Seal & Signature of Bidder 1 BHARAT SANCHAR NIGAM LIMITED (A Govt. of India Enterprise) BID DOCUMENT FOR Repair of SMPS Power Plant Modules In Bhuj Telecom District E - TENDER NO. BJ/PLG/T-04/REP-SMPS/2017-18 DATED: 19.07.2017 AGM (PLG) SECTION O/o The General Manager Telecom District, Haripar Road, Bhuj- 370001. PH. (02832) 231381. Fax NO. 231608 Visit us at: www.gujarat.bsnl.co.in
49
Embed
Repair of SMPS Power Plant Modules In Bhuj Telecom District · 2017. 8. 31. · TABLE - A Name & Scope of Work Repair of SMPS Power Plant Modules In Bhuj Telecom District Duration
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Seal amp Signature of Bidder
1
B H A R A T S A N C H A R N I G A M L I M I T E D
(A Govt of India Enterprise)
BID DOCUMENT
FOR
Repair of SMPS Power Plant Modules
In Bhuj Telecom District
E - TENDER NO BJPLGT-04REP-SMPS2017-18 DATED 19072017
AGM (PLG) SECTION
Oo The General Manager Telecom District Haripar Road Bhuj- 370001
PH (02832) 231381 Fax NO 231608
Visit us at wwwgujaratbsnlcoin
Seal amp Signature of Bidder
2
BHARAT SANCHAR NIGAM LIMITED
(A Govt of India Enterprise)
BHUJ TELECOM DISTRICT
Office of the General Manager (Telecom District
Haripar Road Bhuj 370001
E - TENDER NO BJPLGT-04REP-SMPS2017-18 DATED 19072017
Please find enclosed the tender document in respect of above mentioned tender which contains the
following
Section No Item Page No
1 Part A Detailed NIT 3 to 5
1 Part B Newspaper NIT 6
2 Tender Information 7
2 (Part-A) Agency Details 8
2 PART B Letter of Authorization for attending bid opening 9
2 PART C Undertaking amp Declaration 10
2 PART D Declaration regarding no relative working in BSNL 11
3 Scope of work and jurisdiction of contract 12 to 13
4 (Part-A) General instruction to bidders (GIB) 14 to 28
4 (Part-B) E-tendering Instructions to Bidders 29 to 32
5 (Part-A) General (Commercial) Conditions of the contract
(GCC)
33 to 39
5 (Part-B) Special Conditions of Contract (SCC) 40 to 44
7 (A) Bid Security EMD Guarantee 45
7 (B) Performance Security Bond Form 46
7 (C) Agreement 47
8 FINANCIAL BID 48
CHECK LIST 49
If interested kindly submit your offers by means of online bids only for Electronic E-Tendering at the
portal detailed in lsquoSpecial Instructions to Bidders for E-Tenderingrsquo on or before date amp time specified in
Clause 6 of Detailed NIT
Assistant General Manager (PLG)
Bhuj Telecom District
Ph No (02832) 231381
Fax No (02832) 231608
Email agmplgbhujgmailcom
Seal amp Signature of Bidder
3
SECTION ndash 1 (Part A)
E - TENDER NO BJPLGT-04REP-SMPS2017-18 DATED 19072017
Detailed Notice Inviting Tender
Sealed Tender (Digitally) is invited by General Manager Bhuj on behalf of BHARAT SANCHAR
NIGAM LIMITED from prospective bidders for a period of one Year on `Rate Running Contractrsquo
basis from the date of final acceptance of tender in Bhuj Telecom District
TABLE - A
Name amp Scope of Work Repair of SMPS Power Plant Modules
In Bhuj Telecom District
Duration of contract One year from date of award
Performance Security Deposit 5 of Total cost of tender
Time amp last date of submission of Bid Up to 1430 Hrs on 22092017
Time of Bid opening At 1530 Hrs on 22092017
Place of opening of Tender at Oo General Manager Telecom District
Haripar Road Bhuj-370001
AREA Cost of bid document
(Non Refundable)
Estimated cost of
work in Rs
Bid Security EMD
2in Rs Capacity Qty
Area
under
GMTD
Bhuj
25A 786
Rs 590- 1903000- 38100-
50A 44
100A 134
Control
cardPanel
224
1 Deleted
2 Purchase of Tender Document Tender document can be obtained by downloading it from
the website ldquowwwgujaratbsnlcoinrdquo The official copy of tender document for participating
in E-tender shall be available for downloading from
httpseprocurementsynisecombsnl1gujarat
21 The bidders downloading the tender document are required to submit the tender fee amount
Rs590 ( 500+90 GST)- through DD Bankerrsquos Cheque along with their tender bid failing
which the tender bid shall be left archived unopened rejected
The DD bankerrsquos cheque shall be drawn from any Nationalized Scheduled Bank in favour
of AO (Cash) BSNL Oo GMTD Bhuj and payable at Bhuj
22 The tender documents shall be issued free of cost to MSE bidders on production of
requisite proof in respect of valid certification from MSME for the tendered item
3 Availability of Tender Document The tender document shall be available for downloading
from 01092017 1700 Hrs onwards up to 22092017 1425 Hrs
31 BSNL has decided to use process of e-tendering process for inviting this tender and thus the
physical copy of the tender would not be sold
Note 3 Deleted
Seal amp Signature of Bidder
4
4 Eligibility Criteria-The bidder should have
Sl Particular Details Minimum
requirement
i Experience Bidder should have minimum following experience of repair of various
capacitymake SMPS moduleControl panel as per Para 11 of Section-3
MTNLBSNLCentral or State Govt any PSULicensed Private Telecom
Operator
[a] He should have carried out work of repair for at least 25 of estimated
tendered quantity or amount- during the period from 01072012 to till
date (ie last 05 years) OR
[b] The Bidder is a manufacturer or their Authorized Service centre
(Documentary proof to be attached)
ii Criteria for
Educational
order
He should have carried out work of repairing of Power Plant Modules for at
least 150 Nos of Power Plant Modules of any capacity during the period
from 01072012 to till date (ie last 05 years)
5 Bid SecurityEMD
51 The bidder shall furnish the bid EMD in one of the following ways-
(a) Demand Draft Bankerrsquos cheque drawn in favour of AO (Cash) BSNLGMTD Bhuj
and payable at Bhuj
(b) Bank Guarantee FDR from a Nationalizedscheduled bank drawn in favour of AO
(Cash) BSNL GMTD Bhuj which should be valid for 180 days from the tender
opening date
52 The MSE units shall be exempted from submission of Bid Security deposit on production of
requisite proof in respect of valid certification from MSME for the tendered item
6 Date amp Time of Submission of Tender bids As above in table A
Note 4 In case the date of submission (opening) of bid is declared to be a holiday the date of
submission (opening) of bid will get shifted automatically to next working day at the same
scheduled time Any change in bid opening date due to any other unavoidable reason will
be intimated to all the bidders separately
7 Opening of Tender Bids As above in table
8 Place of opening of Tender bids
81 In case of tenders invited through e-tendering process the tenders shall be opened through
lsquoPublic Online Tender Opening Event (POTOE)rsquo BSNLrsquos Tender Opening Officers as well as
authorized representatives of bidders can attend the Public Online Tender Opening vent (TOE)
from the comfort of their offices Kindly refer clause 8 of Section-4 Part B of Tender
document for further instructions
82 In addition amp in case of tenders invited through manual bidding process authorized
representatives of bidders (ie vendor organization) can attend the TOE at the office of
GMTD Haripar Road BHUJ ndash 370 001 where BSNLrsquos Tender Opening Officers would be
conducting Public Online Tender Opening Event (TOE)
9 Tender bids received after due time amp date will not be accepted by the system or physically
10 Incomplete ambiguous Conditional unsealed tender bids are liable to be rejected
11 GMTD Bhuj reserves the right to accept or reject any or all tender bids without assigning any
reason He is not bound to accept the lowest tender
Seal amp Signature of Bidder
5
12 The official copy of tender document for e-bidding process of E-tender shall be available for
downloading from httpseprocurementsynisecombsnl1gujarat from 01092017 1700 Hrs
onwards This will however be same as available on BSNL website
121 The bidder shall furnish a declaration that no addition deletion corrections have been made in
the downloaded tender document being submitted and it is identical to the tender document
appearing on E-tender Portal httpseprocurementsynisecombsnl1gujarat
122 In case of any correction addition alteration omission in the tender document the tender bid
shall be treated as non responsive and shall be rejected summarily
13 The bidder shall furnish a declaration in his tender bid that his firm has not blacklisted by any
SSA Circle of BSNL MTNL
Note 5 All documents submitted in the bid offer should be preferably in English In case the certificate
viz experience registration etc is issued in any other language other than English the bidder
shall attach an English translation of the same duly attested by the bidder amp the translator to be
true copy in addition to the relevant certificate
Note 6 All computer generated documents should be duly signed attested by the bidder vendor
organization
Seal amp Signature of Bidder
6
SECTION ndash 1 (Part B)
NEWS PAPER NIT (NNIT)
BHARAT SANCHAR NIGAM LIMITED
Office of the General Manager
BHUJ TELECOM DISTRICT
NOTICE INVITING TENDER No BJPLGT-04REP-SMPS2017-18
E-Tenders are invited from the prospective bidders for ldquoREPAIR OF SMPS POWER MODULE
CONTROL CARD IN BHUJ TELECOM DISTRICTrdquo Last date of receipt of tender is
22092017 up to 1430 Hrs
For further details kindly visit our website wwwgujaratbsnlcoin and follow ldquoLink for E-tendersrdquo
Assistant General Manager (PLG)
Bhuj Telecom District
PH 02832-231381 Fax No 231608
Seal amp Signature of Bidder
7
SECTION ndash 2
Tender Information
1 Type of Tender a) No of Bid Submission Stages for tender Single Stage
b) No of Envelopes for submission of Bids Two Nos (The bidders shall submit Techno- commercial
c) E-reverse auction if required by Business Unit Planning cell after opening of the Financial bids
Note 1 In case of 1(b) above the bidder shall submit Techno-commercial amp Financial bid simultaneously
The bids will be evaluated techno-commercially first and thereafter financial bids of techno
commercially compliant bidders only shall be opened
2 Bid Validity Period validity of Bid offer 150 days from the tender opening date and Validity of bid
Offer for acceptance by BSNL can be extended
3 Bid must be submitted by bidder through E-tendering mode only Manual (OFFLINE)
submission of bids should not be considered The following documents are required to be submitted
offline to AGM (PLG) Oo GMTD Haripar Road Bhuj-370001 on or before the date amp time of
submission of bids in a sealed envelope
The envelope shall bear the tender number name of work and the phrase Do Not Open Before (due date amp
time of opening of tender)
i) EMD - Bid security (original copy)
ii) DD Bankers cheque of Tender fee
iii) Power of Attorney in accordance with clause 143 of section 4 Part A and authorization for
executing the power of Attorney
iv) Latest and valid MSME NSIC Certificate duly certified by NSIC if applicable
The purchaser shall not be responsible if the envelop is delivered elsewhere or late
In case of tenders invited under two envelopes system the first envelope will be named as techno commercial amp
will contain documents of bidderrsquos satisfying the eligibility Technical amp commercial conditions and 2nd
envelope will be named as financial envelope containing financial quote
a) Techno-commercial part of the bid shall contain one set of the following documents only-
i) Certificate(s) showing fulfillment of the eligibility criteria The bidder shall furnish as part of his bid
documents establishing the bidders eligibility all the following documents or whichever is required as per
terms and conditions of bid documents
Sl Particular Documents to be submitted
i Registration
Certificate
Firm Registration Certificate Certificate of Incorporation Shop amp
Establishment Certificate
ii In case of
Proprietorship
proprietorship firms an affidavit of that effect should be submitted along with
the bid
iii Partnership
Company
Partnership Deed or ArticlesMemorandum of Association as the case may be
amp Power of Attorney (if applicable) should be made older than the date of
submission of bid
iv Experience Experience Certificate as mentioned in the eligibility criteria
v EMD amp Tender Fee As per Table A amp clause 1 amp 2 OR Copy of Latest amp valid MSE NSIC
Certificate (if applicable)
vi EPF Copy of Registration Certificate of EPF (if applicable)
vii ESIC ESIC Registration (if applicable)
ix Taxes Copy of Valid Goods and Services Tax Registration No Declaration
that he is not registered and will get registered if required x PAN Card Copy of PAN Card
All documents submitted will also be self attested by the bidder
ii) Power of Attorney amp authorization for executing the power of Attorney in accordance with clause 143 of
Section -4 Part A
iii) The complete Bid document duly signed on end of each section at least
iv) Agency details letter for authorization of bid Undertakings Undertakings Non-Relation Certificate as
given vide Section 2(A) to 2(D) of this Bid form
b) Financial envelope shall contain Electronic Form- financial along with Price Schedule (Section 8)
with all relevant bid annexure (in case of tenders invited through e-tendering process)
Seal amp Signature of Bidder
8
SECTION -2 (Part-A)
AGENCY DETAILS
(Including performance records financial viability etc)
Name of firm
Registered Address
Status of the Bidder (i) Proprietorship concern
(ii) Partnership firm
(iii) HUF
(iv) Limited Company
Name of person or authorized signatory for
submitting the tender other documents and
empowered for correspondence with BSNL
GSTIN No
PAN Card particulars
Telephone numbers (with STD Code) of
authorized signatory
Office Residence
Mobile E-mail
Name(s) of Proprietor all Partners all
Directors
Infrastructure capabilities
A Capacity of Repairing 25A module per
week
B Capacity of Repairing 50A module per
week)
C Capacity of Repairing 100A module per
week
D Capacity of Repairing control panel per
week
F Details of trained staff available
A --------------------------------
B --------------------------------
C --------------------------------
D --------------------------------
F --------------------------------
Signature of Tenderer
Name of Tenderer
Along with date amp Seal
Seal amp Signature of Bidder
9
SECTION- 2 PART B
LETTER OF AUTHORISATION FOR ATTENDING BID OPENING
(To be typed preferably on letter head of the company)
Subject Authorization for attending Bid opening
I We Mr Ms helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip have submitted our bid for the tender no
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip in respect of helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip (Item
of work) which is due to open on helliphelliphelliphelliphelliphelliphellip (date) in the Meeting Room
We hereby authorize Mr Ms helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip helliphelliphelliphelliphelliphelliphelliphelliphellipamp
rohelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphereby certify that we or our firm
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip has not been BLACK LISTED by
any SSACircle of MTNLBSNL In case at any stage it is found that the information given by me is
falseincorrect BSNL shall have the absolute right to take any action as deemed fitwithout any prior
intimation to me
e) Clause by Clause Compliance
It is to certify that the tender document is carefully read amp understood and all the sections and clauses
are complied unconditionally amp unequivocally There is no deviation from the terms amp conditions of
the tender
f) Declaration for EPF amp Misc Provisions Act 1952
I _____________________________ (Name of the bidder agency) hereby declare compliance
towards conditions of the EPF and Misc Provisions Act 1952 and authorize BSNL to recover any
payment that arises due to failure to comply with any of the Labour legislations and statutory
conditions viz Labor EPF ESI etc or any other acts dealing with the same and all other acts
mentioned in the tender document
g) CERTIFICATE REGARDING FIRM IS NOT BLACK LISTED BY GST AUTHORITY
rohelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphereby certify that we or our firm
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip has not been BLACK LISTED by
any GST Authority
Date helliphelliphelliphelliphellip helliphellip helliphelliphelliphelliphelliphelliphelliphelliphellip
Signature of Tenderer
Place helliphelliphelliphelliphellip Name of Tenderer
Along with date amp Seal
Seal amp Signature of Bidder
11
SECTION- 2 PART D
DECLARATION REGARDING NO RELATIVE WORKING IN BSNL
I ___________________________Son of W O___________________________
RO _________________________here by certify that none of my relative(s) as defined in tender
document isare employed in BSNL unit as per details given in tender document In case at any stage
it is found that the information given by me is false incorrect BSNL shall have the absolute right to
take any action as deemed fit without any prior intimation to me
Signed ___________________
For and on behalf of the Agency
Name (Capitals) ___________________________
Position ____________________________
Date ____________________________
Note - In case of proprietorship firm certificate will be given by the proprietor for partnership firm
certificate will be given by all the partners on separate paper and in case of limited company by all
the Directors of the Company on separate paper Any breach of these conditions by the company or
firm or any other person the tender work will be cancelled and earnest money security deposit will
be forfeited at any stage whenever it is so noticed BSNL will not pay any damages to the company or
firm or the concerned person The company or firm or the person will also be debarred for further
participation in the concerned unit
Seal amp Signature of Bidder
12
SECTION- 3
SCOPE OF WORK AND JURISDICTION OF CONTRACT
1 SCOPE OF WORK
1 During the entire period of contract repairing of all types and of any make such as AMAR RAJA DACS DELTA DYNA ELTEK EXICOM HIMACHAL EXICOM ITI etc SMPS Power plant Modules (25 AMP 50 AMP 100 Amp ) Control panel are to be carried out including replacement of faulty parts
2 Collection and Delivery of Faulty repaired modules - a The concerned JTOSDEAGM in charge will intimate the contractor the Location Make capacity and
quantity of faulty modules by email (copy to AGM(Plg) on agmplgbhujgmailcom ) followed by ERP PO on mail
b The contractor will collect the module from the concerned in charge with in THREE days from the date of intimation under proper receipt to the concerned in charge However under emergent condition the collection of modules may be done on the same day
c Packing transport and delivery of faulty as well as repaired modules is the responsibility of the contractor
d The contractor shall repair the module and return to the concerned in charge with in Seven days of its collection However under emergent condition as decided by the concerned in charge the collection and repair shall be made within the time period given in the ERP PO
e Repaired modules will be tested by the SDE concern within TWO days on receipt of repaired modules if it is found OK then a certificate of this may be issued to the contractor Otherwise same shall be returned to the contractor for necessary action
f The date of receipt of all the modules mentioned in the ERP PO duly tested OK will be reckoned as the completion of ERP PO
g Repaired modules are warranted for 3 months from the date of successfully taken over During this time the contractor has to rectify the module free of cost
3 INSPECTION AND TESTS - a) The BSNL BHUJ or his representative shall have the right to inspect and test the repaired module as
per prescribed test schedules for their conformity to the specifications Where the BSNL BHUJ decides to conduct such tests on the premises of the Contractor or its subcontractor(s) all reasonable facilities and assistance like Testing Instruments and other test gadgets including access to drawings and production data shall be furnished to the inspectors at no charge to the Purchaser
b) Should any inspected or tested repaired module fail to conform to the Specifications the BSNL BHUJ may reject them and the Contractor shall either replace the rejected repaired module or make all alterations necessary to meet Specification requirements free of cost to the Purchaser
c) Notwithstanding the pre-repair tests and inspections prescribed in clause 3(a) amp 3(b) above the module and accessories on receipt in the BSNL s premises will also be tested during and after installation before take over and if any equipment or part thereof is found defective the same shall be replaced free of all cost to the BSNL BHUJ
d) If any module or any part thereof before it is taken over under clause 3(e) below is found defective or fails to fulfill the requirements of the contract the inspector shall give the Contractor notice setting forth details of such defects or failure and the Contractor shall make the defective module good or alter the same to make it comply with the requirements of the contract forthwith and in any case within a period not exceeding one month of the initial report The replacements shall be made by the Contractor free of all charges at site should it fail to do so within this time the BSNL BHUJ reserves the discretion to reject and replace at the cost of the Contractor the whole or any portion of the module as the case may be which is defective or fails to fulfill the requirements of the contract The cost of any such replacement made by the BSNL BHUJ shall be deducted from the amount payable to the Contractor
Seal amp Signature of Bidder
13
e) When the performance tests called for have been successfully carried out the inspector ultimate
Consignee will forthwith issue a Taking Over Certificate The inspectorultimate consignee shall not delay the issue of any Taking Over Certificate ldquo contemplated by this clause on account of minor defects in the module which do not materially affect the commercial use thereof provided that the Contractor shall undertake to make good the same in a time period not exceeding two months The taking Over Certificate shall be issued by the ultimate consignee within six weeks of successful completion of tests
f) After performance test carried out by the concerned SDE of BSNL as per prescribed schedule and repaired modules are found ok in all respect than the repaired modules will be accepted
g) A register is to be maintained at each placelocation mentioning the details of Modules date of Collection and Delivery of Faulty repaired modules replacement of spares amp remark if any and it is to be signed by the controlling officer amp Service engineer
h) Nothing in clause 3 shall in any way release the Contractor from any Warranty or other obligations under this contract
4 SPARES - All the spare of good quality required for repair of modules of SMPS PP are to be supplied by the contractor including major components
5 The contractor shall be responsible for any loss or damages caused to man or machinespartsinstruments during the execution of work and shall replace with an identical new item at his own cost The authorized officerperson of BSNL will have the liberty to check the material and work etchellip provided by the contractor
6 Governing Conditions for RNP (Repair Not Possible) Cases
A module Control panel may be declared RNP only if cost of material to be replaced exceeds five times of approved rate of repair In no case labour cost involved will be considered for deciding RNP A detailed report is to be submitted by contractor to concerned officer in-charge and final decision in this regard will be taken by concerned DGM subjected to maximum permissible RNP as given below
a)25-A module Maximum 10 of total quantity ordered for repair
b) 50-A 100-A Module Maximum 5 of total quantity ordered for repair
c) Control Panel Maximum 10 of total quantity ordered for repair
In case of RNP exceeding permissible limits penalty will be imposed as per para 11 (d) of section-5 (Part-A)
7 WARRANTY - a) Repaired modules are warranted for 3 months from the date of successfully taken over During this
time the contractor has to rectify the module free of cost The contractor shall warrant that repaired module shall be free from all defects and faults in materials used workmanship It becomes necessary for the contractor to replace or renew any defective portion(s) of the module under this clause
b) Replacement under warranty clause shall be made by the contractor free of all charges at site including freight insurance and other incidental charges
c) If any defect is not remedied by the contractor within a reasonable time the BSNL BHUJ may proceed to get the defects remedied from other contractor etc at the contractors risk and expenses but without prejudice to any other rights which the BSNL BHUJ may have against the contractor in respect of such defects
Seal amp Signature of Bidder
14
SECTION- 4 (Part-A)
GENERAL INSTRUCTION TO BIDDERS (GIB)
1 DEFINITIONS
1 BSNL The BSNL means the BSNL Bhuj Telecom Dist under the Ministry of
Communications which invites the tenders on behalf of the General Manager Bhuj Telecom
District Includes executives in the BSNL whatever designations assigned to them from time
to time who may be the in-charge of direction supervision testing acceptance and
maintenance including their successor(s) in the office appearing in various clauses shall be
taken to mean the BSNL Bhuj Telecom District
b The SSA Head means the Head of SSA General Manager Bhuj Telecom District Bhuj and
his successors
c The jurisdiction of the SSA Head The jurisdiction of the SSA Head means Bhuj Telecom
District which coincides geographically with (Revenue District(s))
d Representative of (the SSA Head) Representative of (the SSA Head ) means Officer and
staff for the time being in Bhuj Telecom District deputed by the General Manager Bhuj for
inspecting or supervising the work of testing etc
e Engineer ndash in - charge The Engineer ndash in - charge means the Engineering Officer
nominated by the BSNL to supervise the work under the contract (Minimum Divisional
Engineer level Officer)
f Site Engineer Site Engineer shall mean an SDESDOJTO of the BSNL who may be placed by
the General Manager Bhuj Telecom District Bhuj as in ndash charge of the work at site at any
particular period of time
g AT Unit AT Unit shall mean Acceptance and Testing unit of the BSNL
h AT Officer An officer authorized by General Manger ndash Bhuj Telecom Dist
i Contract The term contract means the documents forming the tender and acceptance
thereof and the formal agreement executed between the competent authority on behalf of the
BSNL and the contractor together with the documents referred to therein including these
conditions the specifications designs drawings and instructions issued from time to time by
the engineer in ndash charge and all these documents taken together shall be deemed to form one
contract and shall be complementary to one another In the contract the following expressions
shall unless the context otherwise requires have the meanings hereby respectively assigned to
them The expression works or work shall unless there be something either in the subject
context repugnant to such construction be construed or taken to mean the works by or by
virtue of the contract contracted to be executed whether temporary or permanent and whether
original altered substituted or additional
j Contractor The contractor shall mean the individual firm or company enlisted or not
enlisted with BSNL Department of Telecom in accordance with procedure for contractor or
registered for carrying out the work of cable laying whether incorporated or not undertaking
the works and shall include the legal personal representative of such individual or the persons
composing such firm or company or the successors of such firm or company and the
permitted assignees of such individual firm or company
k Work The expression lsquoworksrsquo shall unless there be something either in the subject or context
repugnant to such construction be construct and taken to mean the works by or by virtue of the
Seal amp Signature of Bidder
15
contract contracted to be executed whether temporary or permanent and whether original
altered substituted or additional
l Schedule(s) Schedule(s) referred to in these conditions shall mean the relevant schedule(s)
or the standard schedule of rates mentioned in the document
m Site The site shall mean the land or other places on into or through which work is to be
executed under the contract or any adjacent land path or street through which the work is to
be exacted under the contract or any adjacent land path or street which may be allotted or
used for the purpose of carrying out the contract
n Normal time or stipulated time Normal time or stipulated time means time specified in the
ERP PO to complete the work
o Extension of Time Extension of Time means the time granted by the BSNL to complete the
work beyond the normal time or stipulated time
p Exceptional risk Exceptional risks are risk due to war(whether declared or not) invasion act
of foreign enemies hostilities civil war rebellion revolution insurrection military or
usurped power any acts of Government damages from aircraft acts of God such as
earthquake lightening and unprecedented floods and other causes over which the contractor
has no control and the same having been accepted as such by the Accepting Authority or
causes solely due to use or occupation by the government of the part of the work in respect of
which a certificate of completion has been issued
q The ERP PO means the Order placed by the field units on the contractor signed by
the unit incharge r The Contract Rate means the rate payable to the repairer under the work order for
the full and proper performance of its contractual obligations
2 ELIGIBLE BIDDERS Kindly refer to clause 4 of Section ndash 1 Part A ie Detailed NIT
3 COST OF BIDDING
The bidder shall bear all costs associated with the preparation and submission of the bid The
BSNL will in no case be responsible or liable for these costs regardless of the conduct or
outcome of the bidding process
4 BID DOCUMENTS
41 The goods services required to be supplied bidding procedures and contract terms are prescribed
in the Bid Documents The contents of the Bid documents are specified in the covering letter
42 The Bidder is expected to examine all instructions forms terms and specifications in the Bid
Documents Failure to furnish all information required as per the Bid Documents or submission
of bids not substantially responsive to the Bid Documents in every respect will be at the bidders
risk and may result in rejection of the bid
5 CLARIFICATION OF BID DOCUMENTS
51 A prospective bidder requiring any clarification on the Bid Documents shall notify the User in
writing by FAX or by Email of the User as indicated in the invitation of Bid The User shall
respond in writing to any request for the clarification of the Bid Documents which it receives
7days prior to the date of opening of the Tenders Copies of the query (without identifying the
source) and clarifications by the User shall be uploaded on BSNL website as lsquoClarificationsrsquo on
e-procurement portal of Bhuj Telecom District portal clarification shall be available as
lsquoAddendumrsquo for all the prospective bidders who have downloaded the official copy of tender
documents from e-procurement portal of Bhuj Telecom District
Seal amp Signature of Bidder
16
52 Any clarification issued by BSNL in response to query raised by prospective bidders shall form
an integral part of bid documents and it may amount to an amendment of relevant clauses of the
bid documents
6 AMENDMENT OF BID DOCUMENTS
61 The BSNL may for any reason whether at its own initiative or in response to a clarification
requested by a prospective Bidder may modify bid documents by amendments prior to the date
of submission of Bids with due notification to prospective Bidders
62 The amendments shall be notified in writing or by Fax or by Addendum through e-tendering
portal to all prospective bidders on the address intimated at the time of purchase of bid document
from the BSNL and these amendments will be binding on them
63 In order to afford prospective bidders reasonable time in which to take the amendments into
account in preparing their bids the BSNL may at its discretion extend the deadline for the
submission of bids suitably
7 DOCUMENTS COMPRISING THE BID
The bid prepared by the bidder shall comprise the components specified in Section 2 of this
Tender
8 BID FORM
The bidder shall complete the Bid Form and the appropriate Price Schedule furnished in the Bid
Documents as per Section- 8
9 BID PRICES
91 The bidder shall give the total composite price inclusive of all levies and taxes packing
forwarding freight and insurance in case of materials to be supplied and inclusive of all taxes
and levies except GST in case of works to be executed GST will be paid extra as applicable
The contractor shall be responsible for transporting the materials to be supplied by the BSNL
(At the field Unit Telecom Store or otherwise) to execute the work under the contract to site at
histheir own cost The costs of transportation are subsumed in the standard Schedule Rates and
therefore no separate charges are payable on this account The offer shall be firm in Indian
Rupees
92 The price quoted by the bidder shall remain fixed during the entire period of contract and shall
not be subject to variation on any account A bid submitted with an adjustable price quotation
will be treated as non-responsive and rejected
93 Discount if any offered by the bidders shall not be considered unless they are specifically
indicated in the schedule of rates (financial Bid) Bidders desiring to offer discount shall
therefore modify their offers suitable while quoting and shall quote clearly net price taking all
such factors like Discount free supply etc into account
10 DOCUMENTS ESTABLISHING BIDDERS ELIGIBILITY AND QUALIFICATIONS Kindly refer to clause of Section ndash 1 and 2 of this bid
11 NA
12 BID SECURITYEMD
121 The bidder shall furnish as part of its bid a bid security one of the following ways-
(a) Demand Draft Bankerrsquos cheque from a Nationalizedscheduled bank drawn in favour
of AO (Cash) BSNL Oo GMTD Bhuj and payable at Bhuj
(b) Bank GuaranteeFDR from a Nationalizedscheduled bank drawn in favour of AO
(Cash) BSNL Oo GMTD Bhuj which should be valid for 180 days from the tender
opening date
For educational order EMD to be submitted by bidder as 20 of 10 of estimated tender
cost for each case in the form of cash Demand Draft Bankerrsquos cheque Bank guaranteeFDR
issued by a NationalizedScheduled bank drawn in favour of AO (Cash) BSNL Oo GMTD
Bhuj Bank Guarantee should be valid for 180 days from the tender opening date
122 The MSE bidders are exempted from payment of bid security
Seal amp Signature of Bidder
17
a) A proof regarding valid registration with body specified by Ministry of Micro Small
amp Medium Enterprise for the tendered items will have to be attached along with the
bid
b) The enlistment certificate issued by MSME should be valid on the date of opening of
tender
c) MSE unit is required to submit its monthly delivery schedule
d) If a vender registered with body specified by Ministry of Micro Small amp Medium
Enterprise claiming concessional benefits is awarded work by BSNL and
subsequently fails to obey any of the contractual obligations he will be debarred from
any further work contract by BSNL for one year from the date of issue of such order
123 The bid security is required to protect the BSNL against the risk of bidders conduct which would
warrant the bid securityrsquos forfeiture pursuant to para 127
124 A bid not secured in accordance with para 121 amp 122 shall be rejected by the BSNL being non-
responsive at the bid opening stage and archived unopened on e-tender portal for e-tenders
125 The bid security of the unsuccessful bidder will be dischargedreturned as promptly as possible
as but not later than 30 days after the expiry of the period of bid validity prescribed by the
BSNL pursuant to clause 13
126 The successful bidders bid security will be discharged upon the bidders acceptance of the
advance Purchase Order satisfactorily pursuant to clause 27 and furnishing the performance
security
The successful bidders bid security may be converted to Part Performance Security Deposit in
accordance with clause 28
127 The bid security may be forfeited
a) If the bidder withdraws or amends its bid or impairs or derogates from the bid in any
respect during the period of bid validity specified by the bidder in the bid form or
extended subsequently or
b) If the bidder does not accept the APO AWO and or does not submit PBG amp sign the
contract agreement in accordance with clause 28
Note - The bidder shall mean individual company firm or the front bidder and its technology
consortium partner as applicable
13 PERIOD OF VALIDITY OF BIDS
131 Bid shall remain valid for 150 days from the date of bid opening prescribed by the BSNL A bid
valid for a shorter period shall be rejected by the BSNL as non-responsive
132 In exceptional circumstances the BSNL may request the bidders consent for an extension to the
period of bid validity The request and the responses thereto shall be made in writing The bid
security provided under Clause 12 shall also be suitably extended A bidder may refuse the
request without forfeiting his bid security A bidder accepting the request and granting extension
will not be permitted to modify his bid
14 FORMAT AND SIGNING OF BID
141 The bidder shall submit his bid online (in case of e-tendering) amp through sealed envelopes
physically (in case of tenders with manual bidding process) complying all eligibility
conditions other terms and conditions of tender document to be read along with the
clarifications and amendments issued in this respect All the documents must be authenticated
using Digital Signature (DSC) with Class 2 or above (in case of e-tendering) amp by hand
signatures (for manual bidding process) by the authorized person The letter of authorization
shall be indicated by written power-of-attorney accompanying the bid
Note-The BSNL may ask the bidder(s) to supply besides original bid additional copy of bids as
required by him
142 The bid shall contain no interlineations erasures or overwriting except as necessary to correct
errors made by the bidder in which case such corrections shall be signed by the person or persons
signing the bid All pages of the original bid except for un-amended printed literatures shall be
digitally signed by the person or persons signing the bid
143 Power of Attorney
(a) The power of Attorney should be submitted and executed on the non-judicial stamp paper
Seal amp Signature of Bidder
18
of appropriate value as prevailing in the concerned states(s) and the same be attested by a
Notary public or registered before Sub-registrar of the state(s) concerned
(b) The power of Attorney be executed by a person who has been authorized by the Board of
Directors of the bidder in this regard on behalf of the Company institution Body
corporate
(c) In case of the bidder being a firm the said Power of Attorney should be executed by all the
partner(s) in favour of the said Attorney
(d) Attestation of the specimen signatures of authorized signatory by the Companyrsquos firmrsquos
bankers shall be furnished Name designation Phone number mobile number email
address and postal address of the authorized signatory shall be provided
(e) Individual signing the tenders or other documents connected with the contract shall indicate
the full name below the signature and must specify the capacity and authority under which
he signs such documents and shall also submit documentary evidence of his authority in
the form of Power of Attorney
(f) The Power of Attorney is to be submitted in original if it has been issued for the specific
tender enquiry If the power of attorney is issued in general irrespective of tender enquiry
then photocopy duly certified by notary public can also be accepted
(g) In case the representative of bidder company who uploads the document on e-tender portal
using his Digital Signature Certificates (DSC) which is different from the authorized
signatory for the bid (Power of Attorney holder) then the representative who uploads the
documents on e-tender portal using DSC issued in his name shall also be one of the Power
of Attorney holder by the bidder Company in addition to the authorized signatory for the
bid
15 SEALING AND MARKING OF BIDS
The bid shall be submitted online using single stage bidding and Two Envelope Methodology
151 The first envelope (Techno-commercial bid) This envelope shall contain documents of
bidders satisfying the eligibility Technical amp commercial conditions requirements Second
envelope will be named as financial bid containing price Schedule as per section 8 All
documents submitted will also be self attested by the bidder
152 a) The envelopes for Tender Fee EMD shall be addressed AGM (PLG) Oo GMTD
Haripar Road Bhuj - 370001
b) The envelope for Tender Fee EMD shall bear the name of the tender the tender number
and the words DO NOT OPEN BEFORE (due date amp time)
c) The envelopes for Tender Fee EMD shall indicate the name and complete postal address
of the bidder to enable the User to return the bid unopened in case it is declared to be received
late
d) The envelopes for Tender Fee EMD shall should be deposited in the tender box provided
by tendering authority or sent by registered post or delivered in person on above mentioned
address (address is given above) The responsibility for ensuring that the envelopes for Tender
Fee EMD shall are delivered in time would vest with the bidder
e) The envelopes for Tender Fee EMD shall delivered in person registered post on the day of
tender opening shall be delivered upto specified time amp date as stated in NIT to Oo GMTD
Haripar Road Bhuj - 370001 The User shall not be responsible if the envelopes for Tender
Fee EMD shall are delivered elsewhere
f) Venue of Tender Opening
Tender will be opened in Oo GMTD Haripar Road Bhuj - 370001 at specified time amp
date as stated in NIT If due to administrative reason the venue of Bid opening is changed it
will be displayed prominently on the above address
Seal amp Signature of Bidder
19
153 If envelopes are not sealed and marked as required at para 151 and 152 the bid shall be
rejected
16 SUBMISSION OF BIDS
161 Bids must be submitted by the bidders on or before the specified date amp time indicated in
Section-1 ie DNIT
162 The BSNL may at its discretion extend this deadline for the submission of the bids by
amending the bid documents in accordance with Clause 6 in which case all rights and
obligations of the BSNL and bidders previously subject to the deadline will thereafter be
subject to the deadline as extended
163 The bidder shall submit his bid offer against a set of bid documents purchased by him for all
or some systemservices equipment as per requirement of the Bid Documents He may
include alternate offer if permissible as per the bid However not more than one independent
and complete offer shall be permitted from the bidder
164 Bid must be submitted by the bidder through E-Tendering mode only Manual submission of bid
shall not be needed
17 LATE BIDS
No bid shall be accepted either online by E-Tender Portal or physically in case of manual
bidding process after the specified deadline for submission of bids prescribed by the purchaser
18 MODIFICATION AND WITHDRAWAL OF BIDS
181 The bidder may modify revise or withdraw his bid after submission prior to deadline prescribed
for submission of bid If a bid is withdrawn the same shall be archived unopened in the e-
procurement portal of Bhuj Telecom District
182 The bidderrsquos modification revision or withdrawal shall have to be online and digitally
authenticated as per clause 15
183 Subject to clause 20 no bid shall be modified subsequent to the deadline for submission of bids
19 OPENING OF BIDS BY BSNL
191 The purchaser shall open bids online in the presence of bidders or their authorized representatives
who chose to attend at time specified in Clause 7 of Detailed NIT(Section-1) on due date The
bidderrsquos representatives who are present shall sign in an attendance register Authority letter to
this effect shall be submitted by the bidders before they are allowed to participate in bid opening
(As per Format given in section 2 Part B)
192 A maximum of two representatives for any bidder shall be authorized and permitted to attend
the bid opening
193 (i) The bids will be opened in two stages ie techno-commercial bid shall be opened on the date
of tender opening given in NIT The financial bid will not be opened on the date of opening of
techno commercial bids
The financial bids of those bidders who are approved to be techno commercially compliant by
the competent authority will be opened by TOC in front of techno-commercially eligible
bidders authorized representatives by sending them a suitable notice
(ii) The bidderrsquos names Item name EMD amount amp validity and acceptability Information in
respect of eligible bidders Details of bid modification withdrawal (if any) and such other
details as the purchaser at its discretion may consider appropriate will be made available
online at the time of techno-commercial bid opening
(iii) The bidderrsquos names Name of the Items Quantitiesprices quoted in the bid discount if
offered Taxes amp levies and such other details as the purchaser at its discretion may consider
appropriate will be made available online at the time of financial bid opening
194 The date fixed for opening of bids if subsequently declared as holiday by the BSNL the revised
date of schedule will be notified However in absence of such notification the bids will be
opened in the next working day time and venue remaining unaltered
20 CLARIFICATION OF BIDS
201 To assist in the examination evaluation and comparison of bids the BSNL may at its discretion
Seal amp Signature of Bidder
20
ask the bidder for the clarification of its bid The request for the clarification and the response
shall be in writing However no post bid clarification at the initiative of the bidder shall be
entertained
202 If any of the documents required to be submitted along with the technical bid is found wanting
the offer is liable to be rejected at that stage However the BSNL at its discretion may call for
any clarification regarding the bid document within a stipulated time period The BSNL at itrsquos
discretion may also ask for the submission of any additionalmissing document(s) within a
stipulated time period In such case(s) the bidder shall have to comply the BSNLrsquos requirement
within the specified time In case of non-compliance to such queries the bid will be out rightly
rejected without entertaining further correspondence in this regardrdquo However no post bid
clarification at the initiative of the bidder shall be entertained
21 PRELIMINARY EVALUATION
211 BSNL shall evaluate the bids to determine whether they are complete whether any
computational errors have been made whether required sureties have been furnished whether
the documents have been properly signed and whether the bids are generally in order
212 Arithmetical errors shall be rectified on the following basis If there is a discrepancy between
the unit price and total price that is obtained by multiplying the unit price and quantity the
unit price shall prevail and the total price shall be corrected by the BSNL
213 If there is a discrepancy between words and figures the amount in words shall prevail If the
SupplierBidder does not accept the correction of the errors his bid shall be rejected
214 Prior to the detailed evaluation pursuant to clause 22 the BSNL will determine the substantial
responsiveness of each bid to the Bid documents For purposes of these clauses a substantially
responsive bid is one which conforms to all the terms and conditions of the Bid Documents
without material deviations The BSNLs determination of bids responsiveness is to be based
on the contents of the bid itself without recourse to extrinsic evidence
215 A bid determined as substantially non-responsive will be rejected by the BSNL and shall not
subsequent to the bid opening be made responsive by the bidder by correction of the non-
conformity
216 The BSNL may waive any minor infirmity or non-conformity or irregularity in a bid which
does not constitute a material deviation provided such waiver does not prejudice or affect the
relative ranking of any bidder
22 EVALUATION AND COMPARISON OF SUBSTANTIALLY RESPONSIVE BIDS
221 The Purchaser shall evaluate in detail and compare the bids previously determined to be
substantially responsive pursuant to Clause 21
222 The evaluation will be made on the basis of lowest rate quoted as under Lowest Rate
= (rate quoted for 25AMP Qty +rate quoted for 50AMP 100 AMP Qty + rate
quoted for Control Panel of Power Plant Qty) The bidder who has offered lowest
rate as evaluated above will be treated as L1 bidder 23 CONTACTING THE BSNL
231 Subject to Clause 20 no bidder shall try to influence the BSNL on any matter relating
to its bid from the time of the bid opening till the time the contract is awarded
232 Any effort by a bidder to modify its bid or influence the BSNL in the BSNLs bid evaluation
bid comparison or contract award decisions shall result in the rejection of the bid
24 PLACEMENT OF ORDER
241 The BSNL may consider placement of orders to execute the contract on those bidders whose
offers have been found technically commercially and financially acceptable The BSNL reserves
the right to counter offer price(s) against price(s) quoted by any bidder
The work against the tender is for one yearrsquos requirement and the terms and conditions of
this tender shall be operative for a period of one year from the date of signing of agreement
between the Company and the contractor with an option of extension for a further period
of one year at the same rates terms amp conditions
Seal amp Signature of Bidder
21
Distribution of Work Distribution of quantities for ordering to the selected bidders of a tender
Table 1(A) (Without provisions for MSE Units)
No of Bidders
to be approved
(Col 1)
Quantity allotted to the respective bidder
(Col 2)
L1 L2
One Bidder 100 Nil
Two Bidder 60 40
Table 1(B) (With provisions for MSME Units)
No of Bidders
to be approved
(Col 1)
Quantity allotted to the respective bidder (Col 2)
Qty
Earmarked for MSME
bidder(s)(Col 3)
L1 L2
One Bidder 80 Nil 20
Two Bidder 48 32 20
1) In case L2 and MSE bidder accepts the L1 rate in prescribed time amp do not submit MSD as per
tender terms and conditions the EMD will be forfeited If MSE bidder exceeded more than one than
20 work at L1 rate distributed among them
242 TERMS AND CONDITIONS FOR EDUCATIONAL ORDER
(a) 10 of the estimated quantity of work will be extended to inexperienced contractor for each
Tender
(b) Inexperienced Bidder has to apply separately for each Tender
(c) In case there are more than one bidder work will be distributed into the bidders
(d) The bidder shall not submit financial bid In case if the same is submitted then it will not be opened
(e) BSNL reserves a right to give any area to this bidder including that of other tender in which the
bidder has not participated
(f) The work to the inexperienced is a limited quantity (up to 10) in at a time further work will be
done on the basis of evaluation of field unit Additional quantity of work shall be given to such
contractor only after completion of initial work
(g) The payment for repairing to such contractors shall be based on L1 rates finalized in the tender
The payment will be released only after verification of quantity amp quality done as per the
instruction mentioned in respect of work in the tender
(h) All the other Terms amp conditions will remain the same
25 BSNLS RIGHT TO VARY QUANTITIES AT TIME OF AWARD
(a) BSNL reserves the right to vary up to 25 of the quantity of goods and services specified in
the schedule of requirements without any change in the unit price or other terms and conditions at
the time of award of contract
(b) BSNL also reserves the right for placement of additional order or up to 50 of the
additional quantities of goods and services contained in the running tender contract in the tender
at the same rate or a rate negotiated (downwardly) with the existing venders considering the
reasonability of rates based on prevailing market conditions and the impact of reduction in duties
and taxes etc and supplies to be obtained within delivery period scheduled afresh
No guarantee can be given to actual quantity The quantity mentioned in the tender is
tentative only No claim should entertained for less not allotting the quantum of work for any
reason
(c) In exceptional situation where the requirement is of an emergent nature and it is necessary to
ensure continued supplies from the existing venders the purchaser reserves the right to place
repeat order up to 100 of the quantities of goods and services contained in the running tender
contract at the same rate or a rate negotiated (downwardly) with the existing venders considering
the reasonability of rates based on prevailing market conditions and the impact of reduction in
duties and taxes etc Exceptional situation and emergent nature should be spelt out clearly
detailing the justification as well as benefits accrued out of it and loss incurred in case this
provision is not invoked and approved by the authority competent to accord administrative and
Seal amp Signature of Bidder
22
financial approval for the procurement calculated on the basis of total procurement ie initial and
proposed add-on quantity
26 BSNLS RIGHT TO ACCEPT ANY BID AND TO REJECT ANY OR ALL BIDS
The BSNL reserves the right to accept or reject any bid and to annul the bidding process and
reject all bids at any time prior to award of contract without assigning any reason whatsoever and
without thereby incurring any liability to the affected bidder or bidders on the grounds for the
BSNLs action
27 ISSUE OF ADVANCE WORK ORDER
271 The issue of an Advance Work Order (Letter of Intent) shall constitute the intention of BSNL to
enter into the contract with the bidder
272 The bidder shall within 14 days of issue of an advance work order give his acceptance along with
Performance Security Deposit in conformity with section 7(B) provided with the bid documents
28 SIGNING OF CONTRACT
281 The issue of FAT shall constitute the award of contract on the bidder
282 As soon as the tender is approved by the competent authority the Bid Security deposited by the
successful bidder may be converted into the Performance security deposit which will be held by
the BSNL till the completion of warranty period
29 ANNULMENT OF AWARD
Failure of the successful bidder to comply with the requirement of Clause 27 amp 28 shall
constitute sufficient ground for the annulment of the award and forfeiture of the bid security in
which event the BSNL may make the award to any other bidder at the discretion of BSNL or call
for new bids
30 NA
31 REJECTION OF BIDS
311 While all the conditions specified in the Bid documents are critical and are to be complied special
attention of bidder is invited to the following clauses of the bid documents Non-compliance of any
one of which shall result in outright rejection of the bid
(i) Clause 15 of Section 4 Part A The bids will be recorded returned unopened if covers are not
properly sealed with lsquoPERSONAL SEALrsquo of the bidder
(ii) Clauses 121 122 amp 131 of Section 4 Part A The bids will be rejected at opening stage if Bid
security is not submitted as per Clauses 121 amp 122 and bid validity is less than the period
prescribed in Clause 131 mentioned above
(iii) Clause 2 amp 10 of Section 4 Part A If the eligibility condition as per clause 2 of Section 4 Part
A is not met andor documents prescribed to establish the eligibility as per Clause 10 of
section 4 Part A are not enclosed the bids will be rejected without further evaluation
(iv) Clause 112 of Section 4 Part A NA
(v) Section 5 Part A Commercial conditions Section 5 Part B Special Conditions of Contract
Compliance if given using ambiguous words like ldquoNotedrdquo ldquoUnderstoodrdquo ldquoNoted amp
Understoodrdquo shall not be accepted as complied Mere ldquoCompliedrdquo will also be not sufficient
reference to the enclosed documents showing compliances must be given
(vi) Section 8 Price Schedule Prices are not filled in as prescribed in Financial Bid
(vii) Section 4 Part A clause 93 on discount which is reproduced below
ldquoDiscount if any offered by the bidder shall not be considered unless specifically indicated in
the price schedule Bidders desiring to offer discount shall therefore modify their offer
suitably while quoting and shall quote clearly net price taking all such factors like discount
free supply etc into accountrdquo
312 Before outright rejection of the Bid by Bid-opening team for non-compliance of any of the
provisions mentioned in clause 311(i) 311 (ii) above the bidder company is given
opportunity to explain their position however if the person representing the company is not
satisfied with the decision of the Bid opening team hethey can submit the representation to
Bid opening team immediately but in no case after closing of the tender process with full
justification quoting specifically the violation of tender conditions if any
Seal amp Signature of Bidder
23
313 Bid opening team will not return the bids submitted by the bidders on the date of tender
opening even if it is liable for rejection and will preserve the bids in sealed cover as submitted
by taking signatures of some of the desirous representatives of the participating
biddercompanies present on the occasion
314 The In charge of the Bid opening team will mention the number of bids with name of
company found unsuitable for further processing on the date of tender opening and number of
representations received in Bid opening Minutes and if Bid opening team is satisfied with the
arguments of the biddercompany mentioned in their representation and feel that there is
prima-facie fact for consideration the in charge of the Bid opening team will submit the case
for review to competent authority ie GMTD BHUJ as early as possible preferably on next
working day and decision to this effect should be communicated to the bidder company within
a week positively Bids found liable for rejection and kept preserved on the date of tender
opening will be returned to the bidders after issue of POfinal acceptance of tender against
the instant tender
315 If the reviewing officer finds it fit to open the bid of the petitioner this should be done by
giving three (working) days notice to all the participating bidders to give opportunity to
desirous participants to be present on the occasion
32 ACTION BY PURCHASER AGAINST BIDDER(S) VENDOR(S) IN CASE OF
DEFAULT In case of default by Bidder(s) Vendor(s) such as
a) Does not supply the equipment services in time
b) Equipment Services does not perform satisfactory in the field in accordance with the
specifications
c) Or any other default whose complete list is enclosed in Appendix-1
Purchaser will take action as specified in Appendix-1 of this section
33 DELETED
34 NEAR-RELATIONSHIP CERTIFICATE
341 The bidder should give a certificate that none of his her near relative as defined below is
working in the units where he is going to apply for the tender In case of proprietorship firm
certificate will be given by the proprietor For partnership firm certificate will be given by all
the partners and in case of limited company by all the Directors of the company excluding
Government of India Financial institution nominees and independent non-Official part time
Directors appointed by Govt of India or the Governor of the state and full time Directors of
PSUs both state and central Due to any breach of these conditions by the company or firm or
any other person the tender will be cancelled and Bid Security will be forfeited at any stage
whenever it is noticed and BSNL will not pay any damage to the company or firm or the
concerned person
342 The Company or firm or the person will also be debarred for further participation in the
concerned unit
343 The near relatives for this purpose are defined as-
(a) Members of a Hindu undivided family
(b) They are husband and wife
(c) The one is related to the other in the manner as father mother son(s) amp Sons
wife(daughter in law) Daughter(s) and daughters husband (son in law) brother(s) and
brothers wife sister(s) and sisters husband (brother in law)
344 The format of the certificate is given in Section -2(D)
35 VERIFICATION OF DOCUMENTS AND CERTIFICATES
The bidder will ensure that all the documents and certificates including experience
performance and self certificates submitted by him are correct and genuine before enclosing
them in the bid The onus of proving genuineness of the submitted documents would rest with
the bidder If any document paper certificate submitted by the participant bidder is found
discovered to be false fabricated tempered manipulated either during bid evaluation or
during award of contract or thereafter then the Purchaser will take action as per Clause-1 of
Appendix-1 of this section
Seal amp Signature of Bidder
24
Appendix-1 to Section - 4 (Part-A)
S
No
Defaults of the bidder vendor Action to be taken
A B C
1(a) Submitting fake forged
i) Rejection of tender bid of respective Vendor
ii) Banning of business for 3 years which implies barring
further dealing with the vendor for procurement of Goods amp
Services including participation in future tenders invited by
BSNL for 3 years from date of issue of banning order
iii) Termination Short Closure of POWO if issued This
implies non-acceptance of further supplies work amp services
except to make the already received material work complete
work in hand
a) Bank Instruments with the bid to meet
terms amp condition of tender in respect of
tender fee and or EMD
b) Certificate for claiming exemption in
respect of tender fee and or EMD
c) detection of default at any stage from
receipt of bids till award of APO issue of
POWO
Note 1- However in this case the performance guarantee if alright will not be forfeited
Note 2- Payment for already received supplies completed work shall be made as per terms amp conditions of
PO WO
1(b)
Submitting fake forged documents towards
meeting eligibility criteria such as
experience capability supply proof
registration with GST Income Tax
departments etc and as supporting
documents towards other terms amp conditions
with the bid to meet terms amp condition of
tender
(i) If detection of default is prior to award
of APO
i) Rejection of Bid amp
ii) Forfeiture of EMD
(ii) If detection of default after issue of APO
but before receipt of PG SD (DDBG etc)
i) Cancellation of APO
ii) Rejection of Bid amp
iii) Forfeiture of EMD
(iii) If detection of default after receipt of
PG SD (DDBG etc)
i) Cancellation of APO
ii) Rejection of Bid amp
iii) Forfeiture of PG SD
However on realization of PG SD amount EMD if not
already released shall be returned
(iv) If detection of default after issue of PO
WO
i) Termination Short Closure of POWO and Cancellation
of APO
ii) Rejection of Bid amp
iii) Forfeiture of PG SD
However on realization of PG SD amount EMD if not
released shall be returned
Note 3- However settle bills for the material received in correct quantity and quality if pending items do
not affect working or use of supplied items
Note 4- No further supplies are to be accepted except that required to make the already supplied items
work
Special Note 1- Authority competent to take final decision GMTD Bhuj
2 If vendor or his representative uses violent
coercive means viz Physical Verbal means
to threatens BSNL Executive employees
and or obstruct him from functioning in
discharge of his duties amp responsibilities for
the following
Banning of business for 3 years which implies Barring
further dealing with the vendor for procurement of Goods amp
Services including participation in future tenders invited by
BSNL for 3 years from date of issue of banning order
a) Obstructing functioning of tender opening
executives of BSNL in receipt opening of
tender bids from prospective Bidders
suppliers Contractors
Seal amp Signature of Bidder
25
b) Obstructing Threatening other
prospective bidders ie suppliers
Contractors from entering the tender venue
and or submitting their tender bid freely
Special Note 1- Authority competent to take final decision GMTD Bhuj
3 Non-receipt of acceptance of APO AWO
and SD PG by L-1 bidder within time
period specified in APO AWO
Forfeiture of EMD
Special Note 1- Authority competent to take final decision GMTD Bhuj
41 Failure to supply and or Commission the
equipment and or execution of the work at
all even in extended delivery schedules if
granted against PO WO
i) Termination of PO WO
ii) Under take purchase work at the risk amp cost of
defaulting vendor
iii) Recover the excess charges if incurred from the PG SD
and outstanding bills of the defaulting Vendor
42 Failure to supply and or Commission the
equipment and or execution of the Work in
full even in extended delivery schedules if
granted against PO WO
i) Short Closure of PO WO to the quantity already
received by and or commissioned in BSNL and or in
pipeline provided the same is usable andor the Vendor
promises to make it usable
ii) Under take purchase work for balance quantity at the
risk amp cost of defaulting vendor
iii) Recover the excess charges if incurred from the PG SD
and outstanding bills of the defaulting Vendor
Special Note 1- Authority competent to take final decision for 41 amp 42 by DGM concerned
51 The supplied equipment does not perform
satisfactory in the field in accordance with
the specifications mentioned in the PO
WOContract
i) If the material is not at all acceptable then return the non-
acceptable material (or its part) amp recover its cost if paid
from the os bills PG SD
OR
ii) If the material is inducted in network amp it is not possible
to return it and or material is acceptable with degraded
performance the purchaser may determine the price for
need to be issued in compliant format and timely within the time prescribed under GST law
163 In case of any deficientincompleterejected supply BSNL shall convey the same in a reasonable
time to enable the supplier to issue credit note and take tax adjustment
164 It would be the responsibility of the supplier to declare correct information on invoice and GSTN
viz the amount the place of supply rate of tax etc In case the eligibility of input tax credit is
questioned or denied to BSNL on account of default by the supplier the same would be
recovered by BSNL from the contractor
165 Registered location of the both the parties ie BSNL and contractor should be mentioned in the
agreement with GSTIN No Further supplier should raise invoices at the registered premise of
BSNL for availing of credit and ensure that the place of supply as per GST law is same as
registered premise
166 BSNL could at any time instruct the contractor to raise its invoices at a particular location of
BSNL
Seal amp Signature of Bidder
39
167 It is the responsibility of the supplier to ensure that place of supply and the GSTN of BSNL are
in the same state If for any reason they are not in the same state the contractor shall intimate to
BSNL and give adequate time before raising of the invoice
168 E-waybill number should be mentioned on the invoices
169 contractor shall be responsible for timely issuance and delivery of invoice DN CN to enable
BSNL to claim tax benefit on or before the stipulated time period provided by the GST law
(a) It is the responsibility of the contractor to ensure that outward supply return (GSTR-1) would be
filed correctly If not than cost would be borne by supplier
(b) Reporting of correct outward supply by supplier in the outward return (GSTR-1) is the
responsibility of the supplier In case of mismatch because of contractorrsquos fault prompt
amendments must be made by the supplier else supplier would be required to indemnify BSNL
of the loss of credit due to mis-match The compliances to be adhered by contractor includes
(but is not limited to) the following
(i) Uploading appropriate invoice details on the GSTN within the stipulated time
(ii) Issuing GST compliant invoice CN DN PO issued by BSNL should be referred by
contractor for capturing information on the invoice
(iii) Contractor needs to pay the entire self-assessed tax on timely basis
(iv) Where invoice is not uploaded or incorrect upload of invoice detail of GSTN by supplier
then credit on such invoice will be given provisionally subject to matching So acceptance of
changes made by BSNL on GSTN on account of non-upload or incorrect upload of invoice
details on GSTN is to be submitted by supplier Such changes wrt the mismatch are required
to be accepted by supplier within the time limit prescribed under the GST law It should be
noted that in case supplier does not accept such changes within the time limit prescribed under
GST law the loss of input tax credit (if any) would be recovered from the supplier In case of
mismatch because of Suppliers fault prompt amendments must be made by the supplier else
supplier would be required to indemnify BSNL for the losses of credit and interest paid due to
mismatch
(v) contractor to issue all necessary documentation and perform all necessary compliances for
BSNL to be eligible to claim the input tax credit of GST tax to them In case BSNL is unable to
claim the input tax credit the amount wrt GST charged by the supplier would be recovered
from the supplier
1610 Refer) for clause stating that all the details of supplier (name address GSTN unregistered
supplier place of supply SAC HSN code etc) and other mandatory details shall be mentioned on the
invoice
1611Where the location agreed are more than one state then separate invoice state wise to claim
input tax credit in a particular state (typically happens in a bill to-ship to scenario) shall have to be
submitted
1612 It shall be the responsibility of the supplier to mention State of place of supply of goodsservices
in the invoice issued to BSNL
Seal amp Signature of Bidder
40
SECTION ndash 5 (Part-B)
SPECIAL CONDITIONS OF CONTRACT (SCC)
1 GENERAL
No official of Gazetted rank or other Gazetted officer employed in Engineering or administrative
duties in an Engineering BSNL or any other BSNL of the BSNL is allowed to work as a contractor for
a period of two years after his retirement from BSNL service without the previous permission of
BSNL This contract is liable to be cancelled if either the contractor or any of his employee is found at
any time to be such a person who hadnrsquot obtained the permission of BSNL as aforesaid before
submission of the engagement in the contractorrsquos service as the case may be
2 Material Handed over by The BSNL
21 The contractor shall transport (including loading and unloading) all stores issued to him from
Field Unit Telecom Store to the site of work at his own cost The BSNL shall not pay any
transportation charges to the contractor
22 All materials handed over to the contractor by the BSNL shall remain the absolute property of
BSNL and shall not be removed form site of the work except for use in the work and shall be at all
times open to inspection by the Representative of GMTD BHUJ
23 The contractor shall be responsible for the transportation of store storage and safe custody of all
material supplied to him by the BSNL which in the contractorrsquos custody whether or not installed in
the work The contractor shall satisfy himself regularly the quantity and quality of the materials
supplied to him and he will be responsible for any subsequent deterioration and discrepancy (inclusive
of theft) in the quantity quality the materials
3 LABOUR WELFARE MEASURES AND WORKMAN COMPENSATION
(AS APPLICABLE)
31 Obtaining License before commencement of work
The contractor shall obtain a valid labour license (if applicable) under the Contact Labour (RampA) Act
1919 and the Contract Labour (Regulation and Abolition) Central Rules 1971 before commencement
of the work and continue to have a valid license until the completion of work The contractor shall
also abide by the provisions of the Child Labour (Prohibition and Regulation) Act 1986 Any failure
to fulfill this requirement shall attract the penal provisions of this contract arising out of the resultant
non-execution of work
32 Contractors labour Regulations
321 Working Hours
3211 Normally working hours of an employee should not exceed 9 hours a day The working
day shall be so arranged the inclusive of interval for rest if any it shall not spread over
more than12 hours on any day
3212 When a worker is made to work for more than 9 hours on any day or for more than 48
hours in any week he shall be paid over time for the extra hours put in by him
3213 Every worker shall be given a weekly holiday normally on a Sunday in accordance with
the provisions of minimum Wages (Central Rules 1960 as amended from time to time
irrespective of whether such worker is governed by the Minimum Wages Act or not
3214 Where the minimum wages prescribed by the Government under the Minimum Wages
Act are not inclusive of the wages for the weekly day of rest the worker shall be entitled
to rest day wages at the rate applicable to the next preceding day provided he has
worked under the same contractor for a continuous period of not less than 6 days
3215 Where a contractor is permitted by the Engineer-in-Charge to allowed a worker to work
on a normal weekly holiday he shall grant a substituted holiday to him for the whole day
Seal amp Signature of Bidder
41
on one of the five days immediately before or after the normal weekly holiday and pay
wages to such worker for the work performed on the normal weekly holiday at the
overtime rate
322 Display of Notice Regarding Wages Etc
The contractor shall before he commences his work on contract display and correctly
maintain and continue to display and correctly maintain in a clear and legible condition
in conspicuous places on the work notices in English and in local Indian languages
spoken by the majority of the workers giving the minimum rates of the wages fixed
under Minimum Wages Act the actual wages being paid the hours of work for which
such wage are earned wages periods dates of payments of wages and other relevant
information
323 Payment of Wages
3231 The contractor shall fix wage periods in respect of which wages shall be payable
3232 No wage period shall exceed one month
3233 The wages of every person employed as contract labour in an establishment or by a
contractor where less than one thousand such persons are employed shall be paid before
the expiry of seventh day and in other cases before the expiry of tenth day after the last day
of the wage period in respect of which the wages are payable
3234 Where the employment of any worker is terminated by or on behalf of the contractor the
wages earned by him shall be paid before the expiry of the second working day from the
date on which his employment is terminated
3235 All payment of wages shall be made on a working day at the work premises and during the
working time and on a date notified in advance and in case the work is completed before
the expiry of the wage period final payment shall be made within 48 hours of the last
working day
3236 Wages due to every worker shall be paid to him direct or to other person authorized by him
in this behalf
3237 All wages shall be paid in current coin or currency or in both
3238 Wages shall be paid without any deductions of any kind except those specified by the
Central Government by general or special order in this behalf or permissible under the
Payment of Wages Act 1956
3239 A notice showing the wages period and the place and time of disbursement of wages shall
be displayed at the place of work and a copy sent by the contractor to the Engineer ndashin-
Charge under acknowledgement
32310 It shall be the duty of the contractor to ensure the disbursement of wages in presence of the
site Engineer or any other authorized representative of the Engineer-in-Charge who will be
required to be present at the place and time of the disbursement of wages by the contractor
to workmen
32311 The contractor shall obtain from the site Engineer or any other authorized representative of
the Engineer-in-Charge as the case may be a certificate under his signature at the end of
the entries in the ldquoRegister of Wages ldquo or the ldquoWage-cum-Muster Rollrdquo as the case may
be in the following form -
ldquoCertified that the amount shown in the column Nohelliphelliphelliphelliphas been paid to the
workman concerned in my presence on helliphelliphelliphelliphelliphellip at helliphelliphelliphelliphelliphelliphelliphelliphelliprdquo
32312 Fines and deductions which may be made from wages
A The wages of a worker shall be paid to him without any deduction of any kind except the
following -
a) Fines
(b) Deductions for absence from duty ie from the place or the places where by the terms of
his employment he is required to work The amount of deduction shall be in proportion
to the period for which he was absent
(c) Deductions for damage to or loss of goods expressly entrusted to the employed person
for custody or for loss of money or any other deductions which he is required to
account where such damage or loss is directly attributable to his neglect or default
Seal amp Signature of Bidder
42
(d) Deduction for recovery of advances or for adjustment of over payment of wages
advances granted shall be entered in register
(e) Any other deductions which the Central Government may form time to time allow
B No fines should be imposed on any worker save in respect of such acts and omissions
on his part as have been approved of by the Labour Commissioner
C No fine shall be imposed one worker and no deduction for damage or loss shall be
made from his wages until the worker has been given an opportunity of showing cause
against such fines or deductions
D Every fine shall be deemed to have been imposing on the day of the act or omission in
respect of which it was imposed
524 Labor records 1 The contractor shall maintain a Register of Persons employed on work on contract in
Form XIII of the Contract Labour (RampA) Central Rules 1971
2 The contractor shall maintain a Muster Roll register in respect of all workmen
employed by him on the work under Contract in Form XVI of the CL (RampA) Rules
1971
3 The contractor shall maintain a Wage Register in respect of all workmen employed by
him on the work under contract in From XVII of the CL (RampA) Rules 1971
4 Register of accidents- The contractor shall maintain a register of accidents in such
form as may be convenient at the work place but the same shall include the following
particulars
(a) Full Particulars of the laborers who met with accident
(b) Rate of wages
(c) Sex
(d) Age
(e) Nature of accident and cause of accident
(f) Time and date of accident
(g) Date and time when admitted in hospital
(h) Date of discharge from the hospital
(i) Period of treatment and result of treatment
(j) Percentage of loss of earning capacity and disability as assessed by
Medical officer
(k) Claim required to be paid under Workmenrsquos Compensation Act
(l) Date of payment of compensation
(m) Amount paid with details of the person to whom the same was paid
(n) Authority by whom the compensation was assessed
(o) Remarks
5 The contractor shall maintain a Register of Fines in the Form XII of the CL(RampA)
Rules 1971 the Contractor shall display in a good condition and in a conspicuous
place of work the approved list of acts and commission for which fines can be
imposed
6 The contractor shall maintain a Register of deductions for damage or loss in Form
XX of the CL (RampA) Rules 1971
7 The contractor shall maintain a Register of Advances in Form XXIII of the CL
(RampA) Rules 1971
8 The contractor shall maintain a Register of Overtime in Form XXIII of the CL
(RampA) Rules 1971
9 Attendance card-cum wage slip a The contractor shall issue an Attendance card cum wage slip to each workman
employed by him
b The card shall be valid for each wage period
Seal amp Signature of Bidder
43
c The contractor shall mark the attendance of each workman on the card twice each
day once at the commencement of the day and again after the rest interval before
he actually starts work
d The card shall remain in possession of the worker during the wage period under
reference
e The contractor shall complete the wage slip portion on the reverse of the card at
least a day prior to the disbursement of wages in respect of the wage period under
reference
f The contractor shall obtain the signature or thumb impression of the worker on the
wag slip at the time of disbursement of wages and retain the card with him
10 Employment card The contractor shall issue an Employment Card in the Form XIV of CL (RampA) Central Rules
1971 to each worker within three days of the employment of the worker
11 Service certificate
On termination of employment for any reason whatsoever the contractor shall issue to the
workman whose services have been terminated a Service Certificate in the Form XV of the
CL (RampA) Central Rules 1971
12 Preservation of labour records The labour records and records of Fines and deductions shall be preserved in original for a
period of three years from the date of last entries made in them and shall be made available for
inspection by the Engineer-in-Charge or Labour Officer or any other officers authorized by the
Ministry of Communication in this behalf
13 Power of labour officer to make investigations or enquiry The labour officer or any person authorized by the Central Government on their behalf shall
have power to make enquiries with a view to ascertaining and enforcing due and proper
observance of Fair Wage Clauses and provisions of these Regulations He shall investigate
into any complaint regarding the default made by the contractor in regard to such provision
14 Report of Investigating officer and action thereon The labour Officer or other persons authorized as aforesaid shall submit a report of result of
his investigation or enquiry to the Engineer in-Charge indicating the extent if any to which
the default has been committed with a note that necessary deductions from the contractorrsquos bill
be made and the wages and other dues be paid to the labourers concerned The Engineer in-
Charge shall arrange payments to the labour
concerned within 45 days from the receipt of the report from the Labour Officer or the
authorized officer as the case may be
15 Inspection of Books And slips The contractor shall allow inspection of all the prescribed labour records to any of his workers
or to his agent at a convenient time and place after due notice is received or to the Labour
Officer or any other person authorized by the Central Government on his behalf
16 Submission of Returns The contractor shall submit periodical returns as may be specified form time to time
17 Amendments
The Central Government may from time to time add to or amend the regulations and on any
question as to the applicationinterpretation or effect of those regulations
Contractor must fulfill the terms and condition towards fulfillmentscompliance of the
provision of EPF amp Miscprovision act 1952 amp Employment provident Fund Scheme 1952 in
respect of laborersemployees engaged by the contractor Contractor must submit declaration
form regarding compliance of the condition of EPF act 1952
525 INSURANCE Without limiting any of his other obligations or liabilities the contractor shall at his own
expense take and keep comprehensive insurance including third party risk for the plant
machinery men materials etc brought to the site and for all the work during the execution
The contractor shall also take out workmenrsquos compensations insurance as required by law and
under take to indemnify and keep indemnified the Government from and against all manner of
Seal amp Signature of Bidder
44
claims and demands and losses and damages and cost (including between attorney and client)
charges and expenses that may arise in regard the same or that the Government may suffer or
incur with respect to endor incidental to the same The contractor shall have to furnish
originals and or attested copies as required by the BSNL of the policies of insurance taken
within 15 (fifteen) days of being called upon to do so together with all premium receipts and
other papers related thereto which the BSNL may require
526 COMPLIANCE WITH LAWS AND REGULATION
During the performance of the works the contractor shall at his own cost and initiative
fully comply with all applicable laws of the land and with any and all applicable by-laws
rules regulations and orders and any other provisions having the force of law made or
promulgated or deemed to be made or promulgated by the Government Governmental
agency or BSNL municipal board Government of other regulatory or Authorized body or
persons and shall provide all certificates or compliance therewith as may be required by
such applicable law By-laws Rules Regulations orders and or provisions The
contractor shall assume full responsibility for the payment of all contributions and pay roll
taxes as to its employees servants or agents engaged in the performance of the work
specified in the contractor documents If the contractor shall require any assignee or sub-
contract to comply with the provisions of the clause and in this connection the contractor
agrees as to undertake to save and hold the Government harmless and indemnified from
and against any all penalties actions suits losses and damages claims and demands and
costs (inclusive between attorney and client) charges and expenses whatsoever arising out
or occasioned indirectly or directly by failure of the contractor or any assignee or sub-
contractor to make full and proper compliance with the said by-laws Rules Regulations
laws and Order and provisions as aforesaid
6 TOOLS and PLANTS
The contractor shall provide at his own cost all tools plants appliances implements etc
required for proper execution of works The contractor shall also supply without charge
the requisite number of persons with the means and materials necessary for the purpose of
setting out works counting weighing and assisting the measurements for examination at
any time and from time to time Failing his so doing the same may be provided by the
Engineer-in-charge at the expense of the contractor and the expenses shall be deducted
from any money due to the contractor under this contract or otherwise
As per Para 367 of the recommendationobservation of Tenth Report of parliamentary
standing committee on labour Contractor would provide the same social security to the
labours engaged by him as is available to regular employees
As per Para 368 of the recommendationobservation of Tenth Report of parliamentary
standing committee on labour Contractor shall ensure implementation of equal pay for equal
work and also equal remuneration to men and women
Seal amp Signature of Bidder
45
SECTION ndash 7
PROFORMAS
7 (A) BID SECURITY EMD Guarantee
(To be typed on Rs100- non-judicial stamp paper)
Whereas (hereinafter called the Bidder) has submitted its bid datedfor
the supply of vide Tender Nohelliphelliphelliphelliphelliphelliphelliphellip dated KNOW ALL MEN by
these presents that WE OF having our registered office at
(hereinafter called the Bank) are bound unto Bharat Sanchar Nigam Limited (hereinafter
called the Purchaser) in the sum of Rs for which payment will and truly to be made of
the said Purchaser the Bank binds itself its successors and assigns by these present
THE CONDITIONS of the obligation are
1 If the Bidder withdraws his bid during the period of bid validity specified by the Bidder
on the Bid form or
2 If the Bidder having been notified of the acceptance of his bid by the Purchaser during the
period of bid validity
(a) fails or refuses to execute the Contract if required or
(b) fails or refuses to furnish the Performance Security in accordance with the instructions to
Bidders
We undertake to pay to the Purchaser up to the above amount upon receipt of its first written demand
without the purchaser having to substantiate its demand provided that in its demand the purchaser
will note that the amount claimed by it is due to it owning to the occurrence of one or both of the two
conditions specifying the occurred condition or conditions
This guarantee will remain in force as specified in clauses 12 and 282 of section 4 Part A of the Bid
Document upto and including THIRTY (30) days after the Period of bid validity and any demand in
respect thereof should reach the Bank not later than the specified datedates
Signature of the Bank Authority
Name
Signed in Capacity of
Name amp Signature of witness Full address of Branch
Address of witness Tel No of Branch
Fax No of Branch
Seal amp Signature of Bidder
46
7 (B) PERFORMANCE SECURITY BOND FORM
(To be typed on Rs100- non-judicial stamp paper)
Datedhelliphelliphelliphelliphellip
Sub Performance guarantee
Whereas General Manager Telecom Bhuj Telecom District Bhuj (hereafter referred to as BSNL) has issued an AWO no
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellipDated helliphelliphelliphellip20hellip awarding the work of
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip to Ms
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip(hereafter referred to as ldquoBidderrdquo) and BSNL has asked him to submit a performance guarantee
in favour of AO(Cash) BSNL Oo GMTD BHUJ of Rs helliphelliphelliphelliphelliphellip- (hereafter referred to as ldquoPG Amountrdquo) valid up
to helliphelliphelliphellip20helliphelliphellip (hereafter referred to as ldquoValidity Daterdquo)
Now at the request of the Bidder We helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellipBank
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip Branch having (Address) and Regd
office address as helliphelliphellip helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip (Hereinafter called lsquothe
Bankrdquo) agreed to give this guarantee as hereinafter contained
2 We ldquothe Bankrdquo do hereby undertake and assure to the BSNL that if in the opinion of the BSNL the Bidder has in any way
failed to observe or perform the terms and conditions of the said agreement or has committed any breach of its obligations
there-under the Bank shall on demand and without any objection or demur pay to the BSNL the said sum limited to PG
Amount or such lesser amount as BSNL may demand without requiring BSNL to have recourse to any legal remedy that may
be available to it to compel the Bank to pay the same
3 Any such demand from the BSNL shall be conclusive as regards the liability of Bidder to pay to BSNL or as regards the
amount payable by the Bank under this guarantee The Bank shall not be entitled to withhold payment on the ground that the
Bidder had disputed its liability to pay or has disputed the quantum of the amount or that any arbitration proceeding or legal
proceeding is pending between Bidder and BSNL regarding the claim
4 We the Bank further agree that the guarantee shall come into force from the date of its issue and shall remain in full force
and effect up to its Validity date
5 The Bank further agrees that the BSNL shall have the fullest liberty without the consent of the Bank and without affecting
in any way the obligations hereunder to vary any of the terms and conditions of the said agreement or to extend the time for
performance of the said agreement from any of the powers exercisable by BSNL against the Bidder and to forebear to enforce
any of the terms and conditions relating to the said agreement and the Bank shall not be relieved from its liability by reason
of such failure or extension being granted to Bidder or through any forbearance act or omission on the part of BSNL or any
indulgence by BSNL to Bidder or any other matter or thing whatsoever which under the law relating to sureties would but for
this provision have the effect of relieving or discharging the guarantor
6 Notwithstanding anything herein contained
(a) The liability of the Bank under this guarantee is restricted to the PG Amount and it will remain in force up to its Validity
date
(b) The guarantee shall stand completely discharged and all rights of the BSNL under this Guarantee shall be extinguished if
no claim or demand is made on us in writing on or before its validity date
7 In case BSNL demands for any money under this bank guarantee the same shall be paid through bankerrsquos Cheque in
favour of ldquoAO(Cash) BSNL Oo GMTD BHUJ rdquo payable at Bhuj
8 The Bank guarantees that the below mentioned officer who have signed it on behalf of the Bank have authority to give this
guarantee under its delegated power
Place helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip
Date helliphelliphelliphelliphelliphelliphelliphelliphelliphellip (Signature of the Bank Officer)
Rubber stamp of the bank
Authorized Power of Attorney Number helliphelliphelliphelliphelliphellip
Name of the Bank officer helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip
Having examined the tender documents terms and conditions stipulated therein specifications of work
etc we the under signed offer to execute the repair Works in conformity with the said specifications and
conditions of contract as under
Sl No
ITEM DESCRIPTION
Repair Charges per module inclusive of freight
forwardingpacking amp all taxes amp levies (except GST)
(in Figure)
Unit Rate in Words
Total Cost (unit rate qty)
1 2 3 4 5
1 25 AMP Module
2
50 AMP Module
3 100 AMP Module
4 Control Panel of
Power Plants
25A 50A amp 100A
5 GRAND TOTAL
Note -
1 GST will be payable extra on approved rates 2If our Bid is accepted we shall submit the securities as per the conditions mentioned in the contract
3We agree to abide by this Bid for a period of 180 days from the date of opening of financial bid and it shall
remain binding upon us and may be accepted at any time before the expiry of that period
4 The evaluation will be made on the basis of lowest rate quoted as under Lowest Rate = (rate quoted for 25 AMP Qty + rate quoted for 50 AMP Qty + rate
quoted for 100 AMP Qty + rate quoted for Control Panel of Power Plant AMP Qty)
The bidder who has offered lowest rate as evaluated above will be treated as L1 bidder
Date Signature of Tenderer
Seal amp Signature of Bidder
49
CHECK LIST
Sl No
Description Tender Clause Mode of Submission
1 Tender Fee Section 1 (part A) Para 21 22
Off-line
2 EMD Section 1 (part A) Para 51 52 Off-line 3 Power of Attorney Section 4 (Part A) clause 143 Off-line 4 Latest and Valid MSME NSIC certificate (If Applicable) Off-line 5 Experience Certificate Section 1 (part A)
c) E-reverse auction if required by Business Unit Planning cell after opening of the Financial bids
Note 1 In case of 1(b) above the bidder shall submit Techno-commercial amp Financial bid simultaneously
The bids will be evaluated techno-commercially first and thereafter financial bids of techno
commercially compliant bidders only shall be opened
2 Bid Validity Period validity of Bid offer 150 days from the tender opening date and Validity of bid
Offer for acceptance by BSNL can be extended
3 Bid must be submitted by bidder through E-tendering mode only Manual (OFFLINE)
submission of bids should not be considered The following documents are required to be submitted
offline to AGM (PLG) Oo GMTD Haripar Road Bhuj-370001 on or before the date amp time of
submission of bids in a sealed envelope
The envelope shall bear the tender number name of work and the phrase Do Not Open Before (due date amp
time of opening of tender)
i) EMD - Bid security (original copy)
ii) DD Bankers cheque of Tender fee
iii) Power of Attorney in accordance with clause 143 of section 4 Part A and authorization for
executing the power of Attorney
iv) Latest and valid MSME NSIC Certificate duly certified by NSIC if applicable
The purchaser shall not be responsible if the envelop is delivered elsewhere or late
In case of tenders invited under two envelopes system the first envelope will be named as techno commercial amp
will contain documents of bidderrsquos satisfying the eligibility Technical amp commercial conditions and 2nd
envelope will be named as financial envelope containing financial quote
a) Techno-commercial part of the bid shall contain one set of the following documents only-
i) Certificate(s) showing fulfillment of the eligibility criteria The bidder shall furnish as part of his bid
documents establishing the bidders eligibility all the following documents or whichever is required as per
terms and conditions of bid documents
Sl Particular Documents to be submitted
i Registration
Certificate
Firm Registration Certificate Certificate of Incorporation Shop amp
Establishment Certificate
ii In case of
Proprietorship
proprietorship firms an affidavit of that effect should be submitted along with
the bid
iii Partnership
Company
Partnership Deed or ArticlesMemorandum of Association as the case may be
amp Power of Attorney (if applicable) should be made older than the date of
submission of bid
iv Experience Experience Certificate as mentioned in the eligibility criteria
v EMD amp Tender Fee As per Table A amp clause 1 amp 2 OR Copy of Latest amp valid MSE NSIC
Certificate (if applicable)
vi EPF Copy of Registration Certificate of EPF (if applicable)
vii ESIC ESIC Registration (if applicable)
ix Taxes Copy of Valid Goods and Services Tax Registration No Declaration
that he is not registered and will get registered if required x PAN Card Copy of PAN Card
All documents submitted will also be self attested by the bidder
ii) Power of Attorney amp authorization for executing the power of Attorney in accordance with clause 143 of
Section -4 Part A
iii) The complete Bid document duly signed on end of each section at least
iv) Agency details letter for authorization of bid Undertakings Undertakings Non-Relation Certificate as
given vide Section 2(A) to 2(D) of this Bid form
b) Financial envelope shall contain Electronic Form- financial along with Price Schedule (Section 8)
with all relevant bid annexure (in case of tenders invited through e-tendering process)
Seal amp Signature of Bidder
8
SECTION -2 (Part-A)
AGENCY DETAILS
(Including performance records financial viability etc)
Name of firm
Registered Address
Status of the Bidder (i) Proprietorship concern
(ii) Partnership firm
(iii) HUF
(iv) Limited Company
Name of person or authorized signatory for
submitting the tender other documents and
empowered for correspondence with BSNL
GSTIN No
PAN Card particulars
Telephone numbers (with STD Code) of
authorized signatory
Office Residence
Mobile E-mail
Name(s) of Proprietor all Partners all
Directors
Infrastructure capabilities
A Capacity of Repairing 25A module per
week
B Capacity of Repairing 50A module per
week)
C Capacity of Repairing 100A module per
week
D Capacity of Repairing control panel per
week
F Details of trained staff available
A --------------------------------
B --------------------------------
C --------------------------------
D --------------------------------
F --------------------------------
Signature of Tenderer
Name of Tenderer
Along with date amp Seal
Seal amp Signature of Bidder
9
SECTION- 2 PART B
LETTER OF AUTHORISATION FOR ATTENDING BID OPENING
(To be typed preferably on letter head of the company)
Subject Authorization for attending Bid opening
I We Mr Ms helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip have submitted our bid for the tender no
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip in respect of helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip (Item
of work) which is due to open on helliphelliphelliphelliphelliphelliphellip (date) in the Meeting Room
We hereby authorize Mr Ms helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip helliphelliphelliphelliphelliphelliphelliphelliphellipamp
rohelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphereby certify that we or our firm
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip has not been BLACK LISTED by
any SSACircle of MTNLBSNL In case at any stage it is found that the information given by me is
falseincorrect BSNL shall have the absolute right to take any action as deemed fitwithout any prior
intimation to me
e) Clause by Clause Compliance
It is to certify that the tender document is carefully read amp understood and all the sections and clauses
are complied unconditionally amp unequivocally There is no deviation from the terms amp conditions of
the tender
f) Declaration for EPF amp Misc Provisions Act 1952
I _____________________________ (Name of the bidder agency) hereby declare compliance
towards conditions of the EPF and Misc Provisions Act 1952 and authorize BSNL to recover any
payment that arises due to failure to comply with any of the Labour legislations and statutory
conditions viz Labor EPF ESI etc or any other acts dealing with the same and all other acts
mentioned in the tender document
g) CERTIFICATE REGARDING FIRM IS NOT BLACK LISTED BY GST AUTHORITY
rohelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphereby certify that we or our firm
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip has not been BLACK LISTED by
any GST Authority
Date helliphelliphelliphelliphellip helliphellip helliphelliphelliphelliphelliphelliphelliphelliphellip
Signature of Tenderer
Place helliphelliphelliphelliphellip Name of Tenderer
Along with date amp Seal
Seal amp Signature of Bidder
11
SECTION- 2 PART D
DECLARATION REGARDING NO RELATIVE WORKING IN BSNL
I ___________________________Son of W O___________________________
RO _________________________here by certify that none of my relative(s) as defined in tender
document isare employed in BSNL unit as per details given in tender document In case at any stage
it is found that the information given by me is false incorrect BSNL shall have the absolute right to
take any action as deemed fit without any prior intimation to me
Signed ___________________
For and on behalf of the Agency
Name (Capitals) ___________________________
Position ____________________________
Date ____________________________
Note - In case of proprietorship firm certificate will be given by the proprietor for partnership firm
certificate will be given by all the partners on separate paper and in case of limited company by all
the Directors of the Company on separate paper Any breach of these conditions by the company or
firm or any other person the tender work will be cancelled and earnest money security deposit will
be forfeited at any stage whenever it is so noticed BSNL will not pay any damages to the company or
firm or the concerned person The company or firm or the person will also be debarred for further
participation in the concerned unit
Seal amp Signature of Bidder
12
SECTION- 3
SCOPE OF WORK AND JURISDICTION OF CONTRACT
1 SCOPE OF WORK
1 During the entire period of contract repairing of all types and of any make such as AMAR RAJA DACS DELTA DYNA ELTEK EXICOM HIMACHAL EXICOM ITI etc SMPS Power plant Modules (25 AMP 50 AMP 100 Amp ) Control panel are to be carried out including replacement of faulty parts
2 Collection and Delivery of Faulty repaired modules - a The concerned JTOSDEAGM in charge will intimate the contractor the Location Make capacity and
quantity of faulty modules by email (copy to AGM(Plg) on agmplgbhujgmailcom ) followed by ERP PO on mail
b The contractor will collect the module from the concerned in charge with in THREE days from the date of intimation under proper receipt to the concerned in charge However under emergent condition the collection of modules may be done on the same day
c Packing transport and delivery of faulty as well as repaired modules is the responsibility of the contractor
d The contractor shall repair the module and return to the concerned in charge with in Seven days of its collection However under emergent condition as decided by the concerned in charge the collection and repair shall be made within the time period given in the ERP PO
e Repaired modules will be tested by the SDE concern within TWO days on receipt of repaired modules if it is found OK then a certificate of this may be issued to the contractor Otherwise same shall be returned to the contractor for necessary action
f The date of receipt of all the modules mentioned in the ERP PO duly tested OK will be reckoned as the completion of ERP PO
g Repaired modules are warranted for 3 months from the date of successfully taken over During this time the contractor has to rectify the module free of cost
3 INSPECTION AND TESTS - a) The BSNL BHUJ or his representative shall have the right to inspect and test the repaired module as
per prescribed test schedules for their conformity to the specifications Where the BSNL BHUJ decides to conduct such tests on the premises of the Contractor or its subcontractor(s) all reasonable facilities and assistance like Testing Instruments and other test gadgets including access to drawings and production data shall be furnished to the inspectors at no charge to the Purchaser
b) Should any inspected or tested repaired module fail to conform to the Specifications the BSNL BHUJ may reject them and the Contractor shall either replace the rejected repaired module or make all alterations necessary to meet Specification requirements free of cost to the Purchaser
c) Notwithstanding the pre-repair tests and inspections prescribed in clause 3(a) amp 3(b) above the module and accessories on receipt in the BSNL s premises will also be tested during and after installation before take over and if any equipment or part thereof is found defective the same shall be replaced free of all cost to the BSNL BHUJ
d) If any module or any part thereof before it is taken over under clause 3(e) below is found defective or fails to fulfill the requirements of the contract the inspector shall give the Contractor notice setting forth details of such defects or failure and the Contractor shall make the defective module good or alter the same to make it comply with the requirements of the contract forthwith and in any case within a period not exceeding one month of the initial report The replacements shall be made by the Contractor free of all charges at site should it fail to do so within this time the BSNL BHUJ reserves the discretion to reject and replace at the cost of the Contractor the whole or any portion of the module as the case may be which is defective or fails to fulfill the requirements of the contract The cost of any such replacement made by the BSNL BHUJ shall be deducted from the amount payable to the Contractor
Seal amp Signature of Bidder
13
e) When the performance tests called for have been successfully carried out the inspector ultimate
Consignee will forthwith issue a Taking Over Certificate The inspectorultimate consignee shall not delay the issue of any Taking Over Certificate ldquo contemplated by this clause on account of minor defects in the module which do not materially affect the commercial use thereof provided that the Contractor shall undertake to make good the same in a time period not exceeding two months The taking Over Certificate shall be issued by the ultimate consignee within six weeks of successful completion of tests
f) After performance test carried out by the concerned SDE of BSNL as per prescribed schedule and repaired modules are found ok in all respect than the repaired modules will be accepted
g) A register is to be maintained at each placelocation mentioning the details of Modules date of Collection and Delivery of Faulty repaired modules replacement of spares amp remark if any and it is to be signed by the controlling officer amp Service engineer
h) Nothing in clause 3 shall in any way release the Contractor from any Warranty or other obligations under this contract
4 SPARES - All the spare of good quality required for repair of modules of SMPS PP are to be supplied by the contractor including major components
5 The contractor shall be responsible for any loss or damages caused to man or machinespartsinstruments during the execution of work and shall replace with an identical new item at his own cost The authorized officerperson of BSNL will have the liberty to check the material and work etchellip provided by the contractor
6 Governing Conditions for RNP (Repair Not Possible) Cases
A module Control panel may be declared RNP only if cost of material to be replaced exceeds five times of approved rate of repair In no case labour cost involved will be considered for deciding RNP A detailed report is to be submitted by contractor to concerned officer in-charge and final decision in this regard will be taken by concerned DGM subjected to maximum permissible RNP as given below
a)25-A module Maximum 10 of total quantity ordered for repair
b) 50-A 100-A Module Maximum 5 of total quantity ordered for repair
c) Control Panel Maximum 10 of total quantity ordered for repair
In case of RNP exceeding permissible limits penalty will be imposed as per para 11 (d) of section-5 (Part-A)
7 WARRANTY - a) Repaired modules are warranted for 3 months from the date of successfully taken over During this
time the contractor has to rectify the module free of cost The contractor shall warrant that repaired module shall be free from all defects and faults in materials used workmanship It becomes necessary for the contractor to replace or renew any defective portion(s) of the module under this clause
b) Replacement under warranty clause shall be made by the contractor free of all charges at site including freight insurance and other incidental charges
c) If any defect is not remedied by the contractor within a reasonable time the BSNL BHUJ may proceed to get the defects remedied from other contractor etc at the contractors risk and expenses but without prejudice to any other rights which the BSNL BHUJ may have against the contractor in respect of such defects
Seal amp Signature of Bidder
14
SECTION- 4 (Part-A)
GENERAL INSTRUCTION TO BIDDERS (GIB)
1 DEFINITIONS
1 BSNL The BSNL means the BSNL Bhuj Telecom Dist under the Ministry of
Communications which invites the tenders on behalf of the General Manager Bhuj Telecom
District Includes executives in the BSNL whatever designations assigned to them from time
to time who may be the in-charge of direction supervision testing acceptance and
maintenance including their successor(s) in the office appearing in various clauses shall be
taken to mean the BSNL Bhuj Telecom District
b The SSA Head means the Head of SSA General Manager Bhuj Telecom District Bhuj and
his successors
c The jurisdiction of the SSA Head The jurisdiction of the SSA Head means Bhuj Telecom
District which coincides geographically with (Revenue District(s))
d Representative of (the SSA Head) Representative of (the SSA Head ) means Officer and
staff for the time being in Bhuj Telecom District deputed by the General Manager Bhuj for
inspecting or supervising the work of testing etc
e Engineer ndash in - charge The Engineer ndash in - charge means the Engineering Officer
nominated by the BSNL to supervise the work under the contract (Minimum Divisional
Engineer level Officer)
f Site Engineer Site Engineer shall mean an SDESDOJTO of the BSNL who may be placed by
the General Manager Bhuj Telecom District Bhuj as in ndash charge of the work at site at any
particular period of time
g AT Unit AT Unit shall mean Acceptance and Testing unit of the BSNL
h AT Officer An officer authorized by General Manger ndash Bhuj Telecom Dist
i Contract The term contract means the documents forming the tender and acceptance
thereof and the formal agreement executed between the competent authority on behalf of the
BSNL and the contractor together with the documents referred to therein including these
conditions the specifications designs drawings and instructions issued from time to time by
the engineer in ndash charge and all these documents taken together shall be deemed to form one
contract and shall be complementary to one another In the contract the following expressions
shall unless the context otherwise requires have the meanings hereby respectively assigned to
them The expression works or work shall unless there be something either in the subject
context repugnant to such construction be construed or taken to mean the works by or by
virtue of the contract contracted to be executed whether temporary or permanent and whether
original altered substituted or additional
j Contractor The contractor shall mean the individual firm or company enlisted or not
enlisted with BSNL Department of Telecom in accordance with procedure for contractor or
registered for carrying out the work of cable laying whether incorporated or not undertaking
the works and shall include the legal personal representative of such individual or the persons
composing such firm or company or the successors of such firm or company and the
permitted assignees of such individual firm or company
k Work The expression lsquoworksrsquo shall unless there be something either in the subject or context
repugnant to such construction be construct and taken to mean the works by or by virtue of the
Seal amp Signature of Bidder
15
contract contracted to be executed whether temporary or permanent and whether original
altered substituted or additional
l Schedule(s) Schedule(s) referred to in these conditions shall mean the relevant schedule(s)
or the standard schedule of rates mentioned in the document
m Site The site shall mean the land or other places on into or through which work is to be
executed under the contract or any adjacent land path or street through which the work is to
be exacted under the contract or any adjacent land path or street which may be allotted or
used for the purpose of carrying out the contract
n Normal time or stipulated time Normal time or stipulated time means time specified in the
ERP PO to complete the work
o Extension of Time Extension of Time means the time granted by the BSNL to complete the
work beyond the normal time or stipulated time
p Exceptional risk Exceptional risks are risk due to war(whether declared or not) invasion act
of foreign enemies hostilities civil war rebellion revolution insurrection military or
usurped power any acts of Government damages from aircraft acts of God such as
earthquake lightening and unprecedented floods and other causes over which the contractor
has no control and the same having been accepted as such by the Accepting Authority or
causes solely due to use or occupation by the government of the part of the work in respect of
which a certificate of completion has been issued
q The ERP PO means the Order placed by the field units on the contractor signed by
the unit incharge r The Contract Rate means the rate payable to the repairer under the work order for
the full and proper performance of its contractual obligations
2 ELIGIBLE BIDDERS Kindly refer to clause 4 of Section ndash 1 Part A ie Detailed NIT
3 COST OF BIDDING
The bidder shall bear all costs associated with the preparation and submission of the bid The
BSNL will in no case be responsible or liable for these costs regardless of the conduct or
outcome of the bidding process
4 BID DOCUMENTS
41 The goods services required to be supplied bidding procedures and contract terms are prescribed
in the Bid Documents The contents of the Bid documents are specified in the covering letter
42 The Bidder is expected to examine all instructions forms terms and specifications in the Bid
Documents Failure to furnish all information required as per the Bid Documents or submission
of bids not substantially responsive to the Bid Documents in every respect will be at the bidders
risk and may result in rejection of the bid
5 CLARIFICATION OF BID DOCUMENTS
51 A prospective bidder requiring any clarification on the Bid Documents shall notify the User in
writing by FAX or by Email of the User as indicated in the invitation of Bid The User shall
respond in writing to any request for the clarification of the Bid Documents which it receives
7days prior to the date of opening of the Tenders Copies of the query (without identifying the
source) and clarifications by the User shall be uploaded on BSNL website as lsquoClarificationsrsquo on
e-procurement portal of Bhuj Telecom District portal clarification shall be available as
lsquoAddendumrsquo for all the prospective bidders who have downloaded the official copy of tender
documents from e-procurement portal of Bhuj Telecom District
Seal amp Signature of Bidder
16
52 Any clarification issued by BSNL in response to query raised by prospective bidders shall form
an integral part of bid documents and it may amount to an amendment of relevant clauses of the
bid documents
6 AMENDMENT OF BID DOCUMENTS
61 The BSNL may for any reason whether at its own initiative or in response to a clarification
requested by a prospective Bidder may modify bid documents by amendments prior to the date
of submission of Bids with due notification to prospective Bidders
62 The amendments shall be notified in writing or by Fax or by Addendum through e-tendering
portal to all prospective bidders on the address intimated at the time of purchase of bid document
from the BSNL and these amendments will be binding on them
63 In order to afford prospective bidders reasonable time in which to take the amendments into
account in preparing their bids the BSNL may at its discretion extend the deadline for the
submission of bids suitably
7 DOCUMENTS COMPRISING THE BID
The bid prepared by the bidder shall comprise the components specified in Section 2 of this
Tender
8 BID FORM
The bidder shall complete the Bid Form and the appropriate Price Schedule furnished in the Bid
Documents as per Section- 8
9 BID PRICES
91 The bidder shall give the total composite price inclusive of all levies and taxes packing
forwarding freight and insurance in case of materials to be supplied and inclusive of all taxes
and levies except GST in case of works to be executed GST will be paid extra as applicable
The contractor shall be responsible for transporting the materials to be supplied by the BSNL
(At the field Unit Telecom Store or otherwise) to execute the work under the contract to site at
histheir own cost The costs of transportation are subsumed in the standard Schedule Rates and
therefore no separate charges are payable on this account The offer shall be firm in Indian
Rupees
92 The price quoted by the bidder shall remain fixed during the entire period of contract and shall
not be subject to variation on any account A bid submitted with an adjustable price quotation
will be treated as non-responsive and rejected
93 Discount if any offered by the bidders shall not be considered unless they are specifically
indicated in the schedule of rates (financial Bid) Bidders desiring to offer discount shall
therefore modify their offers suitable while quoting and shall quote clearly net price taking all
such factors like Discount free supply etc into account
10 DOCUMENTS ESTABLISHING BIDDERS ELIGIBILITY AND QUALIFICATIONS Kindly refer to clause of Section ndash 1 and 2 of this bid
11 NA
12 BID SECURITYEMD
