Page 1: Report 2013

Report 2013

Page 2: Report 2013

03

05

07

0808

12

16

1919

20202021

22

23

CONTENTS

Introduction

Key Figures

International Presence

Operational AreasInstallations and Systems

- Electrical and mechanical installations- Manufacture of electrical and control panels- Industrial refrigeration and climate control- Control and safety systems- Audiovisual systems and telecommunications

Industrial Assembly and Automation- Industrial assembly- Engineering and gas- Production line automation projects

Operation and Maintenance- Multi-technical/multidisciplinary maintenance- Communications and networks- Facility management- Operation and maintenance of renewables and the environment- Automation maintenance

Development and Integrated ProjectsRetail Intelligence

Governing BodiesShareholding StructureBoards of Directors Executive Organisational Chart

Human Resources and Corporate Responsibility

Management Departments

Page 3: Report 2013

03

2013Report

2013 was a challenging year for Abantia, shaped in the main

by successive regulatory changes affecting Renewable

Energies which slowed the applied engineering operations

in which we were engaged in this field in Spain practically

to a halt. Meanwhile, the investments in solar power plants

which we have in place in the country, above all the hybrid

biomass/solar thermal facility at Les Borges Blanques,

required inputs of cash rather than generating resources

during the year.

As a result of the above, a series of cost-saving measures

have been implemented to place the breakeven point at

€178M. Meanwhile, our commercial capacity has been

strengthened, above all outside of Spain, in order to increase

revenue by 18% in 2014.

In human resources terms, the workforce at 31 December

was 1,936 people, 4.3% fewer than a year earlier. 20% of

them work outside Spain.

The gross operating profit was 5 million euros.

As for the order book expected to be implemented over the

forthcoming 12 months, this stood at 31/12/13 at 157 million,

representing an increase of 20% compared with the figure

for the previous year, providing the basis for an economic

forecast for 2014 of 18% growth and revenue of 216 million

euros.

Of the order book at the start of 2014, 48% is international,

demonstrating that the measures adopted to diversify the

group’s operations geographically are bearing fruit.

Particular mention should be made of the first contract

awarded by Ecopetrol in Barrancabermeja, Colombia, along

with a contract from Enel Green Power in Chile for the

construction of a 36 MW solar photovoltaic power plant.

Contracts have continued to be secured in Peru and Mexico

in the Oil & Gas sector with Pemex, Calidda and Repsol, while

contracts have been signed in Haiti for the construction of a

hospital in Jacmel, and construction of 10 schools around the

country has also begun.

Likewise of note are the various contracts won in in both

the hospitals and the tertiary and residential sectors. The

country is revealing strong operational growth making us

hopeful of very positive prospects.

In Spain a number of operational lines have now been

implemented and consolidated, in particular tank and

puncture and shutdown operations in the Oil & Gas sector,

and the substations installed for Casa Tarradellas, Iberpotash

and LERSA. Automation operations have also expanded in

the automotive sector, with work performed for Opel and

Mercedes-Benz in Spain, and BMW and Volkswagen in the

United Kingdom, Netherlands and Germany.

In conclusion, 2013 was a year of hard work for the future,

which will allow us to resume a path of growth.

INTRODUCTION

Francisco Boada

Page 4: Report 2013

04

2013Report

Abantia is an international applied engineering group which has since 1944 been delivering comprehensive solutions through the diversification of its main lines of business: installations, energy, the chemical assembly, maintenance, turnkey project construction and retail intelligence.

It closed 2013 with a net turnover of 183 million euros, and an increase of 33% in its international order book compared with the previous year.

19.7% of the 1,936 workers on its staff are located in the other countries where the group is developing projects.

Abantia commits to diversification and international expansion

KEY FIGURES

Page 5: Report 2013

05

2013Report

Specialist Fields Geographical Area

44 %

37 %

7 %

7 %

52 %

Energy, Oil & Gas

Infrastructure

Health

Tertiary

Industry

5 %

48 %

Spain

International

2013

2012

2011

2010

2009

Consolidated Sales

* Figures in thousands of euros

2014 Forecast

Ebitda

9.535

4.955

13.719

14.446

12.047

10.380

215.804

183.155

282.867

264.861

253.423

246.290

Orderbook distribution*

* Data at 31/12/2013

Page 6: Report 2013

06

2013Report

1.967 2.309

Colombia

Guatemala

Peru

Chile

Mexico DF

Veracruz

MEXICO Contracts for the oil firm Pemex, for Gas

Natural Fenosa, and for the Federal Electricity

Commission of Mexico, and others.

CHILE Development

and construction of photovoltaic solar

power plants.

HAITI

Construction of two hospitals

and 10 schools.

PERU Construction of

projects in the oil & gas

and mining sector.

GUATEMALA

Construction of a hospital and automation

and control systems installations at industrial firms.

EL SALVADOR

Photovoltaic solar power generation

project and construction of

a hospital.

COLOMBIA

EPC, Furnace Control Systems at

the Barrancabermeja Refinery

for Ecopetrol.

