGENDWaterProposed Railway TrackProposed Station Extent
MAP INFORMATIONThe information and data contained in this map is forMelbourne Metro Rail Project, and is for information purposes only. It is to be used for reference only and may not be suitablefor any other purpose including design. The information may not be accurate, current or otherwise reliable. NOTES1. Rail alignment sourced from AJM JV, revision P2.3 dated 28-10-2015.2 Aerial imagery sourced from Public Transport Victoria, image resolution 10cm and date of capture February 2015.3. Road and hydro information sourced from Victorian Government Data Directory 2015.
F L I N D E R S S T
SP
EN
CE
R
ST
Y A R R AR I V E R
MOONEE POND
S CR EEK
MARIBYR NO NG RIVER
DYNON RD TIDAL CANAL
ArdenStreet
Parkville
CBDNorth
CBDSouth
Domain
318,000
318,000
320,000
320,000
322,000
322,000
5,811
,500
5,811
,500
5,813
,500
5,813
,500
CLIENTAJM JOINT VENTURE
PROJECTMELBOURNE METRO RAIL PROJECT
TITLE
GEOLOGY PLAN
1525532 220-R 0 2
2016-03-23
JPH / CJS
-
IKH
IKH
Path
: S:\D
TPLI
\Mel
bour
ne R
ail L
ink\
Proj
ect\D
eliv
erab
le\1
5255
32-2
20-R
-D00
02-R
ev0.
mxd
IF T
HIS
ME
ASU
REM
EN
T D
OE
S N
OT
MAT
CH
WH
AT IS
SH
OW
N, T
HE
SHEE
T SI
ZE H
AS B
EEN
MO
DIF
IED
FR
OM
: A3
CONSULTANT
PROJECT No. CONTROL Rev. DRAWING
YYYY-MM-DD
PREPARED
DESIGN
REVIEW
APPROVED
25m
m0
0 200 400 600 800 1,000
METRES
PROJECTION: GDA 1994 MGA Zone 55
REFERENCE SCALE: 1:20,000 (at A3)
LEGENDProposed Railway TrackProposed Station Extent
MAP INFORMATIONThe information and data contained in this map is forMelbourne Metro Rail Project, and is for information purposes only. It is to be used for reference only and may not be suitablefor any other purpose including design. The information may not be accurate, current or otherwise reliable. NOTES1. Rail alignment sourced from AJM JV, revision P2.3 dated 28-10-2015.2 Aerial imagery sourced from Public Transport Victoria, image resolution 10cm and date of capture February 2015.3. Road and hydro information sourced from Victorian Government Data Directory 2015.4. Geology data digitized from Melbourne Geology Map 1:63,000 (1974). Captured at a Scale of 1:10,000. The data has been altered when more accurate data has become available.
LEGENDGroundwater Well (by Monitoring Unit)!A Brighton Group
!A Coode Island Silt
!A Early Pleistocene Aquifer
!AFishermans Bend Silt/Coode IslandSilt
!A Holocene Aquifer
!A Late Pleistocene Aquifer
!A Moray Street Gravels Aquifer
!A Older Volcanics Aquifer
!A Silurian Aquifer
!A Werribee Formation Aquifer
MAP INFORMATIONThe information and data contained in this map is forMelbourne Metro Rail Project, and is for information purposes only. It is to be used for reference only and may not be suitablefor any other purpose including design. The information may not be accurate, current or otherwise reliable.
NOTES1. Rail alignment sourced from AJM JV, revision P2.3 dated 28-10-2015.2. Road and hydro information sourced from Victorian Government Data Directory 2015.