121 The bidder shall furnish as part of its bid a bid security one of the following ways-
(a) Demand Draft Bankerrsquos cheque from a Nationalizedscheduled bank drawn in favour
of AO (Cash) BSNL Oo GMTD Bhuj and payable at Bhuj
(b) Bank GuaranteeFDR from a Nationalizedscheduled bank drawn in favour of AO
(Cash) BSNL Oo GMTD Bhuj which should be valid for 180 days from the tender
opening date
For educational order EMD to be submitted by bidder as 20 of 10 of estimated tender
cost for each case in the form of cash Demand Draft Bankerrsquos cheque Bank guaranteeFDR
issued by a NationalizedScheduled bank drawn in favour of AO (Cash) BSNL Oo GMTD
Bhuj Bank Guarantee should be valid for 180 days from the tender opening date
122 The MSE bidders are exempted from payment of bid security
Seal amp Signature of Bidder
17
a) A proof regarding valid registration with body specified by Ministry of Micro Small
amp Medium Enterprise for the tendered items will have to be attached along with the
bid
b) The enlistment certificate issued by MSME should be valid on the date of opening of
tender
c) MSE unit is required to submit its monthly delivery schedule
d) If a vender registered with body specified by Ministry of Micro Small amp Medium
Enterprise claiming concessional benefits is awarded work by BSNL and
subsequently fails to obey any of the contractual obligations he will be debarred from
any further work contract by BSNL for one year from the date of issue of such order
123 The bid security is required to protect the BSNL against the risk of bidders conduct which would
warrant the bid securityrsquos forfeiture pursuant to para 127
124 A bid not secured in accordance with para 121 amp 122 shall be rejected by the BSNL being non-
responsive at the bid opening stage and archived unopened on e-tender portal for e-tenders
125 The bid security of the unsuccessful bidder will be dischargedreturned as promptly as possible
as but not later than 30 days after the expiry of the period of bid validity prescribed by the
BSNL pursuant to clause 13
126 The successful bidders bid security will be discharged upon the bidders acceptance of the
advance Purchase Order satisfactorily pursuant to clause 27 and furnishing the performance
security
The successful bidders bid security may be converted to Part Performance Security Deposit in
accordance with clause 28
127 The bid security may be forfeited
a) If the bidder withdraws or amends its bid or impairs or derogates from the bid in any
respect during the period of bid validity specified by the bidder in the bid form or
extended subsequently or
b) If the bidder does not accept the APO AWO and or does not submit PBG amp sign the
contract agreement in accordance with clause 28
Note - The bidder shall mean individual company firm or the front bidder and its technology
consortium partner as applicable
13 PERIOD OF VALIDITY OF BIDS
131 Bid shall remain valid for 150 days from the date of bid opening prescribed by the BSNL A bid
valid for a shorter period shall be rejected by the BSNL as non-responsive
132 In exceptional circumstances the BSNL may request the bidders consent for an extension to the
period of bid validity The request and the responses thereto shall be made in writing The bid
security provided under Clause 12 shall also be suitably extended A bidder may refuse the
request without forfeiting his bid security A bidder accepting the request and granting extension
will not be permitted to modify his bid
14 FORMAT AND SIGNING OF BID
141 The bidder shall submit his bid online (in case of e-tendering) amp through sealed envelopes
physically (in case of tenders with manual bidding process) complying all eligibility
conditions other terms and conditions of tender document to be read along with the
clarifications and amendments issued in this respect All the documents must be authenticated
using Digital Signature (DSC) with Class 2 or above (in case of e-tendering) amp by hand
signatures (for manual bidding process) by the authorized person The letter of authorization
shall be indicated by written power-of-attorney accompanying the bid
Note-The BSNL may ask the bidder(s) to supply besides original bid additional copy of bids as
required by him
142 The bid shall contain no interlineations erasures or overwriting except as necessary to correct
errors made by the bidder in which case such corrections shall be signed by the person or persons
signing the bid All pages of the original bid except for un-amended printed literatures shall be
digitally signed by the person or persons signing the bid
143 Power of Attorney
(a) The power of Attorney should be submitted and executed on the non-judicial stamp paper
Seal amp Signature of Bidder
18
of appropriate value as prevailing in the concerned states(s) and the same be attested by a
Notary public or registered before Sub-registrar of the state(s) concerned
(b) The power of Attorney be executed by a person who has been authorized by the Board of
Directors of the bidder in this regard on behalf of the Company institution Body
corporate
(c) In case of the bidder being a firm the said Power of Attorney should be executed by all the
partner(s) in favour of the said Attorney
(d) Attestation of the specimen signatures of authorized signatory by the Companyrsquos firmrsquos
bankers shall be furnished Name designation Phone number mobile number email
address and postal address of the authorized signatory shall be provided
(e) Individual signing the tenders or other documents connected with the contract shall indicate
the full name below the signature and must specify the capacity and authority under which
he signs such documents and shall also submit documentary evidence of his authority in
the form of Power of Attorney
(f) The Power of Attorney is to be submitted in original if it has been issued for the specific
tender enquiry If the power of attorney is issued in general irrespective of tender enquiry
then photocopy duly certified by notary public can also be accepted
(g) In case the representative of bidder company who uploads the document on e-tender portal
using his Digital Signature Certificates (DSC) which is different from the authorized
signatory for the bid (Power of Attorney holder) then the representative who uploads the
documents on e-tender portal using DSC issued in his name shall also be one of the Power
of Attorney holder by the bidder Company in addition to the authorized signatory for the
bid
15 SEALING AND MARKING OF BIDS
The bid shall be submitted online using single stage bidding and Two Envelope Methodology
151 The first envelope (Techno-commercial bid) This envelope shall contain documents of
bidders satisfying the eligibility Technical amp commercial conditions requirements Second
envelope will be named as financial bid containing price Schedule as per section 8 All
documents submitted will also be self attested by the bidder
152 a) The envelopes for Tender Fee EMD shall be addressed AGM (PLG) Oo GMTD
Haripar Road Bhuj - 370001
b) The envelope for Tender Fee EMD shall bear the name of the tender the tender number
and the words DO NOT OPEN BEFORE (due date amp time)
c) The envelopes for Tender Fee EMD shall indicate the name and complete postal address
of the bidder to enable the User to return the bid unopened in case it is declared to be received
late
d) The envelopes for Tender Fee EMD shall should be deposited in the tender box provided
by tendering authority or sent by registered post or delivered in person on above mentioned
address (address is given above) The responsibility for ensuring that the envelopes for Tender
Fee EMD shall are delivered in time would vest with the bidder
e) The envelopes for Tender Fee EMD shall delivered in person registered post on the day of
tender opening shall be delivered upto specified time amp date as stated in NIT to Oo GMTD
Haripar Road Bhuj - 370001 The User shall not be responsible if the envelopes for Tender
Fee EMD shall are delivered elsewhere
f) Venue of Tender Opening
Tender will be opened in Oo GMTD Haripar Road Bhuj - 370001 at specified time amp
date as stated in NIT If due to administrative reason the venue of Bid opening is changed it
will be displayed prominently on the above address
Seal amp Signature of Bidder
19
153 If envelopes are not sealed and marked as required at para 151 and 152 the bid shall be
rejected
16 SUBMISSION OF BIDS
161 Bids must be submitted by the bidders on or before the specified date amp time indicated in
Section-1 ie DNIT
162 The BSNL may at its discretion extend this deadline for the submission of the bids by
amending the bid documents in accordance with Clause 6 in which case all rights and
obligations of the BSNL and bidders previously subject to the deadline will thereafter be
subject to the deadline as extended
163 The bidder shall submit his bid offer against a set of bid documents purchased by him for all
or some systemservices equipment as per requirement of the Bid Documents He may
include alternate offer if permissible as per the bid However not more than one independent
and complete offer shall be permitted from the bidder
164 Bid must be submitted by the bidder through E-Tendering mode only Manual submission of bid
shall not be needed
17 LATE BIDS
No bid shall be accepted either online by E-Tender Portal or physically in case of manual
bidding process after the specified deadline for submission of bids prescribed by the purchaser
18 MODIFICATION AND WITHDRAWAL OF BIDS
181 The bidder may modify revise or withdraw his bid after submission prior to deadline prescribed
for submission of bid If a bid is withdrawn the same shall be archived unopened in the e-
procurement portal of Bhuj Telecom District
182 The bidderrsquos modification revision or withdrawal shall have to be online and digitally
authenticated as per clause 15
183 Subject to clause 20 no bid shall be modified subsequent to the deadline for submission of bids
19 OPENING OF BIDS BY BSNL
191 The purchaser shall open bids online in the presence of bidders or their authorized representatives
who chose to attend at time specified in Clause 7 of Detailed NIT(Section-1) on due date The
bidderrsquos representatives who are present shall sign in an attendance register Authority letter to
this effect shall be submitted by the bidders before they are allowed to participate in bid opening
(As per Format given in section 2 Part B)
192 A maximum of two representatives for any bidder shall be authorized and permitted to attend
the bid opening
193 (i) The bids will be opened in two stages ie techno-commercial bid shall be opened on the date
of tender opening given in NIT The financial bid will not be opened on the date of opening of
techno commercial bids
The financial bids of those bidders who are approved to be techno commercially compliant by
the competent authority will be opened by TOC in front of techno-commercially eligible
bidders authorized representatives by sending them a suitable notice
(ii) The bidderrsquos names Item name EMD amount amp validity and acceptability Information in
respect of eligible bidders Details of bid modification withdrawal (if any) and such other
details as the purchaser at its discretion may consider appropriate will be made available
online at the time of techno-commercial bid opening
(iii) The bidderrsquos names Name of the Items Quantitiesprices quoted in the bid discount if
offered Taxes amp levies and such other details as the purchaser at its discretion may consider
appropriate will be made available online at the time of financial bid opening
194 The date fixed for opening of bids if subsequently declared as holiday by the BSNL the revised
date of schedule will be notified However in absence of such notification the bids will be
opened in the next working day time and venue remaining unaltered
20 CLARIFICATION OF BIDS
201 To assist in the examination evaluation and comparison of bids the BSNL may at its discretion
Seal amp Signature of Bidder
20
ask the bidder for the clarification of its bid The request for the clarification and the response
shall be in writing However no post bid clarification at the initiative of the bidder shall be
entertained
202 If any of the documents required to be submitted along with the technical bid is found wanting
the offer is liable to be rejected at that stage However the BSNL at its discretion may call for
any clarification regarding the bid document within a stipulated time period The BSNL at itrsquos
discretion may also ask for the submission of any additionalmissing document(s) within a
stipulated time period In such case(s) the bidder shall have to comply the BSNLrsquos requirement
within the specified time In case of non-compliance to such queries the bid will be out rightly
rejected without entertaining further correspondence in this regardrdquo However no post bid
clarification at the initiative of the bidder shall be entertained
21 PRELIMINARY EVALUATION
211 BSNL shall evaluate the bids to determine whether they are complete whether any
computational errors have been made whether required sureties have been furnished whether
the documents have been properly signed and whether the bids are generally in order
212 Arithmetical errors shall be rectified on the following basis If there is a discrepancy between
the unit price and total price that is obtained by multiplying the unit price and quantity the
unit price shall prevail and the total price shall be corrected by the BSNL
213 If there is a discrepancy between words and figures the amount in words shall prevail If the
SupplierBidder does not accept the correction of the errors his bid shall be rejected
214 Prior to the detailed evaluation pursuant to clause 22 the BSNL will determine the substantial
responsiveness of each bid to the Bid documents For purposes of these clauses a substantially
responsive bid is one which conforms to all the terms and conditions of the Bid Documents
without material deviations The BSNLs determination of bids responsiveness is to be based
on the contents of the bid itself without recourse to extrinsic evidence
215 A bid determined as substantially non-responsive will be rejected by the BSNL and shall not
subsequent to the bid opening be made responsive by the bidder by correction of the non-
conformity
216 The BSNL may waive any minor infirmity or non-conformity or irregularity in a bid which
does not constitute a material deviation provided such waiver does not prejudice or affect the
relative ranking of any bidder
22 EVALUATION AND COMPARISON OF SUBSTANTIALLY RESPONSIVE BIDS
221 The Purchaser shall evaluate in detail and compare the bids previously determined to be
substantially responsive pursuant to Clause 21
222 The evaluation will be made on the basis of lowest rate quoted as under Lowest Rate
= (rate quoted for 25AMP Qty +rate quoted for 50AMP 100 AMP Qty + rate
quoted for Control Panel of Power Plant Qty) The bidder who has offered lowest
rate as evaluated above will be treated as L1 bidder 23 CONTACTING THE BSNL
231 Subject to Clause 20 no bidder shall try to influence the BSNL on any matter relating
to its bid from the time of the bid opening till the time the contract is awarded
232 Any effort by a bidder to modify its bid or influence the BSNL in the BSNLs bid evaluation
bid comparison or contract award decisions shall result in the rejection of the bid
24 PLACEMENT OF ORDER
241 The BSNL may consider placement of orders to execute the contract on those bidders whose
offers have been found technically commercially and financially acceptable The BSNL reserves
the right to counter offer price(s) against price(s) quoted by any bidder
The work against the tender is for one yearrsquos requirement and the terms and conditions of
this tender shall be operative for a period of one year from the date of signing of agreement
between the Company and the contractor with an option of extension for a further period
of one year at the same rates terms amp conditions
Seal amp Signature of Bidder
21
Distribution of Work Distribution of quantities for ordering to the selected bidders of a tender
Table 1(A) (Without provisions for MSE Units)
No of Bidders
to be approved
(Col 1)
Quantity allotted to the respective bidder
(Col 2)
L1 L2
One Bidder 100 Nil
Two Bidder 60 40
Table 1(B) (With provisions for MSME Units)
No of Bidders
to be approved
(Col 1)
Quantity allotted to the respective bidder (Col 2)
Qty
Earmarked for MSME
bidder(s)(Col 3)
L1 L2
One Bidder 80 Nil 20
Two Bidder 48 32 20
1) In case L2 and MSE bidder accepts the L1 rate in prescribed time amp do not submit MSD as per
tender terms and conditions the EMD will be forfeited If MSE bidder exceeded more than one than
20 work at L1 rate distributed among them
242 TERMS AND CONDITIONS FOR EDUCATIONAL ORDER
(a) 10 of the estimated quantity of work will be extended to inexperienced contractor for each
Tender
(b) Inexperienced Bidder has to apply separately for each Tender
(c) In case there are more than one bidder work will be distributed into the bidders
(d) The bidder shall not submit financial bid In case if the same is submitted then it will not be opened
(e) BSNL reserves a right to give any area to this bidder including that of other tender in which the
bidder has not participated
(f) The work to the inexperienced is a limited quantity (up to 10) in at a time further work will be
done on the basis of evaluation of field unit Additional quantity of work shall be given to such
contractor only after completion of initial work
(g) The payment for repairing to such contractors shall be based on L1 rates finalized in the tender
The payment will be released only after verification of quantity amp quality done as per the
instruction mentioned in respect of work in the tender
(h) All the other Terms amp conditions will remain the same
25 BSNLS RIGHT TO VARY QUANTITIES AT TIME OF AWARD
(a) BSNL reserves the right to vary up to 25 of the quantity of goods and services specified in
the schedule of requirements without any change in the unit price or other terms and conditions at
the time of award of contract
(b) BSNL also reserves the right for placement of additional order or up to 50 of the
additional quantities of goods and services contained in the running tender contract in the tender
at the same rate or a rate negotiated (downwardly) with the existing venders considering the
reasonability of rates based on prevailing market conditions and the impact of reduction in duties
and taxes etc and supplies to be obtained within delivery period scheduled afresh
No guarantee can be given to actual quantity The quantity mentioned in the tender is
tentative only No claim should entertained for less not allotting the quantum of work for any
reason
(c) In exceptional situation where the requirement is of an emergent nature and it is necessary to
ensure continued supplies from the existing venders the purchaser reserves the right to place
repeat order up to 100 of the quantities of goods and services contained in the running tender
contract at the same rate or a rate negotiated (downwardly) with the existing venders considering
the reasonability of rates based on prevailing market conditions and the impact of reduction in
duties and taxes etc Exceptional situation and emergent nature should be spelt out clearly
detailing the justification as well as benefits accrued out of it and loss incurred in case this
provision is not invoked and approved by the authority competent to accord administrative and
Seal amp Signature of Bidder
22
financial approval for the procurement calculated on the basis of total procurement ie initial and
proposed add-on quantity
26 BSNLS RIGHT TO ACCEPT ANY BID AND TO REJECT ANY OR ALL BIDS
The BSNL reserves the right to accept or reject any bid and to annul the bidding process and
reject all bids at any time prior to award of contract without assigning any reason whatsoever and
without thereby incurring any liability to the affected bidder or bidders on the grounds for the
BSNLs action
27 ISSUE OF ADVANCE WORK ORDER
271 The issue of an Advance Work Order (Letter of Intent) shall constitute the intention of BSNL to
enter into the contract with the bidder
272 The bidder shall within 14 days of issue of an advance work order give his acceptance along with
Performance Security Deposit in conformity with section 7(B) provided with the bid documents
28 SIGNING OF CONTRACT
281 The issue of FAT shall constitute the award of contract on the bidder
282 As soon as the tender is approved by the competent authority the Bid Security deposited by the
successful bidder may be converted into the Performance security deposit which will be held by
the BSNL till the completion of warranty period
29 ANNULMENT OF AWARD
Failure of the successful bidder to comply with the requirement of Clause 27 amp 28 shall
constitute sufficient ground for the annulment of the award and forfeiture of the bid security in
which event the BSNL may make the award to any other bidder at the discretion of BSNL or call
for new bids
30 NA
31 REJECTION OF BIDS
311 While all the conditions specified in the Bid documents are critical and are to be complied special
attention of bidder is invited to the following clauses of the bid documents Non-compliance of any
one of which shall result in outright rejection of the bid
(i) Clause 15 of Section 4 Part A The bids will be recorded returned unopened if covers are not
properly sealed with lsquoPERSONAL SEALrsquo of the bidder
(ii) Clauses 121 122 amp 131 of Section 4 Part A The bids will be rejected at opening stage if Bid
security is not submitted as per Clauses 121 amp 122 and bid validity is less than the period
prescribed in Clause 131 mentioned above
(iii) Clause 2 amp 10 of Section 4 Part A If the eligibility condition as per clause 2 of Section 4 Part
A is not met andor documents prescribed to establish the eligibility as per Clause 10 of
section 4 Part A are not enclosed the bids will be rejected without further evaluation
(iv) Clause 112 of Section 4 Part A NA
(v) Section 5 Part A Commercial conditions Section 5 Part B Special Conditions of Contract
Compliance if given using ambiguous words like ldquoNotedrdquo ldquoUnderstoodrdquo ldquoNoted amp
Understoodrdquo shall not be accepted as complied Mere ldquoCompliedrdquo will also be not sufficient
reference to the enclosed documents showing compliances must be given
(vi) Section 8 Price Schedule Prices are not filled in as prescribed in Financial Bid
(vii) Section 4 Part A clause 93 on discount which is reproduced below
ldquoDiscount if any offered by the bidder shall not be considered unless specifically indicated in
the price schedule Bidders desiring to offer discount shall therefore modify their offer
suitably while quoting and shall quote clearly net price taking all such factors like discount
free supply etc into accountrdquo
312 Before outright rejection of the Bid by Bid-opening team for non-compliance of any of the
provisions mentioned in clause 311(i) 311 (ii) above the bidder company is given
opportunity to explain their position however if the person representing the company is not
satisfied with the decision of the Bid opening team hethey can submit the representation to
Bid opening team immediately but in no case after closing of the tender process with full
justification quoting specifically the violation of tender conditions if any
Seal amp Signature of Bidder
23
313 Bid opening team will not return the bids submitted by the bidders on the date of tender
opening even if it is liable for rejection and will preserve the bids in sealed cover as submitted
by taking signatures of some of the desirous representatives of the participating
biddercompanies present on the occasion
314 The In charge of the Bid opening team will mention the number of bids with name of
company found unsuitable for further processing on the date of tender opening and number of
representations received in Bid opening Minutes and if Bid opening team is satisfied with the
arguments of the biddercompany mentioned in their representation and feel that there is
prima-facie fact for consideration the in charge of the Bid opening team will submit the case
for review to competent authority ie GMTD BHUJ as early as possible preferably on next
working day and decision to this effect should be communicated to the bidder company within
a week positively Bids found liable for rejection and kept preserved on the date of tender
opening will be returned to the bidders after issue of POfinal acceptance of tender against
the instant tender
315 If the reviewing officer finds it fit to open the bid of the petitioner this should be done by
giving three (working) days notice to all the participating bidders to give opportunity to
desirous participants to be present on the occasion
32 ACTION BY PURCHASER AGAINST BIDDER(S) VENDOR(S) IN CASE OF
DEFAULT In case of default by Bidder(s) Vendor(s) such as
a) Does not supply the equipment services in time
b) Equipment Services does not perform satisfactory in the field in accordance with the
specifications
c) Or any other default whose complete list is enclosed in Appendix-1
Purchaser will take action as specified in Appendix-1 of this section
33 DELETED
34 NEAR-RELATIONSHIP CERTIFICATE
341 The bidder should give a certificate that none of his her near relative as defined below is
working in the units where he is going to apply for the tender In case of proprietorship firm
certificate will be given by the proprietor For partnership firm certificate will be given by all
the partners and in case of limited company by all the Directors of the company excluding
Government of India Financial institution nominees and independent non-Official part time
Directors appointed by Govt of India or the Governor of the state and full time Directors of
PSUs both state and central Due to any breach of these conditions by the company or firm or
any other person the tender will be cancelled and Bid Security will be forfeited at any stage
whenever it is noticed and BSNL will not pay any damage to the company or firm or the
concerned person
342 The Company or firm or the person will also be debarred for further participation in the
concerned unit
343 The near relatives for this purpose are defined as-
(a) Members of a Hindu undivided family
(b) They are husband and wife
(c) The one is related to the other in the manner as father mother son(s) amp Sons
wife(daughter in law) Daughter(s) and daughters husband (son in law) brother(s) and
brothers wife sister(s) and sisters husband (brother in law)
344 The format of the certificate is given in Section -2(D)
35 VERIFICATION OF DOCUMENTS AND CERTIFICATES
The bidder will ensure that all the documents and certificates including experience
performance and self certificates submitted by him are correct and genuine before enclosing
them in the bid The onus of proving genuineness of the submitted documents would rest with
the bidder If any document paper certificate submitted by the participant bidder is found
discovered to be false fabricated tempered manipulated either during bid evaluation or
during award of contract or thereafter then the Purchaser will take action as per Clause-1 of
Appendix-1 of this section
Seal amp Signature of Bidder
24
Appendix-1 to Section - 4 (Part-A)
S
No
Defaults of the bidder vendor Action to be taken
A B C
1(a) Submitting fake forged
i) Rejection of tender bid of respective Vendor
ii) Banning of business for 3 years which implies barring
further dealing with the vendor for procurement of Goods amp
Services including participation in future tenders invited by
BSNL for 3 years from date of issue of banning order
iii) Termination Short Closure of POWO if issued This
implies non-acceptance of further supplies work amp services
except to make the already received material work complete
work in hand
a) Bank Instruments with the bid to meet
terms amp condition of tender in respect of
tender fee and or EMD
b) Certificate for claiming exemption in
respect of tender fee and or EMD
c) detection of default at any stage from
receipt of bids till award of APO issue of
POWO
Note 1- However in this case the performance guarantee if alright will not be forfeited
Note 2- Payment for already received supplies completed work shall be made as per terms amp conditions of
PO WO
1(b)
Submitting fake forged documents towards
meeting eligibility criteria such as
experience capability supply proof
registration with GST Income Tax
departments etc and as supporting
documents towards other terms amp conditions
with the bid to meet terms amp condition of
tender
(i) If detection of default is prior to award
of APO
i) Rejection of Bid amp
ii) Forfeiture of EMD
(ii) If detection of default after issue of APO
but before receipt of PG SD (DDBG etc)
i) Cancellation of APO
ii) Rejection of Bid amp
iii) Forfeiture of EMD
(iii) If detection of default after receipt of
PG SD (DDBG etc)
i) Cancellation of APO
ii) Rejection of Bid amp
iii) Forfeiture of PG SD
However on realization of PG SD amount EMD if not
already released shall be returned
(iv) If detection of default after issue of PO
WO
i) Termination Short Closure of POWO and Cancellation
of APO
ii) Rejection of Bid amp
iii) Forfeiture of PG SD
However on realization of PG SD amount EMD if not
released shall be returned
Note 3- However settle bills for the material received in correct quantity and quality if pending items do
not affect working or use of supplied items
Note 4- No further supplies are to be accepted except that required to make the already supplied items
work
Special Note 1- Authority competent to take final decision GMTD Bhuj
2 If vendor or his representative uses violent
coercive means viz Physical Verbal means
to threatens BSNL Executive employees
and or obstruct him from functioning in
discharge of his duties amp responsibilities for
the following
Banning of business for 3 years which implies Barring
further dealing with the vendor for procurement of Goods amp
Services including participation in future tenders invited by
BSNL for 3 years from date of issue of banning order
a) Obstructing functioning of tender opening
executives of BSNL in receipt opening of
tender bids from prospective Bidders
suppliers Contractors
Seal amp Signature of Bidder
25
b) Obstructing Threatening other
prospective bidders ie suppliers
Contractors from entering the tender venue
and or submitting their tender bid freely
Special Note 1- Authority competent to take final decision GMTD Bhuj
3 Non-receipt of acceptance of APO AWO
and SD PG by L-1 bidder within time
period specified in APO AWO
Forfeiture of EMD
Special Note 1- Authority competent to take final decision GMTD Bhuj
41 Failure to supply and or Commission the
equipment and or execution of the work at
all even in extended delivery schedules if
granted against PO WO
i) Termination of PO WO
ii) Under take purchase work at the risk amp cost of
defaulting vendor
iii) Recover the excess charges if incurred from the PG SD
and outstanding bills of the defaulting Vendor
42 Failure to supply and or Commission the
equipment and or execution of the Work in
full even in extended delivery schedules if
granted against PO WO
i) Short Closure of PO WO to the quantity already
received by and or commissioned in BSNL and or in
pipeline provided the same is usable andor the Vendor
promises to make it usable
ii) Under take purchase work for balance quantity at the
risk amp cost of defaulting vendor
iii) Recover the excess charges if incurred from the PG SD
and outstanding bills of the defaulting Vendor
Special Note 1- Authority competent to take final decision for 41 amp 42 by DGM concerned
51 The supplied equipment does not perform
satisfactory in the field in accordance with
the specifications mentioned in the PO
WOContract
i) If the material is not at all acceptable then return the non-
acceptable material (or its part) amp recover its cost if paid
from the os bills PG SD
OR
ii) If the material is inducted in network amp it is not possible
to return it and or material is acceptable with degraded
performance the purchaser may determine the price for
need to be issued in compliant format and timely within the time prescribed under GST law
163 In case of any deficientincompleterejected supply BSNL shall convey the same in a reasonable
time to enable the supplier to issue credit note and take tax adjustment
164 It would be the responsibility of the supplier to declare correct information on invoice and GSTN
viz the amount the place of supply rate of tax etc In case the eligibility of input tax credit is
questioned or denied to BSNL on account of default by the supplier the same would be
recovered by BSNL from the contractor
165 Registered location of the both the parties ie BSNL and contractor should be mentioned in the
agreement with GSTIN No Further supplier should raise invoices at the registered premise of
BSNL for availing of credit and ensure that the place of supply as per GST law is same as
registered premise
166 BSNL could at any time instruct the contractor to raise its invoices at a particular location of
BSNL
Seal amp Signature of Bidder
39
167 It is the responsibility of the supplier to ensure that place of supply and the GSTN of BSNL are
in the same state If for any reason they are not in the same state the contractor shall intimate to
BSNL and give adequate time before raising of the invoice
168 E-waybill number should be mentioned on the invoices
169 contractor shall be responsible for timely issuance and delivery of invoice DN CN to enable
BSNL to claim tax benefit on or before the stipulated time period provided by the GST law
(a) It is the responsibility of the contractor to ensure that outward supply return (GSTR-1) would be
filed correctly If not than cost would be borne by supplier
(b) Reporting of correct outward supply by supplier in the outward return (GSTR-1) is the
responsibility of the supplier In case of mismatch because of contractorrsquos fault prompt
amendments must be made by the supplier else supplier would be required to indemnify BSNL
of the loss of credit due to mis-match The compliances to be adhered by contractor includes
(but is not limited to) the following
(i) Uploading appropriate invoice details on the GSTN within the stipulated time
(ii) Issuing GST compliant invoice CN DN PO issued by BSNL should be referred by
contractor for capturing information on the invoice
(iii) Contractor needs to pay the entire self-assessed tax on timely basis
(iv) Where invoice is not uploaded or incorrect upload of invoice detail of GSTN by supplier
then credit on such invoice will be given provisionally subject to matching So acceptance of
changes made by BSNL on GSTN on account of non-upload or incorrect upload of invoice
details on GSTN is to be submitted by supplier Such changes wrt the mismatch are required
to be accepted by supplier within the time limit prescribed under the GST law It should be
noted that in case supplier does not accept such changes within the time limit prescribed under
GST law the loss of input tax credit (if any) would be recovered from the supplier In case of
mismatch because of Suppliers fault prompt amendments must be made by the supplier else
supplier would be required to indemnify BSNL for the losses of credit and interest paid due to
mismatch
(v) contractor to issue all necessary documentation and perform all necessary compliances for
BSNL to be eligible to claim the input tax credit of GST tax to them In case BSNL is unable to
claim the input tax credit the amount wrt GST charged by the supplier would be recovered
from the supplier
1610 Refer) for clause stating that all the details of supplier (name address GSTN unregistered
supplier place of supply SAC HSN code etc) and other mandatory details shall be mentioned on the
invoice
1611Where the location agreed are more than one state then separate invoice state wise to claim
input tax credit in a particular state (typically happens in a bill to-ship to scenario) shall have to be
submitted
1612 It shall be the responsibility of the supplier to mention State of place of supply of goodsservices
in the invoice issued to BSNL
Seal amp Signature of Bidder
40
SECTION ndash 5 (Part-B)
SPECIAL CONDITIONS OF CONTRACT (SCC)
1 GENERAL
No official of Gazetted rank or other Gazetted officer employed in Engineering or administrative
duties in an Engineering BSNL or any other BSNL of the BSNL is allowed to work as a contractor for
a period of two years after his retirement from BSNL service without the previous permission of
BSNL This contract is liable to be cancelled if either the contractor or any of his employee is found at
any time to be such a person who hadnrsquot obtained the permission of BSNL as aforesaid before
submission of the engagement in the contractorrsquos service as the case may be
2 Material Handed over by The BSNL
21 The contractor shall transport (including loading and unloading) all stores issued to him from
Field Unit Telecom Store to the site of work at his own cost The BSNL shall not pay any
transportation charges to the contractor
22 All materials handed over to the contractor by the BSNL shall remain the absolute property of
BSNL and shall not be removed form site of the work except for use in the work and shall be at all
times open to inspection by the Representative of GMTD BHUJ
23 The contractor shall be responsible for the transportation of store storage and safe custody of all
material supplied to him by the BSNL which in the contractorrsquos custody whether or not installed in
the work The contractor shall satisfy himself regularly the quantity and quality of the materials
supplied to him and he will be responsible for any subsequent deterioration and discrepancy (inclusive
of theft) in the quantity quality the materials
3 LABOUR WELFARE MEASURES AND WORKMAN COMPENSATION
(AS APPLICABLE)
31 Obtaining License before commencement of work
The contractor shall obtain a valid labour license (if applicable) under the Contact Labour (RampA) Act
1919 and the Contract Labour (Regulation and Abolition) Central Rules 1971 before commencement
of the work and continue to have a valid license until the completion of work The contractor shall
also abide by the provisions of the Child Labour (Prohibition and Regulation) Act 1986 Any failure
to fulfill this requirement shall attract the penal provisions of this contract arising out of the resultant
non-execution of work
32 Contractors labour Regulations
321 Working Hours
3211 Normally working hours of an employee should not exceed 9 hours a day The working
day shall be so arranged the inclusive of interval for rest if any it shall not spread over
more than12 hours on any day
3212 When a worker is made to work for more than 9 hours on any day or for more than 48
hours in any week he shall be paid over time for the extra hours put in by him
3213 Every worker shall be given a weekly holiday normally on a Sunday in accordance with
the provisions of minimum Wages (Central Rules 1960 as amended from time to time
irrespective of whether such worker is governed by the Minimum Wages Act or not
3214 Where the minimum wages prescribed by the Government under the Minimum Wages
Act are not inclusive of the wages for the weekly day of rest the worker shall be entitled
to rest day wages at the rate applicable to the next preceding day provided he has
worked under the same contractor for a continuous period of not less than 6 days
3215 Where a contractor is permitted by the Engineer-in-Charge to allowed a worker to work
on a normal weekly holiday he shall grant a substituted holiday to him for the whole day
Seal amp Signature of Bidder
41
on one of the five days immediately before or after the normal weekly holiday and pay
wages to such worker for the work performed on the normal weekly holiday at the
overtime rate
322 Display of Notice Regarding Wages Etc
The contractor shall before he commences his work on contract display and correctly
maintain and continue to display and correctly maintain in a clear and legible condition
in conspicuous places on the work notices in English and in local Indian languages
spoken by the majority of the workers giving the minimum rates of the wages fixed
under Minimum Wages Act the actual wages being paid the hours of work for which
such wage are earned wages periods dates of payments of wages and other relevant
information
323 Payment of Wages
3231 The contractor shall fix wage periods in respect of which wages shall be payable
3232 No wage period shall exceed one month
3233 The wages of every person employed as contract labour in an establishment or by a
contractor where less than one thousand such persons are employed shall be paid before
the expiry of seventh day and in other cases before the expiry of tenth day after the last day
of the wage period in respect of which the wages are payable
3234 Where the employment of any worker is terminated by or on behalf of the contractor the
wages earned by him shall be paid before the expiry of the second working day from the
date on which his employment is terminated
3235 All payment of wages shall be made on a working day at the work premises and during the
working time and on a date notified in advance and in case the work is completed before
the expiry of the wage period final payment shall be made within 48 hours of the last
working day
3236 Wages due to every worker shall be paid to him direct or to other person authorized by him
in this behalf
3237 All wages shall be paid in current coin or currency or in both
3238 Wages shall be paid without any deductions of any kind except those specified by the
Central Government by general or special order in this behalf or permissible under the
Payment of Wages Act 1956
3239 A notice showing the wages period and the place and time of disbursement of wages shall
be displayed at the place of work and a copy sent by the contractor to the Engineer ndashin-
Charge under acknowledgement
32310 It shall be the duty of the contractor to ensure the disbursement of wages in presence of the
site Engineer or any other authorized representative of the Engineer-in-Charge who will be
required to be present at the place and time of the disbursement of wages by the contractor
to workmen
32311 The contractor shall obtain from the site Engineer or any other authorized representative of
the Engineer-in-Charge as the case may be a certificate under his signature at the end of
the entries in the ldquoRegister of Wages ldquo or the ldquoWage-cum-Muster Rollrdquo as the case may
be in the following form -
ldquoCertified that the amount shown in the column Nohelliphelliphelliphelliphas been paid to the
workman concerned in my presence on helliphelliphelliphelliphelliphellip at helliphelliphelliphelliphelliphelliphelliphelliphelliprdquo
32312 Fines and deductions which may be made from wages
A The wages of a worker shall be paid to him without any deduction of any kind except the
following -
a) Fines
(b) Deductions for absence from duty ie from the place or the places where by the terms of
his employment he is required to work The amount of deduction shall be in proportion
to the period for which he was absent
(c) Deductions for damage to or loss of goods expressly entrusted to the employed person
for custody or for loss of money or any other deductions which he is required to
account where such damage or loss is directly attributable to his neglect or default
Seal amp Signature of Bidder
42
(d) Deduction for recovery of advances or for adjustment of over payment of wages
advances granted shall be entered in register
(e) Any other deductions which the Central Government may form time to time allow
B No fines should be imposed on any worker save in respect of such acts and omissions
on his part as have been approved of by the Labour Commissioner
C No fine shall be imposed one worker and no deduction for damage or loss shall be
made from his wages until the worker has been given an opportunity of showing cause
against such fines or deductions
D Every fine shall be deemed to have been imposing on the day of the act or omission in
respect of which it was imposed
524 Labor records 1 The contractor shall maintain a Register of Persons employed on work on contract in
Form XIII of the Contract Labour (RampA) Central Rules 1971
2 The contractor shall maintain a Muster Roll register in respect of all workmen
employed by him on the work under Contract in Form XVI of the CL (RampA) Rules
1971
3 The contractor shall maintain a Wage Register in respect of all workmen employed by
him on the work under contract in From XVII of the CL (RampA) Rules 1971
4 Register of accidents- The contractor shall maintain a register of accidents in such
form as may be convenient at the work place but the same shall include the following
particulars
(a) Full Particulars of the laborers who met with accident
(b) Rate of wages
(c) Sex
(d) Age
(e) Nature of accident and cause of accident
(f) Time and date of accident
(g) Date and time when admitted in hospital
(h) Date of discharge from the hospital
(i) Period of treatment and result of treatment
(j) Percentage of loss of earning capacity and disability as assessed by
Medical officer
(k) Claim required to be paid under Workmenrsquos Compensation Act
(l) Date of payment of compensation
(m) Amount paid with details of the person to whom the same was paid
(n) Authority by whom the compensation was assessed
(o) Remarks
5 The contractor shall maintain a Register of Fines in the Form XII of the CL(RampA)
Rules 1971 the Contractor shall display in a good condition and in a conspicuous
place of work the approved list of acts and commission for which fines can be
imposed
6 The contractor shall maintain a Register of deductions for damage or loss in Form
XX of the CL (RampA) Rules 1971
7 The contractor shall maintain a Register of Advances in Form XXIII of the CL
(RampA) Rules 1971
8 The contractor shall maintain a Register of Overtime in Form XXIII of the CL
(RampA) Rules 1971
9 Attendance card-cum wage slip a The contractor shall issue an Attendance card cum wage slip to each workman
employed by him
b The card shall be valid for each wage period
Seal amp Signature of Bidder
43
c The contractor shall mark the attendance of each workman on the card twice each
day once at the commencement of the day and again after the rest interval before
he actually starts work
d The card shall remain in possession of the worker during the wage period under
reference
e The contractor shall complete the wage slip portion on the reverse of the card at
least a day prior to the disbursement of wages in respect of the wage period under
reference
f The contractor shall obtain the signature or thumb impression of the worker on the
wag slip at the time of disbursement of wages and retain the card with him
10 Employment card The contractor shall issue an Employment Card in the Form XIV of CL (RampA) Central Rules
1971 to each worker within three days of the employment of the worker
11 Service certificate
On termination of employment for any reason whatsoever the contractor shall issue to the
workman whose services have been terminated a Service Certificate in the Form XV of the
CL (RampA) Central Rules 1971
12 Preservation of labour records The labour records and records of Fines and deductions shall be preserved in original for a
period of three years from the date of last entries made in them and shall be made available for
inspection by the Engineer-in-Charge or Labour Officer or any other officers authorized by the
Ministry of Communication in this behalf
13 Power of labour officer to make investigations or enquiry The labour officer or any person authorized by the Central Government on their behalf shall
have power to make enquiries with a view to ascertaining and enforcing due and proper
observance of Fair Wage Clauses and provisions of these Regulations He shall investigate
into any complaint regarding the default made by the contractor in regard to such provision
14 Report of Investigating officer and action thereon The labour Officer or other persons authorized as aforesaid shall submit a report of result of
his investigation or enquiry to the Engineer in-Charge indicating the extent if any to which
the default has been committed with a note that necessary deductions from the contractorrsquos bill
be made and the wages and other dues be paid to the labourers concerned The Engineer in-
Charge shall arrange payments to the labour
concerned within 45 days from the receipt of the report from the Labour Officer or the
authorized officer as the case may be
15 Inspection of Books And slips The contractor shall allow inspection of all the prescribed labour records to any of his workers
or to his agent at a convenient time and place after due notice is received or to the Labour
Officer or any other person authorized by the Central Government on his behalf
16 Submission of Returns The contractor shall submit periodical returns as may be specified form time to time
17 Amendments
The Central Government may from time to time add to or amend the regulations and on any
question as to the applicationinterpretation or effect of those regulations
Contractor must fulfill the terms and condition towards fulfillmentscompliance of the
provision of EPF amp Miscprovision act 1952 amp Employment provident Fund Scheme 1952 in
respect of laborersemployees engaged by the contractor Contractor must submit declaration
form regarding compliance of the condition of EPF act 1952
525 INSURANCE Without limiting any of his other obligations or liabilities the contractor shall at his own
expense take and keep comprehensive insurance including third party risk for the plant
machinery men materials etc brought to the site and for all the work during the execution
The contractor shall also take out workmenrsquos compensations insurance as required by law and
under take to indemnify and keep indemnified the Government from and against all manner of
Seal amp Signature of Bidder
44
claims and demands and losses and damages and cost (including between attorney and client)
charges and expenses that may arise in regard the same or that the Government may suffer or
incur with respect to endor incidental to the same The contractor shall have to furnish
originals and or attested copies as required by the BSNL of the policies of insurance taken
within 15 (fifteen) days of being called upon to do so together with all premium receipts and
other papers related thereto which the BSNL may require
526 COMPLIANCE WITH LAWS AND REGULATION
During the performance of the works the contractor shall at his own cost and initiative
fully comply with all applicable laws of the land and with any and all applicable by-laws
rules regulations and orders and any other provisions having the force of law made or
promulgated or deemed to be made or promulgated by the Government Governmental
agency or BSNL municipal board Government of other regulatory or Authorized body or
persons and shall provide all certificates or compliance therewith as may be required by
such applicable law By-laws Rules Regulations orders and or provisions The
contractor shall assume full responsibility for the payment of all contributions and pay roll
taxes as to its employees servants or agents engaged in the performance of the work
specified in the contractor documents If the contractor shall require any assignee or sub-
contract to comply with the provisions of the clause and in this connection the contractor
agrees as to undertake to save and hold the Government harmless and indemnified from
and against any all penalties actions suits losses and damages claims and demands and
costs (inclusive between attorney and client) charges and expenses whatsoever arising out
or occasioned indirectly or directly by failure of the contractor or any assignee or sub-
contractor to make full and proper compliance with the said by-laws Rules Regulations
laws and Order and provisions as aforesaid
6 TOOLS and PLANTS
The contractor shall provide at his own cost all tools plants appliances implements etc
required for proper execution of works The contractor shall also supply without charge
the requisite number of persons with the means and materials necessary for the purpose of
setting out works counting weighing and assisting the measurements for examination at
any time and from time to time Failing his so doing the same may be provided by the
Engineer-in-charge at the expense of the contractor and the expenses shall be deducted
from any money due to the contractor under this contract or otherwise
As per Para 367 of the recommendationobservation of Tenth Report of parliamentary
standing committee on labour Contractor would provide the same social security to the
labours engaged by him as is available to regular employees
As per Para 368 of the recommendationobservation of Tenth Report of parliamentary
standing committee on labour Contractor shall ensure implementation of equal pay for equal
work and also equal remuneration to men and women
Seal amp Signature of Bidder
45
SECTION ndash 7
PROFORMAS
7 (A) BID SECURITY EMD Guarantee
(To be typed on Rs100- non-judicial stamp paper)
Whereas (hereinafter called the Bidder) has submitted its bid datedfor
the supply of vide Tender Nohelliphelliphelliphelliphelliphelliphelliphellip dated KNOW ALL MEN by
these presents that WE OF having our registered office at
(hereinafter called the Bank) are bound unto Bharat Sanchar Nigam Limited (hereinafter
called the Purchaser) in the sum of Rs for which payment will and truly to be made of
the said Purchaser the Bank binds itself its successors and assigns by these present
THE CONDITIONS of the obligation are
1 If the Bidder withdraws his bid during the period of bid validity specified by the Bidder
on the Bid form or
2 If the Bidder having been notified of the acceptance of his bid by the Purchaser during the
period of bid validity
(a) fails or refuses to execute the Contract if required or
(b) fails or refuses to furnish the Performance Security in accordance with the instructions to
Bidders
We undertake to pay to the Purchaser up to the above amount upon receipt of its first written demand
without the purchaser having to substantiate its demand provided that in its demand the purchaser
will note that the amount claimed by it is due to it owning to the occurrence of one or both of the two
conditions specifying the occurred condition or conditions
This guarantee will remain in force as specified in clauses 12 and 282 of section 4 Part A of the Bid
Document upto and including THIRTY (30) days after the Period of bid validity and any demand in
respect thereof should reach the Bank not later than the specified datedates
Signature of the Bank Authority
Name
Signed in Capacity of
Name amp Signature of witness Full address of Branch
Address of witness Tel No of Branch
Fax No of Branch
Seal amp Signature of Bidder
46
7 (B) PERFORMANCE SECURITY BOND FORM
(To be typed on Rs100- non-judicial stamp paper)
Datedhelliphelliphelliphelliphellip
Sub Performance guarantee
Whereas General Manager Telecom Bhuj Telecom District Bhuj (hereafter referred to as BSNL) has issued an AWO no
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellipDated helliphelliphelliphellip20hellip awarding the work of
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip to Ms
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip(hereafter referred to as ldquoBidderrdquo) and BSNL has asked him to submit a performance guarantee
in favour of AO(Cash) BSNL Oo GMTD BHUJ of Rs helliphelliphelliphelliphelliphellip- (hereafter referred to as ldquoPG Amountrdquo) valid up
to helliphelliphelliphellip20helliphelliphellip (hereafter referred to as ldquoValidity Daterdquo)
Now at the request of the Bidder We helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellipBank
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip Branch having (Address) and Regd
office address as helliphelliphellip helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip (Hereinafter called lsquothe
Bankrdquo) agreed to give this guarantee as hereinafter contained
2 We ldquothe Bankrdquo do hereby undertake and assure to the BSNL that if in the opinion of the BSNL the Bidder has in any way
failed to observe or perform the terms and conditions of the said agreement or has committed any breach of its obligations
there-under the Bank shall on demand and without any objection or demur pay to the BSNL the said sum limited to PG
Amount or such lesser amount as BSNL may demand without requiring BSNL to have recourse to any legal remedy that may
be available to it to compel the Bank to pay the same
3 Any such demand from the BSNL shall be conclusive as regards the liability of Bidder to pay to BSNL or as regards the
amount payable by the Bank under this guarantee The Bank shall not be entitled to withhold payment on the ground that the
Bidder had disputed its liability to pay or has disputed the quantum of the amount or that any arbitration proceeding or legal
proceeding is pending between Bidder and BSNL regarding the claim
4 We the Bank further agree that the guarantee shall come into force from the date of its issue and shall remain in full force
and effect up to its Validity date
5 The Bank further agrees that the BSNL shall have the fullest liberty without the consent of the Bank and without affecting
in any way the obligations hereunder to vary any of the terms and conditions of the said agreement or to extend the time for
performance of the said agreement from any of the powers exercisable by BSNL against the Bidder and to forebear to enforce
any of the terms and conditions relating to the said agreement and the Bank shall not be relieved from its liability by reason
of such failure or extension being granted to Bidder or through any forbearance act or omission on the part of BSNL or any
indulgence by BSNL to Bidder or any other matter or thing whatsoever which under the law relating to sureties would but for
this provision have the effect of relieving or discharging the guarantor
6 Notwithstanding anything herein contained
(a) The liability of the Bank under this guarantee is restricted to the PG Amount and it will remain in force up to its Validity
date
(b) The guarantee shall stand completely discharged and all rights of the BSNL under this Guarantee shall be extinguished if
no claim or demand is made on us in writing on or before its validity date
7 In case BSNL demands for any money under this bank guarantee the same shall be paid through bankerrsquos Cheque in
favour of ldquoAO(Cash) BSNL Oo GMTD BHUJ rdquo payable at Bhuj
8 The Bank guarantees that the below mentioned officer who have signed it on behalf of the Bank have authority to give this
guarantee under its delegated power
Place helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip
Date helliphelliphelliphelliphelliphelliphelliphelliphelliphellip (Signature of the Bank Officer)
Rubber stamp of the bank
Authorized Power of Attorney Number helliphelliphelliphelliphelliphellip
Name of the Bank officer helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip
Having examined the tender documents terms and conditions stipulated therein specifications of work
etc we the under signed offer to execute the repair Works in conformity with the said specifications and
conditions of contract as under
Sl No
ITEM DESCRIPTION
Repair Charges per module inclusive of freight
forwardingpacking amp all taxes amp levies (except GST)
(in Figure)
Unit Rate in Words
Total Cost (unit rate qty)
1 2 3 4 5
1 25 AMP Module
2
50 AMP Module
3 100 AMP Module
4 Control Panel of
Power Plants
25A 50A amp 100A
5 GRAND TOTAL
Note -
1 GST will be payable extra on approved rates 2If our Bid is accepted we shall submit the securities as per the conditions mentioned in the contract
3We agree to abide by this Bid for a period of 180 days from the date of opening of financial bid and it shall
remain binding upon us and may be accepted at any time before the expiry of that period
4 The evaluation will be made on the basis of lowest rate quoted as under Lowest Rate = (rate quoted for 25 AMP Qty + rate quoted for 50 AMP Qty + rate
quoted for 100 AMP Qty + rate quoted for Control Panel of Power Plant AMP Qty)
The bidder who has offered lowest rate as evaluated above will be treated as L1 bidder
Date Signature of Tenderer
Seal amp Signature of Bidder
49
CHECK LIST
Sl No
Description Tender Clause Mode of Submission
1 Tender Fee Section 1 (part A) Para 21 22
Off-line
2 EMD Section 1 (part A) Para 51 52 Off-line 3 Power of Attorney Section 4 (Part A) clause 143 Off-line 4 Latest and Valid MSME NSIC certificate (If Applicable) Off-line 5 Experience Certificate Section 1 (part A)
c) E-reverse auction if required by Business Unit Planning cell after opening of the Financial bids
Note 1 In case of 1(b) above the bidder shall submit Techno-commercial amp Financial bid simultaneously
The bids will be evaluated techno-commercially first and thereafter financial bids of techno
commercially compliant bidders only shall be opened
2 Bid Validity Period validity of Bid offer 150 days from the tender opening date and Validity of bid
Offer for acceptance by BSNL can be extended
3 Bid must be submitted by bidder through E-tendering mode only Manual (OFFLINE)
submission of bids should not be considered The following documents are required to be submitted
offline to AGM (PLG) Oo GMTD Haripar Road Bhuj-370001 on or before the date amp time of
submission of bids in a sealed envelope
The envelope shall bear the tender number name of work and the phrase Do Not Open Before (due date amp
time of opening of tender)
i) EMD - Bid security (original copy)
ii) DD Bankers cheque of Tender fee
iii) Power of Attorney in accordance with clause 143 of section 4 Part A and authorization for
executing the power of Attorney
iv) Latest and valid MSME NSIC Certificate duly certified by NSIC if applicable
The purchaser shall not be responsible if the envelop is delivered elsewhere or late
In case of tenders invited under two envelopes system the first envelope will be named as techno commercial amp
will contain documents of bidderrsquos satisfying the eligibility Technical amp commercial conditions and 2nd
envelope will be named as financial envelope containing financial quote
a) Techno-commercial part of the bid shall contain one set of the following documents only-
i) Certificate(s) showing fulfillment of the eligibility criteria The bidder shall furnish as part of his bid
documents establishing the bidders eligibility all the following documents or whichever is required as per
terms and conditions of bid documents
Sl Particular Documents to be submitted
i Registration
Certificate
Firm Registration Certificate Certificate of Incorporation Shop amp
Establishment Certificate
ii In case of
Proprietorship
proprietorship firms an affidavit of that effect should be submitted along with
the bid
iii Partnership
Company
Partnership Deed or ArticlesMemorandum of Association as the case may be
amp Power of Attorney (if applicable) should be made older than the date of
submission of bid
iv Experience Experience Certificate as mentioned in the eligibility criteria
v EMD amp Tender Fee As per Table A amp clause 1 amp 2 OR Copy of Latest amp valid MSE NSIC
Certificate (if applicable)
vi EPF Copy of Registration Certificate of EPF (if applicable)
vii ESIC ESIC Registration (if applicable)
ix Taxes Copy of Valid Goods and Services Tax Registration No Declaration
that he is not registered and will get registered if required x PAN Card Copy of PAN Card
All documents submitted will also be self attested by the bidder
ii) Power of Attorney amp authorization for executing the power of Attorney in accordance with clause 143 of
Section -4 Part A
iii) The complete Bid document duly signed on end of each section at least
iv) Agency details letter for authorization of bid Undertakings Undertakings Non-Relation Certificate as
given vide Section 2(A) to 2(D) of this Bid form
b) Financial envelope shall contain Electronic Form- financial along with Price Schedule (Section 8)
with all relevant bid annexure (in case of tenders invited through e-tendering process)
Seal amp Signature of Bidder
8
SECTION -2 (Part-A)
AGENCY DETAILS
(Including performance records financial viability etc)
Name of firm
Registered Address
Status of the Bidder (i) Proprietorship concern
(ii) Partnership firm
(iii) HUF
(iv) Limited Company
Name of person or authorized signatory for
submitting the tender other documents and
empowered for correspondence with BSNL
GSTIN No
PAN Card particulars
Telephone numbers (with STD Code) of
authorized signatory
Office Residence
Mobile E-mail
Name(s) of Proprietor all Partners all
Directors
Infrastructure capabilities
A Capacity of Repairing 25A module per
week
B Capacity of Repairing 50A module per
week)
C Capacity of Repairing 100A module per
week
D Capacity of Repairing control panel per
week
F Details of trained staff available
A --------------------------------
B --------------------------------
C --------------------------------
D --------------------------------
F --------------------------------
Signature of Tenderer
Name of Tenderer
Along with date amp Seal
Seal amp Signature of Bidder
9
SECTION- 2 PART B
LETTER OF AUTHORISATION FOR ATTENDING BID OPENING
(To be typed preferably on letter head of the company)
Subject Authorization for attending Bid opening
I We Mr Ms helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip have submitted our bid for the tender no
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip in respect of helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip (Item
of work) which is due to open on helliphelliphelliphelliphelliphelliphellip (date) in the Meeting Room
We hereby authorize Mr Ms helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip helliphelliphelliphelliphelliphelliphelliphelliphellipamp
rohelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphereby certify that we or our firm
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip has not been BLACK LISTED by
any SSACircle of MTNLBSNL In case at any stage it is found that the information given by me is
falseincorrect BSNL shall have the absolute right to take any action as deemed fitwithout any prior
intimation to me
e) Clause by Clause Compliance
It is to certify that the tender document is carefully read amp understood and all the sections and clauses
are complied unconditionally amp unequivocally There is no deviation from the terms amp conditions of
the tender
f) Declaration for EPF amp Misc Provisions Act 1952
I _____________________________ (Name of the bidder agency) hereby declare compliance
towards conditions of the EPF and Misc Provisions Act 1952 and authorize BSNL to recover any
payment that arises due to failure to comply with any of the Labour legislations and statutory
conditions viz Labor EPF ESI etc or any other acts dealing with the same and all other acts
mentioned in the tender document
g) CERTIFICATE REGARDING FIRM IS NOT BLACK LISTED BY GST AUTHORITY
rohelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphereby certify that we or our firm
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip has not been BLACK LISTED by
any GST Authority
Date helliphelliphelliphelliphellip helliphellip helliphelliphelliphelliphelliphelliphelliphelliphellip
Signature of Tenderer
Place helliphelliphelliphelliphellip Name of Tenderer
Along with date amp Seal
Seal amp Signature of Bidder
11
SECTION- 2 PART D
DECLARATION REGARDING NO RELATIVE WORKING IN BSNL
I ___________________________Son of W O___________________________
RO _________________________here by certify that none of my relative(s) as defined in tender
document isare employed in BSNL unit as per details given in tender document In case at any stage
it is found that the information given by me is false incorrect BSNL shall have the absolute right to
take any action as deemed fit without any prior intimation to me
Signed ___________________
For and on behalf of the Agency
Name (Capitals) ___________________________
Position ____________________________
Date ____________________________
Note - In case of proprietorship firm certificate will be given by the proprietor for partnership firm
certificate will be given by all the partners on separate paper and in case of limited company by all
the Directors of the Company on separate paper Any breach of these conditions by the company or
firm or any other person the tender work will be cancelled and earnest money security deposit will
be forfeited at any stage whenever it is so noticed BSNL will not pay any damages to the company or
firm or the concerned person The company or firm or the person will also be debarred for further
participation in the concerned unit
Seal amp Signature of Bidder
12
SECTION- 3
SCOPE OF WORK AND JURISDICTION OF CONTRACT
1 SCOPE OF WORK
1 During the entire period of contract repairing of all types and of any make such as AMAR RAJA DACS DELTA DYNA ELTEK EXICOM HIMACHAL EXICOM ITI etc SMPS Power plant Modules (25 AMP 50 AMP 100 Amp ) Control panel are to be carried out including replacement of faulty parts
2 Collection and Delivery of Faulty repaired modules - a The concerned JTOSDEAGM in charge will intimate the contractor the Location Make capacity and
quantity of faulty modules by email (copy to AGM(Plg) on agmplgbhujgmailcom ) followed by ERP PO on mail
b The contractor will collect the module from the concerned in charge with in THREE days from the date of intimation under proper receipt to the concerned in charge However under emergent condition the collection of modules may be done on the same day
c Packing transport and delivery of faulty as well as repaired modules is the responsibility of the contractor
d The contractor shall repair the module and return to the concerned in charge with in Seven days of its collection However under emergent condition as decided by the concerned in charge the collection and repair shall be made within the time period given in the ERP PO
e Repaired modules will be tested by the SDE concern within TWO days on receipt of repaired modules if it is found OK then a certificate of this may be issued to the contractor Otherwise same shall be returned to the contractor for necessary action
f The date of receipt of all the modules mentioned in the ERP PO duly tested OK will be reckoned as the completion of ERP PO
g Repaired modules are warranted for 3 months from the date of successfully taken over During this time the contractor has to rectify the module free of cost
3 INSPECTION AND TESTS - a) The BSNL BHUJ or his representative shall have the right to inspect and test the repaired module as
per prescribed test schedules for their conformity to the specifications Where the BSNL BHUJ decides to conduct such tests on the premises of the Contractor or its subcontractor(s) all reasonable facilities and assistance like Testing Instruments and other test gadgets including access to drawings and production data shall be furnished to the inspectors at no charge to the Purchaser
b) Should any inspected or tested repaired module fail to conform to the Specifications the BSNL BHUJ may reject them and the Contractor shall either replace the rejected repaired module or make all alterations necessary to meet Specification requirements free of cost to the Purchaser
c) Notwithstanding the pre-repair tests and inspections prescribed in clause 3(a) amp 3(b) above the module and accessories on receipt in the BSNL s premises will also be tested during and after installation before take over and if any equipment or part thereof is found defective the same shall be replaced free of all cost to the BSNL BHUJ
d) If any module or any part thereof before it is taken over under clause 3(e) below is found defective or fails to fulfill the requirements of the contract the inspector shall give the Contractor notice setting forth details of such defects or failure and the Contractor shall make the defective module good or alter the same to make it comply with the requirements of the contract forthwith and in any case within a period not exceeding one month of the initial report The replacements shall be made by the Contractor free of all charges at site should it fail to do so within this time the BSNL BHUJ reserves the discretion to reject and replace at the cost of the Contractor the whole or any portion of the module as the case may be which is defective or fails to fulfill the requirements of the contract The cost of any such replacement made by the BSNL BHUJ shall be deducted from the amount payable to the Contractor
Seal amp Signature of Bidder
13
e) When the performance tests called for have been successfully carried out the inspector ultimate
Consignee will forthwith issue a Taking Over Certificate The inspectorultimate consignee shall not delay the issue of any Taking Over Certificate ldquo contemplated by this clause on account of minor defects in the module which do not materially affect the commercial use thereof provided that the Contractor shall undertake to make good the same in a time period not exceeding two months The taking Over Certificate shall be issued by the ultimate consignee within six weeks of successful completion of tests
f) After performance test carried out by the concerned SDE of BSNL as per prescribed schedule and repaired modules are found ok in all respect than the repaired modules will be accepted
g) A register is to be maintained at each placelocation mentioning the details of Modules date of Collection and Delivery of Faulty repaired modules replacement of spares amp remark if any and it is to be signed by the controlling officer amp Service engineer
h) Nothing in clause 3 shall in any way release the Contractor from any Warranty or other obligations under this contract
4 SPARES - All the spare of good quality required for repair of modules of SMPS PP are to be supplied by the contractor including major components
5 The contractor shall be responsible for any loss or damages caused to man or machinespartsinstruments during the execution of work and shall replace with an identical new item at his own cost The authorized officerperson of BSNL will have the liberty to check the material and work etchellip provided by the contractor
6 Governing Conditions for RNP (Repair Not Possible) Cases
A module Control panel may be declared RNP only if cost of material to be replaced exceeds five times of approved rate of repair In no case labour cost involved will be considered for deciding RNP A detailed report is to be submitted by contractor to concerned officer in-charge and final decision in this regard will be taken by concerned DGM subjected to maximum permissible RNP as given below
a)25-A module Maximum 10 of total quantity ordered for repair
b) 50-A 100-A Module Maximum 5 of total quantity ordered for repair
c) Control Panel Maximum 10 of total quantity ordered for repair
In case of RNP exceeding permissible limits penalty will be imposed as per para 11 (d) of section-5 (Part-A)
7 WARRANTY - a) Repaired modules are warranted for 3 months from the date of successfully taken over During this
time the contractor has to rectify the module free of cost The contractor shall warrant that repaired module shall be free from all defects and faults in materials used workmanship It becomes necessary for the contractor to replace or renew any defective portion(s) of the module under this clause
b) Replacement under warranty clause shall be made by the contractor free of all charges at site including freight insurance and other incidental charges
c) If any defect is not remedied by the contractor within a reasonable time the BSNL BHUJ may proceed to get the defects remedied from other contractor etc at the contractors risk and expenses but without prejudice to any other rights which the BSNL BHUJ may have against the contractor in respect of such defects
Seal amp Signature of Bidder
14
SECTION- 4 (Part-A)
GENERAL INSTRUCTION TO BIDDERS (GIB)
1 DEFINITIONS
1 BSNL The BSNL means the BSNL Bhuj Telecom Dist under the Ministry of
Communications which invites the tenders on behalf of the General Manager Bhuj Telecom
District Includes executives in the BSNL whatever designations assigned to them from time
to time who may be the in-charge of direction supervision testing acceptance and
maintenance including their successor(s) in the office appearing in various clauses shall be
taken to mean the BSNL Bhuj Telecom District
b The SSA Head means the Head of SSA General Manager Bhuj Telecom District Bhuj and
his successors
c The jurisdiction of the SSA Head The jurisdiction of the SSA Head means Bhuj Telecom
District which coincides geographically with (Revenue District(s))
d Representative of (the SSA Head) Representative of (the SSA Head ) means Officer and
staff for the time being in Bhuj Telecom District deputed by the General Manager Bhuj for
inspecting or supervising the work of testing etc
e Engineer ndash in - charge The Engineer ndash in - charge means the Engineering Officer
nominated by the BSNL to supervise the work under the contract (Minimum Divisional
Engineer level Officer)
f Site Engineer Site Engineer shall mean an SDESDOJTO of the BSNL who may be placed by
the General Manager Bhuj Telecom District Bhuj as in ndash charge of the work at site at any
particular period of time
g AT Unit AT Unit shall mean Acceptance and Testing unit of the BSNL
h AT Officer An officer authorized by General Manger ndash Bhuj Telecom Dist
i Contract The term contract means the documents forming the tender and acceptance
thereof and the formal agreement executed between the competent authority on behalf of the
BSNL and the contractor together with the documents referred to therein including these
conditions the specifications designs drawings and instructions issued from time to time by
the engineer in ndash charge and all these documents taken together shall be deemed to form one
contract and shall be complementary to one another In the contract the following expressions
shall unless the context otherwise requires have the meanings hereby respectively assigned to
them The expression works or work shall unless there be something either in the subject
context repugnant to such construction be construed or taken to mean the works by or by
virtue of the contract contracted to be executed whether temporary or permanent and whether
original altered substituted or additional
j Contractor The contractor shall mean the individual firm or company enlisted or not
enlisted with BSNL Department of Telecom in accordance with procedure for contractor or
registered for carrying out the work of cable laying whether incorporated or not undertaking
the works and shall include the legal personal representative of such individual or the persons
composing such firm or company or the successors of such firm or company and the
permitted assignees of such individual firm or company
k Work The expression lsquoworksrsquo shall unless there be something either in the subject or context
repugnant to such construction be construct and taken to mean the works by or by virtue of the
Seal amp Signature of Bidder
15
contract contracted to be executed whether temporary or permanent and whether original
altered substituted or additional
l Schedule(s) Schedule(s) referred to in these conditions shall mean the relevant schedule(s)
or the standard schedule of rates mentioned in the document
m Site The site shall mean the land or other places on into or through which work is to be
executed under the contract or any adjacent land path or street through which the work is to
be exacted under the contract or any adjacent land path or street which may be allotted or
used for the purpose of carrying out the contract
n Normal time or stipulated time Normal time or stipulated time means time specified in the
ERP PO to complete the work
o Extension of Time Extension of Time means the time granted by the BSNL to complete the
work beyond the normal time or stipulated time
p Exceptional risk Exceptional risks are risk due to war(whether declared or not) invasion act
of foreign enemies hostilities civil war rebellion revolution insurrection military or
usurped power any acts of Government damages from aircraft acts of God such as
earthquake lightening and unprecedented floods and other causes over which the contractor
has no control and the same having been accepted as such by the Accepting Authority or
causes solely due to use or occupation by the government of the part of the work in respect of
which a certificate of completion has been issued
q The ERP PO means the Order placed by the field units on the contractor signed by
the unit incharge r The Contract Rate means the rate payable to the repairer under the work order for
the full and proper performance of its contractual obligations
2 ELIGIBLE BIDDERS Kindly refer to clause 4 of Section ndash 1 Part A ie Detailed NIT
3 COST OF BIDDING
The bidder shall bear all costs associated with the preparation and submission of the bid The
BSNL will in no case be responsible or liable for these costs regardless of the conduct or
outcome of the bidding process
4 BID DOCUMENTS
41 The goods services required to be supplied bidding procedures and contract terms are prescribed
in the Bid Documents The contents of the Bid documents are specified in the covering letter
42 The Bidder is expected to examine all instructions forms terms and specifications in the Bid
Documents Failure to furnish all information required as per the Bid Documents or submission
of bids not substantially responsive to the Bid Documents in every respect will be at the bidders
risk and may result in rejection of the bid
5 CLARIFICATION OF BID DOCUMENTS
51 A prospective bidder requiring any clarification on the Bid Documents shall notify the User in
writing by FAX or by Email of the User as indicated in the invitation of Bid The User shall
respond in writing to any request for the clarification of the Bid Documents which it receives
7days prior to the date of opening of the Tenders Copies of the query (without identifying the
source) and clarifications by the User shall be uploaded on BSNL website as lsquoClarificationsrsquo on
e-procurement portal of Bhuj Telecom District portal clarification shall be available as
lsquoAddendumrsquo for all the prospective bidders who have downloaded the official copy of tender
documents from e-procurement portal of Bhuj Telecom District
Seal amp Signature of Bidder
16
52 Any clarification issued by BSNL in response to query raised by prospective bidders shall form
an integral part of bid documents and it may amount to an amendment of relevant clauses of the
bid documents
6 AMENDMENT OF BID DOCUMENTS
61 The BSNL may for any reason whether at its own initiative or in response to a clarification
requested by a prospective Bidder may modify bid documents by amendments prior to the date
of submission of Bids with due notification to prospective Bidders
62 The amendments shall be notified in writing or by Fax or by Addendum through e-tendering
portal to all prospective bidders on the address intimated at the time of purchase of bid document
from the BSNL and these amendments will be binding on them
63 In order to afford prospective bidders reasonable time in which to take the amendments into
account in preparing their bids the BSNL may at its discretion extend the deadline for the
submission of bids suitably
7 DOCUMENTS COMPRISING THE BID
The bid prepared by the bidder shall comprise the components specified in Section 2 of this
Tender
8 BID FORM
The bidder shall complete the Bid Form and the appropriate Price Schedule furnished in the Bid
Documents as per Section- 8
9 BID PRICES
91 The bidder shall give the total composite price inclusive of all levies and taxes packing
forwarding freight and insurance in case of materials to be supplied and inclusive of all taxes
and levies except GST in case of works to be executed GST will be paid extra as applicable
The contractor shall be responsible for transporting the materials to be supplied by the BSNL
(At the field Unit Telecom Store or otherwise) to execute the work under the contract to site at
histheir own cost The costs of transportation are subsumed in the standard Schedule Rates and
therefore no separate charges are payable on this account The offer shall be firm in Indian
Rupees
92 The price quoted by the bidder shall remain fixed during the entire period of contract and shall
not be subject to variation on any account A bid submitted with an adjustable price quotation
will be treated as non-responsive and rejected
93 Discount if any offered by the bidders shall not be considered unless they are specifically
indicated in the schedule of rates (financial Bid) Bidders desiring to offer discount shall
therefore modify their offers suitable while quoting and shall quote clearly net price taking all
such factors like Discount free supply etc into account
10 DOCUMENTS ESTABLISHING BIDDERS ELIGIBILITY AND QUALIFICATIONS Kindly refer to clause of Section ndash 1 and 2 of this bid
11 NA
12 BID SECURITYEMD
121 The bidder shall furnish as part of its bid a bid security one of the following ways-
(a) Demand Draft Bankerrsquos cheque from a Nationalizedscheduled bank drawn in favour
of AO (Cash) BSNL Oo GMTD Bhuj and payable at Bhuj
(b) Bank GuaranteeFDR from a Nationalizedscheduled bank drawn in favour of AO
(Cash) BSNL Oo GMTD Bhuj which should be valid for 180 days from the tender
opening date
For educational order EMD to be submitted by bidder as 20 of 10 of estimated tender
cost for each case in the form of cash Demand Draft Bankerrsquos cheque Bank guaranteeFDR
issued by a NationalizedScheduled bank drawn in favour of AO (Cash) BSNL Oo GMTD
Bhuj Bank Guarantee should be valid for 180 days from the tender opening date
122 The MSE bidders are exempted from payment of bid security
Seal amp Signature of Bidder
17
a) A proof regarding valid registration with body specified by Ministry of Micro Small
amp Medium Enterprise for the tendered items will have to be attached along with the
bid
b) The enlistment certificate issued by MSME should be valid on the date of opening of
tender
c) MSE unit is required to submit its monthly delivery schedule
d) If a vender registered with body specified by Ministry of Micro Small amp Medium
Enterprise claiming concessional benefits is awarded work by BSNL and
subsequently fails to obey any of the contractual obligations he will be debarred from
any further work contract by BSNL for one year from the date of issue of such order
123 The bid security is required to protect the BSNL against the risk of bidders conduct which would
warrant the bid securityrsquos forfeiture pursuant to para 127
124 A bid not secured in accordance with para 121 amp 122 shall be rejected by the BSNL being non-
responsive at the bid opening stage and archived unopened on e-tender portal for e-tenders
125 The bid security of the unsuccessful bidder will be dischargedreturned as promptly as possible
as but not later than 30 days after the expiry of the period of bid validity prescribed by the
BSNL pursuant to clause 13
126 The successful bidders bid security will be discharged upon the bidders acceptance of the
advance Purchase Order satisfactorily pursuant to clause 27 and furnishing the performance
security
The successful bidders bid security may be converted to Part Performance Security Deposit in
accordance with clause 28
127 The bid security may be forfeited
a) If the bidder withdraws or amends its bid or impairs or derogates from the bid in any
respect during the period of bid validity specified by the bidder in the bid form or
extended subsequently or
b) If the bidder does not accept the APO AWO and or does not submit PBG amp sign the
contract agreement in accordance with clause 28
Note - The bidder shall mean individual company firm or the front bidder and its technology
consortium partner as applicable
13 PERIOD OF VALIDITY OF BIDS
131 Bid shall remain valid for 150 days from the date of bid opening prescribed by the BSNL A bid
valid for a shorter period shall be rejected by the BSNL as non-responsive
132 In exceptional circumstances the BSNL may request the bidders consent for an extension to the
period of bid validity The request and the responses thereto shall be made in writing The bid
security provided under Clause 12 shall also be suitably extended A bidder may refuse the
request without forfeiting his bid security A bidder accepting the request and granting extension
will not be permitted to modify his bid
14 FORMAT AND SIGNING OF BID
141 The bidder shall submit his bid online (in case of e-tendering) amp through sealed envelopes
physically (in case of tenders with manual bidding process) complying all eligibility
conditions other terms and conditions of tender document to be read along with the
clarifications and amendments issued in this respect All the documents must be authenticated
using Digital Signature (DSC) with Class 2 or above (in case of e-tendering) amp by hand
signatures (for manual bidding process) by the authorized person The letter of authorization
shall be indicated by written power-of-attorney accompanying the bid
Note-The BSNL may ask the bidder(s) to supply besides original bid additional copy of bids as
required by him
142 The bid shall contain no interlineations erasures or overwriting except as necessary to correct
errors made by the bidder in which case such corrections shall be signed by the person or persons
signing the bid All pages of the original bid except for un-amended printed literatures shall be
digitally signed by the person or persons signing the bid
143 Power of Attorney
(a) The power of Attorney should be submitted and executed on the non-judicial stamp paper
Seal amp Signature of Bidder
18
of appropriate value as prevailing in the concerned states(s) and the same be attested by a
Notary public or registered before Sub-registrar of the state(s) concerned
(b) The power of Attorney be executed by a person who has been authorized by the Board of
Directors of the bidder in this regard on behalf of the Company institution Body
corporate
(c) In case of the bidder being a firm the said Power of Attorney should be executed by all the
partner(s) in favour of the said Attorney
(d) Attestation of the specimen signatures of authorized signatory by the Companyrsquos firmrsquos
bankers shall be furnished Name designation Phone number mobile number email
address and postal address of the authorized signatory shall be provided
(e) Individual signing the tenders or other documents connected with the contract shall indicate
the full name below the signature and must specify the capacity and authority under which
he signs such documents and shall also submit documentary evidence of his authority in
the form of Power of Attorney
(f) The Power of Attorney is to be submitted in original if it has been issued for the specific
tender enquiry If the power of attorney is issued in general irrespective of tender enquiry
then photocopy duly certified by notary public can also be accepted
(g) In case the representative of bidder company who uploads the document on e-tender portal
using his Digital Signature Certificates (DSC) which is different from the authorized
signatory for the bid (Power of Attorney holder) then the representative who uploads the
documents on e-tender portal using DSC issued in his name shall also be one of the Power
of Attorney holder by the bidder Company in addition to the authorized signatory for the
bid
15 SEALING AND MARKING OF BIDS
The bid shall be submitted online using single stage bidding and Two Envelope Methodology
151 The first envelope (Techno-commercial bid) This envelope shall contain documents of
bidders satisfying the eligibility Technical amp commercial conditions requirements Second
envelope will be named as financial bid containing price Schedule as per section 8 All
documents submitted will also be self attested by the bidder
152 a) The envelopes for Tender Fee EMD shall be addressed AGM (PLG) Oo GMTD
Haripar Road Bhuj - 370001
b) The envelope for Tender Fee EMD shall bear the name of the tender the tender number
and the words DO NOT OPEN BEFORE (due date amp time)
c) The envelopes for Tender Fee EMD shall indicate the name and complete postal address
of the bidder to enable the User to return the bid unopened in case it is declared to be received
late
d) The envelopes for Tender Fee EMD shall should be deposited in the tender box provided
by tendering authority or sent by registered post or delivered in person on above mentioned
address (address is given above) The responsibility for ensuring that the envelopes for Tender
Fee EMD shall are delivered in time would vest with the bidder
e) The envelopes for Tender Fee EMD shall delivered in person registered post on the day of
tender opening shall be delivered upto specified time amp date as stated in NIT to Oo GMTD
Haripar Road Bhuj - 370001 The User shall not be responsible if the envelopes for Tender
Fee EMD shall are delivered elsewhere
f) Venue of Tender Opening
Tender will be opened in Oo GMTD Haripar Road Bhuj - 370001 at specified time amp
date as stated in NIT If due to administrative reason the venue of Bid opening is changed it
will be displayed prominently on the above address
Seal amp Signature of Bidder
19
153 If envelopes are not sealed and marked as required at para 151 and 152 the bid shall be
rejected
16 SUBMISSION OF BIDS
161 Bids must be submitted by the bidders on or before the specified date amp time indicated in
Section-1 ie DNIT
162 The BSNL may at its discretion extend this deadline for the submission of the bids by
amending the bid documents in accordance with Clause 6 in which case all rights and
obligations of the BSNL and bidders previously subject to the deadline will thereafter be
subject to the deadline as extended
163 The bidder shall submit his bid offer against a set of bid documents purchased by him for all
or some systemservices equipment as per requirement of the Bid Documents He may
include alternate offer if permissible as per the bid However not more than one independent
and complete offer shall be permitted from the bidder
164 Bid must be submitted by the bidder through E-Tendering mode only Manual submission of bid
shall not be needed
17 LATE BIDS
No bid shall be accepted either online by E-Tender Portal or physically in case of manual
bidding process after the specified deadline for submission of bids prescribed by the purchaser
18 MODIFICATION AND WITHDRAWAL OF BIDS
181 The bidder may modify revise or withdraw his bid after submission prior to deadline prescribed
for submission of bid If a bid is withdrawn the same shall be archived unopened in the e-
procurement portal of Bhuj Telecom District
182 The bidderrsquos modification revision or withdrawal shall have to be online and digitally
authenticated as per clause 15
183 Subject to clause 20 no bid shall be modified subsequent to the deadline for submission of bids
19 OPENING OF BIDS BY BSNL
191 The purchaser shall open bids online in the presence of bidders or their authorized representatives
who chose to attend at time specified in Clause 7 of Detailed NIT(Section-1) on due date The
bidderrsquos representatives who are present shall sign in an attendance register Authority letter to
this effect shall be submitted by the bidders before they are allowed to participate in bid opening
(As per Format given in section 2 Part B)
192 A maximum of two representatives for any bidder shall be authorized and permitted to attend
the bid opening
193 (i) The bids will be opened in two stages ie techno-commercial bid shall be opened on the date
of tender opening given in NIT The financial bid will not be opened on the date of opening of
techno commercial bids
The financial bids of those bidders who are approved to be techno commercially compliant by
the competent authority will be opened by TOC in front of techno-commercially eligible
bidders authorized representatives by sending them a suitable notice
(ii) The bidderrsquos names Item name EMD amount amp validity and acceptability Information in
respect of eligible bidders Details of bid modification withdrawal (if any) and such other
details as the purchaser at its discretion may consider appropriate will be made available
online at the time of techno-commercial bid opening
(iii) The bidderrsquos names Name of the Items Quantitiesprices quoted in the bid discount if
offered Taxes amp levies and such other details as the purchaser at its discretion may consider
appropriate will be made available online at the time of financial bid opening
194 The date fixed for opening of bids if subsequently declared as holiday by the BSNL the revised
date of schedule will be notified However in absence of such notification the bids will be
opened in the next working day time and venue remaining unaltered
20 CLARIFICATION OF BIDS
201 To assist in the examination evaluation and comparison of bids the BSNL may at its discretion
Seal amp Signature of Bidder
20
ask the bidder for the clarification of its bid The request for the clarification and the response
shall be in writing However no post bid clarification at the initiative of the bidder shall be
entertained
202 If any of the documents required to be submitted along with the technical bid is found wanting
the offer is liable to be rejected at that stage However the BSNL at its discretion may call for
any clarification regarding the bid document within a stipulated time period The BSNL at itrsquos
discretion may also ask for the submission of any additionalmissing document(s) within a
stipulated time period In such case(s) the bidder shall have to comply the BSNLrsquos requirement
within the specified time In case of non-compliance to such queries the bid will be out rightly
rejected without entertaining further correspondence in this regardrdquo However no post bid
clarification at the initiative of the bidder shall be entertained
21 PRELIMINARY EVALUATION
211 BSNL shall evaluate the bids to determine whether they are complete whether any
computational errors have been made whether required sureties have been furnished whether
the documents have been properly signed and whether the bids are generally in order
212 Arithmetical errors shall be rectified on the following basis If there is a discrepancy between
the unit price and total price that is obtained by multiplying the unit price and quantity the
unit price shall prevail and the total price shall be corrected by the BSNL
213 If there is a discrepancy between words and figures the amount in words shall prevail If the
SupplierBidder does not accept the correction of the errors his bid shall be rejected
214 Prior to the detailed evaluation pursuant to clause 22 the BSNL will determine the substantial
responsiveness of each bid to the Bid documents For purposes of these clauses a substantially
responsive bid is one which conforms to all the terms and conditions of the Bid Documents
without material deviations The BSNLs determination of bids responsiveness is to be based
on the contents of the bid itself without recourse to extrinsic evidence
215 A bid determined as substantially non-responsive will be rejected by the BSNL and shall not
subsequent to the bid opening be made responsive by the bidder by correction of the non-
conformity
216 The BSNL may waive any minor infirmity or non-conformity or irregularity in a bid which
does not constitute a material deviation provided such waiver does not prejudice or affect the
relative ranking of any bidder
22 EVALUATION AND COMPARISON OF SUBSTANTIALLY RESPONSIVE BIDS
221 The Purchaser shall evaluate in detail and compare the bids previously determined to be
substantially responsive pursuant to Clause 21
222 The evaluation will be made on the basis of lowest rate quoted as under Lowest Rate
= (rate quoted for 25AMP Qty +rate quoted for 50AMP 100 AMP Qty + rate
quoted for Control Panel of Power Plant Qty) The bidder who has offered lowest
rate as evaluated above will be treated as L1 bidder 23 CONTACTING THE BSNL
231 Subject to Clause 20 no bidder shall try to influence the BSNL on any matter relating
to its bid from the time of the bid opening till the time the contract is awarded
232 Any effort by a bidder to modify its bid or influence the BSNL in the BSNLs bid evaluation
bid comparison or contract award decisions shall result in the rejection of the bid
24 PLACEMENT OF ORDER
241 The BSNL may consider placement of orders to execute the contract on those bidders whose
offers have been found technically commercially and financially acceptable The BSNL reserves
the right to counter offer price(s) against price(s) quoted by any bidder
The work against the tender is for one yearrsquos requirement and the terms and conditions of
this tender shall be operative for a period of one year from the date of signing of agreement
between the Company and the contractor with an option of extension for a further period
of one year at the same rates terms amp conditions
Seal amp Signature of Bidder
21
Distribution of Work Distribution of quantities for ordering to the selected bidders of a tender
Table 1(A) (Without provisions for MSE Units)
No of Bidders
to be approved
(Col 1)
Quantity allotted to the respective bidder
(Col 2)
L1 L2
One Bidder 100 Nil
Two Bidder 60 40
Table 1(B) (With provisions for MSME Units)
No of Bidders
to be approved
(Col 1)
Quantity allotted to the respective bidder (Col 2)
Qty
Earmarked for MSME
bidder(s)(Col 3)
L1 L2
One Bidder 80 Nil 20
Two Bidder 48 32 20
1) In case L2 and MSE bidder accepts the L1 rate in prescribed time amp do not submit MSD as per
tender terms and conditions the EMD will be forfeited If MSE bidder exceeded more than one than
20 work at L1 rate distributed among them
242 TERMS AND CONDITIONS FOR EDUCATIONAL ORDER
(a) 10 of the estimated quantity of work will be extended to inexperienced contractor for each
Tender
(b) Inexperienced Bidder has to apply separately for each Tender
(c) In case there are more than one bidder work will be distributed into the bidders
(d) The bidder shall not submit financial bid In case if the same is submitted then it will not be opened
(e) BSNL reserves a right to give any area to this bidder including that of other tender in which the
bidder has not participated
(f) The work to the inexperienced is a limited quantity (up to 10) in at a time further work will be
done on the basis of evaluation of field unit Additional quantity of work shall be given to such
contractor only after completion of initial work
(g) The payment for repairing to such contractors shall be based on L1 rates finalized in the tender
The payment will be released only after verification of quantity amp quality done as per the
instruction mentioned in respect of work in the tender
(h) All the other Terms amp conditions will remain the same
25 BSNLS RIGHT TO VARY QUANTITIES AT TIME OF AWARD
(a) BSNL reserves the right to vary up to 25 of the quantity of goods and services specified in
the schedule of requirements without any change in the unit price or other terms and conditions at
the time of award of contract
(b) BSNL also reserves the right for placement of additional order or up to 50 of the
additional quantities of goods and services contained in the running tender contract in the tender
at the same rate or a rate negotiated (downwardly) with the existing venders considering the
reasonability of rates based on prevailing market conditions and the impact of reduction in duties
and taxes etc and supplies to be obtained within delivery period scheduled afresh
No guarantee can be given to actual quantity The quantity mentioned in the tender is
tentative only No claim should entertained for less not allotting the quantum of work for any
reason
(c) In exceptional situation where the requirement is of an emergent nature and it is necessary to
ensure continued supplies from the existing venders the purchaser reserves the right to place
repeat order up to 100 of the quantities of goods and services contained in the running tender
contract at the same rate or a rate negotiated (downwardly) with the existing venders considering
the reasonability of rates based on prevailing market conditions and the impact of reduction in
duties and taxes etc Exceptional situation and emergent nature should be spelt out clearly
detailing the justification as well as benefits accrued out of it and loss incurred in case this
provision is not invoked and approved by the authority competent to accord administrative and
Seal amp Signature of Bidder
22
financial approval for the procurement calculated on the basis of total procurement ie initial and
proposed add-on quantity
26 BSNLS RIGHT TO ACCEPT ANY BID AND TO REJECT ANY OR ALL BIDS
The BSNL reserves the right to accept or reject any bid and to annul the bidding process and
reject all bids at any time prior to award of contract without assigning any reason whatsoever and
without thereby incurring any liability to the affected bidder or bidders on the grounds for the
BSNLs action
27 ISSUE OF ADVANCE WORK ORDER
271 The issue of an Advance Work Order (Letter of Intent) shall constitute the intention of BSNL to
enter into the contract with the bidder
272 The bidder shall within 14 days of issue of an advance work order give his acceptance along with
Performance Security Deposit in conformity with section 7(B) provided with the bid documents
28 SIGNING OF CONTRACT
281 The issue of FAT shall constitute the award of contract on the bidder
282 As soon as the tender is approved by the competent authority the Bid Security deposited by the
successful bidder may be converted into the Performance security deposit which will be held by
the BSNL till the completion of warranty period
29 ANNULMENT OF AWARD
Failure of the successful bidder to comply with the requirement of Clause 27 amp 28 shall
constitute sufficient ground for the annulment of the award and forfeiture of the bid security in
which event the BSNL may make the award to any other bidder at the discretion of BSNL or call
for new bids
30 NA
31 REJECTION OF BIDS
311 While all the conditions specified in the Bid documents are critical and are to be complied special
attention of bidder is invited to the following clauses of the bid documents Non-compliance of any
one of which shall result in outright rejection of the bid
(i) Clause 15 of Section 4 Part A The bids will be recorded returned unopened if covers are not
properly sealed with lsquoPERSONAL SEALrsquo of the bidder
(ii) Clauses 121 122 amp 131 of Section 4 Part A The bids will be rejected at opening stage if Bid
security is not submitted as per Clauses 121 amp 122 and bid validity is less than the period
prescribed in Clause 131 mentioned above
(iii) Clause 2 amp 10 of Section 4 Part A If the eligibility condition as per clause 2 of Section 4 Part
A is not met andor documents prescribed to establish the eligibility as per Clause 10 of
section 4 Part A are not enclosed the bids will be rejected without further evaluation
(iv) Clause 112 of Section 4 Part A NA
(v) Section 5 Part A Commercial conditions Section 5 Part B Special Conditions of Contract
Compliance if given using ambiguous words like ldquoNotedrdquo ldquoUnderstoodrdquo ldquoNoted amp
Understoodrdquo shall not be accepted as complied Mere ldquoCompliedrdquo will also be not sufficient
reference to the enclosed documents showing compliances must be given
(vi) Section 8 Price Schedule Prices are not filled in as prescribed in Financial Bid
(vii) Section 4 Part A clause 93 on discount which is reproduced below
ldquoDiscount if any offered by the bidder shall not be considered unless specifically indicated in
the price schedule Bidders desiring to offer discount shall therefore modify their offer
suitably while quoting and shall quote clearly net price taking all such factors like discount
free supply etc into accountrdquo
312 Before outright rejection of the Bid by Bid-opening team for non-compliance of any of the
provisions mentioned in clause 311(i) 311 (ii) above the bidder company is given
opportunity to explain their position however if the person representing the company is not
satisfied with the decision of the Bid opening team hethey can submit the representation to
Bid opening team immediately but in no case after closing of the tender process with full
justification quoting specifically the violation of tender conditions if any
Seal amp Signature of Bidder
23
313 Bid opening team will not return the bids submitted by the bidders on the date of tender
opening even if it is liable for rejection and will preserve the bids in sealed cover as submitted
by taking signatures of some of the desirous representatives of the participating
biddercompanies present on the occasion
314 The In charge of the Bid opening team will mention the number of bids with name of
company found unsuitable for further processing on the date of tender opening and number of
representations received in Bid opening Minutes and if Bid opening team is satisfied with the
arguments of the biddercompany mentioned in their representation and feel that there is
prima-facie fact for consideration the in charge of the Bid opening team will submit the case
for review to competent authority ie GMTD BHUJ as early as possible preferably on next
working day and decision to this effect should be communicated to the bidder company within
a week positively Bids found liable for rejection and kept preserved on the date of tender
opening will be returned to the bidders after issue of POfinal acceptance of tender against
the instant tender
315 If the reviewing officer finds it fit to open the bid of the petitioner this should be done by
giving three (working) days notice to all the participating bidders to give opportunity to
desirous participants to be present on the occasion
32 ACTION BY PURCHASER AGAINST BIDDER(S) VENDOR(S) IN CASE OF
DEFAULT In case of default by Bidder(s) Vendor(s) such as
a) Does not supply the equipment services in time
b) Equipment Services does not perform satisfactory in the field in accordance with the
specifications
c) Or any other default whose complete list is enclosed in Appendix-1
Purchaser will take action as specified in Appendix-1 of this section
33 DELETED
34 NEAR-RELATIONSHIP CERTIFICATE
341 The bidder should give a certificate that none of his her near relative as defined below is
working in the units where he is going to apply for the tender In case of proprietorship firm
certificate will be given by the proprietor For partnership firm certificate will be given by all
the partners and in case of limited company by all the Directors of the company excluding
Government of India Financial institution nominees and independent non-Official part time
Directors appointed by Govt of India or the Governor of the state and full time Directors of
PSUs both state and central Due to any breach of these conditions by the company or firm or
any other person the tender will be cancelled and Bid Security will be forfeited at any stage
whenever it is noticed and BSNL will not pay any damage to the company or firm or the
concerned person
342 The Company or firm or the person will also be debarred for further participation in the
concerned unit
343 The near relatives for this purpose are defined as-
(a) Members of a Hindu undivided family
(b) They are husband and wife
(c) The one is related to the other in the manner as father mother son(s) amp Sons
wife(daughter in law) Daughter(s) and daughters husband (son in law) brother(s) and
brothers wife sister(s) and sisters husband (brother in law)
344 The format of the certificate is given in Section -2(D)
35 VERIFICATION OF DOCUMENTS AND CERTIFICATES
The bidder will ensure that all the documents and certificates including experience
performance and self certificates submitted by him are correct and genuine before enclosing
them in the bid The onus of proving genuineness of the submitted documents would rest with
the bidder If any document paper certificate submitted by the participant bidder is found
discovered to be false fabricated tempered manipulated either during bid evaluation or
during award of contract or thereafter then the Purchaser will take action as per Clause-1 of
Appendix-1 of this section
Seal amp Signature of Bidder
24
Appendix-1 to Section - 4 (Part-A)
S
No
Defaults of the bidder vendor Action to be taken
A B C
1(a) Submitting fake forged
i) Rejection of tender bid of respective Vendor
ii) Banning of business for 3 years which implies barring
further dealing with the vendor for procurement of Goods amp
Services including participation in future tenders invited by
BSNL for 3 years from date of issue of banning order
iii) Termination Short Closure of POWO if issued This
implies non-acceptance of further supplies work amp services
except to make the already received material work complete
work in hand
a) Bank Instruments with the bid to meet
terms amp condition of tender in respect of
tender fee and or EMD
b) Certificate for claiming exemption in
respect of tender fee and or EMD
c) detection of default at any stage from
receipt of bids till award of APO issue of
POWO
Note 1- However in this case the performance guarantee if alright will not be forfeited
Note 2- Payment for already received supplies completed work shall be made as per terms amp conditions of
PO WO
1(b)
Submitting fake forged documents towards
meeting eligibility criteria such as
experience capability supply proof
registration with GST Income Tax
departments etc and as supporting
documents towards other terms amp conditions
with the bid to meet terms amp condition of
tender
(i) If detection of default is prior to award
of APO
i) Rejection of Bid amp
ii) Forfeiture of EMD
(ii) If detection of default after issue of APO
but before receipt of PG SD (DDBG etc)
i) Cancellation of APO
ii) Rejection of Bid amp
iii) Forfeiture of EMD
(iii) If detection of default after receipt of
PG SD (DDBG etc)
i) Cancellation of APO
ii) Rejection of Bid amp
iii) Forfeiture of PG SD
However on realization of PG SD amount EMD if not
already released shall be returned
(iv) If detection of default after issue of PO
WO
i) Termination Short Closure of POWO and Cancellation
of APO
ii) Rejection of Bid amp
iii) Forfeiture of PG SD
However on realization of PG SD amount EMD if not
released shall be returned
Note 3- However settle bills for the material received in correct quantity and quality if pending items do
not affect working or use of supplied items
Note 4- No further supplies are to be accepted except that required to make the already supplied items
work
Special Note 1- Authority competent to take final decision GMTD Bhuj
2 If vendor or his representative uses violent
coercive means viz Physical Verbal means
to threatens BSNL Executive employees
and or obstruct him from functioning in
discharge of his duties amp responsibilities for
the following
Banning of business for 3 years which implies Barring
further dealing with the vendor for procurement of Goods amp
Services including participation in future tenders invited by
BSNL for 3 years from date of issue of banning order
a) Obstructing functioning of tender opening
executives of BSNL in receipt opening of
tender bids from prospective Bidders
suppliers Contractors
Seal amp Signature of Bidder
25
b) Obstructing Threatening other
prospective bidders ie suppliers
Contractors from entering the tender venue
and or submitting their tender bid freely
Special Note 1- Authority competent to take final decision GMTD Bhuj
3 Non-receipt of acceptance of APO AWO
and SD PG by L-1 bidder within time
period specified in APO AWO
Forfeiture of EMD
Special Note 1- Authority competent to take final decision GMTD Bhuj
41 Failure to supply and or Commission the
equipment and or execution of the work at
all even in extended delivery schedules if
granted against PO WO
i) Termination of PO WO
ii) Under take purchase work at the risk amp cost of
defaulting vendor
iii) Recover the excess charges if incurred from the PG SD
and outstanding bills of the defaulting Vendor
42 Failure to supply and or Commission the
equipment and or execution of the Work in
full even in extended delivery schedules if
granted against PO WO
i) Short Closure of PO WO to the quantity already
received by and or commissioned in BSNL and or in
pipeline provided the same is usable andor the Vendor
promises to make it usable
ii) Under take purchase work for balance quantity at the
risk amp cost of defaulting vendor
iii) Recover the excess charges if incurred from the PG SD
and outstanding bills of the defaulting Vendor
Special Note 1- Authority competent to take final decision for 41 amp 42 by DGM concerned
51 The supplied equipment does not perform
satisfactory in the field in accordance with
the specifications mentioned in the PO
WOContract
i) If the material is not at all acceptable then return the non-
acceptable material (or its part) amp recover its cost if paid
from the os bills PG SD
OR
ii) If the material is inducted in network amp it is not possible
to return it and or material is acceptable with degraded
performance the purchaser may determine the price for
need to be issued in compliant format and timely within the time prescribed under GST law
163 In case of any deficientincompleterejected supply BSNL shall convey the same in a reasonable
time to enable the supplier to issue credit note and take tax adjustment
164 It would be the responsibility of the supplier to declare correct information on invoice and GSTN
viz the amount the place of supply rate of tax etc In case the eligibility of input tax credit is
questioned or denied to BSNL on account of default by the supplier the same would be
recovered by BSNL from the contractor
165 Registered location of the both the parties ie BSNL and contractor should be mentioned in the
agreement with GSTIN No Further supplier should raise invoices at the registered premise of
BSNL for availing of credit and ensure that the place of supply as per GST law is same as
registered premise
166 BSNL could at any time instruct the contractor to raise its invoices at a particular location of
BSNL
Seal amp Signature of Bidder
39
167 It is the responsibility of the supplier to ensure that place of supply and the GSTN of BSNL are
in the same state If for any reason they are not in the same state the contractor shall intimate to
BSNL and give adequate time before raising of the invoice
168 E-waybill number should be mentioned on the invoices
169 contractor shall be responsible for timely issuance and delivery of invoice DN CN to enable
BSNL to claim tax benefit on or before the stipulated time period provided by the GST law
(a) It is the responsibility of the contractor to ensure that outward supply return (GSTR-1) would be
filed correctly If not than cost would be borne by supplier
(b) Reporting of correct outward supply by supplier in the outward return (GSTR-1) is the
responsibility of the supplier In case of mismatch because of contractorrsquos fault prompt