NICARAGUA

Development and installation of the

control system (panels and software)

for the sugar industry.

HONDURAS

Control systems for sugar production

and energy installations.

Haiti

URUGUAY Assembly

of a windfarm.

INTERNATIONAL PRESENCE

Permanent operational centres

CORPORATE HEADQUARTERS

Regional Offices

Page 7: Report 2013

07

2013Report

MADRID

BARCELONATarragona

Palma deMajorca

Castellón

Valencia

AlicanteCartagena

Algeciras

MálagaHuelva

Seville

Granada

Mérida

Valladolid

VitoriaBilbaoSantiago de

Compostela

Oviedo

ZaragozaLleida

Puertollano

Santa Cruzde Tenerife

Las Palmasde Gran Canaria

UNITED KINGDOM

Electrical automation projects for various

assembly lines in the automotive sector.

ITALY Photovoltaic solar power

plants.

QATAR Construction of two

data processing centres and various projects

and works for electromechanical

installations in the tertiary sector.

NORTH AFRICA

Project development

partnership agreements.

BARMAN Audiovisual systems for the auditorium at Muscat airport.

NETHERLANDS

Electrical automation projects for various

assembly lines in the automotive sector.

FRANCE

EPC projects for Liquefied

Natural Gas plants and various projects in the retail sector.

GERMANY

Production line automation project at the Volkswagen plant in Wolfsburg for Thyssen-Krupp.

Soria

Page 8: Report 2013

08

ELECTRICAL AND MECHANICAL INSTALLATIONS

Abantia has consolidated its leading position in installations and infrastructure construction.

Among the key projects undertaken in 2013 within the hospitals sector, Abantia is building in Jacmel, Haiti, in partnership with Construcciones Cots y Claret, the Saint Michel Hospital, funded by the Canadian Red Cross, along with the La Providence Hospital in Gonaïves, a 10,380 m2 complex funded by the Canadian International Development Agency.

In Guatemala, work continues in partnership with the local building firm COCISA for the construction and outfitting of the Villanueva Hospital.

Construction and outfitting of the San Salvador National Maternity Hospital is drawing to a close in El Salvador.

In Spain, work has begun to perform the complete refurbishment of the geriatric rehabilitation facilities, new paediatric services and outpatients department at the Parc Sanitari Pere Virgili in Barcelona. The third phase of work to replace electrical generator sets and to refurbish the coronary unit has begun for Barcelona’s Provincial Clinical Hospital, while work has also been performed under phase II of the extension to the Sant Joan de Déu Hospital in Manresa for the ALTHAIA Foundation, the

contract being awarded to the Nova Bages Sanitària joint venture in which Abantia holds a stake.

In the chemicals and pharmaceuticals sector, particularly mention should be made of the installation undertaken for the production expansion required for the factory processes of the pharmaceuticals firm Grifols in Parets del Vallès. Another key project is the new picking plant for Airfarm in Barcelona, and the adaptation of ventilation and electrical systems for silo transportation at the Bunge plant in Barcelona.

For the hotel sector, electrical, mechanical and special installations have been performed for the hotels Sunotel,Royal, H-10 Port Vell and the third phase of the Hotel Majestic in Barcelona.

In the tertiary sector, work is underway in Qatar on the following projects:For the Qatar Foundation, in partnership with Harinsa Contracting, the turnkey construction of two Data Processing Centres, MV-2 and MV-3.

For Harinsa Contracting, supply and assembly of climate control, plumbing and firefighting installations for the 26-storey Viva Bahariya tower in La Perla.

Residential projects comprising the design and construction of electromechanical installations at such

Work on the Saint Michel Hospital in Jacmel, Haiti, began in 2013.

INSTALLATIONS AND SYSTEMS

OPERATIONAL AREAS

INSTALLATIONS AND SYSTEMS

Page 9: Report 2013

09

2013Report

MANUFACTURE OF ELECTRICAL AND CONTROL BOARDS

Abantia has 1500 m2 of premises for the manufacture of electrical and control boards, with a technical office for the design and programming of its products. The most significant manufacturing tasks undertaken were as follows:

At the international level, PDUs (Power Distributional Units) and Battery Panels were manufactured for the MV-2 Data Processing Centre in Doha, Qatar, for the Qatar Foundation, along with general electrical boards for the La Providence Hospital in Gonaïves, Haiti.

In the hospitals sector in Spain, the general low-voltage board was installed in the old building at the Sant Joan de Déu Hospital in Esplugues de Llobregat. Boards were also installed at the new hospital in Manresa for the ALTHAIA Foundation, along with boards in the second phase of the Hospital del Mar Teaching Building in Barcelona, for the Parc Salut Mar consortium.

Numerous projects were undertaken during 2013 for the tertiary sector, including both hotels, such as the installation of general and distribution boards for the Royal and the H-10 Port Vell in Barcelona, and also for retail distribution companies and supermarkets. Examples of the latter would include the industrial refrigeration boards for the Eroski logistics platform in Palma de Majorca, for Carrefour at its new centre in Aretxabaleta and for Bon Preu in Barcelona, along with the installation of industrial refrigeration boards for the renewed machine room and new services for El Corte Inglés on Plaza de Cataluña in Barcelona.