!A
!A!A
!A
!A
!A
!A
FLINDERS ST
GA15-BH021
GA15-BH108
GA15-BH109
GA15-BH110
GA15-BH111
GA15-BH112
MM1BH013
!A
!A
!A
!A
!A
!A
!A
ST KILDA RD
GA11-BH017
GA11-BH018
GA11-BH041
GA15-BH120
MM1BH015
MM1BH016
MM1BH017
!A
!A!A
!A!A
!A
!A!A
!A
!A
!A
!A!A
!A !A
VICTORIA ST
DYNON RD
WEST
ERN
LINK
GA11-BH007
GA11-BH008
GA11-BH009 GA11-BH011GA11-BH012
GA11-BH013
GA15-BH001GA15-BH002
GA15-BH003
GA15-BH005
MM1BH001
MM1BH002
MM1BH003
MM1BH004 MM1BH006
0 500Metres
0 100Metres
0 500Metres
!A
!A
!A
!A
!A!A!A
!AST KILDA RD
GA11-BH019
GA11-BH026
GA11-BH027
GA15-BH029
GA15-BH030 GA15-BH031GA15-BH032
GA15-BH033
0 100Metres
Major Sewer
Proposed Railway Track
Proposed Station Extent
Melbourne Underground Rail LoopTunnel (MURL)
!A!A
!A!A
!A!A
!A
!A
!A
!A!A!A
!A
!A!A
!A
!A!A!A
!A!A!A
!A!A
!A!A!A!A!A
!A!A!A!A!A
!A
!A!A!A
!A
!A
!A!A
!A
!A
!A
!A !A!A
!A!A
!A!A
!A
!A
!A
!A
!A
!A!A
!A!A!A
!A
!A
!A
!A
!A!A
!A
!A CARLTON
DOCKLANDS
NORTHMELBOURNE
WESTMELBOURNE
RICHMOND
SOUTHMELBOURNE
SOUTHYARRA
BATMAN AV
SOUTHERNLINK
FLINDERS ST
FLEMINGTON RD
FERRARS ST
SPENCER ST
STKI
L DA
RD
EASTERN FWY
WELLINGTONPDE
VICTORIA ST
PUNT
RD
NICH
OLSO
N ST
LORIMER ST
WES
TERN
LINK
H ODD
LEST
MONASH FWY
WESTGATE FWY
DYNON RD
FOOTSCRAY RD
Y A R R A R I V E R
DYNON RD TIDAL CANAL
MERR
ICRE
EK
MOON
EEPO
NDS
CREE
K
MARIBYRNONG RIVER
ArdenStreet
Parkville
Domain
GA11-BH002-1.32
(23/09/2015)GA11-BH005
-1.89(29/10/2015)
GA11-BH0223.96 (29/10/2015)
GA11-BH031-1.18
(23/09/2015)
GA15-BH00714.25
(28/10/2015)
GA15-BH00812.46 (23/09/2015)
GA15-BH00922.44 (15/10/2015)
GA15-BH01011.46 (23/09/2015)
GA15-BH0115.01
(23/09/2015)GA15-BH0120.51(29/10/2015)
GA15-BH018-0.44 (23/09/2015)
GA15-BH019-1.52 (23/09/2015)
GA15-BH027-12.33 (28/10/2015)
GA15-BH028-12.71 (28/10/2015)
GA15-BH121-6.15 (23/09/2015)
GA15-BH122-14.1(23/09/2015)
GA15-BH123-11.39 (23/09/2015)
MM1BH00921.53(28/10/2015)
MM1BH018-0.66 (23/09/2015)
GA11-BH0010.02
(9/07/2013)
GA11-BH020-1.62(18/01/2013)
GA11-BH0213.37
(18/01/2013)
GA11-BH0236.22 (17/01/2013)
GA11-BH0243.29
(17/01/2013)
GA11-BH025-4.62 (17/01/2013)
MM1BH02011.91 (5/07/2012)
MM1BH0199.25 (5/07/2012)
MM1BH01212.88 (5/07/2012)
MM1BH0109.3(19/06/2012)
MM1BH0087.64
(5/07/2012)MM1BH007
5.08(5/07/2012)
GA11-BH0149.2 (25/07/2013)
GA11-BH0033.52 (19/06/2012)
CLIENTAJM JOINT VENTURE
PROJECTMELBOURNE METRO RAIL PROJECT
TITLE
GROUNDWATER LEVELS
1525532 220-R 0 4
2016-03-23
JPH / CJS
-
IKH
IKH
Path
: S:\D
TPLI
\Mel
bour
ne R
ail L
ink\
Proj
ect\D
eliv
erab
le\1
5255
32-2
20-R
-D00
04-R
ev0.
mxd
IF T
HIS
ME
ASU
REM
EN
T D
OE
S N
OT
MAT
CH
WH
AT IS
SH
OW
N, T
HE
SHEE
T SI
ZE H
AS B
EEN
MO
DIF
IED
FR
OM
: A3
CONSULTANT
PROJECT No. CONTROL Rev. DRAWING
YYYY-MM-DD
PREPARED
DESIGN
REVIEW
APPROVED
25m
m0
0 200 400 600 800 1,000
METRES
PROJECTION: GDA 1994 MGA Zone 55
REFERENCE SCALE: 1:25,000 (at A3)
LEGENDGroundnwater Well (by Monitoring Unit)!A Brighton Group
!A Coode Island Silt
!A Early Pleistocene Aquifer
!A Fishermans Bend Silt/Coode Island Silt
!A Holocene Aquifer
!A Late Pleistocene Aquifer
!A Moray Street Gravels Aquifer
!A Older Volcanics Aquifer
!A Silurian Aquifer
!A Werribee Formation Aquifer
MAP INFORMATIONThe information and data contained in this map is forMelbourne Metro Rail Project, and is for information purposes only. It is to be used for reference only and may not be suitablefor any other purpose including design. The information may not be accurate, current or otherwise reliable.