amendments must be made by the supplier else supplier would be required to indemnify BSNL
of the loss of credit due to mis-match The compliances to be adhered by contractor includes
(but is not limited to) the following
(i) Uploading appropriate invoice details on the GSTN within the stipulated time
(ii) Issuing GST compliant invoice CN DN PO issued by BSNL should be referred by
contractor for capturing information on the invoice
(iii) Contractor needs to pay the entire self-assessed tax on timely basis
(iv) Where invoice is not uploaded or incorrect upload of invoice detail of GSTN by supplier
then credit on such invoice will be given provisionally subject to matching So acceptance of
changes made by BSNL on GSTN on account of non-upload or incorrect upload of invoice
details on GSTN is to be submitted by supplier Such changes wrt the mismatch are required
to be accepted by supplier within the time limit prescribed under the GST law It should be
noted that in case supplier does not accept such changes within the time limit prescribed under
GST law the loss of input tax credit (if any) would be recovered from the supplier In case of
mismatch because of Suppliers fault prompt amendments must be made by the supplier else
supplier would be required to indemnify BSNL for the losses of credit and interest paid due to
mismatch
(v) contractor to issue all necessary documentation and perform all necessary compliances for
BSNL to be eligible to claim the input tax credit of GST tax to them In case BSNL is unable to
claim the input tax credit the amount wrt GST charged by the supplier would be recovered
from the supplier
1610 Refer) for clause stating that all the details of supplier (name address GSTN unregistered
supplier place of supply SAC HSN code etc) and other mandatory details shall be mentioned on the
invoice
1611Where the location agreed are more than one state then separate invoice state wise to claim
input tax credit in a particular state (typically happens in a bill to-ship to scenario) shall have to be
submitted
1612 It shall be the responsibility of the supplier to mention State of place of supply of goodsservices
in the invoice issued to BSNL
Seal amp Signature of Bidder
40
SECTION ndash 5 (Part-B)
SPECIAL CONDITIONS OF CONTRACT (SCC)
1 GENERAL
No official of Gazetted rank or other Gazetted officer employed in Engineering or administrative
duties in an Engineering BSNL or any other BSNL of the BSNL is allowed to work as a contractor for
a period of two years after his retirement from BSNL service without the previous permission of
BSNL This contract is liable to be cancelled if either the contractor or any of his employee is found at
any time to be such a person who hadnrsquot obtained the permission of BSNL as aforesaid before
submission of the engagement in the contractorrsquos service as the case may be
2 Material Handed over by The BSNL
21 The contractor shall transport (including loading and unloading) all stores issued to him from
Field Unit Telecom Store to the site of work at his own cost The BSNL shall not pay any
transportation charges to the contractor
22 All materials handed over to the contractor by the BSNL shall remain the absolute property of
BSNL and shall not be removed form site of the work except for use in the work and shall be at all
times open to inspection by the Representative of GMTD BHUJ
23 The contractor shall be responsible for the transportation of store storage and safe custody of all
material supplied to him by the BSNL which in the contractorrsquos custody whether or not installed in
the work The contractor shall satisfy himself regularly the quantity and quality of the materials
supplied to him and he will be responsible for any subsequent deterioration and discrepancy (inclusive
of theft) in the quantity quality the materials
3 LABOUR WELFARE MEASURES AND WORKMAN COMPENSATION
(AS APPLICABLE)
31 Obtaining License before commencement of work
The contractor shall obtain a valid labour license (if applicable) under the Contact Labour (RampA) Act
1919 and the Contract Labour (Regulation and Abolition) Central Rules 1971 before commencement
of the work and continue to have a valid license until the completion of work The contractor shall
also abide by the provisions of the Child Labour (Prohibition and Regulation) Act 1986 Any failure
to fulfill this requirement shall attract the penal provisions of this contract arising out of the resultant
non-execution of work
32 Contractors labour Regulations
321 Working Hours
3211 Normally working hours of an employee should not exceed 9 hours a day The working
day shall be so arranged the inclusive of interval for rest if any it shall not spread over
more than12 hours on any day
3212 When a worker is made to work for more than 9 hours on any day or for more than 48
hours in any week he shall be paid over time for the extra hours put in by him
3213 Every worker shall be given a weekly holiday normally on a Sunday in accordance with
the provisions of minimum Wages (Central Rules 1960 as amended from time to time
irrespective of whether such worker is governed by the Minimum Wages Act or not
3214 Where the minimum wages prescribed by the Government under the Minimum Wages
Act are not inclusive of the wages for the weekly day of rest the worker shall be entitled
to rest day wages at the rate applicable to the next preceding day provided he has
worked under the same contractor for a continuous period of not less than 6 days
3215 Where a contractor is permitted by the Engineer-in-Charge to allowed a worker to work
on a normal weekly holiday he shall grant a substituted holiday to him for the whole day
Seal amp Signature of Bidder
41
on one of the five days immediately before or after the normal weekly holiday and pay
wages to such worker for the work performed on the normal weekly holiday at the
overtime rate
322 Display of Notice Regarding Wages Etc
The contractor shall before he commences his work on contract display and correctly
maintain and continue to display and correctly maintain in a clear and legible condition
in conspicuous places on the work notices in English and in local Indian languages
spoken by the majority of the workers giving the minimum rates of the wages fixed
under Minimum Wages Act the actual wages being paid the hours of work for which
such wage are earned wages periods dates of payments of wages and other relevant
information
323 Payment of Wages
3231 The contractor shall fix wage periods in respect of which wages shall be payable
3232 No wage period shall exceed one month
3233 The wages of every person employed as contract labour in an establishment or by a
contractor where less than one thousand such persons are employed shall be paid before
the expiry of seventh day and in other cases before the expiry of tenth day after the last day
of the wage period in respect of which the wages are payable
3234 Where the employment of any worker is terminated by or on behalf of the contractor the
wages earned by him shall be paid before the expiry of the second working day from the
date on which his employment is terminated
3235 All payment of wages shall be made on a working day at the work premises and during the
working time and on a date notified in advance and in case the work is completed before
the expiry of the wage period final payment shall be made within 48 hours of the last
working day
3236 Wages due to every worker shall be paid to him direct or to other person authorized by him
in this behalf
3237 All wages shall be paid in current coin or currency or in both
3238 Wages shall be paid without any deductions of any kind except those specified by the
Central Government by general or special order in this behalf or permissible under the
Payment of Wages Act 1956
3239 A notice showing the wages period and the place and time of disbursement of wages shall
be displayed at the place of work and a copy sent by the contractor to the Engineer ndashin-
Charge under acknowledgement
32310 It shall be the duty of the contractor to ensure the disbursement of wages in presence of the
site Engineer or any other authorized representative of the Engineer-in-Charge who will be
required to be present at the place and time of the disbursement of wages by the contractor
to workmen
32311 The contractor shall obtain from the site Engineer or any other authorized representative of
the Engineer-in-Charge as the case may be a certificate under his signature at the end of
the entries in the ldquoRegister of Wages ldquo or the ldquoWage-cum-Muster Rollrdquo as the case may
be in the following form -
ldquoCertified that the amount shown in the column Nohelliphelliphelliphelliphas been paid to the
workman concerned in my presence on helliphelliphelliphelliphelliphellip at helliphelliphelliphelliphelliphelliphelliphelliphelliprdquo
32312 Fines and deductions which may be made from wages
A The wages of a worker shall be paid to him without any deduction of any kind except the
following -
a) Fines
(b) Deductions for absence from duty ie from the place or the places where by the terms of
his employment he is required to work The amount of deduction shall be in proportion
to the period for which he was absent
(c) Deductions for damage to or loss of goods expressly entrusted to the employed person
for custody or for loss of money or any other deductions which he is required to
account where such damage or loss is directly attributable to his neglect or default
Seal amp Signature of Bidder
42
(d) Deduction for recovery of advances or for adjustment of over payment of wages
advances granted shall be entered in register
(e) Any other deductions which the Central Government may form time to time allow
B No fines should be imposed on any worker save in respect of such acts and omissions
on his part as have been approved of by the Labour Commissioner
C No fine shall be imposed one worker and no deduction for damage or loss shall be
made from his wages until the worker has been given an opportunity of showing cause
against such fines or deductions
D Every fine shall be deemed to have been imposing on the day of the act or omission in
respect of which it was imposed
524 Labor records 1 The contractor shall maintain a Register of Persons employed on work on contract in
Form XIII of the Contract Labour (RampA) Central Rules 1971
2 The contractor shall maintain a Muster Roll register in respect of all workmen
employed by him on the work under Contract in Form XVI of the CL (RampA) Rules
1971
3 The contractor shall maintain a Wage Register in respect of all workmen employed by
him on the work under contract in From XVII of the CL (RampA) Rules 1971
4 Register of accidents- The contractor shall maintain a register of accidents in such
form as may be convenient at the work place but the same shall include the following
particulars
(a) Full Particulars of the laborers who met with accident
(b) Rate of wages
(c) Sex
(d) Age
(e) Nature of accident and cause of accident
(f) Time and date of accident
(g) Date and time when admitted in hospital
(h) Date of discharge from the hospital
(i) Period of treatment and result of treatment
(j) Percentage of loss of earning capacity and disability as assessed by
Medical officer
(k) Claim required to be paid under Workmenrsquos Compensation Act
(l) Date of payment of compensation
(m) Amount paid with details of the person to whom the same was paid
(n) Authority by whom the compensation was assessed
(o) Remarks
5 The contractor shall maintain a Register of Fines in the Form XII of the CL(RampA)
Rules 1971 the Contractor shall display in a good condition and in a conspicuous
place of work the approved list of acts and commission for which fines can be
imposed
6 The contractor shall maintain a Register of deductions for damage or loss in Form
XX of the CL (RampA) Rules 1971
7 The contractor shall maintain a Register of Advances in Form XXIII of the CL
(RampA) Rules 1971
8 The contractor shall maintain a Register of Overtime in Form XXIII of the CL
(RampA) Rules 1971
9 Attendance card-cum wage slip a The contractor shall issue an Attendance card cum wage slip to each workman
employed by him
b The card shall be valid for each wage period
Seal amp Signature of Bidder
43
c The contractor shall mark the attendance of each workman on the card twice each
day once at the commencement of the day and again after the rest interval before
he actually starts work
d The card shall remain in possession of the worker during the wage period under
reference
e The contractor shall complete the wage slip portion on the reverse of the card at
least a day prior to the disbursement of wages in respect of the wage period under
reference
f The contractor shall obtain the signature or thumb impression of the worker on the
wag slip at the time of disbursement of wages and retain the card with him
10 Employment card The contractor shall issue an Employment Card in the Form XIV of CL (RampA) Central Rules
1971 to each worker within three days of the employment of the worker
11 Service certificate
On termination of employment for any reason whatsoever the contractor shall issue to the
workman whose services have been terminated a Service Certificate in the Form XV of the
CL (RampA) Central Rules 1971
12 Preservation of labour records The labour records and records of Fines and deductions shall be preserved in original for a
period of three years from the date of last entries made in them and shall be made available for
inspection by the Engineer-in-Charge or Labour Officer or any other officers authorized by the
Ministry of Communication in this behalf
13 Power of labour officer to make investigations or enquiry The labour officer or any person authorized by the Central Government on their behalf shall
have power to make enquiries with a view to ascertaining and enforcing due and proper
observance of Fair Wage Clauses and provisions of these Regulations He shall investigate
into any complaint regarding the default made by the contractor in regard to such provision
14 Report of Investigating officer and action thereon The labour Officer or other persons authorized as aforesaid shall submit a report of result of
his investigation or enquiry to the Engineer in-Charge indicating the extent if any to which
the default has been committed with a note that necessary deductions from the contractorrsquos bill
be made and the wages and other dues be paid to the labourers concerned The Engineer in-
Charge shall arrange payments to the labour
concerned within 45 days from the receipt of the report from the Labour Officer or the
authorized officer as the case may be
15 Inspection of Books And slips The contractor shall allow inspection of all the prescribed labour records to any of his workers
or to his agent at a convenient time and place after due notice is received or to the Labour
Officer or any other person authorized by the Central Government on his behalf
16 Submission of Returns The contractor shall submit periodical returns as may be specified form time to time
17 Amendments
The Central Government may from time to time add to or amend the regulations and on any
question as to the applicationinterpretation or effect of those regulations
Contractor must fulfill the terms and condition towards fulfillmentscompliance of the
provision of EPF amp Miscprovision act 1952 amp Employment provident Fund Scheme 1952 in
respect of laborersemployees engaged by the contractor Contractor must submit declaration
form regarding compliance of the condition of EPF act 1952
525 INSURANCE Without limiting any of his other obligations or liabilities the contractor shall at his own
expense take and keep comprehensive insurance including third party risk for the plant
machinery men materials etc brought to the site and for all the work during the execution
The contractor shall also take out workmenrsquos compensations insurance as required by law and
under take to indemnify and keep indemnified the Government from and against all manner of
Seal amp Signature of Bidder
44
claims and demands and losses and damages and cost (including between attorney and client)
charges and expenses that may arise in regard the same or that the Government may suffer or
incur with respect to endor incidental to the same The contractor shall have to furnish
originals and or attested copies as required by the BSNL of the policies of insurance taken
within 15 (fifteen) days of being called upon to do so together with all premium receipts and
other papers related thereto which the BSNL may require
526 COMPLIANCE WITH LAWS AND REGULATION
During the performance of the works the contractor shall at his own cost and initiative
fully comply with all applicable laws of the land and with any and all applicable by-laws
rules regulations and orders and any other provisions having the force of law made or
promulgated or deemed to be made or promulgated by the Government Governmental
agency or BSNL municipal board Government of other regulatory or Authorized body or
persons and shall provide all certificates or compliance therewith as may be required by
such applicable law By-laws Rules Regulations orders and or provisions The
contractor shall assume full responsibility for the payment of all contributions and pay roll
taxes as to its employees servants or agents engaged in the performance of the work
specified in the contractor documents If the contractor shall require any assignee or sub-
contract to comply with the provisions of the clause and in this connection the contractor
agrees as to undertake to save and hold the Government harmless and indemnified from
and against any all penalties actions suits losses and damages claims and demands and
costs (inclusive between attorney and client) charges and expenses whatsoever arising out
or occasioned indirectly or directly by failure of the contractor or any assignee or sub-
contractor to make full and proper compliance with the said by-laws Rules Regulations
laws and Order and provisions as aforesaid
6 TOOLS and PLANTS
The contractor shall provide at his own cost all tools plants appliances implements etc
required for proper execution of works The contractor shall also supply without charge
the requisite number of persons with the means and materials necessary for the purpose of
setting out works counting weighing and assisting the measurements for examination at
any time and from time to time Failing his so doing the same may be provided by the
Engineer-in-charge at the expense of the contractor and the expenses shall be deducted
from any money due to the contractor under this contract or otherwise
As per Para 367 of the recommendationobservation of Tenth Report of parliamentary
standing committee on labour Contractor would provide the same social security to the
labours engaged by him as is available to regular employees
As per Para 368 of the recommendationobservation of Tenth Report of parliamentary
standing committee on labour Contractor shall ensure implementation of equal pay for equal
work and also equal remuneration to men and women
Seal amp Signature of Bidder
45
SECTION ndash 7
PROFORMAS
7 (A) BID SECURITY EMD Guarantee
(To be typed on Rs100- non-judicial stamp paper)
Whereas (hereinafter called the Bidder) has submitted its bid datedfor
the supply of vide Tender Nohelliphelliphelliphelliphelliphelliphelliphellip dated KNOW ALL MEN by
these presents that WE OF having our registered office at
(hereinafter called the Bank) are bound unto Bharat Sanchar Nigam Limited (hereinafter
called the Purchaser) in the sum of Rs for which payment will and truly to be made of
the said Purchaser the Bank binds itself its successors and assigns by these present
THE CONDITIONS of the obligation are
1 If the Bidder withdraws his bid during the period of bid validity specified by the Bidder
on the Bid form or
2 If the Bidder having been notified of the acceptance of his bid by the Purchaser during the
period of bid validity
(a) fails or refuses to execute the Contract if required or
(b) fails or refuses to furnish the Performance Security in accordance with the instructions to
Bidders
We undertake to pay to the Purchaser up to the above amount upon receipt of its first written demand
without the purchaser having to substantiate its demand provided that in its demand the purchaser
will note that the amount claimed by it is due to it owning to the occurrence of one or both of the two
conditions specifying the occurred condition or conditions
This guarantee will remain in force as specified in clauses 12 and 282 of section 4 Part A of the Bid
Document upto and including THIRTY (30) days after the Period of bid validity and any demand in
respect thereof should reach the Bank not later than the specified datedates
Signature of the Bank Authority
Name
Signed in Capacity of
Name amp Signature of witness Full address of Branch
Address of witness Tel No of Branch
Fax No of Branch
Seal amp Signature of Bidder
46
7 (B) PERFORMANCE SECURITY BOND FORM
(To be typed on Rs100- non-judicial stamp paper)
Datedhelliphelliphelliphelliphellip
Sub Performance guarantee
Whereas General Manager Telecom Bhuj Telecom District Bhuj (hereafter referred to as BSNL) has issued an AWO no
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellipDated helliphelliphelliphellip20hellip awarding the work of
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip to Ms
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip(hereafter referred to as ldquoBidderrdquo) and BSNL has asked him to submit a performance guarantee
in favour of AO(Cash) BSNL Oo GMTD BHUJ of Rs helliphelliphelliphelliphelliphellip- (hereafter referred to as ldquoPG Amountrdquo) valid up
to helliphelliphelliphellip20helliphelliphellip (hereafter referred to as ldquoValidity Daterdquo)
Now at the request of the Bidder We helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellipBank
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip Branch having (Address) and Regd
office address as helliphelliphellip helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip (Hereinafter called lsquothe
Bankrdquo) agreed to give this guarantee as hereinafter contained
2 We ldquothe Bankrdquo do hereby undertake and assure to the BSNL that if in the opinion of the BSNL the Bidder has in any way
failed to observe or perform the terms and conditions of the said agreement or has committed any breach of its obligations
there-under the Bank shall on demand and without any objection or demur pay to the BSNL the said sum limited to PG
Amount or such lesser amount as BSNL may demand without requiring BSNL to have recourse to any legal remedy that may
be available to it to compel the Bank to pay the same
3 Any such demand from the BSNL shall be conclusive as regards the liability of Bidder to pay to BSNL or as regards the
amount payable by the Bank under this guarantee The Bank shall not be entitled to withhold payment on the ground that the
Bidder had disputed its liability to pay or has disputed the quantum of the amount or that any arbitration proceeding or legal
proceeding is pending between Bidder and BSNL regarding the claim
4 We the Bank further agree that the guarantee shall come into force from the date of its issue and shall remain in full force
and effect up to its Validity date
5 The Bank further agrees that the BSNL shall have the fullest liberty without the consent of the Bank and without affecting
in any way the obligations hereunder to vary any of the terms and conditions of the said agreement or to extend the time for
performance of the said agreement from any of the powers exercisable by BSNL against the Bidder and to forebear to enforce
any of the terms and conditions relating to the said agreement and the Bank shall not be relieved from its liability by reason
of such failure or extension being granted to Bidder or through any forbearance act or omission on the part of BSNL or any
indulgence by BSNL to Bidder or any other matter or thing whatsoever which under the law relating to sureties would but for
this provision have the effect of relieving or discharging the guarantor
6 Notwithstanding anything herein contained
(a) The liability of the Bank under this guarantee is restricted to the PG Amount and it will remain in force up to its Validity
date
(b) The guarantee shall stand completely discharged and all rights of the BSNL under this Guarantee shall be extinguished if
no claim or demand is made on us in writing on or before its validity date
7 In case BSNL demands for any money under this bank guarantee the same shall be paid through bankerrsquos Cheque in
favour of ldquoAO(Cash) BSNL Oo GMTD BHUJ rdquo payable at Bhuj
8 The Bank guarantees that the below mentioned officer who have signed it on behalf of the Bank have authority to give this
guarantee under its delegated power
Place helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip
Date helliphelliphelliphelliphelliphelliphelliphelliphelliphellip (Signature of the Bank Officer)
Rubber stamp of the bank
Authorized Power of Attorney Number helliphelliphelliphelliphelliphellip
Name of the Bank officer helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip
Having examined the tender documents terms and conditions stipulated therein specifications of work
etc we the under signed offer to execute the repair Works in conformity with the said specifications and
conditions of contract as under
Sl No
ITEM DESCRIPTION
Repair Charges per module inclusive of freight
forwardingpacking amp all taxes amp levies (except GST)
(in Figure)
Unit Rate in Words
Total Cost (unit rate qty)
1 2 3 4 5
1 25 AMP Module
2
50 AMP Module
3 100 AMP Module
4 Control Panel of
Power Plants
25A 50A amp 100A
5 GRAND TOTAL
Note -
1 GST will be payable extra on approved rates 2If our Bid is accepted we shall submit the securities as per the conditions mentioned in the contract
3We agree to abide by this Bid for a period of 180 days from the date of opening of financial bid and it shall
remain binding upon us and may be accepted at any time before the expiry of that period
4 The evaluation will be made on the basis of lowest rate quoted as under Lowest Rate = (rate quoted for 25 AMP Qty + rate quoted for 50 AMP Qty + rate
quoted for 100 AMP Qty + rate quoted for Control Panel of Power Plant AMP Qty)
The bidder who has offered lowest rate as evaluated above will be treated as L1 bidder
Date Signature of Tenderer
Seal amp Signature of Bidder
49
CHECK LIST
Sl No
Description Tender Clause Mode of Submission
1 Tender Fee Section 1 (part A) Para 21 22
Off-line
2 EMD Section 1 (part A) Para 51 52 Off-line 3 Power of Attorney Section 4 (Part A) clause 143 Off-line 4 Latest and Valid MSME NSIC certificate (If Applicable) Off-line 5 Experience Certificate Section 1 (part A)
c) E-reverse auction if required by Business Unit Planning cell after opening of the Financial bids
Note 1 In case of 1(b) above the bidder shall submit Techno-commercial amp Financial bid simultaneously
The bids will be evaluated techno-commercially first and thereafter financial bids of techno
commercially compliant bidders only shall be opened
2 Bid Validity Period validity of Bid offer 150 days from the tender opening date and Validity of bid
Offer for acceptance by BSNL can be extended
3 Bid must be submitted by bidder through E-tendering mode only Manual (OFFLINE)
submission of bids should not be considered The following documents are required to be submitted
offline to AGM (PLG) Oo GMTD Haripar Road Bhuj-370001 on or before the date amp time of
submission of bids in a sealed envelope
The envelope shall bear the tender number name of work and the phrase Do Not Open Before (due date amp
time of opening of tender)
i) EMD - Bid security (original copy)
ii) DD Bankers cheque of Tender fee
iii) Power of Attorney in accordance with clause 143 of section 4 Part A and authorization for
executing the power of Attorney
iv) Latest and valid MSME NSIC Certificate duly certified by NSIC if applicable
The purchaser shall not be responsible if the envelop is delivered elsewhere or late
In case of tenders invited under two envelopes system the first envelope will be named as techno commercial amp
will contain documents of bidderrsquos satisfying the eligibility Technical amp commercial conditions and 2nd
envelope will be named as financial envelope containing financial quote
a) Techno-commercial part of the bid shall contain one set of the following documents only-
i) Certificate(s) showing fulfillment of the eligibility criteria The bidder shall furnish as part of his bid
documents establishing the bidders eligibility all the following documents or whichever is required as per
terms and conditions of bid documents
Sl Particular Documents to be submitted
i Registration
Certificate
Firm Registration Certificate Certificate of Incorporation Shop amp
Establishment Certificate
ii In case of
Proprietorship
proprietorship firms an affidavit of that effect should be submitted along with
the bid
iii Partnership
Company
Partnership Deed or ArticlesMemorandum of Association as the case may be
amp Power of Attorney (if applicable) should be made older than the date of
submission of bid
iv Experience Experience Certificate as mentioned in the eligibility criteria
v EMD amp Tender Fee As per Table A amp clause 1 amp 2 OR Copy of Latest amp valid MSE NSIC
Certificate (if applicable)
vi EPF Copy of Registration Certificate of EPF (if applicable)
vii ESIC ESIC Registration (if applicable)
ix Taxes Copy of Valid Goods and Services Tax Registration No Declaration
that he is not registered and will get registered if required x PAN Card Copy of PAN Card
All documents submitted will also be self attested by the bidder
ii) Power of Attorney amp authorization for executing the power of Attorney in accordance with clause 143 of
Section -4 Part A
iii) The complete Bid document duly signed on end of each section at least
iv) Agency details letter for authorization of bid Undertakings Undertakings Non-Relation Certificate as
given vide Section 2(A) to 2(D) of this Bid form
b) Financial envelope shall contain Electronic Form- financial along with Price Schedule (Section 8)
with all relevant bid annexure (in case of tenders invited through e-tendering process)
Seal amp Signature of Bidder
8
SECTION -2 (Part-A)
AGENCY DETAILS
(Including performance records financial viability etc)
Name of firm
Registered Address
Status of the Bidder (i) Proprietorship concern
(ii) Partnership firm
(iii) HUF
(iv) Limited Company
Name of person or authorized signatory for
submitting the tender other documents and
empowered for correspondence with BSNL
GSTIN No
PAN Card particulars
Telephone numbers (with STD Code) of
authorized signatory
Office Residence
Mobile E-mail
Name(s) of Proprietor all Partners all
Directors
Infrastructure capabilities
A Capacity of Repairing 25A module per
week
B Capacity of Repairing 50A module per
week)
C Capacity of Repairing 100A module per
week
D Capacity of Repairing control panel per
week
F Details of trained staff available
A --------------------------------
B --------------------------------
C --------------------------------
D --------------------------------
F --------------------------------
Signature of Tenderer
Name of Tenderer
Along with date amp Seal
Seal amp Signature of Bidder
9
SECTION- 2 PART B
LETTER OF AUTHORISATION FOR ATTENDING BID OPENING
(To be typed preferably on letter head of the company)
Subject Authorization for attending Bid opening
I We Mr Ms helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip have submitted our bid for the tender no
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip in respect of helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip (Item
of work) which is due to open on helliphelliphelliphelliphelliphelliphellip (date) in the Meeting Room
We hereby authorize Mr Ms helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip helliphelliphelliphelliphelliphelliphelliphelliphellipamp
rohelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphereby certify that we or our firm
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip has not been BLACK LISTED by
any SSACircle of MTNLBSNL In case at any stage it is found that the information given by me is
falseincorrect BSNL shall have the absolute right to take any action as deemed fitwithout any prior
intimation to me
e) Clause by Clause Compliance
It is to certify that the tender document is carefully read amp understood and all the sections and clauses
are complied unconditionally amp unequivocally There is no deviation from the terms amp conditions of
the tender
f) Declaration for EPF amp Misc Provisions Act 1952
I _____________________________ (Name of the bidder agency) hereby declare compliance
towards conditions of the EPF and Misc Provisions Act 1952 and authorize BSNL to recover any
payment that arises due to failure to comply with any of the Labour legislations and statutory
conditions viz Labor EPF ESI etc or any other acts dealing with the same and all other acts
mentioned in the tender document
g) CERTIFICATE REGARDING FIRM IS NOT BLACK LISTED BY GST AUTHORITY
rohelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphereby certify that we or our firm
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip has not been BLACK LISTED by
any GST Authority
Date helliphelliphelliphelliphellip helliphellip helliphelliphelliphelliphelliphelliphelliphelliphellip
Signature of Tenderer
Place helliphelliphelliphelliphellip Name of Tenderer
Along with date amp Seal
Seal amp Signature of Bidder
11
SECTION- 2 PART D
DECLARATION REGARDING NO RELATIVE WORKING IN BSNL
I ___________________________Son of W O___________________________
RO _________________________here by certify that none of my relative(s) as defined in tender
document isare employed in BSNL unit as per details given in tender document In case at any stage
it is found that the information given by me is false incorrect BSNL shall have the absolute right to
take any action as deemed fit without any prior intimation to me
Signed ___________________
For and on behalf of the Agency
Name (Capitals) ___________________________
Position ____________________________
Date ____________________________
Note - In case of proprietorship firm certificate will be given by the proprietor for partnership firm
certificate will be given by all the partners on separate paper and in case of limited company by all
the Directors of the Company on separate paper Any breach of these conditions by the company or
firm or any other person the tender work will be cancelled and earnest money security deposit will
be forfeited at any stage whenever it is so noticed BSNL will not pay any damages to the company or
firm or the concerned person The company or firm or the person will also be debarred for further
participation in the concerned unit
Seal amp Signature of Bidder
12
SECTION- 3
SCOPE OF WORK AND JURISDICTION OF CONTRACT
1 SCOPE OF WORK
1 During the entire period of contract repairing of all types and of any make such as AMAR RAJA DACS DELTA DYNA ELTEK EXICOM HIMACHAL EXICOM ITI etc SMPS Power plant Modules (25 AMP 50 AMP 100 Amp ) Control panel are to be carried out including replacement of faulty parts
2 Collection and Delivery of Faulty repaired modules - a The concerned JTOSDEAGM in charge will intimate the contractor the Location Make capacity and
quantity of faulty modules by email (copy to AGM(Plg) on agmplgbhujgmailcom ) followed by ERP PO on mail
b The contractor will collect the module from the concerned in charge with in THREE days from the date of intimation under proper receipt to the concerned in charge However under emergent condition the collection of modules may be done on the same day
c Packing transport and delivery of faulty as well as repaired modules is the responsibility of the contractor
d The contractor shall repair the module and return to the concerned in charge with in Seven days of its collection However under emergent condition as decided by the concerned in charge the collection and repair shall be made within the time period given in the ERP PO
e Repaired modules will be tested by the SDE concern within TWO days on receipt of repaired modules if it is found OK then a certificate of this may be issued to the contractor Otherwise same shall be returned to the contractor for necessary action
f The date of receipt of all the modules mentioned in the ERP PO duly tested OK will be reckoned as the completion of ERP PO
g Repaired modules are warranted for 3 months from the date of successfully taken over During this time the contractor has to rectify the module free of cost
3 INSPECTION AND TESTS - a) The BSNL BHUJ or his representative shall have the right to inspect and test the repaired module as
per prescribed test schedules for their conformity to the specifications Where the BSNL BHUJ decides to conduct such tests on the premises of the Contractor or its subcontractor(s) all reasonable facilities and assistance like Testing Instruments and other test gadgets including access to drawings and production data shall be furnished to the inspectors at no charge to the Purchaser
b) Should any inspected or tested repaired module fail to conform to the Specifications the BSNL BHUJ may reject them and the Contractor shall either replace the rejected repaired module or make all alterations necessary to meet Specification requirements free of cost to the Purchaser
c) Notwithstanding the pre-repair tests and inspections prescribed in clause 3(a) amp 3(b) above the module and accessories on receipt in the BSNL s premises will also be tested during and after installation before take over and if any equipment or part thereof is found defective the same shall be replaced free of all cost to the BSNL BHUJ
d) If any module or any part thereof before it is taken over under clause 3(e) below is found defective or fails to fulfill the requirements of the contract the inspector shall give the Contractor notice setting forth details of such defects or failure and the Contractor shall make the defective module good or alter the same to make it comply with the requirements of the contract forthwith and in any case within a period not exceeding one month of the initial report The replacements shall be made by the Contractor free of all charges at site should it fail to do so within this time the BSNL BHUJ reserves the discretion to reject and replace at the cost of the Contractor the whole or any portion of the module as the case may be which is defective or fails to fulfill the requirements of the contract The cost of any such replacement made by the BSNL BHUJ shall be deducted from the amount payable to the Contractor
Seal amp Signature of Bidder
13
e) When the performance tests called for have been successfully carried out the inspector ultimate
Consignee will forthwith issue a Taking Over Certificate The inspectorultimate consignee shall not delay the issue of any Taking Over Certificate ldquo contemplated by this clause on account of minor defects in the module which do not materially affect the commercial use thereof provided that the Contractor shall undertake to make good the same in a time period not exceeding two months The taking Over Certificate shall be issued by the ultimate consignee within six weeks of successful completion of tests
f) After performance test carried out by the concerned SDE of BSNL as per prescribed schedule and repaired modules are found ok in all respect than the repaired modules will be accepted
g) A register is to be maintained at each placelocation mentioning the details of Modules date of Collection and Delivery of Faulty repaired modules replacement of spares amp remark if any and it is to be signed by the controlling officer amp Service engineer
h) Nothing in clause 3 shall in any way release the Contractor from any Warranty or other obligations under this contract
4 SPARES - All the spare of good quality required for repair of modules of SMPS PP are to be supplied by the contractor including major components
5 The contractor shall be responsible for any loss or damages caused to man or machinespartsinstruments during the execution of work and shall replace with an identical new item at his own cost The authorized officerperson of BSNL will have the liberty to check the material and work etchellip provided by the contractor
6 Governing Conditions for RNP (Repair Not Possible) Cases
A module Control panel may be declared RNP only if cost of material to be replaced exceeds five times of approved rate of repair In no case labour cost involved will be considered for deciding RNP A detailed report is to be submitted by contractor to concerned officer in-charge and final decision in this regard will be taken by concerned DGM subjected to maximum permissible RNP as given below
a)25-A module Maximum 10 of total quantity ordered for repair
b) 50-A 100-A Module Maximum 5 of total quantity ordered for repair
c) Control Panel Maximum 10 of total quantity ordered for repair
In case of RNP exceeding permissible limits penalty will be imposed as per para 11 (d) of section-5 (Part-A)
7 WARRANTY - a) Repaired modules are warranted for 3 months from the date of successfully taken over During this
time the contractor has to rectify the module free of cost The contractor shall warrant that repaired module shall be free from all defects and faults in materials used workmanship It becomes necessary for the contractor to replace or renew any defective portion(s) of the module under this clause
b) Replacement under warranty clause shall be made by the contractor free of all charges at site including freight insurance and other incidental charges
c) If any defect is not remedied by the contractor within a reasonable time the BSNL BHUJ may proceed to get the defects remedied from other contractor etc at the contractors risk and expenses but without prejudice to any other rights which the BSNL BHUJ may have against the contractor in respect of such defects
Seal amp Signature of Bidder
14
SECTION- 4 (Part-A)
GENERAL INSTRUCTION TO BIDDERS (GIB)
1 DEFINITIONS
1 BSNL The BSNL means the BSNL Bhuj Telecom Dist under the Ministry of
Communications which invites the tenders on behalf of the General Manager Bhuj Telecom
District Includes executives in the BSNL whatever designations assigned to them from time
to time who may be the in-charge of direction supervision testing acceptance and
maintenance including their successor(s) in the office appearing in various clauses shall be
taken to mean the BSNL Bhuj Telecom District
b The SSA Head means the Head of SSA General Manager Bhuj Telecom District Bhuj and
his successors
c The jurisdiction of the SSA Head The jurisdiction of the SSA Head means Bhuj Telecom
District which coincides geographically with (Revenue District(s))
d Representative of (the SSA Head) Representative of (the SSA Head ) means Officer and
staff for the time being in Bhuj Telecom District deputed by the General Manager Bhuj for
inspecting or supervising the work of testing etc
e Engineer ndash in - charge The Engineer ndash in - charge means the Engineering Officer
nominated by the BSNL to supervise the work under the contract (Minimum Divisional
Engineer level Officer)
f Site Engineer Site Engineer shall mean an SDESDOJTO of the BSNL who may be placed by
the General Manager Bhuj Telecom District Bhuj as in ndash charge of the work at site at any
particular period of time
g AT Unit AT Unit shall mean Acceptance and Testing unit of the BSNL
h AT Officer An officer authorized by General Manger ndash Bhuj Telecom Dist
i Contract The term contract means the documents forming the tender and acceptance
thereof and the formal agreement executed between the competent authority on behalf of the
BSNL and the contractor together with the documents referred to therein including these
conditions the specifications designs drawings and instructions issued from time to time by
the engineer in ndash charge and all these documents taken together shall be deemed to form one
contract and shall be complementary to one another In the contract the following expressions
shall unless the context otherwise requires have the meanings hereby respectively assigned to
them The expression works or work shall unless there be something either in the subject
context repugnant to such construction be construed or taken to mean the works by or by
virtue of the contract contracted to be executed whether temporary or permanent and whether
original altered substituted or additional
j Contractor The contractor shall mean the individual firm or company enlisted or not
enlisted with BSNL Department of Telecom in accordance with procedure for contractor or
registered for carrying out the work of cable laying whether incorporated or not undertaking
the works and shall include the legal personal representative of such individual or the persons
composing such firm or company or the successors of such firm or company and the
permitted assignees of such individual firm or company
k Work The expression lsquoworksrsquo shall unless there be something either in the subject or context
repugnant to such construction be construct and taken to mean the works by or by virtue of the
Seal amp Signature of Bidder
15
contract contracted to be executed whether temporary or permanent and whether original
altered substituted or additional
l Schedule(s) Schedule(s) referred to in these conditions shall mean the relevant schedule(s)
or the standard schedule of rates mentioned in the document
m Site The site shall mean the land or other places on into or through which work is to be
executed under the contract or any adjacent land path or street through which the work is to
be exacted under the contract or any adjacent land path or street which may be allotted or
used for the purpose of carrying out the contract
n Normal time or stipulated time Normal time or stipulated time means time specified in the
ERP PO to complete the work
o Extension of Time Extension of Time means the time granted by the BSNL to complete the
work beyond the normal time or stipulated time
p Exceptional risk Exceptional risks are risk due to war(whether declared or not) invasion act
of foreign enemies hostilities civil war rebellion revolution insurrection military or
usurped power any acts of Government damages from aircraft acts of God such as
earthquake lightening and unprecedented floods and other causes over which the contractor
has no control and the same having been accepted as such by the Accepting Authority or
causes solely due to use or occupation by the government of the part of the work in respect of
which a certificate of completion has been issued
q The ERP PO means the Order placed by the field units on the contractor signed by
the unit incharge r The Contract Rate means the rate payable to the repairer under the work order for
the full and proper performance of its contractual obligations
2 ELIGIBLE BIDDERS Kindly refer to clause 4 of Section ndash 1 Part A ie Detailed NIT
3 COST OF BIDDING
The bidder shall bear all costs associated with the preparation and submission of the bid The
BSNL will in no case be responsible or liable for these costs regardless of the conduct or
outcome of the bidding process
4 BID DOCUMENTS
41 The goods services required to be supplied bidding procedures and contract terms are prescribed
in the Bid Documents The contents of the Bid documents are specified in the covering letter
42 The Bidder is expected to examine all instructions forms terms and specifications in the Bid
Documents Failure to furnish all information required as per the Bid Documents or submission
of bids not substantially responsive to the Bid Documents in every respect will be at the bidders
risk and may result in rejection of the bid
5 CLARIFICATION OF BID DOCUMENTS
51 A prospective bidder requiring any clarification on the Bid Documents shall notify the User in
writing by FAX or by Email of the User as indicated in the invitation of Bid The User shall
respond in writing to any request for the clarification of the Bid Documents which it receives
7days prior to the date of opening of the Tenders Copies of the query (without identifying the
source) and clarifications by the User shall be uploaded on BSNL website as lsquoClarificationsrsquo on
e-procurement portal of Bhuj Telecom District portal clarification shall be available as
lsquoAddendumrsquo for all the prospective bidders who have downloaded the official copy of tender
documents from e-procurement portal of Bhuj Telecom District
Seal amp Signature of Bidder
16
52 Any clarification issued by BSNL in response to query raised by prospective bidders shall form
an integral part of bid documents and it may amount to an amendment of relevant clauses of the
bid documents
6 AMENDMENT OF BID DOCUMENTS
61 The BSNL may for any reason whether at its own initiative or in response to a clarification
requested by a prospective Bidder may modify bid documents by amendments prior to the date
of submission of Bids with due notification to prospective Bidders
62 The amendments shall be notified in writing or by Fax or by Addendum through e-tendering
portal to all prospective bidders on the address intimated at the time of purchase of bid document
from the BSNL and these amendments will be binding on them
63 In order to afford prospective bidders reasonable time in which to take the amendments into
account in preparing their bids the BSNL may at its discretion extend the deadline for the
submission of bids suitably
7 DOCUMENTS COMPRISING THE BID
The bid prepared by the bidder shall comprise the components specified in Section 2 of this
Tender
8 BID FORM
The bidder shall complete the Bid Form and the appropriate Price Schedule furnished in the Bid
Documents as per Section- 8
9 BID PRICES
91 The bidder shall give the total composite price inclusive of all levies and taxes packing
forwarding freight and insurance in case of materials to be supplied and inclusive of all taxes
and levies except GST in case of works to be executed GST will be paid extra as applicable
The contractor shall be responsible for transporting the materials to be supplied by the BSNL
(At the field Unit Telecom Store or otherwise) to execute the work under the contract to site at
histheir own cost The costs of transportation are subsumed in the standard Schedule Rates and
therefore no separate charges are payable on this account The offer shall be firm in Indian
Rupees
92 The price quoted by the bidder shall remain fixed during the entire period of contract and shall
not be subject to variation on any account A bid submitted with an adjustable price quotation
will be treated as non-responsive and rejected
93 Discount if any offered by the bidders shall not be considered unless they are specifically
indicated in the schedule of rates (financial Bid) Bidders desiring to offer discount shall
therefore modify their offers suitable while quoting and shall quote clearly net price taking all
such factors like Discount free supply etc into account
10 DOCUMENTS ESTABLISHING BIDDERS ELIGIBILITY AND QUALIFICATIONS Kindly refer to clause of Section ndash 1 and 2 of this bid
11 NA
12 BID SECURITYEMD
121 The bidder shall furnish as part of its bid a bid security one of the following ways-
(a) Demand Draft Bankerrsquos cheque from a Nationalizedscheduled bank drawn in favour
of AO (Cash) BSNL Oo GMTD Bhuj and payable at Bhuj
(b) Bank GuaranteeFDR from a Nationalizedscheduled bank drawn in favour of AO
(Cash) BSNL Oo GMTD Bhuj which should be valid for 180 days from the tender
opening date
For educational order EMD to be submitted by bidder as 20 of 10 of estimated tender
cost for each case in the form of cash Demand Draft Bankerrsquos cheque Bank guaranteeFDR
issued by a NationalizedScheduled bank drawn in favour of AO (Cash) BSNL Oo GMTD
Bhuj Bank Guarantee should be valid for 180 days from the tender opening date
122 The MSE bidders are exempted from payment of bid security
Seal amp Signature of Bidder
17
a) A proof regarding valid registration with body specified by Ministry of Micro Small
amp Medium Enterprise for the tendered items will have to be attached along with the
bid
b) The enlistment certificate issued by MSME should be valid on the date of opening of
tender
c) MSE unit is required to submit its monthly delivery schedule
d) If a vender registered with body specified by Ministry of Micro Small amp Medium
Enterprise claiming concessional benefits is awarded work by BSNL and
subsequently fails to obey any of the contractual obligations he will be debarred from
any further work contract by BSNL for one year from the date of issue of such order
123 The bid security is required to protect the BSNL against the risk of bidders conduct which would
warrant the bid securityrsquos forfeiture pursuant to para 127
124 A bid not secured in accordance with para 121 amp 122 shall be rejected by the BSNL being non-
responsive at the bid opening stage and archived unopened on e-tender portal for e-tenders
125 The bid security of the unsuccessful bidder will be dischargedreturned as promptly as possible
as but not later than 30 days after the expiry of the period of bid validity prescribed by the
BSNL pursuant to clause 13
126 The successful bidders bid security will be discharged upon the bidders acceptance of the
advance Purchase Order satisfactorily pursuant to clause 27 and furnishing the performance
security
The successful bidders bid security may be converted to Part Performance Security Deposit in
accordance with clause 28
127 The bid security may be forfeited
a) If the bidder withdraws or amends its bid or impairs or derogates from the bid in any
respect during the period of bid validity specified by the bidder in the bid form or
extended subsequently or
b) If the bidder does not accept the APO AWO and or does not submit PBG amp sign the
contract agreement in accordance with clause 28
Note - The bidder shall mean individual company firm or the front bidder and its technology
consortium partner as applicable
13 PERIOD OF VALIDITY OF BIDS
131 Bid shall remain valid for 150 days from the date of bid opening prescribed by the BSNL A bid
valid for a shorter period shall be rejected by the BSNL as non-responsive
132 In exceptional circumstances the BSNL may request the bidders consent for an extension to the
period of bid validity The request and the responses thereto shall be made in writing The bid
security provided under Clause 12 shall also be suitably extended A bidder may refuse the
request without forfeiting his bid security A bidder accepting the request and granting extension
will not be permitted to modify his bid
14 FORMAT AND SIGNING OF BID
141 The bidder shall submit his bid online (in case of e-tendering) amp through sealed envelopes
physically (in case of tenders with manual bidding process) complying all eligibility
conditions other terms and conditions of tender document to be read along with the
clarifications and amendments issued in this respect All the documents must be authenticated
using Digital Signature (DSC) with Class 2 or above (in case of e-tendering) amp by hand
signatures (for manual bidding process) by the authorized person The letter of authorization
shall be indicated by written power-of-attorney accompanying the bid
Note-The BSNL may ask the bidder(s) to supply besides original bid additional copy of bids as
required by him
142 The bid shall contain no interlineations erasures or overwriting except as necessary to correct
errors made by the bidder in which case such corrections shall be signed by the person or persons
signing the bid All pages of the original bid except for un-amended printed literatures shall be
digitally signed by the person or persons signing the bid
143 Power of Attorney
(a) The power of Attorney should be submitted and executed on the non-judicial stamp paper
Seal amp Signature of Bidder
18
of appropriate value as prevailing in the concerned states(s) and the same be attested by a
Notary public or registered before Sub-registrar of the state(s) concerned
(b) The power of Attorney be executed by a person who has been authorized by the Board of
Directors of the bidder in this regard on behalf of the Company institution Body
corporate
(c) In case of the bidder being a firm the said Power of Attorney should be executed by all the
partner(s) in favour of the said Attorney
(d) Attestation of the specimen signatures of authorized signatory by the Companyrsquos firmrsquos
bankers shall be furnished Name designation Phone number mobile number email
address and postal address of the authorized signatory shall be provided
(e) Individual signing the tenders or other documents connected with the contract shall indicate
the full name below the signature and must specify the capacity and authority under which
he signs such documents and shall also submit documentary evidence of his authority in
the form of Power of Attorney
(f) The Power of Attorney is to be submitted in original if it has been issued for the specific
tender enquiry If the power of attorney is issued in general irrespective of tender enquiry
then photocopy duly certified by notary public can also be accepted
(g) In case the representative of bidder company who uploads the document on e-tender portal
using his Digital Signature Certificates (DSC) which is different from the authorized
signatory for the bid (Power of Attorney holder) then the representative who uploads the
documents on e-tender portal using DSC issued in his name shall also be one of the Power
of Attorney holder by the bidder Company in addition to the authorized signatory for the
bid
15 SEALING AND MARKING OF BIDS
The bid shall be submitted online using single stage bidding and Two Envelope Methodology
151 The first envelope (Techno-commercial bid) This envelope shall contain documents of
bidders satisfying the eligibility Technical amp commercial conditions requirements Second
envelope will be named as financial bid containing price Schedule as per section 8 All
documents submitted will also be self attested by the bidder
152 a) The envelopes for Tender Fee EMD shall be addressed AGM (PLG) Oo GMTD
Haripar Road Bhuj - 370001
b) The envelope for Tender Fee EMD shall bear the name of the tender the tender number
and the words DO NOT OPEN BEFORE (due date amp time)
c) The envelopes for Tender Fee EMD shall indicate the name and complete postal address
of the bidder to enable the User to return the bid unopened in case it is declared to be received
late
d) The envelopes for Tender Fee EMD shall should be deposited in the tender box provided
by tendering authority or sent by registered post or delivered in person on above mentioned
address (address is given above) The responsibility for ensuring that the envelopes for Tender
Fee EMD shall are delivered in time would vest with the bidder
e) The envelopes for Tender Fee EMD shall delivered in person registered post on the day of
tender opening shall be delivered upto specified time amp date as stated in NIT to Oo GMTD
Haripar Road Bhuj - 370001 The User shall not be responsible if the envelopes for Tender
Fee EMD shall are delivered elsewhere
f) Venue of Tender Opening
Tender will be opened in Oo GMTD Haripar Road Bhuj - 370001 at specified time amp
date as stated in NIT If due to administrative reason the venue of Bid opening is changed it
will be displayed prominently on the above address
Seal amp Signature of Bidder
19
153 If envelopes are not sealed and marked as required at para 151 and 152 the bid shall be
rejected
16 SUBMISSION OF BIDS
161 Bids must be submitted by the bidders on or before the specified date amp time indicated in
Section-1 ie DNIT
162 The BSNL may at its discretion extend this deadline for the submission of the bids by
amending the bid documents in accordance with Clause 6 in which case all rights and
obligations of the BSNL and bidders previously subject to the deadline will thereafter be
subject to the deadline as extended
163 The bidder shall submit his bid offer against a set of bid documents purchased by him for all
or some systemservices equipment as per requirement of the Bid Documents He may
include alternate offer if permissible as per the bid However not more than one independent
and complete offer shall be permitted from the bidder
164 Bid must be submitted by the bidder through E-Tendering mode only Manual submission of bid
shall not be needed
17 LATE BIDS
No bid shall be accepted either online by E-Tender Portal or physically in case of manual
bidding process after the specified deadline for submission of bids prescribed by the purchaser
18 MODIFICATION AND WITHDRAWAL OF BIDS
181 The bidder may modify revise or withdraw his bid after submission prior to deadline prescribed
for submission of bid If a bid is withdrawn the same shall be archived unopened in the e-
procurement portal of Bhuj Telecom District
182 The bidderrsquos modification revision or withdrawal shall have to be online and digitally
authenticated as per clause 15
183 Subject to clause 20 no bid shall be modified subsequent to the deadline for submission of bids
19 OPENING OF BIDS BY BSNL
191 The purchaser shall open bids online in the presence of bidders or their authorized representatives
who chose to attend at time specified in Clause 7 of Detailed NIT(Section-1) on due date The
bidderrsquos representatives who are present shall sign in an attendance register Authority letter to
this effect shall be submitted by the bidders before they are allowed to participate in bid opening
(As per Format given in section 2 Part B)
192 A maximum of two representatives for any bidder shall be authorized and permitted to attend
the bid opening
193 (i) The bids will be opened in two stages ie techno-commercial bid shall be opened on the date
of tender opening given in NIT The financial bid will not be opened on the date of opening of
techno commercial bids
The financial bids of those bidders who are approved to be techno commercially compliant by
the competent authority will be opened by TOC in front of techno-commercially eligible
bidders authorized representatives by sending them a suitable notice
(ii) The bidderrsquos names Item name EMD amount amp validity and acceptability Information in
respect of eligible bidders Details of bid modification withdrawal (if any) and such other
details as the purchaser at its discretion may consider appropriate will be made available
online at the time of techno-commercial bid opening
(iii) The bidderrsquos names Name of the Items Quantitiesprices quoted in the bid discount if
offered Taxes amp levies and such other details as the purchaser at its discretion may consider
appropriate will be made available online at the time of financial bid opening
194 The date fixed for opening of bids if subsequently declared as holiday by the BSNL the revised
date of schedule will be notified However in absence of such notification the bids will be
opened in the next working day time and venue remaining unaltered
20 CLARIFICATION OF BIDS
201 To assist in the examination evaluation and comparison of bids the BSNL may at its discretion
Seal amp Signature of Bidder
20
ask the bidder for the clarification of its bid The request for the clarification and the response
shall be in writing However no post bid clarification at the initiative of the bidder shall be
entertained
202 If any of the documents required to be submitted along with the technical bid is found wanting
the offer is liable to be rejected at that stage However the BSNL at its discretion may call for
any clarification regarding the bid document within a stipulated time period The BSNL at itrsquos
discretion may also ask for the submission of any additionalmissing document(s) within a
stipulated time period In such case(s) the bidder shall have to comply the BSNLrsquos requirement
within the specified time In case of non-compliance to such queries the bid will be out rightly
rejected without entertaining further correspondence in this regardrdquo However no post bid
clarification at the initiative of the bidder shall be entertained
21 PRELIMINARY EVALUATION
211 BSNL shall evaluate the bids to determine whether they are complete whether any
computational errors have been made whether required sureties have been furnished whether
the documents have been properly signed and whether the bids are generally in order
212 Arithmetical errors shall be rectified on the following basis If there is a discrepancy between
the unit price and total price that is obtained by multiplying the unit price and quantity the
unit price shall prevail and the total price shall be corrected by the BSNL
213 If there is a discrepancy between words and figures the amount in words shall prevail If the
SupplierBidder does not accept the correction of the errors his bid shall be rejected
214 Prior to the detailed evaluation pursuant to clause 22 the BSNL will determine the substantial
responsiveness of each bid to the Bid documents For purposes of these clauses a substantially
responsive bid is one which conforms to all the terms and conditions of the Bid Documents
without material deviations The BSNLs determination of bids responsiveness is to be based
on the contents of the bid itself without recourse to extrinsic evidence
215 A bid determined as substantially non-responsive will be rejected by the BSNL and shall not
subsequent to the bid opening be made responsive by the bidder by correction of the non-
conformity
216 The BSNL may waive any minor infirmity or non-conformity or irregularity in a bid which
does not constitute a material deviation provided such waiver does not prejudice or affect the
relative ranking of any bidder
22 EVALUATION AND COMPARISON OF SUBSTANTIALLY RESPONSIVE BIDS
221 The Purchaser shall evaluate in detail and compare the bids previously determined to be
substantially responsive pursuant to Clause 21
222 The evaluation will be made on the basis of lowest rate quoted as under Lowest Rate
= (rate quoted for 25AMP Qty +rate quoted for 50AMP 100 AMP Qty + rate
quoted for Control Panel of Power Plant Qty) The bidder who has offered lowest
rate as evaluated above will be treated as L1 bidder 23 CONTACTING THE BSNL
231 Subject to Clause 20 no bidder shall try to influence the BSNL on any matter relating
to its bid from the time of the bid opening till the time the contract is awarded
232 Any effort by a bidder to modify its bid or influence the BSNL in the BSNLs bid evaluation
bid comparison or contract award decisions shall result in the rejection of the bid
24 PLACEMENT OF ORDER
241 The BSNL may consider placement of orders to execute the contract on those bidders whose
offers have been found technically commercially and financially acceptable The BSNL reserves
the right to counter offer price(s) against price(s) quoted by any bidder
The work against the tender is for one yearrsquos requirement and the terms and conditions of
this tender shall be operative for a period of one year from the date of signing of agreement
between the Company and the contractor with an option of extension for a further period
of one year at the same rates terms amp conditions
Seal amp Signature of Bidder
21
Distribution of Work Distribution of quantities for ordering to the selected bidders of a tender
Table 1(A) (Without provisions for MSE Units)
No of Bidders
to be approved
(Col 1)
Quantity allotted to the respective bidder
(Col 2)
L1 L2
One Bidder 100 Nil
Two Bidder 60 40
Table 1(B) (With provisions for MSME Units)
No of Bidders
to be approved
(Col 1)
Quantity allotted to the respective bidder (Col 2)
Qty
Earmarked for MSME
bidder(s)(Col 3)
L1 L2
One Bidder 80 Nil 20
Two Bidder 48 32 20
1) In case L2 and MSE bidder accepts the L1 rate in prescribed time amp do not submit MSD as per
tender terms and conditions the EMD will be forfeited If MSE bidder exceeded more than one than
20 work at L1 rate distributed among them
242 TERMS AND CONDITIONS FOR EDUCATIONAL ORDER
(a) 10 of the estimated quantity of work will be extended to inexperienced contractor for each
Tender
(b) Inexperienced Bidder has to apply separately for each Tender
(c) In case there are more than one bidder work will be distributed into the bidders
(d) The bidder shall not submit financial bid In case if the same is submitted then it will not be opened
(e) BSNL reserves a right to give any area to this bidder including that of other tender in which the
bidder has not participated
(f) The work to the inexperienced is a limited quantity (up to 10) in at a time further work will be
done on the basis of evaluation of field unit Additional quantity of work shall be given to such
contractor only after completion of initial work
(g) The payment for repairing to such contractors shall be based on L1 rates finalized in the tender
The payment will be released only after verification of quantity amp quality done as per the
instruction mentioned in respect of work in the tender
(h) All the other Terms amp conditions will remain the same
25 BSNLS RIGHT TO VARY QUANTITIES AT TIME OF AWARD
(a) BSNL reserves the right to vary up to 25 of the quantity of goods and services specified in
the schedule of requirements without any change in the unit price or other terms and conditions at
the time of award of contract
(b) BSNL also reserves the right for placement of additional order or up to 50 of the
additional quantities of goods and services contained in the running tender contract in the tender
at the same rate or a rate negotiated (downwardly) with the existing venders considering the
reasonability of rates based on prevailing market conditions and the impact of reduction in duties
and taxes etc and supplies to be obtained within delivery period scheduled afresh
No guarantee can be given to actual quantity The quantity mentioned in the tender is
tentative only No claim should entertained for less not allotting the quantum of work for any
reason
(c) In exceptional situation where the requirement is of an emergent nature and it is necessary to
ensure continued supplies from the existing venders the purchaser reserves the right to place
repeat order up to 100 of the quantities of goods and services contained in the running tender
contract at the same rate or a rate negotiated (downwardly) with the existing venders considering
the reasonability of rates based on prevailing market conditions and the impact of reduction in
duties and taxes etc Exceptional situation and emergent nature should be spelt out clearly
detailing the justification as well as benefits accrued out of it and loss incurred in case this
provision is not invoked and approved by the authority competent to accord administrative and
Seal amp Signature of Bidder
22
financial approval for the procurement calculated on the basis of total procurement ie initial and
proposed add-on quantity
26 BSNLS RIGHT TO ACCEPT ANY BID AND TO REJECT ANY OR ALL BIDS
The BSNL reserves the right to accept or reject any bid and to annul the bidding process and
reject all bids at any time prior to award of contract without assigning any reason whatsoever and
without thereby incurring any liability to the affected bidder or bidders on the grounds for the
BSNLs action
27 ISSUE OF ADVANCE WORK ORDER
271 The issue of an Advance Work Order (Letter of Intent) shall constitute the intention of BSNL to
enter into the contract with the bidder
272 The bidder shall within 14 days of issue of an advance work order give his acceptance along with
Performance Security Deposit in conformity with section 7(B) provided with the bid documents
28 SIGNING OF CONTRACT
281 The issue of FAT shall constitute the award of contract on the bidder
282 As soon as the tender is approved by the competent authority the Bid Security deposited by the
successful bidder may be converted into the Performance security deposit which will be held by
the BSNL till the completion of warranty period
29 ANNULMENT OF AWARD
Failure of the successful bidder to comply with the requirement of Clause 27 amp 28 shall
constitute sufficient ground for the annulment of the award and forfeiture of the bid security in
which event the BSNL may make the award to any other bidder at the discretion of BSNL or call
for new bids
30 NA
31 REJECTION OF BIDS
311 While all the conditions specified in the Bid documents are critical and are to be complied special
attention of bidder is invited to the following clauses of the bid documents Non-compliance of any
one of which shall result in outright rejection of the bid
(i) Clause 15 of Section 4 Part A The bids will be recorded returned unopened if covers are not
properly sealed with lsquoPERSONAL SEALrsquo of the bidder
(ii) Clauses 121 122 amp 131 of Section 4 Part A The bids will be rejected at opening stage if Bid
security is not submitted as per Clauses 121 amp 122 and bid validity is less than the period
prescribed in Clause 131 mentioned above
(iii) Clause 2 amp 10 of Section 4 Part A If the eligibility condition as per clause 2 of Section 4 Part
A is not met andor documents prescribed to establish the eligibility as per Clause 10 of
section 4 Part A are not enclosed the bids will be rejected without further evaluation
(iv) Clause 112 of Section 4 Part A NA
(v) Section 5 Part A Commercial conditions Section 5 Part B Special Conditions of Contract
Compliance if given using ambiguous words like ldquoNotedrdquo ldquoUnderstoodrdquo ldquoNoted amp
Understoodrdquo shall not be accepted as complied Mere ldquoCompliedrdquo will also be not sufficient
reference to the enclosed documents showing compliances must be given
(vi) Section 8 Price Schedule Prices are not filled in as prescribed in Financial Bid
(vii) Section 4 Part A clause 93 on discount which is reproduced below
ldquoDiscount if any offered by the bidder shall not be considered unless specifically indicated in
the price schedule Bidders desiring to offer discount shall therefore modify their offer
suitably while quoting and shall quote clearly net price taking all such factors like discount
free supply etc into accountrdquo
312 Before outright rejection of the Bid by Bid-opening team for non-compliance of any of the
provisions mentioned in clause 311(i) 311 (ii) above the bidder company is given
opportunity to explain their position however if the person representing the company is not
satisfied with the decision of the Bid opening team hethey can submit the representation to
Bid opening team immediately but in no case after closing of the tender process with full
justification quoting specifically the violation of tender conditions if any
Seal amp Signature of Bidder
23
313 Bid opening team will not return the bids submitted by the bidders on the date of tender
opening even if it is liable for rejection and will preserve the bids in sealed cover as submitted
by taking signatures of some of the desirous representatives of the participating
biddercompanies present on the occasion
314 The In charge of the Bid opening team will mention the number of bids with name of
company found unsuitable for further processing on the date of tender opening and number of
representations received in Bid opening Minutes and if Bid opening team is satisfied with the
arguments of the biddercompany mentioned in their representation and feel that there is
prima-facie fact for consideration the in charge of the Bid opening team will submit the case
for review to competent authority ie GMTD BHUJ as early as possible preferably on next
working day and decision to this effect should be communicated to the bidder company within
a week positively Bids found liable for rejection and kept preserved on the date of tender
opening will be returned to the bidders after issue of POfinal acceptance of tender against
the instant tender
315 If the reviewing officer finds it fit to open the bid of the petitioner this should be done by
giving three (working) days notice to all the participating bidders to give opportunity to
desirous participants to be present on the occasion
32 ACTION BY PURCHASER AGAINST BIDDER(S) VENDOR(S) IN CASE OF
DEFAULT In case of default by Bidder(s) Vendor(s) such as
a) Does not supply the equipment services in time
b) Equipment Services does not perform satisfactory in the field in accordance with the
specifications
c) Or any other default whose complete list is enclosed in Appendix-1
Purchaser will take action as specified in Appendix-1 of this section
33 DELETED
34 NEAR-RELATIONSHIP CERTIFICATE
341 The bidder should give a certificate that none of his her near relative as defined below is
working in the units where he is going to apply for the tender In case of proprietorship firm
certificate will be given by the proprietor For partnership firm certificate will be given by all
the partners and in case of limited company by all the Directors of the company excluding
Government of India Financial institution nominees and independent non-Official part time
Directors appointed by Govt of India or the Governor of the state and full time Directors of
PSUs both state and central Due to any breach of these conditions by the company or firm or
any other person the tender will be cancelled and Bid Security will be forfeited at any stage
whenever it is noticed and BSNL will not pay any damage to the company or firm or the
concerned person
342 The Company or firm or the person will also be debarred for further participation in the
concerned unit
343 The near relatives for this purpose are defined as-
(a) Members of a Hindu undivided family
(b) They are husband and wife
(c) The one is related to the other in the manner as father mother son(s) amp Sons
wife(daughter in law) Daughter(s) and daughters husband (son in law) brother(s) and
brothers wife sister(s) and sisters husband (brother in law)
344 The format of the certificate is given in Section -2(D)
35 VERIFICATION OF DOCUMENTS AND CERTIFICATES
The bidder will ensure that all the documents and certificates including experience
performance and self certificates submitted by him are correct and genuine before enclosing
them in the bid The onus of proving genuineness of the submitted documents would rest with
the bidder If any document paper certificate submitted by the participant bidder is found
discovered to be false fabricated tempered manipulated either during bid evaluation or
during award of contract or thereafter then the Purchaser will take action as per Clause-1 of
Appendix-1 of this section
Seal amp Signature of Bidder
24
Appendix-1 to Section - 4 (Part-A)
S
No
Defaults of the bidder vendor Action to be taken
A B C
1(a) Submitting fake forged
i) Rejection of tender bid of respective Vendor
ii) Banning of business for 3 years which implies barring
further dealing with the vendor for procurement of Goods amp
Services including participation in future tenders invited by
BSNL for 3 years from date of issue of banning order
iii) Termination Short Closure of POWO if issued This
implies non-acceptance of further supplies work amp services
except to make the already received material work complete
work in hand
a) Bank Instruments with the bid to meet
terms amp condition of tender in respect of
tender fee and or EMD
b) Certificate for claiming exemption in
respect of tender fee and or EMD
c) detection of default at any stage from
receipt of bids till award of APO issue of
POWO
Note 1- However in this case the performance guarantee if alright will not be forfeited
Note 2- Payment for already received supplies completed work shall be made as per terms amp conditions of
PO WO
1(b)
Submitting fake forged documents towards
meeting eligibility criteria such as
experience capability supply proof
registration with GST Income Tax
departments etc and as supporting
documents towards other terms amp conditions
with the bid to meet terms amp condition of
tender
(i) If detection of default is prior to award
of APO
i) Rejection of Bid amp
ii) Forfeiture of EMD
(ii) If detection of default after issue of APO
but before receipt of PG SD (DDBG etc)
i) Cancellation of APO
ii) Rejection of Bid amp
iii) Forfeiture of EMD
(iii) If detection of default after receipt of
PG SD (DDBG etc)
i) Cancellation of APO
ii) Rejection of Bid amp
iii) Forfeiture of PG SD
However on realization of PG SD amount EMD if not
already released shall be returned
(iv) If detection of default after issue of PO
WO
i) Termination Short Closure of POWO and Cancellation
of APO
ii) Rejection of Bid amp
iii) Forfeiture of PG SD
However on realization of PG SD amount EMD if not
released shall be returned
Note 3- However settle bills for the material received in correct quantity and quality if pending items do
not affect working or use of supplied items
Note 4- No further supplies are to be accepted except that required to make the already supplied items
work
Special Note 1- Authority competent to take final decision GMTD Bhuj
2 If vendor or his representative uses violent
coercive means viz Physical Verbal means
to threatens BSNL Executive employees
and or obstruct him from functioning in
discharge of his duties amp responsibilities for
the following
Banning of business for 3 years which implies Barring
further dealing with the vendor for procurement of Goods amp
Services including participation in future tenders invited by
BSNL for 3 years from date of issue of banning order
a) Obstructing functioning of tender opening
executives of BSNL in receipt opening of
tender bids from prospective Bidders
suppliers Contractors
Seal amp Signature of Bidder
25
b) Obstructing Threatening other
prospective bidders ie suppliers
Contractors from entering the tender venue
and or submitting their tender bid freely
Special Note 1- Authority competent to take final decision GMTD Bhuj
3 Non-receipt of acceptance of APO AWO
and SD PG by L-1 bidder within time
period specified in APO AWO
Forfeiture of EMD
Special Note 1- Authority competent to take final decision GMTD Bhuj
41 Failure to supply and or Commission the
equipment and or execution of the work at
all even in extended delivery schedules if
granted against PO WO
i) Termination of PO WO
ii) Under take purchase work at the risk amp cost of
defaulting vendor
iii) Recover the excess charges if incurred from the PG SD
and outstanding bills of the defaulting Vendor
42 Failure to supply and or Commission the
equipment and or execution of the Work in
full even in extended delivery schedules if
granted against PO WO
i) Short Closure of PO WO to the quantity already
received by and or commissioned in BSNL and or in
pipeline provided the same is usable andor the Vendor
promises to make it usable
ii) Under take purchase work for balance quantity at the
risk amp cost of defaulting vendor
iii) Recover the excess charges if incurred from the PG SD
and outstanding bills of the defaulting Vendor
Special Note 1- Authority competent to take final decision for 41 amp 42 by DGM concerned
51 The supplied equipment does not perform
satisfactory in the field in accordance with
the specifications mentioned in the PO
WOContract
i) If the material is not at all acceptable then return the non-
acceptable material (or its part) amp recover its cost if paid
from the os bills PG SD
OR
ii) If the material is inducted in network amp it is not possible
to return it and or material is acceptable with degraded
performance the purchaser may determine the price for
need to be issued in compliant format and timely within the time prescribed under GST law
163 In case of any deficientincompleterejected supply BSNL shall convey the same in a reasonable
time to enable the supplier to issue credit note and take tax adjustment
164 It would be the responsibility of the supplier to declare correct information on invoice and GSTN
viz the amount the place of supply rate of tax etc In case the eligibility of input tax credit is
questioned or denied to BSNL on account of default by the supplier the same would be
recovered by BSNL from the contractor
165 Registered location of the both the parties ie BSNL and contractor should be mentioned in the
agreement with GSTIN No Further supplier should raise invoices at the registered premise of
BSNL for availing of credit and ensure that the place of supply as per GST law is same as
registered premise
166 BSNL could at any time instruct the contractor to raise its invoices at a particular location of
BSNL
Seal amp Signature of Bidder
39
167 It is the responsibility of the supplier to ensure that place of supply and the GSTN of BSNL are
in the same state If for any reason they are not in the same state the contractor shall intimate to
BSNL and give adequate time before raising of the invoice
168 E-waybill number should be mentioned on the invoices
169 contractor shall be responsible for timely issuance and delivery of invoice DN CN to enable
BSNL to claim tax benefit on or before the stipulated time period provided by the GST law
(a) It is the responsibility of the contractor to ensure that outward supply return (GSTR-1) would be
filed correctly If not than cost would be borne by supplier
(b) Reporting of correct outward supply by supplier in the outward return (GSTR-1) is the
responsibility of the supplier In case of mismatch because of contractorrsquos fault prompt
amendments must be made by the supplier else supplier would be required to indemnify BSNL
of the loss of credit due to mis-match The compliances to be adhered by contractor includes
(but is not limited to) the following
(i) Uploading appropriate invoice details on the GSTN within the stipulated time
(ii) Issuing GST compliant invoice CN DN PO issued by BSNL should be referred by
contractor for capturing information on the invoice
(iii) Contractor needs to pay the entire self-assessed tax on timely basis
(iv) Where invoice is not uploaded or incorrect upload of invoice detail of GSTN by supplier
then credit on such invoice will be given provisionally subject to matching So acceptance of
changes made by BSNL on GSTN on account of non-upload or incorrect upload of invoice
details on GSTN is to be submitted by supplier Such changes wrt the mismatch are required
to be accepted by supplier within the time limit prescribed under the GST law It should be
noted that in case supplier does not accept such changes within the time limit prescribed under
GST law the loss of input tax credit (if any) would be recovered from the supplier In case of
mismatch because of Suppliers fault prompt amendments must be made by the supplier else
supplier would be required to indemnify BSNL for the losses of credit and interest paid due to
mismatch
(v) contractor to issue all necessary documentation and perform all necessary compliances for
BSNL to be eligible to claim the input tax credit of GST tax to them In case BSNL is unable to
claim the input tax credit the amount wrt GST charged by the supplier would be recovered
from the supplier
1610 Refer) for clause stating that all the details of supplier (name address GSTN unregistered
supplier place of supply SAC HSN code etc) and other mandatory details shall be mentioned on the
invoice
1611Where the location agreed are more than one state then separate invoice state wise to claim
input tax credit in a particular state (typically happens in a bill to-ship to scenario) shall have to be
submitted
1612 It shall be the responsibility of the supplier to mention State of place of supply of goodsservices
in the invoice issued to BSNL
Seal amp Signature of Bidder
40
SECTION ndash 5 (Part-B)
SPECIAL CONDITIONS OF CONTRACT (SCC)
1 GENERAL
No official of Gazetted rank or other Gazetted officer employed in Engineering or administrative
duties in an Engineering BSNL or any other BSNL of the BSNL is allowed to work as a contractor for
a period of two years after his retirement from BSNL service without the previous permission of
BSNL This contract is liable to be cancelled if either the contractor or any of his employee is found at
any time to be such a person who hadnrsquot obtained the permission of BSNL as aforesaid before
submission of the engagement in the contractorrsquos service as the case may be
2 Material Handed over by The BSNL
21 The contractor shall transport (including loading and unloading) all stores issued to him from
Field Unit Telecom Store to the site of work at his own cost The BSNL shall not pay any
transportation charges to the contractor
22 All materials handed over to the contractor by the BSNL shall remain the absolute property of
BSNL and shall not be removed form site of the work except for use in the work and shall be at all
times open to inspection by the Representative of GMTD BHUJ
23 The contractor shall be responsible for the transportation of store storage and safe custody of all
material supplied to him by the BSNL which in the contractorrsquos custody whether or not installed in
the work The contractor shall satisfy himself regularly the quantity and quality of the materials
supplied to him and he will be responsible for any subsequent deterioration and discrepancy (inclusive
of theft) in the quantity quality the materials
3 LABOUR WELFARE MEASURES AND WORKMAN COMPENSATION
(AS APPLICABLE)
31 Obtaining License before commencement of work
The contractor shall obtain a valid labour license (if applicable) under the Contact Labour (RampA) Act
1919 and the Contract Labour (Regulation and Abolition) Central Rules 1971 before commencement
of the work and continue to have a valid license until the completion of work The contractor shall
also abide by the provisions of the Child Labour (Prohibition and Regulation) Act 1986 Any failure
to fulfill this requirement shall attract the penal provisions of this contract arising out of the resultant
non-execution of work
32 Contractors labour Regulations
321 Working Hours
3211 Normally working hours of an employee should not exceed 9 hours a day The working
day shall be so arranged the inclusive of interval for rest if any it shall not spread over
more than12 hours on any day
3212 When a worker is made to work for more than 9 hours on any day or for more than 48
hours in any week he shall be paid over time for the extra hours put in by him
3213 Every worker shall be given a weekly holiday normally on a Sunday in accordance with
the provisions of minimum Wages (Central Rules 1960 as amended from time to time
irrespective of whether such worker is governed by the Minimum Wages Act or not
3214 Where the minimum wages prescribed by the Government under the Minimum Wages
Act are not inclusive of the wages for the weekly day of rest the worker shall be entitled
to rest day wages at the rate applicable to the next preceding day provided he has
worked under the same contractor for a continuous period of not less than 6 days
3215 Where a contractor is permitted by the Engineer-in-Charge to allowed a worker to work
on a normal weekly holiday he shall grant a substituted holiday to him for the whole day
Seal amp Signature of Bidder
41
on one of the five days immediately before or after the normal weekly holiday and pay
wages to such worker for the work performed on the normal weekly holiday at the
overtime rate
322 Display of Notice Regarding Wages Etc
The contractor shall before he commences his work on contract display and correctly
maintain and continue to display and correctly maintain in a clear and legible condition
in conspicuous places on the work notices in English and in local Indian languages
spoken by the majority of the workers giving the minimum rates of the wages fixed
under Minimum Wages Act the actual wages being paid the hours of work for which
such wage are earned wages periods dates of payments of wages and other relevant
information
323 Payment of Wages
3231 The contractor shall fix wage periods in respect of which wages shall be payable
3232 No wage period shall exceed one month
3233 The wages of every person employed as contract labour in an establishment or by a
contractor where less than one thousand such persons are employed shall be paid before
the expiry of seventh day and in other cases before the expiry of tenth day after the last day
of the wage period in respect of which the wages are payable
3234 Where the employment of any worker is terminated by or on behalf of the contractor the
wages earned by him shall be paid before the expiry of the second working day from the
date on which his employment is terminated
3235 All payment of wages shall be made on a working day at the work premises and during the
working time and on a date notified in advance and in case the work is completed before
the expiry of the wage period final payment shall be made within 48 hours of the last
working day
3236 Wages due to every worker shall be paid to him direct or to other person authorized by him
in this behalf
3237 All wages shall be paid in current coin or currency or in both
3238 Wages shall be paid without any deductions of any kind except those specified by the
Central Government by general or special order in this behalf or permissible under the
Payment of Wages Act 1956
3239 A notice showing the wages period and the place and time of disbursement of wages shall
be displayed at the place of work and a copy sent by the contractor to the Engineer ndashin-
Charge under acknowledgement
32310 It shall be the duty of the contractor to ensure the disbursement of wages in presence of the
site Engineer or any other authorized representative of the Engineer-in-Charge who will be
required to be present at the place and time of the disbursement of wages by the contractor
to workmen
32311 The contractor shall obtain from the site Engineer or any other authorized representative of
the Engineer-in-Charge as the case may be a certificate under his signature at the end of
the entries in the ldquoRegister of Wages ldquo or the ldquoWage-cum-Muster Rollrdquo as the case may
be in the following form -
ldquoCertified that the amount shown in the column Nohelliphelliphelliphelliphas been paid to the
workman concerned in my presence on helliphelliphelliphelliphelliphellip at helliphelliphelliphelliphelliphelliphelliphelliphelliprdquo
32312 Fines and deductions which may be made from wages
A The wages of a worker shall be paid to him without any deduction of any kind except the
following -
a) Fines
(b) Deductions for absence from duty ie from the place or the places where by the terms of
his employment he is required to work The amount of deduction shall be in proportion
to the period for which he was absent
(c) Deductions for damage to or loss of goods expressly entrusted to the employed person
for custody or for loss of money or any other deductions which he is required to
account where such damage or loss is directly attributable to his neglect or default
Seal amp Signature of Bidder
42
(d) Deduction for recovery of advances or for adjustment of over payment of wages
advances granted shall be entered in register
(e) Any other deductions which the Central Government may form time to time allow
B No fines should be imposed on any worker save in respect of such acts and omissions
on his part as have been approved of by the Labour Commissioner
C No fine shall be imposed one worker and no deduction for damage or loss shall be
made from his wages until the worker has been given an opportunity of showing cause
against such fines or deductions
D Every fine shall be deemed to have been imposing on the day of the act or omission in
respect of which it was imposed
524 Labor records 1 The contractor shall maintain a Register of Persons employed on work on contract in
Form XIII of the Contract Labour (RampA) Central Rules 1971
2 The contractor shall maintain a Muster Roll register in respect of all workmen
employed by him on the work under Contract in Form XVI of the CL (RampA) Rules
1971
3 The contractor shall maintain a Wage Register in respect of all workmen employed by
him on the work under contract in From XVII of the CL (RampA) Rules 1971
4 Register of accidents- The contractor shall maintain a register of accidents in such
form as may be convenient at the work place but the same shall include the following
particulars
(a) Full Particulars of the laborers who met with accident
(b) Rate of wages
(c) Sex
(d) Age
(e) Nature of accident and cause of accident
(f) Time and date of accident
(g) Date and time when admitted in hospital
(h) Date of discharge from the hospital
(i) Period of treatment and result of treatment
(j) Percentage of loss of earning capacity and disability as assessed by
Medical officer
(k) Claim required to be paid under Workmenrsquos Compensation Act
(l) Date of payment of compensation
(m) Amount paid with details of the person to whom the same was paid
(n) Authority by whom the compensation was assessed
(o) Remarks
5 The contractor shall maintain a Register of Fines in the Form XII of the CL(RampA)
Rules 1971 the Contractor shall display in a good condition and in a conspicuous
place of work the approved list of acts and commission for which fines can be
imposed
6 The contractor shall maintain a Register of deductions for damage or loss in Form
XX of the CL (RampA) Rules 1971
7 The contractor shall maintain a Register of Advances in Form XXIII of the CL
(RampA) Rules 1971
8 The contractor shall maintain a Register of Overtime in Form XXIII of the CL
(RampA) Rules 1971
9 Attendance card-cum wage slip a The contractor shall issue an Attendance card cum wage slip to each workman
employed by him
b The card shall be valid for each wage period
Seal amp Signature of Bidder
43
c The contractor shall mark the attendance of each workman on the card twice each
day once at the commencement of the day and again after the rest interval before
he actually starts work
d The card shall remain in possession of the worker during the wage period under
reference
e The contractor shall complete the wage slip portion on the reverse of the card at
least a day prior to the disbursement of wages in respect of the wage period under
reference
f The contractor shall obtain the signature or thumb impression of the worker on the
wag slip at the time of disbursement of wages and retain the card with him
10 Employment card The contractor shall issue an Employment Card in the Form XIV of CL (RampA) Central Rules
1971 to each worker within three days of the employment of the worker
11 Service certificate
On termination of employment for any reason whatsoever the contractor shall issue to the
workman whose services have been terminated a Service Certificate in the Form XV of the
CL (RampA) Central Rules 1971
12 Preservation of labour records The labour records and records of Fines and deductions shall be preserved in original for a
period of three years from the date of last entries made in them and shall be made available for
inspection by the Engineer-in-Charge or Labour Officer or any other officers authorized by the
Ministry of Communication in this behalf
13 Power of labour officer to make investigations or enquiry The labour officer or any person authorized by the Central Government on their behalf shall
have power to make enquiries with a view to ascertaining and enforcing due and proper
observance of Fair Wage Clauses and provisions of these Regulations He shall investigate
into any complaint regarding the default made by the contractor in regard to such provision
14 Report of Investigating officer and action thereon The labour Officer or other persons authorized as aforesaid shall submit a report of result of
his investigation or enquiry to the Engineer in-Charge indicating the extent if any to which
the default has been committed with a note that necessary deductions from the contractorrsquos bill
be made and the wages and other dues be paid to the labourers concerned The Engineer in-
Charge shall arrange payments to the labour
concerned within 45 days from the receipt of the report from the Labour Officer or the
authorized officer as the case may be
15 Inspection of Books And slips The contractor shall allow inspection of all the prescribed labour records to any of his workers
or to his agent at a convenient time and place after due notice is received or to the Labour
Officer or any other person authorized by the Central Government on his behalf
16 Submission of Returns The contractor shall submit periodical returns as may be specified form time to time
17 Amendments
The Central Government may from time to time add to or amend the regulations and on any
question as to the applicationinterpretation or effect of those regulations
Contractor must fulfill the terms and condition towards fulfillmentscompliance of the
provision of EPF amp Miscprovision act 1952 amp Employment provident Fund Scheme 1952 in
respect of laborersemployees engaged by the contractor Contractor must submit declaration
form regarding compliance of the condition of EPF act 1952
525 INSURANCE Without limiting any of his other obligations or liabilities the contractor shall at his own
expense take and keep comprehensive insurance including third party risk for the plant
machinery men materials etc brought to the site and for all the work during the execution
The contractor shall also take out workmenrsquos compensations insurance as required by law and
under take to indemnify and keep indemnified the Government from and against all manner of
Seal amp Signature of Bidder
44
claims and demands and losses and damages and cost (including between attorney and client)
charges and expenses that may arise in regard the same or that the Government may suffer or
incur with respect to endor incidental to the same The contractor shall have to furnish
originals and or attested copies as required by the BSNL of the policies of insurance taken
within 15 (fifteen) days of being called upon to do so together with all premium receipts and
other papers related thereto which the BSNL may require
526 COMPLIANCE WITH LAWS AND REGULATION
During the performance of the works the contractor shall at his own cost and initiative
fully comply with all applicable laws of the land and with any and all applicable by-laws
rules regulations and orders and any other provisions having the force of law made or
promulgated or deemed to be made or promulgated by the Government Governmental
agency or BSNL municipal board Government of other regulatory or Authorized body or
persons and shall provide all certificates or compliance therewith as may be required by
such applicable law By-laws Rules Regulations orders and or provisions The
contractor shall assume full responsibility for the payment of all contributions and pay roll
taxes as to its employees servants or agents engaged in the performance of the work
specified in the contractor documents If the contractor shall require any assignee or sub-
contract to comply with the provisions of the clause and in this connection the contractor
agrees as to undertake to save and hold the Government harmless and indemnified from
and against any all penalties actions suits losses and damages claims and demands and
costs (inclusive between attorney and client) charges and expenses whatsoever arising out
or occasioned indirectly or directly by failure of the contractor or any assignee or sub-
contractor to make full and proper compliance with the said by-laws Rules Regulations
laws and Order and provisions as aforesaid
6 TOOLS and PLANTS
The contractor shall provide at his own cost all tools plants appliances implements etc
required for proper execution of works The contractor shall also supply without charge
the requisite number of persons with the means and materials necessary for the purpose of
setting out works counting weighing and assisting the measurements for examination at
any time and from time to time Failing his so doing the same may be provided by the
Engineer-in-charge at the expense of the contractor and the expenses shall be deducted
from any money due to the contractor under this contract or otherwise
As per Para 367 of the recommendationobservation of Tenth Report of parliamentary
standing committee on labour Contractor would provide the same social security to the
labours engaged by him as is available to regular employees
As per Para 368 of the recommendationobservation of Tenth Report of parliamentary
standing committee on labour Contractor shall ensure implementation of equal pay for equal
work and also equal remuneration to men and women
Seal amp Signature of Bidder
45
SECTION ndash 7
PROFORMAS
7 (A) BID SECURITY EMD Guarantee
(To be typed on Rs100- non-judicial stamp paper)
Whereas (hereinafter called the Bidder) has submitted its bid datedfor
the supply of vide Tender Nohelliphelliphelliphelliphelliphelliphelliphellip dated KNOW ALL MEN by
these presents that WE OF having our registered office at
(hereinafter called the Bank) are bound unto Bharat Sanchar Nigam Limited (hereinafter
called the Purchaser) in the sum of Rs for which payment will and truly to be made of
the said Purchaser the Bank binds itself its successors and assigns by these present
THE CONDITIONS of the obligation are
1 If the Bidder withdraws his bid during the period of bid validity specified by the Bidder
on the Bid form or
2 If the Bidder having been notified of the acceptance of his bid by the Purchaser during the
period of bid validity
(a) fails or refuses to execute the Contract if required or
(b) fails or refuses to furnish the Performance Security in accordance with the instructions to
Bidders
We undertake to pay to the Purchaser up to the above amount upon receipt of its first written demand
without the purchaser having to substantiate its demand provided that in its demand the purchaser
will note that the amount claimed by it is due to it owning to the occurrence of one or both of the two
conditions specifying the occurred condition or conditions
This guarantee will remain in force as specified in clauses 12 and 282 of section 4 Part A of the Bid
Document upto and including THIRTY (30) days after the Period of bid validity and any demand in
respect thereof should reach the Bank not later than the specified datedates
Signature of the Bank Authority
Name
Signed in Capacity of
Name amp Signature of witness Full address of Branch
Address of witness Tel No of Branch
Fax No of Branch
Seal amp Signature of Bidder
46
7 (B) PERFORMANCE SECURITY BOND FORM
(To be typed on Rs100- non-judicial stamp paper)
Datedhelliphelliphelliphelliphellip
Sub Performance guarantee
Whereas General Manager Telecom Bhuj Telecom District Bhuj (hereafter referred to as BSNL) has issued an AWO no
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellipDated helliphelliphelliphellip20hellip awarding the work of
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip to Ms
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip(hereafter referred to as ldquoBidderrdquo) and BSNL has asked him to submit a performance guarantee
in favour of AO(Cash) BSNL Oo GMTD BHUJ of Rs helliphelliphelliphelliphelliphellip- (hereafter referred to as ldquoPG Amountrdquo) valid up
to helliphelliphelliphellip20helliphelliphellip (hereafter referred to as ldquoValidity Daterdquo)
Now at the request of the Bidder We helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellipBank
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip Branch having (Address) and Regd
office address as helliphelliphellip helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip (Hereinafter called lsquothe
Bankrdquo) agreed to give this guarantee as hereinafter contained
2 We ldquothe Bankrdquo do hereby undertake and assure to the BSNL that if in the opinion of the BSNL the Bidder has in any way
failed to observe or perform the terms and conditions of the said agreement or has committed any breach of its obligations
there-under the Bank shall on demand and without any objection or demur pay to the BSNL the said sum limited to PG
Amount or such lesser amount as BSNL may demand without requiring BSNL to have recourse to any legal remedy that may
be available to it to compel the Bank to pay the same
3 Any such demand from the BSNL shall be conclusive as regards the liability of Bidder to pay to BSNL or as regards the
amount payable by the Bank under this guarantee The Bank shall not be entitled to withhold payment on the ground that the
Bidder had disputed its liability to pay or has disputed the quantum of the amount or that any arbitration proceeding or legal
proceeding is pending between Bidder and BSNL regarding the claim
4 We the Bank further agree that the guarantee shall come into force from the date of its issue and shall remain in full force
and effect up to its Validity date
5 The Bank further agrees that the BSNL shall have the fullest liberty without the consent of the Bank and without affecting
in any way the obligations hereunder to vary any of the terms and conditions of the said agreement or to extend the time for
performance of the said agreement from any of the powers exercisable by BSNL against the Bidder and to forebear to enforce
any of the terms and conditions relating to the said agreement and the Bank shall not be relieved from its liability by reason
of such failure or extension being granted to Bidder or through any forbearance act or omission on the part of BSNL or any
indulgence by BSNL to Bidder or any other matter or thing whatsoever which under the law relating to sureties would but for
this provision have the effect of relieving or discharging the guarantor
6 Notwithstanding anything herein contained
(a) The liability of the Bank under this guarantee is restricted to the PG Amount and it will remain in force up to its Validity
date
(b) The guarantee shall stand completely discharged and all rights of the BSNL under this Guarantee shall be extinguished if
no claim or demand is made on us in writing on or before its validity date
7 In case BSNL demands for any money under this bank guarantee the same shall be paid through bankerrsquos Cheque in
favour of ldquoAO(Cash) BSNL Oo GMTD BHUJ rdquo payable at Bhuj
8 The Bank guarantees that the below mentioned officer who have signed it on behalf of the Bank have authority to give this
guarantee under its delegated power
Place helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip
Date helliphelliphelliphelliphelliphelliphelliphelliphelliphellip (Signature of the Bank Officer)
Rubber stamp of the bank
Authorized Power of Attorney Number helliphelliphelliphelliphelliphellip
Name of the Bank officer helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip
Having examined the tender documents terms and conditions stipulated therein specifications of work
etc we the under signed offer to execute the repair Works in conformity with the said specifications and
conditions of contract as under
Sl No
ITEM DESCRIPTION
Repair Charges per module inclusive of freight
forwardingpacking amp all taxes amp levies (except GST)
(in Figure)
Unit Rate in Words
Total Cost (unit rate qty)
1 2 3 4 5
1 25 AMP Module
2
50 AMP Module
3 100 AMP Module
4 Control Panel of
Power Plants
25A 50A amp 100A
5 GRAND TOTAL
Note -
1 GST will be payable extra on approved rates 2If our Bid is accepted we shall submit the securities as per the conditions mentioned in the contract
3We agree to abide by this Bid for a period of 180 days from the date of opening of financial bid and it shall
remain binding upon us and may be accepted at any time before the expiry of that period
4 The evaluation will be made on the basis of lowest rate quoted as under Lowest Rate = (rate quoted for 25 AMP Qty + rate quoted for 50 AMP Qty + rate
quoted for 100 AMP Qty + rate quoted for Control Panel of Power Plant AMP Qty)
The bidder who has offered lowest rate as evaluated above will be treated as L1 bidder
Date Signature of Tenderer
Seal amp Signature of Bidder
49
CHECK LIST
Sl No
Description Tender Clause Mode of Submission
1 Tender Fee Section 1 (part A) Para 21 22
Off-line
2 EMD Section 1 (part A) Para 51 52 Off-line 3 Power of Attorney Section 4 (Part A) clause 143 Off-line 4 Latest and Valid MSME NSIC certificate (If Applicable) Off-line 5 Experience Certificate Section 1 (part A)
c) E-reverse auction if required by Business Unit Planning cell after opening of the Financial bids
Note 1 In case of 1(b) above the bidder shall submit Techno-commercial amp Financial bid simultaneously
The bids will be evaluated techno-commercially first and thereafter financial bids of techno
commercially compliant bidders only shall be opened
2 Bid Validity Period validity of Bid offer 150 days from the tender opening date and Validity of bid
Offer for acceptance by BSNL can be extended
3 Bid must be submitted by bidder through E-tendering mode only Manual (OFFLINE)
submission of bids should not be considered The following documents are required to be submitted
offline to AGM (PLG) Oo GMTD Haripar Road Bhuj-370001 on or before the date amp time of
submission of bids in a sealed envelope
The envelope shall bear the tender number name of work and the phrase Do Not Open Before (due date amp
time of opening of tender)
i) EMD - Bid security (original copy)
ii) DD Bankers cheque of Tender fee
iii) Power of Attorney in accordance with clause 143 of section 4 Part A and authorization for
executing the power of Attorney
iv) Latest and valid MSME NSIC Certificate duly certified by NSIC if applicable
The purchaser shall not be responsible if the envelop is delivered elsewhere or late
In case of tenders invited under two envelopes system the first envelope will be named as techno commercial amp
will contain documents of bidderrsquos satisfying the eligibility Technical amp commercial conditions and 2nd
envelope will be named as financial envelope containing financial quote
a) Techno-commercial part of the bid shall contain one set of the following documents only-
i) Certificate(s) showing fulfillment of the eligibility criteria The bidder shall furnish as part of his bid
documents establishing the bidders eligibility all the following documents or whichever is required as per
terms and conditions of bid documents
Sl Particular Documents to be submitted
i Registration
Certificate
Firm Registration Certificate Certificate of Incorporation Shop amp
Establishment Certificate
ii In case of
Proprietorship
proprietorship firms an affidavit of that effect should be submitted along with
the bid
iii Partnership
Company
Partnership Deed or ArticlesMemorandum of Association as the case may be
amp Power of Attorney (if applicable) should be made older than the date of
submission of bid
iv Experience Experience Certificate as mentioned in the eligibility criteria
v EMD amp Tender Fee As per Table A amp clause 1 amp 2 OR Copy of Latest amp valid MSE NSIC
Certificate (if applicable)
vi EPF Copy of Registration Certificate of EPF (if applicable)
vii ESIC ESIC Registration (if applicable)
ix Taxes Copy of Valid Goods and Services Tax Registration No Declaration
that he is not registered and will get registered if required x PAN Card Copy of PAN Card
All documents submitted will also be self attested by the bidder
ii) Power of Attorney amp authorization for executing the power of Attorney in accordance with clause 143 of
Section -4 Part A
iii) The complete Bid document duly signed on end of each section at least
iv) Agency details letter for authorization of bid Undertakings Undertakings Non-Relation Certificate as
given vide Section 2(A) to 2(D) of this Bid form
b) Financial envelope shall contain Electronic Form- financial along with Price Schedule (Section 8)
with all relevant bid annexure (in case of tenders invited through e-tendering process)
Seal amp Signature of Bidder
8
SECTION -2 (Part-A)
AGENCY DETAILS
(Including performance records financial viability etc)
Name of firm
Registered Address
Status of the Bidder (i) Proprietorship concern
(ii) Partnership firm
(iii) HUF
(iv) Limited Company
Name of person or authorized signatory for
submitting the tender other documents and
empowered for correspondence with BSNL
GSTIN No
PAN Card particulars
Telephone numbers (with STD Code) of
authorized signatory
Office Residence
Mobile E-mail
Name(s) of Proprietor all Partners all
Directors
Infrastructure capabilities
A Capacity of Repairing 25A module per
week
B Capacity of Repairing 50A module per
week)
C Capacity of Repairing 100A module per
week
D Capacity of Repairing control panel per
week
F Details of trained staff available
A --------------------------------
B --------------------------------
C --------------------------------
D --------------------------------
F --------------------------------
Signature of Tenderer
Name of Tenderer
Along with date amp Seal
Seal amp Signature of Bidder
9
SECTION- 2 PART B
LETTER OF AUTHORISATION FOR ATTENDING BID OPENING
(To be typed preferably on letter head of the company)
Subject Authorization for attending Bid opening
I We Mr Ms helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip have submitted our bid for the tender no
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip in respect of helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip (Item
of work) which is due to open on helliphelliphelliphelliphelliphelliphellip (date) in the Meeting Room
We hereby authorize Mr Ms helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip helliphelliphelliphelliphelliphelliphelliphelliphellipamp
rohelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphereby certify that we or our firm
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip has not been BLACK LISTED by
any SSACircle of MTNLBSNL In case at any stage it is found that the information given by me is
falseincorrect BSNL shall have the absolute right to take any action as deemed fitwithout any prior
intimation to me
e) Clause by Clause Compliance
It is to certify that the tender document is carefully read amp understood and all the sections and clauses
are complied unconditionally amp unequivocally There is no deviation from the terms amp conditions of
the tender
f) Declaration for EPF amp Misc Provisions Act 1952
I _____________________________ (Name of the bidder agency) hereby declare compliance
towards conditions of the EPF and Misc Provisions Act 1952 and authorize BSNL to recover any
payment that arises due to failure to comply with any of the Labour legislations and statutory
conditions viz Labor EPF ESI etc or any other acts dealing with the same and all other acts
mentioned in the tender document
g) CERTIFICATE REGARDING FIRM IS NOT BLACK LISTED BY GST AUTHORITY
rohelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphereby certify that we or our firm
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip has not been BLACK LISTED by
any GST Authority
Date helliphelliphelliphelliphellip helliphellip helliphelliphelliphelliphelliphelliphelliphelliphellip
Signature of Tenderer
Place helliphelliphelliphelliphellip Name of Tenderer
Along with date amp Seal
Seal amp Signature of Bidder
11
SECTION- 2 PART D
DECLARATION REGARDING NO RELATIVE WORKING IN BSNL
I ___________________________Son of W O___________________________
RO _________________________here by certify that none of my relative(s) as defined in tender
document isare employed in BSNL unit as per details given in tender document In case at any stage
it is found that the information given by me is false incorrect BSNL shall have the absolute right to