Auxiliary service and protection boards were likewise installed for the 110/25 kV substation for Casa Taradellas in Gurb.

villas as the Sultan Villa, Shawani Villa, Umm Salal for Khayyat Contracting and Trading.

Design and construction of electromechanical installations at the office building and annexes at the New Doha Port, for QSEC.

In Haiti, Abantia was awarded a contract by the FAES (Economic and Social Assistance Fund) for the construction of 10 schools, in partnership with Estructuras Titan Steel, to be financed by international funds.

In Spain, work has begun on the electrical and mechanical refurbishment of the Sten office building in Barcelona.

Construction of the new Casa Taradellas electrical substation by Abantia comprises such new projects as the optimisation of electrical connections between the food company’s various factories located in Gurb.

Other projects include the new 9.5 MVA transformation substation and the 25 kV/5 kV transformation subtation +25 kV power line at Iberpotash, one of Europe’s largest deposits of potash and salt.

Detail of the cold and hot water production expansion at the Grifols factory.

Abantia electrical and control board production workshop in Sant Boi.

INSTALLATIONS AND SYSTEMS

Page 10: Report 2013

10

2013Report

in Barcelona. The same company also contracted us to install the fire detection system in various technical rooms and warehouses at its Barcelona plant. The work comprises the refurbishment, updating and regulatory adaptation of fire detection for various automatic extinguisher systems using inert gases.

Iberdrola (Tarragona Power Plant) commissioned the migration of the control and supervision system to the new version of the Siemens PCS7 V7.1 system. This included two new redundant PLCs and the supervision system, with an approximate volume of 2000 input and output signals.

In the hospitals sector, mention should be made of the installation of a CCTV system using TCP/IP technology,

CONTROL AND SECURITY SYSTEMS

In the chemicals industry, an instrumented security system was installed during 2013 for the company BASF in Tarragona, to protect the Lynx facility. The scope includes the design of the system based on the Safety Requirement Specifications, and also commissioning.

Kao Corporation contracted us to migrate the HTR plant control system in Mollet del Vallès to a new system, including reverse engineering and reprogramming of the existing software, and the design of boards for the changeover of the peripheral input and output hardware.

For the gas and energy industry, Abantia was awarded the planning, procurement and installation of the chemical dry powder fire extinguisher system for the LNG B3003 spillage basin at the Enagás Transporte plant

INDUSTRIAL REFRIGERATION AND CLIMATE CONTROL

In the industrial sector, a 3500 kW refrigeration installation was undertaken for ammonia-based glycolated water cooling in fermentation tanks at the Spanish Damm brewery in Santarem, Portugal.

A climate control system was installed for Prologis Spain VI at its pharmaceutical warehouse unit, along with the extension of the firefighting installation in Alcalá de henares.

A clean room climate control system was installed for Airfarm Group, for the packaging of pharmaceutical products at its logistical centre in the Barcelona Free Zone.

In the retail distribution and supermarkets sector, a refrigeration installation was performed for the Eroski logistical distribution platform in Palm de Majorca.

A number of refrigeration installations and maintenance projects were also undertaken for supermarkets belonging to the Bon Preu food group.

A pumped CO2 and Nitrogen refrigeration installation was undertaken for LIDL Spain, in Montcada, at their frozen produce logistics platform.

Refrigeration and climate control installations were completed for supermarkets belonging to the Carrefour grocery chain in Barcelona and Vitoria.

Final mention should be made of the complete refurbishment of the refrigeration installation at the El Corte Inglés supermarket on Plaza Cataluña in Barcelona.

Detail of the climate control installations of Prologis Spain VI. CO2 and Nitrogen refrigeration installation for Lidl Spain.

INSTALLATIONS AND SYSTEMS

Page 11: Report 2013

11

2013Report

AUDIOVISUAL SYSTEMS AND TELECOMMUNICATIONS

Abantia performed the design, supply and installation of the audiovisual systems equipment for a 600-seat auditorium at Muscat Airport in Oman.

In Spain, supply and installation work was performed on the network equipment for the establishment of the Section II Data Network on Barcelona Metro Line 9.

In the health sector, supply, installation and configuration of a patient-nurse call system was configured using an IP communications platform at Vigo’s New Hospital.

Sanitas Residencial commissioned the development and implementation of an Energy Efficiency platform for 37 old people’s homes in Spain.

The telephony system was also migrated to a unified communications platform to cover the Clinical and Consultancy buildings at the Sagrada Familia clinic in Barcelona.

A unified communications infrastructure was installed for the new San Juan de Dios Hospital in Pamplona.

For Olympus, a video and communications system was implemented for the operating theatres at the Central University Hospital of Asturias.

an image recording system, alarm management, display and centralisation system at Manresa Hospital, using equipment manufactured by Bosch.