NOTES1. Rail alignment sourced from AJM JV, revision P2.3 dated 28-10-2015.2. Road and hydro information sourced from Victorian Government Data Directory 2015.
CitylinkProposed Railway TrackProposed Station ExtentSewerMelbourne Underground Rail Loop Tunnel (MURL)Study Area Extent
MAP INFORMATIONThe information and data contained in this map is forMelbourne Metro Rail Project, and is for information purposes only. It is to be used for reference only and may not be suitablefor any other purpose including design. The information may not be accurate, current or otherwise reliable. NOTES1. Rail alignment/station extents sourced from AJM JV, dated 13-05-2015 for Concept Design.2. Aerial imagery sourced from Public Transport Victoria, image resolution 10cm and date of capture October 2014.3. Road and hydro information sourced from Victorian Government Data Directory 2015.
MAP INFORMATIONThe information and data contained in this map is forMelbourne Metro Rail Project, and is for information purposes only. It is to be used for reference only and may not be suitablefor any other purpose including design. The information may not be accurate, current or otherwise reliable.
NOTES1. Rail alignment sourced from AJM JV, revision P2.3 dated 28-10-2015.2. Road and hydro information sourced from Victorian Government Data Directory 2015.
All concentrations shown are in mg/L. FeTDSCl-S04 2-(F)
IronTotal dissolved solidsChloride SulphateIndicated a filtered analyte
LEGENDGroundwater Well (by Monitoring Unit)!A Brighton Group
!A Coode Island Silt
!A Early Pleistocene Aquifer
!A Fishermans Bend Silt/Coode Island Silt
!A Holocene Aquifer
!A Late Pleistocene Aquifer
!A Moray Street Gravels Aquifer
!A Older Volcanics Aquifer
!A Silurian Aquifer
!A Werribee Formation Aquifer
!A !A !A !A!A
!A !A !A !A!A
!A
!A!A
!A
!A !A !A!A
!A!A
!A!A
!A
!A
!A!A!A
!A
!A!A
!A
!A!A!A
!A!A!A
!A!A
!A!A!A!A!A
!A!A!A!A!A
!A
!A!A!A
!A
!A !A!A !A
!A!A !A
!A
!A
!A
!A!A!A
!A
!A
!A
GA11-BH018 |2013-07-08CF |<0.005 PCE |<0.005 B |<0.001 Phenol|<0.001
GA11-BH041 |2013-07-23CF |<0.005 PCE |<0.005 B |<0.001 Phenol|<0.001
GA15-BH007 |2015-07-07CF |0.01 PCE |<0.005 B |<0.001 Phenol|0.0017
GA11-BH022 |2013-01-18CF |<0.005 PCE |<0.005 B |0.002 Phenol|<0.001
GA11-BH014 |2013-07-25CF |<0.005 PCE |0.012 B |<0.001 Phenol|<0.001
GA15-BH012 |2015-08-27CF |<0.005 PCE |<0.005 B |<0.001 Phenol|<0.001
GA15-BH011 |2015-10-15CF |<0.005 PCE |<0.005 B |<0.001 Phenol|<0.001
GA15-BH009 |2015-08-03CF |<0.005 PCE |<0.005 B |<0.001 Phenol|<0.001
GA15-BH008 |2015-08-31CF |<0.005 PCE |<0.005 B |<0.001 Phenol|<0.001
GA11-BH024 |2013-01-17CF |<0.005 PCE |<0.005 B |<0.001 Phenol|<0.001
GA11-BH023 |2013-01-17CF |<0.005 PCE |<0.005 B |<0.001 Phenol|<0.001
GA11-BH005 |2012-02-21CF |<0.005 PCE |<0.005 B |<0.001 Phenol|<0.001
GA11-BH002 |2012-02-21CF |<0.005 PCE |<0.005 B |<0.001 Phenol|<0.001
BATMAN AV
SOUTHERNLINK
FLINDERS ST
FLEMINGTON RD
FERRARS ST
SPENCER ST
STK I
LDA
R D
EASTERNFWY
WELLINGTONPDE
VICTORIA ST
PUNT
RD
NICH
OLSO
N ST
LORIMER ST
WES
TERN
LI NK
H ODD
LEST
MONASH
FWY
WESTGATE FWY
DYNON RD
FOOTSCRAY RD
YARRARIVER
MERRICREEK
MOON
EEPO
NDS
CREE
K
MAR IBYRNONGRIV ER
DYNON RDTIDAL CANAL
CARLTON
DOCKLANDS
NORTHMELBOURNE
WEST MELBOURNE
RICHMOND
SOUTHMELBOURNE
SOUTHYARRA
ArdenStreet
Parkville
CBD North
CBDSouth
Domain
CLIENTAJM JOINT VENTURE
PROJECTMELBOURNE METRO RAIL PROJECT
TITLE
DISTRIBUTION OF KEY CONTAMINANT
1525532 220-R 0 7
2016-03-23
JPH / CJS
-
FC
IKH
Path
: S:\D
TPLI
\Mel
bour
ne R
ail L
ink\
Proj
ect\D
eliv
erab
le\1
5255
32-2
20-R
-D00
07-R
ev0.