take any action as deemed fit without any prior intimation to me
Signed ___________________
For and on behalf of the Agency
Name (Capitals) ___________________________
Position ____________________________
Date ____________________________
Note - In case of proprietorship firm certificate will be given by the proprietor for partnership firm
certificate will be given by all the partners on separate paper and in case of limited company by all
the Directors of the Company on separate paper Any breach of these conditions by the company or
firm or any other person the tender work will be cancelled and earnest money security deposit will
be forfeited at any stage whenever it is so noticed BSNL will not pay any damages to the company or
firm or the concerned person The company or firm or the person will also be debarred for further
participation in the concerned unit
Seal amp Signature of Bidder
12
SECTION- 3
SCOPE OF WORK AND JURISDICTION OF CONTRACT
1 SCOPE OF WORK
1 During the entire period of contract repairing of all types and of any make such as AMAR RAJA DACS DELTA DYNA ELTEK EXICOM HIMACHAL EXICOM ITI etc SMPS Power plant Modules (25 AMP 50 AMP 100 Amp ) Control panel are to be carried out including replacement of faulty parts
2 Collection and Delivery of Faulty repaired modules - a The concerned JTOSDEAGM in charge will intimate the contractor the Location Make capacity and
quantity of faulty modules by email (copy to AGM(Plg) on agmplgbhujgmailcom ) followed by ERP PO on mail
b The contractor will collect the module from the concerned in charge with in THREE days from the date of intimation under proper receipt to the concerned in charge However under emergent condition the collection of modules may be done on the same day
c Packing transport and delivery of faulty as well as repaired modules is the responsibility of the contractor
d The contractor shall repair the module and return to the concerned in charge with in Seven days of its collection However under emergent condition as decided by the concerned in charge the collection and repair shall be made within the time period given in the ERP PO
e Repaired modules will be tested by the SDE concern within TWO days on receipt of repaired modules if it is found OK then a certificate of this may be issued to the contractor Otherwise same shall be returned to the contractor for necessary action
f The date of receipt of all the modules mentioned in the ERP PO duly tested OK will be reckoned as the completion of ERP PO
g Repaired modules are warranted for 3 months from the date of successfully taken over During this time the contractor has to rectify the module free of cost
3 INSPECTION AND TESTS - a) The BSNL BHUJ or his representative shall have the right to inspect and test the repaired module as
per prescribed test schedules for their conformity to the specifications Where the BSNL BHUJ decides to conduct such tests on the premises of the Contractor or its subcontractor(s) all reasonable facilities and assistance like Testing Instruments and other test gadgets including access to drawings and production data shall be furnished to the inspectors at no charge to the Purchaser
b) Should any inspected or tested repaired module fail to conform to the Specifications the BSNL BHUJ may reject them and the Contractor shall either replace the rejected repaired module or make all alterations necessary to meet Specification requirements free of cost to the Purchaser
c) Notwithstanding the pre-repair tests and inspections prescribed in clause 3(a) amp 3(b) above the module and accessories on receipt in the BSNL s premises will also be tested during and after installation before take over and if any equipment or part thereof is found defective the same shall be replaced free of all cost to the BSNL BHUJ
d) If any module or any part thereof before it is taken over under clause 3(e) below is found defective or fails to fulfill the requirements of the contract the inspector shall give the Contractor notice setting forth details of such defects or failure and the Contractor shall make the defective module good or alter the same to make it comply with the requirements of the contract forthwith and in any case within a period not exceeding one month of the initial report The replacements shall be made by the Contractor free of all charges at site should it fail to do so within this time the BSNL BHUJ reserves the discretion to reject and replace at the cost of the Contractor the whole or any portion of the module as the case may be which is defective or fails to fulfill the requirements of the contract The cost of any such replacement made by the BSNL BHUJ shall be deducted from the amount payable to the Contractor
Seal amp Signature of Bidder
13
e) When the performance tests called for have been successfully carried out the inspector ultimate
Consignee will forthwith issue a Taking Over Certificate The inspectorultimate consignee shall not delay the issue of any Taking Over Certificate ldquo contemplated by this clause on account of minor defects in the module which do not materially affect the commercial use thereof provided that the Contractor shall undertake to make good the same in a time period not exceeding two months The taking Over Certificate shall be issued by the ultimate consignee within six weeks of successful completion of tests
f) After performance test carried out by the concerned SDE of BSNL as per prescribed schedule and repaired modules are found ok in all respect than the repaired modules will be accepted
g) A register is to be maintained at each placelocation mentioning the details of Modules date of Collection and Delivery of Faulty repaired modules replacement of spares amp remark if any and it is to be signed by the controlling officer amp Service engineer
h) Nothing in clause 3 shall in any way release the Contractor from any Warranty or other obligations under this contract
4 SPARES - All the spare of good quality required for repair of modules of SMPS PP are to be supplied by the contractor including major components
5 The contractor shall be responsible for any loss or damages caused to man or machinespartsinstruments during the execution of work and shall replace with an identical new item at his own cost The authorized officerperson of BSNL will have the liberty to check the material and work etchellip provided by the contractor
6 Governing Conditions for RNP (Repair Not Possible) Cases
A module Control panel may be declared RNP only if cost of material to be replaced exceeds five times of approved rate of repair In no case labour cost involved will be considered for deciding RNP A detailed report is to be submitted by contractor to concerned officer in-charge and final decision in this regard will be taken by concerned DGM subjected to maximum permissible RNP as given below
a)25-A module Maximum 10 of total quantity ordered for repair
b) 50-A 100-A Module Maximum 5 of total quantity ordered for repair
c) Control Panel Maximum 10 of total quantity ordered for repair
In case of RNP exceeding permissible limits penalty will be imposed as per para 11 (d) of section-5 (Part-A)
7 WARRANTY - a) Repaired modules are warranted for 3 months from the date of successfully taken over During this
time the contractor has to rectify the module free of cost The contractor shall warrant that repaired module shall be free from all defects and faults in materials used workmanship It becomes necessary for the contractor to replace or renew any defective portion(s) of the module under this clause
b) Replacement under warranty clause shall be made by the contractor free of all charges at site including freight insurance and other incidental charges
c) If any defect is not remedied by the contractor within a reasonable time the BSNL BHUJ may proceed to get the defects remedied from other contractor etc at the contractors risk and expenses but without prejudice to any other rights which the BSNL BHUJ may have against the contractor in respect of such defects
Seal amp Signature of Bidder
14
SECTION- 4 (Part-A)
GENERAL INSTRUCTION TO BIDDERS (GIB)
1 DEFINITIONS
1 BSNL The BSNL means the BSNL Bhuj Telecom Dist under the Ministry of
Communications which invites the tenders on behalf of the General Manager Bhuj Telecom
District Includes executives in the BSNL whatever designations assigned to them from time
to time who may be the in-charge of direction supervision testing acceptance and
maintenance including their successor(s) in the office appearing in various clauses shall be
taken to mean the BSNL Bhuj Telecom District
b The SSA Head means the Head of SSA General Manager Bhuj Telecom District Bhuj and
his successors
c The jurisdiction of the SSA Head The jurisdiction of the SSA Head means Bhuj Telecom
District which coincides geographically with (Revenue District(s))
d Representative of (the SSA Head) Representative of (the SSA Head ) means Officer and
staff for the time being in Bhuj Telecom District deputed by the General Manager Bhuj for
inspecting or supervising the work of testing etc
e Engineer ndash in - charge The Engineer ndash in - charge means the Engineering Officer
nominated by the BSNL to supervise the work under the contract (Minimum Divisional
Engineer level Officer)
f Site Engineer Site Engineer shall mean an SDESDOJTO of the BSNL who may be placed by
the General Manager Bhuj Telecom District Bhuj as in ndash charge of the work at site at any
particular period of time
g AT Unit AT Unit shall mean Acceptance and Testing unit of the BSNL
h AT Officer An officer authorized by General Manger ndash Bhuj Telecom Dist
i Contract The term contract means the documents forming the tender and acceptance
thereof and the formal agreement executed between the competent authority on behalf of the
BSNL and the contractor together with the documents referred to therein including these
conditions the specifications designs drawings and instructions issued from time to time by
the engineer in ndash charge and all these documents taken together shall be deemed to form one
contract and shall be complementary to one another In the contract the following expressions
shall unless the context otherwise requires have the meanings hereby respectively assigned to
them The expression works or work shall unless there be something either in the subject
context repugnant to such construction be construed or taken to mean the works by or by
virtue of the contract contracted to be executed whether temporary or permanent and whether
original altered substituted or additional
j Contractor The contractor shall mean the individual firm or company enlisted or not
enlisted with BSNL Department of Telecom in accordance with procedure for contractor or
registered for carrying out the work of cable laying whether incorporated or not undertaking
the works and shall include the legal personal representative of such individual or the persons
composing such firm or company or the successors of such firm or company and the
permitted assignees of such individual firm or company
k Work The expression lsquoworksrsquo shall unless there be something either in the subject or context
repugnant to such construction be construct and taken to mean the works by or by virtue of the
Seal amp Signature of Bidder
15
contract contracted to be executed whether temporary or permanent and whether original
altered substituted or additional
l Schedule(s) Schedule(s) referred to in these conditions shall mean the relevant schedule(s)
or the standard schedule of rates mentioned in the document
m Site The site shall mean the land or other places on into or through which work is to be
executed under the contract or any adjacent land path or street through which the work is to
be exacted under the contract or any adjacent land path or street which may be allotted or
used for the purpose of carrying out the contract
n Normal time or stipulated time Normal time or stipulated time means time specified in the
ERP PO to complete the work
o Extension of Time Extension of Time means the time granted by the BSNL to complete the
work beyond the normal time or stipulated time
p Exceptional risk Exceptional risks are risk due to war(whether declared or not) invasion act
of foreign enemies hostilities civil war rebellion revolution insurrection military or
usurped power any acts of Government damages from aircraft acts of God such as
earthquake lightening and unprecedented floods and other causes over which the contractor
has no control and the same having been accepted as such by the Accepting Authority or
causes solely due to use or occupation by the government of the part of the work in respect of
which a certificate of completion has been issued
q The ERP PO means the Order placed by the field units on the contractor signed by
the unit incharge r The Contract Rate means the rate payable to the repairer under the work order for
the full and proper performance of its contractual obligations
2 ELIGIBLE BIDDERS Kindly refer to clause 4 of Section ndash 1 Part A ie Detailed NIT
3 COST OF BIDDING
The bidder shall bear all costs associated with the preparation and submission of the bid The
BSNL will in no case be responsible or liable for these costs regardless of the conduct or
outcome of the bidding process
4 BID DOCUMENTS
41 The goods services required to be supplied bidding procedures and contract terms are prescribed
in the Bid Documents The contents of the Bid documents are specified in the covering letter
42 The Bidder is expected to examine all instructions forms terms and specifications in the Bid
Documents Failure to furnish all information required as per the Bid Documents or submission
of bids not substantially responsive to the Bid Documents in every respect will be at the bidders
risk and may result in rejection of the bid
5 CLARIFICATION OF BID DOCUMENTS
51 A prospective bidder requiring any clarification on the Bid Documents shall notify the User in
writing by FAX or by Email of the User as indicated in the invitation of Bid The User shall
respond in writing to any request for the clarification of the Bid Documents which it receives
7days prior to the date of opening of the Tenders Copies of the query (without identifying the
source) and clarifications by the User shall be uploaded on BSNL website as lsquoClarificationsrsquo on
e-procurement portal of Bhuj Telecom District portal clarification shall be available as
lsquoAddendumrsquo for all the prospective bidders who have downloaded the official copy of tender
documents from e-procurement portal of Bhuj Telecom District
Seal amp Signature of Bidder
16
52 Any clarification issued by BSNL in response to query raised by prospective bidders shall form
an integral part of bid documents and it may amount to an amendment of relevant clauses of the
bid documents
6 AMENDMENT OF BID DOCUMENTS
61 The BSNL may for any reason whether at its own initiative or in response to a clarification
requested by a prospective Bidder may modify bid documents by amendments prior to the date
of submission of Bids with due notification to prospective Bidders
62 The amendments shall be notified in writing or by Fax or by Addendum through e-tendering
portal to all prospective bidders on the address intimated at the time of purchase of bid document
from the BSNL and these amendments will be binding on them
63 In order to afford prospective bidders reasonable time in which to take the amendments into
account in preparing their bids the BSNL may at its discretion extend the deadline for the
submission of bids suitably
7 DOCUMENTS COMPRISING THE BID
The bid prepared by the bidder shall comprise the components specified in Section 2 of this
Tender
8 BID FORM
The bidder shall complete the Bid Form and the appropriate Price Schedule furnished in the Bid
Documents as per Section- 8
9 BID PRICES
91 The bidder shall give the total composite price inclusive of all levies and taxes packing
forwarding freight and insurance in case of materials to be supplied and inclusive of all taxes
and levies except GST in case of works to be executed GST will be paid extra as applicable
The contractor shall be responsible for transporting the materials to be supplied by the BSNL
(At the field Unit Telecom Store or otherwise) to execute the work under the contract to site at
histheir own cost The costs of transportation are subsumed in the standard Schedule Rates and
therefore no separate charges are payable on this account The offer shall be firm in Indian
Rupees
92 The price quoted by the bidder shall remain fixed during the entire period of contract and shall
not be subject to variation on any account A bid submitted with an adjustable price quotation
will be treated as non-responsive and rejected
93 Discount if any offered by the bidders shall not be considered unless they are specifically
indicated in the schedule of rates (financial Bid) Bidders desiring to offer discount shall
therefore modify their offers suitable while quoting and shall quote clearly net price taking all
such factors like Discount free supply etc into account
10 DOCUMENTS ESTABLISHING BIDDERS ELIGIBILITY AND QUALIFICATIONS Kindly refer to clause of Section ndash 1 and 2 of this bid
11 NA
12 BID SECURITYEMD
121 The bidder shall furnish as part of its bid a bid security one of the following ways-
(a) Demand Draft Bankerrsquos cheque from a Nationalizedscheduled bank drawn in favour
of AO (Cash) BSNL Oo GMTD Bhuj and payable at Bhuj
(b) Bank GuaranteeFDR from a Nationalizedscheduled bank drawn in favour of AO
(Cash) BSNL Oo GMTD Bhuj which should be valid for 180 days from the tender
opening date
For educational order EMD to be submitted by bidder as 20 of 10 of estimated tender
cost for each case in the form of cash Demand Draft Bankerrsquos cheque Bank guaranteeFDR
issued by a NationalizedScheduled bank drawn in favour of AO (Cash) BSNL Oo GMTD
Bhuj Bank Guarantee should be valid for 180 days from the tender opening date
122 The MSE bidders are exempted from payment of bid security
Seal amp Signature of Bidder
17
a) A proof regarding valid registration with body specified by Ministry of Micro Small
amp Medium Enterprise for the tendered items will have to be attached along with the
bid
b) The enlistment certificate issued by MSME should be valid on the date of opening of
tender
c) MSE unit is required to submit its monthly delivery schedule
d) If a vender registered with body specified by Ministry of Micro Small amp Medium
Enterprise claiming concessional benefits is awarded work by BSNL and
subsequently fails to obey any of the contractual obligations he will be debarred from
any further work contract by BSNL for one year from the date of issue of such order
123 The bid security is required to protect the BSNL against the risk of bidders conduct which would
warrant the bid securityrsquos forfeiture pursuant to para 127
124 A bid not secured in accordance with para 121 amp 122 shall be rejected by the BSNL being non-
responsive at the bid opening stage and archived unopened on e-tender portal for e-tenders
125 The bid security of the unsuccessful bidder will be dischargedreturned as promptly as possible
as but not later than 30 days after the expiry of the period of bid validity prescribed by the
BSNL pursuant to clause 13
126 The successful bidders bid security will be discharged upon the bidders acceptance of the
advance Purchase Order satisfactorily pursuant to clause 27 and furnishing the performance
security
The successful bidders bid security may be converted to Part Performance Security Deposit in
accordance with clause 28
127 The bid security may be forfeited
a) If the bidder withdraws or amends its bid or impairs or derogates from the bid in any
respect during the period of bid validity specified by the bidder in the bid form or
extended subsequently or
b) If the bidder does not accept the APO AWO and or does not submit PBG amp sign the
contract agreement in accordance with clause 28
Note - The bidder shall mean individual company firm or the front bidder and its technology
consortium partner as applicable
13 PERIOD OF VALIDITY OF BIDS
131 Bid shall remain valid for 150 days from the date of bid opening prescribed by the BSNL A bid
valid for a shorter period shall be rejected by the BSNL as non-responsive
132 In exceptional circumstances the BSNL may request the bidders consent for an extension to the
period of bid validity The request and the responses thereto shall be made in writing The bid
security provided under Clause 12 shall also be suitably extended A bidder may refuse the
request without forfeiting his bid security A bidder accepting the request and granting extension
will not be permitted to modify his bid
14 FORMAT AND SIGNING OF BID
141 The bidder shall submit his bid online (in case of e-tendering) amp through sealed envelopes
physically (in case of tenders with manual bidding process) complying all eligibility
conditions other terms and conditions of tender document to be read along with the
clarifications and amendments issued in this respect All the documents must be authenticated
using Digital Signature (DSC) with Class 2 or above (in case of e-tendering) amp by hand
signatures (for manual bidding process) by the authorized person The letter of authorization
shall be indicated by written power-of-attorney accompanying the bid
Note-The BSNL may ask the bidder(s) to supply besides original bid additional copy of bids as
required by him
142 The bid shall contain no interlineations erasures or overwriting except as necessary to correct
errors made by the bidder in which case such corrections shall be signed by the person or persons
signing the bid All pages of the original bid except for un-amended printed literatures shall be
digitally signed by the person or persons signing the bid
143 Power of Attorney
(a) The power of Attorney should be submitted and executed on the non-judicial stamp paper
Seal amp Signature of Bidder
18
of appropriate value as prevailing in the concerned states(s) and the same be attested by a
Notary public or registered before Sub-registrar of the state(s) concerned
(b) The power of Attorney be executed by a person who has been authorized by the Board of
Directors of the bidder in this regard on behalf of the Company institution Body
corporate
(c) In case of the bidder being a firm the said Power of Attorney should be executed by all the
partner(s) in favour of the said Attorney
(d) Attestation of the specimen signatures of authorized signatory by the Companyrsquos firmrsquos
bankers shall be furnished Name designation Phone number mobile number email
address and postal address of the authorized signatory shall be provided
(e) Individual signing the tenders or other documents connected with the contract shall indicate
the full name below the signature and must specify the capacity and authority under which
he signs such documents and shall also submit documentary evidence of his authority in
the form of Power of Attorney
(f) The Power of Attorney is to be submitted in original if it has been issued for the specific
tender enquiry If the power of attorney is issued in general irrespective of tender enquiry
then photocopy duly certified by notary public can also be accepted
(g) In case the representative of bidder company who uploads the document on e-tender portal
using his Digital Signature Certificates (DSC) which is different from the authorized
signatory for the bid (Power of Attorney holder) then the representative who uploads the
documents on e-tender portal using DSC issued in his name shall also be one of the Power
of Attorney holder by the bidder Company in addition to the authorized signatory for the
bid
15 SEALING AND MARKING OF BIDS
The bid shall be submitted online using single stage bidding and Two Envelope Methodology
151 The first envelope (Techno-commercial bid) This envelope shall contain documents of
bidders satisfying the eligibility Technical amp commercial conditions requirements Second
envelope will be named as financial bid containing price Schedule as per section 8 All
documents submitted will also be self attested by the bidder
152 a) The envelopes for Tender Fee EMD shall be addressed AGM (PLG) Oo GMTD
Haripar Road Bhuj - 370001
b) The envelope for Tender Fee EMD shall bear the name of the tender the tender number
and the words DO NOT OPEN BEFORE (due date amp time)
c) The envelopes for Tender Fee EMD shall indicate the name and complete postal address
of the bidder to enable the User to return the bid unopened in case it is declared to be received
late
d) The envelopes for Tender Fee EMD shall should be deposited in the tender box provided
by tendering authority or sent by registered post or delivered in person on above mentioned
address (address is given above) The responsibility for ensuring that the envelopes for Tender
Fee EMD shall are delivered in time would vest with the bidder
e) The envelopes for Tender Fee EMD shall delivered in person registered post on the day of
tender opening shall be delivered upto specified time amp date as stated in NIT to Oo GMTD
Haripar Road Bhuj - 370001 The User shall not be responsible if the envelopes for Tender
Fee EMD shall are delivered elsewhere
f) Venue of Tender Opening
Tender will be opened in Oo GMTD Haripar Road Bhuj - 370001 at specified time amp
date as stated in NIT If due to administrative reason the venue of Bid opening is changed it
will be displayed prominently on the above address
Seal amp Signature of Bidder
19
153 If envelopes are not sealed and marked as required at para 151 and 152 the bid shall be
rejected
16 SUBMISSION OF BIDS
161 Bids must be submitted by the bidders on or before the specified date amp time indicated in
Section-1 ie DNIT
162 The BSNL may at its discretion extend this deadline for the submission of the bids by
amending the bid documents in accordance with Clause 6 in which case all rights and
obligations of the BSNL and bidders previously subject to the deadline will thereafter be
subject to the deadline as extended
163 The bidder shall submit his bid offer against a set of bid documents purchased by him for all
or some systemservices equipment as per requirement of the Bid Documents He may
include alternate offer if permissible as per the bid However not more than one independent
and complete offer shall be permitted from the bidder
164 Bid must be submitted by the bidder through E-Tendering mode only Manual submission of bid
shall not be needed
17 LATE BIDS
No bid shall be accepted either online by E-Tender Portal or physically in case of manual
bidding process after the specified deadline for submission of bids prescribed by the purchaser
18 MODIFICATION AND WITHDRAWAL OF BIDS
181 The bidder may modify revise or withdraw his bid after submission prior to deadline prescribed
for submission of bid If a bid is withdrawn the same shall be archived unopened in the e-
procurement portal of Bhuj Telecom District
182 The bidderrsquos modification revision or withdrawal shall have to be online and digitally
authenticated as per clause 15
183 Subject to clause 20 no bid shall be modified subsequent to the deadline for submission of bids
19 OPENING OF BIDS BY BSNL
191 The purchaser shall open bids online in the presence of bidders or their authorized representatives
who chose to attend at time specified in Clause 7 of Detailed NIT(Section-1) on due date The
bidderrsquos representatives who are present shall sign in an attendance register Authority letter to
this effect shall be submitted by the bidders before they are allowed to participate in bid opening
(As per Format given in section 2 Part B)
192 A maximum of two representatives for any bidder shall be authorized and permitted to attend
the bid opening
193 (i) The bids will be opened in two stages ie techno-commercial bid shall be opened on the date
of tender opening given in NIT The financial bid will not be opened on the date of opening of
techno commercial bids
The financial bids of those bidders who are approved to be techno commercially compliant by
the competent authority will be opened by TOC in front of techno-commercially eligible
bidders authorized representatives by sending them a suitable notice
(ii) The bidderrsquos names Item name EMD amount amp validity and acceptability Information in
respect of eligible bidders Details of bid modification withdrawal (if any) and such other
details as the purchaser at its discretion may consider appropriate will be made available
online at the time of techno-commercial bid opening
(iii) The bidderrsquos names Name of the Items Quantitiesprices quoted in the bid discount if
offered Taxes amp levies and such other details as the purchaser at its discretion may consider
appropriate will be made available online at the time of financial bid opening
194 The date fixed for opening of bids if subsequently declared as holiday by the BSNL the revised
date of schedule will be notified However in absence of such notification the bids will be
opened in the next working day time and venue remaining unaltered
20 CLARIFICATION OF BIDS
201 To assist in the examination evaluation and comparison of bids the BSNL may at its discretion
Seal amp Signature of Bidder
20
ask the bidder for the clarification of its bid The request for the clarification and the response
shall be in writing However no post bid clarification at the initiative of the bidder shall be
entertained
202 If any of the documents required to be submitted along with the technical bid is found wanting
the offer is liable to be rejected at that stage However the BSNL at its discretion may call for
any clarification regarding the bid document within a stipulated time period The BSNL at itrsquos
discretion may also ask for the submission of any additionalmissing document(s) within a
stipulated time period In such case(s) the bidder shall have to comply the BSNLrsquos requirement
within the specified time In case of non-compliance to such queries the bid will be out rightly
rejected without entertaining further correspondence in this regardrdquo However no post bid
clarification at the initiative of the bidder shall be entertained
21 PRELIMINARY EVALUATION
211 BSNL shall evaluate the bids to determine whether they are complete whether any
computational errors have been made whether required sureties have been furnished whether
the documents have been properly signed and whether the bids are generally in order
212 Arithmetical errors shall be rectified on the following basis If there is a discrepancy between
the unit price and total price that is obtained by multiplying the unit price and quantity the
unit price shall prevail and the total price shall be corrected by the BSNL
213 If there is a discrepancy between words and figures the amount in words shall prevail If the
SupplierBidder does not accept the correction of the errors his bid shall be rejected
214 Prior to the detailed evaluation pursuant to clause 22 the BSNL will determine the substantial
responsiveness of each bid to the Bid documents For purposes of these clauses a substantially
responsive bid is one which conforms to all the terms and conditions of the Bid Documents
without material deviations The BSNLs determination of bids responsiveness is to be based
on the contents of the bid itself without recourse to extrinsic evidence
215 A bid determined as substantially non-responsive will be rejected by the BSNL and shall not
subsequent to the bid opening be made responsive by the bidder by correction of the non-
conformity
216 The BSNL may waive any minor infirmity or non-conformity or irregularity in a bid which
does not constitute a material deviation provided such waiver does not prejudice or affect the
relative ranking of any bidder
22 EVALUATION AND COMPARISON OF SUBSTANTIALLY RESPONSIVE BIDS
221 The Purchaser shall evaluate in detail and compare the bids previously determined to be
substantially responsive pursuant to Clause 21
222 The evaluation will be made on the basis of lowest rate quoted as under Lowest Rate
= (rate quoted for 25AMP Qty +rate quoted for 50AMP 100 AMP Qty + rate
quoted for Control Panel of Power Plant Qty) The bidder who has offered lowest
rate as evaluated above will be treated as L1 bidder 23 CONTACTING THE BSNL
231 Subject to Clause 20 no bidder shall try to influence the BSNL on any matter relating
to its bid from the time of the bid opening till the time the contract is awarded
232 Any effort by a bidder to modify its bid or influence the BSNL in the BSNLs bid evaluation
bid comparison or contract award decisions shall result in the rejection of the bid
24 PLACEMENT OF ORDER
241 The BSNL may consider placement of orders to execute the contract on those bidders whose
offers have been found technically commercially and financially acceptable The BSNL reserves
the right to counter offer price(s) against price(s) quoted by any bidder
The work against the tender is for one yearrsquos requirement and the terms and conditions of
this tender shall be operative for a period of one year from the date of signing of agreement
between the Company and the contractor with an option of extension for a further period
of one year at the same rates terms amp conditions
Seal amp Signature of Bidder
21
Distribution of Work Distribution of quantities for ordering to the selected bidders of a tender
Table 1(A) (Without provisions for MSE Units)
No of Bidders
to be approved
(Col 1)
Quantity allotted to the respective bidder
(Col 2)
L1 L2
One Bidder 100 Nil
Two Bidder 60 40
Table 1(B) (With provisions for MSME Units)
No of Bidders
to be approved
(Col 1)
Quantity allotted to the respective bidder (Col 2)
Qty
Earmarked for MSME
bidder(s)(Col 3)
L1 L2
One Bidder 80 Nil 20
Two Bidder 48 32 20
1) In case L2 and MSE bidder accepts the L1 rate in prescribed time amp do not submit MSD as per
tender terms and conditions the EMD will be forfeited If MSE bidder exceeded more than one than
20 work at L1 rate distributed among them
242 TERMS AND CONDITIONS FOR EDUCATIONAL ORDER
(a) 10 of the estimated quantity of work will be extended to inexperienced contractor for each
Tender
(b) Inexperienced Bidder has to apply separately for each Tender
(c) In case there are more than one bidder work will be distributed into the bidders
(d) The bidder shall not submit financial bid In case if the same is submitted then it will not be opened
(e) BSNL reserves a right to give any area to this bidder including that of other tender in which the
bidder has not participated
(f) The work to the inexperienced is a limited quantity (up to 10) in at a time further work will be
done on the basis of evaluation of field unit Additional quantity of work shall be given to such
contractor only after completion of initial work
(g) The payment for repairing to such contractors shall be based on L1 rates finalized in the tender
The payment will be released only after verification of quantity amp quality done as per the
instruction mentioned in respect of work in the tender
(h) All the other Terms amp conditions will remain the same
25 BSNLS RIGHT TO VARY QUANTITIES AT TIME OF AWARD
(a) BSNL reserves the right to vary up to 25 of the quantity of goods and services specified in
the schedule of requirements without any change in the unit price or other terms and conditions at
the time of award of contract
(b) BSNL also reserves the right for placement of additional order or up to 50 of the
additional quantities of goods and services contained in the running tender contract in the tender
at the same rate or a rate negotiated (downwardly) with the existing venders considering the
reasonability of rates based on prevailing market conditions and the impact of reduction in duties
and taxes etc and supplies to be obtained within delivery period scheduled afresh
No guarantee can be given to actual quantity The quantity mentioned in the tender is
tentative only No claim should entertained for less not allotting the quantum of work for any
reason
(c) In exceptional situation where the requirement is of an emergent nature and it is necessary to
ensure continued supplies from the existing venders the purchaser reserves the right to place
repeat order up to 100 of the quantities of goods and services contained in the running tender
contract at the same rate or a rate negotiated (downwardly) with the existing venders considering
the reasonability of rates based on prevailing market conditions and the impact of reduction in
duties and taxes etc Exceptional situation and emergent nature should be spelt out clearly
detailing the justification as well as benefits accrued out of it and loss incurred in case this
provision is not invoked and approved by the authority competent to accord administrative and
Seal amp Signature of Bidder
22
financial approval for the procurement calculated on the basis of total procurement ie initial and
proposed add-on quantity
26 BSNLS RIGHT TO ACCEPT ANY BID AND TO REJECT ANY OR ALL BIDS
The BSNL reserves the right to accept or reject any bid and to annul the bidding process and
reject all bids at any time prior to award of contract without assigning any reason whatsoever and
without thereby incurring any liability to the affected bidder or bidders on the grounds for the
BSNLs action
27 ISSUE OF ADVANCE WORK ORDER
271 The issue of an Advance Work Order (Letter of Intent) shall constitute the intention of BSNL to
enter into the contract with the bidder
272 The bidder shall within 14 days of issue of an advance work order give his acceptance along with
Performance Security Deposit in conformity with section 7(B) provided with the bid documents
28 SIGNING OF CONTRACT
281 The issue of FAT shall constitute the award of contract on the bidder
282 As soon as the tender is approved by the competent authority the Bid Security deposited by the
successful bidder may be converted into the Performance security deposit which will be held by
the BSNL till the completion of warranty period
29 ANNULMENT OF AWARD
Failure of the successful bidder to comply with the requirement of Clause 27 amp 28 shall
constitute sufficient ground for the annulment of the award and forfeiture of the bid security in
which event the BSNL may make the award to any other bidder at the discretion of BSNL or call
for new bids
30 NA
31 REJECTION OF BIDS
311 While all the conditions specified in the Bid documents are critical and are to be complied special
attention of bidder is invited to the following clauses of the bid documents Non-compliance of any
one of which shall result in outright rejection of the bid
(i) Clause 15 of Section 4 Part A The bids will be recorded returned unopened if covers are not
properly sealed with lsquoPERSONAL SEALrsquo of the bidder
(ii) Clauses 121 122 amp 131 of Section 4 Part A The bids will be rejected at opening stage if Bid
security is not submitted as per Clauses 121 amp 122 and bid validity is less than the period
prescribed in Clause 131 mentioned above
(iii) Clause 2 amp 10 of Section 4 Part A If the eligibility condition as per clause 2 of Section 4 Part
A is not met andor documents prescribed to establish the eligibility as per Clause 10 of
section 4 Part A are not enclosed the bids will be rejected without further evaluation
(iv) Clause 112 of Section 4 Part A NA
(v) Section 5 Part A Commercial conditions Section 5 Part B Special Conditions of Contract
Compliance if given using ambiguous words like ldquoNotedrdquo ldquoUnderstoodrdquo ldquoNoted amp
Understoodrdquo shall not be accepted as complied Mere ldquoCompliedrdquo will also be not sufficient
reference to the enclosed documents showing compliances must be given
(vi) Section 8 Price Schedule Prices are not filled in as prescribed in Financial Bid
(vii) Section 4 Part A clause 93 on discount which is reproduced below
ldquoDiscount if any offered by the bidder shall not be considered unless specifically indicated in
the price schedule Bidders desiring to offer discount shall therefore modify their offer
suitably while quoting and shall quote clearly net price taking all such factors like discount
free supply etc into accountrdquo
312 Before outright rejection of the Bid by Bid-opening team for non-compliance of any of the
provisions mentioned in clause 311(i) 311 (ii) above the bidder company is given
opportunity to explain their position however if the person representing the company is not
satisfied with the decision of the Bid opening team hethey can submit the representation to
Bid opening team immediately but in no case after closing of the tender process with full
justification quoting specifically the violation of tender conditions if any
Seal amp Signature of Bidder
23
313 Bid opening team will not return the bids submitted by the bidders on the date of tender
opening even if it is liable for rejection and will preserve the bids in sealed cover as submitted
by taking signatures of some of the desirous representatives of the participating
biddercompanies present on the occasion
314 The In charge of the Bid opening team will mention the number of bids with name of
company found unsuitable for further processing on the date of tender opening and number of
representations received in Bid opening Minutes and if Bid opening team is satisfied with the
arguments of the biddercompany mentioned in their representation and feel that there is
prima-facie fact for consideration the in charge of the Bid opening team will submit the case
for review to competent authority ie GMTD BHUJ as early as possible preferably on next
working day and decision to this effect should be communicated to the bidder company within
a week positively Bids found liable for rejection and kept preserved on the date of tender
opening will be returned to the bidders after issue of POfinal acceptance of tender against
the instant tender
315 If the reviewing officer finds it fit to open the bid of the petitioner this should be done by
giving three (working) days notice to all the participating bidders to give opportunity to
desirous participants to be present on the occasion
32 ACTION BY PURCHASER AGAINST BIDDER(S) VENDOR(S) IN CASE OF
DEFAULT In case of default by Bidder(s) Vendor(s) such as
a) Does not supply the equipment services in time
b) Equipment Services does not perform satisfactory in the field in accordance with the
specifications
c) Or any other default whose complete list is enclosed in Appendix-1
Purchaser will take action as specified in Appendix-1 of this section
33 DELETED
34 NEAR-RELATIONSHIP CERTIFICATE
341 The bidder should give a certificate that none of his her near relative as defined below is
working in the units where he is going to apply for the tender In case of proprietorship firm
certificate will be given by the proprietor For partnership firm certificate will be given by all
the partners and in case of limited company by all the Directors of the company excluding
Government of India Financial institution nominees and independent non-Official part time
Directors appointed by Govt of India or the Governor of the state and full time Directors of
PSUs both state and central Due to any breach of these conditions by the company or firm or
any other person the tender will be cancelled and Bid Security will be forfeited at any stage
whenever it is noticed and BSNL will not pay any damage to the company or firm or the
concerned person
342 The Company or firm or the person will also be debarred for further participation in the
concerned unit
343 The near relatives for this purpose are defined as-
(a) Members of a Hindu undivided family
(b) They are husband and wife
(c) The one is related to the other in the manner as father mother son(s) amp Sons
wife(daughter in law) Daughter(s) and daughters husband (son in law) brother(s) and
brothers wife sister(s) and sisters husband (brother in law)
344 The format of the certificate is given in Section -2(D)
35 VERIFICATION OF DOCUMENTS AND CERTIFICATES
The bidder will ensure that all the documents and certificates including experience
performance and self certificates submitted by him are correct and genuine before enclosing
them in the bid The onus of proving genuineness of the submitted documents would rest with
the bidder If any document paper certificate submitted by the participant bidder is found
discovered to be false fabricated tempered manipulated either during bid evaluation or
during award of contract or thereafter then the Purchaser will take action as per Clause-1 of
Appendix-1 of this section
Seal amp Signature of Bidder
24
Appendix-1 to Section - 4 (Part-A)
S
No
Defaults of the bidder vendor Action to be taken
A B C
1(a) Submitting fake forged
i) Rejection of tender bid of respective Vendor
ii) Banning of business for 3 years which implies barring
further dealing with the vendor for procurement of Goods amp
Services including participation in future tenders invited by
BSNL for 3 years from date of issue of banning order
iii) Termination Short Closure of POWO if issued This
implies non-acceptance of further supplies work amp services
except to make the already received material work complete
work in hand
a) Bank Instruments with the bid to meet
terms amp condition of tender in respect of
tender fee and or EMD
b) Certificate for claiming exemption in
respect of tender fee and or EMD
c) detection of default at any stage from
receipt of bids till award of APO issue of
POWO
Note 1- However in this case the performance guarantee if alright will not be forfeited
Note 2- Payment for already received supplies completed work shall be made as per terms amp conditions of
PO WO
1(b)
Submitting fake forged documents towards
meeting eligibility criteria such as
experience capability supply proof
registration with GST Income Tax
departments etc and as supporting
documents towards other terms amp conditions
with the bid to meet terms amp condition of
tender
(i) If detection of default is prior to award
of APO
i) Rejection of Bid amp
ii) Forfeiture of EMD
(ii) If detection of default after issue of APO
but before receipt of PG SD (DDBG etc)
i) Cancellation of APO
ii) Rejection of Bid amp
iii) Forfeiture of EMD
(iii) If detection of default after receipt of
PG SD (DDBG etc)
i) Cancellation of APO
ii) Rejection of Bid amp
iii) Forfeiture of PG SD
However on realization of PG SD amount EMD if not
already released shall be returned
(iv) If detection of default after issue of PO
WO
i) Termination Short Closure of POWO and Cancellation
of APO
ii) Rejection of Bid amp
iii) Forfeiture of PG SD
However on realization of PG SD amount EMD if not
released shall be returned
Note 3- However settle bills for the material received in correct quantity and quality if pending items do
not affect working or use of supplied items
Note 4- No further supplies are to be accepted except that required to make the already supplied items
work
Special Note 1- Authority competent to take final decision GMTD Bhuj
2 If vendor or his representative uses violent
coercive means viz Physical Verbal means
to threatens BSNL Executive employees
and or obstruct him from functioning in
discharge of his duties amp responsibilities for
the following
Banning of business for 3 years which implies Barring
further dealing with the vendor for procurement of Goods amp
Services including participation in future tenders invited by
BSNL for 3 years from date of issue of banning order
a) Obstructing functioning of tender opening
executives of BSNL in receipt opening of
tender bids from prospective Bidders
suppliers Contractors
Seal amp Signature of Bidder
25
b) Obstructing Threatening other
prospective bidders ie suppliers
Contractors from entering the tender venue
and or submitting their tender bid freely
Special Note 1- Authority competent to take final decision GMTD Bhuj
3 Non-receipt of acceptance of APO AWO
and SD PG by L-1 bidder within time
period specified in APO AWO
Forfeiture of EMD
Special Note 1- Authority competent to take final decision GMTD Bhuj
41 Failure to supply and or Commission the
equipment and or execution of the work at
all even in extended delivery schedules if
granted against PO WO
i) Termination of PO WO
ii) Under take purchase work at the risk amp cost of
defaulting vendor
iii) Recover the excess charges if incurred from the PG SD
and outstanding bills of the defaulting Vendor
42 Failure to supply and or Commission the
equipment and or execution of the Work in
full even in extended delivery schedules if
granted against PO WO
i) Short Closure of PO WO to the quantity already
received by and or commissioned in BSNL and or in
pipeline provided the same is usable andor the Vendor
promises to make it usable
ii) Under take purchase work for balance quantity at the
risk amp cost of defaulting vendor
iii) Recover the excess charges if incurred from the PG SD
and outstanding bills of the defaulting Vendor
Special Note 1- Authority competent to take final decision for 41 amp 42 by DGM concerned
51 The supplied equipment does not perform
satisfactory in the field in accordance with
the specifications mentioned in the PO
WOContract
i) If the material is not at all acceptable then return the non-
acceptable material (or its part) amp recover its cost if paid
from the os bills PG SD
OR
ii) If the material is inducted in network amp it is not possible
to return it and or material is acceptable with degraded
performance the purchaser may determine the price for
need to be issued in compliant format and timely within the time prescribed under GST law
163 In case of any deficientincompleterejected supply BSNL shall convey the same in a reasonable
time to enable the supplier to issue credit note and take tax adjustment
164 It would be the responsibility of the supplier to declare correct information on invoice and GSTN
viz the amount the place of supply rate of tax etc In case the eligibility of input tax credit is
questioned or denied to BSNL on account of default by the supplier the same would be
recovered by BSNL from the contractor
165 Registered location of the both the parties ie BSNL and contractor should be mentioned in the
agreement with GSTIN No Further supplier should raise invoices at the registered premise of
BSNL for availing of credit and ensure that the place of supply as per GST law is same as
registered premise
166 BSNL could at any time instruct the contractor to raise its invoices at a particular location of
BSNL
Seal amp Signature of Bidder
39
167 It is the responsibility of the supplier to ensure that place of supply and the GSTN of BSNL are
in the same state If for any reason they are not in the same state the contractor shall intimate to
BSNL and give adequate time before raising of the invoice
168 E-waybill number should be mentioned on the invoices
169 contractor shall be responsible for timely issuance and delivery of invoice DN CN to enable
BSNL to claim tax benefit on or before the stipulated time period provided by the GST law
(a) It is the responsibility of the contractor to ensure that outward supply return (GSTR-1) would be
filed correctly If not than cost would be borne by supplier
(b) Reporting of correct outward supply by supplier in the outward return (GSTR-1) is the
responsibility of the supplier In case of mismatch because of contractorrsquos fault prompt
amendments must be made by the supplier else supplier would be required to indemnify BSNL
of the loss of credit due to mis-match The compliances to be adhered by contractor includes
(but is not limited to) the following
(i) Uploading appropriate invoice details on the GSTN within the stipulated time
(ii) Issuing GST compliant invoice CN DN PO issued by BSNL should be referred by
contractor for capturing information on the invoice
(iii) Contractor needs to pay the entire self-assessed tax on timely basis
(iv) Where invoice is not uploaded or incorrect upload of invoice detail of GSTN by supplier
then credit on such invoice will be given provisionally subject to matching So acceptance of
changes made by BSNL on GSTN on account of non-upload or incorrect upload of invoice
details on GSTN is to be submitted by supplier Such changes wrt the mismatch are required
to be accepted by supplier within the time limit prescribed under the GST law It should be
noted that in case supplier does not accept such changes within the time limit prescribed under
GST law the loss of input tax credit (if any) would be recovered from the supplier In case of
mismatch because of Suppliers fault prompt amendments must be made by the supplier else
supplier would be required to indemnify BSNL for the losses of credit and interest paid due to
mismatch
(v) contractor to issue all necessary documentation and perform all necessary compliances for
BSNL to be eligible to claim the input tax credit of GST tax to them In case BSNL is unable to
claim the input tax credit the amount wrt GST charged by the supplier would be recovered
from the supplier
1610 Refer) for clause stating that all the details of supplier (name address GSTN unregistered
supplier place of supply SAC HSN code etc) and other mandatory details shall be mentioned on the
invoice
1611Where the location agreed are more than one state then separate invoice state wise to claim
input tax credit in a particular state (typically happens in a bill to-ship to scenario) shall have to be
submitted
1612 It shall be the responsibility of the supplier to mention State of place of supply of goodsservices
in the invoice issued to BSNL
Seal amp Signature of Bidder
40
SECTION ndash 5 (Part-B)
SPECIAL CONDITIONS OF CONTRACT (SCC)
1 GENERAL
No official of Gazetted rank or other Gazetted officer employed in Engineering or administrative
duties in an Engineering BSNL or any other BSNL of the BSNL is allowed to work as a contractor for
a period of two years after his retirement from BSNL service without the previous permission of
BSNL This contract is liable to be cancelled if either the contractor or any of his employee is found at
any time to be such a person who hadnrsquot obtained the permission of BSNL as aforesaid before
submission of the engagement in the contractorrsquos service as the case may be
2 Material Handed over by The BSNL
21 The contractor shall transport (including loading and unloading) all stores issued to him from
Field Unit Telecom Store to the site of work at his own cost The BSNL shall not pay any
transportation charges to the contractor
22 All materials handed over to the contractor by the BSNL shall remain the absolute property of
BSNL and shall not be removed form site of the work except for use in the work and shall be at all
times open to inspection by the Representative of GMTD BHUJ
23 The contractor shall be responsible for the transportation of store storage and safe custody of all
material supplied to him by the BSNL which in the contractorrsquos custody whether or not installed in
the work The contractor shall satisfy himself regularly the quantity and quality of the materials
supplied to him and he will be responsible for any subsequent deterioration and discrepancy (inclusive
of theft) in the quantity quality the materials
3 LABOUR WELFARE MEASURES AND WORKMAN COMPENSATION
(AS APPLICABLE)
31 Obtaining License before commencement of work
The contractor shall obtain a valid labour license (if applicable) under the Contact Labour (RampA) Act
1919 and the Contract Labour (Regulation and Abolition) Central Rules 1971 before commencement
of the work and continue to have a valid license until the completion of work The contractor shall
also abide by the provisions of the Child Labour (Prohibition and Regulation) Act 1986 Any failure
to fulfill this requirement shall attract the penal provisions of this contract arising out of the resultant
non-execution of work
32 Contractors labour Regulations
321 Working Hours
3211 Normally working hours of an employee should not exceed 9 hours a day The working
day shall be so arranged the inclusive of interval for rest if any it shall not spread over
more than12 hours on any day
3212 When a worker is made to work for more than 9 hours on any day or for more than 48
hours in any week he shall be paid over time for the extra hours put in by him
3213 Every worker shall be given a weekly holiday normally on a Sunday in accordance with
the provisions of minimum Wages (Central Rules 1960 as amended from time to time
irrespective of whether such worker is governed by the Minimum Wages Act or not
3214 Where the minimum wages prescribed by the Government under the Minimum Wages
Act are not inclusive of the wages for the weekly day of rest the worker shall be entitled
to rest day wages at the rate applicable to the next preceding day provided he has
worked under the same contractor for a continuous period of not less than 6 days
3215 Where a contractor is permitted by the Engineer-in-Charge to allowed a worker to work
on a normal weekly holiday he shall grant a substituted holiday to him for the whole day
Seal amp Signature of Bidder
41
on one of the five days immediately before or after the normal weekly holiday and pay
wages to such worker for the work performed on the normal weekly holiday at the
overtime rate
322 Display of Notice Regarding Wages Etc
The contractor shall before he commences his work on contract display and correctly
maintain and continue to display and correctly maintain in a clear and legible condition
in conspicuous places on the work notices in English and in local Indian languages
spoken by the majority of the workers giving the minimum rates of the wages fixed
under Minimum Wages Act the actual wages being paid the hours of work for which
such wage are earned wages periods dates of payments of wages and other relevant
information
323 Payment of Wages
3231 The contractor shall fix wage periods in respect of which wages shall be payable
3232 No wage period shall exceed one month
3233 The wages of every person employed as contract labour in an establishment or by a
contractor where less than one thousand such persons are employed shall be paid before
the expiry of seventh day and in other cases before the expiry of tenth day after the last day
of the wage period in respect of which the wages are payable
3234 Where the employment of any worker is terminated by or on behalf of the contractor the
wages earned by him shall be paid before the expiry of the second working day from the
date on which his employment is terminated
3235 All payment of wages shall be made on a working day at the work premises and during the
working time and on a date notified in advance and in case the work is completed before
the expiry of the wage period final payment shall be made within 48 hours of the last
working day
3236 Wages due to every worker shall be paid to him direct or to other person authorized by him
in this behalf
3237 All wages shall be paid in current coin or currency or in both
3238 Wages shall be paid without any deductions of any kind except those specified by the
Central Government by general or special order in this behalf or permissible under the
Payment of Wages Act 1956
3239 A notice showing the wages period and the place and time of disbursement of wages shall
be displayed at the place of work and a copy sent by the contractor to the Engineer ndashin-
Charge under acknowledgement
32310 It shall be the duty of the contractor to ensure the disbursement of wages in presence of the
site Engineer or any other authorized representative of the Engineer-in-Charge who will be
required to be present at the place and time of the disbursement of wages by the contractor
to workmen
32311 The contractor shall obtain from the site Engineer or any other authorized representative of
the Engineer-in-Charge as the case may be a certificate under his signature at the end of
the entries in the ldquoRegister of Wages ldquo or the ldquoWage-cum-Muster Rollrdquo as the case may
be in the following form -
ldquoCertified that the amount shown in the column Nohelliphelliphelliphelliphas been paid to the
workman concerned in my presence on helliphelliphelliphelliphelliphellip at helliphelliphelliphelliphelliphelliphelliphelliphelliprdquo
32312 Fines and deductions which may be made from wages
A The wages of a worker shall be paid to him without any deduction of any kind except the
following -
a) Fines
(b) Deductions for absence from duty ie from the place or the places where by the terms of
his employment he is required to work The amount of deduction shall be in proportion
to the period for which he was absent
(c) Deductions for damage to or loss of goods expressly entrusted to the employed person
for custody or for loss of money or any other deductions which he is required to
account where such damage or loss is directly attributable to his neglect or default
Seal amp Signature of Bidder
42
(d) Deduction for recovery of advances or for adjustment of over payment of wages
advances granted shall be entered in register
(e) Any other deductions which the Central Government may form time to time allow
B No fines should be imposed on any worker save in respect of such acts and omissions
on his part as have been approved of by the Labour Commissioner
C No fine shall be imposed one worker and no deduction for damage or loss shall be
made from his wages until the worker has been given an opportunity of showing cause
against such fines or deductions
D Every fine shall be deemed to have been imposing on the day of the act or omission in
respect of which it was imposed
524 Labor records 1 The contractor shall maintain a Register of Persons employed on work on contract in
Form XIII of the Contract Labour (RampA) Central Rules 1971
2 The contractor shall maintain a Muster Roll register in respect of all workmen
employed by him on the work under Contract in Form XVI of the CL (RampA) Rules
1971
3 The contractor shall maintain a Wage Register in respect of all workmen employed by
him on the work under contract in From XVII of the CL (RampA) Rules 1971
4 Register of accidents- The contractor shall maintain a register of accidents in such
form as may be convenient at the work place but the same shall include the following
particulars
(a) Full Particulars of the laborers who met with accident
(b) Rate of wages
(c) Sex
(d) Age
(e) Nature of accident and cause of accident
(f) Time and date of accident
(g) Date and time when admitted in hospital
(h) Date of discharge from the hospital
(i) Period of treatment and result of treatment
(j) Percentage of loss of earning capacity and disability as assessed by
Medical officer
(k) Claim required to be paid under Workmenrsquos Compensation Act
(l) Date of payment of compensation
(m) Amount paid with details of the person to whom the same was paid
(n) Authority by whom the compensation was assessed
(o) Remarks
5 The contractor shall maintain a Register of Fines in the Form XII of the CL(RampA)
Rules 1971 the Contractor shall display in a good condition and in a conspicuous
place of work the approved list of acts and commission for which fines can be
imposed
6 The contractor shall maintain a Register of deductions for damage or loss in Form
XX of the CL (RampA) Rules 1971
7 The contractor shall maintain a Register of Advances in Form XXIII of the CL
(RampA) Rules 1971
8 The contractor shall maintain a Register of Overtime in Form XXIII of the CL
(RampA) Rules 1971
9 Attendance card-cum wage slip a The contractor shall issue an Attendance card cum wage slip to each workman
employed by him
b The card shall be valid for each wage period
Seal amp Signature of Bidder
43
c The contractor shall mark the attendance of each workman on the card twice each
day once at the commencement of the day and again after the rest interval before
he actually starts work
d The card shall remain in possession of the worker during the wage period under
reference
e The contractor shall complete the wage slip portion on the reverse of the card at
least a day prior to the disbursement of wages in respect of the wage period under
reference
f The contractor shall obtain the signature or thumb impression of the worker on the
wag slip at the time of disbursement of wages and retain the card with him
10 Employment card The contractor shall issue an Employment Card in the Form XIV of CL (RampA) Central Rules
1971 to each worker within three days of the employment of the worker
11 Service certificate
On termination of employment for any reason whatsoever the contractor shall issue to the
workman whose services have been terminated a Service Certificate in the Form XV of the
CL (RampA) Central Rules 1971
12 Preservation of labour records The labour records and records of Fines and deductions shall be preserved in original for a
period of three years from the date of last entries made in them and shall be made available for
inspection by the Engineer-in-Charge or Labour Officer or any other officers authorized by the
Ministry of Communication in this behalf
13 Power of labour officer to make investigations or enquiry The labour officer or any person authorized by the Central Government on their behalf shall
have power to make enquiries with a view to ascertaining and enforcing due and proper
observance of Fair Wage Clauses and provisions of these Regulations He shall investigate
into any complaint regarding the default made by the contractor in regard to such provision
14 Report of Investigating officer and action thereon The labour Officer or other persons authorized as aforesaid shall submit a report of result of
his investigation or enquiry to the Engineer in-Charge indicating the extent if any to which
the default has been committed with a note that necessary deductions from the contractorrsquos bill
be made and the wages and other dues be paid to the labourers concerned The Engineer in-
Charge shall arrange payments to the labour
concerned within 45 days from the receipt of the report from the Labour Officer or the
authorized officer as the case may be
15 Inspection of Books And slips The contractor shall allow inspection of all the prescribed labour records to any of his workers
or to his agent at a convenient time and place after due notice is received or to the Labour
Officer or any other person authorized by the Central Government on his behalf
16 Submission of Returns The contractor shall submit periodical returns as may be specified form time to time
17 Amendments
The Central Government may from time to time add to or amend the regulations and on any
question as to the applicationinterpretation or effect of those regulations
Contractor must fulfill the terms and condition towards fulfillmentscompliance of the
provision of EPF amp Miscprovision act 1952 amp Employment provident Fund Scheme 1952 in
respect of laborersemployees engaged by the contractor Contractor must submit declaration
form regarding compliance of the condition of EPF act 1952
525 INSURANCE Without limiting any of his other obligations or liabilities the contractor shall at his own
expense take and keep comprehensive insurance including third party risk for the plant
machinery men materials etc brought to the site and for all the work during the execution
The contractor shall also take out workmenrsquos compensations insurance as required by law and
under take to indemnify and keep indemnified the Government from and against all manner of
Seal amp Signature of Bidder
44
claims and demands and losses and damages and cost (including between attorney and client)
charges and expenses that may arise in regard the same or that the Government may suffer or
incur with respect to endor incidental to the same The contractor shall have to furnish
originals and or attested copies as required by the BSNL of the policies of insurance taken
within 15 (fifteen) days of being called upon to do so together with all premium receipts and
other papers related thereto which the BSNL may require
526 COMPLIANCE WITH LAWS AND REGULATION
During the performance of the works the contractor shall at his own cost and initiative
fully comply with all applicable laws of the land and with any and all applicable by-laws
rules regulations and orders and any other provisions having the force of law made or
promulgated or deemed to be made or promulgated by the Government Governmental
agency or BSNL municipal board Government of other regulatory or Authorized body or
persons and shall provide all certificates or compliance therewith as may be required by
such applicable law By-laws Rules Regulations orders and or provisions The
contractor shall assume full responsibility for the payment of all contributions and pay roll
taxes as to its employees servants or agents engaged in the performance of the work
specified in the contractor documents If the contractor shall require any assignee or sub-
contract to comply with the provisions of the clause and in this connection the contractor
agrees as to undertake to save and hold the Government harmless and indemnified from
and against any all penalties actions suits losses and damages claims and demands and
costs (inclusive between attorney and client) charges and expenses whatsoever arising out
or occasioned indirectly or directly by failure of the contractor or any assignee or sub-
contractor to make full and proper compliance with the said by-laws Rules Regulations
laws and Order and provisions as aforesaid
6 TOOLS and PLANTS
The contractor shall provide at his own cost all tools plants appliances implements etc
required for proper execution of works The contractor shall also supply without charge
the requisite number of persons with the means and materials necessary for the purpose of
setting out works counting weighing and assisting the measurements for examination at
any time and from time to time Failing his so doing the same may be provided by the
Engineer-in-charge at the expense of the contractor and the expenses shall be deducted
from any money due to the contractor under this contract or otherwise
As per Para 367 of the recommendationobservation of Tenth Report of parliamentary
standing committee on labour Contractor would provide the same social security to the
labours engaged by him as is available to regular employees
As per Para 368 of the recommendationobservation of Tenth Report of parliamentary
standing committee on labour Contractor shall ensure implementation of equal pay for equal
work and also equal remuneration to men and women
Seal amp Signature of Bidder
45
SECTION ndash 7
PROFORMAS
7 (A) BID SECURITY EMD Guarantee
(To be typed on Rs100- non-judicial stamp paper)
Whereas (hereinafter called the Bidder) has submitted its bid datedfor
the supply of vide Tender Nohelliphelliphelliphelliphelliphelliphelliphellip dated KNOW ALL MEN by
these presents that WE OF having our registered office at
(hereinafter called the Bank) are bound unto Bharat Sanchar Nigam Limited (hereinafter
called the Purchaser) in the sum of Rs for which payment will and truly to be made of
the said Purchaser the Bank binds itself its successors and assigns by these present
THE CONDITIONS of the obligation are
1 If the Bidder withdraws his bid during the period of bid validity specified by the Bidder
on the Bid form or
2 If the Bidder having been notified of the acceptance of his bid by the Purchaser during the
period of bid validity
(a) fails or refuses to execute the Contract if required or
(b) fails or refuses to furnish the Performance Security in accordance with the instructions to
Bidders
We undertake to pay to the Purchaser up to the above amount upon receipt of its first written demand
without the purchaser having to substantiate its demand provided that in its demand the purchaser
will note that the amount claimed by it is due to it owning to the occurrence of one or both of the two
conditions specifying the occurred condition or conditions
This guarantee will remain in force as specified in clauses 12 and 282 of section 4 Part A of the Bid
Document upto and including THIRTY (30) days after the Period of bid validity and any demand in
respect thereof should reach the Bank not later than the specified datedates
Signature of the Bank Authority
Name
Signed in Capacity of
Name amp Signature of witness Full address of Branch
Address of witness Tel No of Branch
Fax No of Branch
Seal amp Signature of Bidder
46
7 (B) PERFORMANCE SECURITY BOND FORM
(To be typed on Rs100- non-judicial stamp paper)
Datedhelliphelliphelliphelliphellip
Sub Performance guarantee
Whereas General Manager Telecom Bhuj Telecom District Bhuj (hereafter referred to as BSNL) has issued an AWO no
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellipDated helliphelliphelliphellip20hellip awarding the work of
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip to Ms
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip(hereafter referred to as ldquoBidderrdquo) and BSNL has asked him to submit a performance guarantee
in favour of AO(Cash) BSNL Oo GMTD BHUJ of Rs helliphelliphelliphelliphelliphellip- (hereafter referred to as ldquoPG Amountrdquo) valid up
to helliphelliphelliphellip20helliphelliphellip (hereafter referred to as ldquoValidity Daterdquo)
Now at the request of the Bidder We helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellipBank
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip Branch having (Address) and Regd
office address as helliphelliphellip helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip (Hereinafter called lsquothe
Bankrdquo) agreed to give this guarantee as hereinafter contained
2 We ldquothe Bankrdquo do hereby undertake and assure to the BSNL that if in the opinion of the BSNL the Bidder has in any way
failed to observe or perform the terms and conditions of the said agreement or has committed any breach of its obligations
there-under the Bank shall on demand and without any objection or demur pay to the BSNL the said sum limited to PG
Amount or such lesser amount as BSNL may demand without requiring BSNL to have recourse to any legal remedy that may
be available to it to compel the Bank to pay the same
3 Any such demand from the BSNL shall be conclusive as regards the liability of Bidder to pay to BSNL or as regards the
amount payable by the Bank under this guarantee The Bank shall not be entitled to withhold payment on the ground that the
Bidder had disputed its liability to pay or has disputed the quantum of the amount or that any arbitration proceeding or legal
proceeding is pending between Bidder and BSNL regarding the claim
4 We the Bank further agree that the guarantee shall come into force from the date of its issue and shall remain in full force
and effect up to its Validity date
5 The Bank further agrees that the BSNL shall have the fullest liberty without the consent of the Bank and without affecting
in any way the obligations hereunder to vary any of the terms and conditions of the said agreement or to extend the time for
performance of the said agreement from any of the powers exercisable by BSNL against the Bidder and to forebear to enforce
any of the terms and conditions relating to the said agreement and the Bank shall not be relieved from its liability by reason
of such failure or extension being granted to Bidder or through any forbearance act or omission on the part of BSNL or any
indulgence by BSNL to Bidder or any other matter or thing whatsoever which under the law relating to sureties would but for
this provision have the effect of relieving or discharging the guarantor
6 Notwithstanding anything herein contained
(a) The liability of the Bank under this guarantee is restricted to the PG Amount and it will remain in force up to its Validity
date
(b) The guarantee shall stand completely discharged and all rights of the BSNL under this Guarantee shall be extinguished if
no claim or demand is made on us in writing on or before its validity date
7 In case BSNL demands for any money under this bank guarantee the same shall be paid through bankerrsquos Cheque in
favour of ldquoAO(Cash) BSNL Oo GMTD BHUJ rdquo payable at Bhuj
8 The Bank guarantees that the below mentioned officer who have signed it on behalf of the Bank have authority to give this
guarantee under its delegated power
Place helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip
Date helliphelliphelliphelliphelliphelliphelliphelliphelliphellip (Signature of the Bank Officer)
Rubber stamp of the bank
Authorized Power of Attorney Number helliphelliphelliphelliphelliphellip
Name of the Bank officer helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip
Having examined the tender documents terms and conditions stipulated therein specifications of work
etc we the under signed offer to execute the repair Works in conformity with the said specifications and
conditions of contract as under
Sl No
ITEM DESCRIPTION
Repair Charges per module inclusive of freight
forwardingpacking amp all taxes amp levies (except GST)
(in Figure)
Unit Rate in Words
Total Cost (unit rate qty)
1 2 3 4 5
1 25 AMP Module
2
50 AMP Module
3 100 AMP Module
4 Control Panel of
Power Plants
25A 50A amp 100A
5 GRAND TOTAL
Note -
1 GST will be payable extra on approved rates 2If our Bid is accepted we shall submit the securities as per the conditions mentioned in the contract
3We agree to abide by this Bid for a period of 180 days from the date of opening of financial bid and it shall
remain binding upon us and may be accepted at any time before the expiry of that period
4 The evaluation will be made on the basis of lowest rate quoted as under Lowest Rate = (rate quoted for 25 AMP Qty + rate quoted for 50 AMP Qty + rate
quoted for 100 AMP Qty + rate quoted for Control Panel of Power Plant AMP Qty)
The bidder who has offered lowest rate as evaluated above will be treated as L1 bidder
Date Signature of Tenderer
Seal amp Signature of Bidder
49
CHECK LIST
Sl No
Description Tender Clause Mode of Submission
1 Tender Fee Section 1 (part A) Para 21 22
Off-line
2 EMD Section 1 (part A) Para 51 52 Off-line 3 Power of Attorney Section 4 (Part A) clause 143 Off-line 4 Latest and Valid MSME NSIC certificate (If Applicable) Off-line 5 Experience Certificate Section 1 (part A)
c) E-reverse auction if required by Business Unit Planning cell after opening of the Financial bids
Note 1 In case of 1(b) above the bidder shall submit Techno-commercial amp Financial bid simultaneously
The bids will be evaluated techno-commercially first and thereafter financial bids of techno
commercially compliant bidders only shall be opened
2 Bid Validity Period validity of Bid offer 150 days from the tender opening date and Validity of bid
Offer for acceptance by BSNL can be extended
3 Bid must be submitted by bidder through E-tendering mode only Manual (OFFLINE)
submission of bids should not be considered The following documents are required to be submitted
offline to AGM (PLG) Oo GMTD Haripar Road Bhuj-370001 on or before the date amp time of
submission of bids in a sealed envelope
The envelope shall bear the tender number name of work and the phrase Do Not Open Before (due date amp
time of opening of tender)
i) EMD - Bid security (original copy)
ii) DD Bankers cheque of Tender fee
iii) Power of Attorney in accordance with clause 143 of section 4 Part A and authorization for
executing the power of Attorney
iv) Latest and valid MSME NSIC Certificate duly certified by NSIC if applicable
The purchaser shall not be responsible if the envelop is delivered elsewhere or late
In case of tenders invited under two envelopes system the first envelope will be named as techno commercial amp
will contain documents of bidderrsquos satisfying the eligibility Technical amp commercial conditions and 2nd
envelope will be named as financial envelope containing financial quote
a) Techno-commercial part of the bid shall contain one set of the following documents only-
i) Certificate(s) showing fulfillment of the eligibility criteria The bidder shall furnish as part of his bid
documents establishing the bidders eligibility all the following documents or whichever is required as per
terms and conditions of bid documents
Sl Particular Documents to be submitted
i Registration
Certificate
Firm Registration Certificate Certificate of Incorporation Shop amp
Establishment Certificate
ii In case of
Proprietorship
proprietorship firms an affidavit of that effect should be submitted along with
the bid
iii Partnership
Company
Partnership Deed or ArticlesMemorandum of Association as the case may be
amp Power of Attorney (if applicable) should be made older than the date of
submission of bid
iv Experience Experience Certificate as mentioned in the eligibility criteria
v EMD amp Tender Fee As per Table A amp clause 1 amp 2 OR Copy of Latest amp valid MSE NSIC
Certificate (if applicable)
vi EPF Copy of Registration Certificate of EPF (if applicable)
vii ESIC ESIC Registration (if applicable)
ix Taxes Copy of Valid Goods and Services Tax Registration No Declaration
that he is not registered and will get registered if required x PAN Card Copy of PAN Card
All documents submitted will also be self attested by the bidder
ii) Power of Attorney amp authorization for executing the power of Attorney in accordance with clause 143 of
Section -4 Part A
iii) The complete Bid document duly signed on end of each section at least
iv) Agency details letter for authorization of bid Undertakings Undertakings Non-Relation Certificate as
given vide Section 2(A) to 2(D) of this Bid form
b) Financial envelope shall contain Electronic Form- financial along with Price Schedule (Section 8)
with all relevant bid annexure (in case of tenders invited through e-tendering process)
Seal amp Signature of Bidder
8
SECTION -2 (Part-A)
AGENCY DETAILS
(Including performance records financial viability etc)
Name of firm
Registered Address
Status of the Bidder (i) Proprietorship concern
(ii) Partnership firm
(iii) HUF
(iv) Limited Company
Name of person or authorized signatory for
submitting the tender other documents and
empowered for correspondence with BSNL
GSTIN No
PAN Card particulars
Telephone numbers (with STD Code) of
authorized signatory
Office Residence
Mobile E-mail
Name(s) of Proprietor all Partners all
Directors
Infrastructure capabilities
A Capacity of Repairing 25A module per
week
B Capacity of Repairing 50A module per
week)
C Capacity of Repairing 100A module per
week
D Capacity of Repairing control panel per
week
F Details of trained staff available
A --------------------------------
B --------------------------------
C --------------------------------
D --------------------------------
F --------------------------------
Signature of Tenderer
Name of Tenderer
Along with date amp Seal
Seal amp Signature of Bidder
9
SECTION- 2 PART B
LETTER OF AUTHORISATION FOR ATTENDING BID OPENING
(To be typed preferably on letter head of the company)
Subject Authorization for attending Bid opening
I We Mr Ms helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip have submitted our bid for the tender no
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip in respect of helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip (Item
of work) which is due to open on helliphelliphelliphelliphelliphelliphellip (date) in the Meeting Room
We hereby authorize Mr Ms helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip helliphelliphelliphelliphelliphelliphelliphelliphellipamp
rohelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphereby certify that we or our firm
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip has not been BLACK LISTED by
any SSACircle of MTNLBSNL In case at any stage it is found that the information given by me is
falseincorrect BSNL shall have the absolute right to take any action as deemed fitwithout any prior
intimation to me
e) Clause by Clause Compliance
It is to certify that the tender document is carefully read amp understood and all the sections and clauses
are complied unconditionally amp unequivocally There is no deviation from the terms amp conditions of
the tender
f) Declaration for EPF amp Misc Provisions Act 1952
I _____________________________ (Name of the bidder agency) hereby declare compliance
towards conditions of the EPF and Misc Provisions Act 1952 and authorize BSNL to recover any
payment that arises due to failure to comply with any of the Labour legislations and statutory
conditions viz Labor EPF ESI etc or any other acts dealing with the same and all other acts
mentioned in the tender document
g) CERTIFICATE REGARDING FIRM IS NOT BLACK LISTED BY GST AUTHORITY
rohelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphereby certify that we or our firm
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip has not been BLACK LISTED by
any GST Authority
Date helliphelliphelliphelliphellip helliphellip helliphelliphelliphelliphelliphelliphelliphelliphellip
Signature of Tenderer
Place helliphelliphelliphelliphellip Name of Tenderer
Along with date amp Seal
Seal amp Signature of Bidder
11
SECTION- 2 PART D
DECLARATION REGARDING NO RELATIVE WORKING IN BSNL
I ___________________________Son of W O___________________________
RO _________________________here by certify that none of my relative(s) as defined in tender
document isare employed in BSNL unit as per details given in tender document In case at any stage
it is found that the information given by me is false incorrect BSNL shall have the absolute right to
take any action as deemed fit without any prior intimation to me
Signed ___________________
For and on behalf of the Agency
Name (Capitals) ___________________________
Position ____________________________
Date ____________________________
Note - In case of proprietorship firm certificate will be given by the proprietor for partnership firm
certificate will be given by all the partners on separate paper and in case of limited company by all
the Directors of the Company on separate paper Any breach of these conditions by the company or
firm or any other person the tender work will be cancelled and earnest money security deposit will
be forfeited at any stage whenever it is so noticed BSNL will not pay any damages to the company or
firm or the concerned person The company or firm or the person will also be debarred for further
participation in the concerned unit
Seal amp Signature of Bidder
12
SECTION- 3
SCOPE OF WORK AND JURISDICTION OF CONTRACT
1 SCOPE OF WORK
1 During the entire period of contract repairing of all types and of any make such as AMAR RAJA DACS DELTA DYNA ELTEK EXICOM HIMACHAL EXICOM ITI etc SMPS Power plant Modules (25 AMP 50 AMP 100 Amp ) Control panel are to be carried out including replacement of faulty parts
2 Collection and Delivery of Faulty repaired modules - a The concerned JTOSDEAGM in charge will intimate the contractor the Location Make capacity and
quantity of faulty modules by email (copy to AGM(Plg) on agmplgbhujgmailcom ) followed by ERP PO on mail
b The contractor will collect the module from the concerned in charge with in THREE days from the date of intimation under proper receipt to the concerned in charge However under emergent condition the collection of modules may be done on the same day
c Packing transport and delivery of faulty as well as repaired modules is the responsibility of the contractor
d The contractor shall repair the module and return to the concerned in charge with in Seven days of its collection However under emergent condition as decided by the concerned in charge the collection and repair shall be made within the time period given in the ERP PO
e Repaired modules will be tested by the SDE concern within TWO days on receipt of repaired modules if it is found OK then a certificate of this may be issued to the contractor Otherwise same shall be returned to the contractor for necessary action
f The date of receipt of all the modules mentioned in the ERP PO duly tested OK will be reckoned as the completion of ERP PO
g Repaired modules are warranted for 3 months from the date of successfully taken over During this time the contractor has to rectify the module free of cost
3 INSPECTION AND TESTS - a) The BSNL BHUJ or his representative shall have the right to inspect and test the repaired module as
per prescribed test schedules for their conformity to the specifications Where the BSNL BHUJ decides to conduct such tests on the premises of the Contractor or its subcontractor(s) all reasonable facilities and assistance like Testing Instruments and other test gadgets including access to drawings and production data shall be furnished to the inspectors at no charge to the Purchaser
b) Should any inspected or tested repaired module fail to conform to the Specifications the BSNL BHUJ may reject them and the Contractor shall either replace the rejected repaired module or make all alterations necessary to meet Specification requirements free of cost to the Purchaser
c) Notwithstanding the pre-repair tests and inspections prescribed in clause 3(a) amp 3(b) above the module and accessories on receipt in the BSNL s premises will also be tested during and after installation before take over and if any equipment or part thereof is found defective the same shall be replaced free of all cost to the BSNL BHUJ
d) If any module or any part thereof before it is taken over under clause 3(e) below is found defective or fails to fulfill the requirements of the contract the inspector shall give the Contractor notice setting forth details of such defects or failure and the Contractor shall make the defective module good or alter the same to make it comply with the requirements of the contract forthwith and in any case within a period not exceeding one month of the initial report The replacements shall be made by the Contractor free of all charges at site should it fail to do so within this time the BSNL BHUJ reserves the discretion to reject and replace at the cost of the Contractor the whole or any portion of the module as the case may be which is defective or fails to fulfill the requirements of the contract The cost of any such replacement made by the BSNL BHUJ shall be deducted from the amount payable to the Contractor
Seal amp Signature of Bidder
13
e) When the performance tests called for have been successfully carried out the inspector ultimate
Consignee will forthwith issue a Taking Over Certificate The inspectorultimate consignee shall not delay the issue of any Taking Over Certificate ldquo contemplated by this clause on account of minor defects in the module which do not materially affect the commercial use thereof provided that the Contractor shall undertake to make good the same in a time period not exceeding two months The taking Over Certificate shall be issued by the ultimate consignee within six weeks of successful completion of tests
f) After performance test carried out by the concerned SDE of BSNL as per prescribed schedule and repaired modules are found ok in all respect than the repaired modules will be accepted
g) A register is to be maintained at each placelocation mentioning the details of Modules date of Collection and Delivery of Faulty repaired modules replacement of spares amp remark if any and it is to be signed by the controlling officer amp Service engineer
h) Nothing in clause 3 shall in any way release the Contractor from any Warranty or other obligations under this contract
4 SPARES - All the spare of good quality required for repair of modules of SMPS PP are to be supplied by the contractor including major components
5 The contractor shall be responsible for any loss or damages caused to man or machinespartsinstruments during the execution of work and shall replace with an identical new item at his own cost The authorized officerperson of BSNL will have the liberty to check the material and work etchellip provided by the contractor
6 Governing Conditions for RNP (Repair Not Possible) Cases
A module Control panel may be declared RNP only if cost of material to be replaced exceeds five times of approved rate of repair In no case labour cost involved will be considered for deciding RNP A detailed report is to be submitted by contractor to concerned officer in-charge and final decision in this regard will be taken by concerned DGM subjected to maximum permissible RNP as given below
a)25-A module Maximum 10 of total quantity ordered for repair
b) 50-A 100-A Module Maximum 5 of total quantity ordered for repair
c) Control Panel Maximum 10 of total quantity ordered for repair
In case of RNP exceeding permissible limits penalty will be imposed as per para 11 (d) of section-5 (Part-A)
7 WARRANTY - a) Repaired modules are warranted for 3 months from the date of successfully taken over During this
time the contractor has to rectify the module free of cost The contractor shall warrant that repaired module shall be free from all defects and faults in materials used workmanship It becomes necessary for the contractor to replace or renew any defective portion(s) of the module under this clause
b) Replacement under warranty clause shall be made by the contractor free of all charges at site including freight insurance and other incidental charges
c) If any defect is not remedied by the contractor within a reasonable time the BSNL BHUJ may proceed to get the defects remedied from other contractor etc at the contractors risk and expenses but without prejudice to any other rights which the BSNL BHUJ may have against the contractor in respect of such defects
Seal amp Signature of Bidder
14
SECTION- 4 (Part-A)
GENERAL INSTRUCTION TO BIDDERS (GIB)
1 DEFINITIONS
1 BSNL The BSNL means the BSNL Bhuj Telecom Dist under the Ministry of
Communications which invites the tenders on behalf of the General Manager Bhuj Telecom
District Includes executives in the BSNL whatever designations assigned to them from time
to time who may be the in-charge of direction supervision testing acceptance and
maintenance including their successor(s) in the office appearing in various clauses shall be
taken to mean the BSNL Bhuj Telecom District
b The SSA Head means the Head of SSA General Manager Bhuj Telecom District Bhuj and
his successors
c The jurisdiction of the SSA Head The jurisdiction of the SSA Head means Bhuj Telecom
District which coincides geographically with (Revenue District(s))
d Representative of (the SSA Head) Representative of (the SSA Head ) means Officer and
staff for the time being in Bhuj Telecom District deputed by the General Manager Bhuj for
inspecting or supervising the work of testing etc
e Engineer ndash in - charge The Engineer ndash in - charge means the Engineering Officer
nominated by the BSNL to supervise the work under the contract (Minimum Divisional
Engineer level Officer)
f Site Engineer Site Engineer shall mean an SDESDOJTO of the BSNL who may be placed by
the General Manager Bhuj Telecom District Bhuj as in ndash charge of the work at site at any
particular period of time
g AT Unit AT Unit shall mean Acceptance and Testing unit of the BSNL
h AT Officer An officer authorized by General Manger ndash Bhuj Telecom Dist
i Contract The term contract means the documents forming the tender and acceptance
thereof and the formal agreement executed between the competent authority on behalf of the
BSNL and the contractor together with the documents referred to therein including these
conditions the specifications designs drawings and instructions issued from time to time by
the engineer in ndash charge and all these documents taken together shall be deemed to form one
contract and shall be complementary to one another In the contract the following expressions
shall unless the context otherwise requires have the meanings hereby respectively assigned to
them The expression works or work shall unless there be something either in the subject
context repugnant to such construction be construed or taken to mean the works by or by
virtue of the contract contracted to be executed whether temporary or permanent and whether
original altered substituted or additional
j Contractor The contractor shall mean the individual firm or company enlisted or not
enlisted with BSNL Department of Telecom in accordance with procedure for contractor or
registered for carrying out the work of cable laying whether incorporated or not undertaking
the works and shall include the legal personal representative of such individual or the persons
composing such firm or company or the successors of such firm or company and the
permitted assignees of such individual firm or company
k Work The expression lsquoworksrsquo shall unless there be something either in the subject or context
repugnant to such construction be construct and taken to mean the works by or by virtue of the
Seal amp Signature of Bidder
15
contract contracted to be executed whether temporary or permanent and whether original
altered substituted or additional
l Schedule(s) Schedule(s) referred to in these conditions shall mean the relevant schedule(s)
or the standard schedule of rates mentioned in the document
m Site The site shall mean the land or other places on into or through which work is to be
executed under the contract or any adjacent land path or street through which the work is to
be exacted under the contract or any adjacent land path or street which may be allotted or
used for the purpose of carrying out the contract
n Normal time or stipulated time Normal time or stipulated time means time specified in the
ERP PO to complete the work
o Extension of Time Extension of Time means the time granted by the BSNL to complete the
work beyond the normal time or stipulated time
p Exceptional risk Exceptional risks are risk due to war(whether declared or not) invasion act
of foreign enemies hostilities civil war rebellion revolution insurrection military or
usurped power any acts of Government damages from aircraft acts of God such as
earthquake lightening and unprecedented floods and other causes over which the contractor
has no control and the same having been accepted as such by the Accepting Authority or
causes solely due to use or occupation by the government of the part of the work in respect of
which a certificate of completion has been issued
q The ERP PO means the Order placed by the field units on the contractor signed by
the unit incharge r The Contract Rate means the rate payable to the repairer under the work order for
the full and proper performance of its contractual obligations
2 ELIGIBLE BIDDERS Kindly refer to clause 4 of Section ndash 1 Part A ie Detailed NIT
3 COST OF BIDDING
The bidder shall bear all costs associated with the preparation and submission of the bid The
BSNL will in no case be responsible or liable for these costs regardless of the conduct or
outcome of the bidding process
4 BID DOCUMENTS
41 The goods services required to be supplied bidding procedures and contract terms are prescribed
in the Bid Documents The contents of the Bid documents are specified in the covering letter
42 The Bidder is expected to examine all instructions forms terms and specifications in the Bid
Documents Failure to furnish all information required as per the Bid Documents or submission
of bids not substantially responsive to the Bid Documents in every respect will be at the bidders
risk and may result in rejection of the bid
5 CLARIFICATION OF BID DOCUMENTS
51 A prospective bidder requiring any clarification on the Bid Documents shall notify the User in
writing by FAX or by Email of the User as indicated in the invitation of Bid The User shall
respond in writing to any request for the clarification of the Bid Documents which it receives
7days prior to the date of opening of the Tenders Copies of the query (without identifying the
source) and clarifications by the User shall be uploaded on BSNL website as lsquoClarificationsrsquo on
e-procurement portal of Bhuj Telecom District portal clarification shall be available as
lsquoAddendumrsquo for all the prospective bidders who have downloaded the official copy of tender
documents from e-procurement portal of Bhuj Telecom District
Seal amp Signature of Bidder
16
52 Any clarification issued by BSNL in response to query raised by prospective bidders shall form
an integral part of bid documents and it may amount to an amendment of relevant clauses of the
bid documents
6 AMENDMENT OF BID DOCUMENTS
61 The BSNL may for any reason whether at its own initiative or in response to a clarification
requested by a prospective Bidder may modify bid documents by amendments prior to the date
of submission of Bids with due notification to prospective Bidders
62 The amendments shall be notified in writing or by Fax or by Addendum through e-tendering
portal to all prospective bidders on the address intimated at the time of purchase of bid document
from the BSNL and these amendments will be binding on them
63 In order to afford prospective bidders reasonable time in which to take the amendments into
account in preparing their bids the BSNL may at its discretion extend the deadline for the
submission of bids suitably
7 DOCUMENTS COMPRISING THE BID
The bid prepared by the bidder shall comprise the components specified in Section 2 of this
Tender
8 BID FORM
The bidder shall complete the Bid Form and the appropriate Price Schedule furnished in the Bid
Documents as per Section- 8
9 BID PRICES
91 The bidder shall give the total composite price inclusive of all levies and taxes packing
forwarding freight and insurance in case of materials to be supplied and inclusive of all taxes
and levies except GST in case of works to be executed GST will be paid extra as applicable
The contractor shall be responsible for transporting the materials to be supplied by the BSNL
(At the field Unit Telecom Store or otherwise) to execute the work under the contract to site at
histheir own cost The costs of transportation are subsumed in the standard Schedule Rates and
therefore no separate charges are payable on this account The offer shall be firm in Indian
Rupees
92 The price quoted by the bidder shall remain fixed during the entire period of contract and shall
not be subject to variation on any account A bid submitted with an adjustable price quotation
will be treated as non-responsive and rejected
93 Discount if any offered by the bidders shall not be considered unless they are specifically
indicated in the schedule of rates (financial Bid) Bidders desiring to offer discount shall
therefore modify their offers suitable while quoting and shall quote clearly net price taking all
such factors like Discount free supply etc into account
10 DOCUMENTS ESTABLISHING BIDDERS ELIGIBILITY AND QUALIFICATIONS Kindly refer to clause of Section ndash 1 and 2 of this bid
11 NA
12 BID SECURITYEMD
121 The bidder shall furnish as part of its bid a bid security one of the following ways-
(a) Demand Draft Bankerrsquos cheque from a Nationalizedscheduled bank drawn in favour
of AO (Cash) BSNL Oo GMTD Bhuj and payable at Bhuj
(b) Bank GuaranteeFDR from a Nationalizedscheduled bank drawn in favour of AO
(Cash) BSNL Oo GMTD Bhuj which should be valid for 180 days from the tender
opening date
For educational order EMD to be submitted by bidder as 20 of 10 of estimated tender
cost for each case in the form of cash Demand Draft Bankerrsquos cheque Bank guaranteeFDR
issued by a NationalizedScheduled bank drawn in favour of AO (Cash) BSNL Oo GMTD
Bhuj Bank Guarantee should be valid for 180 days from the tender opening date
122 The MSE bidders are exempted from payment of bid security
Seal amp Signature of Bidder
17
a) A proof regarding valid registration with body specified by Ministry of Micro Small
amp Medium Enterprise for the tendered items will have to be attached along with the
bid
b) The enlistment certificate issued by MSME should be valid on the date of opening of
tender
c) MSE unit is required to submit its monthly delivery schedule
d) If a vender registered with body specified by Ministry of Micro Small amp Medium
Enterprise claiming concessional benefits is awarded work by BSNL and
subsequently fails to obey any of the contractual obligations he will be debarred from
any further work contract by BSNL for one year from the date of issue of such order
123 The bid security is required to protect the BSNL against the risk of bidders conduct which would
warrant the bid securityrsquos forfeiture pursuant to para 127
124 A bid not secured in accordance with para 121 amp 122 shall be rejected by the BSNL being non-
responsive at the bid opening stage and archived unopened on e-tender portal for e-tenders
125 The bid security of the unsuccessful bidder will be dischargedreturned as promptly as possible
as but not later than 30 days after the expiry of the period of bid validity prescribed by the
BSNL pursuant to clause 13
126 The successful bidders bid security will be discharged upon the bidders acceptance of the
advance Purchase Order satisfactorily pursuant to clause 27 and furnishing the performance
security
The successful bidders bid security may be converted to Part Performance Security Deposit in
accordance with clause 28
127 The bid security may be forfeited
a) If the bidder withdraws or amends its bid or impairs or derogates from the bid in any
respect during the period of bid validity specified by the bidder in the bid form or
extended subsequently or
b) If the bidder does not accept the APO AWO and or does not submit PBG amp sign the
contract agreement in accordance with clause 28
Note - The bidder shall mean individual company firm or the front bidder and its technology
consortium partner as applicable
13 PERIOD OF VALIDITY OF BIDS
131 Bid shall remain valid for 150 days from the date of bid opening prescribed by the BSNL A bid
valid for a shorter period shall be rejected by the BSNL as non-responsive
132 In exceptional circumstances the BSNL may request the bidders consent for an extension to the
period of bid validity The request and the responses thereto shall be made in writing The bid
security provided under Clause 12 shall also be suitably extended A bidder may refuse the
request without forfeiting his bid security A bidder accepting the request and granting extension
will not be permitted to modify his bid
14 FORMAT AND SIGNING OF BID
141 The bidder shall submit his bid online (in case of e-tendering) amp through sealed envelopes
physically (in case of tenders with manual bidding process) complying all eligibility
conditions other terms and conditions of tender document to be read along with the
clarifications and amendments issued in this respect All the documents must be authenticated
using Digital Signature (DSC) with Class 2 or above (in case of e-tendering) amp by hand
signatures (for manual bidding process) by the authorized person The letter of authorization
shall be indicated by written power-of-attorney accompanying the bid
Note-The BSNL may ask the bidder(s) to supply besides original bid additional copy of bids as
required by him
142 The bid shall contain no interlineations erasures or overwriting except as necessary to correct
errors made by the bidder in which case such corrections shall be signed by the person or persons
signing the bid All pages of the original bid except for un-amended printed literatures shall be
digitally signed by the person or persons signing the bid
143 Power of Attorney
(a) The power of Attorney should be submitted and executed on the non-judicial stamp paper
Seal amp Signature of Bidder
18
of appropriate value as prevailing in the concerned states(s) and the same be attested by a
Notary public or registered before Sub-registrar of the state(s) concerned
(b) The power of Attorney be executed by a person who has been authorized by the Board of
Directors of the bidder in this regard on behalf of the Company institution Body
corporate
(c) In case of the bidder being a firm the said Power of Attorney should be executed by all the
partner(s) in favour of the said Attorney
(d) Attestation of the specimen signatures of authorized signatory by the Companyrsquos firmrsquos
bankers shall be furnished Name designation Phone number mobile number email
address and postal address of the authorized signatory shall be provided
(e) Individual signing the tenders or other documents connected with the contract shall indicate
the full name below the signature and must specify the capacity and authority under which
he signs such documents and shall also submit documentary evidence of his authority in
the form of Power of Attorney
(f) The Power of Attorney is to be submitted in original if it has been issued for the specific
tender enquiry If the power of attorney is issued in general irrespective of tender enquiry
then photocopy duly certified by notary public can also be accepted
(g) In case the representative of bidder company who uploads the document on e-tender portal
using his Digital Signature Certificates (DSC) which is different from the authorized
signatory for the bid (Power of Attorney holder) then the representative who uploads the
documents on e-tender portal using DSC issued in his name shall also be one of the Power
of Attorney holder by the bidder Company in addition to the authorized signatory for the
bid
15 SEALING AND MARKING OF BIDS
The bid shall be submitted online using single stage bidding and Two Envelope Methodology
151 The first envelope (Techno-commercial bid) This envelope shall contain documents of
bidders satisfying the eligibility Technical amp commercial conditions requirements Second
envelope will be named as financial bid containing price Schedule as per section 8 All
documents submitted will also be self attested by the bidder
152 a) The envelopes for Tender Fee EMD shall be addressed AGM (PLG) Oo GMTD
Haripar Road Bhuj - 370001
b) The envelope for Tender Fee EMD shall bear the name of the tender the tender number
and the words DO NOT OPEN BEFORE (due date amp time)
c) The envelopes for Tender Fee EMD shall indicate the name and complete postal address
of the bidder to enable the User to return the bid unopened in case it is declared to be received
late
d) The envelopes for Tender Fee EMD shall should be deposited in the tender box provided
by tendering authority or sent by registered post or delivered in person on above mentioned
address (address is given above) The responsibility for ensuring that the envelopes for Tender
Fee EMD shall are delivered in time would vest with the bidder
e) The envelopes for Tender Fee EMD shall delivered in person registered post on the day of
tender opening shall be delivered upto specified time amp date as stated in NIT to Oo GMTD
Haripar Road Bhuj - 370001 The User shall not be responsible if the envelopes for Tender
Fee EMD shall are delivered elsewhere
f) Venue of Tender Opening
Tender will be opened in Oo GMTD Haripar Road Bhuj - 370001 at specified time amp
date as stated in NIT If due to administrative reason the venue of Bid opening is changed it
will be displayed prominently on the above address
Seal amp Signature of Bidder
19
153 If envelopes are not sealed and marked as required at para 151 and 152 the bid shall be
rejected
16 SUBMISSION OF BIDS
161 Bids must be submitted by the bidders on or before the specified date amp time indicated in
Section-1 ie DNIT
162 The BSNL may at its discretion extend this deadline for the submission of the bids by
amending the bid documents in accordance with Clause 6 in which case all rights and
obligations of the BSNL and bidders previously subject to the deadline will thereafter be
subject to the deadline as extended
163 The bidder shall submit his bid offer against a set of bid documents purchased by him for all
or some systemservices equipment as per requirement of the Bid Documents He may
include alternate offer if permissible as per the bid However not more than one independent
and complete offer shall be permitted from the bidder
164 Bid must be submitted by the bidder through E-Tendering mode only Manual submission of bid
shall not be needed
17 LATE BIDS
No bid shall be accepted either online by E-Tender Portal or physically in case of manual
bidding process after the specified deadline for submission of bids prescribed by the purchaser
18 MODIFICATION AND WITHDRAWAL OF BIDS
181 The bidder may modify revise or withdraw his bid after submission prior to deadline prescribed
for submission of bid If a bid is withdrawn the same shall be archived unopened in the e-
procurement portal of Bhuj Telecom District
182 The bidderrsquos modification revision or withdrawal shall have to be online and digitally
authenticated as per clause 15
183 Subject to clause 20 no bid shall be modified subsequent to the deadline for submission of bids
19 OPENING OF BIDS BY BSNL
191 The purchaser shall open bids online in the presence of bidders or their authorized representatives
who chose to attend at time specified in Clause 7 of Detailed NIT(Section-1) on due date The
bidderrsquos representatives who are present shall sign in an attendance register Authority letter to
this effect shall be submitted by the bidders before they are allowed to participate in bid opening
(As per Format given in section 2 Part B)
192 A maximum of two representatives for any bidder shall be authorized and permitted to attend
the bid opening
193 (i) The bids will be opened in two stages ie techno-commercial bid shall be opened on the date
of tender opening given in NIT The financial bid will not be opened on the date of opening of
techno commercial bids
The financial bids of those bidders who are approved to be techno commercially compliant by
the competent authority will be opened by TOC in front of techno-commercially eligible
bidders authorized representatives by sending them a suitable notice
(ii) The bidderrsquos names Item name EMD amount amp validity and acceptability Information in
respect of eligible bidders Details of bid modification withdrawal (if any) and such other
details as the purchaser at its discretion may consider appropriate will be made available
online at the time of techno-commercial bid opening
(iii) The bidderrsquos names Name of the Items Quantitiesprices quoted in the bid discount if
offered Taxes amp levies and such other details as the purchaser at its discretion may consider
appropriate will be made available online at the time of financial bid opening
194 The date fixed for opening of bids if subsequently declared as holiday by the BSNL the revised
date of schedule will be notified However in absence of such notification the bids will be
opened in the next working day time and venue remaining unaltered
20 CLARIFICATION OF BIDS
201 To assist in the examination evaluation and comparison of bids the BSNL may at its discretion
Seal amp Signature of Bidder
20
ask the bidder for the clarification of its bid The request for the clarification and the response
shall be in writing However no post bid clarification at the initiative of the bidder shall be
entertained
202 If any of the documents required to be submitted along with the technical bid is found wanting
the offer is liable to be rejected at that stage However the BSNL at its discretion may call for
any clarification regarding the bid document within a stipulated time period The BSNL at itrsquos
discretion may also ask for the submission of any additionalmissing document(s) within a
stipulated time period In such case(s) the bidder shall have to comply the BSNLrsquos requirement
within the specified time In case of non-compliance to such queries the bid will be out rightly
rejected without entertaining further correspondence in this regardrdquo However no post bid
clarification at the initiative of the bidder shall be entertained
21 PRELIMINARY EVALUATION
211 BSNL shall evaluate the bids to determine whether they are complete whether any
computational errors have been made whether required sureties have been furnished whether
the documents have been properly signed and whether the bids are generally in order
212 Arithmetical errors shall be rectified on the following basis If there is a discrepancy between
the unit price and total price that is obtained by multiplying the unit price and quantity the
unit price shall prevail and the total price shall be corrected by the BSNL
213 If there is a discrepancy between words and figures the amount in words shall prevail If the
SupplierBidder does not accept the correction of the errors his bid shall be rejected
214 Prior to the detailed evaluation pursuant to clause 22 the BSNL will determine the substantial
responsiveness of each bid to the Bid documents For purposes of these clauses a substantially
responsive bid is one which conforms to all the terms and conditions of the Bid Documents
without material deviations The BSNLs determination of bids responsiveness is to be based
on the contents of the bid itself without recourse to extrinsic evidence
215 A bid determined as substantially non-responsive will be rejected by the BSNL and shall not
subsequent to the bid opening be made responsive by the bidder by correction of the non-
conformity
216 The BSNL may waive any minor infirmity or non-conformity or irregularity in a bid which
does not constitute a material deviation provided such waiver does not prejudice or affect the
relative ranking of any bidder
22 EVALUATION AND COMPARISON OF SUBSTANTIALLY RESPONSIVE BIDS
221 The Purchaser shall evaluate in detail and compare the bids previously determined to be
substantially responsive pursuant to Clause 21
222 The evaluation will be made on the basis of lowest rate quoted as under Lowest Rate
= (rate quoted for 25AMP Qty +rate quoted for 50AMP 100 AMP Qty + rate
quoted for Control Panel of Power Plant Qty) The bidder who has offered lowest
rate as evaluated above will be treated as L1 bidder 23 CONTACTING THE BSNL
231 Subject to Clause 20 no bidder shall try to influence the BSNL on any matter relating
to its bid from the time of the bid opening till the time the contract is awarded
232 Any effort by a bidder to modify its bid or influence the BSNL in the BSNLs bid evaluation
bid comparison or contract award decisions shall result in the rejection of the bid
24 PLACEMENT OF ORDER
241 The BSNL may consider placement of orders to execute the contract on those bidders whose
offers have been found technically commercially and financially acceptable The BSNL reserves
the right to counter offer price(s) against price(s) quoted by any bidder
The work against the tender is for one yearrsquos requirement and the terms and conditions of
this tender shall be operative for a period of one year from the date of signing of agreement
between the Company and the contractor with an option of extension for a further period
of one year at the same rates terms amp conditions
Seal amp Signature of Bidder
21
Distribution of Work Distribution of quantities for ordering to the selected bidders of a tender
Table 1(A) (Without provisions for MSE Units)
No of Bidders
to be approved
(Col 1)
Quantity allotted to the respective bidder
(Col 2)
L1 L2
One Bidder 100 Nil
Two Bidder 60 40
Table 1(B) (With provisions for MSME Units)
No of Bidders
to be approved
(Col 1)
Quantity allotted to the respective bidder (Col 2)
Qty
Earmarked for MSME
bidder(s)(Col 3)
L1 L2
One Bidder 80 Nil 20
Two Bidder 48 32 20
1) In case L2 and MSE bidder accepts the L1 rate in prescribed time amp do not submit MSD as per
tender terms and conditions the EMD will be forfeited If MSE bidder exceeded more than one than
20 work at L1 rate distributed among them
242 TERMS AND CONDITIONS FOR EDUCATIONAL ORDER