An access control and presence system was also installed for the headquarters of the Catalan health agency, CatSalut, in Barcelona. This includes access turnstiles, proximity and digital fingerprint readers, and integration with human resources.

In the food sector, the Pantaleón Group commissioned the development and implementation of control systems for its sugar and energy production installations at its

plants in Guatemala, Nicaragua, Honduras and Mexico. Work was also performed on the boilers, sugar recovery, centrifuges and other elements involved in the process.

The sugar producer Azucarera Española commissioned a project to migrate the control system at its plant in Toro.

In the public sector, preventive and corrective maintenance and firefighting tasks were performed at twenty buildings belonging to the Barcelona Provincial Authority.

Migration of Control and Supervision System for Iberdrola. San Juan de Dios Hospital in Pamplona, Spain.

Muscat Airport Auditorium in Oman.

INSTALLATIONS AND SYSTEMS

Page 12: Report 2013

12

Supply and installation of equipment at CEPSA’s San Roque refinery in Spain.

INDUSTRIAL ASSEMBLY

Abantia strengthened its regular capabilities in the energy, industry and oil & gas sectors, covering such new operational spheres as the repair and construction of storage tanks, along with new projects in the field of mining.

In the mining sector, Abantia was awarded two contracts at the Brocal mine in Cerro Pasco, Peru, through OHL Industrial. Both comprise the assembly of a new transportation system using fourteen conveyor belts.

In the field of refineries, work was performed on major projects for Repsol. At its La Pampilla refinery in Ventanilla, Peru, earthmoving and all civil engineering associated with the bases of the new storage tanks were performed, within the context of the RLP 21 expansion project. Three new projects also began at the close of the year: maintenance of civil engineering, electrics and instrumentation for the new tanks, and construction of the new service canteens for the extension to the refinery.

Ecopetrol awarded Abantia the contract for the Barrancabermeja refinery in Colombia for the updating of the control and safeguard protection systems for furnaces H201 and H202.

For Repsol, a warehouse was built in Spain for organic peroxides at the Puertollano plants, in accordance with standard ITC-MIE-APQ-9, on a turnkey basis requiring execution of the civil engineering, the peroxides collection trough, the metal structure, insulation, climate control, firefighting system, electrics and instrumentation.

Repair of tanks T134 and T135 at the Tarragona refinery. These are comprehensive projects including cleaning and inertisation, paintwork, civil engineering, scaffolding, metallurgical repairs and tests. Repair projects are likewise being undertaken on tanks at the Coruña and Cartagena refineries.

Three projects were performed for CEPSA at its San Roque refinery, comprising among other aspects the supply, prefabrication, painting and assembly of structures and pipelines and installation of equipment for the Non-condensables plant at the Gibraltar refinery and for the new vacuum and paraffins units at the Guadarranque plant.

Within the Oil & Gas field, a number of projects were undertaken for PEMEX Exploration Production. Particular mention should be made of construction works in the Matapionche and Angus Stora fields, including the manufacture and installation of recovery tanks, stabiliser tower, gas burners and crude or oil pumps for optimisation of operations in the stated fields.

INDUSTRIAL ASSEMBLY AND AUTOMATION

OPERATIONAL AREAS

Abantia staff performing manufacturing and assembly work for the Tem JV.

INDUSTRIAL ASSEMBLY AND AUTOMATION

Page 13: Report 2013

13

2013Report

For the Coapechaca, Furbero, Humapa and Remolino fields work was performed on the ATG (Tertiary Gulf Oil) project, including manufacture, installation and three-phase separator tests, burners and capture tanks.

For the Gasífero, Playuela and Aris Kabuki fields, manufacture, installation and commissioning of surface production installations was performed, comprising pipelines, filters, electrical infrastructure and a range of instrumentation, to increase output in the stated fields.

Meanwhile, a number of contracts were won for Calidda in Lima, Peru, ranging from the assembly of the fencing at a number of its facilities, to sundry tasks including the assembly of drainage pipelines for the facilities and ERMs, with the corresponding input and output lines and fibre-optic connections.

In late 2013, Abantia Corfree was founded in partnership with Corfree, a company with 10 years’ experience focused on the wind turbine assembly and maintenance sector, to embark on assembly and maintenance projects in the wind sector. Particular mention should be made of the assembly of a wind farm featuring 17 machines of the Vestas V100 model in Uruguay.

Likewise in the field of renewable energies, this time in Spain, manufacture and assembly of pipelines was performed at the solar thermal power plant in Villena for Sener Energía.

Within the field of waste treatment plants, supply, manufacture and assembly of boiler panels were performed at the solid urban waste incineration plant of the TEM (Tratamientos Ecológicos del Maresme) joint venture.

One other particularly noteworthy initiative was the urgent repair of the Sirusa Urban waste incineration plant in Tarragona. Thanks to in situ engineering and considerable efforts in terms of installation and operational start-up tasks, it was successfully brought back on-stream in record time.