mxd
IF T
HIS
ME
ASU
REM
EN
T D
OE
S N
OT
MAT
CH
WH
AT IS
SH
OW
N, T
HE
SHEE
T SI
ZE H
AS B
EEN
MO
DIF
IED
FR
OM
: A3
CONSULTANT
PROJECT No. CONTROL Rev. DRAWING
YYYY-MM-DD
PREPARED
DESIGN
REVIEW
APPROVED
25m
m0
0 200 400 600 800 1,000
METRES
PROJECTION: GDA 1994 MGA Zone 55
REFERENCE SCALE: 1:25,000 (at A3)
Major Sewer
Proposed Railway Track
Proposed Station Extent
Melbourne Underground Rail LoopTunnel (MURL)
MAP INFORMATIONThe information and data contained in this map is forMelbourne Metro Rail Project, and is for information purposes only. It is to be used for reference only and may not be suitablefor any other purpose including design. The information may not be accurate, current or otherwise reliable.
NOTES1. Rail alignment sourced from AJM JV, revision P2.3 dated 28-10-2015.2. Road and hydro information sourced from Victorian Government Data Directory 2015.
!A
!A!A
!A
!A
!A
!A
GA15-BH112 |2015-08-28CF |<0.005 PCE |<0.005 B |<0.001 Phenol|<0.001
GA15-BH110 |2015-08-04CF |<0.005 PCE |<0.005 B |<0.001 Phenol|<0.002
GA15-BH108 |2015-11-06CF |<0.005 PCE |<0.005 B |<0.001 Phenol|<0.001
GA15-BH021 |2015-07-31CF |<0.005 PCE |<0.005 B |<0.001 Phenol|<0.002
FLINDERS ST
!A
!A
!A!A
!A!A
!A!A
!A
!A
!A
!A!A
!AGA15-BH005 |2015-08-07CF |<0.005 PCE |<0.005 B |<0.001 Phenol|<0.001
GA15-BH003 |2015-07-06CF |<0.005 PCE |<0.005 B |<0.001 Phenol|<0.001
GA15-BH001 |2015-07-03CF |<0.005 PCE |<0.005 B |<0.001 Phenol|<0.001
GA11-BH011 |2013-07-23CF |<0.005 PCE |<0.005 B |<0.001 Phenol|<0.001
GA11-BH009 |2013-08-30CF |<0.005 PCE |<0.005 B |<0.001 Phenol|<0.001
GA11-BH007 |2012-02-21CF |<0.005 PCE |<0.005 B |<0.001 Phenol|<0.001
DYNON RD
WESTE
RN LI
NK
WESTER N
LIN KW
E STER NLINK
WES
TERN
LIN K
0 300Metres
0 500Metres
!A
!A
!A
!A
!A!A!A
!A
GA11-BH026 |2012-02-23CF |0.006 PCE |<0.005 B |<0.001 Phenol|<0.001
GA15-BH031 |2015-09-28CF |<0.005 PCE |<0.005 B |<0.001 Phenol|<0.001
GA15-BH029 |2015-10-06CF |<0.005 PCE |<0.005 B |<0.001 Phenol|<0.001
GA11-BH019 |2012-02-23CF |<0.005 PCE |<0.005 B |<0.001 Phenol|<0.001
ST KILDA RD
ST KILDA RD
0 100Metres
All concentrations shown are in mg/L.