(a) 10 of the estimated quantity of work will be extended to inexperienced contractor for each
Tender
(b) Inexperienced Bidder has to apply separately for each Tender
(c) In case there are more than one bidder work will be distributed into the bidders
(d) The bidder shall not submit financial bid In case if the same is submitted then it will not be opened
(e) BSNL reserves a right to give any area to this bidder including that of other tender in which the
bidder has not participated
(f) The work to the inexperienced is a limited quantity (up to 10) in at a time further work will be
done on the basis of evaluation of field unit Additional quantity of work shall be given to such
contractor only after completion of initial work
(g) The payment for repairing to such contractors shall be based on L1 rates finalized in the tender
The payment will be released only after verification of quantity amp quality done as per the
instruction mentioned in respect of work in the tender
(h) All the other Terms amp conditions will remain the same
25 BSNLS RIGHT TO VARY QUANTITIES AT TIME OF AWARD
(a) BSNL reserves the right to vary up to 25 of the quantity of goods and services specified in
the schedule of requirements without any change in the unit price or other terms and conditions at
the time of award of contract
(b) BSNL also reserves the right for placement of additional order or up to 50 of the
additional quantities of goods and services contained in the running tender contract in the tender
at the same rate or a rate negotiated (downwardly) with the existing venders considering the
reasonability of rates based on prevailing market conditions and the impact of reduction in duties
and taxes etc and supplies to be obtained within delivery period scheduled afresh
No guarantee can be given to actual quantity The quantity mentioned in the tender is
tentative only No claim should entertained for less not allotting the quantum of work for any
reason
(c) In exceptional situation where the requirement is of an emergent nature and it is necessary to
ensure continued supplies from the existing venders the purchaser reserves the right to place
repeat order up to 100 of the quantities of goods and services contained in the running tender
contract at the same rate or a rate negotiated (downwardly) with the existing venders considering
the reasonability of rates based on prevailing market conditions and the impact of reduction in
duties and taxes etc Exceptional situation and emergent nature should be spelt out clearly
detailing the justification as well as benefits accrued out of it and loss incurred in case this
provision is not invoked and approved by the authority competent to accord administrative and
Seal amp Signature of Bidder
22
financial approval for the procurement calculated on the basis of total procurement ie initial and
proposed add-on quantity
26 BSNLS RIGHT TO ACCEPT ANY BID AND TO REJECT ANY OR ALL BIDS
The BSNL reserves the right to accept or reject any bid and to annul the bidding process and
reject all bids at any time prior to award of contract without assigning any reason whatsoever and
without thereby incurring any liability to the affected bidder or bidders on the grounds for the
BSNLs action
27 ISSUE OF ADVANCE WORK ORDER
271 The issue of an Advance Work Order (Letter of Intent) shall constitute the intention of BSNL to
enter into the contract with the bidder
272 The bidder shall within 14 days of issue of an advance work order give his acceptance along with
Performance Security Deposit in conformity with section 7(B) provided with the bid documents
28 SIGNING OF CONTRACT
281 The issue of FAT shall constitute the award of contract on the bidder
282 As soon as the tender is approved by the competent authority the Bid Security deposited by the
successful bidder may be converted into the Performance security deposit which will be held by
the BSNL till the completion of warranty period
29 ANNULMENT OF AWARD
Failure of the successful bidder to comply with the requirement of Clause 27 amp 28 shall
constitute sufficient ground for the annulment of the award and forfeiture of the bid security in
which event the BSNL may make the award to any other bidder at the discretion of BSNL or call
for new bids
30 NA
31 REJECTION OF BIDS
311 While all the conditions specified in the Bid documents are critical and are to be complied special
attention of bidder is invited to the following clauses of the bid documents Non-compliance of any
one of which shall result in outright rejection of the bid
(i) Clause 15 of Section 4 Part A The bids will be recorded returned unopened if covers are not
properly sealed with lsquoPERSONAL SEALrsquo of the bidder
(ii) Clauses 121 122 amp 131 of Section 4 Part A The bids will be rejected at opening stage if Bid
security is not submitted as per Clauses 121 amp 122 and bid validity is less than the period
prescribed in Clause 131 mentioned above
(iii) Clause 2 amp 10 of Section 4 Part A If the eligibility condition as per clause 2 of Section 4 Part
A is not met andor documents prescribed to establish the eligibility as per Clause 10 of
section 4 Part A are not enclosed the bids will be rejected without further evaluation
(iv) Clause 112 of Section 4 Part A NA
(v) Section 5 Part A Commercial conditions Section 5 Part B Special Conditions of Contract
Compliance if given using ambiguous words like ldquoNotedrdquo ldquoUnderstoodrdquo ldquoNoted amp
Understoodrdquo shall not be accepted as complied Mere ldquoCompliedrdquo will also be not sufficient
reference to the enclosed documents showing compliances must be given
(vi) Section 8 Price Schedule Prices are not filled in as prescribed in Financial Bid
(vii) Section 4 Part A clause 93 on discount which is reproduced below
ldquoDiscount if any offered by the bidder shall not be considered unless specifically indicated in
the price schedule Bidders desiring to offer discount shall therefore modify their offer
suitably while quoting and shall quote clearly net price taking all such factors like discount
free supply etc into accountrdquo
312 Before outright rejection of the Bid by Bid-opening team for non-compliance of any of the
provisions mentioned in clause 311(i) 311 (ii) above the bidder company is given
opportunity to explain their position however if the person representing the company is not
satisfied with the decision of the Bid opening team hethey can submit the representation to
Bid opening team immediately but in no case after closing of the tender process with full
justification quoting specifically the violation of tender conditions if any
Seal amp Signature of Bidder
23
313 Bid opening team will not return the bids submitted by the bidders on the date of tender
opening even if it is liable for rejection and will preserve the bids in sealed cover as submitted
by taking signatures of some of the desirous representatives of the participating
biddercompanies present on the occasion
314 The In charge of the Bid opening team will mention the number of bids with name of
company found unsuitable for further processing on the date of tender opening and number of
representations received in Bid opening Minutes and if Bid opening team is satisfied with the
arguments of the biddercompany mentioned in their representation and feel that there is
prima-facie fact for consideration the in charge of the Bid opening team will submit the case
for review to competent authority ie GMTD BHUJ as early as possible preferably on next
working day and decision to this effect should be communicated to the bidder company within
a week positively Bids found liable for rejection and kept preserved on the date of tender
opening will be returned to the bidders after issue of POfinal acceptance of tender against
the instant tender
315 If the reviewing officer finds it fit to open the bid of the petitioner this should be done by
giving three (working) days notice to all the participating bidders to give opportunity to
desirous participants to be present on the occasion
32 ACTION BY PURCHASER AGAINST BIDDER(S) VENDOR(S) IN CASE OF
DEFAULT In case of default by Bidder(s) Vendor(s) such as
a) Does not supply the equipment services in time
b) Equipment Services does not perform satisfactory in the field in accordance with the
specifications
c) Or any other default whose complete list is enclosed in Appendix-1
Purchaser will take action as specified in Appendix-1 of this section
33 DELETED
34 NEAR-RELATIONSHIP CERTIFICATE
341 The bidder should give a certificate that none of his her near relative as defined below is
working in the units where he is going to apply for the tender In case of proprietorship firm
certificate will be given by the proprietor For partnership firm certificate will be given by all
the partners and in case of limited company by all the Directors of the company excluding
Government of India Financial institution nominees and independent non-Official part time
Directors appointed by Govt of India or the Governor of the state and full time Directors of
PSUs both state and central Due to any breach of these conditions by the company or firm or
any other person the tender will be cancelled and Bid Security will be forfeited at any stage
whenever it is noticed and BSNL will not pay any damage to the company or firm or the
concerned person
342 The Company or firm or the person will also be debarred for further participation in the
concerned unit
343 The near relatives for this purpose are defined as-
(a) Members of a Hindu undivided family
(b) They are husband and wife
(c) The one is related to the other in the manner as father mother son(s) amp Sons
wife(daughter in law) Daughter(s) and daughters husband (son in law) brother(s) and
brothers wife sister(s) and sisters husband (brother in law)
344 The format of the certificate is given in Section -2(D)
35 VERIFICATION OF DOCUMENTS AND CERTIFICATES
The bidder will ensure that all the documents and certificates including experience
performance and self certificates submitted by him are correct and genuine before enclosing
them in the bid The onus of proving genuineness of the submitted documents would rest with
the bidder If any document paper certificate submitted by the participant bidder is found
discovered to be false fabricated tempered manipulated either during bid evaluation or
during award of contract or thereafter then the Purchaser will take action as per Clause-1 of
Appendix-1 of this section
Seal amp Signature of Bidder
24
Appendix-1 to Section - 4 (Part-A)
S
No
Defaults of the bidder vendor Action to be taken
A B C
1(a) Submitting fake forged
i) Rejection of tender bid of respective Vendor
ii) Banning of business for 3 years which implies barring
further dealing with the vendor for procurement of Goods amp
Services including participation in future tenders invited by
BSNL for 3 years from date of issue of banning order
iii) Termination Short Closure of POWO if issued This
implies non-acceptance of further supplies work amp services
except to make the already received material work complete
work in hand
a) Bank Instruments with the bid to meet
terms amp condition of tender in respect of
tender fee and or EMD
b) Certificate for claiming exemption in
respect of tender fee and or EMD
c) detection of default at any stage from
receipt of bids till award of APO issue of
POWO
Note 1- However in this case the performance guarantee if alright will not be forfeited
Note 2- Payment for already received supplies completed work shall be made as per terms amp conditions of
PO WO
1(b)
Submitting fake forged documents towards
meeting eligibility criteria such as
experience capability supply proof
registration with GST Income Tax
departments etc and as supporting
documents towards other terms amp conditions
with the bid to meet terms amp condition of
tender
(i) If detection of default is prior to award
of APO
i) Rejection of Bid amp
ii) Forfeiture of EMD
(ii) If detection of default after issue of APO
but before receipt of PG SD (DDBG etc)
i) Cancellation of APO
ii) Rejection of Bid amp
iii) Forfeiture of EMD
(iii) If detection of default after receipt of
PG SD (DDBG etc)
i) Cancellation of APO
ii) Rejection of Bid amp
iii) Forfeiture of PG SD
However on realization of PG SD amount EMD if not
already released shall be returned
(iv) If detection of default after issue of PO
WO
i) Termination Short Closure of POWO and Cancellation
of APO
ii) Rejection of Bid amp
iii) Forfeiture of PG SD
However on realization of PG SD amount EMD if not
released shall be returned
Note 3- However settle bills for the material received in correct quantity and quality if pending items do
not affect working or use of supplied items
Note 4- No further supplies are to be accepted except that required to make the already supplied items
work
Special Note 1- Authority competent to take final decision GMTD Bhuj
2 If vendor or his representative uses violent
coercive means viz Physical Verbal means
to threatens BSNL Executive employees
and or obstruct him from functioning in
discharge of his duties amp responsibilities for
the following
Banning of business for 3 years which implies Barring
further dealing with the vendor for procurement of Goods amp
Services including participation in future tenders invited by
BSNL for 3 years from date of issue of banning order
a) Obstructing functioning of tender opening
executives of BSNL in receipt opening of
tender bids from prospective Bidders
suppliers Contractors
Seal amp Signature of Bidder
25
b) Obstructing Threatening other
prospective bidders ie suppliers
Contractors from entering the tender venue
and or submitting their tender bid freely
Special Note 1- Authority competent to take final decision GMTD Bhuj
3 Non-receipt of acceptance of APO AWO
and SD PG by L-1 bidder within time
period specified in APO AWO
Forfeiture of EMD
Special Note 1- Authority competent to take final decision GMTD Bhuj
41 Failure to supply and or Commission the
equipment and or execution of the work at
all even in extended delivery schedules if
granted against PO WO
i) Termination of PO WO
ii) Under take purchase work at the risk amp cost of
defaulting vendor
iii) Recover the excess charges if incurred from the PG SD
and outstanding bills of the defaulting Vendor
42 Failure to supply and or Commission the
equipment and or execution of the Work in
full even in extended delivery schedules if
granted against PO WO
i) Short Closure of PO WO to the quantity already
received by and or commissioned in BSNL and or in
pipeline provided the same is usable andor the Vendor
promises to make it usable
ii) Under take purchase work for balance quantity at the
risk amp cost of defaulting vendor
iii) Recover the excess charges if incurred from the PG SD
and outstanding bills of the defaulting Vendor
Special Note 1- Authority competent to take final decision for 41 amp 42 by DGM concerned
51 The supplied equipment does not perform
satisfactory in the field in accordance with
the specifications mentioned in the PO
WOContract
i) If the material is not at all acceptable then return the non-
acceptable material (or its part) amp recover its cost if paid
from the os bills PG SD
OR
ii) If the material is inducted in network amp it is not possible
to return it and or material is acceptable with degraded
performance the purchaser may determine the price for
need to be issued in compliant format and timely within the time prescribed under GST law
163 In case of any deficientincompleterejected supply BSNL shall convey the same in a reasonable
time to enable the supplier to issue credit note and take tax adjustment
164 It would be the responsibility of the supplier to declare correct information on invoice and GSTN
viz the amount the place of supply rate of tax etc In case the eligibility of input tax credit is
questioned or denied to BSNL on account of default by the supplier the same would be
recovered by BSNL from the contractor
165 Registered location of the both the parties ie BSNL and contractor should be mentioned in the
agreement with GSTIN No Further supplier should raise invoices at the registered premise of
BSNL for availing of credit and ensure that the place of supply as per GST law is same as
registered premise
166 BSNL could at any time instruct the contractor to raise its invoices at a particular location of
BSNL
Seal amp Signature of Bidder
39
167 It is the responsibility of the supplier to ensure that place of supply and the GSTN of BSNL are
in the same state If for any reason they are not in the same state the contractor shall intimate to
BSNL and give adequate time before raising of the invoice
168 E-waybill number should be mentioned on the invoices
169 contractor shall be responsible for timely issuance and delivery of invoice DN CN to enable
BSNL to claim tax benefit on or before the stipulated time period provided by the GST law
(a) It is the responsibility of the contractor to ensure that outward supply return (GSTR-1) would be
filed correctly If not than cost would be borne by supplier
(b) Reporting of correct outward supply by supplier in the outward return (GSTR-1) is the
responsibility of the supplier In case of mismatch because of contractorrsquos fault prompt
amendments must be made by the supplier else supplier would be required to indemnify BSNL
of the loss of credit due to mis-match The compliances to be adhered by contractor includes
(but is not limited to) the following
(i) Uploading appropriate invoice details on the GSTN within the stipulated time
(ii) Issuing GST compliant invoice CN DN PO issued by BSNL should be referred by
contractor for capturing information on the invoice
(iii) Contractor needs to pay the entire self-assessed tax on timely basis
(iv) Where invoice is not uploaded or incorrect upload of invoice detail of GSTN by supplier
then credit on such invoice will be given provisionally subject to matching So acceptance of
changes made by BSNL on GSTN on account of non-upload or incorrect upload of invoice
details on GSTN is to be submitted by supplier Such changes wrt the mismatch are required
to be accepted by supplier within the time limit prescribed under the GST law It should be
noted that in case supplier does not accept such changes within the time limit prescribed under
GST law the loss of input tax credit (if any) would be recovered from the supplier In case of
mismatch because of Suppliers fault prompt amendments must be made by the supplier else
supplier would be required to indemnify BSNL for the losses of credit and interest paid due to
mismatch
(v) contractor to issue all necessary documentation and perform all necessary compliances for
BSNL to be eligible to claim the input tax credit of GST tax to them In case BSNL is unable to
claim the input tax credit the amount wrt GST charged by the supplier would be recovered
from the supplier
1610 Refer) for clause stating that all the details of supplier (name address GSTN unregistered
supplier place of supply SAC HSN code etc) and other mandatory details shall be mentioned on the
invoice
1611Where the location agreed are more than one state then separate invoice state wise to claim
input tax credit in a particular state (typically happens in a bill to-ship to scenario) shall have to be
submitted
1612 It shall be the responsibility of the supplier to mention State of place of supply of goodsservices
in the invoice issued to BSNL
Seal amp Signature of Bidder
40
SECTION ndash 5 (Part-B)
SPECIAL CONDITIONS OF CONTRACT (SCC)
1 GENERAL
No official of Gazetted rank or other Gazetted officer employed in Engineering or administrative
duties in an Engineering BSNL or any other BSNL of the BSNL is allowed to work as a contractor for
a period of two years after his retirement from BSNL service without the previous permission of
BSNL This contract is liable to be cancelled if either the contractor or any of his employee is found at
any time to be such a person who hadnrsquot obtained the permission of BSNL as aforesaid before
submission of the engagement in the contractorrsquos service as the case may be
2 Material Handed over by The BSNL
21 The contractor shall transport (including loading and unloading) all stores issued to him from
Field Unit Telecom Store to the site of work at his own cost The BSNL shall not pay any
transportation charges to the contractor
22 All materials handed over to the contractor by the BSNL shall remain the absolute property of
BSNL and shall not be removed form site of the work except for use in the work and shall be at all
times open to inspection by the Representative of GMTD BHUJ
23 The contractor shall be responsible for the transportation of store storage and safe custody of all
material supplied to him by the BSNL which in the contractorrsquos custody whether or not installed in
the work The contractor shall satisfy himself regularly the quantity and quality of the materials
supplied to him and he will be responsible for any subsequent deterioration and discrepancy (inclusive
of theft) in the quantity quality the materials
3 LABOUR WELFARE MEASURES AND WORKMAN COMPENSATION
(AS APPLICABLE)
31 Obtaining License before commencement of work
The contractor shall obtain a valid labour license (if applicable) under the Contact Labour (RampA) Act
1919 and the Contract Labour (Regulation and Abolition) Central Rules 1971 before commencement
of the work and continue to have a valid license until the completion of work The contractor shall
also abide by the provisions of the Child Labour (Prohibition and Regulation) Act 1986 Any failure
to fulfill this requirement shall attract the penal provisions of this contract arising out of the resultant
non-execution of work
32 Contractors labour Regulations
321 Working Hours
3211 Normally working hours of an employee should not exceed 9 hours a day The working
day shall be so arranged the inclusive of interval for rest if any it shall not spread over
more than12 hours on any day
3212 When a worker is made to work for more than 9 hours on any day or for more than 48
hours in any week he shall be paid over time for the extra hours put in by him
3213 Every worker shall be given a weekly holiday normally on a Sunday in accordance with
the provisions of minimum Wages (Central Rules 1960 as amended from time to time
irrespective of whether such worker is governed by the Minimum Wages Act or not
3214 Where the minimum wages prescribed by the Government under the Minimum Wages
Act are not inclusive of the wages for the weekly day of rest the worker shall be entitled
to rest day wages at the rate applicable to the next preceding day provided he has
worked under the same contractor for a continuous period of not less than 6 days
3215 Where a contractor is permitted by the Engineer-in-Charge to allowed a worker to work
on a normal weekly holiday he shall grant a substituted holiday to him for the whole day
Seal amp Signature of Bidder
41
on one of the five days immediately before or after the normal weekly holiday and pay
wages to such worker for the work performed on the normal weekly holiday at the
overtime rate
322 Display of Notice Regarding Wages Etc
The contractor shall before he commences his work on contract display and correctly
maintain and continue to display and correctly maintain in a clear and legible condition
in conspicuous places on the work notices in English and in local Indian languages
spoken by the majority of the workers giving the minimum rates of the wages fixed
under Minimum Wages Act the actual wages being paid the hours of work for which
such wage are earned wages periods dates of payments of wages and other relevant
information
323 Payment of Wages
3231 The contractor shall fix wage periods in respect of which wages shall be payable
3232 No wage period shall exceed one month
3233 The wages of every person employed as contract labour in an establishment or by a
contractor where less than one thousand such persons are employed shall be paid before
the expiry of seventh day and in other cases before the expiry of tenth day after the last day
of the wage period in respect of which the wages are payable
3234 Where the employment of any worker is terminated by or on behalf of the contractor the
wages earned by him shall be paid before the expiry of the second working day from the
date on which his employment is terminated
3235 All payment of wages shall be made on a working day at the work premises and during the
working time and on a date notified in advance and in case the work is completed before
the expiry of the wage period final payment shall be made within 48 hours of the last
working day
3236 Wages due to every worker shall be paid to him direct or to other person authorized by him
in this behalf
3237 All wages shall be paid in current coin or currency or in both
3238 Wages shall be paid without any deductions of any kind except those specified by the
Central Government by general or special order in this behalf or permissible under the
Payment of Wages Act 1956
3239 A notice showing the wages period and the place and time of disbursement of wages shall
be displayed at the place of work and a copy sent by the contractor to the Engineer ndashin-
Charge under acknowledgement
32310 It shall be the duty of the contractor to ensure the disbursement of wages in presence of the
site Engineer or any other authorized representative of the Engineer-in-Charge who will be
required to be present at the place and time of the disbursement of wages by the contractor
to workmen
32311 The contractor shall obtain from the site Engineer or any other authorized representative of
the Engineer-in-Charge as the case may be a certificate under his signature at the end of
the entries in the ldquoRegister of Wages ldquo or the ldquoWage-cum-Muster Rollrdquo as the case may
be in the following form -
ldquoCertified that the amount shown in the column Nohelliphelliphelliphelliphas been paid to the
workman concerned in my presence on helliphelliphelliphelliphelliphellip at helliphelliphelliphelliphelliphelliphelliphelliphelliprdquo
32312 Fines and deductions which may be made from wages
A The wages of a worker shall be paid to him without any deduction of any kind except the
following -
a) Fines
(b) Deductions for absence from duty ie from the place or the places where by the terms of
his employment he is required to work The amount of deduction shall be in proportion
to the period for which he was absent
(c) Deductions for damage to or loss of goods expressly entrusted to the employed person
for custody or for loss of money or any other deductions which he is required to
account where such damage or loss is directly attributable to his neglect or default
Seal amp Signature of Bidder
42
(d) Deduction for recovery of advances or for adjustment of over payment of wages
advances granted shall be entered in register
(e) Any other deductions which the Central Government may form time to time allow
B No fines should be imposed on any worker save in respect of such acts and omissions
on his part as have been approved of by the Labour Commissioner
C No fine shall be imposed one worker and no deduction for damage or loss shall be
made from his wages until the worker has been given an opportunity of showing cause
against such fines or deductions
D Every fine shall be deemed to have been imposing on the day of the act or omission in
respect of which it was imposed
524 Labor records 1 The contractor shall maintain a Register of Persons employed on work on contract in
Form XIII of the Contract Labour (RampA) Central Rules 1971
2 The contractor shall maintain a Muster Roll register in respect of all workmen
employed by him on the work under Contract in Form XVI of the CL (RampA) Rules
1971
3 The contractor shall maintain a Wage Register in respect of all workmen employed by
him on the work under contract in From XVII of the CL (RampA) Rules 1971
4 Register of accidents- The contractor shall maintain a register of accidents in such
form as may be convenient at the work place but the same shall include the following
particulars
(a) Full Particulars of the laborers who met with accident
(b) Rate of wages
(c) Sex
(d) Age
(e) Nature of accident and cause of accident
(f) Time and date of accident
(g) Date and time when admitted in hospital
(h) Date of discharge from the hospital
(i) Period of treatment and result of treatment
(j) Percentage of loss of earning capacity and disability as assessed by
Medical officer
(k) Claim required to be paid under Workmenrsquos Compensation Act
(l) Date of payment of compensation
(m) Amount paid with details of the person to whom the same was paid
(n) Authority by whom the compensation was assessed
(o) Remarks
5 The contractor shall maintain a Register of Fines in the Form XII of the CL(RampA)
Rules 1971 the Contractor shall display in a good condition and in a conspicuous
place of work the approved list of acts and commission for which fines can be
imposed
6 The contractor shall maintain a Register of deductions for damage or loss in Form
XX of the CL (RampA) Rules 1971
7 The contractor shall maintain a Register of Advances in Form XXIII of the CL
(RampA) Rules 1971
8 The contractor shall maintain a Register of Overtime in Form XXIII of the CL
(RampA) Rules 1971
9 Attendance card-cum wage slip a The contractor shall issue an Attendance card cum wage slip to each workman
employed by him
b The card shall be valid for each wage period
Seal amp Signature of Bidder
43
c The contractor shall mark the attendance of each workman on the card twice each
day once at the commencement of the day and again after the rest interval before
he actually starts work
d The card shall remain in possession of the worker during the wage period under
reference
e The contractor shall complete the wage slip portion on the reverse of the card at
least a day prior to the disbursement of wages in respect of the wage period under
reference
f The contractor shall obtain the signature or thumb impression of the worker on the
wag slip at the time of disbursement of wages and retain the card with him
10 Employment card The contractor shall issue an Employment Card in the Form XIV of CL (RampA) Central Rules
1971 to each worker within three days of the employment of the worker
11 Service certificate
On termination of employment for any reason whatsoever the contractor shall issue to the
workman whose services have been terminated a Service Certificate in the Form XV of the
CL (RampA) Central Rules 1971
12 Preservation of labour records The labour records and records of Fines and deductions shall be preserved in original for a
period of three years from the date of last entries made in them and shall be made available for
inspection by the Engineer-in-Charge or Labour Officer or any other officers authorized by the
Ministry of Communication in this behalf
13 Power of labour officer to make investigations or enquiry The labour officer or any person authorized by the Central Government on their behalf shall
have power to make enquiries with a view to ascertaining and enforcing due and proper
observance of Fair Wage Clauses and provisions of these Regulations He shall investigate
into any complaint regarding the default made by the contractor in regard to such provision
14 Report of Investigating officer and action thereon The labour Officer or other persons authorized as aforesaid shall submit a report of result of
his investigation or enquiry to the Engineer in-Charge indicating the extent if any to which
the default has been committed with a note that necessary deductions from the contractorrsquos bill
be made and the wages and other dues be paid to the labourers concerned The Engineer in-
Charge shall arrange payments to the labour
concerned within 45 days from the receipt of the report from the Labour Officer or the
authorized officer as the case may be
15 Inspection of Books And slips The contractor shall allow inspection of all the prescribed labour records to any of his workers
or to his agent at a convenient time and place after due notice is received or to the Labour
Officer or any other person authorized by the Central Government on his behalf
16 Submission of Returns The contractor shall submit periodical returns as may be specified form time to time
17 Amendments
The Central Government may from time to time add to or amend the regulations and on any
question as to the applicationinterpretation or effect of those regulations
Contractor must fulfill the terms and condition towards fulfillmentscompliance of the
provision of EPF amp Miscprovision act 1952 amp Employment provident Fund Scheme 1952 in
respect of laborersemployees engaged by the contractor Contractor must submit declaration
form regarding compliance of the condition of EPF act 1952
525 INSURANCE Without limiting any of his other obligations or liabilities the contractor shall at his own
expense take and keep comprehensive insurance including third party risk for the plant
machinery men materials etc brought to the site and for all the work during the execution
The contractor shall also take out workmenrsquos compensations insurance as required by law and
under take to indemnify and keep indemnified the Government from and against all manner of
Seal amp Signature of Bidder
44
claims and demands and losses and damages and cost (including between attorney and client)
charges and expenses that may arise in regard the same or that the Government may suffer or
incur with respect to endor incidental to the same The contractor shall have to furnish
originals and or attested copies as required by the BSNL of the policies of insurance taken
within 15 (fifteen) days of being called upon to do so together with all premium receipts and
other papers related thereto which the BSNL may require
526 COMPLIANCE WITH LAWS AND REGULATION
During the performance of the works the contractor shall at his own cost and initiative
fully comply with all applicable laws of the land and with any and all applicable by-laws
rules regulations and orders and any other provisions having the force of law made or
promulgated or deemed to be made or promulgated by the Government Governmental
agency or BSNL municipal board Government of other regulatory or Authorized body or
persons and shall provide all certificates or compliance therewith as may be required by
such applicable law By-laws Rules Regulations orders and or provisions The
contractor shall assume full responsibility for the payment of all contributions and pay roll
taxes as to its employees servants or agents engaged in the performance of the work
specified in the contractor documents If the contractor shall require any assignee or sub-
contract to comply with the provisions of the clause and in this connection the contractor
agrees as to undertake to save and hold the Government harmless and indemnified from
and against any all penalties actions suits losses and damages claims and demands and
costs (inclusive between attorney and client) charges and expenses whatsoever arising out
or occasioned indirectly or directly by failure of the contractor or any assignee or sub-
contractor to make full and proper compliance with the said by-laws Rules Regulations
laws and Order and provisions as aforesaid
6 TOOLS and PLANTS
The contractor shall provide at his own cost all tools plants appliances implements etc
required for proper execution of works The contractor shall also supply without charge
the requisite number of persons with the means and materials necessary for the purpose of
setting out works counting weighing and assisting the measurements for examination at
any time and from time to time Failing his so doing the same may be provided by the
Engineer-in-charge at the expense of the contractor and the expenses shall be deducted
from any money due to the contractor under this contract or otherwise
As per Para 367 of the recommendationobservation of Tenth Report of parliamentary
standing committee on labour Contractor would provide the same social security to the
labours engaged by him as is available to regular employees
As per Para 368 of the recommendationobservation of Tenth Report of parliamentary
standing committee on labour Contractor shall ensure implementation of equal pay for equal
work and also equal remuneration to men and women
Seal amp Signature of Bidder
45
SECTION ndash 7
PROFORMAS
7 (A) BID SECURITY EMD Guarantee
(To be typed on Rs100- non-judicial stamp paper)
Whereas (hereinafter called the Bidder) has submitted its bid datedfor
the supply of vide Tender Nohelliphelliphelliphelliphelliphelliphelliphellip dated KNOW ALL MEN by
these presents that WE OF having our registered office at
(hereinafter called the Bank) are bound unto Bharat Sanchar Nigam Limited (hereinafter
called the Purchaser) in the sum of Rs for which payment will and truly to be made of
the said Purchaser the Bank binds itself its successors and assigns by these present
THE CONDITIONS of the obligation are
1 If the Bidder withdraws his bid during the period of bid validity specified by the Bidder
on the Bid form or
2 If the Bidder having been notified of the acceptance of his bid by the Purchaser during the
period of bid validity
(a) fails or refuses to execute the Contract if required or
(b) fails or refuses to furnish the Performance Security in accordance with the instructions to
Bidders
We undertake to pay to the Purchaser up to the above amount upon receipt of its first written demand
without the purchaser having to substantiate its demand provided that in its demand the purchaser
will note that the amount claimed by it is due to it owning to the occurrence of one or both of the two
conditions specifying the occurred condition or conditions
This guarantee will remain in force as specified in clauses 12 and 282 of section 4 Part A of the Bid
Document upto and including THIRTY (30) days after the Period of bid validity and any demand in
respect thereof should reach the Bank not later than the specified datedates
Signature of the Bank Authority
Name
Signed in Capacity of
Name amp Signature of witness Full address of Branch
Address of witness Tel No of Branch
Fax No of Branch
Seal amp Signature of Bidder
46
7 (B) PERFORMANCE SECURITY BOND FORM
(To be typed on Rs100- non-judicial stamp paper)
Datedhelliphelliphelliphelliphellip
Sub Performance guarantee
Whereas General Manager Telecom Bhuj Telecom District Bhuj (hereafter referred to as BSNL) has issued an AWO no
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellipDated helliphelliphelliphellip20hellip awarding the work of
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip to Ms
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip(hereafter referred to as ldquoBidderrdquo) and BSNL has asked him to submit a performance guarantee
in favour of AO(Cash) BSNL Oo GMTD BHUJ of Rs helliphelliphelliphelliphelliphellip- (hereafter referred to as ldquoPG Amountrdquo) valid up
to helliphelliphelliphellip20helliphelliphellip (hereafter referred to as ldquoValidity Daterdquo)
Now at the request of the Bidder We helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellipBank
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip Branch having (Address) and Regd
office address as helliphelliphellip helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip (Hereinafter called lsquothe
Bankrdquo) agreed to give this guarantee as hereinafter contained
2 We ldquothe Bankrdquo do hereby undertake and assure to the BSNL that if in the opinion of the BSNL the Bidder has in any way
failed to observe or perform the terms and conditions of the said agreement or has committed any breach of its obligations
there-under the Bank shall on demand and without any objection or demur pay to the BSNL the said sum limited to PG
Amount or such lesser amount as BSNL may demand without requiring BSNL to have recourse to any legal remedy that may
be available to it to compel the Bank to pay the same
3 Any such demand from the BSNL shall be conclusive as regards the liability of Bidder to pay to BSNL or as regards the
amount payable by the Bank under this guarantee The Bank shall not be entitled to withhold payment on the ground that the
Bidder had disputed its liability to pay or has disputed the quantum of the amount or that any arbitration proceeding or legal
proceeding is pending between Bidder and BSNL regarding the claim
4 We the Bank further agree that the guarantee shall come into force from the date of its issue and shall remain in full force
and effect up to its Validity date
5 The Bank further agrees that the BSNL shall have the fullest liberty without the consent of the Bank and without affecting
in any way the obligations hereunder to vary any of the terms and conditions of the said agreement or to extend the time for
performance of the said agreement from any of the powers exercisable by BSNL against the Bidder and to forebear to enforce
any of the terms and conditions relating to the said agreement and the Bank shall not be relieved from its liability by reason
of such failure or extension being granted to Bidder or through any forbearance act or omission on the part of BSNL or any
indulgence by BSNL to Bidder or any other matter or thing whatsoever which under the law relating to sureties would but for
this provision have the effect of relieving or discharging the guarantor
6 Notwithstanding anything herein contained
(a) The liability of the Bank under this guarantee is restricted to the PG Amount and it will remain in force up to its Validity
date
(b) The guarantee shall stand completely discharged and all rights of the BSNL under this Guarantee shall be extinguished if
no claim or demand is made on us in writing on or before its validity date
7 In case BSNL demands for any money under this bank guarantee the same shall be paid through bankerrsquos Cheque in
favour of ldquoAO(Cash) BSNL Oo GMTD BHUJ rdquo payable at Bhuj
8 The Bank guarantees that the below mentioned officer who have signed it on behalf of the Bank have authority to give this
guarantee under its delegated power
Place helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip
Date helliphelliphelliphelliphelliphelliphelliphelliphelliphellip (Signature of the Bank Officer)
Rubber stamp of the bank
Authorized Power of Attorney Number helliphelliphelliphelliphelliphellip
Name of the Bank officer helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip
Having examined the tender documents terms and conditions stipulated therein specifications of work
etc we the under signed offer to execute the repair Works in conformity with the said specifications and
conditions of contract as under
Sl No
ITEM DESCRIPTION
Repair Charges per module inclusive of freight
forwardingpacking amp all taxes amp levies (except GST)
(in Figure)
Unit Rate in Words
Total Cost (unit rate qty)
1 2 3 4 5
1 25 AMP Module
2
50 AMP Module
3 100 AMP Module
4 Control Panel of
Power Plants
25A 50A amp 100A
5 GRAND TOTAL
Note -
1 GST will be payable extra on approved rates 2If our Bid is accepted we shall submit the securities as per the conditions mentioned in the contract
3We agree to abide by this Bid for a period of 180 days from the date of opening of financial bid and it shall
remain binding upon us and may be accepted at any time before the expiry of that period
4 The evaluation will be made on the basis of lowest rate quoted as under Lowest Rate = (rate quoted for 25 AMP Qty + rate quoted for 50 AMP Qty + rate
quoted for 100 AMP Qty + rate quoted for Control Panel of Power Plant AMP Qty)
The bidder who has offered lowest rate as evaluated above will be treated as L1 bidder
Date Signature of Tenderer
Seal amp Signature of Bidder
49
CHECK LIST
Sl No
Description Tender Clause Mode of Submission
1 Tender Fee Section 1 (part A) Para 21 22
Off-line
2 EMD Section 1 (part A) Para 51 52 Off-line 3 Power of Attorney Section 4 (Part A) clause 143 Off-line 4 Latest and Valid MSME NSIC certificate (If Applicable) Off-line 5 Experience Certificate Section 1 (part A)
c) E-reverse auction if required by Business Unit Planning cell after opening of the Financial bids
Note 1 In case of 1(b) above the bidder shall submit Techno-commercial amp Financial bid simultaneously
The bids will be evaluated techno-commercially first and thereafter financial bids of techno
commercially compliant bidders only shall be opened
2 Bid Validity Period validity of Bid offer 150 days from the tender opening date and Validity of bid
Offer for acceptance by BSNL can be extended
3 Bid must be submitted by bidder through E-tendering mode only Manual (OFFLINE)
submission of bids should not be considered The following documents are required to be submitted
offline to AGM (PLG) Oo GMTD Haripar Road Bhuj-370001 on or before the date amp time of
submission of bids in a sealed envelope
The envelope shall bear the tender number name of work and the phrase Do Not Open Before (due date amp
time of opening of tender)
i) EMD - Bid security (original copy)
ii) DD Bankers cheque of Tender fee
iii) Power of Attorney in accordance with clause 143 of section 4 Part A and authorization for
executing the power of Attorney
iv) Latest and valid MSME NSIC Certificate duly certified by NSIC if applicable
The purchaser shall not be responsible if the envelop is delivered elsewhere or late
In case of tenders invited under two envelopes system the first envelope will be named as techno commercial amp
will contain documents of bidderrsquos satisfying the eligibility Technical amp commercial conditions and 2nd
envelope will be named as financial envelope containing financial quote
a) Techno-commercial part of the bid shall contain one set of the following documents only-
i) Certificate(s) showing fulfillment of the eligibility criteria The bidder shall furnish as part of his bid
documents establishing the bidders eligibility all the following documents or whichever is required as per
terms and conditions of bid documents
Sl Particular Documents to be submitted
i Registration
Certificate
Firm Registration Certificate Certificate of Incorporation Shop amp
Establishment Certificate
ii In case of
Proprietorship
proprietorship firms an affidavit of that effect should be submitted along with
the bid
iii Partnership
Company
Partnership Deed or ArticlesMemorandum of Association as the case may be
amp Power of Attorney (if applicable) should be made older than the date of
submission of bid
iv Experience Experience Certificate as mentioned in the eligibility criteria
v EMD amp Tender Fee As per Table A amp clause 1 amp 2 OR Copy of Latest amp valid MSE NSIC
Certificate (if applicable)
vi EPF Copy of Registration Certificate of EPF (if applicable)
vii ESIC ESIC Registration (if applicable)
ix Taxes Copy of Valid Goods and Services Tax Registration No Declaration
that he is not registered and will get registered if required x PAN Card Copy of PAN Card
All documents submitted will also be self attested by the bidder
ii) Power of Attorney amp authorization for executing the power of Attorney in accordance with clause 143 of
Section -4 Part A
iii) The complete Bid document duly signed on end of each section at least
iv) Agency details letter for authorization of bid Undertakings Undertakings Non-Relation Certificate as
given vide Section 2(A) to 2(D) of this Bid form
b) Financial envelope shall contain Electronic Form- financial along with Price Schedule (Section 8)
with all relevant bid annexure (in case of tenders invited through e-tendering process)
Seal amp Signature of Bidder
8
SECTION -2 (Part-A)
AGENCY DETAILS
(Including performance records financial viability etc)
Name of firm
Registered Address
Status of the Bidder (i) Proprietorship concern
(ii) Partnership firm
(iii) HUF
(iv) Limited Company
Name of person or authorized signatory for
submitting the tender other documents and
empowered for correspondence with BSNL
GSTIN No
PAN Card particulars
Telephone numbers (with STD Code) of
authorized signatory
Office Residence
Mobile E-mail
Name(s) of Proprietor all Partners all
Directors
Infrastructure capabilities
A Capacity of Repairing 25A module per
week
B Capacity of Repairing 50A module per
week)
C Capacity of Repairing 100A module per
week
D Capacity of Repairing control panel per
week
F Details of trained staff available
A --------------------------------
B --------------------------------
C --------------------------------
D --------------------------------
F --------------------------------
Signature of Tenderer
Name of Tenderer
Along with date amp Seal
Seal amp Signature of Bidder
9
SECTION- 2 PART B
LETTER OF AUTHORISATION FOR ATTENDING BID OPENING
(To be typed preferably on letter head of the company)
Subject Authorization for attending Bid opening
I We Mr Ms helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip have submitted our bid for the tender no
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip in respect of helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip (Item
of work) which is due to open on helliphelliphelliphelliphelliphelliphellip (date) in the Meeting Room
We hereby authorize Mr Ms helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip helliphelliphelliphelliphelliphelliphelliphelliphellipamp
rohelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphereby certify that we or our firm
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip has not been BLACK LISTED by
any SSACircle of MTNLBSNL In case at any stage it is found that the information given by me is
falseincorrect BSNL shall have the absolute right to take any action as deemed fitwithout any prior
intimation to me
e) Clause by Clause Compliance
It is to certify that the tender document is carefully read amp understood and all the sections and clauses
are complied unconditionally amp unequivocally There is no deviation from the terms amp conditions of
the tender
f) Declaration for EPF amp Misc Provisions Act 1952
I _____________________________ (Name of the bidder agency) hereby declare compliance
towards conditions of the EPF and Misc Provisions Act 1952 and authorize BSNL to recover any
payment that arises due to failure to comply with any of the Labour legislations and statutory
conditions viz Labor EPF ESI etc or any other acts dealing with the same and all other acts
mentioned in the tender document
g) CERTIFICATE REGARDING FIRM IS NOT BLACK LISTED BY GST AUTHORITY
rohelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphereby certify that we or our firm
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip has not been BLACK LISTED by
any GST Authority
Date helliphelliphelliphelliphellip helliphellip helliphelliphelliphelliphelliphelliphelliphelliphellip
Signature of Tenderer
Place helliphelliphelliphelliphellip Name of Tenderer
Along with date amp Seal
Seal amp Signature of Bidder
11
SECTION- 2 PART D
DECLARATION REGARDING NO RELATIVE WORKING IN BSNL
I ___________________________Son of W O___________________________
RO _________________________here by certify that none of my relative(s) as defined in tender
document isare employed in BSNL unit as per details given in tender document In case at any stage
it is found that the information given by me is false incorrect BSNL shall have the absolute right to
take any action as deemed fit without any prior intimation to me
Signed ___________________
For and on behalf of the Agency
Name (Capitals) ___________________________
Position ____________________________
Date ____________________________
Note - In case of proprietorship firm certificate will be given by the proprietor for partnership firm
certificate will be given by all the partners on separate paper and in case of limited company by all
the Directors of the Company on separate paper Any breach of these conditions by the company or
firm or any other person the tender work will be cancelled and earnest money security deposit will
be forfeited at any stage whenever it is so noticed BSNL will not pay any damages to the company or
firm or the concerned person The company or firm or the person will also be debarred for further
participation in the concerned unit
Seal amp Signature of Bidder
12
SECTION- 3
SCOPE OF WORK AND JURISDICTION OF CONTRACT
1 SCOPE OF WORK
1 During the entire period of contract repairing of all types and of any make such as AMAR RAJA DACS DELTA DYNA ELTEK EXICOM HIMACHAL EXICOM ITI etc SMPS Power plant Modules (25 AMP 50 AMP 100 Amp ) Control panel are to be carried out including replacement of faulty parts
2 Collection and Delivery of Faulty repaired modules - a The concerned JTOSDEAGM in charge will intimate the contractor the Location Make capacity and
quantity of faulty modules by email (copy to AGM(Plg) on agmplgbhujgmailcom ) followed by ERP PO on mail
b The contractor will collect the module from the concerned in charge with in THREE days from the date of intimation under proper receipt to the concerned in charge However under emergent condition the collection of modules may be done on the same day
c Packing transport and delivery of faulty as well as repaired modules is the responsibility of the contractor
d The contractor shall repair the module and return to the concerned in charge with in Seven days of its collection However under emergent condition as decided by the concerned in charge the collection and repair shall be made within the time period given in the ERP PO
e Repaired modules will be tested by the SDE concern within TWO days on receipt of repaired modules if it is found OK then a certificate of this may be issued to the contractor Otherwise same shall be returned to the contractor for necessary action
f The date of receipt of all the modules mentioned in the ERP PO duly tested OK will be reckoned as the completion of ERP PO
g Repaired modules are warranted for 3 months from the date of successfully taken over During this time the contractor has to rectify the module free of cost
3 INSPECTION AND TESTS - a) The BSNL BHUJ or his representative shall have the right to inspect and test the repaired module as
per prescribed test schedules for their conformity to the specifications Where the BSNL BHUJ decides to conduct such tests on the premises of the Contractor or its subcontractor(s) all reasonable facilities and assistance like Testing Instruments and other test gadgets including access to drawings and production data shall be furnished to the inspectors at no charge to the Purchaser
b) Should any inspected or tested repaired module fail to conform to the Specifications the BSNL BHUJ may reject them and the Contractor shall either replace the rejected repaired module or make all alterations necessary to meet Specification requirements free of cost to the Purchaser
c) Notwithstanding the pre-repair tests and inspections prescribed in clause 3(a) amp 3(b) above the module and accessories on receipt in the BSNL s premises will also be tested during and after installation before take over and if any equipment or part thereof is found defective the same shall be replaced free of all cost to the BSNL BHUJ
d) If any module or any part thereof before it is taken over under clause 3(e) below is found defective or fails to fulfill the requirements of the contract the inspector shall give the Contractor notice setting forth details of such defects or failure and the Contractor shall make the defective module good or alter the same to make it comply with the requirements of the contract forthwith and in any case within a period not exceeding one month of the initial report The replacements shall be made by the Contractor free of all charges at site should it fail to do so within this time the BSNL BHUJ reserves the discretion to reject and replace at the cost of the Contractor the whole or any portion of the module as the case may be which is defective or fails to fulfill the requirements of the contract The cost of any such replacement made by the BSNL BHUJ shall be deducted from the amount payable to the Contractor
Seal amp Signature of Bidder
13
e) When the performance tests called for have been successfully carried out the inspector ultimate
Consignee will forthwith issue a Taking Over Certificate The inspectorultimate consignee shall not delay the issue of any Taking Over Certificate ldquo contemplated by this clause on account of minor defects in the module which do not materially affect the commercial use thereof provided that the Contractor shall undertake to make good the same in a time period not exceeding two months The taking Over Certificate shall be issued by the ultimate consignee within six weeks of successful completion of tests
f) After performance test carried out by the concerned SDE of BSNL as per prescribed schedule and repaired modules are found ok in all respect than the repaired modules will be accepted
g) A register is to be maintained at each placelocation mentioning the details of Modules date of Collection and Delivery of Faulty repaired modules replacement of spares amp remark if any and it is to be signed by the controlling officer amp Service engineer
h) Nothing in clause 3 shall in any way release the Contractor from any Warranty or other obligations under this contract
4 SPARES - All the spare of good quality required for repair of modules of SMPS PP are to be supplied by the contractor including major components
5 The contractor shall be responsible for any loss or damages caused to man or machinespartsinstruments during the execution of work and shall replace with an identical new item at his own cost The authorized officerperson of BSNL will have the liberty to check the material and work etchellip provided by the contractor
6 Governing Conditions for RNP (Repair Not Possible) Cases
A module Control panel may be declared RNP only if cost of material to be replaced exceeds five times of approved rate of repair In no case labour cost involved will be considered for deciding RNP A detailed report is to be submitted by contractor to concerned officer in-charge and final decision in this regard will be taken by concerned DGM subjected to maximum permissible RNP as given below
a)25-A module Maximum 10 of total quantity ordered for repair
b) 50-A 100-A Module Maximum 5 of total quantity ordered for repair
c) Control Panel Maximum 10 of total quantity ordered for repair
In case of RNP exceeding permissible limits penalty will be imposed as per para 11 (d) of section-5 (Part-A)
7 WARRANTY - a) Repaired modules are warranted for 3 months from the date of successfully taken over During this
time the contractor has to rectify the module free of cost The contractor shall warrant that repaired module shall be free from all defects and faults in materials used workmanship It becomes necessary for the contractor to replace or renew any defective portion(s) of the module under this clause
b) Replacement under warranty clause shall be made by the contractor free of all charges at site including freight insurance and other incidental charges
c) If any defect is not remedied by the contractor within a reasonable time the BSNL BHUJ may proceed to get the defects remedied from other contractor etc at the contractors risk and expenses but without prejudice to any other rights which the BSNL BHUJ may have against the contractor in respect of such defects
Seal amp Signature of Bidder
14
SECTION- 4 (Part-A)
GENERAL INSTRUCTION TO BIDDERS (GIB)
1 DEFINITIONS
1 BSNL The BSNL means the BSNL Bhuj Telecom Dist under the Ministry of
Communications which invites the tenders on behalf of the General Manager Bhuj Telecom
District Includes executives in the BSNL whatever designations assigned to them from time
to time who may be the in-charge of direction supervision testing acceptance and
maintenance including their successor(s) in the office appearing in various clauses shall be
taken to mean the BSNL Bhuj Telecom District
b The SSA Head means the Head of SSA General Manager Bhuj Telecom District Bhuj and
his successors
c The jurisdiction of the SSA Head The jurisdiction of the SSA Head means Bhuj Telecom
District which coincides geographically with (Revenue District(s))
d Representative of (the SSA Head) Representative of (the SSA Head ) means Officer and
staff for the time being in Bhuj Telecom District deputed by the General Manager Bhuj for
inspecting or supervising the work of testing etc
e Engineer ndash in - charge The Engineer ndash in - charge means the Engineering Officer
nominated by the BSNL to supervise the work under the contract (Minimum Divisional
Engineer level Officer)
f Site Engineer Site Engineer shall mean an SDESDOJTO of the BSNL who may be placed by
the General Manager Bhuj Telecom District Bhuj as in ndash charge of the work at site at any
particular period of time
g AT Unit AT Unit shall mean Acceptance and Testing unit of the BSNL
h AT Officer An officer authorized by General Manger ndash Bhuj Telecom Dist
i Contract The term contract means the documents forming the tender and acceptance
thereof and the formal agreement executed between the competent authority on behalf of the
BSNL and the contractor together with the documents referred to therein including these
conditions the specifications designs drawings and instructions issued from time to time by
the engineer in ndash charge and all these documents taken together shall be deemed to form one
contract and shall be complementary to one another In the contract the following expressions
shall unless the context otherwise requires have the meanings hereby respectively assigned to
them The expression works or work shall unless there be something either in the subject
context repugnant to such construction be construed or taken to mean the works by or by
virtue of the contract contracted to be executed whether temporary or permanent and whether
original altered substituted or additional
j Contractor The contractor shall mean the individual firm or company enlisted or not
enlisted with BSNL Department of Telecom in accordance with procedure for contractor or
registered for carrying out the work of cable laying whether incorporated or not undertaking
the works and shall include the legal personal representative of such individual or the persons
composing such firm or company or the successors of such firm or company and the
permitted assignees of such individual firm or company
k Work The expression lsquoworksrsquo shall unless there be something either in the subject or context
repugnant to such construction be construct and taken to mean the works by or by virtue of the
Seal amp Signature of Bidder
15
contract contracted to be executed whether temporary or permanent and whether original
altered substituted or additional
l Schedule(s) Schedule(s) referred to in these conditions shall mean the relevant schedule(s)
or the standard schedule of rates mentioned in the document
m Site The site shall mean the land or other places on into or through which work is to be
executed under the contract or any adjacent land path or street through which the work is to
be exacted under the contract or any adjacent land path or street which may be allotted or
used for the purpose of carrying out the contract
n Normal time or stipulated time Normal time or stipulated time means time specified in the
ERP PO to complete the work
o Extension of Time Extension of Time means the time granted by the BSNL to complete the
work beyond the normal time or stipulated time
p Exceptional risk Exceptional risks are risk due to war(whether declared or not) invasion act
of foreign enemies hostilities civil war rebellion revolution insurrection military or
usurped power any acts of Government damages from aircraft acts of God such as
earthquake lightening and unprecedented floods and other causes over which the contractor
has no control and the same having been accepted as such by the Accepting Authority or
causes solely due to use or occupation by the government of the part of the work in respect of
which a certificate of completion has been issued
q The ERP PO means the Order placed by the field units on the contractor signed by
the unit incharge r The Contract Rate means the rate payable to the repairer under the work order for
the full and proper performance of its contractual obligations
2 ELIGIBLE BIDDERS Kindly refer to clause 4 of Section ndash 1 Part A ie Detailed NIT
3 COST OF BIDDING
The bidder shall bear all costs associated with the preparation and submission of the bid The
BSNL will in no case be responsible or liable for these costs regardless of the conduct or
outcome of the bidding process
4 BID DOCUMENTS
41 The goods services required to be supplied bidding procedures and contract terms are prescribed
in the Bid Documents The contents of the Bid documents are specified in the covering letter
42 The Bidder is expected to examine all instructions forms terms and specifications in the Bid
Documents Failure to furnish all information required as per the Bid Documents or submission
of bids not substantially responsive to the Bid Documents in every respect will be at the bidders
risk and may result in rejection of the bid
5 CLARIFICATION OF BID DOCUMENTS
51 A prospective bidder requiring any clarification on the Bid Documents shall notify the User in
writing by FAX or by Email of the User as indicated in the invitation of Bid The User shall
respond in writing to any request for the clarification of the Bid Documents which it receives
7days prior to the date of opening of the Tenders Copies of the query (without identifying the
source) and clarifications by the User shall be uploaded on BSNL website as lsquoClarificationsrsquo on
e-procurement portal of Bhuj Telecom District portal clarification shall be available as
lsquoAddendumrsquo for all the prospective bidders who have downloaded the official copy of tender
documents from e-procurement portal of Bhuj Telecom District
Seal amp Signature of Bidder
16
52 Any clarification issued by BSNL in response to query raised by prospective bidders shall form
an integral part of bid documents and it may amount to an amendment of relevant clauses of the
bid documents
6 AMENDMENT OF BID DOCUMENTS
61 The BSNL may for any reason whether at its own initiative or in response to a clarification
requested by a prospective Bidder may modify bid documents by amendments prior to the date
of submission of Bids with due notification to prospective Bidders
62 The amendments shall be notified in writing or by Fax or by Addendum through e-tendering
portal to all prospective bidders on the address intimated at the time of purchase of bid document
from the BSNL and these amendments will be binding on them
63 In order to afford prospective bidders reasonable time in which to take the amendments into
account in preparing their bids the BSNL may at its discretion extend the deadline for the
submission of bids suitably
7 DOCUMENTS COMPRISING THE BID
The bid prepared by the bidder shall comprise the components specified in Section 2 of this
Tender
8 BID FORM
The bidder shall complete the Bid Form and the appropriate Price Schedule furnished in the Bid
Documents as per Section- 8
9 BID PRICES
91 The bidder shall give the total composite price inclusive of all levies and taxes packing
forwarding freight and insurance in case of materials to be supplied and inclusive of all taxes
and levies except GST in case of works to be executed GST will be paid extra as applicable
The contractor shall be responsible for transporting the materials to be supplied by the BSNL
(At the field Unit Telecom Store or otherwise) to execute the work under the contract to site at
histheir own cost The costs of transportation are subsumed in the standard Schedule Rates and
therefore no separate charges are payable on this account The offer shall be firm in Indian
Rupees
92 The price quoted by the bidder shall remain fixed during the entire period of contract and shall
not be subject to variation on any account A bid submitted with an adjustable price quotation
will be treated as non-responsive and rejected
93 Discount if any offered by the bidders shall not be considered unless they are specifically
indicated in the schedule of rates (financial Bid) Bidders desiring to offer discount shall
therefore modify their offers suitable while quoting and shall quote clearly net price taking all
such factors like Discount free supply etc into account
10 DOCUMENTS ESTABLISHING BIDDERS ELIGIBILITY AND QUALIFICATIONS Kindly refer to clause of Section ndash 1 and 2 of this bid
11 NA
12 BID SECURITYEMD
121 The bidder shall furnish as part of its bid a bid security one of the following ways-
(a) Demand Draft Bankerrsquos cheque from a Nationalizedscheduled bank drawn in favour
of AO (Cash) BSNL Oo GMTD Bhuj and payable at Bhuj
(b) Bank GuaranteeFDR from a Nationalizedscheduled bank drawn in favour of AO
(Cash) BSNL Oo GMTD Bhuj which should be valid for 180 days from the tender
opening date
For educational order EMD to be submitted by bidder as 20 of 10 of estimated tender
cost for each case in the form of cash Demand Draft Bankerrsquos cheque Bank guaranteeFDR
issued by a NationalizedScheduled bank drawn in favour of AO (Cash) BSNL Oo GMTD
Bhuj Bank Guarantee should be valid for 180 days from the tender opening date
122 The MSE bidders are exempted from payment of bid security
Seal amp Signature of Bidder
17
a) A proof regarding valid registration with body specified by Ministry of Micro Small
amp Medium Enterprise for the tendered items will have to be attached along with the
bid
b) The enlistment certificate issued by MSME should be valid on the date of opening of
tender
c) MSE unit is required to submit its monthly delivery schedule
d) If a vender registered with body specified by Ministry of Micro Small amp Medium
Enterprise claiming concessional benefits is awarded work by BSNL and
subsequently fails to obey any of the contractual obligations he will be debarred from
any further work contract by BSNL for one year from the date of issue of such order
123 The bid security is required to protect the BSNL against the risk of bidders conduct which would
warrant the bid securityrsquos forfeiture pursuant to para 127
124 A bid not secured in accordance with para 121 amp 122 shall be rejected by the BSNL being non-
responsive at the bid opening stage and archived unopened on e-tender portal for e-tenders
125 The bid security of the unsuccessful bidder will be dischargedreturned as promptly as possible
as but not later than 30 days after the expiry of the period of bid validity prescribed by the
BSNL pursuant to clause 13
126 The successful bidders bid security will be discharged upon the bidders acceptance of the
advance Purchase Order satisfactorily pursuant to clause 27 and furnishing the performance
security
The successful bidders bid security may be converted to Part Performance Security Deposit in
accordance with clause 28
127 The bid security may be forfeited
a) If the bidder withdraws or amends its bid or impairs or derogates from the bid in any
respect during the period of bid validity specified by the bidder in the bid form or
extended subsequently or
b) If the bidder does not accept the APO AWO and or does not submit PBG amp sign the
contract agreement in accordance with clause 28
Note - The bidder shall mean individual company firm or the front bidder and its technology
consortium partner as applicable
13 PERIOD OF VALIDITY OF BIDS
131 Bid shall remain valid for 150 days from the date of bid opening prescribed by the BSNL A bid
valid for a shorter period shall be rejected by the BSNL as non-responsive
132 In exceptional circumstances the BSNL may request the bidders consent for an extension to the
period of bid validity The request and the responses thereto shall be made in writing The bid
security provided under Clause 12 shall also be suitably extended A bidder may refuse the
request without forfeiting his bid security A bidder accepting the request and granting extension
will not be permitted to modify his bid
14 FORMAT AND SIGNING OF BID
141 The bidder shall submit his bid online (in case of e-tendering) amp through sealed envelopes
physically (in case of tenders with manual bidding process) complying all eligibility
conditions other terms and conditions of tender document to be read along with the
clarifications and amendments issued in this respect All the documents must be authenticated
using Digital Signature (DSC) with Class 2 or above (in case of e-tendering) amp by hand
signatures (for manual bidding process) by the authorized person The letter of authorization
shall be indicated by written power-of-attorney accompanying the bid
Note-The BSNL may ask the bidder(s) to supply besides original bid additional copy of bids as
required by him
142 The bid shall contain no interlineations erasures or overwriting except as necessary to correct
errors made by the bidder in which case such corrections shall be signed by the person or persons
signing the bid All pages of the original bid except for un-amended printed literatures shall be
digitally signed by the person or persons signing the bid
143 Power of Attorney
(a) The power of Attorney should be submitted and executed on the non-judicial stamp paper
Seal amp Signature of Bidder
18
of appropriate value as prevailing in the concerned states(s) and the same be attested by a
Notary public or registered before Sub-registrar of the state(s) concerned
(b) The power of Attorney be executed by a person who has been authorized by the Board of
Directors of the bidder in this regard on behalf of the Company institution Body
corporate
(c) In case of the bidder being a firm the said Power of Attorney should be executed by all the
partner(s) in favour of the said Attorney
(d) Attestation of the specimen signatures of authorized signatory by the Companyrsquos firmrsquos
bankers shall be furnished Name designation Phone number mobile number email
address and postal address of the authorized signatory shall be provided
(e) Individual signing the tenders or other documents connected with the contract shall indicate
the full name below the signature and must specify the capacity and authority under which
he signs such documents and shall also submit documentary evidence of his authority in
the form of Power of Attorney
(f) The Power of Attorney is to be submitted in original if it has been issued for the specific
tender enquiry If the power of attorney is issued in general irrespective of tender enquiry
then photocopy duly certified by notary public can also be accepted
(g) In case the representative of bidder company who uploads the document on e-tender portal
using his Digital Signature Certificates (DSC) which is different from the authorized
signatory for the bid (Power of Attorney holder) then the representative who uploads the
documents on e-tender portal using DSC issued in his name shall also be one of the Power
of Attorney holder by the bidder Company in addition to the authorized signatory for the
bid
15 SEALING AND MARKING OF BIDS
The bid shall be submitted online using single stage bidding and Two Envelope Methodology
151 The first envelope (Techno-commercial bid) This envelope shall contain documents of
bidders satisfying the eligibility Technical amp commercial conditions requirements Second
envelope will be named as financial bid containing price Schedule as per section 8 All
documents submitted will also be self attested by the bidder
152 a) The envelopes for Tender Fee EMD shall be addressed AGM (PLG) Oo GMTD
Haripar Road Bhuj - 370001
b) The envelope for Tender Fee EMD shall bear the name of the tender the tender number
and the words DO NOT OPEN BEFORE (due date amp time)
c) The envelopes for Tender Fee EMD shall indicate the name and complete postal address
of the bidder to enable the User to return the bid unopened in case it is declared to be received
late
d) The envelopes for Tender Fee EMD shall should be deposited in the tender box provided
by tendering authority or sent by registered post or delivered in person on above mentioned
address (address is given above) The responsibility for ensuring that the envelopes for Tender
Fee EMD shall are delivered in time would vest with the bidder
e) The envelopes for Tender Fee EMD shall delivered in person registered post on the day of
tender opening shall be delivered upto specified time amp date as stated in NIT to Oo GMTD
Haripar Road Bhuj - 370001 The User shall not be responsible if the envelopes for Tender
Fee EMD shall are delivered elsewhere
f) Venue of Tender Opening
Tender will be opened in Oo GMTD Haripar Road Bhuj - 370001 at specified time amp
date as stated in NIT If due to administrative reason the venue of Bid opening is changed it
will be displayed prominently on the above address
Seal amp Signature of Bidder
19
153 If envelopes are not sealed and marked as required at para 151 and 152 the bid shall be
rejected
16 SUBMISSION OF BIDS
161 Bids must be submitted by the bidders on or before the specified date amp time indicated in
Section-1 ie DNIT
162 The BSNL may at its discretion extend this deadline for the submission of the bids by
amending the bid documents in accordance with Clause 6 in which case all rights and
obligations of the BSNL and bidders previously subject to the deadline will thereafter be
subject to the deadline as extended
163 The bidder shall submit his bid offer against a set of bid documents purchased by him for all
or some systemservices equipment as per requirement of the Bid Documents He may
include alternate offer if permissible as per the bid However not more than one independent
and complete offer shall be permitted from the bidder
164 Bid must be submitted by the bidder through E-Tendering mode only Manual submission of bid
shall not be needed
17 LATE BIDS
No bid shall be accepted either online by E-Tender Portal or physically in case of manual
bidding process after the specified deadline for submission of bids prescribed by the purchaser
18 MODIFICATION AND WITHDRAWAL OF BIDS
181 The bidder may modify revise or withdraw his bid after submission prior to deadline prescribed
for submission of bid If a bid is withdrawn the same shall be archived unopened in the e-
procurement portal of Bhuj Telecom District
182 The bidderrsquos modification revision or withdrawal shall have to be online and digitally
authenticated as per clause 15
183 Subject to clause 20 no bid shall be modified subsequent to the deadline for submission of bids
19 OPENING OF BIDS BY BSNL
191 The purchaser shall open bids online in the presence of bidders or their authorized representatives
who chose to attend at time specified in Clause 7 of Detailed NIT(Section-1) on due date The
bidderrsquos representatives who are present shall sign in an attendance register Authority letter to
this effect shall be submitted by the bidders before they are allowed to participate in bid opening
(As per Format given in section 2 Part B)
192 A maximum of two representatives for any bidder shall be authorized and permitted to attend
the bid opening
193 (i) The bids will be opened in two stages ie techno-commercial bid shall be opened on the date
of tender opening given in NIT The financial bid will not be opened on the date of opening of
techno commercial bids
The financial bids of those bidders who are approved to be techno commercially compliant by
the competent authority will be opened by TOC in front of techno-commercially eligible
bidders authorized representatives by sending them a suitable notice
(ii) The bidderrsquos names Item name EMD amount amp validity and acceptability Information in
respect of eligible bidders Details of bid modification withdrawal (if any) and such other
details as the purchaser at its discretion may consider appropriate will be made available
online at the time of techno-commercial bid opening
(iii) The bidderrsquos names Name of the Items Quantitiesprices quoted in the bid discount if
offered Taxes amp levies and such other details as the purchaser at its discretion may consider
appropriate will be made available online at the time of financial bid opening
194 The date fixed for opening of bids if subsequently declared as holiday by the BSNL the revised
date of schedule will be notified However in absence of such notification the bids will be
opened in the next working day time and venue remaining unaltered
20 CLARIFICATION OF BIDS
201 To assist in the examination evaluation and comparison of bids the BSNL may at its discretion
Seal amp Signature of Bidder
20
ask the bidder for the clarification of its bid The request for the clarification and the response
shall be in writing However no post bid clarification at the initiative of the bidder shall be
entertained
202 If any of the documents required to be submitted along with the technical bid is found wanting
the offer is liable to be rejected at that stage However the BSNL at its discretion may call for
any clarification regarding the bid document within a stipulated time period The BSNL at itrsquos
discretion may also ask for the submission of any additionalmissing document(s) within a
stipulated time period In such case(s) the bidder shall have to comply the BSNLrsquos requirement
within the specified time In case of non-compliance to such queries the bid will be out rightly
rejected without entertaining further correspondence in this regardrdquo However no post bid
clarification at the initiative of the bidder shall be entertained
21 PRELIMINARY EVALUATION
211 BSNL shall evaluate the bids to determine whether they are complete whether any
computational errors have been made whether required sureties have been furnished whether
the documents have been properly signed and whether the bids are generally in order
212 Arithmetical errors shall be rectified on the following basis If there is a discrepancy between
the unit price and total price that is obtained by multiplying the unit price and quantity the
unit price shall prevail and the total price shall be corrected by the BSNL
213 If there is a discrepancy between words and figures the amount in words shall prevail If the
SupplierBidder does not accept the correction of the errors his bid shall be rejected
214 Prior to the detailed evaluation pursuant to clause 22 the BSNL will determine the substantial
responsiveness of each bid to the Bid documents For purposes of these clauses a substantially
responsive bid is one which conforms to all the terms and conditions of the Bid Documents
without material deviations The BSNLs determination of bids responsiveness is to be based
on the contents of the bid itself without recourse to extrinsic evidence
215 A bid determined as substantially non-responsive will be rejected by the BSNL and shall not
subsequent to the bid opening be made responsive by the bidder by correction of the non-
conformity
216 The BSNL may waive any minor infirmity or non-conformity or irregularity in a bid which
does not constitute a material deviation provided such waiver does not prejudice or affect the
relative ranking of any bidder
22 EVALUATION AND COMPARISON OF SUBSTANTIALLY RESPONSIVE BIDS
221 The Purchaser shall evaluate in detail and compare the bids previously determined to be
substantially responsive pursuant to Clause 21
222 The evaluation will be made on the basis of lowest rate quoted as under Lowest Rate
= (rate quoted for 25AMP Qty +rate quoted for 50AMP 100 AMP Qty + rate
quoted for Control Panel of Power Plant Qty) The bidder who has offered lowest
rate as evaluated above will be treated as L1 bidder 23 CONTACTING THE BSNL
231 Subject to Clause 20 no bidder shall try to influence the BSNL on any matter relating
to its bid from the time of the bid opening till the time the contract is awarded
232 Any effort by a bidder to modify its bid or influence the BSNL in the BSNLs bid evaluation
bid comparison or contract award decisions shall result in the rejection of the bid
24 PLACEMENT OF ORDER
241 The BSNL may consider placement of orders to execute the contract on those bidders whose
offers have been found technically commercially and financially acceptable The BSNL reserves
the right to counter offer price(s) against price(s) quoted by any bidder
The work against the tender is for one yearrsquos requirement and the terms and conditions of
this tender shall be operative for a period of one year from the date of signing of agreement
between the Company and the contractor with an option of extension for a further period
of one year at the same rates terms amp conditions
Seal amp Signature of Bidder
21
Distribution of Work Distribution of quantities for ordering to the selected bidders of a tender
Table 1(A) (Without provisions for MSE Units)
No of Bidders
to be approved
(Col 1)
Quantity allotted to the respective bidder
(Col 2)
L1 L2
One Bidder 100 Nil
Two Bidder 60 40
Table 1(B) (With provisions for MSME Units)
No of Bidders
to be approved
(Col 1)
Quantity allotted to the respective bidder (Col 2)
Qty
Earmarked for MSME
bidder(s)(Col 3)
L1 L2
One Bidder 80 Nil 20
Two Bidder 48 32 20
1) In case L2 and MSE bidder accepts the L1 rate in prescribed time amp do not submit MSD as per
tender terms and conditions the EMD will be forfeited If MSE bidder exceeded more than one than
20 work at L1 rate distributed among them
242 TERMS AND CONDITIONS FOR EDUCATIONAL ORDER
(a) 10 of the estimated quantity of work will be extended to inexperienced contractor for each
Tender
(b) Inexperienced Bidder has to apply separately for each Tender
(c) In case there are more than one bidder work will be distributed into the bidders
(d) The bidder shall not submit financial bid In case if the same is submitted then it will not be opened
(e) BSNL reserves a right to give any area to this bidder including that of other tender in which the
bidder has not participated
(f) The work to the inexperienced is a limited quantity (up to 10) in at a time further work will be
done on the basis of evaluation of field unit Additional quantity of work shall be given to such
contractor only after completion of initial work
(g) The payment for repairing to such contractors shall be based on L1 rates finalized in the tender
The payment will be released only after verification of quantity amp quality done as per the
instruction mentioned in respect of work in the tender
(h) All the other Terms amp conditions will remain the same
25 BSNLS RIGHT TO VARY QUANTITIES AT TIME OF AWARD
(a) BSNL reserves the right to vary up to 25 of the quantity of goods and services specified in
the schedule of requirements without any change in the unit price or other terms and conditions at
the time of award of contract
(b) BSNL also reserves the right for placement of additional order or up to 50 of the
additional quantities of goods and services contained in the running tender contract in the tender
at the same rate or a rate negotiated (downwardly) with the existing venders considering the
reasonability of rates based on prevailing market conditions and the impact of reduction in duties
and taxes etc and supplies to be obtained within delivery period scheduled afresh
No guarantee can be given to actual quantity The quantity mentioned in the tender is
tentative only No claim should entertained for less not allotting the quantum of work for any
reason
(c) In exceptional situation where the requirement is of an emergent nature and it is necessary to
ensure continued supplies from the existing venders the purchaser reserves the right to place
repeat order up to 100 of the quantities of goods and services contained in the running tender
contract at the same rate or a rate negotiated (downwardly) with the existing venders considering
the reasonability of rates based on prevailing market conditions and the impact of reduction in
duties and taxes etc Exceptional situation and emergent nature should be spelt out clearly
detailing the justification as well as benefits accrued out of it and loss incurred in case this
provision is not invoked and approved by the authority competent to accord administrative and
Seal amp Signature of Bidder
22
financial approval for the procurement calculated on the basis of total procurement ie initial and
proposed add-on quantity
26 BSNLS RIGHT TO ACCEPT ANY BID AND TO REJECT ANY OR ALL BIDS
The BSNL reserves the right to accept or reject any bid and to annul the bidding process and
reject all bids at any time prior to award of contract without assigning any reason whatsoever and
without thereby incurring any liability to the affected bidder or bidders on the grounds for the
BSNLs action
27 ISSUE OF ADVANCE WORK ORDER
271 The issue of an Advance Work Order (Letter of Intent) shall constitute the intention of BSNL to
enter into the contract with the bidder
272 The bidder shall within 14 days of issue of an advance work order give his acceptance along with
Performance Security Deposit in conformity with section 7(B) provided with the bid documents
28 SIGNING OF CONTRACT
281 The issue of FAT shall constitute the award of contract on the bidder
282 As soon as the tender is approved by the competent authority the Bid Security deposited by the
successful bidder may be converted into the Performance security deposit which will be held by
the BSNL till the completion of warranty period
29 ANNULMENT OF AWARD
Failure of the successful bidder to comply with the requirement of Clause 27 amp 28 shall
constitute sufficient ground for the annulment of the award and forfeiture of the bid security in
which event the BSNL may make the award to any other bidder at the discretion of BSNL or call
for new bids
30 NA
31 REJECTION OF BIDS
311 While all the conditions specified in the Bid documents are critical and are to be complied special
attention of bidder is invited to the following clauses of the bid documents Non-compliance of any
one of which shall result in outright rejection of the bid
(i) Clause 15 of Section 4 Part A The bids will be recorded returned unopened if covers are not
properly sealed with lsquoPERSONAL SEALrsquo of the bidder
(ii) Clauses 121 122 amp 131 of Section 4 Part A The bids will be rejected at opening stage if Bid
security is not submitted as per Clauses 121 amp 122 and bid validity is less than the period
prescribed in Clause 131 mentioned above
(iii) Clause 2 amp 10 of Section 4 Part A If the eligibility condition as per clause 2 of Section 4 Part
A is not met andor documents prescribed to establish the eligibility as per Clause 10 of
section 4 Part A are not enclosed the bids will be rejected without further evaluation
(iv) Clause 112 of Section 4 Part A NA
(v) Section 5 Part A Commercial conditions Section 5 Part B Special Conditions of Contract
Compliance if given using ambiguous words like ldquoNotedrdquo ldquoUnderstoodrdquo ldquoNoted amp
Understoodrdquo shall not be accepted as complied Mere ldquoCompliedrdquo will also be not sufficient
reference to the enclosed documents showing compliances must be given
(vi) Section 8 Price Schedule Prices are not filled in as prescribed in Financial Bid
(vii) Section 4 Part A clause 93 on discount which is reproduced below
ldquoDiscount if any offered by the bidder shall not be considered unless specifically indicated in
the price schedule Bidders desiring to offer discount shall therefore modify their offer
suitably while quoting and shall quote clearly net price taking all such factors like discount
free supply etc into accountrdquo
312 Before outright rejection of the Bid by Bid-opening team for non-compliance of any of the
provisions mentioned in clause 311(i) 311 (ii) above the bidder company is given
opportunity to explain their position however if the person representing the company is not
satisfied with the decision of the Bid opening team hethey can submit the representation to
Bid opening team immediately but in no case after closing of the tender process with full
justification quoting specifically the violation of tender conditions if any
Seal amp Signature of Bidder
23
313 Bid opening team will not return the bids submitted by the bidders on the date of tender
opening even if it is liable for rejection and will preserve the bids in sealed cover as submitted
by taking signatures of some of the desirous representatives of the participating
biddercompanies present on the occasion
314 The In charge of the Bid opening team will mention the number of bids with name of
company found unsuitable for further processing on the date of tender opening and number of
representations received in Bid opening Minutes and if Bid opening team is satisfied with the
arguments of the biddercompany mentioned in their representation and feel that there is
prima-facie fact for consideration the in charge of the Bid opening team will submit the case
for review to competent authority ie GMTD BHUJ as early as possible preferably on next
working day and decision to this effect should be communicated to the bidder company within
a week positively Bids found liable for rejection and kept preserved on the date of tender
opening will be returned to the bidders after issue of POfinal acceptance of tender against
the instant tender
315 If the reviewing officer finds it fit to open the bid of the petitioner this should be done by
giving three (working) days notice to all the participating bidders to give opportunity to
desirous participants to be present on the occasion
32 ACTION BY PURCHASER AGAINST BIDDER(S) VENDOR(S) IN CASE OF
DEFAULT In case of default by Bidder(s) Vendor(s) such as
a) Does not supply the equipment services in time
b) Equipment Services does not perform satisfactory in the field in accordance with the
specifications
c) Or any other default whose complete list is enclosed in Appendix-1
Purchaser will take action as specified in Appendix-1 of this section
33 DELETED
34 NEAR-RELATIONSHIP CERTIFICATE
341 The bidder should give a certificate that none of his her near relative as defined below is
working in the units where he is going to apply for the tender In case of proprietorship firm
certificate will be given by the proprietor For partnership firm certificate will be given by all
the partners and in case of limited company by all the Directors of the company excluding
Government of India Financial institution nominees and independent non-Official part time
Directors appointed by Govt of India or the Governor of the state and full time Directors of
PSUs both state and central Due to any breach of these conditions by the company or firm or
any other person the tender will be cancelled and Bid Security will be forfeited at any stage
whenever it is noticed and BSNL will not pay any damage to the company or firm or the
concerned person
342 The Company or firm or the person will also be debarred for further participation in the
concerned unit
343 The near relatives for this purpose are defined as-
(a) Members of a Hindu undivided family
(b) They are husband and wife
(c) The one is related to the other in the manner as father mother son(s) amp Sons
wife(daughter in law) Daughter(s) and daughters husband (son in law) brother(s) and
brothers wife sister(s) and sisters husband (brother in law)
344 The format of the certificate is given in Section -2(D)
35 VERIFICATION OF DOCUMENTS AND CERTIFICATES
The bidder will ensure that all the documents and certificates including experience
performance and self certificates submitted by him are correct and genuine before enclosing
them in the bid The onus of proving genuineness of the submitted documents would rest with
the bidder If any document paper certificate submitted by the participant bidder is found
discovered to be false fabricated tempered manipulated either during bid evaluation or
during award of contract or thereafter then the Purchaser will take action as per Clause-1 of
Appendix-1 of this section
Seal amp Signature of Bidder
24
Appendix-1 to Section - 4 (Part-A)
S
No
Defaults of the bidder vendor Action to be taken
A B C
1(a) Submitting fake forged
i) Rejection of tender bid of respective Vendor
ii) Banning of business for 3 years which implies barring
further dealing with the vendor for procurement of Goods amp
Services including participation in future tenders invited by
BSNL for 3 years from date of issue of banning order
iii) Termination Short Closure of POWO if issued This
implies non-acceptance of further supplies work amp services
except to make the already received material work complete
work in hand
a) Bank Instruments with the bid to meet
terms amp condition of tender in respect of
tender fee and or EMD
b) Certificate for claiming exemption in
respect of tender fee and or EMD
c) detection of default at any stage from
receipt of bids till award of APO issue of
POWO
Note 1- However in this case the performance guarantee if alright will not be forfeited
Note 2- Payment for already received supplies completed work shall be made as per terms amp conditions of
PO WO
1(b)
Submitting fake forged documents towards
meeting eligibility criteria such as
experience capability supply proof
registration with GST Income Tax
departments etc and as supporting
documents towards other terms amp conditions
with the bid to meet terms amp condition of
tender
(i) If detection of default is prior to award
of APO
i) Rejection of Bid amp
ii) Forfeiture of EMD
(ii) If detection of default after issue of APO
but before receipt of PG SD (DDBG etc)
i) Cancellation of APO
ii) Rejection of Bid amp
iii) Forfeiture of EMD
(iii) If detection of default after receipt of
PG SD (DDBG etc)
i) Cancellation of APO
ii) Rejection of Bid amp
iii) Forfeiture of PG SD
However on realization of PG SD amount EMD if not
already released shall be returned
(iv) If detection of default after issue of PO
WO
i) Termination Short Closure of POWO and Cancellation
of APO
ii) Rejection of Bid amp
iii) Forfeiture of PG SD
However on realization of PG SD amount EMD if not
released shall be returned
Note 3- However settle bills for the material received in correct quantity and quality if pending items do
not affect working or use of supplied items
Note 4- No further supplies are to be accepted except that required to make the already supplied items
work
Special Note 1- Authority competent to take final decision GMTD Bhuj
2 If vendor or his representative uses violent
coercive means viz Physical Verbal means
to threatens BSNL Executive employees
and or obstruct him from functioning in
discharge of his duties amp responsibilities for
the following
Banning of business for 3 years which implies Barring
further dealing with the vendor for procurement of Goods amp
Services including participation in future tenders invited by
BSNL for 3 years from date of issue of banning order
a) Obstructing functioning of tender opening
executives of BSNL in receipt opening of
tender bids from prospective Bidders
suppliers Contractors
Seal amp Signature of Bidder
25
b) Obstructing Threatening other
prospective bidders ie suppliers
Contractors from entering the tender venue
and or submitting their tender bid freely
Special Note 1- Authority competent to take final decision GMTD Bhuj
3 Non-receipt of acceptance of APO AWO
and SD PG by L-1 bidder within time
period specified in APO AWO
Forfeiture of EMD
Special Note 1- Authority competent to take final decision GMTD Bhuj
41 Failure to supply and or Commission the
equipment and or execution of the work at
all even in extended delivery schedules if
granted against PO WO
i) Termination of PO WO
ii) Under take purchase work at the risk amp cost of
defaulting vendor
iii) Recover the excess charges if incurred from the PG SD
and outstanding bills of the defaulting Vendor
42 Failure to supply and or Commission the
equipment and or execution of the Work in
full even in extended delivery schedules if
granted against PO WO
i) Short Closure of PO WO to the quantity already
received by and or commissioned in BSNL and or in
pipeline provided the same is usable andor the Vendor
promises to make it usable
ii) Under take purchase work for balance quantity at the
risk amp cost of defaulting vendor
iii) Recover the excess charges if incurred from the PG SD
and outstanding bills of the defaulting Vendor
Special Note 1- Authority competent to take final decision for 41 amp 42 by DGM concerned
51 The supplied equipment does not perform
satisfactory in the field in accordance with
the specifications mentioned in the PO
WOContract
i) If the material is not at all acceptable then return the non-
acceptable material (or its part) amp recover its cost if paid
from the os bills PG SD
OR
ii) If the material is inducted in network amp it is not possible
to return it and or material is acceptable with degraded
performance the purchaser may determine the price for
need to be issued in compliant format and timely within the time prescribed under GST law
163 In case of any deficientincompleterejected supply BSNL shall convey the same in a reasonable
time to enable the supplier to issue credit note and take tax adjustment
164 It would be the responsibility of the supplier to declare correct information on invoice and GSTN
viz the amount the place of supply rate of tax etc In case the eligibility of input tax credit is
questioned or denied to BSNL on account of default by the supplier the same would be
recovered by BSNL from the contractor
165 Registered location of the both the parties ie BSNL and contractor should be mentioned in the
agreement with GSTIN No Further supplier should raise invoices at the registered premise of
BSNL for availing of credit and ensure that the place of supply as per GST law is same as
registered premise
166 BSNL could at any time instruct the contractor to raise its invoices at a particular location of
BSNL
Seal amp Signature of Bidder
39
167 It is the responsibility of the supplier to ensure that place of supply and the GSTN of BSNL are
in the same state If for any reason they are not in the same state the contractor shall intimate to
BSNL and give adequate time before raising of the invoice
168 E-waybill number should be mentioned on the invoices
169 contractor shall be responsible for timely issuance and delivery of invoice DN CN to enable
BSNL to claim tax benefit on or before the stipulated time period provided by the GST law
(a) It is the responsibility of the contractor to ensure that outward supply return (GSTR-1) would be
filed correctly If not than cost would be borne by supplier
(b) Reporting of correct outward supply by supplier in the outward return (GSTR-1) is the
responsibility of the supplier In case of mismatch because of contractorrsquos fault prompt
amendments must be made by the supplier else supplier would be required to indemnify BSNL
of the loss of credit due to mis-match The compliances to be adhered by contractor includes
(but is not limited to) the following
(i) Uploading appropriate invoice details on the GSTN within the stipulated time
(ii) Issuing GST compliant invoice CN DN PO issued by BSNL should be referred by
contractor for capturing information on the invoice
(iii) Contractor needs to pay the entire self-assessed tax on timely basis
(iv) Where invoice is not uploaded or incorrect upload of invoice detail of GSTN by supplier
then credit on such invoice will be given provisionally subject to matching So acceptance of
changes made by BSNL on GSTN on account of non-upload or incorrect upload of invoice
details on GSTN is to be submitted by supplier Such changes wrt the mismatch are required
to be accepted by supplier within the time limit prescribed under the GST law It should be
noted that in case supplier does not accept such changes within the time limit prescribed under
GST law the loss of input tax credit (if any) would be recovered from the supplier In case of
mismatch because of Suppliers fault prompt amendments must be made by the supplier else
supplier would be required to indemnify BSNL for the losses of credit and interest paid due to
mismatch
(v) contractor to issue all necessary documentation and perform all necessary compliances for
BSNL to be eligible to claim the input tax credit of GST tax to them In case BSNL is unable to
claim the input tax credit the amount wrt GST charged by the supplier would be recovered
from the supplier
1610 Refer) for clause stating that all the details of supplier (name address GSTN unregistered
supplier place of supply SAC HSN code etc) and other mandatory details shall be mentioned on the
invoice
1611Where the location agreed are more than one state then separate invoice state wise to claim
input tax credit in a particular state (typically happens in a bill to-ship to scenario) shall have to be
submitted
1612 It shall be the responsibility of the supplier to mention State of place of supply of goodsservices
in the invoice issued to BSNL
Seal amp Signature of Bidder
40
SECTION ndash 5 (Part-B)
SPECIAL CONDITIONS OF CONTRACT (SCC)
1 GENERAL
No official of Gazetted rank or other Gazetted officer employed in Engineering or administrative
duties in an Engineering BSNL or any other BSNL of the BSNL is allowed to work as a contractor for
a period of two years after his retirement from BSNL service without the previous permission of
BSNL This contract is liable to be cancelled if either the contractor or any of his employee is found at
any time to be such a person who hadnrsquot obtained the permission of BSNL as aforesaid before
submission of the engagement in the contractorrsquos service as the case may be
2 Material Handed over by The BSNL
21 The contractor shall transport (including loading and unloading) all stores issued to him from
Field Unit Telecom Store to the site of work at his own cost The BSNL shall not pay any
transportation charges to the contractor
22 All materials handed over to the contractor by the BSNL shall remain the absolute property of
BSNL and shall not be removed form site of the work except for use in the work and shall be at all
times open to inspection by the Representative of GMTD BHUJ
23 The contractor shall be responsible for the transportation of store storage and safe custody of all
material supplied to him by the BSNL which in the contractorrsquos custody whether or not installed in
the work The contractor shall satisfy himself regularly the quantity and quality of the materials
supplied to him and he will be responsible for any subsequent deterioration and discrepancy (inclusive
of theft) in the quantity quality the materials
3 LABOUR WELFARE MEASURES AND WORKMAN COMPENSATION
(AS APPLICABLE)
31 Obtaining License before commencement of work
The contractor shall obtain a valid labour license (if applicable) under the Contact Labour (RampA) Act
1919 and the Contract Labour (Regulation and Abolition) Central Rules 1971 before commencement
of the work and continue to have a valid license until the completion of work The contractor shall
also abide by the provisions of the Child Labour (Prohibition and Regulation) Act 1986 Any failure
to fulfill this requirement shall attract the penal provisions of this contract arising out of the resultant
non-execution of work
32 Contractors labour Regulations
321 Working Hours
3211 Normally working hours of an employee should not exceed 9 hours a day The working
day shall be so arranged the inclusive of interval for rest if any it shall not spread over
more than12 hours on any day
3212 When a worker is made to work for more than 9 hours on any day or for more than 48
hours in any week he shall be paid over time for the extra hours put in by him
3213 Every worker shall be given a weekly holiday normally on a Sunday in accordance with
the provisions of minimum Wages (Central Rules 1960 as amended from time to time
irrespective of whether such worker is governed by the Minimum Wages Act or not
3214 Where the minimum wages prescribed by the Government under the Minimum Wages
Act are not inclusive of the wages for the weekly day of rest the worker shall be entitled
to rest day wages at the rate applicable to the next preceding day provided he has
worked under the same contractor for a continuous period of not less than 6 days
3215 Where a contractor is permitted by the Engineer-in-Charge to allowed a worker to work
on a normal weekly holiday he shall grant a substituted holiday to him for the whole day
Seal amp Signature of Bidder
41
on one of the five days immediately before or after the normal weekly holiday and pay
wages to such worker for the work performed on the normal weekly holiday at the
overtime rate
322 Display of Notice Regarding Wages Etc
The contractor shall before he commences his work on contract display and correctly
maintain and continue to display and correctly maintain in a clear and legible condition
in conspicuous places on the work notices in English and in local Indian languages
spoken by the majority of the workers giving the minimum rates of the wages fixed
under Minimum Wages Act the actual wages being paid the hours of work for which
such wage are earned wages periods dates of payments of wages and other relevant
information
323 Payment of Wages
3231 The contractor shall fix wage periods in respect of which wages shall be payable
3232 No wage period shall exceed one month
3233 The wages of every person employed as contract labour in an establishment or by a
contractor where less than one thousand such persons are employed shall be paid before
the expiry of seventh day and in other cases before the expiry of tenth day after the last day
of the wage period in respect of which the wages are payable
3234 Where the employment of any worker is terminated by or on behalf of the contractor the
wages earned by him shall be paid before the expiry of the second working day from the
date on which his employment is terminated
3235 All payment of wages shall be made on a working day at the work premises and during the
working time and on a date notified in advance and in case the work is completed before
the expiry of the wage period final payment shall be made within 48 hours of the last
working day
3236 Wages due to every worker shall be paid to him direct or to other person authorized by him
in this behalf
3237 All wages shall be paid in current coin or currency or in both
3238 Wages shall be paid without any deductions of any kind except those specified by the
Central Government by general or special order in this behalf or permissible under the
Payment of Wages Act 1956
3239 A notice showing the wages period and the place and time of disbursement of wages shall
be displayed at the place of work and a copy sent by the contractor to the Engineer ndashin-
Charge under acknowledgement
32310 It shall be the duty of the contractor to ensure the disbursement of wages in presence of the
site Engineer or any other authorized representative of the Engineer-in-Charge who will be
required to be present at the place and time of the disbursement of wages by the contractor
to workmen
32311 The contractor shall obtain from the site Engineer or any other authorized representative of
the Engineer-in-Charge as the case may be a certificate under his signature at the end of
the entries in the ldquoRegister of Wages ldquo or the ldquoWage-cum-Muster Rollrdquo as the case may
be in the following form -
ldquoCertified that the amount shown in the column Nohelliphelliphelliphelliphas been paid to the
workman concerned in my presence on helliphelliphelliphelliphelliphellip at helliphelliphelliphelliphelliphelliphelliphelliphelliprdquo
32312 Fines and deductions which may be made from wages
A The wages of a worker shall be paid to him without any deduction of any kind except the
following -
a) Fines
(b) Deductions for absence from duty ie from the place or the places where by the terms of
his employment he is required to work The amount of deduction shall be in proportion
to the period for which he was absent
(c) Deductions for damage to or loss of goods expressly entrusted to the employed person
for custody or for loss of money or any other deductions which he is required to
account where such damage or loss is directly attributable to his neglect or default
Seal amp Signature of Bidder
42
(d) Deduction for recovery of advances or for adjustment of over payment of wages
advances granted shall be entered in register
(e) Any other deductions which the Central Government may form time to time allow
B No fines should be imposed on any worker save in respect of such acts and omissions
on his part as have been approved of by the Labour Commissioner
C No fine shall be imposed one worker and no deduction for damage or loss shall be
made from his wages until the worker has been given an opportunity of showing cause
against such fines or deductions
D Every fine shall be deemed to have been imposing on the day of the act or omission in
respect of which it was imposed
524 Labor records 1 The contractor shall maintain a Register of Persons employed on work on contract in
Form XIII of the Contract Labour (RampA) Central Rules 1971
2 The contractor shall maintain a Muster Roll register in respect of all workmen
employed by him on the work under Contract in Form XVI of the CL (RampA) Rules
1971
3 The contractor shall maintain a Wage Register in respect of all workmen employed by
him on the work under contract in From XVII of the CL (RampA) Rules 1971
4 Register of accidents- The contractor shall maintain a register of accidents in such
form as may be convenient at the work place but the same shall include the following
particulars
(a) Full Particulars of the laborers who met with accident
(b) Rate of wages
(c) Sex
(d) Age
(e) Nature of accident and cause of accident
(f) Time and date of accident
(g) Date and time when admitted in hospital
(h) Date of discharge from the hospital
(i) Period of treatment and result of treatment
(j) Percentage of loss of earning capacity and disability as assessed by
Medical officer
(k) Claim required to be paid under Workmenrsquos Compensation Act
(l) Date of payment of compensation
(m) Amount paid with details of the person to whom the same was paid
(n) Authority by whom the compensation was assessed
(o) Remarks
5 The contractor shall maintain a Register of Fines in the Form XII of the CL(RampA)
Rules 1971 the Contractor shall display in a good condition and in a conspicuous
place of work the approved list of acts and commission for which fines can be
imposed
6 The contractor shall maintain a Register of deductions for damage or loss in Form
XX of the CL (RampA) Rules 1971
7 The contractor shall maintain a Register of Advances in Form XXIII of the CL
(RampA) Rules 1971
8 The contractor shall maintain a Register of Overtime in Form XXIII of the CL
(RampA) Rules 1971
9 Attendance card-cum wage slip a The contractor shall issue an Attendance card cum wage slip to each workman
employed by him
b The card shall be valid for each wage period
Seal amp Signature of Bidder
43
c The contractor shall mark the attendance of each workman on the card twice each
day once at the commencement of the day and again after the rest interval before
he actually starts work
d The card shall remain in possession of the worker during the wage period under
reference
e The contractor shall complete the wage slip portion on the reverse of the card at
least a day prior to the disbursement of wages in respect of the wage period under
reference
f The contractor shall obtain the signature or thumb impression of the worker on the
wag slip at the time of disbursement of wages and retain the card with him
10 Employment card The contractor shall issue an Employment Card in the Form XIV of CL (RampA) Central Rules
1971 to each worker within three days of the employment of the worker
11 Service certificate
On termination of employment for any reason whatsoever the contractor shall issue to the
workman whose services have been terminated a Service Certificate in the Form XV of the
CL (RampA) Central Rules 1971
12 Preservation of labour records The labour records and records of Fines and deductions shall be preserved in original for a
period of three years from the date of last entries made in them and shall be made available for
inspection by the Engineer-in-Charge or Labour Officer or any other officers authorized by the
Ministry of Communication in this behalf
13 Power of labour officer to make investigations or enquiry The labour officer or any person authorized by the Central Government on their behalf shall
have power to make enquiries with a view to ascertaining and enforcing due and proper
observance of Fair Wage Clauses and provisions of these Regulations He shall investigate
into any complaint regarding the default made by the contractor in regard to such provision
14 Report of Investigating officer and action thereon The labour Officer or other persons authorized as aforesaid shall submit a report of result of
his investigation or enquiry to the Engineer in-Charge indicating the extent if any to which
the default has been committed with a note that necessary deductions from the contractorrsquos bill
be made and the wages and other dues be paid to the labourers concerned The Engineer in-
Charge shall arrange payments to the labour
concerned within 45 days from the receipt of the report from the Labour Officer or the
authorized officer as the case may be
15 Inspection of Books And slips The contractor shall allow inspection of all the prescribed labour records to any of his workers
or to his agent at a convenient time and place after due notice is received or to the Labour
Officer or any other person authorized by the Central Government on his behalf
16 Submission of Returns The contractor shall submit periodical returns as may be specified form time to time
17 Amendments
The Central Government may from time to time add to or amend the regulations and on any
question as to the applicationinterpretation or effect of those regulations
Contractor must fulfill the terms and condition towards fulfillmentscompliance of the
provision of EPF amp Miscprovision act 1952 amp Employment provident Fund Scheme 1952 in
respect of laborersemployees engaged by the contractor Contractor must submit declaration
form regarding compliance of the condition of EPF act 1952
525 INSURANCE Without limiting any of his other obligations or liabilities the contractor shall at his own
expense take and keep comprehensive insurance including third party risk for the plant
machinery men materials etc brought to the site and for all the work during the execution
The contractor shall also take out workmenrsquos compensations insurance as required by law and
under take to indemnify and keep indemnified the Government from and against all manner of
Seal amp Signature of Bidder
44
claims and demands and losses and damages and cost (including between attorney and client)
charges and expenses that may arise in regard the same or that the Government may suffer or
incur with respect to endor incidental to the same The contractor shall have to furnish
originals and or attested copies as required by the BSNL of the policies of insurance taken
within 15 (fifteen) days of being called upon to do so together with all premium receipts and
other papers related thereto which the BSNL may require
526 COMPLIANCE WITH LAWS AND REGULATION
During the performance of the works the contractor shall at his own cost and initiative
fully comply with all applicable laws of the land and with any and all applicable by-laws