The metal producer Atlantic Copper was the client for the supply, manufacture and assembly of radio equipment at its acid treatment plant in Huelva. Particular emphasis should be placed on the huge efforts dedicated to the general shut-down, with a peak workforce of more than 200 people involved to perform reconstruction work in the flash furnace, inspection of electrical filters, maintenance tasks, etc. Work is being performed in partnership with Asturiana de Zinc on projects to achieve improvements and provide support during planned maintenance shut-downs.

For Chepro, the company performed the supply, manufacture and assembly of the firefighting system at the new Vopak storage facility in Algeciras.

Abantia is responsible for the assembly of fourteen conveyor belts at the Brocal mine in Peru.

INDUSTRIAL ASSEMBLY AND AUTOMATION

The company Abantia Corfree is assembling a windfarm in Uruguay.

Page 14: Report 2013

14

2013Report

Commission, comprising analysis and detailed design of structures, systems and components.

Engineering, procurement, construction and assembly of an ERM was performed for Duro Felguera at its new combined cycle power plant at Vuelta Obligado, in Argentina.

Endesa Energía awarded a full EPC contract for a Liquefied Natural Gas Satellite plant with a capacity of 105 m3 to be installed at the premises of Fonderie de Matour, in France.

ENGINEERING AND GAS

In 2013 Abantia was awarded several projects in the energy sector, three of them in Mexico. Elecnor commissioned the prefabrication and assembly of positions for the new Morelos gas pipeline, covering a length of 160 kilometres. Iberdrola Ingeniería y Construcción contracted the development of engineering, supply, manufacture, transportation and assembly of gas burners for co-generation at its Salamanca refinery. The Office of Nuclear Power Plant Engineering in Mexico commissioned engineering work at the Laguna Verde Nuclear Power Plant, belonging to the Federal Electricity

Transformation to natural gas of the MAN 1 and 2 motors at the Ibiza Thermal Power Plant.

Prefabrication and assembly of Regulation and Metering Stations and Positions at the Morelos gas pipeline in Mexico.

In Argentina, ERM assembly at a new combined cycle plant for Duro Felguera.

INDUSTRIAL ASSEMBLY AND AUTOMATION

Page 15: Report 2013

15

2013Report

In Spain, the same client also awarded a full EPC contract at the Alcoa plant in San Ciprian for a Liquefied Natural Gas Satellite plant with a storage capacity of 640 m3.

MAN commissioned the engineering, manufacture and assembly of the gas network for adaptation of the motors at the Ibiza Thermal Power Plant to gas consumption.

With Ence as the end client work was performed at its plants in Huelva and Navia, each with EPC contracts for the natural gas consumption infrastructure, with adaptation of the existing installations, ERMs, connection lines, etc. A similar task was performed for Cosentino’s Cantoria plant in Almeria, installing the infrastructure for natural gas consumption, along with an LNG plant pending the arrival of the gas pipeline.

hardware design, PLC programming, programming of robots and commissioning.

Meanwhile, the Volkswagen Group commissioned for its headquarters in Wolfsburg, Germany, the electrical installation of a welding line for the manufacture of the rear floor and chassis of the new Tiguan and Touran models.

Combined lines were created for the manufacture of rear, front and boot doors of the Corsa 4440 and 4430 models at Opel’s plant in Zaragoza. The work comprised the modification of cabinets, electrical installation, programming of PLCs and programming of robots.

An electrical installation was performed for Mercedes-Benz at its Vitoria plant for the door, boot, wing and bonnet assembly lines for the new VS20 (Vito) model. The work comprised the manufacture of electrical booths and modification of the electrical installation, along with the programming of PLCs and robots in certain production areas.

Various tasks have been performed to supply Flexible Manufacturing System lines for a number of clients. Of particular note is the automatic assembly and boot closure verification system for Land Rover, assembly and verification of the daylight control unit for Magnetti Marelli, and assembly of the different phases of the closure system for various automobile models for Flex’n’Gate.

Detail of gas burners at the Salamanca refinery installed for Iberdrola in Mexico.

In the automotive sector, electrical automation projects were undertaken for Thyssen Krupp System Enginering (TKSE), for a number of production lines of the new BMW Mini, at the plant in Oxford, UK, and also at the VDL Nedcar plant in the Netherlands. The specific supply comprised electrical boards, control boards, full electrical installation,

Programming of PLCs and robots for Mercedes-Benz in Vitoria.

PRODUCTION LINE AUTOMATION PROJECTS

INDUSTRIAL ASSEMBLY AND AUTOMATION

Page 16: Report 2013

16

In Spain, combined cycle power plant maintenance is performed for the same client, along with the Besós plant for Endesa, the Aceca, Castellón and Tarragona plants for Iberdrola and the Campo de Gibraltar plant for NGS (Nueva Generadora del Sur).

For Enagás, gas pipeline network surveillance services are performed, along with repair maintenance and upkeep of civil engineering and emergency response.

A comprehensive maintenance contract is in place with SAGGAS for its regasification plant in Sagunto.