CFPCEBPhenol
ChloroformTetrachloroetheneBenzenePhenol
LEGENDGroundwater Well (by Monitoring Unit)!A Brighton Group
!A Coode Island Silt
!A Early Pleistocene Aquifer
!A Fishermans Bend Silt/Coode Island Silt
!A Holocene Aquifer
!A Late Pleistocene Aquifer
!A Moray Street Gravels Aquifer
!A Older Volcanics Aquifer
!A Silurian Aquifer
!A Werribee Formation Aquifer
!A !A !A !A!A
!A !A !A !A!A
!A
!A!A
!A
!A !A !A!A
!A!A
!A!A
!A
!A
!A!A!A
!A
!A!A
!A
!A!A!A
!A!A!A
!A!A
!A!A!A!A!A
!A!A!A!A!A
!A
!A!A!A
!A
!A !A!A !A
!A!A !A
!A
!A
!A
!A!A!A
!A
!A
!A
CARLTON
DOCKLANDS
NORTHMELBOURNE
WESTMELBOURNE
RICHMOND
SOUTHMELBOURNE
SOUTH YARRA
BATMAN AV
SOUTHERNLINK
FLINDERS ST
EASTERNFWY
FLEMINGTON RD
FERRARS ST
SPENCER ST
STK ILD A
RD
WELLINGTONPDE
VICTORIA ST
PUNT
RD
NICH
OLSO
N ST
LORIMER ST
WES
TERN
LINK
H ODD
LEST
MONASH FWY
WESTGATE FWY
DYNON RD
FOOTSCRAY RD
GA11-BH001 GA11-BH002GA11-BH003 GA11-BH005
GA11-BH014
GA11-BH020GA11-BH021 GA11-BH022
GA11-BH023GA11-BH024 GA11-BH025
GA11-BH031
GA15-BH007GA15-BH008 GA15-BH009
GA15-BH010GA15-BH011
GA15-BH012
GA15-BH018GA15-BH019
GA15-BH027GA15-BH028
GA15-BH121 GA15-BH122
GA15-BH123
MM1BH007
MM1BH008MM1BH009
MM1BH010
MM1BH012
MM1BH018
MM1BH019
MM1BH020
Y A R R A R I V E R
DYNON RD TIDAL CANAL
MERR
ICRE
EK
MOON
EEPO
NDS
CREE
K
MARIBYRNONG RIVER
ArdenStreet
Parkville
CBDNorth
CBDSouth
Domain
CLIENTAJM JOINT VENTURE
PROJECTMELBOURNE METRO RAIL PROJECT
TITLE
GROUNDWATER SEGMENT CLASSIFICATION
1525532 220-R 0 8
2016-03-23
JPH / CJS
-
IKH
IKH
Path
: S:\D
TPLI
\Mel
bour
ne R
ail L
ink\
Proj
ect\D
eliv
erab
le\1
5255
32-2
20-R
-D00
08-R
ev0.
mxd
IF T
HIS
ME
ASU
REM
EN
T D
OE
S N
OT
MAT
CH
WH
AT IS
SH
OW
N, T
HE
SHEE
T SI
ZE H
AS B
EEN
MO
DIF
IED
FR
OM
: A3
CONSULTANT
PROJECT No. CONTROL Rev. DRAWING
YYYY-MM-DD
PREPARED
DESIGN
REVIEW
APPROVED
25m
m0
0 200 400 600 800 1,000
METRES
PROJECTION: GDA 1994 MGA Zone 55
REFERENCE SCALE: 1:25,000 (at A3)
LEGENDGroundwater Well (by Monitoring Unit)!A Brighton Group
!A Coode Island Silt
!A Early Pleistocene Aquifer
!A Fishermans Bend Silt/Coode Island Silt
!A Holocene Aquifer
!A Late Pleistocene Aquifer
!A Moray Street Gravels Aquifer
!A Older Volcanics Aquifer
!A Silurian Aquifer
!A Werribee Formation Aquifer
Major Sewer
Proposed Railway Track
Proposed Station Extent
Inferred Groundwater SegmentClassification (mg/L)
Segment A (0 - 1,000)
Segment B (1,000 - 3,500)
Segment C (3,500 - 13,000)
Segment D (13000>)
MAP INFORMATIONThe information and data contained in this map is forMelbourne Metro Rail Project, and is for information purposes only. It is to be used for reference only and may not be suitablefor any other purpose including design. The information may not be accurate, current or otherwise reliable.
NOTES1. Rail alignment sourced from AJM JV, revision P2.3 dated 28-10-2015.2. Road and hydro information sourced from Victorian Government Data Directory 2015.