rules regulations and orders and any other provisions having the force of law made or
promulgated or deemed to be made or promulgated by the Government Governmental
agency or BSNL municipal board Government of other regulatory or Authorized body or
persons and shall provide all certificates or compliance therewith as may be required by
such applicable law By-laws Rules Regulations orders and or provisions The
contractor shall assume full responsibility for the payment of all contributions and pay roll
taxes as to its employees servants or agents engaged in the performance of the work
specified in the contractor documents If the contractor shall require any assignee or sub-
contract to comply with the provisions of the clause and in this connection the contractor
agrees as to undertake to save and hold the Government harmless and indemnified from
and against any all penalties actions suits losses and damages claims and demands and
costs (inclusive between attorney and client) charges and expenses whatsoever arising out
or occasioned indirectly or directly by failure of the contractor or any assignee or sub-
contractor to make full and proper compliance with the said by-laws Rules Regulations
laws and Order and provisions as aforesaid
6 TOOLS and PLANTS
The contractor shall provide at his own cost all tools plants appliances implements etc
required for proper execution of works The contractor shall also supply without charge
the requisite number of persons with the means and materials necessary for the purpose of
setting out works counting weighing and assisting the measurements for examination at
any time and from time to time Failing his so doing the same may be provided by the
Engineer-in-charge at the expense of the contractor and the expenses shall be deducted
from any money due to the contractor under this contract or otherwise
As per Para 367 of the recommendationobservation of Tenth Report of parliamentary
standing committee on labour Contractor would provide the same social security to the
labours engaged by him as is available to regular employees
As per Para 368 of the recommendationobservation of Tenth Report of parliamentary
standing committee on labour Contractor shall ensure implementation of equal pay for equal
work and also equal remuneration to men and women
Seal amp Signature of Bidder
45
SECTION ndash 7
PROFORMAS
7 (A) BID SECURITY EMD Guarantee
(To be typed on Rs100- non-judicial stamp paper)
Whereas (hereinafter called the Bidder) has submitted its bid datedfor
the supply of vide Tender Nohelliphelliphelliphelliphelliphelliphelliphellip dated KNOW ALL MEN by
these presents that WE OF having our registered office at
(hereinafter called the Bank) are bound unto Bharat Sanchar Nigam Limited (hereinafter
called the Purchaser) in the sum of Rs for which payment will and truly to be made of
the said Purchaser the Bank binds itself its successors and assigns by these present
THE CONDITIONS of the obligation are
1 If the Bidder withdraws his bid during the period of bid validity specified by the Bidder
on the Bid form or
2 If the Bidder having been notified of the acceptance of his bid by the Purchaser during the
period of bid validity
(a) fails or refuses to execute the Contract if required or
(b) fails or refuses to furnish the Performance Security in accordance with the instructions to
Bidders
We undertake to pay to the Purchaser up to the above amount upon receipt of its first written demand
without the purchaser having to substantiate its demand provided that in its demand the purchaser
will note that the amount claimed by it is due to it owning to the occurrence of one or both of the two
conditions specifying the occurred condition or conditions
This guarantee will remain in force as specified in clauses 12 and 282 of section 4 Part A of the Bid
Document upto and including THIRTY (30) days after the Period of bid validity and any demand in
respect thereof should reach the Bank not later than the specified datedates
Signature of the Bank Authority
Name
Signed in Capacity of
Name amp Signature of witness Full address of Branch
Address of witness Tel No of Branch
Fax No of Branch
Seal amp Signature of Bidder
46
7 (B) PERFORMANCE SECURITY BOND FORM
(To be typed on Rs100- non-judicial stamp paper)
Datedhelliphelliphelliphelliphellip
Sub Performance guarantee
Whereas General Manager Telecom Bhuj Telecom District Bhuj (hereafter referred to as BSNL) has issued an AWO no
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellipDated helliphelliphelliphellip20hellip awarding the work of
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip to Ms
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip(hereafter referred to as ldquoBidderrdquo) and BSNL has asked him to submit a performance guarantee
in favour of AO(Cash) BSNL Oo GMTD BHUJ of Rs helliphelliphelliphelliphelliphellip- (hereafter referred to as ldquoPG Amountrdquo) valid up
to helliphelliphelliphellip20helliphelliphellip (hereafter referred to as ldquoValidity Daterdquo)
Now at the request of the Bidder We helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellipBank
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip Branch having (Address) and Regd
office address as helliphelliphellip helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip (Hereinafter called lsquothe
Bankrdquo) agreed to give this guarantee as hereinafter contained
2 We ldquothe Bankrdquo do hereby undertake and assure to the BSNL that if in the opinion of the BSNL the Bidder has in any way
failed to observe or perform the terms and conditions of the said agreement or has committed any breach of its obligations
there-under the Bank shall on demand and without any objection or demur pay to the BSNL the said sum limited to PG
Amount or such lesser amount as BSNL may demand without requiring BSNL to have recourse to any legal remedy that may
be available to it to compel the Bank to pay the same
3 Any such demand from the BSNL shall be conclusive as regards the liability of Bidder to pay to BSNL or as regards the
amount payable by the Bank under this guarantee The Bank shall not be entitled to withhold payment on the ground that the
Bidder had disputed its liability to pay or has disputed the quantum of the amount or that any arbitration proceeding or legal
proceeding is pending between Bidder and BSNL regarding the claim
4 We the Bank further agree that the guarantee shall come into force from the date of its issue and shall remain in full force
and effect up to its Validity date
5 The Bank further agrees that the BSNL shall have the fullest liberty without the consent of the Bank and without affecting
in any way the obligations hereunder to vary any of the terms and conditions of the said agreement or to extend the time for
performance of the said agreement from any of the powers exercisable by BSNL against the Bidder and to forebear to enforce
any of the terms and conditions relating to the said agreement and the Bank shall not be relieved from its liability by reason
of such failure or extension being granted to Bidder or through any forbearance act or omission on the part of BSNL or any
indulgence by BSNL to Bidder or any other matter or thing whatsoever which under the law relating to sureties would but for
this provision have the effect of relieving or discharging the guarantor
6 Notwithstanding anything herein contained
(a) The liability of the Bank under this guarantee is restricted to the PG Amount and it will remain in force up to its Validity
date
(b) The guarantee shall stand completely discharged and all rights of the BSNL under this Guarantee shall be extinguished if
no claim or demand is made on us in writing on or before its validity date
7 In case BSNL demands for any money under this bank guarantee the same shall be paid through bankerrsquos Cheque in
favour of ldquoAO(Cash) BSNL Oo GMTD BHUJ rdquo payable at Bhuj
8 The Bank guarantees that the below mentioned officer who have signed it on behalf of the Bank have authority to give this
guarantee under its delegated power
Place helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip
Date helliphelliphelliphelliphelliphelliphelliphelliphelliphellip (Signature of the Bank Officer)
Rubber stamp of the bank
Authorized Power of Attorney Number helliphelliphelliphelliphelliphellip
Name of the Bank officer helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip
Having examined the tender documents terms and conditions stipulated therein specifications of work
etc we the under signed offer to execute the repair Works in conformity with the said specifications and
conditions of contract as under
Sl No
ITEM DESCRIPTION
Repair Charges per module inclusive of freight
forwardingpacking amp all taxes amp levies (except GST)
(in Figure)
Unit Rate in Words
Total Cost (unit rate qty)
1 2 3 4 5
1 25 AMP Module
2
50 AMP Module
3 100 AMP Module
4 Control Panel of
Power Plants
25A 50A amp 100A
5 GRAND TOTAL
Note -
1 GST will be payable extra on approved rates 2If our Bid is accepted we shall submit the securities as per the conditions mentioned in the contract
3We agree to abide by this Bid for a period of 180 days from the date of opening of financial bid and it shall
remain binding upon us and may be accepted at any time before the expiry of that period
4 The evaluation will be made on the basis of lowest rate quoted as under Lowest Rate = (rate quoted for 25 AMP Qty + rate quoted for 50 AMP Qty + rate
quoted for 100 AMP Qty + rate quoted for Control Panel of Power Plant AMP Qty)
The bidder who has offered lowest rate as evaluated above will be treated as L1 bidder
Date Signature of Tenderer
Seal amp Signature of Bidder
49
CHECK LIST
Sl No
Description Tender Clause Mode of Submission
1 Tender Fee Section 1 (part A) Para 21 22
Off-line
2 EMD Section 1 (part A) Para 51 52 Off-line 3 Power of Attorney Section 4 (Part A) clause 143 Off-line 4 Latest and Valid MSME NSIC certificate (If Applicable) Off-line 5 Experience Certificate Section 1 (part A)
9 EPF (If applicable) Section 2 Para 3 (a) (i) ON-Line 10 ESIC (If applicable) Section 2 Para 3 (a) (i) ON-Line 11 PAN Card Section 2 Para 3 (a) (i) ON-Line 12 Agency Detail Section 2 (part-A) ON-Line 13 Letter of Authorization Section 2 (part-B) ON-Line 14 Under taking amp
declaration Section 2 (part-C) ON-Line
15 Declaration regarding no relative working in BSNL
Section 2 (part-D) To be submitted by proprietor or separately by each partnerDirector
ON-Line
Seal amp Signature of Bidder
8
SECTION -2 (Part-A)
AGENCY DETAILS
(Including performance records financial viability etc)
Name of firm
Registered Address
Status of the Bidder (i) Proprietorship concern
(ii) Partnership firm
(iii) HUF
(iv) Limited Company
Name of person or authorized signatory for
submitting the tender other documents and
empowered for correspondence with BSNL
GSTIN No
PAN Card particulars
Telephone numbers (with STD Code) of
authorized signatory
Office Residence
Mobile E-mail
Name(s) of Proprietor all Partners all
Directors
Infrastructure capabilities
A Capacity of Repairing 25A module per
week
B Capacity of Repairing 50A module per
week)
C Capacity of Repairing 100A module per
week
D Capacity of Repairing control panel per
week
F Details of trained staff available
A --------------------------------
B --------------------------------
C --------------------------------
D --------------------------------
F --------------------------------
Signature of Tenderer
Name of Tenderer
Along with date amp Seal
Seal amp Signature of Bidder
9
SECTION- 2 PART B
LETTER OF AUTHORISATION FOR ATTENDING BID OPENING
(To be typed preferably on letter head of the company)
Subject Authorization for attending Bid opening
I We Mr Ms helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip have submitted our bid for the tender no
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip in respect of helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip (Item
of work) which is due to open on helliphelliphelliphelliphelliphelliphellip (date) in the Meeting Room
We hereby authorize Mr Ms helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip helliphelliphelliphelliphelliphelliphelliphelliphellipamp
rohelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphereby certify that we or our firm
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip has not been BLACK LISTED by
any SSACircle of MTNLBSNL In case at any stage it is found that the information given by me is
falseincorrect BSNL shall have the absolute right to take any action as deemed fitwithout any prior
intimation to me
e) Clause by Clause Compliance
It is to certify that the tender document is carefully read amp understood and all the sections and clauses
are complied unconditionally amp unequivocally There is no deviation from the terms amp conditions of
the tender
f) Declaration for EPF amp Misc Provisions Act 1952
I _____________________________ (Name of the bidder agency) hereby declare compliance
towards conditions of the EPF and Misc Provisions Act 1952 and authorize BSNL to recover any
payment that arises due to failure to comply with any of the Labour legislations and statutory
conditions viz Labor EPF ESI etc or any other acts dealing with the same and all other acts
mentioned in the tender document
g) CERTIFICATE REGARDING FIRM IS NOT BLACK LISTED BY GST AUTHORITY
rohelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphereby certify that we or our firm
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip has not been BLACK LISTED by
any GST Authority
Date helliphelliphelliphelliphellip helliphellip helliphelliphelliphelliphelliphelliphelliphelliphellip
Signature of Tenderer
Place helliphelliphelliphelliphellip Name of Tenderer
Along with date amp Seal
Seal amp Signature of Bidder
11
SECTION- 2 PART D
DECLARATION REGARDING NO RELATIVE WORKING IN BSNL
I ___________________________Son of W O___________________________
RO _________________________here by certify that none of my relative(s) as defined in tender
document isare employed in BSNL unit as per details given in tender document In case at any stage
it is found that the information given by me is false incorrect BSNL shall have the absolute right to
take any action as deemed fit without any prior intimation to me
Signed ___________________
For and on behalf of the Agency
Name (Capitals) ___________________________
Position ____________________________
Date ____________________________
Note - In case of proprietorship firm certificate will be given by the proprietor for partnership firm
certificate will be given by all the partners on separate paper and in case of limited company by all
the Directors of the Company on separate paper Any breach of these conditions by the company or
firm or any other person the tender work will be cancelled and earnest money security deposit will
be forfeited at any stage whenever it is so noticed BSNL will not pay any damages to the company or
firm or the concerned person The company or firm or the person will also be debarred for further
participation in the concerned unit
Seal amp Signature of Bidder
12
SECTION- 3
SCOPE OF WORK AND JURISDICTION OF CONTRACT
1 SCOPE OF WORK
1 During the entire period of contract repairing of all types and of any make such as AMAR RAJA DACS DELTA DYNA ELTEK EXICOM HIMACHAL EXICOM ITI etc SMPS Power plant Modules (25 AMP 50 AMP 100 Amp ) Control panel are to be carried out including replacement of faulty parts
2 Collection and Delivery of Faulty repaired modules - a The concerned JTOSDEAGM in charge will intimate the contractor the Location Make capacity and
quantity of faulty modules by email (copy to AGM(Plg) on agmplgbhujgmailcom ) followed by ERP PO on mail
b The contractor will collect the module from the concerned in charge with in THREE days from the date of intimation under proper receipt to the concerned in charge However under emergent condition the collection of modules may be done on the same day
c Packing transport and delivery of faulty as well as repaired modules is the responsibility of the contractor
d The contractor shall repair the module and return to the concerned in charge with in Seven days of its collection However under emergent condition as decided by the concerned in charge the collection and repair shall be made within the time period given in the ERP PO
e Repaired modules will be tested by the SDE concern within TWO days on receipt of repaired modules if it is found OK then a certificate of this may be issued to the contractor Otherwise same shall be returned to the contractor for necessary action
f The date of receipt of all the modules mentioned in the ERP PO duly tested OK will be reckoned as the completion of ERP PO
g Repaired modules are warranted for 3 months from the date of successfully taken over During this time the contractor has to rectify the module free of cost
3 INSPECTION AND TESTS - a) The BSNL BHUJ or his representative shall have the right to inspect and test the repaired module as
per prescribed test schedules for their conformity to the specifications Where the BSNL BHUJ decides to conduct such tests on the premises of the Contractor or its subcontractor(s) all reasonable facilities and assistance like Testing Instruments and other test gadgets including access to drawings and production data shall be furnished to the inspectors at no charge to the Purchaser
b) Should any inspected or tested repaired module fail to conform to the Specifications the BSNL BHUJ may reject them and the Contractor shall either replace the rejected repaired module or make all alterations necessary to meet Specification requirements free of cost to the Purchaser
c) Notwithstanding the pre-repair tests and inspections prescribed in clause 3(a) amp 3(b) above the module and accessories on receipt in the BSNL s premises will also be tested during and after installation before take over and if any equipment or part thereof is found defective the same shall be replaced free of all cost to the BSNL BHUJ
d) If any module or any part thereof before it is taken over under clause 3(e) below is found defective or fails to fulfill the requirements of the contract the inspector shall give the Contractor notice setting forth details of such defects or failure and the Contractor shall make the defective module good or alter the same to make it comply with the requirements of the contract forthwith and in any case within a period not exceeding one month of the initial report The replacements shall be made by the Contractor free of all charges at site should it fail to do so within this time the BSNL BHUJ reserves the discretion to reject and replace at the cost of the Contractor the whole or any portion of the module as the case may be which is defective or fails to fulfill the requirements of the contract The cost of any such replacement made by the BSNL BHUJ shall be deducted from the amount payable to the Contractor
Seal amp Signature of Bidder
13
e) When the performance tests called for have been successfully carried out the inspector ultimate
Consignee will forthwith issue a Taking Over Certificate The inspectorultimate consignee shall not delay the issue of any Taking Over Certificate ldquo contemplated by this clause on account of minor defects in the module which do not materially affect the commercial use thereof provided that the Contractor shall undertake to make good the same in a time period not exceeding two months The taking Over Certificate shall be issued by the ultimate consignee within six weeks of successful completion of tests
f) After performance test carried out by the concerned SDE of BSNL as per prescribed schedule and repaired modules are found ok in all respect than the repaired modules will be accepted
g) A register is to be maintained at each placelocation mentioning the details of Modules date of Collection and Delivery of Faulty repaired modules replacement of spares amp remark if any and it is to be signed by the controlling officer amp Service engineer
h) Nothing in clause 3 shall in any way release the Contractor from any Warranty or other obligations under this contract
4 SPARES - All the spare of good quality required for repair of modules of SMPS PP are to be supplied by the contractor including major components
5 The contractor shall be responsible for any loss or damages caused to man or machinespartsinstruments during the execution of work and shall replace with an identical new item at his own cost The authorized officerperson of BSNL will have the liberty to check the material and work etchellip provided by the contractor
6 Governing Conditions for RNP (Repair Not Possible) Cases
A module Control panel may be declared RNP only if cost of material to be replaced exceeds five times of approved rate of repair In no case labour cost involved will be considered for deciding RNP A detailed report is to be submitted by contractor to concerned officer in-charge and final decision in this regard will be taken by concerned DGM subjected to maximum permissible RNP as given below
a)25-A module Maximum 10 of total quantity ordered for repair
b) 50-A 100-A Module Maximum 5 of total quantity ordered for repair
c) Control Panel Maximum 10 of total quantity ordered for repair
In case of RNP exceeding permissible limits penalty will be imposed as per para 11 (d) of section-5 (Part-A)
7 WARRANTY - a) Repaired modules are warranted for 3 months from the date of successfully taken over During this
time the contractor has to rectify the module free of cost The contractor shall warrant that repaired module shall be free from all defects and faults in materials used workmanship It becomes necessary for the contractor to replace or renew any defective portion(s) of the module under this clause
b) Replacement under warranty clause shall be made by the contractor free of all charges at site including freight insurance and other incidental charges
c) If any defect is not remedied by the contractor within a reasonable time the BSNL BHUJ may proceed to get the defects remedied from other contractor etc at the contractors risk and expenses but without prejudice to any other rights which the BSNL BHUJ may have against the contractor in respect of such defects
Seal amp Signature of Bidder
14
SECTION- 4 (Part-A)
GENERAL INSTRUCTION TO BIDDERS (GIB)
1 DEFINITIONS
1 BSNL The BSNL means the BSNL Bhuj Telecom Dist under the Ministry of
Communications which invites the tenders on behalf of the General Manager Bhuj Telecom
District Includes executives in the BSNL whatever designations assigned to them from time
to time who may be the in-charge of direction supervision testing acceptance and
maintenance including their successor(s) in the office appearing in various clauses shall be
taken to mean the BSNL Bhuj Telecom District
b The SSA Head means the Head of SSA General Manager Bhuj Telecom District Bhuj and
his successors
c The jurisdiction of the SSA Head The jurisdiction of the SSA Head means Bhuj Telecom
District which coincides geographically with (Revenue District(s))
d Representative of (the SSA Head) Representative of (the SSA Head ) means Officer and
staff for the time being in Bhuj Telecom District deputed by the General Manager Bhuj for
inspecting or supervising the work of testing etc
e Engineer ndash in - charge The Engineer ndash in - charge means the Engineering Officer
nominated by the BSNL to supervise the work under the contract (Minimum Divisional
Engineer level Officer)
f Site Engineer Site Engineer shall mean an SDESDOJTO of the BSNL who may be placed by
the General Manager Bhuj Telecom District Bhuj as in ndash charge of the work at site at any
particular period of time
g AT Unit AT Unit shall mean Acceptance and Testing unit of the BSNL
h AT Officer An officer authorized by General Manger ndash Bhuj Telecom Dist
i Contract The term contract means the documents forming the tender and acceptance
thereof and the formal agreement executed between the competent authority on behalf of the
BSNL and the contractor together with the documents referred to therein including these
conditions the specifications designs drawings and instructions issued from time to time by
the engineer in ndash charge and all these documents taken together shall be deemed to form one
contract and shall be complementary to one another In the contract the following expressions
shall unless the context otherwise requires have the meanings hereby respectively assigned to
them The expression works or work shall unless there be something either in the subject
context repugnant to such construction be construed or taken to mean the works by or by
virtue of the contract contracted to be executed whether temporary or permanent and whether
original altered substituted or additional
j Contractor The contractor shall mean the individual firm or company enlisted or not
enlisted with BSNL Department of Telecom in accordance with procedure for contractor or
registered for carrying out the work of cable laying whether incorporated or not undertaking
the works and shall include the legal personal representative of such individual or the persons
composing such firm or company or the successors of such firm or company and the
permitted assignees of such individual firm or company
k Work The expression lsquoworksrsquo shall unless there be something either in the subject or context
repugnant to such construction be construct and taken to mean the works by or by virtue of the
Seal amp Signature of Bidder
15
contract contracted to be executed whether temporary or permanent and whether original
altered substituted or additional
l Schedule(s) Schedule(s) referred to in these conditions shall mean the relevant schedule(s)
or the standard schedule of rates mentioned in the document
m Site The site shall mean the land or other places on into or through which work is to be
executed under the contract or any adjacent land path or street through which the work is to
be exacted under the contract or any adjacent land path or street which may be allotted or
used for the purpose of carrying out the contract
n Normal time or stipulated time Normal time or stipulated time means time specified in the
ERP PO to complete the work
o Extension of Time Extension of Time means the time granted by the BSNL to complete the
work beyond the normal time or stipulated time
p Exceptional risk Exceptional risks are risk due to war(whether declared or not) invasion act
of foreign enemies hostilities civil war rebellion revolution insurrection military or
usurped power any acts of Government damages from aircraft acts of God such as
earthquake lightening and unprecedented floods and other causes over which the contractor
has no control and the same having been accepted as such by the Accepting Authority or
causes solely due to use or occupation by the government of the part of the work in respect of
which a certificate of completion has been issued
q The ERP PO means the Order placed by the field units on the contractor signed by
the unit incharge r The Contract Rate means the rate payable to the repairer under the work order for
the full and proper performance of its contractual obligations
2 ELIGIBLE BIDDERS Kindly refer to clause 4 of Section ndash 1 Part A ie Detailed NIT
3 COST OF BIDDING
The bidder shall bear all costs associated with the preparation and submission of the bid The
BSNL will in no case be responsible or liable for these costs regardless of the conduct or
outcome of the bidding process
4 BID DOCUMENTS
41 The goods services required to be supplied bidding procedures and contract terms are prescribed
in the Bid Documents The contents of the Bid documents are specified in the covering letter
42 The Bidder is expected to examine all instructions forms terms and specifications in the Bid
Documents Failure to furnish all information required as per the Bid Documents or submission
of bids not substantially responsive to the Bid Documents in every respect will be at the bidders
risk and may result in rejection of the bid
5 CLARIFICATION OF BID DOCUMENTS
51 A prospective bidder requiring any clarification on the Bid Documents shall notify the User in
writing by FAX or by Email of the User as indicated in the invitation of Bid The User shall
respond in writing to any request for the clarification of the Bid Documents which it receives
7days prior to the date of opening of the Tenders Copies of the query (without identifying the
source) and clarifications by the User shall be uploaded on BSNL website as lsquoClarificationsrsquo on
e-procurement portal of Bhuj Telecom District portal clarification shall be available as
lsquoAddendumrsquo for all the prospective bidders who have downloaded the official copy of tender
documents from e-procurement portal of Bhuj Telecom District
Seal amp Signature of Bidder
16
52 Any clarification issued by BSNL in response to query raised by prospective bidders shall form
an integral part of bid documents and it may amount to an amendment of relevant clauses of the
bid documents
6 AMENDMENT OF BID DOCUMENTS
61 The BSNL may for any reason whether at its own initiative or in response to a clarification
requested by a prospective Bidder may modify bid documents by amendments prior to the date
of submission of Bids with due notification to prospective Bidders
62 The amendments shall be notified in writing or by Fax or by Addendum through e-tendering
portal to all prospective bidders on the address intimated at the time of purchase of bid document
from the BSNL and these amendments will be binding on them
63 In order to afford prospective bidders reasonable time in which to take the amendments into
account in preparing their bids the BSNL may at its discretion extend the deadline for the
submission of bids suitably
7 DOCUMENTS COMPRISING THE BID
The bid prepared by the bidder shall comprise the components specified in Section 2 of this
Tender
8 BID FORM
The bidder shall complete the Bid Form and the appropriate Price Schedule furnished in the Bid
Documents as per Section- 8
9 BID PRICES
91 The bidder shall give the total composite price inclusive of all levies and taxes packing
forwarding freight and insurance in case of materials to be supplied and inclusive of all taxes
and levies except GST in case of works to be executed GST will be paid extra as applicable
The contractor shall be responsible for transporting the materials to be supplied by the BSNL
(At the field Unit Telecom Store or otherwise) to execute the work under the contract to site at
histheir own cost The costs of transportation are subsumed in the standard Schedule Rates and
therefore no separate charges are payable on this account The offer shall be firm in Indian
Rupees
92 The price quoted by the bidder shall remain fixed during the entire period of contract and shall
not be subject to variation on any account A bid submitted with an adjustable price quotation
will be treated as non-responsive and rejected
93 Discount if any offered by the bidders shall not be considered unless they are specifically
indicated in the schedule of rates (financial Bid) Bidders desiring to offer discount shall
therefore modify their offers suitable while quoting and shall quote clearly net price taking all
such factors like Discount free supply etc into account
10 DOCUMENTS ESTABLISHING BIDDERS ELIGIBILITY AND QUALIFICATIONS Kindly refer to clause of Section ndash 1 and 2 of this bid
11 NA
12 BID SECURITYEMD
121 The bidder shall furnish as part of its bid a bid security one of the following ways-
(a) Demand Draft Bankerrsquos cheque from a Nationalizedscheduled bank drawn in favour
of AO (Cash) BSNL Oo GMTD Bhuj and payable at Bhuj
(b) Bank GuaranteeFDR from a Nationalizedscheduled bank drawn in favour of AO
(Cash) BSNL Oo GMTD Bhuj which should be valid for 180 days from the tender
opening date
For educational order EMD to be submitted by bidder as 20 of 10 of estimated tender
cost for each case in the form of cash Demand Draft Bankerrsquos cheque Bank guaranteeFDR
issued by a NationalizedScheduled bank drawn in favour of AO (Cash) BSNL Oo GMTD
Bhuj Bank Guarantee should be valid for 180 days from the tender opening date
122 The MSE bidders are exempted from payment of bid security
Seal amp Signature of Bidder
17
a) A proof regarding valid registration with body specified by Ministry of Micro Small
amp Medium Enterprise for the tendered items will have to be attached along with the
bid
b) The enlistment certificate issued by MSME should be valid on the date of opening of
tender
c) MSE unit is required to submit its monthly delivery schedule
d) If a vender registered with body specified by Ministry of Micro Small amp Medium
Enterprise claiming concessional benefits is awarded work by BSNL and
subsequently fails to obey any of the contractual obligations he will be debarred from
any further work contract by BSNL for one year from the date of issue of such order
123 The bid security is required to protect the BSNL against the risk of bidders conduct which would
warrant the bid securityrsquos forfeiture pursuant to para 127
124 A bid not secured in accordance with para 121 amp 122 shall be rejected by the BSNL being non-
responsive at the bid opening stage and archived unopened on e-tender portal for e-tenders
125 The bid security of the unsuccessful bidder will be dischargedreturned as promptly as possible
as but not later than 30 days after the expiry of the period of bid validity prescribed by the
BSNL pursuant to clause 13
126 The successful bidders bid security will be discharged upon the bidders acceptance of the
advance Purchase Order satisfactorily pursuant to clause 27 and furnishing the performance
security
The successful bidders bid security may be converted to Part Performance Security Deposit in
accordance with clause 28
127 The bid security may be forfeited
a) If the bidder withdraws or amends its bid or impairs or derogates from the bid in any
respect during the period of bid validity specified by the bidder in the bid form or
extended subsequently or
b) If the bidder does not accept the APO AWO and or does not submit PBG amp sign the
contract agreement in accordance with clause 28
Note - The bidder shall mean individual company firm or the front bidder and its technology
consortium partner as applicable
13 PERIOD OF VALIDITY OF BIDS
131 Bid shall remain valid for 150 days from the date of bid opening prescribed by the BSNL A bid
valid for a shorter period shall be rejected by the BSNL as non-responsive
132 In exceptional circumstances the BSNL may request the bidders consent for an extension to the
period of bid validity The request and the responses thereto shall be made in writing The bid
security provided under Clause 12 shall also be suitably extended A bidder may refuse the
request without forfeiting his bid security A bidder accepting the request and granting extension
will not be permitted to modify his bid
14 FORMAT AND SIGNING OF BID
141 The bidder shall submit his bid online (in case of e-tendering) amp through sealed envelopes
physically (in case of tenders with manual bidding process) complying all eligibility
conditions other terms and conditions of tender document to be read along with the
clarifications and amendments issued in this respect All the documents must be authenticated
using Digital Signature (DSC) with Class 2 or above (in case of e-tendering) amp by hand
signatures (for manual bidding process) by the authorized person The letter of authorization
shall be indicated by written power-of-attorney accompanying the bid
Note-The BSNL may ask the bidder(s) to supply besides original bid additional copy of bids as
required by him
142 The bid shall contain no interlineations erasures or overwriting except as necessary to correct
errors made by the bidder in which case such corrections shall be signed by the person or persons
signing the bid All pages of the original bid except for un-amended printed literatures shall be
digitally signed by the person or persons signing the bid
143 Power of Attorney
(a) The power of Attorney should be submitted and executed on the non-judicial stamp paper
Seal amp Signature of Bidder
18
of appropriate value as prevailing in the concerned states(s) and the same be attested by a
Notary public or registered before Sub-registrar of the state(s) concerned
(b) The power of Attorney be executed by a person who has been authorized by the Board of
Directors of the bidder in this regard on behalf of the Company institution Body
corporate
(c) In case of the bidder being a firm the said Power of Attorney should be executed by all the
partner(s) in favour of the said Attorney
(d) Attestation of the specimen signatures of authorized signatory by the Companyrsquos firmrsquos
bankers shall be furnished Name designation Phone number mobile number email
address and postal address of the authorized signatory shall be provided
(e) Individual signing the tenders or other documents connected with the contract shall indicate
the full name below the signature and must specify the capacity and authority under which
he signs such documents and shall also submit documentary evidence of his authority in
the form of Power of Attorney
(f) The Power of Attorney is to be submitted in original if it has been issued for the specific
tender enquiry If the power of attorney is issued in general irrespective of tender enquiry
then photocopy duly certified by notary public can also be accepted
(g) In case the representative of bidder company who uploads the document on e-tender portal
using his Digital Signature Certificates (DSC) which is different from the authorized
signatory for the bid (Power of Attorney holder) then the representative who uploads the
documents on e-tender portal using DSC issued in his name shall also be one of the Power
of Attorney holder by the bidder Company in addition to the authorized signatory for the
bid
15 SEALING AND MARKING OF BIDS
The bid shall be submitted online using single stage bidding and Two Envelope Methodology
151 The first envelope (Techno-commercial bid) This envelope shall contain documents of
bidders satisfying the eligibility Technical amp commercial conditions requirements Second
envelope will be named as financial bid containing price Schedule as per section 8 All
documents submitted will also be self attested by the bidder
152 a) The envelopes for Tender Fee EMD shall be addressed AGM (PLG) Oo GMTD
Haripar Road Bhuj - 370001
b) The envelope for Tender Fee EMD shall bear the name of the tender the tender number
and the words DO NOT OPEN BEFORE (due date amp time)
c) The envelopes for Tender Fee EMD shall indicate the name and complete postal address
of the bidder to enable the User to return the bid unopened in case it is declared to be received
late
d) The envelopes for Tender Fee EMD shall should be deposited in the tender box provided
by tendering authority or sent by registered post or delivered in person on above mentioned
address (address is given above) The responsibility for ensuring that the envelopes for Tender
Fee EMD shall are delivered in time would vest with the bidder
e) The envelopes for Tender Fee EMD shall delivered in person registered post on the day of
tender opening shall be delivered upto specified time amp date as stated in NIT to Oo GMTD
Haripar Road Bhuj - 370001 The User shall not be responsible if the envelopes for Tender
Fee EMD shall are delivered elsewhere
f) Venue of Tender Opening
Tender will be opened in Oo GMTD Haripar Road Bhuj - 370001 at specified time amp
date as stated in NIT If due to administrative reason the venue of Bid opening is changed it
will be displayed prominently on the above address
Seal amp Signature of Bidder
19
153 If envelopes are not sealed and marked as required at para 151 and 152 the bid shall be
rejected
16 SUBMISSION OF BIDS
161 Bids must be submitted by the bidders on or before the specified date amp time indicated in
Section-1 ie DNIT
162 The BSNL may at its discretion extend this deadline for the submission of the bids by
amending the bid documents in accordance with Clause 6 in which case all rights and
obligations of the BSNL and bidders previously subject to the deadline will thereafter be
subject to the deadline as extended
163 The bidder shall submit his bid offer against a set of bid documents purchased by him for all
or some systemservices equipment as per requirement of the Bid Documents He may
include alternate offer if permissible as per the bid However not more than one independent
and complete offer shall be permitted from the bidder
164 Bid must be submitted by the bidder through E-Tendering mode only Manual submission of bid
shall not be needed
17 LATE BIDS
No bid shall be accepted either online by E-Tender Portal or physically in case of manual
bidding process after the specified deadline for submission of bids prescribed by the purchaser
18 MODIFICATION AND WITHDRAWAL OF BIDS
181 The bidder may modify revise or withdraw his bid after submission prior to deadline prescribed
for submission of bid If a bid is withdrawn the same shall be archived unopened in the e-
procurement portal of Bhuj Telecom District
182 The bidderrsquos modification revision or withdrawal shall have to be online and digitally
authenticated as per clause 15
183 Subject to clause 20 no bid shall be modified subsequent to the deadline for submission of bids
19 OPENING OF BIDS BY BSNL
191 The purchaser shall open bids online in the presence of bidders or their authorized representatives
who chose to attend at time specified in Clause 7 of Detailed NIT(Section-1) on due date The
bidderrsquos representatives who are present shall sign in an attendance register Authority letter to
this effect shall be submitted by the bidders before they are allowed to participate in bid opening
(As per Format given in section 2 Part B)
192 A maximum of two representatives for any bidder shall be authorized and permitted to attend
the bid opening
193 (i) The bids will be opened in two stages ie techno-commercial bid shall be opened on the date
of tender opening given in NIT The financial bid will not be opened on the date of opening of
techno commercial bids
The financial bids of those bidders who are approved to be techno commercially compliant by
the competent authority will be opened by TOC in front of techno-commercially eligible
bidders authorized representatives by sending them a suitable notice
(ii) The bidderrsquos names Item name EMD amount amp validity and acceptability Information in
respect of eligible bidders Details of bid modification withdrawal (if any) and such other
details as the purchaser at its discretion may consider appropriate will be made available
online at the time of techno-commercial bid opening
(iii) The bidderrsquos names Name of the Items Quantitiesprices quoted in the bid discount if
offered Taxes amp levies and such other details as the purchaser at its discretion may consider
appropriate will be made available online at the time of financial bid opening
194 The date fixed for opening of bids if subsequently declared as holiday by the BSNL the revised
date of schedule will be notified However in absence of such notification the bids will be
opened in the next working day time and venue remaining unaltered
20 CLARIFICATION OF BIDS
201 To assist in the examination evaluation and comparison of bids the BSNL may at its discretion
Seal amp Signature of Bidder
20
ask the bidder for the clarification of its bid The request for the clarification and the response
shall be in writing However no post bid clarification at the initiative of the bidder shall be
entertained
202 If any of the documents required to be submitted along with the technical bid is found wanting
the offer is liable to be rejected at that stage However the BSNL at its discretion may call for
any clarification regarding the bid document within a stipulated time period The BSNL at itrsquos
discretion may also ask for the submission of any additionalmissing document(s) within a
stipulated time period In such case(s) the bidder shall have to comply the BSNLrsquos requirement
within the specified time In case of non-compliance to such queries the bid will be out rightly
rejected without entertaining further correspondence in this regardrdquo However no post bid
clarification at the initiative of the bidder shall be entertained
21 PRELIMINARY EVALUATION
211 BSNL shall evaluate the bids to determine whether they are complete whether any
computational errors have been made whether required sureties have been furnished whether
the documents have been properly signed and whether the bids are generally in order
212 Arithmetical errors shall be rectified on the following basis If there is a discrepancy between
the unit price and total price that is obtained by multiplying the unit price and quantity the
unit price shall prevail and the total price shall be corrected by the BSNL
213 If there is a discrepancy between words and figures the amount in words shall prevail If the
SupplierBidder does not accept the correction of the errors his bid shall be rejected
214 Prior to the detailed evaluation pursuant to clause 22 the BSNL will determine the substantial
responsiveness of each bid to the Bid documents For purposes of these clauses a substantially
responsive bid is one which conforms to all the terms and conditions of the Bid Documents
without material deviations The BSNLs determination of bids responsiveness is to be based
on the contents of the bid itself without recourse to extrinsic evidence
215 A bid determined as substantially non-responsive will be rejected by the BSNL and shall not
subsequent to the bid opening be made responsive by the bidder by correction of the non-
conformity
216 The BSNL may waive any minor infirmity or non-conformity or irregularity in a bid which
does not constitute a material deviation provided such waiver does not prejudice or affect the
relative ranking of any bidder
22 EVALUATION AND COMPARISON OF SUBSTANTIALLY RESPONSIVE BIDS
221 The Purchaser shall evaluate in detail and compare the bids previously determined to be
substantially responsive pursuant to Clause 21
222 The evaluation will be made on the basis of lowest rate quoted as under Lowest Rate
= (rate quoted for 25AMP Qty +rate quoted for 50AMP 100 AMP Qty + rate
quoted for Control Panel of Power Plant Qty) The bidder who has offered lowest
rate as evaluated above will be treated as L1 bidder 23 CONTACTING THE BSNL
231 Subject to Clause 20 no bidder shall try to influence the BSNL on any matter relating
to its bid from the time of the bid opening till the time the contract is awarded
232 Any effort by a bidder to modify its bid or influence the BSNL in the BSNLs bid evaluation
bid comparison or contract award decisions shall result in the rejection of the bid
24 PLACEMENT OF ORDER
241 The BSNL may consider placement of orders to execute the contract on those bidders whose
offers have been found technically commercially and financially acceptable The BSNL reserves
the right to counter offer price(s) against price(s) quoted by any bidder
The work against the tender is for one yearrsquos requirement and the terms and conditions of
this tender shall be operative for a period of one year from the date of signing of agreement
between the Company and the contractor with an option of extension for a further period
of one year at the same rates terms amp conditions
Seal amp Signature of Bidder
21
Distribution of Work Distribution of quantities for ordering to the selected bidders of a tender
Table 1(A) (Without provisions for MSE Units)
No of Bidders
to be approved
(Col 1)
Quantity allotted to the respective bidder
(Col 2)
L1 L2
One Bidder 100 Nil
Two Bidder 60 40
Table 1(B) (With provisions for MSME Units)
No of Bidders
to be approved
(Col 1)
Quantity allotted to the respective bidder (Col 2)
Qty
Earmarked for MSME
bidder(s)(Col 3)
L1 L2
One Bidder 80 Nil 20
Two Bidder 48 32 20
1) In case L2 and MSE bidder accepts the L1 rate in prescribed time amp do not submit MSD as per
tender terms and conditions the EMD will be forfeited If MSE bidder exceeded more than one than
20 work at L1 rate distributed among them
242 TERMS AND CONDITIONS FOR EDUCATIONAL ORDER
(a) 10 of the estimated quantity of work will be extended to inexperienced contractor for each
Tender
(b) Inexperienced Bidder has to apply separately for each Tender
(c) In case there are more than one bidder work will be distributed into the bidders
(d) The bidder shall not submit financial bid In case if the same is submitted then it will not be opened
(e) BSNL reserves a right to give any area to this bidder including that of other tender in which the
bidder has not participated
(f) The work to the inexperienced is a limited quantity (up to 10) in at a time further work will be
done on the basis of evaluation of field unit Additional quantity of work shall be given to such
contractor only after completion of initial work
(g) The payment for repairing to such contractors shall be based on L1 rates finalized in the tender
The payment will be released only after verification of quantity amp quality done as per the
instruction mentioned in respect of work in the tender
(h) All the other Terms amp conditions will remain the same
25 BSNLS RIGHT TO VARY QUANTITIES AT TIME OF AWARD
(a) BSNL reserves the right to vary up to 25 of the quantity of goods and services specified in
the schedule of requirements without any change in the unit price or other terms and conditions at
the time of award of contract
(b) BSNL also reserves the right for placement of additional order or up to 50 of the
additional quantities of goods and services contained in the running tender contract in the tender
at the same rate or a rate negotiated (downwardly) with the existing venders considering the
reasonability of rates based on prevailing market conditions and the impact of reduction in duties
and taxes etc and supplies to be obtained within delivery period scheduled afresh
No guarantee can be given to actual quantity The quantity mentioned in the tender is
tentative only No claim should entertained for less not allotting the quantum of work for any
reason
(c) In exceptional situation where the requirement is of an emergent nature and it is necessary to
ensure continued supplies from the existing venders the purchaser reserves the right to place
repeat order up to 100 of the quantities of goods and services contained in the running tender
contract at the same rate or a rate negotiated (downwardly) with the existing venders considering
the reasonability of rates based on prevailing market conditions and the impact of reduction in
duties and taxes etc Exceptional situation and emergent nature should be spelt out clearly
detailing the justification as well as benefits accrued out of it and loss incurred in case this
provision is not invoked and approved by the authority competent to accord administrative and
Seal amp Signature of Bidder
22
financial approval for the procurement calculated on the basis of total procurement ie initial and
proposed add-on quantity
26 BSNLS RIGHT TO ACCEPT ANY BID AND TO REJECT ANY OR ALL BIDS
The BSNL reserves the right to accept or reject any bid and to annul the bidding process and
reject all bids at any time prior to award of contract without assigning any reason whatsoever and
without thereby incurring any liability to the affected bidder or bidders on the grounds for the
BSNLs action
27 ISSUE OF ADVANCE WORK ORDER
271 The issue of an Advance Work Order (Letter of Intent) shall constitute the intention of BSNL to
enter into the contract with the bidder
272 The bidder shall within 14 days of issue of an advance work order give his acceptance along with
Performance Security Deposit in conformity with section 7(B) provided with the bid documents
28 SIGNING OF CONTRACT
281 The issue of FAT shall constitute the award of contract on the bidder
282 As soon as the tender is approved by the competent authority the Bid Security deposited by the
successful bidder may be converted into the Performance security deposit which will be held by
the BSNL till the completion of warranty period
29 ANNULMENT OF AWARD
Failure of the successful bidder to comply with the requirement of Clause 27 amp 28 shall
constitute sufficient ground for the annulment of the award and forfeiture of the bid security in
which event the BSNL may make the award to any other bidder at the discretion of BSNL or call
for new bids
30 NA
31 REJECTION OF BIDS
311 While all the conditions specified in the Bid documents are critical and are to be complied special
attention of bidder is invited to the following clauses of the bid documents Non-compliance of any
one of which shall result in outright rejection of the bid
(i) Clause 15 of Section 4 Part A The bids will be recorded returned unopened if covers are not
properly sealed with lsquoPERSONAL SEALrsquo of the bidder
(ii) Clauses 121 122 amp 131 of Section 4 Part A The bids will be rejected at opening stage if Bid
security is not submitted as per Clauses 121 amp 122 and bid validity is less than the period
prescribed in Clause 131 mentioned above
(iii) Clause 2 amp 10 of Section 4 Part A If the eligibility condition as per clause 2 of Section 4 Part
A is not met andor documents prescribed to establish the eligibility as per Clause 10 of
section 4 Part A are not enclosed the bids will be rejected without further evaluation
(iv) Clause 112 of Section 4 Part A NA
(v) Section 5 Part A Commercial conditions Section 5 Part B Special Conditions of Contract
Compliance if given using ambiguous words like ldquoNotedrdquo ldquoUnderstoodrdquo ldquoNoted amp
Understoodrdquo shall not be accepted as complied Mere ldquoCompliedrdquo will also be not sufficient
reference to the enclosed documents showing compliances must be given
(vi) Section 8 Price Schedule Prices are not filled in as prescribed in Financial Bid
(vii) Section 4 Part A clause 93 on discount which is reproduced below
ldquoDiscount if any offered by the bidder shall not be considered unless specifically indicated in
the price schedule Bidders desiring to offer discount shall therefore modify their offer
suitably while quoting and shall quote clearly net price taking all such factors like discount
free supply etc into accountrdquo
312 Before outright rejection of the Bid by Bid-opening team for non-compliance of any of the
provisions mentioned in clause 311(i) 311 (ii) above the bidder company is given
opportunity to explain their position however if the person representing the company is not
satisfied with the decision of the Bid opening team hethey can submit the representation to
Bid opening team immediately but in no case after closing of the tender process with full
justification quoting specifically the violation of tender conditions if any
Seal amp Signature of Bidder
23
313 Bid opening team will not return the bids submitted by the bidders on the date of tender
opening even if it is liable for rejection and will preserve the bids in sealed cover as submitted
by taking signatures of some of the desirous representatives of the participating
biddercompanies present on the occasion
314 The In charge of the Bid opening team will mention the number of bids with name of
company found unsuitable for further processing on the date of tender opening and number of
representations received in Bid opening Minutes and if Bid opening team is satisfied with the
arguments of the biddercompany mentioned in their representation and feel that there is
prima-facie fact for consideration the in charge of the Bid opening team will submit the case
for review to competent authority ie GMTD BHUJ as early as possible preferably on next
working day and decision to this effect should be communicated to the bidder company within
a week positively Bids found liable for rejection and kept preserved on the date of tender
opening will be returned to the bidders after issue of POfinal acceptance of tender against
the instant tender
315 If the reviewing officer finds it fit to open the bid of the petitioner this should be done by
giving three (working) days notice to all the participating bidders to give opportunity to
desirous participants to be present on the occasion
32 ACTION BY PURCHASER AGAINST BIDDER(S) VENDOR(S) IN CASE OF
DEFAULT In case of default by Bidder(s) Vendor(s) such as
a) Does not supply the equipment services in time
b) Equipment Services does not perform satisfactory in the field in accordance with the
specifications
c) Or any other default whose complete list is enclosed in Appendix-1
Purchaser will take action as specified in Appendix-1 of this section
33 DELETED
34 NEAR-RELATIONSHIP CERTIFICATE
341 The bidder should give a certificate that none of his her near relative as defined below is
working in the units where he is going to apply for the tender In case of proprietorship firm
certificate will be given by the proprietor For partnership firm certificate will be given by all
the partners and in case of limited company by all the Directors of the company excluding
Government of India Financial institution nominees and independent non-Official part time
Directors appointed by Govt of India or the Governor of the state and full time Directors of
PSUs both state and central Due to any breach of these conditions by the company or firm or
any other person the tender will be cancelled and Bid Security will be forfeited at any stage
whenever it is noticed and BSNL will not pay any damage to the company or firm or the
concerned person
342 The Company or firm or the person will also be debarred for further participation in the
concerned unit
343 The near relatives for this purpose are defined as-
(a) Members of a Hindu undivided family
(b) They are husband and wife
(c) The one is related to the other in the manner as father mother son(s) amp Sons
wife(daughter in law) Daughter(s) and daughters husband (son in law) brother(s) and
brothers wife sister(s) and sisters husband (brother in law)
344 The format of the certificate is given in Section -2(D)
35 VERIFICATION OF DOCUMENTS AND CERTIFICATES
The bidder will ensure that all the documents and certificates including experience
performance and self certificates submitted by him are correct and genuine before enclosing
them in the bid The onus of proving genuineness of the submitted documents would rest with
the bidder If any document paper certificate submitted by the participant bidder is found
discovered to be false fabricated tempered manipulated either during bid evaluation or
during award of contract or thereafter then the Purchaser will take action as per Clause-1 of
Appendix-1 of this section
Seal amp Signature of Bidder
24
Appendix-1 to Section - 4 (Part-A)
S
No
Defaults of the bidder vendor Action to be taken
A B C
1(a) Submitting fake forged
i) Rejection of tender bid of respective Vendor
ii) Banning of business for 3 years which implies barring
further dealing with the vendor for procurement of Goods amp
Services including participation in future tenders invited by
BSNL for 3 years from date of issue of banning order
iii) Termination Short Closure of POWO if issued This
implies non-acceptance of further supplies work amp services
except to make the already received material work complete
work in hand
a) Bank Instruments with the bid to meet
terms amp condition of tender in respect of
tender fee and or EMD
b) Certificate for claiming exemption in
respect of tender fee and or EMD
c) detection of default at any stage from
receipt of bids till award of APO issue of
POWO
Note 1- However in this case the performance guarantee if alright will not be forfeited
Note 2- Payment for already received supplies completed work shall be made as per terms amp conditions of
PO WO
1(b)
Submitting fake forged documents towards
meeting eligibility criteria such as
experience capability supply proof
registration with GST Income Tax
departments etc and as supporting
documents towards other terms amp conditions
with the bid to meet terms amp condition of
tender
(i) If detection of default is prior to award
of APO
i) Rejection of Bid amp
ii) Forfeiture of EMD
(ii) If detection of default after issue of APO
but before receipt of PG SD (DDBG etc)
i) Cancellation of APO
ii) Rejection of Bid amp
iii) Forfeiture of EMD
(iii) If detection of default after receipt of
PG SD (DDBG etc)
i) Cancellation of APO
ii) Rejection of Bid amp
iii) Forfeiture of PG SD
However on realization of PG SD amount EMD if not
already released shall be returned
(iv) If detection of default after issue of PO
WO
i) Termination Short Closure of POWO and Cancellation
of APO
ii) Rejection of Bid amp
iii) Forfeiture of PG SD
However on realization of PG SD amount EMD if not
released shall be returned
Note 3- However settle bills for the material received in correct quantity and quality if pending items do
not affect working or use of supplied items
Note 4- No further supplies are to be accepted except that required to make the already supplied items
work
Special Note 1- Authority competent to take final decision GMTD Bhuj
2 If vendor or his representative uses violent
coercive means viz Physical Verbal means
to threatens BSNL Executive employees
and or obstruct him from functioning in
discharge of his duties amp responsibilities for
the following
Banning of business for 3 years which implies Barring
further dealing with the vendor for procurement of Goods amp
Services including participation in future tenders invited by
BSNL for 3 years from date of issue of banning order
a) Obstructing functioning of tender opening
executives of BSNL in receipt opening of
tender bids from prospective Bidders
suppliers Contractors
Seal amp Signature of Bidder
25
b) Obstructing Threatening other
prospective bidders ie suppliers
Contractors from entering the tender venue
and or submitting their tender bid freely
Special Note 1- Authority competent to take final decision GMTD Bhuj
3 Non-receipt of acceptance of APO AWO
and SD PG by L-1 bidder within time
period specified in APO AWO
Forfeiture of EMD
Special Note 1- Authority competent to take final decision GMTD Bhuj
41 Failure to supply and or Commission the
equipment and or execution of the work at
all even in extended delivery schedules if
granted against PO WO
i) Termination of PO WO
ii) Under take purchase work at the risk amp cost of
defaulting vendor
iii) Recover the excess charges if incurred from the PG SD
and outstanding bills of the defaulting Vendor
42 Failure to supply and or Commission the
equipment and or execution of the Work in
full even in extended delivery schedules if
granted against PO WO
i) Short Closure of PO WO to the quantity already
received by and or commissioned in BSNL and or in
pipeline provided the same is usable andor the Vendor
promises to make it usable
ii) Under take purchase work for balance quantity at the
risk amp cost of defaulting vendor
iii) Recover the excess charges if incurred from the PG SD
and outstanding bills of the defaulting Vendor
Special Note 1- Authority competent to take final decision for 41 amp 42 by DGM concerned
51 The supplied equipment does not perform
satisfactory in the field in accordance with
the specifications mentioned in the PO
WOContract
i) If the material is not at all acceptable then return the non-
acceptable material (or its part) amp recover its cost if paid
from the os bills PG SD
OR
ii) If the material is inducted in network amp it is not possible
to return it and or material is acceptable with degraded
performance the purchaser may determine the price for
need to be issued in compliant format and timely within the time prescribed under GST law
163 In case of any deficientincompleterejected supply BSNL shall convey the same in a reasonable
time to enable the supplier to issue credit note and take tax adjustment
164 It would be the responsibility of the supplier to declare correct information on invoice and GSTN
viz the amount the place of supply rate of tax etc In case the eligibility of input tax credit is
questioned or denied to BSNL on account of default by the supplier the same would be
recovered by BSNL from the contractor
165 Registered location of the both the parties ie BSNL and contractor should be mentioned in the
agreement with GSTIN No Further supplier should raise invoices at the registered premise of
BSNL for availing of credit and ensure that the place of supply as per GST law is same as
registered premise
166 BSNL could at any time instruct the contractor to raise its invoices at a particular location of
BSNL
Seal amp Signature of Bidder
39
167 It is the responsibility of the supplier to ensure that place of supply and the GSTN of BSNL are
in the same state If for any reason they are not in the same state the contractor shall intimate to
BSNL and give adequate time before raising of the invoice
168 E-waybill number should be mentioned on the invoices
169 contractor shall be responsible for timely issuance and delivery of invoice DN CN to enable
BSNL to claim tax benefit on or before the stipulated time period provided by the GST law
(a) It is the responsibility of the contractor to ensure that outward supply return (GSTR-1) would be
filed correctly If not than cost would be borne by supplier
(b) Reporting of correct outward supply by supplier in the outward return (GSTR-1) is the
responsibility of the supplier In case of mismatch because of contractorrsquos fault prompt
amendments must be made by the supplier else supplier would be required to indemnify BSNL
of the loss of credit due to mis-match The compliances to be adhered by contractor includes
(but is not limited to) the following
(i) Uploading appropriate invoice details on the GSTN within the stipulated time
(ii) Issuing GST compliant invoice CN DN PO issued by BSNL should be referred by
contractor for capturing information on the invoice
(iii) Contractor needs to pay the entire self-assessed tax on timely basis
(iv) Where invoice is not uploaded or incorrect upload of invoice detail of GSTN by supplier
then credit on such invoice will be given provisionally subject to matching So acceptance of
changes made by BSNL on GSTN on account of non-upload or incorrect upload of invoice
details on GSTN is to be submitted by supplier Such changes wrt the mismatch are required
to be accepted by supplier within the time limit prescribed under the GST law It should be
noted that in case supplier does not accept such changes within the time limit prescribed under
GST law the loss of input tax credit (if any) would be recovered from the supplier In case of
mismatch because of Suppliers fault prompt amendments must be made by the supplier else
supplier would be required to indemnify BSNL for the losses of credit and interest paid due to
mismatch
(v) contractor to issue all necessary documentation and perform all necessary compliances for
BSNL to be eligible to claim the input tax credit of GST tax to them In case BSNL is unable to
claim the input tax credit the amount wrt GST charged by the supplier would be recovered
from the supplier
1610 Refer) for clause stating that all the details of supplier (name address GSTN unregistered
supplier place of supply SAC HSN code etc) and other mandatory details shall be mentioned on the
invoice
1611Where the location agreed are more than one state then separate invoice state wise to claim
input tax credit in a particular state (typically happens in a bill to-ship to scenario) shall have to be
submitted
1612 It shall be the responsibility of the supplier to mention State of place of supply of goodsservices
in the invoice issued to BSNL
Seal amp Signature of Bidder
40
SECTION ndash 5 (Part-B)
SPECIAL CONDITIONS OF CONTRACT (SCC)
1 GENERAL
No official of Gazetted rank or other Gazetted officer employed in Engineering or administrative
duties in an Engineering BSNL or any other BSNL of the BSNL is allowed to work as a contractor for
a period of two years after his retirement from BSNL service without the previous permission of
BSNL This contract is liable to be cancelled if either the contractor or any of his employee is found at
any time to be such a person who hadnrsquot obtained the permission of BSNL as aforesaid before
submission of the engagement in the contractorrsquos service as the case may be
2 Material Handed over by The BSNL
21 The contractor shall transport (including loading and unloading) all stores issued to him from
Field Unit Telecom Store to the site of work at his own cost The BSNL shall not pay any
transportation charges to the contractor
22 All materials handed over to the contractor by the BSNL shall remain the absolute property of
BSNL and shall not be removed form site of the work except for use in the work and shall be at all
times open to inspection by the Representative of GMTD BHUJ
23 The contractor shall be responsible for the transportation of store storage and safe custody of all
material supplied to him by the BSNL which in the contractorrsquos custody whether or not installed in
the work The contractor shall satisfy himself regularly the quantity and quality of the materials
supplied to him and he will be responsible for any subsequent deterioration and discrepancy (inclusive
of theft) in the quantity quality the materials
3 LABOUR WELFARE MEASURES AND WORKMAN COMPENSATION
(AS APPLICABLE)
31 Obtaining License before commencement of work
The contractor shall obtain a valid labour license (if applicable) under the Contact Labour (RampA) Act
1919 and the Contract Labour (Regulation and Abolition) Central Rules 1971 before commencement
of the work and continue to have a valid license until the completion of work The contractor shall
also abide by the provisions of the Child Labour (Prohibition and Regulation) Act 1986 Any failure
to fulfill this requirement shall attract the penal provisions of this contract arising out of the resultant
non-execution of work
32 Contractors labour Regulations
321 Working Hours
3211 Normally working hours of an employee should not exceed 9 hours a day The working
day shall be so arranged the inclusive of interval for rest if any it shall not spread over
more than12 hours on any day
3212 When a worker is made to work for more than 9 hours on any day or for more than 48
hours in any week he shall be paid over time for the extra hours put in by him
3213 Every worker shall be given a weekly holiday normally on a Sunday in accordance with
the provisions of minimum Wages (Central Rules 1960 as amended from time to time
irrespective of whether such worker is governed by the Minimum Wages Act or not
3214 Where the minimum wages prescribed by the Government under the Minimum Wages
Act are not inclusive of the wages for the weekly day of rest the worker shall be entitled
to rest day wages at the rate applicable to the next preceding day provided he has
worked under the same contractor for a continuous period of not less than 6 days
3215 Where a contractor is permitted by the Engineer-in-Charge to allowed a worker to work
on a normal weekly holiday he shall grant a substituted holiday to him for the whole day
Seal amp Signature of Bidder
41
on one of the five days immediately before or after the normal weekly holiday and pay
wages to such worker for the work performed on the normal weekly holiday at the
overtime rate
322 Display of Notice Regarding Wages Etc
The contractor shall before he commences his work on contract display and correctly
maintain and continue to display and correctly maintain in a clear and legible condition
in conspicuous places on the work notices in English and in local Indian languages
spoken by the majority of the workers giving the minimum rates of the wages fixed
under Minimum Wages Act the actual wages being paid the hours of work for which
such wage are earned wages periods dates of payments of wages and other relevant
information
323 Payment of Wages
3231 The contractor shall fix wage periods in respect of which wages shall be payable
3232 No wage period shall exceed one month
3233 The wages of every person employed as contract labour in an establishment or by a
contractor where less than one thousand such persons are employed shall be paid before
the expiry of seventh day and in other cases before the expiry of tenth day after the last day
of the wage period in respect of which the wages are payable
3234 Where the employment of any worker is terminated by or on behalf of the contractor the
wages earned by him shall be paid before the expiry of the second working day from the
date on which his employment is terminated
3235 All payment of wages shall be made on a working day at the work premises and during the
working time and on a date notified in advance and in case the work is completed before
the expiry of the wage period final payment shall be made within 48 hours of the last
working day
3236 Wages due to every worker shall be paid to him direct or to other person authorized by him
in this behalf
3237 All wages shall be paid in current coin or currency or in both
3238 Wages shall be paid without any deductions of any kind except those specified by the
Central Government by general or special order in this behalf or permissible under the
Payment of Wages Act 1956
3239 A notice showing the wages period and the place and time of disbursement of wages shall
be displayed at the place of work and a copy sent by the contractor to the Engineer ndashin-
Charge under acknowledgement
32310 It shall be the duty of the contractor to ensure the disbursement of wages in presence of the
site Engineer or any other authorized representative of the Engineer-in-Charge who will be
required to be present at the place and time of the disbursement of wages by the contractor
to workmen
32311 The contractor shall obtain from the site Engineer or any other authorized representative of
the Engineer-in-Charge as the case may be a certificate under his signature at the end of
the entries in the ldquoRegister of Wages ldquo or the ldquoWage-cum-Muster Rollrdquo as the case may
be in the following form -
ldquoCertified that the amount shown in the column Nohelliphelliphelliphelliphas been paid to the
workman concerned in my presence on helliphelliphelliphelliphelliphellip at helliphelliphelliphelliphelliphelliphelliphelliphelliprdquo
32312 Fines and deductions which may be made from wages
A The wages of a worker shall be paid to him without any deduction of any kind except the
following -
a) Fines
(b) Deductions for absence from duty ie from the place or the places where by the terms of
his employment he is required to work The amount of deduction shall be in proportion
to the period for which he was absent
(c) Deductions for damage to or loss of goods expressly entrusted to the employed person
for custody or for loss of money or any other deductions which he is required to
account where such damage or loss is directly attributable to his neglect or default
Seal amp Signature of Bidder
42
(d) Deduction for recovery of advances or for adjustment of over payment of wages
advances granted shall be entered in register
(e) Any other deductions which the Central Government may form time to time allow
B No fines should be imposed on any worker save in respect of such acts and omissions
on his part as have been approved of by the Labour Commissioner
C No fine shall be imposed one worker and no deduction for damage or loss shall be
made from his wages until the worker has been given an opportunity of showing cause
against such fines or deductions
D Every fine shall be deemed to have been imposing on the day of the act or omission in
respect of which it was imposed
524 Labor records 1 The contractor shall maintain a Register of Persons employed on work on contract in
Form XIII of the Contract Labour (RampA) Central Rules 1971
2 The contractor shall maintain a Muster Roll register in respect of all workmen
employed by him on the work under Contract in Form XVI of the CL (RampA) Rules
1971
3 The contractor shall maintain a Wage Register in respect of all workmen employed by
him on the work under contract in From XVII of the CL (RampA) Rules 1971
4 Register of accidents- The contractor shall maintain a register of accidents in such
form as may be convenient at the work place but the same shall include the following
particulars
(a) Full Particulars of the laborers who met with accident
(b) Rate of wages
(c) Sex
(d) Age
(e) Nature of accident and cause of accident
(f) Time and date of accident
(g) Date and time when admitted in hospital
(h) Date of discharge from the hospital
(i) Period of treatment and result of treatment
(j) Percentage of loss of earning capacity and disability as assessed by
Medical officer
(k) Claim required to be paid under Workmenrsquos Compensation Act
(l) Date of payment of compensation
(m) Amount paid with details of the person to whom the same was paid
(n) Authority by whom the compensation was assessed
(o) Remarks
5 The contractor shall maintain a Register of Fines in the Form XII of the CL(RampA)
Rules 1971 the Contractor shall display in a good condition and in a conspicuous
place of work the approved list of acts and commission for which fines can be
imposed
6 The contractor shall maintain a Register of deductions for damage or loss in Form
XX of the CL (RampA) Rules 1971
7 The contractor shall maintain a Register of Advances in Form XXIII of the CL
(RampA) Rules 1971
8 The contractor shall maintain a Register of Overtime in Form XXIII of the CL
(RampA) Rules 1971
9 Attendance card-cum wage slip a The contractor shall issue an Attendance card cum wage slip to each workman
employed by him
b The card shall be valid for each wage period
Seal amp Signature of Bidder
43
c The contractor shall mark the attendance of each workman on the card twice each
day once at the commencement of the day and again after the rest interval before
he actually starts work
d The card shall remain in possession of the worker during the wage period under
reference
e The contractor shall complete the wage slip portion on the reverse of the card at
least a day prior to the disbursement of wages in respect of the wage period under
reference
f The contractor shall obtain the signature or thumb impression of the worker on the
wag slip at the time of disbursement of wages and retain the card with him
10 Employment card The contractor shall issue an Employment Card in the Form XIV of CL (RampA) Central Rules
1971 to each worker within three days of the employment of the worker
11 Service certificate
On termination of employment for any reason whatsoever the contractor shall issue to the
workman whose services have been terminated a Service Certificate in the Form XV of the
CL (RampA) Central Rules 1971
12 Preservation of labour records The labour records and records of Fines and deductions shall be preserved in original for a
period of three years from the date of last entries made in them and shall be made available for
inspection by the Engineer-in-Charge or Labour Officer or any other officers authorized by the
Ministry of Communication in this behalf
13 Power of labour officer to make investigations or enquiry The labour officer or any person authorized by the Central Government on their behalf shall
have power to make enquiries with a view to ascertaining and enforcing due and proper
observance of Fair Wage Clauses and provisions of these Regulations He shall investigate
into any complaint regarding the default made by the contractor in regard to such provision
14 Report of Investigating officer and action thereon The labour Officer or other persons authorized as aforesaid shall submit a report of result of
his investigation or enquiry to the Engineer in-Charge indicating the extent if any to which
the default has been committed with a note that necessary deductions from the contractorrsquos bill
be made and the wages and other dues be paid to the labourers concerned The Engineer in-
Charge shall arrange payments to the labour
concerned within 45 days from the receipt of the report from the Labour Officer or the
authorized officer as the case may be
15 Inspection of Books And slips The contractor shall allow inspection of all the prescribed labour records to any of his workers
or to his agent at a convenient time and place after due notice is received or to the Labour
Officer or any other person authorized by the Central Government on his behalf
16 Submission of Returns The contractor shall submit periodical returns as may be specified form time to time
17 Amendments
The Central Government may from time to time add to or amend the regulations and on any
question as to the applicationinterpretation or effect of those regulations
Contractor must fulfill the terms and condition towards fulfillmentscompliance of the
provision of EPF amp Miscprovision act 1952 amp Employment provident Fund Scheme 1952 in
respect of laborersemployees engaged by the contractor Contractor must submit declaration
form regarding compliance of the condition of EPF act 1952
525 INSURANCE Without limiting any of his other obligations or liabilities the contractor shall at his own
expense take and keep comprehensive insurance including third party risk for the plant
machinery men materials etc brought to the site and for all the work during the execution
The contractor shall also take out workmenrsquos compensations insurance as required by law and
under take to indemnify and keep indemnified the Government from and against all manner of
Seal amp Signature of Bidder
44
claims and demands and losses and damages and cost (including between attorney and client)
charges and expenses that may arise in regard the same or that the Government may suffer or
incur with respect to endor incidental to the same The contractor shall have to furnish
originals and or attested copies as required by the BSNL of the policies of insurance taken
within 15 (fifteen) days of being called upon to do so together with all premium receipts and
other papers related thereto which the BSNL may require
526 COMPLIANCE WITH LAWS AND REGULATION
During the performance of the works the contractor shall at his own cost and initiative
fully comply with all applicable laws of the land and with any and all applicable by-laws
rules regulations and orders and any other provisions having the force of law made or
promulgated or deemed to be made or promulgated by the Government Governmental
agency or BSNL municipal board Government of other regulatory or Authorized body or
persons and shall provide all certificates or compliance therewith as may be required by
such applicable law By-laws Rules Regulations orders and or provisions The
contractor shall assume full responsibility for the payment of all contributions and pay roll
taxes as to its employees servants or agents engaged in the performance of the work
specified in the contractor documents If the contractor shall require any assignee or sub-
contract to comply with the provisions of the clause and in this connection the contractor
agrees as to undertake to save and hold the Government harmless and indemnified from
and against any all penalties actions suits losses and damages claims and demands and
costs (inclusive between attorney and client) charges and expenses whatsoever arising out
or occasioned indirectly or directly by failure of the contractor or any assignee or sub-
contractor to make full and proper compliance with the said by-laws Rules Regulations
laws and Order and provisions as aforesaid
6 TOOLS and PLANTS
The contractor shall provide at his own cost all tools plants appliances implements etc
required for proper execution of works The contractor shall also supply without charge
the requisite number of persons with the means and materials necessary for the purpose of
setting out works counting weighing and assisting the measurements for examination at
any time and from time to time Failing his so doing the same may be provided by the
Engineer-in-charge at the expense of the contractor and the expenses shall be deducted
from any money due to the contractor under this contract or otherwise
As per Para 367 of the recommendationobservation of Tenth Report of parliamentary
standing committee on labour Contractor would provide the same social security to the
labours engaged by him as is available to regular employees
As per Para 368 of the recommendationobservation of Tenth Report of parliamentary
standing committee on labour Contractor shall ensure implementation of equal pay for equal
work and also equal remuneration to men and women
Seal amp Signature of Bidder
45
SECTION ndash 7
PROFORMAS
7 (A) BID SECURITY EMD Guarantee
(To be typed on Rs100- non-judicial stamp paper)
Whereas (hereinafter called the Bidder) has submitted its bid datedfor
the supply of vide Tender Nohelliphelliphelliphelliphelliphelliphelliphellip dated KNOW ALL MEN by
these presents that WE OF having our registered office at
(hereinafter called the Bank) are bound unto Bharat Sanchar Nigam Limited (hereinafter
called the Purchaser) in the sum of Rs for which payment will and truly to be made of
the said Purchaser the Bank binds itself its successors and assigns by these present
THE CONDITIONS of the obligation are
1 If the Bidder withdraws his bid during the period of bid validity specified by the Bidder
on the Bid form or
2 If the Bidder having been notified of the acceptance of his bid by the Purchaser during the
period of bid validity
(a) fails or refuses to execute the Contract if required or
(b) fails or refuses to furnish the Performance Security in accordance with the instructions to
Bidders
We undertake to pay to the Purchaser up to the above amount upon receipt of its first written demand
without the purchaser having to substantiate its demand provided that in its demand the purchaser
will note that the amount claimed by it is due to it owning to the occurrence of one or both of the two
conditions specifying the occurred condition or conditions
This guarantee will remain in force as specified in clauses 12 and 282 of section 4 Part A of the Bid
Document upto and including THIRTY (30) days after the Period of bid validity and any demand in
respect thereof should reach the Bank not later than the specified datedates
Signature of the Bank Authority
Name
Signed in Capacity of
Name amp Signature of witness Full address of Branch
Address of witness Tel No of Branch
Fax No of Branch
Seal amp Signature of Bidder
46
7 (B) PERFORMANCE SECURITY BOND FORM
(To be typed on Rs100- non-judicial stamp paper)
Datedhelliphelliphelliphelliphellip
Sub Performance guarantee
Whereas General Manager Telecom Bhuj Telecom District Bhuj (hereafter referred to as BSNL) has issued an AWO no
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellipDated helliphelliphelliphellip20hellip awarding the work of
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip to Ms
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip(hereafter referred to as ldquoBidderrdquo) and BSNL has asked him to submit a performance guarantee
in favour of AO(Cash) BSNL Oo GMTD BHUJ of Rs helliphelliphelliphelliphelliphellip- (hereafter referred to as ldquoPG Amountrdquo) valid up
to helliphelliphelliphellip20helliphelliphellip (hereafter referred to as ldquoValidity Daterdquo)
Now at the request of the Bidder We helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellipBank
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip Branch having (Address) and Regd
office address as helliphelliphellip helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip (Hereinafter called lsquothe
Bankrdquo) agreed to give this guarantee as hereinafter contained
2 We ldquothe Bankrdquo do hereby undertake and assure to the BSNL that if in the opinion of the BSNL the Bidder has in any way
failed to observe or perform the terms and conditions of the said agreement or has committed any breach of its obligations
there-under the Bank shall on demand and without any objection or demur pay to the BSNL the said sum limited to PG
Amount or such lesser amount as BSNL may demand without requiring BSNL to have recourse to any legal remedy that may
be available to it to compel the Bank to pay the same
3 Any such demand from the BSNL shall be conclusive as regards the liability of Bidder to pay to BSNL or as regards the
amount payable by the Bank under this guarantee The Bank shall not be entitled to withhold payment on the ground that the
Bidder had disputed its liability to pay or has disputed the quantum of the amount or that any arbitration proceeding or legal
proceeding is pending between Bidder and BSNL regarding the claim
4 We the Bank further agree that the guarantee shall come into force from the date of its issue and shall remain in full force
and effect up to its Validity date
5 The Bank further agrees that the BSNL shall have the fullest liberty without the consent of the Bank and without affecting
in any way the obligations hereunder to vary any of the terms and conditions of the said agreement or to extend the time for
performance of the said agreement from any of the powers exercisable by BSNL against the Bidder and to forebear to enforce
any of the terms and conditions relating to the said agreement and the Bank shall not be relieved from its liability by reason
of such failure or extension being granted to Bidder or through any forbearance act or omission on the part of BSNL or any
indulgence by BSNL to Bidder or any other matter or thing whatsoever which under the law relating to sureties would but for
this provision have the effect of relieving or discharging the guarantor
6 Notwithstanding anything herein contained
(a) The liability of the Bank under this guarantee is restricted to the PG Amount and it will remain in force up to its Validity
date
(b) The guarantee shall stand completely discharged and all rights of the BSNL under this Guarantee shall be extinguished if
no claim or demand is made on us in writing on or before its validity date
7 In case BSNL demands for any money under this bank guarantee the same shall be paid through bankerrsquos Cheque in
favour of ldquoAO(Cash) BSNL Oo GMTD BHUJ rdquo payable at Bhuj
8 The Bank guarantees that the below mentioned officer who have signed it on behalf of the Bank have authority to give this
guarantee under its delegated power
Place helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip
Date helliphelliphelliphelliphelliphelliphelliphelliphelliphellip (Signature of the Bank Officer)
Rubber stamp of the bank
Authorized Power of Attorney Number helliphelliphelliphelliphelliphellip
Name of the Bank officer helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip
Having examined the tender documents terms and conditions stipulated therein specifications of work
etc we the under signed offer to execute the repair Works in conformity with the said specifications and
conditions of contract as under
Sl No
ITEM DESCRIPTION
Repair Charges per module inclusive of freight
forwardingpacking amp all taxes amp levies (except GST)
(in Figure)
Unit Rate in Words
Total Cost (unit rate qty)
1 2 3 4 5
1 25 AMP Module
2
50 AMP Module
3 100 AMP Module
4 Control Panel of
Power Plants
25A 50A amp 100A
5 GRAND TOTAL
Note -
1 GST will be payable extra on approved rates 2If our Bid is accepted we shall submit the securities as per the conditions mentioned in the contract
3We agree to abide by this Bid for a period of 180 days from the date of opening of financial bid and it shall
remain binding upon us and may be accepted at any time before the expiry of that period
4 The evaluation will be made on the basis of lowest rate quoted as under Lowest Rate = (rate quoted for 25 AMP Qty + rate quoted for 50 AMP Qty + rate
quoted for 100 AMP Qty + rate quoted for Control Panel of Power Plant AMP Qty)
The bidder who has offered lowest rate as evaluated above will be treated as L1 bidder
Date Signature of Tenderer
Seal amp Signature of Bidder
49
CHECK LIST
Sl No
Description Tender Clause Mode of Submission
1 Tender Fee Section 1 (part A) Para 21 22
Off-line
2 EMD Section 1 (part A) Para 51 52 Off-line 3 Power of Attorney Section 4 (Part A) clause 143 Off-line 4 Latest and Valid MSME NSIC certificate (If Applicable) Off-line 5 Experience Certificate Section 1 (part A)
9 EPF (If applicable) Section 2 Para 3 (a) (i) ON-Line 10 ESIC (If applicable) Section 2 Para 3 (a) (i) ON-Line 11 PAN Card Section 2 Para 3 (a) (i) ON-Line 12 Agency Detail Section 2 (part-A) ON-Line 13 Letter of Authorization Section 2 (part-B) ON-Line 14 Under taking amp
declaration Section 2 (part-C) ON-Line
15 Declaration regarding no relative working in BSNL
Section 2 (part-D) To be submitted by proprietor or separately by each partnerDirector
ON-Line
Seal amp Signature of Bidder
9
SECTION- 2 PART B
LETTER OF AUTHORISATION FOR ATTENDING BID OPENING
(To be typed preferably on letter head of the company)
Subject Authorization for attending Bid opening
I We Mr Ms helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip have submitted our bid for the tender no
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip in respect of helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip (Item
of work) which is due to open on helliphelliphelliphelliphelliphelliphellip (date) in the Meeting Room
We hereby authorize Mr Ms helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip helliphelliphelliphelliphelliphelliphelliphelliphellipamp
rohelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphereby certify that we or our firm
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip has not been BLACK LISTED by
any SSACircle of MTNLBSNL In case at any stage it is found that the information given by me is
falseincorrect BSNL shall have the absolute right to take any action as deemed fitwithout any prior
intimation to me
e) Clause by Clause Compliance
It is to certify that the tender document is carefully read amp understood and all the sections and clauses
are complied unconditionally amp unequivocally There is no deviation from the terms amp conditions of
the tender
f) Declaration for EPF amp Misc Provisions Act 1952
I _____________________________ (Name of the bidder agency) hereby declare compliance
towards conditions of the EPF and Misc Provisions Act 1952 and authorize BSNL to recover any
payment that arises due to failure to comply with any of the Labour legislations and statutory
conditions viz Labor EPF ESI etc or any other acts dealing with the same and all other acts
mentioned in the tender document
g) CERTIFICATE REGARDING FIRM IS NOT BLACK LISTED BY GST AUTHORITY
rohelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphereby certify that we or our firm
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip has not been BLACK LISTED by
any GST Authority
Date helliphelliphelliphelliphellip helliphellip helliphelliphelliphelliphelliphelliphelliphelliphellip
Signature of Tenderer
Place helliphelliphelliphelliphellip Name of Tenderer
Along with date amp Seal
Seal amp Signature of Bidder
11
SECTION- 2 PART D
DECLARATION REGARDING NO RELATIVE WORKING IN BSNL
I ___________________________Son of W O___________________________
RO _________________________here by certify that none of my relative(s) as defined in tender
document isare employed in BSNL unit as per details given in tender document In case at any stage
it is found that the information given by me is false incorrect BSNL shall have the absolute right to
take any action as deemed fit without any prior intimation to me
Signed ___________________
For and on behalf of the Agency
Name (Capitals) ___________________________
Position ____________________________
Date ____________________________
Note - In case of proprietorship firm certificate will be given by the proprietor for partnership firm
certificate will be given by all the partners on separate paper and in case of limited company by all
the Directors of the Company on separate paper Any breach of these conditions by the company or
firm or any other person the tender work will be cancelled and earnest money security deposit will
be forfeited at any stage whenever it is so noticed BSNL will not pay any damages to the company or
firm or the concerned person The company or firm or the person will also be debarred for further
participation in the concerned unit
Seal amp Signature of Bidder
12
SECTION- 3
SCOPE OF WORK AND JURISDICTION OF CONTRACT
1 SCOPE OF WORK
1 During the entire period of contract repairing of all types and of any make such as AMAR RAJA DACS DELTA DYNA ELTEK EXICOM HIMACHAL EXICOM ITI etc SMPS Power plant Modules (25 AMP 50 AMP 100 Amp ) Control panel are to be carried out including replacement of faulty parts
2 Collection and Delivery of Faulty repaired modules - a The concerned JTOSDEAGM in charge will intimate the contractor the Location Make capacity and
quantity of faulty modules by email (copy to AGM(Plg) on agmplgbhujgmailcom ) followed by ERP PO on mail
b The contractor will collect the module from the concerned in charge with in THREE days from the date of intimation under proper receipt to the concerned in charge However under emergent condition the collection of modules may be done on the same day
c Packing transport and delivery of faulty as well as repaired modules is the responsibility of the contractor
d The contractor shall repair the module and return to the concerned in charge with in Seven days of its collection However under emergent condition as decided by the concerned in charge the collection and repair shall be made within the time period given in the ERP PO
e Repaired modules will be tested by the SDE concern within TWO days on receipt of repaired modules if it is found OK then a certificate of this may be issued to the contractor Otherwise same shall be returned to the contractor for necessary action
f The date of receipt of all the modules mentioned in the ERP PO duly tested OK will be reckoned as the completion of ERP PO
g Repaired modules are warranted for 3 months from the date of successfully taken over During this time the contractor has to rectify the module free of cost
3 INSPECTION AND TESTS - a) The BSNL BHUJ or his representative shall have the right to inspect and test the repaired module as
per prescribed test schedules for their conformity to the specifications Where the BSNL BHUJ decides to conduct such tests on the premises of the Contractor or its subcontractor(s) all reasonable facilities and assistance like Testing Instruments and other test gadgets including access to drawings and production data shall be furnished to the inspectors at no charge to the Purchaser
b) Should any inspected or tested repaired module fail to conform to the Specifications the BSNL BHUJ may reject them and the Contractor shall either replace the rejected repaired module or make all alterations necessary to meet Specification requirements free of cost to the Purchaser
c) Notwithstanding the pre-repair tests and inspections prescribed in clause 3(a) amp 3(b) above the module and accessories on receipt in the BSNL s premises will also be tested during and after installation before take over and if any equipment or part thereof is found defective the same shall be replaced free of all cost to the BSNL BHUJ
d) If any module or any part thereof before it is taken over under clause 3(e) below is found defective or fails to fulfill the requirements of the contract the inspector shall give the Contractor notice setting forth details of such defects or failure and the Contractor shall make the defective module good or alter the same to make it comply with the requirements of the contract forthwith and in any case within a period not exceeding one month of the initial report The replacements shall be made by the Contractor free of all charges at site should it fail to do so within this time the BSNL BHUJ reserves the discretion to reject and replace at the cost of the Contractor the whole or any portion of the module as the case may be which is defective or fails to fulfill the requirements of the contract The cost of any such replacement made by the BSNL BHUJ shall be deducted from the amount payable to the Contractor
Seal amp Signature of Bidder
13
e) When the performance tests called for have been successfully carried out the inspector ultimate
Consignee will forthwith issue a Taking Over Certificate The inspectorultimate consignee shall not delay the issue of any Taking Over Certificate ldquo contemplated by this clause on account of minor defects in the module which do not materially affect the commercial use thereof provided that the Contractor shall undertake to make good the same in a time period not exceeding two months The taking Over Certificate shall be issued by the ultimate consignee within six weeks of successful completion of tests
f) After performance test carried out by the concerned SDE of BSNL as per prescribed schedule and repaired modules are found ok in all respect than the repaired modules will be accepted
g) A register is to be maintained at each placelocation mentioning the details of Modules date of Collection and Delivery of Faulty repaired modules replacement of spares amp remark if any and it is to be signed by the controlling officer amp Service engineer
h) Nothing in clause 3 shall in any way release the Contractor from any Warranty or other obligations under this contract
4 SPARES - All the spare of good quality required for repair of modules of SMPS PP are to be supplied by the contractor including major components
5 The contractor shall be responsible for any loss or damages caused to man or machinespartsinstruments during the execution of work and shall replace with an identical new item at his own cost The authorized officerperson of BSNL will have the liberty to check the material and work etchellip provided by the contractor
6 Governing Conditions for RNP (Repair Not Possible) Cases
A module Control panel may be declared RNP only if cost of material to be replaced exceeds five times of approved rate of repair In no case labour cost involved will be considered for deciding RNP A detailed report is to be submitted by contractor to concerned officer in-charge and final decision in this regard will be taken by concerned DGM subjected to maximum permissible RNP as given below
a)25-A module Maximum 10 of total quantity ordered for repair
b) 50-A 100-A Module Maximum 5 of total quantity ordered for repair
c) Control Panel Maximum 10 of total quantity ordered for repair
In case of RNP exceeding permissible limits penalty will be imposed as per para 11 (d) of section-5 (Part-A)
7 WARRANTY - a) Repaired modules are warranted for 3 months from the date of successfully taken over During this
time the contractor has to rectify the module free of cost The contractor shall warrant that repaired module shall be free from all defects and faults in materials used workmanship It becomes necessary for the contractor to replace or renew any defective portion(s) of the module under this clause
b) Replacement under warranty clause shall be made by the contractor free of all charges at site including freight insurance and other incidental charges
c) If any defect is not remedied by the contractor within a reasonable time the BSNL BHUJ may proceed to get the defects remedied from other contractor etc at the contractors risk and expenses but without prejudice to any other rights which the BSNL BHUJ may have against the contractor in respect of such defects
Seal amp Signature of Bidder
14
SECTION- 4 (Part-A)
GENERAL INSTRUCTION TO BIDDERS (GIB)
1 DEFINITIONS
1 BSNL The BSNL means the BSNL Bhuj Telecom Dist under the Ministry of
Communications which invites the tenders on behalf of the General Manager Bhuj Telecom
District Includes executives in the BSNL whatever designations assigned to them from time
to time who may be the in-charge of direction supervision testing acceptance and
maintenance including their successor(s) in the office appearing in various clauses shall be
taken to mean the BSNL Bhuj Telecom District
b The SSA Head means the Head of SSA General Manager Bhuj Telecom District Bhuj and
his successors
c The jurisdiction of the SSA Head The jurisdiction of the SSA Head means Bhuj Telecom
District which coincides geographically with (Revenue District(s))
d Representative of (the SSA Head) Representative of (the SSA Head ) means Officer and
staff for the time being in Bhuj Telecom District deputed by the General Manager Bhuj for
inspecting or supervising the work of testing etc
e Engineer ndash in - charge The Engineer ndash in - charge means the Engineering Officer
nominated by the BSNL to supervise the work under the contract (Minimum Divisional
Engineer level Officer)
f Site Engineer Site Engineer shall mean an SDESDOJTO of the BSNL who may be placed by
the General Manager Bhuj Telecom District Bhuj as in ndash charge of the work at site at any
particular period of time
g AT Unit AT Unit shall mean Acceptance and Testing unit of the BSNL
h AT Officer An officer authorized by General Manger ndash Bhuj Telecom Dist
i Contract The term contract means the documents forming the tender and acceptance
thereof and the formal agreement executed between the competent authority on behalf of the
BSNL and the contractor together with the documents referred to therein including these
conditions the specifications designs drawings and instructions issued from time to time by
the engineer in ndash charge and all these documents taken together shall be deemed to form one
contract and shall be complementary to one another In the contract the following expressions
shall unless the context otherwise requires have the meanings hereby respectively assigned to
them The expression works or work shall unless there be something either in the subject
context repugnant to such construction be construed or taken to mean the works by or by
virtue of the contract contracted to be executed whether temporary or permanent and whether
original altered substituted or additional
j Contractor The contractor shall mean the individual firm or company enlisted or not
enlisted with BSNL Department of Telecom in accordance with procedure for contractor or
registered for carrying out the work of cable laying whether incorporated or not undertaking
the works and shall include the legal personal representative of such individual or the persons
composing such firm or company or the successors of such firm or company and the
permitted assignees of such individual firm or company
k Work The expression lsquoworksrsquo shall unless there be something either in the subject or context
repugnant to such construction be construct and taken to mean the works by or by virtue of the
Seal amp Signature of Bidder
15
contract contracted to be executed whether temporary or permanent and whether original
altered substituted or additional
l Schedule(s) Schedule(s) referred to in these conditions shall mean the relevant schedule(s)
or the standard schedule of rates mentioned in the document
m Site The site shall mean the land or other places on into or through which work is to be
executed under the contract or any adjacent land path or street through which the work is to
be exacted under the contract or any adjacent land path or street which may be allotted or
used for the purpose of carrying out the contract
n Normal time or stipulated time Normal time or stipulated time means time specified in the
ERP PO to complete the work
o Extension of Time Extension of Time means the time granted by the BSNL to complete the
work beyond the normal time or stipulated time
p Exceptional risk Exceptional risks are risk due to war(whether declared or not) invasion act
of foreign enemies hostilities civil war rebellion revolution insurrection military or
usurped power any acts of Government damages from aircraft acts of God such as
earthquake lightening and unprecedented floods and other causes over which the contractor
has no control and the same having been accepted as such by the Accepting Authority or
causes solely due to use or occupation by the government of the part of the work in respect of
which a certificate of completion has been issued
q The ERP PO means the Order placed by the field units on the contractor signed by
the unit incharge r The Contract Rate means the rate payable to the repairer under the work order for
the full and proper performance of its contractual obligations
2 ELIGIBLE BIDDERS Kindly refer to clause 4 of Section ndash 1 Part A ie Detailed NIT
3 COST OF BIDDING
The bidder shall bear all costs associated with the preparation and submission of the bid The
BSNL will in no case be responsible or liable for these costs regardless of the conduct or
outcome of the bidding process
4 BID DOCUMENTS
41 The goods services required to be supplied bidding procedures and contract terms are prescribed
in the Bid Documents The contents of the Bid documents are specified in the covering letter
42 The Bidder is expected to examine all instructions forms terms and specifications in the Bid
Documents Failure to furnish all information required as per the Bid Documents or submission
of bids not substantially responsive to the Bid Documents in every respect will be at the bidders
risk and may result in rejection of the bid
5 CLARIFICATION OF BID DOCUMENTS
51 A prospective bidder requiring any clarification on the Bid Documents shall notify the User in
writing by FAX or by Email of the User as indicated in the invitation of Bid The User shall
respond in writing to any request for the clarification of the Bid Documents which it receives
7days prior to the date of opening of the Tenders Copies of the query (without identifying the
source) and clarifications by the User shall be uploaded on BSNL website as lsquoClarificationsrsquo on
e-procurement portal of Bhuj Telecom District portal clarification shall be available as
lsquoAddendumrsquo for all the prospective bidders who have downloaded the official copy of tender
documents from e-procurement portal of Bhuj Telecom District
Seal amp Signature of Bidder
16
52 Any clarification issued by BSNL in response to query raised by prospective bidders shall form
an integral part of bid documents and it may amount to an amendment of relevant clauses of the
bid documents
6 AMENDMENT OF BID DOCUMENTS
61 The BSNL may for any reason whether at its own initiative or in response to a clarification
requested by a prospective Bidder may modify bid documents by amendments prior to the date
of submission of Bids with due notification to prospective Bidders
62 The amendments shall be notified in writing or by Fax or by Addendum through e-tendering
portal to all prospective bidders on the address intimated at the time of purchase of bid document
from the BSNL and these amendments will be binding on them
63 In order to afford prospective bidders reasonable time in which to take the amendments into
account in preparing their bids the BSNL may at its discretion extend the deadline for the
submission of bids suitably
7 DOCUMENTS COMPRISING THE BID
The bid prepared by the bidder shall comprise the components specified in Section 2 of this
Tender
8 BID FORM
The bidder shall complete the Bid Form and the appropriate Price Schedule furnished in the Bid
Documents as per Section- 8
9 BID PRICES
91 The bidder shall give the total composite price inclusive of all levies and taxes packing
forwarding freight and insurance in case of materials to be supplied and inclusive of all taxes
and levies except GST in case of works to be executed GST will be paid extra as applicable
The contractor shall be responsible for transporting the materials to be supplied by the BSNL
(At the field Unit Telecom Store or otherwise) to execute the work under the contract to site at
histheir own cost The costs of transportation are subsumed in the standard Schedule Rates and
therefore no separate charges are payable on this account The offer shall be firm in Indian
Rupees
92 The price quoted by the bidder shall remain fixed during the entire period of contract and shall
not be subject to variation on any account A bid submitted with an adjustable price quotation
will be treated as non-responsive and rejected
93 Discount if any offered by the bidders shall not be considered unless they are specifically
indicated in the schedule of rates (financial Bid) Bidders desiring to offer discount shall
therefore modify their offers suitable while quoting and shall quote clearly net price taking all
such factors like Discount free supply etc into account
10 DOCUMENTS ESTABLISHING BIDDERS ELIGIBILITY AND QUALIFICATIONS Kindly refer to clause of Section ndash 1 and 2 of this bid
11 NA
12 BID SECURITYEMD
121 The bidder shall furnish as part of its bid a bid security one of the following ways-
(a) Demand Draft Bankerrsquos cheque from a Nationalizedscheduled bank drawn in favour
of AO (Cash) BSNL Oo GMTD Bhuj and payable at Bhuj
(b) Bank GuaranteeFDR from a Nationalizedscheduled bank drawn in favour of AO
(Cash) BSNL Oo GMTD Bhuj which should be valid for 180 days from the tender
opening date
For educational order EMD to be submitted by bidder as 20 of 10 of estimated tender
cost for each case in the form of cash Demand Draft Bankerrsquos cheque Bank guaranteeFDR
issued by a NationalizedScheduled bank drawn in favour of AO (Cash) BSNL Oo GMTD
Bhuj Bank Guarantee should be valid for 180 days from the tender opening date
122 The MSE bidders are exempted from payment of bid security
Seal amp Signature of Bidder
17
a) A proof regarding valid registration with body specified by Ministry of Micro Small
amp Medium Enterprise for the tendered items will have to be attached along with the
bid
b) The enlistment certificate issued by MSME should be valid on the date of opening of
tender
c) MSE unit is required to submit its monthly delivery schedule
d) If a vender registered with body specified by Ministry of Micro Small amp Medium
Enterprise claiming concessional benefits is awarded work by BSNL and
subsequently fails to obey any of the contractual obligations he will be debarred from
any further work contract by BSNL for one year from the date of issue of such order
123 The bid security is required to protect the BSNL against the risk of bidders conduct which would
warrant the bid securityrsquos forfeiture pursuant to para 127
124 A bid not secured in accordance with para 121 amp 122 shall be rejected by the BSNL being non-
responsive at the bid opening stage and archived unopened on e-tender portal for e-tenders
125 The bid security of the unsuccessful bidder will be dischargedreturned as promptly as possible
as but not later than 30 days after the expiry of the period of bid validity prescribed by the
BSNL pursuant to clause 13
126 The successful bidders bid security will be discharged upon the bidders acceptance of the
advance Purchase Order satisfactorily pursuant to clause 27 and furnishing the performance
security
The successful bidders bid security may be converted to Part Performance Security Deposit in
accordance with clause 28
127 The bid security may be forfeited
a) If the bidder withdraws or amends its bid or impairs or derogates from the bid in any
respect during the period of bid validity specified by the bidder in the bid form or
extended subsequently or
b) If the bidder does not accept the APO AWO and or does not submit PBG amp sign the
contract agreement in accordance with clause 28
Note - The bidder shall mean individual company firm or the front bidder and its technology
consortium partner as applicable
13 PERIOD OF VALIDITY OF BIDS
131 Bid shall remain valid for 150 days from the date of bid opening prescribed by the BSNL A bid
valid for a shorter period shall be rejected by the BSNL as non-responsive
132 In exceptional circumstances the BSNL may request the bidders consent for an extension to the
period of bid validity The request and the responses thereto shall be made in writing The bid
security provided under Clause 12 shall also be suitably extended A bidder may refuse the
request without forfeiting his bid security A bidder accepting the request and granting extension
will not be permitted to modify his bid
14 FORMAT AND SIGNING OF BID
141 The bidder shall submit his bid online (in case of e-tendering) amp through sealed envelopes
physically (in case of tenders with manual bidding process) complying all eligibility
conditions other terms and conditions of tender document to be read along with the
clarifications and amendments issued in this respect All the documents must be authenticated
using Digital Signature (DSC) with Class 2 or above (in case of e-tendering) amp by hand
signatures (for manual bidding process) by the authorized person The letter of authorization
shall be indicated by written power-of-attorney accompanying the bid
Note-The BSNL may ask the bidder(s) to supply besides original bid additional copy of bids as
required by him
142 The bid shall contain no interlineations erasures or overwriting except as necessary to correct
errors made by the bidder in which case such corrections shall be signed by the person or persons
signing the bid All pages of the original bid except for un-amended printed literatures shall be
digitally signed by the person or persons signing the bid
143 Power of Attorney
(a) The power of Attorney should be submitted and executed on the non-judicial stamp paper
Seal amp Signature of Bidder
18
of appropriate value as prevailing in the concerned states(s) and the same be attested by a
Notary public or registered before Sub-registrar of the state(s) concerned
(b) The power of Attorney be executed by a person who has been authorized by the Board of
Directors of the bidder in this regard on behalf of the Company institution Body
corporate
(c) In case of the bidder being a firm the said Power of Attorney should be executed by all the
partner(s) in favour of the said Attorney
(d) Attestation of the specimen signatures of authorized signatory by the Companyrsquos firmrsquos
bankers shall be furnished Name designation Phone number mobile number email
address and postal address of the authorized signatory shall be provided
(e) Individual signing the tenders or other documents connected with the contract shall indicate
the full name below the signature and must specify the capacity and authority under which
he signs such documents and shall also submit documentary evidence of his authority in
the form of Power of Attorney
(f) The Power of Attorney is to be submitted in original if it has been issued for the specific
tender enquiry If the power of attorney is issued in general irrespective of tender enquiry
then photocopy duly certified by notary public can also be accepted
(g) In case the representative of bidder company who uploads the document on e-tender portal
using his Digital Signature Certificates (DSC) which is different from the authorized
signatory for the bid (Power of Attorney holder) then the representative who uploads the
documents on e-tender portal using DSC issued in his name shall also be one of the Power
of Attorney holder by the bidder Company in addition to the authorized signatory for the
bid
15 SEALING AND MARKING OF BIDS
The bid shall be submitted online using single stage bidding and Two Envelope Methodology