In the field of refineries, Abantia performs maintenance of the BP Oil refinery in Castellón, and for Repsol the dynamic equipment at the Cartagena refinery and comprehensive maintenance of the Technology Centre in Móstoles.

In the aeronautical sector, Abantia performs comprehensive maintenance of the means of production for Iberia, along with a warehouse management, servicing of aircraft at Barajas airport and work to convert Air Bus planes for cargo transportation (MRTT Project).

For the automobile industry, comprehensive maintenance tasks are performed on the fluids network at the

MULTI-TECHNICAL/MULTIDISCIPLINARY MAINTENANCE

Abantia specialises in maintaining high value-added, either through the client’s operations or through service conditions.

For the chemicals sector it performs comprehensive maintenance, supply and warehouse management at Ferro Spain. Archroma also contracted Abantia to expand the electro-mechanical maintenance at its El Prat de Llobregat and Castellbisbal plants, among others. The mechanical maintenance service has likewise begun at the BUNGE plant at the Port of Barcelona.

In the food sector, comprehensive maintenance is performed for Europastry at its plants in Azuqueca de Henares, Vallmoll and Rubí.

For the metal company Atlantic Copper, aside from the annual maintenance contracts, a number of tasks have been performed during general plant shut-downs. A contract has also begun at CELSA for the assembly and maintenance of the billet line huts in Barcelona.

In the field of energy, Abantia performs coprehensive maintenance at the Durango and Tuxpan combined cycle plants in Mexico for Gas Natural Fenosa.

OPERATION AND MAINTENANCE

OPERATIONAL AREAS

Maintenance of the BP Oil refinery in Castellón.

OPERATION AND MAINTENANCE

Page 17: Report 2013

17

2013Report

Barcelona Olympic Stadium.

Peugeot-Citroën vehicle assembly factory at its plants in Madrid, along with comprehensive maintenance of the general services at the Renault gearbox production factory in Seville, and maintenance of lifting devices for Volvo in Madrid.

The public corporation Barcelona Serveis Municipals (BSM) awarded Abantia the corrective maintenance contract for the Barcelona Olympic Ring, as a joint venture with ACSA. This supplements the preventive maintenance covering the Palau Sant Jordi events complex, the Olympic Stadium and other infrastructure. Within this field of sporting facilities, mention should also be made of the maintenance of FC Barcelona’s premises.

Pursuing the line of multidisciplinary maintenance at public buildings, a comprehensive maintenance contract has begun at the Alcalá Norte Retail Centre in Madrid.

In the leisure sector, Abantia has renewed its contract with the Port Aventura themepark, including general maintenance of LV and HV installations, public address installations, the management and control system and PCi for both the themepark and the hotels within the complex, along with electronic maintenance of the rides.

For the health sector, of particular note are maintenance operations at the Sant Joan de Déu Hospital in Esplugues, the Parc Sanitari in Sant Boi and the Germans Trias y Pujol Hospital in Badalona, along with others.

For the pharmaceuticals sector, comprehensive maintenance of the Barcelona headquarters and Leganés logistical centre for Sanofi, and the headquarters of Laboratorios Ferrer in Sant Cugat.

COMMUNICATIONS AND NETWORKS

The Communications and Networks Field, has been expanded through a new operational service covering the voice communications and data platform at the MercaPalma wholesale market, for Orange. This includes maintenance, administration, procurement and incident management. The service marks the continuation of the contract with the same client at MercaBarna.

FACILITY MANAGEMENT

Following on from the comprehensive maintenance contract awarded by the food company Nutrexpa for its facilities in 2012, this arrangement has now been extended to the Facility Management service.

OPERATION AND MAINTENANCE

Page 18: Report 2013

18

2013Report

OPERATION AND MAINTENANCE OF RENEWABLES AND ENVIRONMENT

In Italy and Spain Abantia maintains a number of photovoltaic power plants with a total power rating of 25 MW.

The JV comprising Abantia and Comsa Emte undertook the design, development, engineering, construction, commissioning and now the operation and maintenance of the Borges Solar Thermal Power Plant in Les Borges Blanques. This is the first installation anywhere in the world to combine a solar thermal unit with a biomass unit, with a nominal power rating of 25 MW.

Sludge drying plant maintenance is performed for the BOREMER JV in Getafe and BUTARQUE in Madrid.

Meanwhile the Catalan water agency, ACA, relies on Abantia, as a JV with Eulen, to operate and maintain the

sludge treatment plant at the Granollers Waste Water Treatment Plant.

Maintenance and operation are likewise performed at the Miralcamp Slurry Treatment Plan.

AUTOMATION MAINTENANCE

Following conclusion of warranty support at the new package classification installations of the State Postal Company, using Fives Cinetic and Vanderlande technology, maintenance has now been incorporated within the general contract in place with the Abantia Siemens Correos 2 joint venture at more than 19 mail processing centres.

Abantia maintains the sorting lines at Damm in El Prat de Llobregat.

Borges Solar Thermal Plant, in Lleida, Spain.

Package classification installations at the State Postal Company.

Borges Thermal Biomass Unit.

OPERATION AND MAINTENANCE

Page 19: Report 2013

19

PROMOTION AND INTEGRATED PROJECTS

OPERATIONAL AREAS

Enel Green Power Chile awarded Abantia, in association with Collosa, the EPC or partial turnkey construction contract for the 36 MW Emelda photovoltaic power plant in the municipality of Diego de Almagro, in Chile’s Atacama Desert. Abantia will be leading the engineering, procurement, electrical and mechanical assembly operations.

RETAIL INTELLIGENCEAbantia T-Cuento, the Abantia group’s Retail Intelligence solutions company, added 20 new brands to its client portfolio over the course of 2013. With these new additions, the TC-STORE accounting system has now been installed at more than 4000 points of sale, while T-Cuento has succeeded in expanding and diversifying its range of clients by breaking into such diverse sectors as fashion, telecommunications, catering, perfumeries, decoration, optics, electronics, DIY superstores, gardening, sports and public institutions.

Meanwhile, TC-Street Ranking consolidated its position during the year as the leading index of the evolution of pedestrian traffic on Spain’s shopping streets.

In technological terms, mention should be made of the incorporation of heat sensors as a counting system complementing infrared cells, along with the launch of TC-Store Analytics version 2.0, which incorporates new functionalities such as staffing, to calculate optimum staff levels, and scoring, which ranks points of sale in accordance with performance evaluation criteria, alongside such new modules as customer loyalty (repeat visits by customers to the store) and the visit prediction module linked to weather forecasts.

In 2013 Abantia T-Cuento set about internationalising its products in France and Morocco.

PROMOTION AND INTEGRATED PROJECTS / RETAIL INTELLIGENCE

In El Salvador a photovoltaic solar power project with a rated capacity of 19 MW is being developed, comprising two adjacent facilities which will be connected via the same step-up substation to the country’s national grid.

Development of four photovoltaic solar projects with rated capacities of 21 MW, 7.5 MW, 30 MW and 61.5 MW in the province of Huasco, in Chile’s Atacama region.

Lottusse is one of more than 20 new brands added by Abantia T-Cuento to its client portfolio.

Page 20: Report 2013

20

2013Report

SUPERVISORY COMMITTEECharmain: Francisco BoadaMembers: Joan Gummà Maragall, Claudio Boada and Antonio González-Adalid

AUDIT COMMITTEECharmain: Joaquim CoelloMembers: Joan Sanfeliu and Claudio Boada

APPOINTMENTS AND REMUNERATION COMMITTEE Charmain: Aurora CatáMembers: Eulalia Boada and Miguel Tey

Shareholding Structure

Board of Directors

Claudio Boada (Clabesa, S.L.) CharmainFrancisco Boada (Abantia Empresarial, S.L.) MemberCristian Gaju MemberAntonio García Mateo MemberEmilio Novela MemberJosé Luis Sáenz de Miera MemberIgnacio Albiñana Non-Directorial Secretary

ABANTIA TICSA (Advisory council)

Joan Gummà Bargés Honorary CharmainFrancisco Boada Charmain ProprietaryJoan Gummà Maragall Vice-Charmain ProprietaryClaudio Boada (Clabesa, S.L.) Member ProprietaryEulalia Boada Member ProprietaryAurora Catá Member IndependentJoaquim Coello Member IndependentAntonio González-Adalid Member IndependentJoan Sanfeliu Member ProprietaryMiguel Tey (Sigma Partners, S.L.) Member Proprietary

Ignacio Albiñana Non-Directorial Secretary

ABANTIA

Josep Peidro CharmainÁlvaro Angulo MemberCristian Gaju MemberAlfred Nieto Non-Directorial Secretary

ABANTIA T-CUENTO

Claudio Boada (Abantia Ticsa, S.A.U.) CharmainAgustín Ferrer MemberCristian Gaju MemberJesús García MemberEnric Vallbona MemberRicard Puig Non-Directorial Secretary

ABANTIA DENION

47,86%Sigma Partners, S.L.

47,86%

2,19% 2,09%

Napecla de Inversiones, S.L.

Cofema Investments, S.L. Francesc Navarro

GOVERNING BODIES

Page 21: Report 2013

21

2013Report

Executive Organisational Chart

EXECUTIVE CHAIRMAN (CEO)Francisco Boada

VICE-CHAIRMANJoan Gummà

MANAGING DIRECTORCristian Gaju

LEGAL CONSULTANCYRicard Puig

MANAGEMENT CONTROL

Tania Muñoz

RENEWABLE DEVELOPMENTS

Luis Boada

TICSAJesús García

QATAR-PERSIAN GULFEduardo de

la Sotilla

HUMANRESOURCESLuis Cornide

NSTALLATIONSJosep Peidro

MAINTENANCEJosep Oliva

CSCFrancesc Augé

PURCHASINGAlbert Pastor

EPCXavier Ochoa

INSTALLATIONSJordi Montes

SALESÀngel Miquel

Spanish Head Office International Head Office

DENIONEnric Vallbona

T-CUENTOÁlvaro Angulo

CHILECarmenLauder

CENTRAL AMERICA

Josep Golet

NORTH AFRICAMarc

Bertrán

PERUCristóbal

RuizRafael

Delgado

MEXICOCOLOMBIASergio

González

CORFREEÁngel García

Page 22: Report 2013

22

2013Report

Spain1.554 employees

262

Executives and qualified

staff

1.292

Technical,specialist and administrative

Other countries382 employees

91 291

Technical,specialists and administrative

Executives and qualified

staff

(data at 31 December 2013)