151 The first envelope (Techno-commercial bid) This envelope shall contain documents of
bidders satisfying the eligibility Technical amp commercial conditions requirements Second
envelope will be named as financial bid containing price Schedule as per section 8 All
documents submitted will also be self attested by the bidder
152 a) The envelopes for Tender Fee EMD shall be addressed AGM (PLG) Oo GMTD
Haripar Road Bhuj - 370001
b) The envelope for Tender Fee EMD shall bear the name of the tender the tender number
and the words DO NOT OPEN BEFORE (due date amp time)
c) The envelopes for Tender Fee EMD shall indicate the name and complete postal address
of the bidder to enable the User to return the bid unopened in case it is declared to be received
late
d) The envelopes for Tender Fee EMD shall should be deposited in the tender box provided
by tendering authority or sent by registered post or delivered in person on above mentioned
address (address is given above) The responsibility for ensuring that the envelopes for Tender
Fee EMD shall are delivered in time would vest with the bidder
e) The envelopes for Tender Fee EMD shall delivered in person registered post on the day of
tender opening shall be delivered upto specified time amp date as stated in NIT to Oo GMTD
Haripar Road Bhuj - 370001 The User shall not be responsible if the envelopes for Tender
Fee EMD shall are delivered elsewhere
f) Venue of Tender Opening
Tender will be opened in Oo GMTD Haripar Road Bhuj - 370001 at specified time amp
date as stated in NIT If due to administrative reason the venue of Bid opening is changed it
will be displayed prominently on the above address
Seal amp Signature of Bidder
19
153 If envelopes are not sealed and marked as required at para 151 and 152 the bid shall be
rejected
16 SUBMISSION OF BIDS
161 Bids must be submitted by the bidders on or before the specified date amp time indicated in
Section-1 ie DNIT
162 The BSNL may at its discretion extend this deadline for the submission of the bids by
amending the bid documents in accordance with Clause 6 in which case all rights and
obligations of the BSNL and bidders previously subject to the deadline will thereafter be
subject to the deadline as extended
163 The bidder shall submit his bid offer against a set of bid documents purchased by him for all
or some systemservices equipment as per requirement of the Bid Documents He may
include alternate offer if permissible as per the bid However not more than one independent
and complete offer shall be permitted from the bidder
164 Bid must be submitted by the bidder through E-Tendering mode only Manual submission of bid
shall not be needed
17 LATE BIDS
No bid shall be accepted either online by E-Tender Portal or physically in case of manual
bidding process after the specified deadline for submission of bids prescribed by the purchaser
18 MODIFICATION AND WITHDRAWAL OF BIDS
181 The bidder may modify revise or withdraw his bid after submission prior to deadline prescribed
for submission of bid If a bid is withdrawn the same shall be archived unopened in the e-
procurement portal of Bhuj Telecom District
182 The bidderrsquos modification revision or withdrawal shall have to be online and digitally
authenticated as per clause 15
183 Subject to clause 20 no bid shall be modified subsequent to the deadline for submission of bids
19 OPENING OF BIDS BY BSNL
191 The purchaser shall open bids online in the presence of bidders or their authorized representatives
who chose to attend at time specified in Clause 7 of Detailed NIT(Section-1) on due date The
bidderrsquos representatives who are present shall sign in an attendance register Authority letter to
this effect shall be submitted by the bidders before they are allowed to participate in bid opening
(As per Format given in section 2 Part B)
192 A maximum of two representatives for any bidder shall be authorized and permitted to attend
the bid opening
193 (i) The bids will be opened in two stages ie techno-commercial bid shall be opened on the date
of tender opening given in NIT The financial bid will not be opened on the date of opening of
techno commercial bids
The financial bids of those bidders who are approved to be techno commercially compliant by
the competent authority will be opened by TOC in front of techno-commercially eligible
bidders authorized representatives by sending them a suitable notice
(ii) The bidderrsquos names Item name EMD amount amp validity and acceptability Information in
respect of eligible bidders Details of bid modification withdrawal (if any) and such other
details as the purchaser at its discretion may consider appropriate will be made available
online at the time of techno-commercial bid opening
(iii) The bidderrsquos names Name of the Items Quantitiesprices quoted in the bid discount if
offered Taxes amp levies and such other details as the purchaser at its discretion may consider
appropriate will be made available online at the time of financial bid opening
194 The date fixed for opening of bids if subsequently declared as holiday by the BSNL the revised
date of schedule will be notified However in absence of such notification the bids will be
opened in the next working day time and venue remaining unaltered
20 CLARIFICATION OF BIDS
201 To assist in the examination evaluation and comparison of bids the BSNL may at its discretion
Seal amp Signature of Bidder
20
ask the bidder for the clarification of its bid The request for the clarification and the response
shall be in writing However no post bid clarification at the initiative of the bidder shall be
entertained
202 If any of the documents required to be submitted along with the technical bid is found wanting
the offer is liable to be rejected at that stage However the BSNL at its discretion may call for
any clarification regarding the bid document within a stipulated time period The BSNL at itrsquos
discretion may also ask for the submission of any additionalmissing document(s) within a
stipulated time period In such case(s) the bidder shall have to comply the BSNLrsquos requirement
within the specified time In case of non-compliance to such queries the bid will be out rightly
rejected without entertaining further correspondence in this regardrdquo However no post bid
clarification at the initiative of the bidder shall be entertained
21 PRELIMINARY EVALUATION
211 BSNL shall evaluate the bids to determine whether they are complete whether any
computational errors have been made whether required sureties have been furnished whether
the documents have been properly signed and whether the bids are generally in order
212 Arithmetical errors shall be rectified on the following basis If there is a discrepancy between
the unit price and total price that is obtained by multiplying the unit price and quantity the
unit price shall prevail and the total price shall be corrected by the BSNL
213 If there is a discrepancy between words and figures the amount in words shall prevail If the
SupplierBidder does not accept the correction of the errors his bid shall be rejected
214 Prior to the detailed evaluation pursuant to clause 22 the BSNL will determine the substantial
responsiveness of each bid to the Bid documents For purposes of these clauses a substantially
responsive bid is one which conforms to all the terms and conditions of the Bid Documents
without material deviations The BSNLs determination of bids responsiveness is to be based
on the contents of the bid itself without recourse to extrinsic evidence
215 A bid determined as substantially non-responsive will be rejected by the BSNL and shall not
subsequent to the bid opening be made responsive by the bidder by correction of the non-
conformity
216 The BSNL may waive any minor infirmity or non-conformity or irregularity in a bid which
does not constitute a material deviation provided such waiver does not prejudice or affect the
relative ranking of any bidder
22 EVALUATION AND COMPARISON OF SUBSTANTIALLY RESPONSIVE BIDS
221 The Purchaser shall evaluate in detail and compare the bids previously determined to be
substantially responsive pursuant to Clause 21
222 The evaluation will be made on the basis of lowest rate quoted as under Lowest Rate
= (rate quoted for 25AMP Qty +rate quoted for 50AMP 100 AMP Qty + rate
quoted for Control Panel of Power Plant Qty) The bidder who has offered lowest
rate as evaluated above will be treated as L1 bidder 23 CONTACTING THE BSNL
231 Subject to Clause 20 no bidder shall try to influence the BSNL on any matter relating
to its bid from the time of the bid opening till the time the contract is awarded
232 Any effort by a bidder to modify its bid or influence the BSNL in the BSNLs bid evaluation
bid comparison or contract award decisions shall result in the rejection of the bid
24 PLACEMENT OF ORDER
241 The BSNL may consider placement of orders to execute the contract on those bidders whose
offers have been found technically commercially and financially acceptable The BSNL reserves
the right to counter offer price(s) against price(s) quoted by any bidder
The work against the tender is for one yearrsquos requirement and the terms and conditions of
this tender shall be operative for a period of one year from the date of signing of agreement
between the Company and the contractor with an option of extension for a further period
of one year at the same rates terms amp conditions
Seal amp Signature of Bidder
21
Distribution of Work Distribution of quantities for ordering to the selected bidders of a tender
Table 1(A) (Without provisions for MSE Units)
No of Bidders
to be approved
(Col 1)
Quantity allotted to the respective bidder
(Col 2)
L1 L2
One Bidder 100 Nil
Two Bidder 60 40
Table 1(B) (With provisions for MSME Units)
No of Bidders
to be approved
(Col 1)
Quantity allotted to the respective bidder (Col 2)
Qty
Earmarked for MSME
bidder(s)(Col 3)
L1 L2
One Bidder 80 Nil 20
Two Bidder 48 32 20
1) In case L2 and MSE bidder accepts the L1 rate in prescribed time amp do not submit MSD as per
tender terms and conditions the EMD will be forfeited If MSE bidder exceeded more than one than
20 work at L1 rate distributed among them
242 TERMS AND CONDITIONS FOR EDUCATIONAL ORDER
(a) 10 of the estimated quantity of work will be extended to inexperienced contractor for each
Tender
(b) Inexperienced Bidder has to apply separately for each Tender
(c) In case there are more than one bidder work will be distributed into the bidders
(d) The bidder shall not submit financial bid In case if the same is submitted then it will not be opened
(e) BSNL reserves a right to give any area to this bidder including that of other tender in which the
bidder has not participated
(f) The work to the inexperienced is a limited quantity (up to 10) in at a time further work will be
done on the basis of evaluation of field unit Additional quantity of work shall be given to such
contractor only after completion of initial work
(g) The payment for repairing to such contractors shall be based on L1 rates finalized in the tender
The payment will be released only after verification of quantity amp quality done as per the
instruction mentioned in respect of work in the tender
(h) All the other Terms amp conditions will remain the same
25 BSNLS RIGHT TO VARY QUANTITIES AT TIME OF AWARD
(a) BSNL reserves the right to vary up to 25 of the quantity of goods and services specified in
the schedule of requirements without any change in the unit price or other terms and conditions at
the time of award of contract
(b) BSNL also reserves the right for placement of additional order or up to 50 of the
additional quantities of goods and services contained in the running tender contract in the tender
at the same rate or a rate negotiated (downwardly) with the existing venders considering the
reasonability of rates based on prevailing market conditions and the impact of reduction in duties
and taxes etc and supplies to be obtained within delivery period scheduled afresh
No guarantee can be given to actual quantity The quantity mentioned in the tender is
tentative only No claim should entertained for less not allotting the quantum of work for any
reason
(c) In exceptional situation where the requirement is of an emergent nature and it is necessary to
ensure continued supplies from the existing venders the purchaser reserves the right to place
repeat order up to 100 of the quantities of goods and services contained in the running tender
contract at the same rate or a rate negotiated (downwardly) with the existing venders considering
the reasonability of rates based on prevailing market conditions and the impact of reduction in
duties and taxes etc Exceptional situation and emergent nature should be spelt out clearly
detailing the justification as well as benefits accrued out of it and loss incurred in case this
provision is not invoked and approved by the authority competent to accord administrative and
Seal amp Signature of Bidder
22
financial approval for the procurement calculated on the basis of total procurement ie initial and
proposed add-on quantity
26 BSNLS RIGHT TO ACCEPT ANY BID AND TO REJECT ANY OR ALL BIDS
The BSNL reserves the right to accept or reject any bid and to annul the bidding process and
reject all bids at any time prior to award of contract without assigning any reason whatsoever and
without thereby incurring any liability to the affected bidder or bidders on the grounds for the
BSNLs action
27 ISSUE OF ADVANCE WORK ORDER
271 The issue of an Advance Work Order (Letter of Intent) shall constitute the intention of BSNL to
enter into the contract with the bidder
272 The bidder shall within 14 days of issue of an advance work order give his acceptance along with
Performance Security Deposit in conformity with section 7(B) provided with the bid documents
28 SIGNING OF CONTRACT
281 The issue of FAT shall constitute the award of contract on the bidder
282 As soon as the tender is approved by the competent authority the Bid Security deposited by the
successful bidder may be converted into the Performance security deposit which will be held by
the BSNL till the completion of warranty period
29 ANNULMENT OF AWARD
Failure of the successful bidder to comply with the requirement of Clause 27 amp 28 shall
constitute sufficient ground for the annulment of the award and forfeiture of the bid security in
which event the BSNL may make the award to any other bidder at the discretion of BSNL or call
for new bids
30 NA
31 REJECTION OF BIDS
311 While all the conditions specified in the Bid documents are critical and are to be complied special
attention of bidder is invited to the following clauses of the bid documents Non-compliance of any
one of which shall result in outright rejection of the bid
(i) Clause 15 of Section 4 Part A The bids will be recorded returned unopened if covers are not
properly sealed with lsquoPERSONAL SEALrsquo of the bidder
(ii) Clauses 121 122 amp 131 of Section 4 Part A The bids will be rejected at opening stage if Bid
security is not submitted as per Clauses 121 amp 122 and bid validity is less than the period
prescribed in Clause 131 mentioned above
(iii) Clause 2 amp 10 of Section 4 Part A If the eligibility condition as per clause 2 of Section 4 Part
A is not met andor documents prescribed to establish the eligibility as per Clause 10 of
section 4 Part A are not enclosed the bids will be rejected without further evaluation
(iv) Clause 112 of Section 4 Part A NA
(v) Section 5 Part A Commercial conditions Section 5 Part B Special Conditions of Contract
Compliance if given using ambiguous words like ldquoNotedrdquo ldquoUnderstoodrdquo ldquoNoted amp
Understoodrdquo shall not be accepted as complied Mere ldquoCompliedrdquo will also be not sufficient
reference to the enclosed documents showing compliances must be given
(vi) Section 8 Price Schedule Prices are not filled in as prescribed in Financial Bid
(vii) Section 4 Part A clause 93 on discount which is reproduced below
ldquoDiscount if any offered by the bidder shall not be considered unless specifically indicated in
the price schedule Bidders desiring to offer discount shall therefore modify their offer
suitably while quoting and shall quote clearly net price taking all such factors like discount
free supply etc into accountrdquo
312 Before outright rejection of the Bid by Bid-opening team for non-compliance of any of the
provisions mentioned in clause 311(i) 311 (ii) above the bidder company is given
opportunity to explain their position however if the person representing the company is not
satisfied with the decision of the Bid opening team hethey can submit the representation to
Bid opening team immediately but in no case after closing of the tender process with full
justification quoting specifically the violation of tender conditions if any
Seal amp Signature of Bidder
23
313 Bid opening team will not return the bids submitted by the bidders on the date of tender
opening even if it is liable for rejection and will preserve the bids in sealed cover as submitted
by taking signatures of some of the desirous representatives of the participating
biddercompanies present on the occasion
314 The In charge of the Bid opening team will mention the number of bids with name of
company found unsuitable for further processing on the date of tender opening and number of
representations received in Bid opening Minutes and if Bid opening team is satisfied with the
arguments of the biddercompany mentioned in their representation and feel that there is
prima-facie fact for consideration the in charge of the Bid opening team will submit the case
for review to competent authority ie GMTD BHUJ as early as possible preferably on next
working day and decision to this effect should be communicated to the bidder company within
a week positively Bids found liable for rejection and kept preserved on the date of tender
opening will be returned to the bidders after issue of POfinal acceptance of tender against
the instant tender
315 If the reviewing officer finds it fit to open the bid of the petitioner this should be done by
giving three (working) days notice to all the participating bidders to give opportunity to
desirous participants to be present on the occasion
32 ACTION BY PURCHASER AGAINST BIDDER(S) VENDOR(S) IN CASE OF
DEFAULT In case of default by Bidder(s) Vendor(s) such as
a) Does not supply the equipment services in time
b) Equipment Services does not perform satisfactory in the field in accordance with the
specifications
c) Or any other default whose complete list is enclosed in Appendix-1
Purchaser will take action as specified in Appendix-1 of this section
33 DELETED
34 NEAR-RELATIONSHIP CERTIFICATE
341 The bidder should give a certificate that none of his her near relative as defined below is
working in the units where he is going to apply for the tender In case of proprietorship firm
certificate will be given by the proprietor For partnership firm certificate will be given by all
the partners and in case of limited company by all the Directors of the company excluding
Government of India Financial institution nominees and independent non-Official part time
Directors appointed by Govt of India or the Governor of the state and full time Directors of
PSUs both state and central Due to any breach of these conditions by the company or firm or
any other person the tender will be cancelled and Bid Security will be forfeited at any stage
whenever it is noticed and BSNL will not pay any damage to the company or firm or the
concerned person
342 The Company or firm or the person will also be debarred for further participation in the
concerned unit
343 The near relatives for this purpose are defined as-
(a) Members of a Hindu undivided family
(b) They are husband and wife
(c) The one is related to the other in the manner as father mother son(s) amp Sons
wife(daughter in law) Daughter(s) and daughters husband (son in law) brother(s) and
brothers wife sister(s) and sisters husband (brother in law)
344 The format of the certificate is given in Section -2(D)
35 VERIFICATION OF DOCUMENTS AND CERTIFICATES
The bidder will ensure that all the documents and certificates including experience
performance and self certificates submitted by him are correct and genuine before enclosing
them in the bid The onus of proving genuineness of the submitted documents would rest with
the bidder If any document paper certificate submitted by the participant bidder is found
discovered to be false fabricated tempered manipulated either during bid evaluation or
during award of contract or thereafter then the Purchaser will take action as per Clause-1 of
Appendix-1 of this section
Seal amp Signature of Bidder
24
Appendix-1 to Section - 4 (Part-A)
S
No
Defaults of the bidder vendor Action to be taken
A B C
1(a) Submitting fake forged
i) Rejection of tender bid of respective Vendor
ii) Banning of business for 3 years which implies barring
further dealing with the vendor for procurement of Goods amp
Services including participation in future tenders invited by
BSNL for 3 years from date of issue of banning order
iii) Termination Short Closure of POWO if issued This
implies non-acceptance of further supplies work amp services
except to make the already received material work complete
work in hand
a) Bank Instruments with the bid to meet
terms amp condition of tender in respect of
tender fee and or EMD
b) Certificate for claiming exemption in
respect of tender fee and or EMD
c) detection of default at any stage from
receipt of bids till award of APO issue of
POWO
Note 1- However in this case the performance guarantee if alright will not be forfeited
Note 2- Payment for already received supplies completed work shall be made as per terms amp conditions of
PO WO
1(b)
Submitting fake forged documents towards
meeting eligibility criteria such as
experience capability supply proof
registration with GST Income Tax
departments etc and as supporting
documents towards other terms amp conditions
with the bid to meet terms amp condition of
tender
(i) If detection of default is prior to award
of APO
i) Rejection of Bid amp
ii) Forfeiture of EMD
(ii) If detection of default after issue of APO
but before receipt of PG SD (DDBG etc)
i) Cancellation of APO
ii) Rejection of Bid amp
iii) Forfeiture of EMD
(iii) If detection of default after receipt of
PG SD (DDBG etc)
i) Cancellation of APO
ii) Rejection of Bid amp
iii) Forfeiture of PG SD
However on realization of PG SD amount EMD if not
already released shall be returned
(iv) If detection of default after issue of PO
WO
i) Termination Short Closure of POWO and Cancellation
of APO
ii) Rejection of Bid amp
iii) Forfeiture of PG SD
However on realization of PG SD amount EMD if not
released shall be returned
Note 3- However settle bills for the material received in correct quantity and quality if pending items do
not affect working or use of supplied items
Note 4- No further supplies are to be accepted except that required to make the already supplied items
work
Special Note 1- Authority competent to take final decision GMTD Bhuj
2 If vendor or his representative uses violent
coercive means viz Physical Verbal means
to threatens BSNL Executive employees
and or obstruct him from functioning in
discharge of his duties amp responsibilities for
the following
Banning of business for 3 years which implies Barring
further dealing with the vendor for procurement of Goods amp
Services including participation in future tenders invited by
BSNL for 3 years from date of issue of banning order
a) Obstructing functioning of tender opening
executives of BSNL in receipt opening of
tender bids from prospective Bidders
suppliers Contractors
Seal amp Signature of Bidder
25
b) Obstructing Threatening other
prospective bidders ie suppliers
Contractors from entering the tender venue
and or submitting their tender bid freely
Special Note 1- Authority competent to take final decision GMTD Bhuj
3 Non-receipt of acceptance of APO AWO
and SD PG by L-1 bidder within time
period specified in APO AWO
Forfeiture of EMD
Special Note 1- Authority competent to take final decision GMTD Bhuj
41 Failure to supply and or Commission the
equipment and or execution of the work at
all even in extended delivery schedules if
granted against PO WO
i) Termination of PO WO
ii) Under take purchase work at the risk amp cost of
defaulting vendor
iii) Recover the excess charges if incurred from the PG SD
and outstanding bills of the defaulting Vendor
42 Failure to supply and or Commission the
equipment and or execution of the Work in
full even in extended delivery schedules if
granted against PO WO
i) Short Closure of PO WO to the quantity already
received by and or commissioned in BSNL and or in
pipeline provided the same is usable andor the Vendor
promises to make it usable
ii) Under take purchase work for balance quantity at the
risk amp cost of defaulting vendor
iii) Recover the excess charges if incurred from the PG SD
and outstanding bills of the defaulting Vendor
Special Note 1- Authority competent to take final decision for 41 amp 42 by DGM concerned
51 The supplied equipment does not perform
satisfactory in the field in accordance with
the specifications mentioned in the PO
WOContract
i) If the material is not at all acceptable then return the non-
acceptable material (or its part) amp recover its cost if paid
from the os bills PG SD
OR
ii) If the material is inducted in network amp it is not possible
to return it and or material is acceptable with degraded
performance the purchaser may determine the price for
need to be issued in compliant format and timely within the time prescribed under GST law
163 In case of any deficientincompleterejected supply BSNL shall convey the same in a reasonable
time to enable the supplier to issue credit note and take tax adjustment
164 It would be the responsibility of the supplier to declare correct information on invoice and GSTN
viz the amount the place of supply rate of tax etc In case the eligibility of input tax credit is
questioned or denied to BSNL on account of default by the supplier the same would be
recovered by BSNL from the contractor
165 Registered location of the both the parties ie BSNL and contractor should be mentioned in the
agreement with GSTIN No Further supplier should raise invoices at the registered premise of
BSNL for availing of credit and ensure that the place of supply as per GST law is same as
registered premise
166 BSNL could at any time instruct the contractor to raise its invoices at a particular location of
BSNL
Seal amp Signature of Bidder
39
167 It is the responsibility of the supplier to ensure that place of supply and the GSTN of BSNL are
in the same state If for any reason they are not in the same state the contractor shall intimate to
BSNL and give adequate time before raising of the invoice
168 E-waybill number should be mentioned on the invoices
169 contractor shall be responsible for timely issuance and delivery of invoice DN CN to enable
BSNL to claim tax benefit on or before the stipulated time period provided by the GST law
(a) It is the responsibility of the contractor to ensure that outward supply return (GSTR-1) would be
filed correctly If not than cost would be borne by supplier
(b) Reporting of correct outward supply by supplier in the outward return (GSTR-1) is the
responsibility of the supplier In case of mismatch because of contractorrsquos fault prompt
amendments must be made by the supplier else supplier would be required to indemnify BSNL
of the loss of credit due to mis-match The compliances to be adhered by contractor includes
(but is not limited to) the following
(i) Uploading appropriate invoice details on the GSTN within the stipulated time
(ii) Issuing GST compliant invoice CN DN PO issued by BSNL should be referred by
contractor for capturing information on the invoice
(iii) Contractor needs to pay the entire self-assessed tax on timely basis
(iv) Where invoice is not uploaded or incorrect upload of invoice detail of GSTN by supplier
then credit on such invoice will be given provisionally subject to matching So acceptance of
changes made by BSNL on GSTN on account of non-upload or incorrect upload of invoice
details on GSTN is to be submitted by supplier Such changes wrt the mismatch are required
to be accepted by supplier within the time limit prescribed under the GST law It should be
noted that in case supplier does not accept such changes within the time limit prescribed under
GST law the loss of input tax credit (if any) would be recovered from the supplier In case of
mismatch because of Suppliers fault prompt amendments must be made by the supplier else
supplier would be required to indemnify BSNL for the losses of credit and interest paid due to
mismatch
(v) contractor to issue all necessary documentation and perform all necessary compliances for
BSNL to be eligible to claim the input tax credit of GST tax to them In case BSNL is unable to
claim the input tax credit the amount wrt GST charged by the supplier would be recovered
from the supplier
1610 Refer) for clause stating that all the details of supplier (name address GSTN unregistered
supplier place of supply SAC HSN code etc) and other mandatory details shall be mentioned on the
invoice
1611Where the location agreed are more than one state then separate invoice state wise to claim
input tax credit in a particular state (typically happens in a bill to-ship to scenario) shall have to be
submitted
1612 It shall be the responsibility of the supplier to mention State of place of supply of goodsservices
in the invoice issued to BSNL
Seal amp Signature of Bidder
40
SECTION ndash 5 (Part-B)
SPECIAL CONDITIONS OF CONTRACT (SCC)
1 GENERAL
No official of Gazetted rank or other Gazetted officer employed in Engineering or administrative
duties in an Engineering BSNL or any other BSNL of the BSNL is allowed to work as a contractor for
a period of two years after his retirement from BSNL service without the previous permission of
BSNL This contract is liable to be cancelled if either the contractor or any of his employee is found at
any time to be such a person who hadnrsquot obtained the permission of BSNL as aforesaid before
submission of the engagement in the contractorrsquos service as the case may be
2 Material Handed over by The BSNL
21 The contractor shall transport (including loading and unloading) all stores issued to him from
Field Unit Telecom Store to the site of work at his own cost The BSNL shall not pay any
transportation charges to the contractor
22 All materials handed over to the contractor by the BSNL shall remain the absolute property of
BSNL and shall not be removed form site of the work except for use in the work and shall be at all
times open to inspection by the Representative of GMTD BHUJ
23 The contractor shall be responsible for the transportation of store storage and safe custody of all
material supplied to him by the BSNL which in the contractorrsquos custody whether or not installed in
the work The contractor shall satisfy himself regularly the quantity and quality of the materials
supplied to him and he will be responsible for any subsequent deterioration and discrepancy (inclusive
of theft) in the quantity quality the materials
3 LABOUR WELFARE MEASURES AND WORKMAN COMPENSATION
(AS APPLICABLE)
31 Obtaining License before commencement of work
The contractor shall obtain a valid labour license (if applicable) under the Contact Labour (RampA) Act
1919 and the Contract Labour (Regulation and Abolition) Central Rules 1971 before commencement
of the work and continue to have a valid license until the completion of work The contractor shall
also abide by the provisions of the Child Labour (Prohibition and Regulation) Act 1986 Any failure
to fulfill this requirement shall attract the penal provisions of this contract arising out of the resultant
non-execution of work
32 Contractors labour Regulations
321 Working Hours
3211 Normally working hours of an employee should not exceed 9 hours a day The working
day shall be so arranged the inclusive of interval for rest if any it shall not spread over
more than12 hours on any day
3212 When a worker is made to work for more than 9 hours on any day or for more than 48
hours in any week he shall be paid over time for the extra hours put in by him
3213 Every worker shall be given a weekly holiday normally on a Sunday in accordance with
the provisions of minimum Wages (Central Rules 1960 as amended from time to time
irrespective of whether such worker is governed by the Minimum Wages Act or not
3214 Where the minimum wages prescribed by the Government under the Minimum Wages
Act are not inclusive of the wages for the weekly day of rest the worker shall be entitled
to rest day wages at the rate applicable to the next preceding day provided he has
worked under the same contractor for a continuous period of not less than 6 days
3215 Where a contractor is permitted by the Engineer-in-Charge to allowed a worker to work
on a normal weekly holiday he shall grant a substituted holiday to him for the whole day
Seal amp Signature of Bidder
41
on one of the five days immediately before or after the normal weekly holiday and pay
wages to such worker for the work performed on the normal weekly holiday at the
overtime rate
322 Display of Notice Regarding Wages Etc
The contractor shall before he commences his work on contract display and correctly
maintain and continue to display and correctly maintain in a clear and legible condition
in conspicuous places on the work notices in English and in local Indian languages
spoken by the majority of the workers giving the minimum rates of the wages fixed
under Minimum Wages Act the actual wages being paid the hours of work for which
such wage are earned wages periods dates of payments of wages and other relevant
information
323 Payment of Wages
3231 The contractor shall fix wage periods in respect of which wages shall be payable
3232 No wage period shall exceed one month
3233 The wages of every person employed as contract labour in an establishment or by a
contractor where less than one thousand such persons are employed shall be paid before
the expiry of seventh day and in other cases before the expiry of tenth day after the last day
of the wage period in respect of which the wages are payable
3234 Where the employment of any worker is terminated by or on behalf of the contractor the
wages earned by him shall be paid before the expiry of the second working day from the
date on which his employment is terminated
3235 All payment of wages shall be made on a working day at the work premises and during the
working time and on a date notified in advance and in case the work is completed before
the expiry of the wage period final payment shall be made within 48 hours of the last
working day
3236 Wages due to every worker shall be paid to him direct or to other person authorized by him
in this behalf
3237 All wages shall be paid in current coin or currency or in both
3238 Wages shall be paid without any deductions of any kind except those specified by the
Central Government by general or special order in this behalf or permissible under the
Payment of Wages Act 1956
3239 A notice showing the wages period and the place and time of disbursement of wages shall
be displayed at the place of work and a copy sent by the contractor to the Engineer ndashin-
Charge under acknowledgement
32310 It shall be the duty of the contractor to ensure the disbursement of wages in presence of the
site Engineer or any other authorized representative of the Engineer-in-Charge who will be
required to be present at the place and time of the disbursement of wages by the contractor
to workmen
32311 The contractor shall obtain from the site Engineer or any other authorized representative of
the Engineer-in-Charge as the case may be a certificate under his signature at the end of
the entries in the ldquoRegister of Wages ldquo or the ldquoWage-cum-Muster Rollrdquo as the case may
be in the following form -
ldquoCertified that the amount shown in the column Nohelliphelliphelliphelliphas been paid to the
workman concerned in my presence on helliphelliphelliphelliphelliphellip at helliphelliphelliphelliphelliphelliphelliphelliphelliprdquo
32312 Fines and deductions which may be made from wages
A The wages of a worker shall be paid to him without any deduction of any kind except the
following -
a) Fines
(b) Deductions for absence from duty ie from the place or the places where by the terms of
his employment he is required to work The amount of deduction shall be in proportion
to the period for which he was absent
(c) Deductions for damage to or loss of goods expressly entrusted to the employed person
for custody or for loss of money or any other deductions which he is required to
account where such damage or loss is directly attributable to his neglect or default
Seal amp Signature of Bidder
42
(d) Deduction for recovery of advances or for adjustment of over payment of wages
advances granted shall be entered in register
(e) Any other deductions which the Central Government may form time to time allow
B No fines should be imposed on any worker save in respect of such acts and omissions
on his part as have been approved of by the Labour Commissioner
C No fine shall be imposed one worker and no deduction for damage or loss shall be
made from his wages until the worker has been given an opportunity of showing cause
against such fines or deductions
D Every fine shall be deemed to have been imposing on the day of the act or omission in
respect of which it was imposed
524 Labor records 1 The contractor shall maintain a Register of Persons employed on work on contract in
Form XIII of the Contract Labour (RampA) Central Rules 1971
2 The contractor shall maintain a Muster Roll register in respect of all workmen
employed by him on the work under Contract in Form XVI of the CL (RampA) Rules
1971
3 The contractor shall maintain a Wage Register in respect of all workmen employed by
him on the work under contract in From XVII of the CL (RampA) Rules 1971
4 Register of accidents- The contractor shall maintain a register of accidents in such
form as may be convenient at the work place but the same shall include the following
particulars
(a) Full Particulars of the laborers who met with accident
(b) Rate of wages
(c) Sex
(d) Age
(e) Nature of accident and cause of accident
(f) Time and date of accident
(g) Date and time when admitted in hospital
(h) Date of discharge from the hospital
(i) Period of treatment and result of treatment
(j) Percentage of loss of earning capacity and disability as assessed by
Medical officer
(k) Claim required to be paid under Workmenrsquos Compensation Act
(l) Date of payment of compensation
(m) Amount paid with details of the person to whom the same was paid
(n) Authority by whom the compensation was assessed
(o) Remarks
5 The contractor shall maintain a Register of Fines in the Form XII of the CL(RampA)
Rules 1971 the Contractor shall display in a good condition and in a conspicuous
place of work the approved list of acts and commission for which fines can be
imposed
6 The contractor shall maintain a Register of deductions for damage or loss in Form
XX of the CL (RampA) Rules 1971
7 The contractor shall maintain a Register of Advances in Form XXIII of the CL
(RampA) Rules 1971
8 The contractor shall maintain a Register of Overtime in Form XXIII of the CL
(RampA) Rules 1971
9 Attendance card-cum wage slip a The contractor shall issue an Attendance card cum wage slip to each workman
employed by him
b The card shall be valid for each wage period
Seal amp Signature of Bidder
43
c The contractor shall mark the attendance of each workman on the card twice each
day once at the commencement of the day and again after the rest interval before
he actually starts work
d The card shall remain in possession of the worker during the wage period under
reference
e The contractor shall complete the wage slip portion on the reverse of the card at
least a day prior to the disbursement of wages in respect of the wage period under
reference
f The contractor shall obtain the signature or thumb impression of the worker on the
wag slip at the time of disbursement of wages and retain the card with him
10 Employment card The contractor shall issue an Employment Card in the Form XIV of CL (RampA) Central Rules
1971 to each worker within three days of the employment of the worker
11 Service certificate
On termination of employment for any reason whatsoever the contractor shall issue to the
workman whose services have been terminated a Service Certificate in the Form XV of the
CL (RampA) Central Rules 1971
12 Preservation of labour records The labour records and records of Fines and deductions shall be preserved in original for a
period of three years from the date of last entries made in them and shall be made available for
inspection by the Engineer-in-Charge or Labour Officer or any other officers authorized by the
Ministry of Communication in this behalf
13 Power of labour officer to make investigations or enquiry The labour officer or any person authorized by the Central Government on their behalf shall
have power to make enquiries with a view to ascertaining and enforcing due and proper
observance of Fair Wage Clauses and provisions of these Regulations He shall investigate
into any complaint regarding the default made by the contractor in regard to such provision
14 Report of Investigating officer and action thereon The labour Officer or other persons authorized as aforesaid shall submit a report of result of
his investigation or enquiry to the Engineer in-Charge indicating the extent if any to which
the default has been committed with a note that necessary deductions from the contractorrsquos bill
be made and the wages and other dues be paid to the labourers concerned The Engineer in-
Charge shall arrange payments to the labour
concerned within 45 days from the receipt of the report from the Labour Officer or the
authorized officer as the case may be
15 Inspection of Books And slips The contractor shall allow inspection of all the prescribed labour records to any of his workers
or to his agent at a convenient time and place after due notice is received or to the Labour
Officer or any other person authorized by the Central Government on his behalf
16 Submission of Returns The contractor shall submit periodical returns as may be specified form time to time
17 Amendments
The Central Government may from time to time add to or amend the regulations and on any
question as to the applicationinterpretation or effect of those regulations
Contractor must fulfill the terms and condition towards fulfillmentscompliance of the
provision of EPF amp Miscprovision act 1952 amp Employment provident Fund Scheme 1952 in
respect of laborersemployees engaged by the contractor Contractor must submit declaration
form regarding compliance of the condition of EPF act 1952
525 INSURANCE Without limiting any of his other obligations or liabilities the contractor shall at his own
expense take and keep comprehensive insurance including third party risk for the plant
machinery men materials etc brought to the site and for all the work during the execution
The contractor shall also take out workmenrsquos compensations insurance as required by law and
under take to indemnify and keep indemnified the Government from and against all manner of
Seal amp Signature of Bidder
44
claims and demands and losses and damages and cost (including between attorney and client)
charges and expenses that may arise in regard the same or that the Government may suffer or
incur with respect to endor incidental to the same The contractor shall have to furnish
originals and or attested copies as required by the BSNL of the policies of insurance taken
within 15 (fifteen) days of being called upon to do so together with all premium receipts and
other papers related thereto which the BSNL may require
526 COMPLIANCE WITH LAWS AND REGULATION
During the performance of the works the contractor shall at his own cost and initiative
fully comply with all applicable laws of the land and with any and all applicable by-laws
rules regulations and orders and any other provisions having the force of law made or
promulgated or deemed to be made or promulgated by the Government Governmental
agency or BSNL municipal board Government of other regulatory or Authorized body or
persons and shall provide all certificates or compliance therewith as may be required by
such applicable law By-laws Rules Regulations orders and or provisions The
contractor shall assume full responsibility for the payment of all contributions and pay roll
taxes as to its employees servants or agents engaged in the performance of the work
specified in the contractor documents If the contractor shall require any assignee or sub-
contract to comply with the provisions of the clause and in this connection the contractor
agrees as to undertake to save and hold the Government harmless and indemnified from
and against any all penalties actions suits losses and damages claims and demands and
costs (inclusive between attorney and client) charges and expenses whatsoever arising out
or occasioned indirectly or directly by failure of the contractor or any assignee or sub-
contractor to make full and proper compliance with the said by-laws Rules Regulations
laws and Order and provisions as aforesaid
6 TOOLS and PLANTS
The contractor shall provide at his own cost all tools plants appliances implements etc
required for proper execution of works The contractor shall also supply without charge
the requisite number of persons with the means and materials necessary for the purpose of
setting out works counting weighing and assisting the measurements for examination at
any time and from time to time Failing his so doing the same may be provided by the
Engineer-in-charge at the expense of the contractor and the expenses shall be deducted
from any money due to the contractor under this contract or otherwise
As per Para 367 of the recommendationobservation of Tenth Report of parliamentary
standing committee on labour Contractor would provide the same social security to the
labours engaged by him as is available to regular employees
As per Para 368 of the recommendationobservation of Tenth Report of parliamentary
standing committee on labour Contractor shall ensure implementation of equal pay for equal
work and also equal remuneration to men and women
Seal amp Signature of Bidder
45
SECTION ndash 7
PROFORMAS
7 (A) BID SECURITY EMD Guarantee
(To be typed on Rs100- non-judicial stamp paper)
Whereas (hereinafter called the Bidder) has submitted its bid datedfor
the supply of vide Tender Nohelliphelliphelliphelliphelliphelliphelliphellip dated KNOW ALL MEN by
these presents that WE OF having our registered office at
(hereinafter called the Bank) are bound unto Bharat Sanchar Nigam Limited (hereinafter
called the Purchaser) in the sum of Rs for which payment will and truly to be made of
the said Purchaser the Bank binds itself its successors and assigns by these present
THE CONDITIONS of the obligation are
1 If the Bidder withdraws his bid during the period of bid validity specified by the Bidder
on the Bid form or
2 If the Bidder having been notified of the acceptance of his bid by the Purchaser during the
period of bid validity
(a) fails or refuses to execute the Contract if required or
(b) fails or refuses to furnish the Performance Security in accordance with the instructions to
Bidders
We undertake to pay to the Purchaser up to the above amount upon receipt of its first written demand
without the purchaser having to substantiate its demand provided that in its demand the purchaser
will note that the amount claimed by it is due to it owning to the occurrence of one or both of the two
conditions specifying the occurred condition or conditions
This guarantee will remain in force as specified in clauses 12 and 282 of section 4 Part A of the Bid
Document upto and including THIRTY (30) days after the Period of bid validity and any demand in
respect thereof should reach the Bank not later than the specified datedates
Signature of the Bank Authority
Name
Signed in Capacity of
Name amp Signature of witness Full address of Branch
Address of witness Tel No of Branch
Fax No of Branch
Seal amp Signature of Bidder
46
7 (B) PERFORMANCE SECURITY BOND FORM
(To be typed on Rs100- non-judicial stamp paper)
Datedhelliphelliphelliphelliphellip
Sub Performance guarantee
Whereas General Manager Telecom Bhuj Telecom District Bhuj (hereafter referred to as BSNL) has issued an AWO no
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellipDated helliphelliphelliphellip20hellip awarding the work of
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip to Ms
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip(hereafter referred to as ldquoBidderrdquo) and BSNL has asked him to submit a performance guarantee
in favour of AO(Cash) BSNL Oo GMTD BHUJ of Rs helliphelliphelliphelliphelliphellip- (hereafter referred to as ldquoPG Amountrdquo) valid up
to helliphelliphelliphellip20helliphelliphellip (hereafter referred to as ldquoValidity Daterdquo)
Now at the request of the Bidder We helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellipBank
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip Branch having (Address) and Regd
office address as helliphelliphellip helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip (Hereinafter called lsquothe
Bankrdquo) agreed to give this guarantee as hereinafter contained
2 We ldquothe Bankrdquo do hereby undertake and assure to the BSNL that if in the opinion of the BSNL the Bidder has in any way
failed to observe or perform the terms and conditions of the said agreement or has committed any breach of its obligations
there-under the Bank shall on demand and without any objection or demur pay to the BSNL the said sum limited to PG
Amount or such lesser amount as BSNL may demand without requiring BSNL to have recourse to any legal remedy that may
be available to it to compel the Bank to pay the same
3 Any such demand from the BSNL shall be conclusive as regards the liability of Bidder to pay to BSNL or as regards the
amount payable by the Bank under this guarantee The Bank shall not be entitled to withhold payment on the ground that the
Bidder had disputed its liability to pay or has disputed the quantum of the amount or that any arbitration proceeding or legal
proceeding is pending between Bidder and BSNL regarding the claim
4 We the Bank further agree that the guarantee shall come into force from the date of its issue and shall remain in full force
and effect up to its Validity date
5 The Bank further agrees that the BSNL shall have the fullest liberty without the consent of the Bank and without affecting
in any way the obligations hereunder to vary any of the terms and conditions of the said agreement or to extend the time for
performance of the said agreement from any of the powers exercisable by BSNL against the Bidder and to forebear to enforce
any of the terms and conditions relating to the said agreement and the Bank shall not be relieved from its liability by reason
of such failure or extension being granted to Bidder or through any forbearance act or omission on the part of BSNL or any
indulgence by BSNL to Bidder or any other matter or thing whatsoever which under the law relating to sureties would but for
this provision have the effect of relieving or discharging the guarantor
6 Notwithstanding anything herein contained
(a) The liability of the Bank under this guarantee is restricted to the PG Amount and it will remain in force up to its Validity
date
(b) The guarantee shall stand completely discharged and all rights of the BSNL under this Guarantee shall be extinguished if
no claim or demand is made on us in writing on or before its validity date
7 In case BSNL demands for any money under this bank guarantee the same shall be paid through bankerrsquos Cheque in
favour of ldquoAO(Cash) BSNL Oo GMTD BHUJ rdquo payable at Bhuj
8 The Bank guarantees that the below mentioned officer who have signed it on behalf of the Bank have authority to give this
guarantee under its delegated power
Place helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip
Date helliphelliphelliphelliphelliphelliphelliphelliphelliphellip (Signature of the Bank Officer)
Rubber stamp of the bank
Authorized Power of Attorney Number helliphelliphelliphelliphelliphellip
Name of the Bank officer helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip
Having examined the tender documents terms and conditions stipulated therein specifications of work
etc we the under signed offer to execute the repair Works in conformity with the said specifications and
conditions of contract as under
Sl No
ITEM DESCRIPTION
Repair Charges per module inclusive of freight
forwardingpacking amp all taxes amp levies (except GST)
(in Figure)
Unit Rate in Words
Total Cost (unit rate qty)
1 2 3 4 5
1 25 AMP Module
2
50 AMP Module
3 100 AMP Module
4 Control Panel of
Power Plants
25A 50A amp 100A
5 GRAND TOTAL
Note -
1 GST will be payable extra on approved rates 2If our Bid is accepted we shall submit the securities as per the conditions mentioned in the contract
3We agree to abide by this Bid for a period of 180 days from the date of opening of financial bid and it shall
remain binding upon us and may be accepted at any time before the expiry of that period
4 The evaluation will be made on the basis of lowest rate quoted as under Lowest Rate = (rate quoted for 25 AMP Qty + rate quoted for 50 AMP Qty + rate
quoted for 100 AMP Qty + rate quoted for Control Panel of Power Plant AMP Qty)
The bidder who has offered lowest rate as evaluated above will be treated as L1 bidder
Date Signature of Tenderer
Seal amp Signature of Bidder
49
CHECK LIST
Sl No
Description Tender Clause Mode of Submission
1 Tender Fee Section 1 (part A) Para 21 22
Off-line
2 EMD Section 1 (part A) Para 51 52 Off-line 3 Power of Attorney Section 4 (Part A) clause 143 Off-line 4 Latest and Valid MSME NSIC certificate (If Applicable) Off-line 5 Experience Certificate Section 1 (part A)
rohelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphereby certify that we or our firm
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip has not been BLACK LISTED by
any SSACircle of MTNLBSNL In case at any stage it is found that the information given by me is
falseincorrect BSNL shall have the absolute right to take any action as deemed fitwithout any prior
intimation to me
e) Clause by Clause Compliance
It is to certify that the tender document is carefully read amp understood and all the sections and clauses
are complied unconditionally amp unequivocally There is no deviation from the terms amp conditions of
the tender
f) Declaration for EPF amp Misc Provisions Act 1952
I _____________________________ (Name of the bidder agency) hereby declare compliance
towards conditions of the EPF and Misc Provisions Act 1952 and authorize BSNL to recover any
payment that arises due to failure to comply with any of the Labour legislations and statutory
conditions viz Labor EPF ESI etc or any other acts dealing with the same and all other acts
mentioned in the tender document
g) CERTIFICATE REGARDING FIRM IS NOT BLACK LISTED BY GST AUTHORITY
rohelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphereby certify that we or our firm
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip has not been BLACK LISTED by
any GST Authority
Date helliphelliphelliphelliphellip helliphellip helliphelliphelliphelliphelliphelliphelliphelliphellip
Signature of Tenderer
Place helliphelliphelliphelliphellip Name of Tenderer
Along with date amp Seal
Seal amp Signature of Bidder
11
SECTION- 2 PART D
DECLARATION REGARDING NO RELATIVE WORKING IN BSNL
I ___________________________Son of W O___________________________
RO _________________________here by certify that none of my relative(s) as defined in tender
document isare employed in BSNL unit as per details given in tender document In case at any stage
it is found that the information given by me is false incorrect BSNL shall have the absolute right to
take any action as deemed fit without any prior intimation to me
Signed ___________________
For and on behalf of the Agency
Name (Capitals) ___________________________
Position ____________________________
Date ____________________________
Note - In case of proprietorship firm certificate will be given by the proprietor for partnership firm
certificate will be given by all the partners on separate paper and in case of limited company by all
the Directors of the Company on separate paper Any breach of these conditions by the company or
firm or any other person the tender work will be cancelled and earnest money security deposit will
be forfeited at any stage whenever it is so noticed BSNL will not pay any damages to the company or
firm or the concerned person The company or firm or the person will also be debarred for further
participation in the concerned unit
Seal amp Signature of Bidder
12
SECTION- 3
SCOPE OF WORK AND JURISDICTION OF CONTRACT
1 SCOPE OF WORK
1 During the entire period of contract repairing of all types and of any make such as AMAR RAJA DACS DELTA DYNA ELTEK EXICOM HIMACHAL EXICOM ITI etc SMPS Power plant Modules (25 AMP 50 AMP 100 Amp ) Control panel are to be carried out including replacement of faulty parts
2 Collection and Delivery of Faulty repaired modules - a The concerned JTOSDEAGM in charge will intimate the contractor the Location Make capacity and
quantity of faulty modules by email (copy to AGM(Plg) on agmplgbhujgmailcom ) followed by ERP PO on mail
b The contractor will collect the module from the concerned in charge with in THREE days from the date of intimation under proper receipt to the concerned in charge However under emergent condition the collection of modules may be done on the same day
c Packing transport and delivery of faulty as well as repaired modules is the responsibility of the contractor
d The contractor shall repair the module and return to the concerned in charge with in Seven days of its collection However under emergent condition as decided by the concerned in charge the collection and repair shall be made within the time period given in the ERP PO
e Repaired modules will be tested by the SDE concern within TWO days on receipt of repaired modules if it is found OK then a certificate of this may be issued to the contractor Otherwise same shall be returned to the contractor for necessary action
f The date of receipt of all the modules mentioned in the ERP PO duly tested OK will be reckoned as the completion of ERP PO
g Repaired modules are warranted for 3 months from the date of successfully taken over During this time the contractor has to rectify the module free of cost
3 INSPECTION AND TESTS - a) The BSNL BHUJ or his representative shall have the right to inspect and test the repaired module as
per prescribed test schedules for their conformity to the specifications Where the BSNL BHUJ decides to conduct such tests on the premises of the Contractor or its subcontractor(s) all reasonable facilities and assistance like Testing Instruments and other test gadgets including access to drawings and production data shall be furnished to the inspectors at no charge to the Purchaser
b) Should any inspected or tested repaired module fail to conform to the Specifications the BSNL BHUJ may reject them and the Contractor shall either replace the rejected repaired module or make all alterations necessary to meet Specification requirements free of cost to the Purchaser
c) Notwithstanding the pre-repair tests and inspections prescribed in clause 3(a) amp 3(b) above the module and accessories on receipt in the BSNL s premises will also be tested during and after installation before take over and if any equipment or part thereof is found defective the same shall be replaced free of all cost to the BSNL BHUJ
d) If any module or any part thereof before it is taken over under clause 3(e) below is found defective or fails to fulfill the requirements of the contract the inspector shall give the Contractor notice setting forth details of such defects or failure and the Contractor shall make the defective module good or alter the same to make it comply with the requirements of the contract forthwith and in any case within a period not exceeding one month of the initial report The replacements shall be made by the Contractor free of all charges at site should it fail to do so within this time the BSNL BHUJ reserves the discretion to reject and replace at the cost of the Contractor the whole or any portion of the module as the case may be which is defective or fails to fulfill the requirements of the contract The cost of any such replacement made by the BSNL BHUJ shall be deducted from the amount payable to the Contractor
Seal amp Signature of Bidder
13
e) When the performance tests called for have been successfully carried out the inspector ultimate
Consignee will forthwith issue a Taking Over Certificate The inspectorultimate consignee shall not delay the issue of any Taking Over Certificate ldquo contemplated by this clause on account of minor defects in the module which do not materially affect the commercial use thereof provided that the Contractor shall undertake to make good the same in a time period not exceeding two months The taking Over Certificate shall be issued by the ultimate consignee within six weeks of successful completion of tests
f) After performance test carried out by the concerned SDE of BSNL as per prescribed schedule and repaired modules are found ok in all respect than the repaired modules will be accepted
g) A register is to be maintained at each placelocation mentioning the details of Modules date of Collection and Delivery of Faulty repaired modules replacement of spares amp remark if any and it is to be signed by the controlling officer amp Service engineer
h) Nothing in clause 3 shall in any way release the Contractor from any Warranty or other obligations under this contract
4 SPARES - All the spare of good quality required for repair of modules of SMPS PP are to be supplied by the contractor including major components
5 The contractor shall be responsible for any loss or damages caused to man or machinespartsinstruments during the execution of work and shall replace with an identical new item at his own cost The authorized officerperson of BSNL will have the liberty to check the material and work etchellip provided by the contractor
6 Governing Conditions for RNP (Repair Not Possible) Cases
A module Control panel may be declared RNP only if cost of material to be replaced exceeds five times of approved rate of repair In no case labour cost involved will be considered for deciding RNP A detailed report is to be submitted by contractor to concerned officer in-charge and final decision in this regard will be taken by concerned DGM subjected to maximum permissible RNP as given below
a)25-A module Maximum 10 of total quantity ordered for repair
b) 50-A 100-A Module Maximum 5 of total quantity ordered for repair
c) Control Panel Maximum 10 of total quantity ordered for repair
In case of RNP exceeding permissible limits penalty will be imposed as per para 11 (d) of section-5 (Part-A)
7 WARRANTY - a) Repaired modules are warranted for 3 months from the date of successfully taken over During this
time the contractor has to rectify the module free of cost The contractor shall warrant that repaired module shall be free from all defects and faults in materials used workmanship It becomes necessary for the contractor to replace or renew any defective portion(s) of the module under this clause
b) Replacement under warranty clause shall be made by the contractor free of all charges at site including freight insurance and other incidental charges
c) If any defect is not remedied by the contractor within a reasonable time the BSNL BHUJ may proceed to get the defects remedied from other contractor etc at the contractors risk and expenses but without prejudice to any other rights which the BSNL BHUJ may have against the contractor in respect of such defects
Seal amp Signature of Bidder
14
SECTION- 4 (Part-A)
GENERAL INSTRUCTION TO BIDDERS (GIB)
1 DEFINITIONS
1 BSNL The BSNL means the BSNL Bhuj Telecom Dist under the Ministry of
Communications which invites the tenders on behalf of the General Manager Bhuj Telecom
District Includes executives in the BSNL whatever designations assigned to them from time
to time who may be the in-charge of direction supervision testing acceptance and
maintenance including their successor(s) in the office appearing in various clauses shall be
taken to mean the BSNL Bhuj Telecom District
b The SSA Head means the Head of SSA General Manager Bhuj Telecom District Bhuj and
his successors
c The jurisdiction of the SSA Head The jurisdiction of the SSA Head means Bhuj Telecom
District which coincides geographically with (Revenue District(s))
d Representative of (the SSA Head) Representative of (the SSA Head ) means Officer and
staff for the time being in Bhuj Telecom District deputed by the General Manager Bhuj for
inspecting or supervising the work of testing etc
e Engineer ndash in - charge The Engineer ndash in - charge means the Engineering Officer
nominated by the BSNL to supervise the work under the contract (Minimum Divisional
Engineer level Officer)
f Site Engineer Site Engineer shall mean an SDESDOJTO of the BSNL who may be placed by
the General Manager Bhuj Telecom District Bhuj as in ndash charge of the work at site at any
particular period of time
g AT Unit AT Unit shall mean Acceptance and Testing unit of the BSNL
h AT Officer An officer authorized by General Manger ndash Bhuj Telecom Dist
i Contract The term contract means the documents forming the tender and acceptance
thereof and the formal agreement executed between the competent authority on behalf of the
BSNL and the contractor together with the documents referred to therein including these
conditions the specifications designs drawings and instructions issued from time to time by
the engineer in ndash charge and all these documents taken together shall be deemed to form one
contract and shall be complementary to one another In the contract the following expressions
shall unless the context otherwise requires have the meanings hereby respectively assigned to
them The expression works or work shall unless there be something either in the subject
context repugnant to such construction be construed or taken to mean the works by or by
virtue of the contract contracted to be executed whether temporary or permanent and whether
original altered substituted or additional
j Contractor The contractor shall mean the individual firm or company enlisted or not
enlisted with BSNL Department of Telecom in accordance with procedure for contractor or
registered for carrying out the work of cable laying whether incorporated or not undertaking
the works and shall include the legal personal representative of such individual or the persons
composing such firm or company or the successors of such firm or company and the
permitted assignees of such individual firm or company
k Work The expression lsquoworksrsquo shall unless there be something either in the subject or context
repugnant to such construction be construct and taken to mean the works by or by virtue of the
Seal amp Signature of Bidder
15
contract contracted to be executed whether temporary or permanent and whether original
altered substituted or additional
l Schedule(s) Schedule(s) referred to in these conditions shall mean the relevant schedule(s)
or the standard schedule of rates mentioned in the document
m Site The site shall mean the land or other places on into or through which work is to be
executed under the contract or any adjacent land path or street through which the work is to
be exacted under the contract or any adjacent land path or street which may be allotted or
used for the purpose of carrying out the contract
n Normal time or stipulated time Normal time or stipulated time means time specified in the
ERP PO to complete the work
o Extension of Time Extension of Time means the time granted by the BSNL to complete the
work beyond the normal time or stipulated time
p Exceptional risk Exceptional risks are risk due to war(whether declared or not) invasion act
of foreign enemies hostilities civil war rebellion revolution insurrection military or
usurped power any acts of Government damages from aircraft acts of God such as
earthquake lightening and unprecedented floods and other causes over which the contractor
has no control and the same having been accepted as such by the Accepting Authority or
causes solely due to use or occupation by the government of the part of the work in respect of
which a certificate of completion has been issued
q The ERP PO means the Order placed by the field units on the contractor signed by
the unit incharge r The Contract Rate means the rate payable to the repairer under the work order for
the full and proper performance of its contractual obligations
2 ELIGIBLE BIDDERS Kindly refer to clause 4 of Section ndash 1 Part A ie Detailed NIT
3 COST OF BIDDING
The bidder shall bear all costs associated with the preparation and submission of the bid The
BSNL will in no case be responsible or liable for these costs regardless of the conduct or
outcome of the bidding process
4 BID DOCUMENTS
41 The goods services required to be supplied bidding procedures and contract terms are prescribed
in the Bid Documents The contents of the Bid documents are specified in the covering letter
42 The Bidder is expected to examine all instructions forms terms and specifications in the Bid
Documents Failure to furnish all information required as per the Bid Documents or submission
of bids not substantially responsive to the Bid Documents in every respect will be at the bidders
risk and may result in rejection of the bid
5 CLARIFICATION OF BID DOCUMENTS
51 A prospective bidder requiring any clarification on the Bid Documents shall notify the User in
writing by FAX or by Email of the User as indicated in the invitation of Bid The User shall
respond in writing to any request for the clarification of the Bid Documents which it receives
7days prior to the date of opening of the Tenders Copies of the query (without identifying the
source) and clarifications by the User shall be uploaded on BSNL website as lsquoClarificationsrsquo on
e-procurement portal of Bhuj Telecom District portal clarification shall be available as
lsquoAddendumrsquo for all the prospective bidders who have downloaded the official copy of tender
documents from e-procurement portal of Bhuj Telecom District
Seal amp Signature of Bidder
16
52 Any clarification issued by BSNL in response to query raised by prospective bidders shall form
an integral part of bid documents and it may amount to an amendment of relevant clauses of the
bid documents
6 AMENDMENT OF BID DOCUMENTS
61 The BSNL may for any reason whether at its own initiative or in response to a clarification
requested by a prospective Bidder may modify bid documents by amendments prior to the date
of submission of Bids with due notification to prospective Bidders
62 The amendments shall be notified in writing or by Fax or by Addendum through e-tendering
portal to all prospective bidders on the address intimated at the time of purchase of bid document
from the BSNL and these amendments will be binding on them
63 In order to afford prospective bidders reasonable time in which to take the amendments into
account in preparing their bids the BSNL may at its discretion extend the deadline for the
submission of bids suitably
7 DOCUMENTS COMPRISING THE BID
The bid prepared by the bidder shall comprise the components specified in Section 2 of this
Tender
8 BID FORM
The bidder shall complete the Bid Form and the appropriate Price Schedule furnished in the Bid
Documents as per Section- 8
9 BID PRICES
91 The bidder shall give the total composite price inclusive of all levies and taxes packing
forwarding freight and insurance in case of materials to be supplied and inclusive of all taxes
and levies except GST in case of works to be executed GST will be paid extra as applicable
The contractor shall be responsible for transporting the materials to be supplied by the BSNL
(At the field Unit Telecom Store or otherwise) to execute the work under the contract to site at
histheir own cost The costs of transportation are subsumed in the standard Schedule Rates and
therefore no separate charges are payable on this account The offer shall be firm in Indian
Rupees
92 The price quoted by the bidder shall remain fixed during the entire period of contract and shall
not be subject to variation on any account A bid submitted with an adjustable price quotation
will be treated as non-responsive and rejected
93 Discount if any offered by the bidders shall not be considered unless they are specifically
indicated in the schedule of rates (financial Bid) Bidders desiring to offer discount shall
therefore modify their offers suitable while quoting and shall quote clearly net price taking all
such factors like Discount free supply etc into account
10 DOCUMENTS ESTABLISHING BIDDERS ELIGIBILITY AND QUALIFICATIONS Kindly refer to clause of Section ndash 1 and 2 of this bid
11 NA
12 BID SECURITYEMD
121 The bidder shall furnish as part of its bid a bid security one of the following ways-
(a) Demand Draft Bankerrsquos cheque from a Nationalizedscheduled bank drawn in favour
of AO (Cash) BSNL Oo GMTD Bhuj and payable at Bhuj
(b) Bank GuaranteeFDR from a Nationalizedscheduled bank drawn in favour of AO
(Cash) BSNL Oo GMTD Bhuj which should be valid for 180 days from the tender
opening date
For educational order EMD to be submitted by bidder as 20 of 10 of estimated tender
cost for each case in the form of cash Demand Draft Bankerrsquos cheque Bank guaranteeFDR
issued by a NationalizedScheduled bank drawn in favour of AO (Cash) BSNL Oo GMTD
Bhuj Bank Guarantee should be valid for 180 days from the tender opening date
122 The MSE bidders are exempted from payment of bid security
Seal amp Signature of Bidder
17
a) A proof regarding valid registration with body specified by Ministry of Micro Small
amp Medium Enterprise for the tendered items will have to be attached along with the
bid
b) The enlistment certificate issued by MSME should be valid on the date of opening of
tender
c) MSE unit is required to submit its monthly delivery schedule
d) If a vender registered with body specified by Ministry of Micro Small amp Medium
Enterprise claiming concessional benefits is awarded work by BSNL and
subsequently fails to obey any of the contractual obligations he will be debarred from
any further work contract by BSNL for one year from the date of issue of such order
123 The bid security is required to protect the BSNL against the risk of bidders conduct which would
warrant the bid securityrsquos forfeiture pursuant to para 127
124 A bid not secured in accordance with para 121 amp 122 shall be rejected by the BSNL being non-
responsive at the bid opening stage and archived unopened on e-tender portal for e-tenders
125 The bid security of the unsuccessful bidder will be dischargedreturned as promptly as possible
as but not later than 30 days after the expiry of the period of bid validity prescribed by the
BSNL pursuant to clause 13
126 The successful bidders bid security will be discharged upon the bidders acceptance of the
advance Purchase Order satisfactorily pursuant to clause 27 and furnishing the performance
security
The successful bidders bid security may be converted to Part Performance Security Deposit in
accordance with clause 28
127 The bid security may be forfeited
a) If the bidder withdraws or amends its bid or impairs or derogates from the bid in any
respect during the period of bid validity specified by the bidder in the bid form or
extended subsequently or
b) If the bidder does not accept the APO AWO and or does not submit PBG amp sign the
contract agreement in accordance with clause 28
Note - The bidder shall mean individual company firm or the front bidder and its technology
consortium partner as applicable
13 PERIOD OF VALIDITY OF BIDS
131 Bid shall remain valid for 150 days from the date of bid opening prescribed by the BSNL A bid
valid for a shorter period shall be rejected by the BSNL as non-responsive
132 In exceptional circumstances the BSNL may request the bidders consent for an extension to the
period of bid validity The request and the responses thereto shall be made in writing The bid
security provided under Clause 12 shall also be suitably extended A bidder may refuse the
request without forfeiting his bid security A bidder accepting the request and granting extension
will not be permitted to modify his bid
14 FORMAT AND SIGNING OF BID
141 The bidder shall submit his bid online (in case of e-tendering) amp through sealed envelopes
physically (in case of tenders with manual bidding process) complying all eligibility
conditions other terms and conditions of tender document to be read along with the
clarifications and amendments issued in this respect All the documents must be authenticated
using Digital Signature (DSC) with Class 2 or above (in case of e-tendering) amp by hand
signatures (for manual bidding process) by the authorized person The letter of authorization
shall be indicated by written power-of-attorney accompanying the bid
Note-The BSNL may ask the bidder(s) to supply besides original bid additional copy of bids as
required by him
142 The bid shall contain no interlineations erasures or overwriting except as necessary to correct
errors made by the bidder in which case such corrections shall be signed by the person or persons
signing the bid All pages of the original bid except for un-amended printed literatures shall be
digitally signed by the person or persons signing the bid
143 Power of Attorney
(a) The power of Attorney should be submitted and executed on the non-judicial stamp paper
Seal amp Signature of Bidder
18
of appropriate value as prevailing in the concerned states(s) and the same be attested by a
Notary public or registered before Sub-registrar of the state(s) concerned
(b) The power of Attorney be executed by a person who has been authorized by the Board of
Directors of the bidder in this regard on behalf of the Company institution Body
corporate
(c) In case of the bidder being a firm the said Power of Attorney should be executed by all the
partner(s) in favour of the said Attorney
(d) Attestation of the specimen signatures of authorized signatory by the Companyrsquos firmrsquos
bankers shall be furnished Name designation Phone number mobile number email
address and postal address of the authorized signatory shall be provided
(e) Individual signing the tenders or other documents connected with the contract shall indicate
the full name below the signature and must specify the capacity and authority under which
he signs such documents and shall also submit documentary evidence of his authority in
the form of Power of Attorney
(f) The Power of Attorney is to be submitted in original if it has been issued for the specific
tender enquiry If the power of attorney is issued in general irrespective of tender enquiry
then photocopy duly certified by notary public can also be accepted
(g) In case the representative of bidder company who uploads the document on e-tender portal
using his Digital Signature Certificates (DSC) which is different from the authorized
signatory for the bid (Power of Attorney holder) then the representative who uploads the
documents on e-tender portal using DSC issued in his name shall also be one of the Power
of Attorney holder by the bidder Company in addition to the authorized signatory for the
bid
15 SEALING AND MARKING OF BIDS
The bid shall be submitted online using single stage bidding and Two Envelope Methodology
151 The first envelope (Techno-commercial bid) This envelope shall contain documents of
bidders satisfying the eligibility Technical amp commercial conditions requirements Second
envelope will be named as financial bid containing price Schedule as per section 8 All
documents submitted will also be self attested by the bidder
152 a) The envelopes for Tender Fee EMD shall be addressed AGM (PLG) Oo GMTD
Haripar Road Bhuj - 370001
b) The envelope for Tender Fee EMD shall bear the name of the tender the tender number
and the words DO NOT OPEN BEFORE (due date amp time)
c) The envelopes for Tender Fee EMD shall indicate the name and complete postal address
of the bidder to enable the User to return the bid unopened in case it is declared to be received
late
d) The envelopes for Tender Fee EMD shall should be deposited in the tender box provided
by tendering authority or sent by registered post or delivered in person on above mentioned
address (address is given above) The responsibility for ensuring that the envelopes for Tender
Fee EMD shall are delivered in time would vest with the bidder
e) The envelopes for Tender Fee EMD shall delivered in person registered post on the day of
tender opening shall be delivered upto specified time amp date as stated in NIT to Oo GMTD
Haripar Road Bhuj - 370001 The User shall not be responsible if the envelopes for Tender
Fee EMD shall are delivered elsewhere
f) Venue of Tender Opening
Tender will be opened in Oo GMTD Haripar Road Bhuj - 370001 at specified time amp
date as stated in NIT If due to administrative reason the venue of Bid opening is changed it
will be displayed prominently on the above address
Seal amp Signature of Bidder
19
153 If envelopes are not sealed and marked as required at para 151 and 152 the bid shall be
rejected
16 SUBMISSION OF BIDS
161 Bids must be submitted by the bidders on or before the specified date amp time indicated in
Section-1 ie DNIT
162 The BSNL may at its discretion extend this deadline for the submission of the bids by
amending the bid documents in accordance with Clause 6 in which case all rights and
obligations of the BSNL and bidders previously subject to the deadline will thereafter be
subject to the deadline as extended
163 The bidder shall submit his bid offer against a set of bid documents purchased by him for all
or some systemservices equipment as per requirement of the Bid Documents He may
include alternate offer if permissible as per the bid However not more than one independent
and complete offer shall be permitted from the bidder
164 Bid must be submitted by the bidder through E-Tendering mode only Manual submission of bid
shall not be needed
17 LATE BIDS
No bid shall be accepted either online by E-Tender Portal or physically in case of manual
bidding process after the specified deadline for submission of bids prescribed by the purchaser
18 MODIFICATION AND WITHDRAWAL OF BIDS
181 The bidder may modify revise or withdraw his bid after submission prior to deadline prescribed
for submission of bid If a bid is withdrawn the same shall be archived unopened in the e-
procurement portal of Bhuj Telecom District
182 The bidderrsquos modification revision or withdrawal shall have to be online and digitally
authenticated as per clause 15
183 Subject to clause 20 no bid shall be modified subsequent to the deadline for submission of bids
19 OPENING OF BIDS BY BSNL
191 The purchaser shall open bids online in the presence of bidders or their authorized representatives
who chose to attend at time specified in Clause 7 of Detailed NIT(Section-1) on due date The
bidderrsquos representatives who are present shall sign in an attendance register Authority letter to
this effect shall be submitted by the bidders before they are allowed to participate in bid opening
(As per Format given in section 2 Part B)
192 A maximum of two representatives for any bidder shall be authorized and permitted to attend
the bid opening
193 (i) The bids will be opened in two stages ie techno-commercial bid shall be opened on the date
of tender opening given in NIT The financial bid will not be opened on the date of opening of
techno commercial bids
The financial bids of those bidders who are approved to be techno commercially compliant by
the competent authority will be opened by TOC in front of techno-commercially eligible
bidders authorized representatives by sending them a suitable notice
(ii) The bidderrsquos names Item name EMD amount amp validity and acceptability Information in
respect of eligible bidders Details of bid modification withdrawal (if any) and such other
details as the purchaser at its discretion may consider appropriate will be made available
online at the time of techno-commercial bid opening
(iii) The bidderrsquos names Name of the Items Quantitiesprices quoted in the bid discount if
offered Taxes amp levies and such other details as the purchaser at its discretion may consider
appropriate will be made available online at the time of financial bid opening
194 The date fixed for opening of bids if subsequently declared as holiday by the BSNL the revised
date of schedule will be notified However in absence of such notification the bids will be
opened in the next working day time and venue remaining unaltered
20 CLARIFICATION OF BIDS
201 To assist in the examination evaluation and comparison of bids the BSNL may at its discretion
Seal amp Signature of Bidder
20
ask the bidder for the clarification of its bid The request for the clarification and the response
shall be in writing However no post bid clarification at the initiative of the bidder shall be
entertained
202 If any of the documents required to be submitted along with the technical bid is found wanting
the offer is liable to be rejected at that stage However the BSNL at its discretion may call for
any clarification regarding the bid document within a stipulated time period The BSNL at itrsquos
discretion may also ask for the submission of any additionalmissing document(s) within a
stipulated time period In such case(s) the bidder shall have to comply the BSNLrsquos requirement
within the specified time In case of non-compliance to such queries the bid will be out rightly
rejected without entertaining further correspondence in this regardrdquo However no post bid
clarification at the initiative of the bidder shall be entertained
21 PRELIMINARY EVALUATION
211 BSNL shall evaluate the bids to determine whether they are complete whether any
computational errors have been made whether required sureties have been furnished whether
the documents have been properly signed and whether the bids are generally in order
212 Arithmetical errors shall be rectified on the following basis If there is a discrepancy between
the unit price and total price that is obtained by multiplying the unit price and quantity the
unit price shall prevail and the total price shall be corrected by the BSNL
213 If there is a discrepancy between words and figures the amount in words shall prevail If the
SupplierBidder does not accept the correction of the errors his bid shall be rejected
214 Prior to the detailed evaluation pursuant to clause 22 the BSNL will determine the substantial
responsiveness of each bid to the Bid documents For purposes of these clauses a substantially
responsive bid is one which conforms to all the terms and conditions of the Bid Documents
without material deviations The BSNLs determination of bids responsiveness is to be based
on the contents of the bid itself without recourse to extrinsic evidence
215 A bid determined as substantially non-responsive will be rejected by the BSNL and shall not
subsequent to the bid opening be made responsive by the bidder by correction of the non-
conformity
216 The BSNL may waive any minor infirmity or non-conformity or irregularity in a bid which
does not constitute a material deviation provided such waiver does not prejudice or affect the
relative ranking of any bidder
22 EVALUATION AND COMPARISON OF SUBSTANTIALLY RESPONSIVE BIDS
221 The Purchaser shall evaluate in detail and compare the bids previously determined to be
substantially responsive pursuant to Clause 21
222 The evaluation will be made on the basis of lowest rate quoted as under Lowest Rate
= (rate quoted for 25AMP Qty +rate quoted for 50AMP 100 AMP Qty + rate
quoted for Control Panel of Power Plant Qty) The bidder who has offered lowest
rate as evaluated above will be treated as L1 bidder 23 CONTACTING THE BSNL
231 Subject to Clause 20 no bidder shall try to influence the BSNL on any matter relating
to its bid from the time of the bid opening till the time the contract is awarded
232 Any effort by a bidder to modify its bid or influence the BSNL in the BSNLs bid evaluation
bid comparison or contract award decisions shall result in the rejection of the bid
24 PLACEMENT OF ORDER
241 The BSNL may consider placement of orders to execute the contract on those bidders whose
offers have been found technically commercially and financially acceptable The BSNL reserves
the right to counter offer price(s) against price(s) quoted by any bidder
The work against the tender is for one yearrsquos requirement and the terms and conditions of
this tender shall be operative for a period of one year from the date of signing of agreement
between the Company and the contractor with an option of extension for a further period
of one year at the same rates terms amp conditions
Seal amp Signature of Bidder
21
Distribution of Work Distribution of quantities for ordering to the selected bidders of a tender
Table 1(A) (Without provisions for MSE Units)
No of Bidders
to be approved
(Col 1)
Quantity allotted to the respective bidder
(Col 2)
L1 L2
One Bidder 100 Nil
Two Bidder 60 40
Table 1(B) (With provisions for MSME Units)
No of Bidders
to be approved
(Col 1)
Quantity allotted to the respective bidder (Col 2)
Qty
Earmarked for MSME
bidder(s)(Col 3)
L1 L2
One Bidder 80 Nil 20
Two Bidder 48 32 20
1) In case L2 and MSE bidder accepts the L1 rate in prescribed time amp do not submit MSD as per
tender terms and conditions the EMD will be forfeited If MSE bidder exceeded more than one than
20 work at L1 rate distributed among them
242 TERMS AND CONDITIONS FOR EDUCATIONAL ORDER
(a) 10 of the estimated quantity of work will be extended to inexperienced contractor for each
Tender
(b) Inexperienced Bidder has to apply separately for each Tender
(c) In case there are more than one bidder work will be distributed into the bidders
(d) The bidder shall not submit financial bid In case if the same is submitted then it will not be opened
(e) BSNL reserves a right to give any area to this bidder including that of other tender in which the
bidder has not participated
(f) The work to the inexperienced is a limited quantity (up to 10) in at a time further work will be
done on the basis of evaluation of field unit Additional quantity of work shall be given to such
contractor only after completion of initial work
(g) The payment for repairing to such contractors shall be based on L1 rates finalized in the tender
The payment will be released only after verification of quantity amp quality done as per the
instruction mentioned in respect of work in the tender
(h) All the other Terms amp conditions will remain the same
25 BSNLS RIGHT TO VARY QUANTITIES AT TIME OF AWARD
(a) BSNL reserves the right to vary up to 25 of the quantity of goods and services specified in
the schedule of requirements without any change in the unit price or other terms and conditions at
the time of award of contract
(b) BSNL also reserves the right for placement of additional order or up to 50 of the
additional quantities of goods and services contained in the running tender contract in the tender
at the same rate or a rate negotiated (downwardly) with the existing venders considering the
reasonability of rates based on prevailing market conditions and the impact of reduction in duties
and taxes etc and supplies to be obtained within delivery period scheduled afresh
No guarantee can be given to actual quantity The quantity mentioned in the tender is
tentative only No claim should entertained for less not allotting the quantum of work for any
reason
(c) In exceptional situation where the requirement is of an emergent nature and it is necessary to
ensure continued supplies from the existing venders the purchaser reserves the right to place
repeat order up to 100 of the quantities of goods and services contained in the running tender
contract at the same rate or a rate negotiated (downwardly) with the existing venders considering
the reasonability of rates based on prevailing market conditions and the impact of reduction in
duties and taxes etc Exceptional situation and emergent nature should be spelt out clearly
detailing the justification as well as benefits accrued out of it and loss incurred in case this
provision is not invoked and approved by the authority competent to accord administrative and
Seal amp Signature of Bidder
22
financial approval for the procurement calculated on the basis of total procurement ie initial and
proposed add-on quantity
26 BSNLS RIGHT TO ACCEPT ANY BID AND TO REJECT ANY OR ALL BIDS
The BSNL reserves the right to accept or reject any bid and to annul the bidding process and
reject all bids at any time prior to award of contract without assigning any reason whatsoever and
without thereby incurring any liability to the affected bidder or bidders on the grounds for the
BSNLs action
27 ISSUE OF ADVANCE WORK ORDER
271 The issue of an Advance Work Order (Letter of Intent) shall constitute the intention of BSNL to
enter into the contract with the bidder
272 The bidder shall within 14 days of issue of an advance work order give his acceptance along with
Performance Security Deposit in conformity with section 7(B) provided with the bid documents
28 SIGNING OF CONTRACT
281 The issue of FAT shall constitute the award of contract on the bidder
282 As soon as the tender is approved by the competent authority the Bid Security deposited by the
successful bidder may be converted into the Performance security deposit which will be held by
the BSNL till the completion of warranty period
29 ANNULMENT OF AWARD
Failure of the successful bidder to comply with the requirement of Clause 27 amp 28 shall
constitute sufficient ground for the annulment of the award and forfeiture of the bid security in
which event the BSNL may make the award to any other bidder at the discretion of BSNL or call
for new bids
30 NA
31 REJECTION OF BIDS
311 While all the conditions specified in the Bid documents are critical and are to be complied special
attention of bidder is invited to the following clauses of the bid documents Non-compliance of any
one of which shall result in outright rejection of the bid
(i) Clause 15 of Section 4 Part A The bids will be recorded returned unopened if covers are not
properly sealed with lsquoPERSONAL SEALrsquo of the bidder
(ii) Clauses 121 122 amp 131 of Section 4 Part A The bids will be rejected at opening stage if Bid
security is not submitted as per Clauses 121 amp 122 and bid validity is less than the period
prescribed in Clause 131 mentioned above
(iii) Clause 2 amp 10 of Section 4 Part A If the eligibility condition as per clause 2 of Section 4 Part
A is not met andor documents prescribed to establish the eligibility as per Clause 10 of
section 4 Part A are not enclosed the bids will be rejected without further evaluation
(iv) Clause 112 of Section 4 Part A NA
(v) Section 5 Part A Commercial conditions Section 5 Part B Special Conditions of Contract
Compliance if given using ambiguous words like ldquoNotedrdquo ldquoUnderstoodrdquo ldquoNoted amp
Understoodrdquo shall not be accepted as complied Mere ldquoCompliedrdquo will also be not sufficient
reference to the enclosed documents showing compliances must be given
(vi) Section 8 Price Schedule Prices are not filled in as prescribed in Financial Bid
(vii) Section 4 Part A clause 93 on discount which is reproduced below
ldquoDiscount if any offered by the bidder shall not be considered unless specifically indicated in
the price schedule Bidders desiring to offer discount shall therefore modify their offer
suitably while quoting and shall quote clearly net price taking all such factors like discount
free supply etc into accountrdquo
312 Before outright rejection of the Bid by Bid-opening team for non-compliance of any of the
provisions mentioned in clause 311(i) 311 (ii) above the bidder company is given
opportunity to explain their position however if the person representing the company is not
satisfied with the decision of the Bid opening team hethey can submit the representation to
Bid opening team immediately but in no case after closing of the tender process with full
justification quoting specifically the violation of tender conditions if any
Seal amp Signature of Bidder
23
313 Bid opening team will not return the bids submitted by the bidders on the date of tender
opening even if it is liable for rejection and will preserve the bids in sealed cover as submitted
by taking signatures of some of the desirous representatives of the participating
biddercompanies present on the occasion
314 The In charge of the Bid opening team will mention the number of bids with name of
company found unsuitable for further processing on the date of tender opening and number of
representations received in Bid opening Minutes and if Bid opening team is satisfied with the
arguments of the biddercompany mentioned in their representation and feel that there is
prima-facie fact for consideration the in charge of the Bid opening team will submit the case
for review to competent authority ie GMTD BHUJ as early as possible preferably on next
working day and decision to this effect should be communicated to the bidder company within
a week positively Bids found liable for rejection and kept preserved on the date of tender
opening will be returned to the bidders after issue of POfinal acceptance of tender against
the instant tender
315 If the reviewing officer finds it fit to open the bid of the petitioner this should be done by
giving three (working) days notice to all the participating bidders to give opportunity to
desirous participants to be present on the occasion
32 ACTION BY PURCHASER AGAINST BIDDER(S) VENDOR(S) IN CASE OF
DEFAULT In case of default by Bidder(s) Vendor(s) such as
a) Does not supply the equipment services in time
b) Equipment Services does not perform satisfactory in the field in accordance with the
specifications
c) Or any other default whose complete list is enclosed in Appendix-1
Purchaser will take action as specified in Appendix-1 of this section
33 DELETED
34 NEAR-RELATIONSHIP CERTIFICATE
341 The bidder should give a certificate that none of his her near relative as defined below is
working in the units where he is going to apply for the tender In case of proprietorship firm
certificate will be given by the proprietor For partnership firm certificate will be given by all
the partners and in case of limited company by all the Directors of the company excluding
Government of India Financial institution nominees and independent non-Official part time
Directors appointed by Govt of India or the Governor of the state and full time Directors of
PSUs both state and central Due to any breach of these conditions by the company or firm or
any other person the tender will be cancelled and Bid Security will be forfeited at any stage
whenever it is noticed and BSNL will not pay any damage to the company or firm or the
concerned person
342 The Company or firm or the person will also be debarred for further participation in the
concerned unit
343 The near relatives for this purpose are defined as-
(a) Members of a Hindu undivided family
(b) They are husband and wife
(c) The one is related to the other in the manner as father mother son(s) amp Sons
wife(daughter in law) Daughter(s) and daughters husband (son in law) brother(s) and
brothers wife sister(s) and sisters husband (brother in law)
344 The format of the certificate is given in Section -2(D)
35 VERIFICATION OF DOCUMENTS AND CERTIFICATES
The bidder will ensure that all the documents and certificates including experience
performance and self certificates submitted by him are correct and genuine before enclosing
them in the bid The onus of proving genuineness of the submitted documents would rest with
the bidder If any document paper certificate submitted by the participant bidder is found
discovered to be false fabricated tempered manipulated either during bid evaluation or
during award of contract or thereafter then the Purchaser will take action as per Clause-1 of
Appendix-1 of this section
Seal amp Signature of Bidder
24
Appendix-1 to Section - 4 (Part-A)
S
No
Defaults of the bidder vendor Action to be taken
A B C
1(a) Submitting fake forged
i) Rejection of tender bid of respective Vendor
ii) Banning of business for 3 years which implies barring
further dealing with the vendor for procurement of Goods amp
Services including participation in future tenders invited by
BSNL for 3 years from date of issue of banning order
iii) Termination Short Closure of POWO if issued This
implies non-acceptance of further supplies work amp services
except to make the already received material work complete
work in hand
a) Bank Instruments with the bid to meet
terms amp condition of tender in respect of
tender fee and or EMD
b) Certificate for claiming exemption in
respect of tender fee and or EMD
c) detection of default at any stage from
receipt of bids till award of APO issue of
POWO
Note 1- However in this case the performance guarantee if alright will not be forfeited
Note 2- Payment for already received supplies completed work shall be made as per terms amp conditions of
PO WO
1(b)
Submitting fake forged documents towards
meeting eligibility criteria such as
experience capability supply proof
registration with GST Income Tax
departments etc and as supporting
documents towards other terms amp conditions
with the bid to meet terms amp condition of
tender
(i) If detection of default is prior to award
of APO
i) Rejection of Bid amp
ii) Forfeiture of EMD
(ii) If detection of default after issue of APO
but before receipt of PG SD (DDBG etc)
i) Cancellation of APO
ii) Rejection of Bid amp
iii) Forfeiture of EMD
(iii) If detection of default after receipt of
PG SD (DDBG etc)
i) Cancellation of APO
ii) Rejection of Bid amp
iii) Forfeiture of PG SD
However on realization of PG SD amount EMD if not
already released shall be returned
(iv) If detection of default after issue of PO
WO
i) Termination Short Closure of POWO and Cancellation
of APO
ii) Rejection of Bid amp
iii) Forfeiture of PG SD
However on realization of PG SD amount EMD if not
released shall be returned
Note 3- However settle bills for the material received in correct quantity and quality if pending items do
not affect working or use of supplied items
Note 4- No further supplies are to be accepted except that required to make the already supplied items
work
Special Note 1- Authority competent to take final decision GMTD Bhuj
2 If vendor or his representative uses violent
coercive means viz Physical Verbal means
to threatens BSNL Executive employees
and or obstruct him from functioning in
discharge of his duties amp responsibilities for
the following
Banning of business for 3 years which implies Barring
further dealing with the vendor for procurement of Goods amp
Services including participation in future tenders invited by
BSNL for 3 years from date of issue of banning order
a) Obstructing functioning of tender opening
executives of BSNL in receipt opening of
tender bids from prospective Bidders
suppliers Contractors
Seal amp Signature of Bidder
25
b) Obstructing Threatening other
prospective bidders ie suppliers
Contractors from entering the tender venue
and or submitting their tender bid freely
Special Note 1- Authority competent to take final decision GMTD Bhuj
3 Non-receipt of acceptance of APO AWO
and SD PG by L-1 bidder within time
period specified in APO AWO
Forfeiture of EMD
Special Note 1- Authority competent to take final decision GMTD Bhuj
41 Failure to supply and or Commission the
equipment and or execution of the work at
all even in extended delivery schedules if
granted against PO WO
i) Termination of PO WO
ii) Under take purchase work at the risk amp cost of
defaulting vendor
iii) Recover the excess charges if incurred from the PG SD
and outstanding bills of the defaulting Vendor
42 Failure to supply and or Commission the
equipment and or execution of the Work in
full even in extended delivery schedules if
granted against PO WO
i) Short Closure of PO WO to the quantity already
received by and or commissioned in BSNL and or in
pipeline provided the same is usable andor the Vendor
promises to make it usable
ii) Under take purchase work for balance quantity at the
risk amp cost of defaulting vendor
iii) Recover the excess charges if incurred from the PG SD
and outstanding bills of the defaulting Vendor
Special Note 1- Authority competent to take final decision for 41 amp 42 by DGM concerned
51 The supplied equipment does not perform
satisfactory in the field in accordance with
the specifications mentioned in the PO
WOContract
i) If the material is not at all acceptable then return the non-
acceptable material (or its part) amp recover its cost if paid
from the os bills PG SD
OR
ii) If the material is inducted in network amp it is not possible
to return it and or material is acceptable with degraded
performance the purchaser may determine the price for
need to be issued in compliant format and timely within the time prescribed under GST law
163 In case of any deficientincompleterejected supply BSNL shall convey the same in a reasonable
time to enable the supplier to issue credit note and take tax adjustment
164 It would be the responsibility of the supplier to declare correct information on invoice and GSTN
viz the amount the place of supply rate of tax etc In case the eligibility of input tax credit is
questioned or denied to BSNL on account of default by the supplier the same would be
recovered by BSNL from the contractor
165 Registered location of the both the parties ie BSNL and contractor should be mentioned in the
agreement with GSTIN No Further supplier should raise invoices at the registered premise of
BSNL for availing of credit and ensure that the place of supply as per GST law is same as
registered premise
166 BSNL could at any time instruct the contractor to raise its invoices at a particular location of
BSNL
Seal amp Signature of Bidder
39
167 It is the responsibility of the supplier to ensure that place of supply and the GSTN of BSNL are
in the same state If for any reason they are not in the same state the contractor shall intimate to
BSNL and give adequate time before raising of the invoice
168 E-waybill number should be mentioned on the invoices
169 contractor shall be responsible for timely issuance and delivery of invoice DN CN to enable
BSNL to claim tax benefit on or before the stipulated time period provided by the GST law
(a) It is the responsibility of the contractor to ensure that outward supply return (GSTR-1) would be
filed correctly If not than cost would be borne by supplier
(b) Reporting of correct outward supply by supplier in the outward return (GSTR-1) is the
responsibility of the supplier In case of mismatch because of contractorrsquos fault prompt
amendments must be made by the supplier else supplier would be required to indemnify BSNL
of the loss of credit due to mis-match The compliances to be adhered by contractor includes
(but is not limited to) the following
(i) Uploading appropriate invoice details on the GSTN within the stipulated time
(ii) Issuing GST compliant invoice CN DN PO issued by BSNL should be referred by
contractor for capturing information on the invoice
(iii) Contractor needs to pay the entire self-assessed tax on timely basis
(iv) Where invoice is not uploaded or incorrect upload of invoice detail of GSTN by supplier
then credit on such invoice will be given provisionally subject to matching So acceptance of
changes made by BSNL on GSTN on account of non-upload or incorrect upload of invoice
details on GSTN is to be submitted by supplier Such changes wrt the mismatch are required
to be accepted by supplier within the time limit prescribed under the GST law It should be
noted that in case supplier does not accept such changes within the time limit prescribed under
GST law the loss of input tax credit (if any) would be recovered from the supplier In case of
mismatch because of Suppliers fault prompt amendments must be made by the supplier else
supplier would be required to indemnify BSNL for the losses of credit and interest paid due to
mismatch
(v) contractor to issue all necessary documentation and perform all necessary compliances for
BSNL to be eligible to claim the input tax credit of GST tax to them In case BSNL is unable to
claim the input tax credit the amount wrt GST charged by the supplier would be recovered
from the supplier
1610 Refer) for clause stating that all the details of supplier (name address GSTN unregistered
supplier place of supply SAC HSN code etc) and other mandatory details shall be mentioned on the
invoice
1611Where the location agreed are more than one state then separate invoice state wise to claim
input tax credit in a particular state (typically happens in a bill to-ship to scenario) shall have to be
submitted
1612 It shall be the responsibility of the supplier to mention State of place of supply of goodsservices
in the invoice issued to BSNL
Seal amp Signature of Bidder
40
SECTION ndash 5 (Part-B)
SPECIAL CONDITIONS OF CONTRACT (SCC)
1 GENERAL
No official of Gazetted rank or other Gazetted officer employed in Engineering or administrative
duties in an Engineering BSNL or any other BSNL of the BSNL is allowed to work as a contractor for
a period of two years after his retirement from BSNL service without the previous permission of
BSNL This contract is liable to be cancelled if either the contractor or any of his employee is found at
any time to be such a person who hadnrsquot obtained the permission of BSNL as aforesaid before
submission of the engagement in the contractorrsquos service as the case may be
2 Material Handed over by The BSNL
21 The contractor shall transport (including loading and unloading) all stores issued to him from
Field Unit Telecom Store to the site of work at his own cost The BSNL shall not pay any
transportation charges to the contractor
22 All materials handed over to the contractor by the BSNL shall remain the absolute property of
BSNL and shall not be removed form site of the work except for use in the work and shall be at all
times open to inspection by the Representative of GMTD BHUJ
23 The contractor shall be responsible for the transportation of store storage and safe custody of all
material supplied to him by the BSNL which in the contractorrsquos custody whether or not installed in
the work The contractor shall satisfy himself regularly the quantity and quality of the materials
supplied to him and he will be responsible for any subsequent deterioration and discrepancy (inclusive
of theft) in the quantity quality the materials
3 LABOUR WELFARE MEASURES AND WORKMAN COMPENSATION
(AS APPLICABLE)
31 Obtaining License before commencement of work
The contractor shall obtain a valid labour license (if applicable) under the Contact Labour (RampA) Act
1919 and the Contract Labour (Regulation and Abolition) Central Rules 1971 before commencement
of the work and continue to have a valid license until the completion of work The contractor shall
also abide by the provisions of the Child Labour (Prohibition and Regulation) Act 1986 Any failure
to fulfill this requirement shall attract the penal provisions of this contract arising out of the resultant
non-execution of work
32 Contractors labour Regulations
321 Working Hours
3211 Normally working hours of an employee should not exceed 9 hours a day The working
day shall be so arranged the inclusive of interval for rest if any it shall not spread over
more than12 hours on any day
3212 When a worker is made to work for more than 9 hours on any day or for more than 48
hours in any week he shall be paid over time for the extra hours put in by him
3213 Every worker shall be given a weekly holiday normally on a Sunday in accordance with
the provisions of minimum Wages (Central Rules 1960 as amended from time to time
irrespective of whether such worker is governed by the Minimum Wages Act or not
3214 Where the minimum wages prescribed by the Government under the Minimum Wages
Act are not inclusive of the wages for the weekly day of rest the worker shall be entitled
to rest day wages at the rate applicable to the next preceding day provided he has
worked under the same contractor for a continuous period of not less than 6 days
3215 Where a contractor is permitted by the Engineer-in-Charge to allowed a worker to work
on a normal weekly holiday he shall grant a substituted holiday to him for the whole day
Seal amp Signature of Bidder
41
on one of the five days immediately before or after the normal weekly holiday and pay
wages to such worker for the work performed on the normal weekly holiday at the
overtime rate
322 Display of Notice Regarding Wages Etc
The contractor shall before he commences his work on contract display and correctly
maintain and continue to display and correctly maintain in a clear and legible condition
in conspicuous places on the work notices in English and in local Indian languages
spoken by the majority of the workers giving the minimum rates of the wages fixed
under Minimum Wages Act the actual wages being paid the hours of work for which
such wage are earned wages periods dates of payments of wages and other relevant
information
323 Payment of Wages
3231 The contractor shall fix wage periods in respect of which wages shall be payable
3232 No wage period shall exceed one month
3233 The wages of every person employed as contract labour in an establishment or by a
contractor where less than one thousand such persons are employed shall be paid before
the expiry of seventh day and in other cases before the expiry of tenth day after the last day
of the wage period in respect of which the wages are payable
3234 Where the employment of any worker is terminated by or on behalf of the contractor the
wages earned by him shall be paid before the expiry of the second working day from the
date on which his employment is terminated
3235 All payment of wages shall be made on a working day at the work premises and during the
working time and on a date notified in advance and in case the work is completed before
the expiry of the wage period final payment shall be made within 48 hours of the last
working day
3236 Wages due to every worker shall be paid to him direct or to other person authorized by him
in this behalf
3237 All wages shall be paid in current coin or currency or in both
3238 Wages shall be paid without any deductions of any kind except those specified by the
Central Government by general or special order in this behalf or permissible under the
Payment of Wages Act 1956
3239 A notice showing the wages period and the place and time of disbursement of wages shall
be displayed at the place of work and a copy sent by the contractor to the Engineer ndashin-
Charge under acknowledgement
32310 It shall be the duty of the contractor to ensure the disbursement of wages in presence of the
site Engineer or any other authorized representative of the Engineer-in-Charge who will be
required to be present at the place and time of the disbursement of wages by the contractor
to workmen
32311 The contractor shall obtain from the site Engineer or any other authorized representative of
the Engineer-in-Charge as the case may be a certificate under his signature at the end of
the entries in the ldquoRegister of Wages ldquo or the ldquoWage-cum-Muster Rollrdquo as the case may
be in the following form -
ldquoCertified that the amount shown in the column Nohelliphelliphelliphelliphas been paid to the
workman concerned in my presence on helliphelliphelliphelliphelliphellip at helliphelliphelliphelliphelliphelliphelliphelliphelliprdquo
32312 Fines and deductions which may be made from wages
A The wages of a worker shall be paid to him without any deduction of any kind except the
following -
a) Fines
(b) Deductions for absence from duty ie from the place or the places where by the terms of
his employment he is required to work The amount of deduction shall be in proportion
to the period for which he was absent
(c) Deductions for damage to or loss of goods expressly entrusted to the employed person
for custody or for loss of money or any other deductions which he is required to
account where such damage or loss is directly attributable to his neglect or default
Seal amp Signature of Bidder
42
(d) Deduction for recovery of advances or for adjustment of over payment of wages
advances granted shall be entered in register
(e) Any other deductions which the Central Government may form time to time allow
B No fines should be imposed on any worker save in respect of such acts and omissions
on his part as have been approved of by the Labour Commissioner
C No fine shall be imposed one worker and no deduction for damage or loss shall be
made from his wages until the worker has been given an opportunity of showing cause
against such fines or deductions
D Every fine shall be deemed to have been imposing on the day of the act or omission in
respect of which it was imposed
524 Labor records 1 The contractor shall maintain a Register of Persons employed on work on contract in
Form XIII of the Contract Labour (RampA) Central Rules 1971
2 The contractor shall maintain a Muster Roll register in respect of all workmen
employed by him on the work under Contract in Form XVI of the CL (RampA) Rules
1971
3 The contractor shall maintain a Wage Register in respect of all workmen employed by
him on the work under contract in From XVII of the CL (RampA) Rules 1971
4 Register of accidents- The contractor shall maintain a register of accidents in such
form as may be convenient at the work place but the same shall include the following
particulars
(a) Full Particulars of the laborers who met with accident
(b) Rate of wages
(c) Sex
(d) Age
(e) Nature of accident and cause of accident
(f) Time and date of accident
(g) Date and time when admitted in hospital
(h) Date of discharge from the hospital
(i) Period of treatment and result of treatment
(j) Percentage of loss of earning capacity and disability as assessed by
Medical officer
(k) Claim required to be paid under Workmenrsquos Compensation Act
(l) Date of payment of compensation
(m) Amount paid with details of the person to whom the same was paid
(n) Authority by whom the compensation was assessed
(o) Remarks
5 The contractor shall maintain a Register of Fines in the Form XII of the CL(RampA)
Rules 1971 the Contractor shall display in a good condition and in a conspicuous
place of work the approved list of acts and commission for which fines can be
imposed