The Executive Management of Abantia establishes as one of its key goals the delivery of optimum service to its clients, based on a commitment to satisfy their requirements in full. They furthermore undertake to provide the means and resources necessary in order to perform this task, and are dedicated to the professional development and qualifications of our workers. Abantia places the utmost importance on collaboration with its suppliers and subcontractors, who are selected on the basis of quality. They are informed of and involved in Management Systems.

Executive Management guarantee compliance with the legislation and regulations in force, and also fulfilment of the 10 Principles of the United Nations Global Compact, which Abantia signed up to in 2009, and ratifies by means of its Annual Progress Report.

Abantia is committed to Integrated Management of Management Systems for Quality, the Environment and Occupational Risk Prevention. This Integrated Management generates working methods and processes the key purpose of which is to achieve continuous improvement as a requirement of the principles implemented in accordance with international standards ISO 9001:2008, ISO 14001 and OHSAS 18001.

Abantia maintains its social commitment to the communities of the countries where it operates, in particular those regions with the greatest need. Each project undertaken by Abantia has a direct impact on the communities within which it is performed, and on the local population.

HUMANS RESOURCES

CORPORATE RESPONSIBILITY

Group total1.936 employees

353 1.583

Technical,specialists and administrative

Executives and qualified

staff

Page 23: Report 2013

© All rights reserved. No part of this publication may be reproduced, transmitted in any form or by any means, electronic or mechanical, including photocopying, recording or any retrieval system of information storage, without written permission from the copyright holder.

© ABANTIA EMPRESARIAL, S.L.Astúries, 8-10, 08830 Sant Boi de Llobregat, Barcelona

Leaders in commitment

HEAD OFFICESBARCELONA - SANT BOI DE LLOBREGATAstúries, 8-10, 08830 Sant Boi de Llobregat, Barcelona • tel. +34 935 521 400ABANTIA EMPRESARIAL • ABANTIA INSTALACIONES • ABANTIA SEGURIDAD • ABANTIA MANTENIMIENTO • ABANTIA SUN ENERGY • ABANTIA TICSAABANTIA CENTRO DE SERVICIOS COMPARTIDOS • ABANTIA T- CUENTO • DENION

MADRIDCastelló 23, 28001 Madrid • tel. +34 917 819 170ABANTIA TICSA • ABANTIA INSTALACIONES • ABANTIA SEGURIDAD • ABANTIA MANTENIMIENTO • ABANTIA SUN ENERGY • ABANTIA CORFREE

SORIAAlbacete 27, 42004 Soria • tel. +34 975 122 122ABANTIA CORFREE

REGIONAL OFFICESAlgeciras • Castellón • Cartagena • Huelva • Puertollano • Seville • Tarragona

PERMANENT OPERATIONAL SITESAlicante • Bilbao • Granada • Mérida • Málaga • Las Palmas de Gran Canaria • Lleida • Oviedo • Palma de Majorca • Santiago de Compostela • Tenerife • Valencia • Valladolid • Vitoria • Zaragoza

BRANCHES AND SUBSIDIARIESMEXICOD.C.S.Eucaliptos 5, Ciudad Bruno Pagliai. Polígono Framboyanes 91697 Veracruz • tel. +52 229 20 10 700 ABANTIA TICSAHomero 136, Int. 102, Col. Chapultepec Morales Del. Miguel Hidalgo • 11570. México, D.F. • tel. +5255 5250 1375

CENTRAL AMERICADiagonal 6 12-42 zona 10. Design Center Torre 2, oficina 3001 • 01010 Guatemala • tel. + 502 40169147

HAITINº 11, Rue Oge Pétion-Ville • Port -au- Prince • tel. +509 4890 3725

COLOMBIACalle 95 nº13-55 Oficina 310, Edificio Pavillon • Bogotá • tel. + 571 467 42 43

PERUAv. Ricardo Elías Aparicio, 141, piso 4, oficina 2. La Molina • Lima • tel. +51 1 479 05 79

CHILEEdificio Torre del Parque Arauco II Cerro Colorado 5240, piso 10 • Las Condes-Santiago • tel. +56 (2) 2 655 5135

FRANCIAABANTIA T-CUENTO 20 Rue des Petites Écuries 75010 Paris

NORTE DE ÁFRICATwin Center, Tour Ouest, 16 ème étage, Angle Bd Zerktouni et El Massira, 20100 , Casablanca

CATARABANTIA TEMPO P.O. Box: 9165 Doha • tel. + 974 4451 55 59