6 The contractor shall maintain a Register of deductions for damage or loss in Form
XX of the CL (RampA) Rules 1971
7 The contractor shall maintain a Register of Advances in Form XXIII of the CL
(RampA) Rules 1971
8 The contractor shall maintain a Register of Overtime in Form XXIII of the CL
(RampA) Rules 1971
9 Attendance card-cum wage slip a The contractor shall issue an Attendance card cum wage slip to each workman
employed by him
b The card shall be valid for each wage period
Seal amp Signature of Bidder
43
c The contractor shall mark the attendance of each workman on the card twice each
day once at the commencement of the day and again after the rest interval before
he actually starts work
d The card shall remain in possession of the worker during the wage period under
reference
e The contractor shall complete the wage slip portion on the reverse of the card at
least a day prior to the disbursement of wages in respect of the wage period under
reference
f The contractor shall obtain the signature or thumb impression of the worker on the
wag slip at the time of disbursement of wages and retain the card with him
10 Employment card The contractor shall issue an Employment Card in the Form XIV of CL (RampA) Central Rules
1971 to each worker within three days of the employment of the worker
11 Service certificate
On termination of employment for any reason whatsoever the contractor shall issue to the
workman whose services have been terminated a Service Certificate in the Form XV of the
CL (RampA) Central Rules 1971
12 Preservation of labour records The labour records and records of Fines and deductions shall be preserved in original for a
period of three years from the date of last entries made in them and shall be made available for
inspection by the Engineer-in-Charge or Labour Officer or any other officers authorized by the
Ministry of Communication in this behalf
13 Power of labour officer to make investigations or enquiry The labour officer or any person authorized by the Central Government on their behalf shall
have power to make enquiries with a view to ascertaining and enforcing due and proper
observance of Fair Wage Clauses and provisions of these Regulations He shall investigate
into any complaint regarding the default made by the contractor in regard to such provision
14 Report of Investigating officer and action thereon The labour Officer or other persons authorized as aforesaid shall submit a report of result of
his investigation or enquiry to the Engineer in-Charge indicating the extent if any to which
the default has been committed with a note that necessary deductions from the contractorrsquos bill
be made and the wages and other dues be paid to the labourers concerned The Engineer in-
Charge shall arrange payments to the labour
concerned within 45 days from the receipt of the report from the Labour Officer or the
authorized officer as the case may be
15 Inspection of Books And slips The contractor shall allow inspection of all the prescribed labour records to any of his workers
or to his agent at a convenient time and place after due notice is received or to the Labour
Officer or any other person authorized by the Central Government on his behalf
16 Submission of Returns The contractor shall submit periodical returns as may be specified form time to time
17 Amendments
The Central Government may from time to time add to or amend the regulations and on any
question as to the applicationinterpretation or effect of those regulations
Contractor must fulfill the terms and condition towards fulfillmentscompliance of the
provision of EPF amp Miscprovision act 1952 amp Employment provident Fund Scheme 1952 in
respect of laborersemployees engaged by the contractor Contractor must submit declaration
form regarding compliance of the condition of EPF act 1952
525 INSURANCE Without limiting any of his other obligations or liabilities the contractor shall at his own
expense take and keep comprehensive insurance including third party risk for the plant
machinery men materials etc brought to the site and for all the work during the execution
The contractor shall also take out workmenrsquos compensations insurance as required by law and
under take to indemnify and keep indemnified the Government from and against all manner of
Seal amp Signature of Bidder
44
claims and demands and losses and damages and cost (including between attorney and client)
charges and expenses that may arise in regard the same or that the Government may suffer or
incur with respect to endor incidental to the same The contractor shall have to furnish
originals and or attested copies as required by the BSNL of the policies of insurance taken
within 15 (fifteen) days of being called upon to do so together with all premium receipts and
other papers related thereto which the BSNL may require
526 COMPLIANCE WITH LAWS AND REGULATION
During the performance of the works the contractor shall at his own cost and initiative
fully comply with all applicable laws of the land and with any and all applicable by-laws
rules regulations and orders and any other provisions having the force of law made or
promulgated or deemed to be made or promulgated by the Government Governmental
agency or BSNL municipal board Government of other regulatory or Authorized body or
persons and shall provide all certificates or compliance therewith as may be required by
such applicable law By-laws Rules Regulations orders and or provisions The
contractor shall assume full responsibility for the payment of all contributions and pay roll
taxes as to its employees servants or agents engaged in the performance of the work
specified in the contractor documents If the contractor shall require any assignee or sub-
contract to comply with the provisions of the clause and in this connection the contractor
agrees as to undertake to save and hold the Government harmless and indemnified from
and against any all penalties actions suits losses and damages claims and demands and
costs (inclusive between attorney and client) charges and expenses whatsoever arising out
or occasioned indirectly or directly by failure of the contractor or any assignee or sub-
contractor to make full and proper compliance with the said by-laws Rules Regulations
laws and Order and provisions as aforesaid
6 TOOLS and PLANTS
The contractor shall provide at his own cost all tools plants appliances implements etc
required for proper execution of works The contractor shall also supply without charge
the requisite number of persons with the means and materials necessary for the purpose of
setting out works counting weighing and assisting the measurements for examination at
any time and from time to time Failing his so doing the same may be provided by the
Engineer-in-charge at the expense of the contractor and the expenses shall be deducted
from any money due to the contractor under this contract or otherwise
As per Para 367 of the recommendationobservation of Tenth Report of parliamentary
standing committee on labour Contractor would provide the same social security to the
labours engaged by him as is available to regular employees
As per Para 368 of the recommendationobservation of Tenth Report of parliamentary
standing committee on labour Contractor shall ensure implementation of equal pay for equal
work and also equal remuneration to men and women
Seal amp Signature of Bidder
45
SECTION ndash 7
PROFORMAS
7 (A) BID SECURITY EMD Guarantee
(To be typed on Rs100- non-judicial stamp paper)
Whereas (hereinafter called the Bidder) has submitted its bid datedfor
the supply of vide Tender Nohelliphelliphelliphelliphelliphelliphelliphellip dated KNOW ALL MEN by
these presents that WE OF having our registered office at
(hereinafter called the Bank) are bound unto Bharat Sanchar Nigam Limited (hereinafter
called the Purchaser) in the sum of Rs for which payment will and truly to be made of
the said Purchaser the Bank binds itself its successors and assigns by these present
THE CONDITIONS of the obligation are
1 If the Bidder withdraws his bid during the period of bid validity specified by the Bidder
on the Bid form or
2 If the Bidder having been notified of the acceptance of his bid by the Purchaser during the
period of bid validity
(a) fails or refuses to execute the Contract if required or
(b) fails or refuses to furnish the Performance Security in accordance with the instructions to
Bidders
We undertake to pay to the Purchaser up to the above amount upon receipt of its first written demand
without the purchaser having to substantiate its demand provided that in its demand the purchaser
will note that the amount claimed by it is due to it owning to the occurrence of one or both of the two
conditions specifying the occurred condition or conditions
This guarantee will remain in force as specified in clauses 12 and 282 of section 4 Part A of the Bid
Document upto and including THIRTY (30) days after the Period of bid validity and any demand in
respect thereof should reach the Bank not later than the specified datedates
Signature of the Bank Authority
Name
Signed in Capacity of
Name amp Signature of witness Full address of Branch
Address of witness Tel No of Branch
Fax No of Branch
Seal amp Signature of Bidder
46
7 (B) PERFORMANCE SECURITY BOND FORM
(To be typed on Rs100- non-judicial stamp paper)
Datedhelliphelliphelliphelliphellip
Sub Performance guarantee
Whereas General Manager Telecom Bhuj Telecom District Bhuj (hereafter referred to as BSNL) has issued an AWO no
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellipDated helliphelliphelliphellip20hellip awarding the work of
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip to Ms
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip(hereafter referred to as ldquoBidderrdquo) and BSNL has asked him to submit a performance guarantee
in favour of AO(Cash) BSNL Oo GMTD BHUJ of Rs helliphelliphelliphelliphelliphellip- (hereafter referred to as ldquoPG Amountrdquo) valid up
to helliphelliphelliphellip20helliphelliphellip (hereafter referred to as ldquoValidity Daterdquo)
Now at the request of the Bidder We helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellipBank
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip Branch having (Address) and Regd
office address as helliphelliphellip helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip (Hereinafter called lsquothe
Bankrdquo) agreed to give this guarantee as hereinafter contained
2 We ldquothe Bankrdquo do hereby undertake and assure to the BSNL that if in the opinion of the BSNL the Bidder has in any way
failed to observe or perform the terms and conditions of the said agreement or has committed any breach of its obligations
there-under the Bank shall on demand and without any objection or demur pay to the BSNL the said sum limited to PG
Amount or such lesser amount as BSNL may demand without requiring BSNL to have recourse to any legal remedy that may
be available to it to compel the Bank to pay the same
3 Any such demand from the BSNL shall be conclusive as regards the liability of Bidder to pay to BSNL or as regards the
amount payable by the Bank under this guarantee The Bank shall not be entitled to withhold payment on the ground that the
Bidder had disputed its liability to pay or has disputed the quantum of the amount or that any arbitration proceeding or legal
proceeding is pending between Bidder and BSNL regarding the claim
4 We the Bank further agree that the guarantee shall come into force from the date of its issue and shall remain in full force
and effect up to its Validity date
5 The Bank further agrees that the BSNL shall have the fullest liberty without the consent of the Bank and without affecting
in any way the obligations hereunder to vary any of the terms and conditions of the said agreement or to extend the time for
performance of the said agreement from any of the powers exercisable by BSNL against the Bidder and to forebear to enforce
any of the terms and conditions relating to the said agreement and the Bank shall not be relieved from its liability by reason
of such failure or extension being granted to Bidder or through any forbearance act or omission on the part of BSNL or any
indulgence by BSNL to Bidder or any other matter or thing whatsoever which under the law relating to sureties would but for
this provision have the effect of relieving or discharging the guarantor
6 Notwithstanding anything herein contained
(a) The liability of the Bank under this guarantee is restricted to the PG Amount and it will remain in force up to its Validity
date
(b) The guarantee shall stand completely discharged and all rights of the BSNL under this Guarantee shall be extinguished if
no claim or demand is made on us in writing on or before its validity date
7 In case BSNL demands for any money under this bank guarantee the same shall be paid through bankerrsquos Cheque in
favour of ldquoAO(Cash) BSNL Oo GMTD BHUJ rdquo payable at Bhuj
8 The Bank guarantees that the below mentioned officer who have signed it on behalf of the Bank have authority to give this
guarantee under its delegated power
Place helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip
Date helliphelliphelliphelliphelliphelliphelliphelliphelliphellip (Signature of the Bank Officer)
Rubber stamp of the bank
Authorized Power of Attorney Number helliphelliphelliphelliphelliphellip
Name of the Bank officer helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip
Having examined the tender documents terms and conditions stipulated therein specifications of work
etc we the under signed offer to execute the repair Works in conformity with the said specifications and
conditions of contract as under
Sl No
ITEM DESCRIPTION
Repair Charges per module inclusive of freight
forwardingpacking amp all taxes amp levies (except GST)
(in Figure)
Unit Rate in Words
Total Cost (unit rate qty)
1 2 3 4 5
1 25 AMP Module
2
50 AMP Module
3 100 AMP Module
4 Control Panel of
Power Plants
25A 50A amp 100A
5 GRAND TOTAL
Note -
1 GST will be payable extra on approved rates 2If our Bid is accepted we shall submit the securities as per the conditions mentioned in the contract
3We agree to abide by this Bid for a period of 180 days from the date of opening of financial bid and it shall
remain binding upon us and may be accepted at any time before the expiry of that period
4 The evaluation will be made on the basis of lowest rate quoted as under Lowest Rate = (rate quoted for 25 AMP Qty + rate quoted for 50 AMP Qty + rate
quoted for 100 AMP Qty + rate quoted for Control Panel of Power Plant AMP Qty)
The bidder who has offered lowest rate as evaluated above will be treated as L1 bidder
Date Signature of Tenderer
Seal amp Signature of Bidder
49
CHECK LIST
Sl No
Description Tender Clause Mode of Submission
1 Tender Fee Section 1 (part A) Para 21 22
Off-line
2 EMD Section 1 (part A) Para 51 52 Off-line 3 Power of Attorney Section 4 (Part A) clause 143 Off-line 4 Latest and Valid MSME NSIC certificate (If Applicable) Off-line 5 Experience Certificate Section 1 (part A)
9 EPF (If applicable) Section 2 Para 3 (a) (i) ON-Line 10 ESIC (If applicable) Section 2 Para 3 (a) (i) ON-Line 11 PAN Card Section 2 Para 3 (a) (i) ON-Line 12 Agency Detail Section 2 (part-A) ON-Line 13 Letter of Authorization Section 2 (part-B) ON-Line 14 Under taking amp
declaration Section 2 (part-C) ON-Line
15 Declaration regarding no relative working in BSNL
Section 2 (part-D) To be submitted by proprietor or separately by each partnerDirector
ON-Line
Seal amp Signature of Bidder
11
SECTION- 2 PART D
DECLARATION REGARDING NO RELATIVE WORKING IN BSNL
I ___________________________Son of W O___________________________
RO _________________________here by certify that none of my relative(s) as defined in tender
document isare employed in BSNL unit as per details given in tender document In case at any stage
it is found that the information given by me is false incorrect BSNL shall have the absolute right to
take any action as deemed fit without any prior intimation to me
Signed ___________________
For and on behalf of the Agency
Name (Capitals) ___________________________
Position ____________________________
Date ____________________________
Note - In case of proprietorship firm certificate will be given by the proprietor for partnership firm
certificate will be given by all the partners on separate paper and in case of limited company by all
the Directors of the Company on separate paper Any breach of these conditions by the company or
firm or any other person the tender work will be cancelled and earnest money security deposit will
be forfeited at any stage whenever it is so noticed BSNL will not pay any damages to the company or
firm or the concerned person The company or firm or the person will also be debarred for further
participation in the concerned unit
Seal amp Signature of Bidder
12
SECTION- 3
SCOPE OF WORK AND JURISDICTION OF CONTRACT
1 SCOPE OF WORK
1 During the entire period of contract repairing of all types and of any make such as AMAR RAJA DACS DELTA DYNA ELTEK EXICOM HIMACHAL EXICOM ITI etc SMPS Power plant Modules (25 AMP 50 AMP 100 Amp ) Control panel are to be carried out including replacement of faulty parts
2 Collection and Delivery of Faulty repaired modules - a The concerned JTOSDEAGM in charge will intimate the contractor the Location Make capacity and
quantity of faulty modules by email (copy to AGM(Plg) on agmplgbhujgmailcom ) followed by ERP PO on mail
b The contractor will collect the module from the concerned in charge with in THREE days from the date of intimation under proper receipt to the concerned in charge However under emergent condition the collection of modules may be done on the same day
c Packing transport and delivery of faulty as well as repaired modules is the responsibility of the contractor
d The contractor shall repair the module and return to the concerned in charge with in Seven days of its collection However under emergent condition as decided by the concerned in charge the collection and repair shall be made within the time period given in the ERP PO
e Repaired modules will be tested by the SDE concern within TWO days on receipt of repaired modules if it is found OK then a certificate of this may be issued to the contractor Otherwise same shall be returned to the contractor for necessary action
f The date of receipt of all the modules mentioned in the ERP PO duly tested OK will be reckoned as the completion of ERP PO
g Repaired modules are warranted for 3 months from the date of successfully taken over During this time the contractor has to rectify the module free of cost
3 INSPECTION AND TESTS - a) The BSNL BHUJ or his representative shall have the right to inspect and test the repaired module as
per prescribed test schedules for their conformity to the specifications Where the BSNL BHUJ decides to conduct such tests on the premises of the Contractor or its subcontractor(s) all reasonable facilities and assistance like Testing Instruments and other test gadgets including access to drawings and production data shall be furnished to the inspectors at no charge to the Purchaser
b) Should any inspected or tested repaired module fail to conform to the Specifications the BSNL BHUJ may reject them and the Contractor shall either replace the rejected repaired module or make all alterations necessary to meet Specification requirements free of cost to the Purchaser
c) Notwithstanding the pre-repair tests and inspections prescribed in clause 3(a) amp 3(b) above the module and accessories on receipt in the BSNL s premises will also be tested during and after installation before take over and if any equipment or part thereof is found defective the same shall be replaced free of all cost to the BSNL BHUJ
d) If any module or any part thereof before it is taken over under clause 3(e) below is found defective or fails to fulfill the requirements of the contract the inspector shall give the Contractor notice setting forth details of such defects or failure and the Contractor shall make the defective module good or alter the same to make it comply with the requirements of the contract forthwith and in any case within a period not exceeding one month of the initial report The replacements shall be made by the Contractor free of all charges at site should it fail to do so within this time the BSNL BHUJ reserves the discretion to reject and replace at the cost of the Contractor the whole or any portion of the module as the case may be which is defective or fails to fulfill the requirements of the contract The cost of any such replacement made by the BSNL BHUJ shall be deducted from the amount payable to the Contractor
Seal amp Signature of Bidder
13
e) When the performance tests called for have been successfully carried out the inspector ultimate
Consignee will forthwith issue a Taking Over Certificate The inspectorultimate consignee shall not delay the issue of any Taking Over Certificate ldquo contemplated by this clause on account of minor defects in the module which do not materially affect the commercial use thereof provided that the Contractor shall undertake to make good the same in a time period not exceeding two months The taking Over Certificate shall be issued by the ultimate consignee within six weeks of successful completion of tests
f) After performance test carried out by the concerned SDE of BSNL as per prescribed schedule and repaired modules are found ok in all respect than the repaired modules will be accepted
g) A register is to be maintained at each placelocation mentioning the details of Modules date of Collection and Delivery of Faulty repaired modules replacement of spares amp remark if any and it is to be signed by the controlling officer amp Service engineer
h) Nothing in clause 3 shall in any way release the Contractor from any Warranty or other obligations under this contract
4 SPARES - All the spare of good quality required for repair of modules of SMPS PP are to be supplied by the contractor including major components
5 The contractor shall be responsible for any loss or damages caused to man or machinespartsinstruments during the execution of work and shall replace with an identical new item at his own cost The authorized officerperson of BSNL will have the liberty to check the material and work etchellip provided by the contractor
6 Governing Conditions for RNP (Repair Not Possible) Cases
A module Control panel may be declared RNP only if cost of material to be replaced exceeds five times of approved rate of repair In no case labour cost involved will be considered for deciding RNP A detailed report is to be submitted by contractor to concerned officer in-charge and final decision in this regard will be taken by concerned DGM subjected to maximum permissible RNP as given below
a)25-A module Maximum 10 of total quantity ordered for repair
b) 50-A 100-A Module Maximum 5 of total quantity ordered for repair
c) Control Panel Maximum 10 of total quantity ordered for repair
In case of RNP exceeding permissible limits penalty will be imposed as per para 11 (d) of section-5 (Part-A)
7 WARRANTY - a) Repaired modules are warranted for 3 months from the date of successfully taken over During this
time the contractor has to rectify the module free of cost The contractor shall warrant that repaired module shall be free from all defects and faults in materials used workmanship It becomes necessary for the contractor to replace or renew any defective portion(s) of the module under this clause
b) Replacement under warranty clause shall be made by the contractor free of all charges at site including freight insurance and other incidental charges
c) If any defect is not remedied by the contractor within a reasonable time the BSNL BHUJ may proceed to get the defects remedied from other contractor etc at the contractors risk and expenses but without prejudice to any other rights which the BSNL BHUJ may have against the contractor in respect of such defects
Seal amp Signature of Bidder
14
SECTION- 4 (Part-A)
GENERAL INSTRUCTION TO BIDDERS (GIB)
1 DEFINITIONS
1 BSNL The BSNL means the BSNL Bhuj Telecom Dist under the Ministry of
Communications which invites the tenders on behalf of the General Manager Bhuj Telecom
District Includes executives in the BSNL whatever designations assigned to them from time
to time who may be the in-charge of direction supervision testing acceptance and
maintenance including their successor(s) in the office appearing in various clauses shall be
taken to mean the BSNL Bhuj Telecom District
b The SSA Head means the Head of SSA General Manager Bhuj Telecom District Bhuj and
his successors
c The jurisdiction of the SSA Head The jurisdiction of the SSA Head means Bhuj Telecom
District which coincides geographically with (Revenue District(s))
d Representative of (the SSA Head) Representative of (the SSA Head ) means Officer and
staff for the time being in Bhuj Telecom District deputed by the General Manager Bhuj for
inspecting or supervising the work of testing etc
e Engineer ndash in - charge The Engineer ndash in - charge means the Engineering Officer
nominated by the BSNL to supervise the work under the contract (Minimum Divisional
Engineer level Officer)
f Site Engineer Site Engineer shall mean an SDESDOJTO of the BSNL who may be placed by
the General Manager Bhuj Telecom District Bhuj as in ndash charge of the work at site at any
particular period of time
g AT Unit AT Unit shall mean Acceptance and Testing unit of the BSNL
h AT Officer An officer authorized by General Manger ndash Bhuj Telecom Dist
i Contract The term contract means the documents forming the tender and acceptance
thereof and the formal agreement executed between the competent authority on behalf of the
BSNL and the contractor together with the documents referred to therein including these
conditions the specifications designs drawings and instructions issued from time to time by
the engineer in ndash charge and all these documents taken together shall be deemed to form one
contract and shall be complementary to one another In the contract the following expressions
shall unless the context otherwise requires have the meanings hereby respectively assigned to
them The expression works or work shall unless there be something either in the subject
context repugnant to such construction be construed or taken to mean the works by or by
virtue of the contract contracted to be executed whether temporary or permanent and whether
original altered substituted or additional
j Contractor The contractor shall mean the individual firm or company enlisted or not
enlisted with BSNL Department of Telecom in accordance with procedure for contractor or
registered for carrying out the work of cable laying whether incorporated or not undertaking
the works and shall include the legal personal representative of such individual or the persons
composing such firm or company or the successors of such firm or company and the
permitted assignees of such individual firm or company
k Work The expression lsquoworksrsquo shall unless there be something either in the subject or context
repugnant to such construction be construct and taken to mean the works by or by virtue of the
Seal amp Signature of Bidder
15
contract contracted to be executed whether temporary or permanent and whether original
altered substituted or additional
l Schedule(s) Schedule(s) referred to in these conditions shall mean the relevant schedule(s)
or the standard schedule of rates mentioned in the document
m Site The site shall mean the land or other places on into or through which work is to be
executed under the contract or any adjacent land path or street through which the work is to
be exacted under the contract or any adjacent land path or street which may be allotted or
used for the purpose of carrying out the contract
n Normal time or stipulated time Normal time or stipulated time means time specified in the
ERP PO to complete the work
o Extension of Time Extension of Time means the time granted by the BSNL to complete the
work beyond the normal time or stipulated time
p Exceptional risk Exceptional risks are risk due to war(whether declared or not) invasion act
of foreign enemies hostilities civil war rebellion revolution insurrection military or
usurped power any acts of Government damages from aircraft acts of God such as
earthquake lightening and unprecedented floods and other causes over which the contractor
has no control and the same having been accepted as such by the Accepting Authority or
causes solely due to use or occupation by the government of the part of the work in respect of
which a certificate of completion has been issued
q The ERP PO means the Order placed by the field units on the contractor signed by
the unit incharge r The Contract Rate means the rate payable to the repairer under the work order for
the full and proper performance of its contractual obligations
2 ELIGIBLE BIDDERS Kindly refer to clause 4 of Section ndash 1 Part A ie Detailed NIT
3 COST OF BIDDING
The bidder shall bear all costs associated with the preparation and submission of the bid The
BSNL will in no case be responsible or liable for these costs regardless of the conduct or
outcome of the bidding process
4 BID DOCUMENTS
41 The goods services required to be supplied bidding procedures and contract terms are prescribed
in the Bid Documents The contents of the Bid documents are specified in the covering letter
42 The Bidder is expected to examine all instructions forms terms and specifications in the Bid
Documents Failure to furnish all information required as per the Bid Documents or submission
of bids not substantially responsive to the Bid Documents in every respect will be at the bidders
risk and may result in rejection of the bid
5 CLARIFICATION OF BID DOCUMENTS
51 A prospective bidder requiring any clarification on the Bid Documents shall notify the User in
writing by FAX or by Email of the User as indicated in the invitation of Bid The User shall
respond in writing to any request for the clarification of the Bid Documents which it receives
7days prior to the date of opening of the Tenders Copies of the query (without identifying the
source) and clarifications by the User shall be uploaded on BSNL website as lsquoClarificationsrsquo on
e-procurement portal of Bhuj Telecom District portal clarification shall be available as
lsquoAddendumrsquo for all the prospective bidders who have downloaded the official copy of tender
documents from e-procurement portal of Bhuj Telecom District
Seal amp Signature of Bidder
16
52 Any clarification issued by BSNL in response to query raised by prospective bidders shall form
an integral part of bid documents and it may amount to an amendment of relevant clauses of the
bid documents
6 AMENDMENT OF BID DOCUMENTS
61 The BSNL may for any reason whether at its own initiative or in response to a clarification
requested by a prospective Bidder may modify bid documents by amendments prior to the date
of submission of Bids with due notification to prospective Bidders
62 The amendments shall be notified in writing or by Fax or by Addendum through e-tendering
portal to all prospective bidders on the address intimated at the time of purchase of bid document
from the BSNL and these amendments will be binding on them
63 In order to afford prospective bidders reasonable time in which to take the amendments into
account in preparing their bids the BSNL may at its discretion extend the deadline for the
submission of bids suitably
7 DOCUMENTS COMPRISING THE BID
The bid prepared by the bidder shall comprise the components specified in Section 2 of this
Tender
8 BID FORM
The bidder shall complete the Bid Form and the appropriate Price Schedule furnished in the Bid
Documents as per Section- 8
9 BID PRICES
91 The bidder shall give the total composite price inclusive of all levies and taxes packing
forwarding freight and insurance in case of materials to be supplied and inclusive of all taxes
and levies except GST in case of works to be executed GST will be paid extra as applicable
The contractor shall be responsible for transporting the materials to be supplied by the BSNL
(At the field Unit Telecom Store or otherwise) to execute the work under the contract to site at
histheir own cost The costs of transportation are subsumed in the standard Schedule Rates and
therefore no separate charges are payable on this account The offer shall be firm in Indian
Rupees
92 The price quoted by the bidder shall remain fixed during the entire period of contract and shall
not be subject to variation on any account A bid submitted with an adjustable price quotation
will be treated as non-responsive and rejected
93 Discount if any offered by the bidders shall not be considered unless they are specifically
indicated in the schedule of rates (financial Bid) Bidders desiring to offer discount shall
therefore modify their offers suitable while quoting and shall quote clearly net price taking all
such factors like Discount free supply etc into account
10 DOCUMENTS ESTABLISHING BIDDERS ELIGIBILITY AND QUALIFICATIONS Kindly refer to clause of Section ndash 1 and 2 of this bid
11 NA
12 BID SECURITYEMD
121 The bidder shall furnish as part of its bid a bid security one of the following ways-
(a) Demand Draft Bankerrsquos cheque from a Nationalizedscheduled bank drawn in favour
of AO (Cash) BSNL Oo GMTD Bhuj and payable at Bhuj
(b) Bank GuaranteeFDR from a Nationalizedscheduled bank drawn in favour of AO
(Cash) BSNL Oo GMTD Bhuj which should be valid for 180 days from the tender
opening date
For educational order EMD to be submitted by bidder as 20 of 10 of estimated tender
cost for each case in the form of cash Demand Draft Bankerrsquos cheque Bank guaranteeFDR
issued by a NationalizedScheduled bank drawn in favour of AO (Cash) BSNL Oo GMTD
Bhuj Bank Guarantee should be valid for 180 days from the tender opening date
122 The MSE bidders are exempted from payment of bid security
Seal amp Signature of Bidder
17
a) A proof regarding valid registration with body specified by Ministry of Micro Small
amp Medium Enterprise for the tendered items will have to be attached along with the
bid
b) The enlistment certificate issued by MSME should be valid on the date of opening of
tender
c) MSE unit is required to submit its monthly delivery schedule
d) If a vender registered with body specified by Ministry of Micro Small amp Medium
Enterprise claiming concessional benefits is awarded work by BSNL and
subsequently fails to obey any of the contractual obligations he will be debarred from
any further work contract by BSNL for one year from the date of issue of such order
123 The bid security is required to protect the BSNL against the risk of bidders conduct which would
warrant the bid securityrsquos forfeiture pursuant to para 127
124 A bid not secured in accordance with para 121 amp 122 shall be rejected by the BSNL being non-
responsive at the bid opening stage and archived unopened on e-tender portal for e-tenders
125 The bid security of the unsuccessful bidder will be dischargedreturned as promptly as possible
as but not later than 30 days after the expiry of the period of bid validity prescribed by the
BSNL pursuant to clause 13
126 The successful bidders bid security will be discharged upon the bidders acceptance of the
advance Purchase Order satisfactorily pursuant to clause 27 and furnishing the performance
security
The successful bidders bid security may be converted to Part Performance Security Deposit in
accordance with clause 28
127 The bid security may be forfeited
a) If the bidder withdraws or amends its bid or impairs or derogates from the bid in any
respect during the period of bid validity specified by the bidder in the bid form or
extended subsequently or
b) If the bidder does not accept the APO AWO and or does not submit PBG amp sign the
contract agreement in accordance with clause 28
Note - The bidder shall mean individual company firm or the front bidder and its technology
consortium partner as applicable
13 PERIOD OF VALIDITY OF BIDS
131 Bid shall remain valid for 150 days from the date of bid opening prescribed by the BSNL A bid
valid for a shorter period shall be rejected by the BSNL as non-responsive
132 In exceptional circumstances the BSNL may request the bidders consent for an extension to the
period of bid validity The request and the responses thereto shall be made in writing The bid
security provided under Clause 12 shall also be suitably extended A bidder may refuse the
request without forfeiting his bid security A bidder accepting the request and granting extension
will not be permitted to modify his bid
14 FORMAT AND SIGNING OF BID
141 The bidder shall submit his bid online (in case of e-tendering) amp through sealed envelopes
physically (in case of tenders with manual bidding process) complying all eligibility
conditions other terms and conditions of tender document to be read along with the
clarifications and amendments issued in this respect All the documents must be authenticated
using Digital Signature (DSC) with Class 2 or above (in case of e-tendering) amp by hand
signatures (for manual bidding process) by the authorized person The letter of authorization
shall be indicated by written power-of-attorney accompanying the bid
Note-The BSNL may ask the bidder(s) to supply besides original bid additional copy of bids as
required by him
142 The bid shall contain no interlineations erasures or overwriting except as necessary to correct
errors made by the bidder in which case such corrections shall be signed by the person or persons
signing the bid All pages of the original bid except for un-amended printed literatures shall be
digitally signed by the person or persons signing the bid
143 Power of Attorney
(a) The power of Attorney should be submitted and executed on the non-judicial stamp paper
Seal amp Signature of Bidder
18
of appropriate value as prevailing in the concerned states(s) and the same be attested by a
Notary public or registered before Sub-registrar of the state(s) concerned
(b) The power of Attorney be executed by a person who has been authorized by the Board of
Directors of the bidder in this regard on behalf of the Company institution Body
corporate
(c) In case of the bidder being a firm the said Power of Attorney should be executed by all the
partner(s) in favour of the said Attorney
(d) Attestation of the specimen signatures of authorized signatory by the Companyrsquos firmrsquos
bankers shall be furnished Name designation Phone number mobile number email
address and postal address of the authorized signatory shall be provided
(e) Individual signing the tenders or other documents connected with the contract shall indicate
the full name below the signature and must specify the capacity and authority under which
he signs such documents and shall also submit documentary evidence of his authority in
the form of Power of Attorney
(f) The Power of Attorney is to be submitted in original if it has been issued for the specific
tender enquiry If the power of attorney is issued in general irrespective of tender enquiry
then photocopy duly certified by notary public can also be accepted
(g) In case the representative of bidder company who uploads the document on e-tender portal
using his Digital Signature Certificates (DSC) which is different from the authorized
signatory for the bid (Power of Attorney holder) then the representative who uploads the
documents on e-tender portal using DSC issued in his name shall also be one of the Power
of Attorney holder by the bidder Company in addition to the authorized signatory for the
bid
15 SEALING AND MARKING OF BIDS
The bid shall be submitted online using single stage bidding and Two Envelope Methodology
151 The first envelope (Techno-commercial bid) This envelope shall contain documents of
bidders satisfying the eligibility Technical amp commercial conditions requirements Second
envelope will be named as financial bid containing price Schedule as per section 8 All
documents submitted will also be self attested by the bidder
152 a) The envelopes for Tender Fee EMD shall be addressed AGM (PLG) Oo GMTD
Haripar Road Bhuj - 370001
b) The envelope for Tender Fee EMD shall bear the name of the tender the tender number
and the words DO NOT OPEN BEFORE (due date amp time)
c) The envelopes for Tender Fee EMD shall indicate the name and complete postal address
of the bidder to enable the User to return the bid unopened in case it is declared to be received
late
d) The envelopes for Tender Fee EMD shall should be deposited in the tender box provided
by tendering authority or sent by registered post or delivered in person on above mentioned
address (address is given above) The responsibility for ensuring that the envelopes for Tender
Fee EMD shall are delivered in time would vest with the bidder
e) The envelopes for Tender Fee EMD shall delivered in person registered post on the day of
tender opening shall be delivered upto specified time amp date as stated in NIT to Oo GMTD
Haripar Road Bhuj - 370001 The User shall not be responsible if the envelopes for Tender
Fee EMD shall are delivered elsewhere
f) Venue of Tender Opening
Tender will be opened in Oo GMTD Haripar Road Bhuj - 370001 at specified time amp
date as stated in NIT If due to administrative reason the venue of Bid opening is changed it
will be displayed prominently on the above address
Seal amp Signature of Bidder
19
153 If envelopes are not sealed and marked as required at para 151 and 152 the bid shall be
rejected
16 SUBMISSION OF BIDS
161 Bids must be submitted by the bidders on or before the specified date amp time indicated in
Section-1 ie DNIT
162 The BSNL may at its discretion extend this deadline for the submission of the bids by
amending the bid documents in accordance with Clause 6 in which case all rights and
obligations of the BSNL and bidders previously subject to the deadline will thereafter be
subject to the deadline as extended
163 The bidder shall submit his bid offer against a set of bid documents purchased by him for all
or some systemservices equipment as per requirement of the Bid Documents He may
include alternate offer if permissible as per the bid However not more than one independent
and complete offer shall be permitted from the bidder
164 Bid must be submitted by the bidder through E-Tendering mode only Manual submission of bid
shall not be needed
17 LATE BIDS
No bid shall be accepted either online by E-Tender Portal or physically in case of manual
bidding process after the specified deadline for submission of bids prescribed by the purchaser
18 MODIFICATION AND WITHDRAWAL OF BIDS
181 The bidder may modify revise or withdraw his bid after submission prior to deadline prescribed
for submission of bid If a bid is withdrawn the same shall be archived unopened in the e-
procurement portal of Bhuj Telecom District
182 The bidderrsquos modification revision or withdrawal shall have to be online and digitally
authenticated as per clause 15
183 Subject to clause 20 no bid shall be modified subsequent to the deadline for submission of bids
19 OPENING OF BIDS BY BSNL
191 The purchaser shall open bids online in the presence of bidders or their authorized representatives
who chose to attend at time specified in Clause 7 of Detailed NIT(Section-1) on due date The
bidderrsquos representatives who are present shall sign in an attendance register Authority letter to
this effect shall be submitted by the bidders before they are allowed to participate in bid opening
(As per Format given in section 2 Part B)
192 A maximum of two representatives for any bidder shall be authorized and permitted to attend
the bid opening
193 (i) The bids will be opened in two stages ie techno-commercial bid shall be opened on the date
of tender opening given in NIT The financial bid will not be opened on the date of opening of
techno commercial bids
The financial bids of those bidders who are approved to be techno commercially compliant by
the competent authority will be opened by TOC in front of techno-commercially eligible
bidders authorized representatives by sending them a suitable notice
(ii) The bidderrsquos names Item name EMD amount amp validity and acceptability Information in
respect of eligible bidders Details of bid modification withdrawal (if any) and such other
details as the purchaser at its discretion may consider appropriate will be made available
online at the time of techno-commercial bid opening
(iii) The bidderrsquos names Name of the Items Quantitiesprices quoted in the bid discount if
offered Taxes amp levies and such other details as the purchaser at its discretion may consider
appropriate will be made available online at the time of financial bid opening
194 The date fixed for opening of bids if subsequently declared as holiday by the BSNL the revised
date of schedule will be notified However in absence of such notification the bids will be
opened in the next working day time and venue remaining unaltered
20 CLARIFICATION OF BIDS
201 To assist in the examination evaluation and comparison of bids the BSNL may at its discretion
Seal amp Signature of Bidder
20
ask the bidder for the clarification of its bid The request for the clarification and the response
shall be in writing However no post bid clarification at the initiative of the bidder shall be
entertained
202 If any of the documents required to be submitted along with the technical bid is found wanting
the offer is liable to be rejected at that stage However the BSNL at its discretion may call for
any clarification regarding the bid document within a stipulated time period The BSNL at itrsquos
discretion may also ask for the submission of any additionalmissing document(s) within a
stipulated time period In such case(s) the bidder shall have to comply the BSNLrsquos requirement
within the specified time In case of non-compliance to such queries the bid will be out rightly
rejected without entertaining further correspondence in this regardrdquo However no post bid
clarification at the initiative of the bidder shall be entertained
21 PRELIMINARY EVALUATION
211 BSNL shall evaluate the bids to determine whether they are complete whether any
computational errors have been made whether required sureties have been furnished whether
the documents have been properly signed and whether the bids are generally in order
212 Arithmetical errors shall be rectified on the following basis If there is a discrepancy between
the unit price and total price that is obtained by multiplying the unit price and quantity the
unit price shall prevail and the total price shall be corrected by the BSNL
213 If there is a discrepancy between words and figures the amount in words shall prevail If the
SupplierBidder does not accept the correction of the errors his bid shall be rejected
214 Prior to the detailed evaluation pursuant to clause 22 the BSNL will determine the substantial
responsiveness of each bid to the Bid documents For purposes of these clauses a substantially
responsive bid is one which conforms to all the terms and conditions of the Bid Documents
without material deviations The BSNLs determination of bids responsiveness is to be based
on the contents of the bid itself without recourse to extrinsic evidence
215 A bid determined as substantially non-responsive will be rejected by the BSNL and shall not
subsequent to the bid opening be made responsive by the bidder by correction of the non-
conformity
216 The BSNL may waive any minor infirmity or non-conformity or irregularity in a bid which
does not constitute a material deviation provided such waiver does not prejudice or affect the
relative ranking of any bidder
22 EVALUATION AND COMPARISON OF SUBSTANTIALLY RESPONSIVE BIDS
221 The Purchaser shall evaluate in detail and compare the bids previously determined to be
substantially responsive pursuant to Clause 21
222 The evaluation will be made on the basis of lowest rate quoted as under Lowest Rate
= (rate quoted for 25AMP Qty +rate quoted for 50AMP 100 AMP Qty + rate
quoted for Control Panel of Power Plant Qty) The bidder who has offered lowest
rate as evaluated above will be treated as L1 bidder 23 CONTACTING THE BSNL
231 Subject to Clause 20 no bidder shall try to influence the BSNL on any matter relating
to its bid from the time of the bid opening till the time the contract is awarded
232 Any effort by a bidder to modify its bid or influence the BSNL in the BSNLs bid evaluation
bid comparison or contract award decisions shall result in the rejection of the bid
24 PLACEMENT OF ORDER
241 The BSNL may consider placement of orders to execute the contract on those bidders whose
offers have been found technically commercially and financially acceptable The BSNL reserves
the right to counter offer price(s) against price(s) quoted by any bidder
The work against the tender is for one yearrsquos requirement and the terms and conditions of
this tender shall be operative for a period of one year from the date of signing of agreement
between the Company and the contractor with an option of extension for a further period
of one year at the same rates terms amp conditions
Seal amp Signature of Bidder
21
Distribution of Work Distribution of quantities for ordering to the selected bidders of a tender
Table 1(A) (Without provisions for MSE Units)
No of Bidders
to be approved
(Col 1)
Quantity allotted to the respective bidder
(Col 2)
L1 L2
One Bidder 100 Nil
Two Bidder 60 40
Table 1(B) (With provisions for MSME Units)
No of Bidders
to be approved
(Col 1)
Quantity allotted to the respective bidder (Col 2)
Qty
Earmarked for MSME
bidder(s)(Col 3)
L1 L2
One Bidder 80 Nil 20
Two Bidder 48 32 20
1) In case L2 and MSE bidder accepts the L1 rate in prescribed time amp do not submit MSD as per
tender terms and conditions the EMD will be forfeited If MSE bidder exceeded more than one than
20 work at L1 rate distributed among them
242 TERMS AND CONDITIONS FOR EDUCATIONAL ORDER
(a) 10 of the estimated quantity of work will be extended to inexperienced contractor for each
Tender
(b) Inexperienced Bidder has to apply separately for each Tender
(c) In case there are more than one bidder work will be distributed into the bidders
(d) The bidder shall not submit financial bid In case if the same is submitted then it will not be opened
(e) BSNL reserves a right to give any area to this bidder including that of other tender in which the
bidder has not participated
(f) The work to the inexperienced is a limited quantity (up to 10) in at a time further work will be
done on the basis of evaluation of field unit Additional quantity of work shall be given to such
contractor only after completion of initial work
(g) The payment for repairing to such contractors shall be based on L1 rates finalized in the tender
The payment will be released only after verification of quantity amp quality done as per the
instruction mentioned in respect of work in the tender
(h) All the other Terms amp conditions will remain the same
25 BSNLS RIGHT TO VARY QUANTITIES AT TIME OF AWARD
(a) BSNL reserves the right to vary up to 25 of the quantity of goods and services specified in
the schedule of requirements without any change in the unit price or other terms and conditions at
the time of award of contract
(b) BSNL also reserves the right for placement of additional order or up to 50 of the
additional quantities of goods and services contained in the running tender contract in the tender
at the same rate or a rate negotiated (downwardly) with the existing venders considering the
reasonability of rates based on prevailing market conditions and the impact of reduction in duties
and taxes etc and supplies to be obtained within delivery period scheduled afresh
No guarantee can be given to actual quantity The quantity mentioned in the tender is
tentative only No claim should entertained for less not allotting the quantum of work for any
reason
(c) In exceptional situation where the requirement is of an emergent nature and it is necessary to
ensure continued supplies from the existing venders the purchaser reserves the right to place
repeat order up to 100 of the quantities of goods and services contained in the running tender
contract at the same rate or a rate negotiated (downwardly) with the existing venders considering
the reasonability of rates based on prevailing market conditions and the impact of reduction in
duties and taxes etc Exceptional situation and emergent nature should be spelt out clearly
detailing the justification as well as benefits accrued out of it and loss incurred in case this
provision is not invoked and approved by the authority competent to accord administrative and
Seal amp Signature of Bidder
22
financial approval for the procurement calculated on the basis of total procurement ie initial and
proposed add-on quantity
26 BSNLS RIGHT TO ACCEPT ANY BID AND TO REJECT ANY OR ALL BIDS
The BSNL reserves the right to accept or reject any bid and to annul the bidding process and
reject all bids at any time prior to award of contract without assigning any reason whatsoever and
without thereby incurring any liability to the affected bidder or bidders on the grounds for the
BSNLs action
27 ISSUE OF ADVANCE WORK ORDER
271 The issue of an Advance Work Order (Letter of Intent) shall constitute the intention of BSNL to
enter into the contract with the bidder
272 The bidder shall within 14 days of issue of an advance work order give his acceptance along with
Performance Security Deposit in conformity with section 7(B) provided with the bid documents
28 SIGNING OF CONTRACT
281 The issue of FAT shall constitute the award of contract on the bidder
282 As soon as the tender is approved by the competent authority the Bid Security deposited by the
successful bidder may be converted into the Performance security deposit which will be held by
the BSNL till the completion of warranty period
29 ANNULMENT OF AWARD
Failure of the successful bidder to comply with the requirement of Clause 27 amp 28 shall
constitute sufficient ground for the annulment of the award and forfeiture of the bid security in
which event the BSNL may make the award to any other bidder at the discretion of BSNL or call
for new bids
30 NA
31 REJECTION OF BIDS
311 While all the conditions specified in the Bid documents are critical and are to be complied special
attention of bidder is invited to the following clauses of the bid documents Non-compliance of any
one of which shall result in outright rejection of the bid
(i) Clause 15 of Section 4 Part A The bids will be recorded returned unopened if covers are not
properly sealed with lsquoPERSONAL SEALrsquo of the bidder
(ii) Clauses 121 122 amp 131 of Section 4 Part A The bids will be rejected at opening stage if Bid
security is not submitted as per Clauses 121 amp 122 and bid validity is less than the period
prescribed in Clause 131 mentioned above
(iii) Clause 2 amp 10 of Section 4 Part A If the eligibility condition as per clause 2 of Section 4 Part
A is not met andor documents prescribed to establish the eligibility as per Clause 10 of
section 4 Part A are not enclosed the bids will be rejected without further evaluation
(iv) Clause 112 of Section 4 Part A NA
(v) Section 5 Part A Commercial conditions Section 5 Part B Special Conditions of Contract
Compliance if given using ambiguous words like ldquoNotedrdquo ldquoUnderstoodrdquo ldquoNoted amp
Understoodrdquo shall not be accepted as complied Mere ldquoCompliedrdquo will also be not sufficient
reference to the enclosed documents showing compliances must be given
(vi) Section 8 Price Schedule Prices are not filled in as prescribed in Financial Bid
(vii) Section 4 Part A clause 93 on discount which is reproduced below
ldquoDiscount if any offered by the bidder shall not be considered unless specifically indicated in
the price schedule Bidders desiring to offer discount shall therefore modify their offer
suitably while quoting and shall quote clearly net price taking all such factors like discount
free supply etc into accountrdquo
312 Before outright rejection of the Bid by Bid-opening team for non-compliance of any of the
provisions mentioned in clause 311(i) 311 (ii) above the bidder company is given
opportunity to explain their position however if the person representing the company is not
satisfied with the decision of the Bid opening team hethey can submit the representation to
Bid opening team immediately but in no case after closing of the tender process with full
justification quoting specifically the violation of tender conditions if any
Seal amp Signature of Bidder
23
313 Bid opening team will not return the bids submitted by the bidders on the date of tender
opening even if it is liable for rejection and will preserve the bids in sealed cover as submitted
by taking signatures of some of the desirous representatives of the participating
biddercompanies present on the occasion
314 The In charge of the Bid opening team will mention the number of bids with name of
company found unsuitable for further processing on the date of tender opening and number of
representations received in Bid opening Minutes and if Bid opening team is satisfied with the
arguments of the biddercompany mentioned in their representation and feel that there is
prima-facie fact for consideration the in charge of the Bid opening team will submit the case
for review to competent authority ie GMTD BHUJ as early as possible preferably on next
working day and decision to this effect should be communicated to the bidder company within
a week positively Bids found liable for rejection and kept preserved on the date of tender
opening will be returned to the bidders after issue of POfinal acceptance of tender against
the instant tender
315 If the reviewing officer finds it fit to open the bid of the petitioner this should be done by
giving three (working) days notice to all the participating bidders to give opportunity to
desirous participants to be present on the occasion
32 ACTION BY PURCHASER AGAINST BIDDER(S) VENDOR(S) IN CASE OF
DEFAULT In case of default by Bidder(s) Vendor(s) such as
a) Does not supply the equipment services in time
b) Equipment Services does not perform satisfactory in the field in accordance with the
specifications
c) Or any other default whose complete list is enclosed in Appendix-1
Purchaser will take action as specified in Appendix-1 of this section
33 DELETED
34 NEAR-RELATIONSHIP CERTIFICATE
341 The bidder should give a certificate that none of his her near relative as defined below is
working in the units where he is going to apply for the tender In case of proprietorship firm
certificate will be given by the proprietor For partnership firm certificate will be given by all
the partners and in case of limited company by all the Directors of the company excluding
Government of India Financial institution nominees and independent non-Official part time
Directors appointed by Govt of India or the Governor of the state and full time Directors of
PSUs both state and central Due to any breach of these conditions by the company or firm or
any other person the tender will be cancelled and Bid Security will be forfeited at any stage
whenever it is noticed and BSNL will not pay any damage to the company or firm or the
concerned person
342 The Company or firm or the person will also be debarred for further participation in the
concerned unit
343 The near relatives for this purpose are defined as-
(a) Members of a Hindu undivided family
(b) They are husband and wife
(c) The one is related to the other in the manner as father mother son(s) amp Sons
wife(daughter in law) Daughter(s) and daughters husband (son in law) brother(s) and
brothers wife sister(s) and sisters husband (brother in law)
344 The format of the certificate is given in Section -2(D)
35 VERIFICATION OF DOCUMENTS AND CERTIFICATES
The bidder will ensure that all the documents and certificates including experience
performance and self certificates submitted by him are correct and genuine before enclosing
them in the bid The onus of proving genuineness of the submitted documents would rest with
the bidder If any document paper certificate submitted by the participant bidder is found
discovered to be false fabricated tempered manipulated either during bid evaluation or
during award of contract or thereafter then the Purchaser will take action as per Clause-1 of
Appendix-1 of this section
Seal amp Signature of Bidder
24
Appendix-1 to Section - 4 (Part-A)
S
No
Defaults of the bidder vendor Action to be taken
A B C
1(a) Submitting fake forged
i) Rejection of tender bid of respective Vendor
ii) Banning of business for 3 years which implies barring
further dealing with the vendor for procurement of Goods amp
Services including participation in future tenders invited by
BSNL for 3 years from date of issue of banning order
iii) Termination Short Closure of POWO if issued This
implies non-acceptance of further supplies work amp services
except to make the already received material work complete
work in hand
a) Bank Instruments with the bid to meet
terms amp condition of tender in respect of
tender fee and or EMD
b) Certificate for claiming exemption in
respect of tender fee and or EMD
c) detection of default at any stage from
receipt of bids till award of APO issue of
POWO
Note 1- However in this case the performance guarantee if alright will not be forfeited
Note 2- Payment for already received supplies completed work shall be made as per terms amp conditions of
PO WO
1(b)
Submitting fake forged documents towards
meeting eligibility criteria such as
experience capability supply proof
registration with GST Income Tax
departments etc and as supporting
documents towards other terms amp conditions
with the bid to meet terms amp condition of
tender
(i) If detection of default is prior to award
of APO
i) Rejection of Bid amp
ii) Forfeiture of EMD
(ii) If detection of default after issue of APO
but before receipt of PG SD (DDBG etc)
i) Cancellation of APO
ii) Rejection of Bid amp
iii) Forfeiture of EMD
(iii) If detection of default after receipt of
PG SD (DDBG etc)
i) Cancellation of APO
ii) Rejection of Bid amp
iii) Forfeiture of PG SD
However on realization of PG SD amount EMD if not
already released shall be returned
(iv) If detection of default after issue of PO
WO
i) Termination Short Closure of POWO and Cancellation
of APO
ii) Rejection of Bid amp
iii) Forfeiture of PG SD
However on realization of PG SD amount EMD if not
released shall be returned
Note 3- However settle bills for the material received in correct quantity and quality if pending items do
not affect working or use of supplied items
Note 4- No further supplies are to be accepted except that required to make the already supplied items
work
Special Note 1- Authority competent to take final decision GMTD Bhuj
2 If vendor or his representative uses violent
coercive means viz Physical Verbal means
to threatens BSNL Executive employees
and or obstruct him from functioning in
discharge of his duties amp responsibilities for
the following
Banning of business for 3 years which implies Barring
further dealing with the vendor for procurement of Goods amp
Services including participation in future tenders invited by
BSNL for 3 years from date of issue of banning order
a) Obstructing functioning of tender opening
executives of BSNL in receipt opening of
tender bids from prospective Bidders
suppliers Contractors
Seal amp Signature of Bidder
25
b) Obstructing Threatening other
prospective bidders ie suppliers
Contractors from entering the tender venue
and or submitting their tender bid freely
Special Note 1- Authority competent to take final decision GMTD Bhuj
3 Non-receipt of acceptance of APO AWO
and SD PG by L-1 bidder within time
period specified in APO AWO
Forfeiture of EMD
Special Note 1- Authority competent to take final decision GMTD Bhuj
41 Failure to supply and or Commission the
equipment and or execution of the work at
all even in extended delivery schedules if
granted against PO WO
i) Termination of PO WO
ii) Under take purchase work at the risk amp cost of
defaulting vendor
iii) Recover the excess charges if incurred from the PG SD
and outstanding bills of the defaulting Vendor
42 Failure to supply and or Commission the
equipment and or execution of the Work in
full even in extended delivery schedules if
granted against PO WO
i) Short Closure of PO WO to the quantity already
received by and or commissioned in BSNL and or in
pipeline provided the same is usable andor the Vendor
promises to make it usable
ii) Under take purchase work for balance quantity at the
risk amp cost of defaulting vendor
iii) Recover the excess charges if incurred from the PG SD
and outstanding bills of the defaulting Vendor
Special Note 1- Authority competent to take final decision for 41 amp 42 by DGM concerned
51 The supplied equipment does not perform
satisfactory in the field in accordance with
the specifications mentioned in the PO
WOContract
i) If the material is not at all acceptable then return the non-
acceptable material (or its part) amp recover its cost if paid
from the os bills PG SD
OR
ii) If the material is inducted in network amp it is not possible
to return it and or material is acceptable with degraded
performance the purchaser may determine the price for
need to be issued in compliant format and timely within the time prescribed under GST law
163 In case of any deficientincompleterejected supply BSNL shall convey the same in a reasonable
time to enable the supplier to issue credit note and take tax adjustment
164 It would be the responsibility of the supplier to declare correct information on invoice and GSTN
viz the amount the place of supply rate of tax etc In case the eligibility of input tax credit is
questioned or denied to BSNL on account of default by the supplier the same would be
recovered by BSNL from the contractor
165 Registered location of the both the parties ie BSNL and contractor should be mentioned in the
agreement with GSTIN No Further supplier should raise invoices at the registered premise of
BSNL for availing of credit and ensure that the place of supply as per GST law is same as
registered premise
166 BSNL could at any time instruct the contractor to raise its invoices at a particular location of
BSNL
Seal amp Signature of Bidder
39
167 It is the responsibility of the supplier to ensure that place of supply and the GSTN of BSNL are
in the same state If for any reason they are not in the same state the contractor shall intimate to
BSNL and give adequate time before raising of the invoice
168 E-waybill number should be mentioned on the invoices
169 contractor shall be responsible for timely issuance and delivery of invoice DN CN to enable
BSNL to claim tax benefit on or before the stipulated time period provided by the GST law
(a) It is the responsibility of the contractor to ensure that outward supply return (GSTR-1) would be
filed correctly If not than cost would be borne by supplier
(b) Reporting of correct outward supply by supplier in the outward return (GSTR-1) is the
responsibility of the supplier In case of mismatch because of contractorrsquos fault prompt
amendments must be made by the supplier else supplier would be required to indemnify BSNL
of the loss of credit due to mis-match The compliances to be adhered by contractor includes
(but is not limited to) the following
(i) Uploading appropriate invoice details on the GSTN within the stipulated time
(ii) Issuing GST compliant invoice CN DN PO issued by BSNL should be referred by
contractor for capturing information on the invoice
(iii) Contractor needs to pay the entire self-assessed tax on timely basis
(iv) Where invoice is not uploaded or incorrect upload of invoice detail of GSTN by supplier
then credit on such invoice will be given provisionally subject to matching So acceptance of
changes made by BSNL on GSTN on account of non-upload or incorrect upload of invoice
details on GSTN is to be submitted by supplier Such changes wrt the mismatch are required
to be accepted by supplier within the time limit prescribed under the GST law It should be
noted that in case supplier does not accept such changes within the time limit prescribed under
GST law the loss of input tax credit (if any) would be recovered from the supplier In case of
mismatch because of Suppliers fault prompt amendments must be made by the supplier else
supplier would be required to indemnify BSNL for the losses of credit and interest paid due to
mismatch
(v) contractor to issue all necessary documentation and perform all necessary compliances for
BSNL to be eligible to claim the input tax credit of GST tax to them In case BSNL is unable to
claim the input tax credit the amount wrt GST charged by the supplier would be recovered
from the supplier
1610 Refer) for clause stating that all the details of supplier (name address GSTN unregistered
supplier place of supply SAC HSN code etc) and other mandatory details shall be mentioned on the
invoice
1611Where the location agreed are more than one state then separate invoice state wise to claim
input tax credit in a particular state (typically happens in a bill to-ship to scenario) shall have to be
submitted
1612 It shall be the responsibility of the supplier to mention State of place of supply of goodsservices
in the invoice issued to BSNL
Seal amp Signature of Bidder
40
SECTION ndash 5 (Part-B)
SPECIAL CONDITIONS OF CONTRACT (SCC)
1 GENERAL
No official of Gazetted rank or other Gazetted officer employed in Engineering or administrative
duties in an Engineering BSNL or any other BSNL of the BSNL is allowed to work as a contractor for
a period of two years after his retirement from BSNL service without the previous permission of
BSNL This contract is liable to be cancelled if either the contractor or any of his employee is found at
any time to be such a person who hadnrsquot obtained the permission of BSNL as aforesaid before
submission of the engagement in the contractorrsquos service as the case may be
2 Material Handed over by The BSNL
21 The contractor shall transport (including loading and unloading) all stores issued to him from
Field Unit Telecom Store to the site of work at his own cost The BSNL shall not pay any
transportation charges to the contractor
22 All materials handed over to the contractor by the BSNL shall remain the absolute property of
BSNL and shall not be removed form site of the work except for use in the work and shall be at all
times open to inspection by the Representative of GMTD BHUJ
23 The contractor shall be responsible for the transportation of store storage and safe custody of all
material supplied to him by the BSNL which in the contractorrsquos custody whether or not installed in
the work The contractor shall satisfy himself regularly the quantity and quality of the materials
supplied to him and he will be responsible for any subsequent deterioration and discrepancy (inclusive
of theft) in the quantity quality the materials
3 LABOUR WELFARE MEASURES AND WORKMAN COMPENSATION
(AS APPLICABLE)
31 Obtaining License before commencement of work
The contractor shall obtain a valid labour license (if applicable) under the Contact Labour (RampA) Act
1919 and the Contract Labour (Regulation and Abolition) Central Rules 1971 before commencement
of the work and continue to have a valid license until the completion of work The contractor shall
also abide by the provisions of the Child Labour (Prohibition and Regulation) Act 1986 Any failure
to fulfill this requirement shall attract the penal provisions of this contract arising out of the resultant
non-execution of work
32 Contractors labour Regulations
321 Working Hours
3211 Normally working hours of an employee should not exceed 9 hours a day The working
day shall be so arranged the inclusive of interval for rest if any it shall not spread over
more than12 hours on any day
3212 When a worker is made to work for more than 9 hours on any day or for more than 48
hours in any week he shall be paid over time for the extra hours put in by him
3213 Every worker shall be given a weekly holiday normally on a Sunday in accordance with
the provisions of minimum Wages (Central Rules 1960 as amended from time to time
irrespective of whether such worker is governed by the Minimum Wages Act or not
3214 Where the minimum wages prescribed by the Government under the Minimum Wages
Act are not inclusive of the wages for the weekly day of rest the worker shall be entitled
to rest day wages at the rate applicable to the next preceding day provided he has
worked under the same contractor for a continuous period of not less than 6 days
3215 Where a contractor is permitted by the Engineer-in-Charge to allowed a worker to work
on a normal weekly holiday he shall grant a substituted holiday to him for the whole day
Seal amp Signature of Bidder
41
on one of the five days immediately before or after the normal weekly holiday and pay
wages to such worker for the work performed on the normal weekly holiday at the
overtime rate
322 Display of Notice Regarding Wages Etc
The contractor shall before he commences his work on contract display and correctly
maintain and continue to display and correctly maintain in a clear and legible condition
in conspicuous places on the work notices in English and in local Indian languages
spoken by the majority of the workers giving the minimum rates of the wages fixed
under Minimum Wages Act the actual wages being paid the hours of work for which
such wage are earned wages periods dates of payments of wages and other relevant
information
323 Payment of Wages
3231 The contractor shall fix wage periods in respect of which wages shall be payable
3232 No wage period shall exceed one month
3233 The wages of every person employed as contract labour in an establishment or by a
contractor where less than one thousand such persons are employed shall be paid before
the expiry of seventh day and in other cases before the expiry of tenth day after the last day
of the wage period in respect of which the wages are payable
3234 Where the employment of any worker is terminated by or on behalf of the contractor the
wages earned by him shall be paid before the expiry of the second working day from the
date on which his employment is terminated
3235 All payment of wages shall be made on a working day at the work premises and during the
working time and on a date notified in advance and in case the work is completed before
the expiry of the wage period final payment shall be made within 48 hours of the last
working day
3236 Wages due to every worker shall be paid to him direct or to other person authorized by him
in this behalf
3237 All wages shall be paid in current coin or currency or in both
3238 Wages shall be paid without any deductions of any kind except those specified by the
Central Government by general or special order in this behalf or permissible under the
Payment of Wages Act 1956
3239 A notice showing the wages period and the place and time of disbursement of wages shall
be displayed at the place of work and a copy sent by the contractor to the Engineer ndashin-
Charge under acknowledgement
32310 It shall be the duty of the contractor to ensure the disbursement of wages in presence of the
site Engineer or any other authorized representative of the Engineer-in-Charge who will be
required to be present at the place and time of the disbursement of wages by the contractor
to workmen
32311 The contractor shall obtain from the site Engineer or any other authorized representative of
the Engineer-in-Charge as the case may be a certificate under his signature at the end of
the entries in the ldquoRegister of Wages ldquo or the ldquoWage-cum-Muster Rollrdquo as the case may
be in the following form -
ldquoCertified that the amount shown in the column Nohelliphelliphelliphelliphas been paid to the
workman concerned in my presence on helliphelliphelliphelliphelliphellip at helliphelliphelliphelliphelliphelliphelliphelliphelliprdquo
32312 Fines and deductions which may be made from wages
A The wages of a worker shall be paid to him without any deduction of any kind except the
following -
a) Fines
(b) Deductions for absence from duty ie from the place or the places where by the terms of
his employment he is required to work The amount of deduction shall be in proportion
to the period for which he was absent
(c) Deductions for damage to or loss of goods expressly entrusted to the employed person
for custody or for loss of money or any other deductions which he is required to
account where such damage or loss is directly attributable to his neglect or default
Seal amp Signature of Bidder
42
(d) Deduction for recovery of advances or for adjustment of over payment of wages
advances granted shall be entered in register
(e) Any other deductions which the Central Government may form time to time allow
B No fines should be imposed on any worker save in respect of such acts and omissions
on his part as have been approved of by the Labour Commissioner
C No fine shall be imposed one worker and no deduction for damage or loss shall be
made from his wages until the worker has been given an opportunity of showing cause
against such fines or deductions
D Every fine shall be deemed to have been imposing on the day of the act or omission in
respect of which it was imposed
524 Labor records 1 The contractor shall maintain a Register of Persons employed on work on contract in
Form XIII of the Contract Labour (RampA) Central Rules 1971
2 The contractor shall maintain a Muster Roll register in respect of all workmen
employed by him on the work under Contract in Form XVI of the CL (RampA) Rules
1971
3 The contractor shall maintain a Wage Register in respect of all workmen employed by
him on the work under contract in From XVII of the CL (RampA) Rules 1971
4 Register of accidents- The contractor shall maintain a register of accidents in such
form as may be convenient at the work place but the same shall include the following
particulars
(a) Full Particulars of the laborers who met with accident
(b) Rate of wages
(c) Sex
(d) Age
(e) Nature of accident and cause of accident
(f) Time and date of accident
(g) Date and time when admitted in hospital
(h) Date of discharge from the hospital
(i) Period of treatment and result of treatment
(j) Percentage of loss of earning capacity and disability as assessed by
Medical officer
(k) Claim required to be paid under Workmenrsquos Compensation Act
(l) Date of payment of compensation
(m) Amount paid with details of the person to whom the same was paid
(n) Authority by whom the compensation was assessed
(o) Remarks
5 The contractor shall maintain a Register of Fines in the Form XII of the CL(RampA)
Rules 1971 the Contractor shall display in a good condition and in a conspicuous
place of work the approved list of acts and commission for which fines can be
imposed
6 The contractor shall maintain a Register of deductions for damage or loss in Form
XX of the CL (RampA) Rules 1971
7 The contractor shall maintain a Register of Advances in Form XXIII of the CL
(RampA) Rules 1971
8 The contractor shall maintain a Register of Overtime in Form XXIII of the CL
(RampA) Rules 1971
9 Attendance card-cum wage slip a The contractor shall issue an Attendance card cum wage slip to each workman
employed by him
b The card shall be valid for each wage period
Seal amp Signature of Bidder
43
c The contractor shall mark the attendance of each workman on the card twice each
day once at the commencement of the day and again after the rest interval before
he actually starts work
d The card shall remain in possession of the worker during the wage period under
reference
e The contractor shall complete the wage slip portion on the reverse of the card at
least a day prior to the disbursement of wages in respect of the wage period under
reference
f The contractor shall obtain the signature or thumb impression of the worker on the
wag slip at the time of disbursement of wages and retain the card with him
10 Employment card The contractor shall issue an Employment Card in the Form XIV of CL (RampA) Central Rules
1971 to each worker within three days of the employment of the worker
11 Service certificate
On termination of employment for any reason whatsoever the contractor shall issue to the
workman whose services have been terminated a Service Certificate in the Form XV of the
CL (RampA) Central Rules 1971
12 Preservation of labour records The labour records and records of Fines and deductions shall be preserved in original for a
period of three years from the date of last entries made in them and shall be made available for
inspection by the Engineer-in-Charge or Labour Officer or any other officers authorized by the
Ministry of Communication in this behalf
13 Power of labour officer to make investigations or enquiry The labour officer or any person authorized by the Central Government on their behalf shall
have power to make enquiries with a view to ascertaining and enforcing due and proper
observance of Fair Wage Clauses and provisions of these Regulations He shall investigate
into any complaint regarding the default made by the contractor in regard to such provision
14 Report of Investigating officer and action thereon The labour Officer or other persons authorized as aforesaid shall submit a report of result of
his investigation or enquiry to the Engineer in-Charge indicating the extent if any to which
the default has been committed with a note that necessary deductions from the contractorrsquos bill
be made and the wages and other dues be paid to the labourers concerned The Engineer in-
Charge shall arrange payments to the labour
concerned within 45 days from the receipt of the report from the Labour Officer or the
authorized officer as the case may be
15 Inspection of Books And slips The contractor shall allow inspection of all the prescribed labour records to any of his workers
or to his agent at a convenient time and place after due notice is received or to the Labour
Officer or any other person authorized by the Central Government on his behalf
16 Submission of Returns The contractor shall submit periodical returns as may be specified form time to time
17 Amendments
The Central Government may from time to time add to or amend the regulations and on any
question as to the applicationinterpretation or effect of those regulations
Contractor must fulfill the terms and condition towards fulfillmentscompliance of the
provision of EPF amp Miscprovision act 1952 amp Employment provident Fund Scheme 1952 in
respect of laborersemployees engaged by the contractor Contractor must submit declaration
form regarding compliance of the condition of EPF act 1952
525 INSURANCE Without limiting any of his other obligations or liabilities the contractor shall at his own
expense take and keep comprehensive insurance including third party risk for the plant
machinery men materials etc brought to the site and for all the work during the execution
The contractor shall also take out workmenrsquos compensations insurance as required by law and
under take to indemnify and keep indemnified the Government from and against all manner of
Seal amp Signature of Bidder
44
claims and demands and losses and damages and cost (including between attorney and client)
charges and expenses that may arise in regard the same or that the Government may suffer or
incur with respect to endor incidental to the same The contractor shall have to furnish
originals and or attested copies as required by the BSNL of the policies of insurance taken
within 15 (fifteen) days of being called upon to do so together with all premium receipts and
other papers related thereto which the BSNL may require
526 COMPLIANCE WITH LAWS AND REGULATION
During the performance of the works the contractor shall at his own cost and initiative
fully comply with all applicable laws of the land and with any and all applicable by-laws
rules regulations and orders and any other provisions having the force of law made or
promulgated or deemed to be made or promulgated by the Government Governmental
agency or BSNL municipal board Government of other regulatory or Authorized body or
persons and shall provide all certificates or compliance therewith as may be required by
such applicable law By-laws Rules Regulations orders and or provisions The
contractor shall assume full responsibility for the payment of all contributions and pay roll
taxes as to its employees servants or agents engaged in the performance of the work
specified in the contractor documents If the contractor shall require any assignee or sub-
contract to comply with the provisions of the clause and in this connection the contractor
agrees as to undertake to save and hold the Government harmless and indemnified from
and against any all penalties actions suits losses and damages claims and demands and
costs (inclusive between attorney and client) charges and expenses whatsoever arising out
or occasioned indirectly or directly by failure of the contractor or any assignee or sub-
contractor to make full and proper compliance with the said by-laws Rules Regulations
laws and Order and provisions as aforesaid
6 TOOLS and PLANTS
The contractor shall provide at his own cost all tools plants appliances implements etc
required for proper execution of works The contractor shall also supply without charge
the requisite number of persons with the means and materials necessary for the purpose of
setting out works counting weighing and assisting the measurements for examination at
any time and from time to time Failing his so doing the same may be provided by the
Engineer-in-charge at the expense of the contractor and the expenses shall be deducted
from any money due to the contractor under this contract or otherwise
As per Para 367 of the recommendationobservation of Tenth Report of parliamentary
standing committee on labour Contractor would provide the same social security to the
labours engaged by him as is available to regular employees
As per Para 368 of the recommendationobservation of Tenth Report of parliamentary
standing committee on labour Contractor shall ensure implementation of equal pay for equal
work and also equal remuneration to men and women
Seal amp Signature of Bidder
45
SECTION ndash 7
PROFORMAS
7 (A) BID SECURITY EMD Guarantee
(To be typed on Rs100- non-judicial stamp paper)
Whereas (hereinafter called the Bidder) has submitted its bid datedfor
the supply of vide Tender Nohelliphelliphelliphelliphelliphelliphelliphellip dated KNOW ALL MEN by
these presents that WE OF having our registered office at
(hereinafter called the Bank) are bound unto Bharat Sanchar Nigam Limited (hereinafter
called the Purchaser) in the sum of Rs for which payment will and truly to be made of
the said Purchaser the Bank binds itself its successors and assigns by these present
THE CONDITIONS of the obligation are
1 If the Bidder withdraws his bid during the period of bid validity specified by the Bidder
on the Bid form or
2 If the Bidder having been notified of the acceptance of his bid by the Purchaser during the
period of bid validity
(a) fails or refuses to execute the Contract if required or
(b) fails or refuses to furnish the Performance Security in accordance with the instructions to
Bidders
We undertake to pay to the Purchaser up to the above amount upon receipt of its first written demand
without the purchaser having to substantiate its demand provided that in its demand the purchaser
will note that the amount claimed by it is due to it owning to the occurrence of one or both of the two
conditions specifying the occurred condition or conditions
This guarantee will remain in force as specified in clauses 12 and 282 of section 4 Part A of the Bid
Document upto and including THIRTY (30) days after the Period of bid validity and any demand in
respect thereof should reach the Bank not later than the specified datedates
Signature of the Bank Authority
Name
Signed in Capacity of
Name amp Signature of witness Full address of Branch
Address of witness Tel No of Branch
Fax No of Branch
Seal amp Signature of Bidder
46
7 (B) PERFORMANCE SECURITY BOND FORM
(To be typed on Rs100- non-judicial stamp paper)
Datedhelliphelliphelliphelliphellip
Sub Performance guarantee
Whereas General Manager Telecom Bhuj Telecom District Bhuj (hereafter referred to as BSNL) has issued an AWO no
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellipDated helliphelliphelliphellip20hellip awarding the work of
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip to Ms
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip(hereafter referred to as ldquoBidderrdquo) and BSNL has asked him to submit a performance guarantee
in favour of AO(Cash) BSNL Oo GMTD BHUJ of Rs helliphelliphelliphelliphelliphellip- (hereafter referred to as ldquoPG Amountrdquo) valid up
to helliphelliphelliphellip20helliphelliphellip (hereafter referred to as ldquoValidity Daterdquo)
Now at the request of the Bidder We helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellipBank
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip Branch having (Address) and Regd
office address as helliphelliphellip helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip (Hereinafter called lsquothe
Bankrdquo) agreed to give this guarantee as hereinafter contained
2 We ldquothe Bankrdquo do hereby undertake and assure to the BSNL that if in the opinion of the BSNL the Bidder has in any way
failed to observe or perform the terms and conditions of the said agreement or has committed any breach of its obligations
there-under the Bank shall on demand and without any objection or demur pay to the BSNL the said sum limited to PG
Amount or such lesser amount as BSNL may demand without requiring BSNL to have recourse to any legal remedy that may
be available to it to compel the Bank to pay the same
3 Any such demand from the BSNL shall be conclusive as regards the liability of Bidder to pay to BSNL or as regards the
amount payable by the Bank under this guarantee The Bank shall not be entitled to withhold payment on the ground that the
Bidder had disputed its liability to pay or has disputed the quantum of the amount or that any arbitration proceeding or legal
proceeding is pending between Bidder and BSNL regarding the claim
4 We the Bank further agree that the guarantee shall come into force from the date of its issue and shall remain in full force
and effect up to its Validity date
5 The Bank further agrees that the BSNL shall have the fullest liberty without the consent of the Bank and without affecting
in any way the obligations hereunder to vary any of the terms and conditions of the said agreement or to extend the time for
performance of the said agreement from any of the powers exercisable by BSNL against the Bidder and to forebear to enforce
any of the terms and conditions relating to the said agreement and the Bank shall not be relieved from its liability by reason
of such failure or extension being granted to Bidder or through any forbearance act or omission on the part of BSNL or any
indulgence by BSNL to Bidder or any other matter or thing whatsoever which under the law relating to sureties would but for
this provision have the effect of relieving or discharging the guarantor
6 Notwithstanding anything herein contained
(a) The liability of the Bank under this guarantee is restricted to the PG Amount and it will remain in force up to its Validity
date
(b) The guarantee shall stand completely discharged and all rights of the BSNL under this Guarantee shall be extinguished if
no claim or demand is made on us in writing on or before its validity date
7 In case BSNL demands for any money under this bank guarantee the same shall be paid through bankerrsquos Cheque in
favour of ldquoAO(Cash) BSNL Oo GMTD BHUJ rdquo payable at Bhuj
8 The Bank guarantees that the below mentioned officer who have signed it on behalf of the Bank have authority to give this
guarantee under its delegated power
Place helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip
Date helliphelliphelliphelliphelliphelliphelliphelliphelliphellip (Signature of the Bank Officer)
Rubber stamp of the bank
Authorized Power of Attorney Number helliphelliphelliphelliphelliphellip
Name of the Bank officer helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip
Having examined the tender documents terms and conditions stipulated therein specifications of work
etc we the under signed offer to execute the repair Works in conformity with the said specifications and
conditions of contract as under
Sl No
ITEM DESCRIPTION
Repair Charges per module inclusive of freight
forwardingpacking amp all taxes amp levies (except GST)
(in Figure)
Unit Rate in Words
Total Cost (unit rate qty)
1 2 3 4 5
1 25 AMP Module
2
50 AMP Module
3 100 AMP Module
4 Control Panel of
Power Plants
25A 50A amp 100A
5 GRAND TOTAL
Note -
1 GST will be payable extra on approved rates 2If our Bid is accepted we shall submit the securities as per the conditions mentioned in the contract
3We agree to abide by this Bid for a period of 180 days from the date of opening of financial bid and it shall
remain binding upon us and may be accepted at any time before the expiry of that period
4 The evaluation will be made on the basis of lowest rate quoted as under Lowest Rate = (rate quoted for 25 AMP Qty + rate quoted for 50 AMP Qty + rate
quoted for 100 AMP Qty + rate quoted for Control Panel of Power Plant AMP Qty)
The bidder who has offered lowest rate as evaluated above will be treated as L1 bidder
Date Signature of Tenderer
Seal amp Signature of Bidder
49
CHECK LIST
Sl No
Description Tender Clause Mode of Submission
1 Tender Fee Section 1 (part A) Para 21 22
Off-line
2 EMD Section 1 (part A) Para 51 52 Off-line 3 Power of Attorney Section 4 (Part A) clause 143 Off-line 4 Latest and Valid MSME NSIC certificate (If Applicable) Off-line 5 Experience Certificate Section 1 (part A)
9 EPF (If applicable) Section 2 Para 3 (a) (i) ON-Line 10 ESIC (If applicable) Section 2 Para 3 (a) (i) ON-Line 11 PAN Card Section 2 Para 3 (a) (i) ON-Line 12 Agency Detail Section 2 (part-A) ON-Line 13 Letter of Authorization Section 2 (part-B) ON-Line 14 Under taking amp
declaration Section 2 (part-C) ON-Line
15 Declaration regarding no relative working in BSNL
Section 2 (part-D) To be submitted by proprietor or separately by each partnerDirector
ON-Line
Seal amp Signature of Bidder
12
SECTION- 3
SCOPE OF WORK AND JURISDICTION OF CONTRACT
1 SCOPE OF WORK
1 During the entire period of contract repairing of all types and of any make such as AMAR RAJA DACS DELTA DYNA ELTEK EXICOM HIMACHAL EXICOM ITI etc SMPS Power plant Modules (25 AMP 50 AMP 100 Amp ) Control panel are to be carried out including replacement of faulty parts
2 Collection and Delivery of Faulty repaired modules - a The concerned JTOSDEAGM in charge will intimate the contractor the Location Make capacity and
quantity of faulty modules by email (copy to AGM(Plg) on agmplgbhujgmailcom ) followed by ERP PO on mail
b The contractor will collect the module from the concerned in charge with in THREE days from the date of intimation under proper receipt to the concerned in charge However under emergent condition the collection of modules may be done on the same day
c Packing transport and delivery of faulty as well as repaired modules is the responsibility of the contractor
d The contractor shall repair the module and return to the concerned in charge with in Seven days of its collection However under emergent condition as decided by the concerned in charge the collection and repair shall be made within the time period given in the ERP PO
e Repaired modules will be tested by the SDE concern within TWO days on receipt of repaired modules if it is found OK then a certificate of this may be issued to the contractor Otherwise same shall be returned to the contractor for necessary action
f The date of receipt of all the modules mentioned in the ERP PO duly tested OK will be reckoned as the completion of ERP PO
g Repaired modules are warranted for 3 months from the date of successfully taken over During this time the contractor has to rectify the module free of cost
3 INSPECTION AND TESTS - a) The BSNL BHUJ or his representative shall have the right to inspect and test the repaired module as
per prescribed test schedules for their conformity to the specifications Where the BSNL BHUJ decides to conduct such tests on the premises of the Contractor or its subcontractor(s) all reasonable facilities and assistance like Testing Instruments and other test gadgets including access to drawings and production data shall be furnished to the inspectors at no charge to the Purchaser
b) Should any inspected or tested repaired module fail to conform to the Specifications the BSNL BHUJ may reject them and the Contractor shall either replace the rejected repaired module or make all alterations necessary to meet Specification requirements free of cost to the Purchaser
c) Notwithstanding the pre-repair tests and inspections prescribed in clause 3(a) amp 3(b) above the module and accessories on receipt in the BSNL s premises will also be tested during and after installation before take over and if any equipment or part thereof is found defective the same shall be replaced free of all cost to the BSNL BHUJ
d) If any module or any part thereof before it is taken over under clause 3(e) below is found defective or fails to fulfill the requirements of the contract the inspector shall give the Contractor notice setting forth details of such defects or failure and the Contractor shall make the defective module good or alter the same to make it comply with the requirements of the contract forthwith and in any case within a period not exceeding one month of the initial report The replacements shall be made by the Contractor free of all charges at site should it fail to do so within this time the BSNL BHUJ reserves the discretion to reject and replace at the cost of the Contractor the whole or any portion of the module as the case may be which is defective or fails to fulfill the requirements of the contract The cost of any such replacement made by the BSNL BHUJ shall be deducted from the amount payable to the Contractor
Seal amp Signature of Bidder
13
e) When the performance tests called for have been successfully carried out the inspector ultimate
Consignee will forthwith issue a Taking Over Certificate The inspectorultimate consignee shall not delay the issue of any Taking Over Certificate ldquo contemplated by this clause on account of minor defects in the module which do not materially affect the commercial use thereof provided that the Contractor shall undertake to make good the same in a time period not exceeding two months The taking Over Certificate shall be issued by the ultimate consignee within six weeks of successful completion of tests
f) After performance test carried out by the concerned SDE of BSNL as per prescribed schedule and repaired modules are found ok in all respect than the repaired modules will be accepted
g) A register is to be maintained at each placelocation mentioning the details of Modules date of Collection and Delivery of Faulty repaired modules replacement of spares amp remark if any and it is to be signed by the controlling officer amp Service engineer
h) Nothing in clause 3 shall in any way release the Contractor from any Warranty or other obligations under this contract
4 SPARES - All the spare of good quality required for repair of modules of SMPS PP are to be supplied by the contractor including major components
5 The contractor shall be responsible for any loss or damages caused to man or machinespartsinstruments during the execution of work and shall replace with an identical new item at his own cost The authorized officerperson of BSNL will have the liberty to check the material and work etchellip provided by the contractor
6 Governing Conditions for RNP (Repair Not Possible) Cases
A module Control panel may be declared RNP only if cost of material to be replaced exceeds five times of approved rate of repair In no case labour cost involved will be considered for deciding RNP A detailed report is to be submitted by contractor to concerned officer in-charge and final decision in this regard will be taken by concerned DGM subjected to maximum permissible RNP as given below
a)25-A module Maximum 10 of total quantity ordered for repair
b) 50-A 100-A Module Maximum 5 of total quantity ordered for repair
c) Control Panel Maximum 10 of total quantity ordered for repair
In case of RNP exceeding permissible limits penalty will be imposed as per para 11 (d) of section-5 (Part-A)
7 WARRANTY - a) Repaired modules are warranted for 3 months from the date of successfully taken over During this
time the contractor has to rectify the module free of cost The contractor shall warrant that repaired module shall be free from all defects and faults in materials used workmanship It becomes necessary for the contractor to replace or renew any defective portion(s) of the module under this clause
b) Replacement under warranty clause shall be made by the contractor free of all charges at site including freight insurance and other incidental charges
c) If any defect is not remedied by the contractor within a reasonable time the BSNL BHUJ may proceed to get the defects remedied from other contractor etc at the contractors risk and expenses but without prejudice to any other rights which the BSNL BHUJ may have against the contractor in respect of such defects
Seal amp Signature of Bidder
14
SECTION- 4 (Part-A)
GENERAL INSTRUCTION TO BIDDERS (GIB)
1 DEFINITIONS
1 BSNL The BSNL means the BSNL Bhuj Telecom Dist under the Ministry of
Communications which invites the tenders on behalf of the General Manager Bhuj Telecom
District Includes executives in the BSNL whatever designations assigned to them from time
to time who may be the in-charge of direction supervision testing acceptance and
maintenance including their successor(s) in the office appearing in various clauses shall be
taken to mean the BSNL Bhuj Telecom District
b The SSA Head means the Head of SSA General Manager Bhuj Telecom District Bhuj and
his successors
c The jurisdiction of the SSA Head The jurisdiction of the SSA Head means Bhuj Telecom
District which coincides geographically with (Revenue District(s))
d Representative of (the SSA Head) Representative of (the SSA Head ) means Officer and
staff for the time being in Bhuj Telecom District deputed by the General Manager Bhuj for
inspecting or supervising the work of testing etc
e Engineer ndash in - charge The Engineer ndash in - charge means the Engineering Officer
nominated by the BSNL to supervise the work under the contract (Minimum Divisional
Engineer level Officer)
f Site Engineer Site Engineer shall mean an SDESDOJTO of the BSNL who may be placed by
the General Manager Bhuj Telecom District Bhuj as in ndash charge of the work at site at any
particular period of time
g AT Unit AT Unit shall mean Acceptance and Testing unit of the BSNL
h AT Officer An officer authorized by General Manger ndash Bhuj Telecom Dist
i Contract The term contract means the documents forming the tender and acceptance
thereof and the formal agreement executed between the competent authority on behalf of the
BSNL and the contractor together with the documents referred to therein including these
conditions the specifications designs drawings and instructions issued from time to time by
the engineer in ndash charge and all these documents taken together shall be deemed to form one
contract and shall be complementary to one another In the contract the following expressions
shall unless the context otherwise requires have the meanings hereby respectively assigned to
them The expression works or work shall unless there be something either in the subject
context repugnant to such construction be construed or taken to mean the works by or by
virtue of the contract contracted to be executed whether temporary or permanent and whether
original altered substituted or additional
j Contractor The contractor shall mean the individual firm or company enlisted or not
enlisted with BSNL Department of Telecom in accordance with procedure for contractor or
registered for carrying out the work of cable laying whether incorporated or not undertaking
the works and shall include the legal personal representative of such individual or the persons
composing such firm or company or the successors of such firm or company and the
permitted assignees of such individual firm or company
k Work The expression lsquoworksrsquo shall unless there be something either in the subject or context
repugnant to such construction be construct and taken to mean the works by or by virtue of the
Seal amp Signature of Bidder
15
contract contracted to be executed whether temporary or permanent and whether original
altered substituted or additional
l Schedule(s) Schedule(s) referred to in these conditions shall mean the relevant schedule(s)
or the standard schedule of rates mentioned in the document
m Site The site shall mean the land or other places on into or through which work is to be
executed under the contract or any adjacent land path or street through which the work is to
be exacted under the contract or any adjacent land path or street which may be allotted or
used for the purpose of carrying out the contract
n Normal time or stipulated time Normal time or stipulated time means time specified in the
ERP PO to complete the work
o Extension of Time Extension of Time means the time granted by the BSNL to complete the
work beyond the normal time or stipulated time
p Exceptional risk Exceptional risks are risk due to war(whether declared or not) invasion act
of foreign enemies hostilities civil war rebellion revolution insurrection military or
usurped power any acts of Government damages from aircraft acts of God such as
earthquake lightening and unprecedented floods and other causes over which the contractor
has no control and the same having been accepted as such by the Accepting Authority or
causes solely due to use or occupation by the government of the part of the work in respect of
which a certificate of completion has been issued
q The ERP PO means the Order placed by the field units on the contractor signed by
the unit incharge r The Contract Rate means the rate payable to the repairer under the work order for
the full and proper performance of its contractual obligations
2 ELIGIBLE BIDDERS Kindly refer to clause 4 of Section ndash 1 Part A ie Detailed NIT
3 COST OF BIDDING
The bidder shall bear all costs associated with the preparation and submission of the bid The
BSNL will in no case be responsible or liable for these costs regardless of the conduct or
outcome of the bidding process
4 BID DOCUMENTS
41 The goods services required to be supplied bidding procedures and contract terms are prescribed
in the Bid Documents The contents of the Bid documents are specified in the covering letter
42 The Bidder is expected to examine all instructions forms terms and specifications in the Bid
Documents Failure to furnish all information required as per the Bid Documents or submission
of bids not substantially responsive to the Bid Documents in every respect will be at the bidders
risk and may result in rejection of the bid
5 CLARIFICATION OF BID DOCUMENTS
51 A prospective bidder requiring any clarification on the Bid Documents shall notify the User in
writing by FAX or by Email of the User as indicated in the invitation of Bid The User shall
respond in writing to any request for the clarification of the Bid Documents which it receives
7days prior to the date of opening of the Tenders Copies of the query (without identifying the
source) and clarifications by the User shall be uploaded on BSNL website as lsquoClarificationsrsquo on
e-procurement portal of Bhuj Telecom District portal clarification shall be available as
lsquoAddendumrsquo for all the prospective bidders who have downloaded the official copy of tender
documents from e-procurement portal of Bhuj Telecom District
Seal amp Signature of Bidder
16
52 Any clarification issued by BSNL in response to query raised by prospective bidders shall form
an integral part of bid documents and it may amount to an amendment of relevant clauses of the
bid documents
6 AMENDMENT OF BID DOCUMENTS
61 The BSNL may for any reason whether at its own initiative or in response to a clarification
requested by a prospective Bidder may modify bid documents by amendments prior to the date
of submission of Bids with due notification to prospective Bidders
62 The amendments shall be notified in writing or by Fax or by Addendum through e-tendering
portal to all prospective bidders on the address intimated at the time of purchase of bid document
from the BSNL and these amendments will be binding on them
63 In order to afford prospective bidders reasonable time in which to take the amendments into
account in preparing their bids the BSNL may at its discretion extend the deadline for the
submission of bids suitably
7 DOCUMENTS COMPRISING THE BID
The bid prepared by the bidder shall comprise the components specified in Section 2 of this
Tender
8 BID FORM
The bidder shall complete the Bid Form and the appropriate Price Schedule furnished in the Bid
Documents as per Section- 8
9 BID PRICES
91 The bidder shall give the total composite price inclusive of all levies and taxes packing
forwarding freight and insurance in case of materials to be supplied and inclusive of all taxes
and levies except GST in case of works to be executed GST will be paid extra as applicable
The contractor shall be responsible for transporting the materials to be supplied by the BSNL
(At the field Unit Telecom Store or otherwise) to execute the work under the contract to site at
histheir own cost The costs of transportation are subsumed in the standard Schedule Rates and
therefore no separate charges are payable on this account The offer shall be firm in Indian
Rupees
92 The price quoted by the bidder shall remain fixed during the entire period of contract and shall
not be subject to variation on any account A bid submitted with an adjustable price quotation
will be treated as non-responsive and rejected
93 Discount if any offered by the bidders shall not be considered unless they are specifically
indicated in the schedule of rates (financial Bid) Bidders desiring to offer discount shall
therefore modify their offers suitable while quoting and shall quote clearly net price taking all
such factors like Discount free supply etc into account
10 DOCUMENTS ESTABLISHING BIDDERS ELIGIBILITY AND QUALIFICATIONS Kindly refer to clause of Section ndash 1 and 2 of this bid
11 NA
12 BID SECURITYEMD
121 The bidder shall furnish as part of its bid a bid security one of the following ways-
(a) Demand Draft Bankerrsquos cheque from a Nationalizedscheduled bank drawn in favour
of AO (Cash) BSNL Oo GMTD Bhuj and payable at Bhuj
(b) Bank GuaranteeFDR from a Nationalizedscheduled bank drawn in favour of AO
(Cash) BSNL Oo GMTD Bhuj which should be valid for 180 days from the tender
opening date
For educational order EMD to be submitted by bidder as 20 of 10 of estimated tender
cost for each case in the form of cash Demand Draft Bankerrsquos cheque Bank guaranteeFDR
issued by a NationalizedScheduled bank drawn in favour of AO (Cash) BSNL Oo GMTD
Bhuj Bank Guarantee should be valid for 180 days from the tender opening date
122 The MSE bidders are exempted from payment of bid security
Seal amp Signature of Bidder
17
a) A proof regarding valid registration with body specified by Ministry of Micro Small
amp Medium Enterprise for the tendered items will have to be attached along with the
bid
b) The enlistment certificate issued by MSME should be valid on the date of opening of
tender
c) MSE unit is required to submit its monthly delivery schedule
d) If a vender registered with body specified by Ministry of Micro Small amp Medium
Enterprise claiming concessional benefits is awarded work by BSNL and
subsequently fails to obey any of the contractual obligations he will be debarred from
any further work contract by BSNL for one year from the date of issue of such order
123 The bid security is required to protect the BSNL against the risk of bidders conduct which would
warrant the bid securityrsquos forfeiture pursuant to para 127
124 A bid not secured in accordance with para 121 amp 122 shall be rejected by the BSNL being non-
responsive at the bid opening stage and archived unopened on e-tender portal for e-tenders
125 The bid security of the unsuccessful bidder will be dischargedreturned as promptly as possible
as but not later than 30 days after the expiry of the period of bid validity prescribed by the
BSNL pursuant to clause 13
126 The successful bidders bid security will be discharged upon the bidders acceptance of the
advance Purchase Order satisfactorily pursuant to clause 27 and furnishing the performance
security
The successful bidders bid security may be converted to Part Performance Security Deposit in
accordance with clause 28
127 The bid security may be forfeited
a) If the bidder withdraws or amends its bid or impairs or derogates from the bid in any
respect during the period of bid validity specified by the bidder in the bid form or
extended subsequently or
b) If the bidder does not accept the APO AWO and or does not submit PBG amp sign the
contract agreement in accordance with clause 28
Note - The bidder shall mean individual company firm or the front bidder and its technology
consortium partner as applicable
13 PERIOD OF VALIDITY OF BIDS
131 Bid shall remain valid for 150 days from the date of bid opening prescribed by the BSNL A bid
valid for a shorter period shall be rejected by the BSNL as non-responsive
132 In exceptional circumstances the BSNL may request the bidders consent for an extension to the
period of bid validity The request and the responses thereto shall be made in writing The bid
security provided under Clause 12 shall also be suitably extended A bidder may refuse the
request without forfeiting his bid security A bidder accepting the request and granting extension
will not be permitted to modify his bid
14 FORMAT AND SIGNING OF BID
141 The bidder shall submit his bid online (in case of e-tendering) amp through sealed envelopes
physically (in case of tenders with manual bidding process) complying all eligibility
conditions other terms and conditions of tender document to be read along with the
clarifications and amendments issued in this respect All the documents must be authenticated
using Digital Signature (DSC) with Class 2 or above (in case of e-tendering) amp by hand
signatures (for manual bidding process) by the authorized person The letter of authorization
shall be indicated by written power-of-attorney accompanying the bid
Note-The BSNL may ask the bidder(s) to supply besides original bid additional copy of bids as
required by him
142 The bid shall contain no interlineations erasures or overwriting except as necessary to correct
errors made by the bidder in which case such corrections shall be signed by the person or persons
signing the bid All pages of the original bid except for un-amended printed literatures shall be
digitally signed by the person or persons signing the bid
143 Power of Attorney
(a) The power of Attorney should be submitted and executed on the non-judicial stamp paper
Seal amp Signature of Bidder
18
of appropriate value as prevailing in the concerned states(s) and the same be attested by a
Notary public or registered before Sub-registrar of the state(s) concerned
(b) The power of Attorney be executed by a person who has been authorized by the Board of
Directors of the bidder in this regard on behalf of the Company institution Body
corporate
(c) In case of the bidder being a firm the said Power of Attorney should be executed by all the
partner(s) in favour of the said Attorney
(d) Attestation of the specimen signatures of authorized signatory by the Companyrsquos firmrsquos
bankers shall be furnished Name designation Phone number mobile number email
address and postal address of the authorized signatory shall be provided
(e) Individual signing the tenders or other documents connected with the contract shall indicate
the full name below the signature and must specify the capacity and authority under which
he signs such documents and shall also submit documentary evidence of his authority in
the form of Power of Attorney
(f) The Power of Attorney is to be submitted in original if it has been issued for the specific
tender enquiry If the power of attorney is issued in general irrespective of tender enquiry
then photocopy duly certified by notary public can also be accepted
(g) In case the representative of bidder company who uploads the document on e-tender portal
using his Digital Signature Certificates (DSC) which is different from the authorized
signatory for the bid (Power of Attorney holder) then the representative who uploads the
documents on e-tender portal using DSC issued in his name shall also be one of the Power
of Attorney holder by the bidder Company in addition to the authorized signatory for the
bid
15 SEALING AND MARKING OF BIDS
The bid shall be submitted online using single stage bidding and Two Envelope Methodology
151 The first envelope (Techno-commercial bid) This envelope shall contain documents of
bidders satisfying the eligibility Technical amp commercial conditions requirements Second
envelope will be named as financial bid containing price Schedule as per section 8 All
documents submitted will also be self attested by the bidder
152 a) The envelopes for Tender Fee EMD shall be addressed AGM (PLG) Oo GMTD
Haripar Road Bhuj - 370001
b) The envelope for Tender Fee EMD shall bear the name of the tender the tender number
and the words DO NOT OPEN BEFORE (due date amp time)
c) The envelopes for Tender Fee EMD shall indicate the name and complete postal address
of the bidder to enable the User to return the bid unopened in case it is declared to be received
late
d) The envelopes for Tender Fee EMD shall should be deposited in the tender box provided
by tendering authority or sent by registered post or delivered in person on above mentioned
address (address is given above) The responsibility for ensuring that the envelopes for Tender
Fee EMD shall are delivered in time would vest with the bidder
e) The envelopes for Tender Fee EMD shall delivered in person registered post on the day of
tender opening shall be delivered upto specified time amp date as stated in NIT to Oo GMTD
Haripar Road Bhuj - 370001 The User shall not be responsible if the envelopes for Tender
Fee EMD shall are delivered elsewhere
f) Venue of Tender Opening
Tender will be opened in Oo GMTD Haripar Road Bhuj - 370001 at specified time amp
date as stated in NIT If due to administrative reason the venue of Bid opening is changed it
will be displayed prominently on the above address
Seal amp Signature of Bidder
19
153 If envelopes are not sealed and marked as required at para 151 and 152 the bid shall be
rejected
16 SUBMISSION OF BIDS
161 Bids must be submitted by the bidders on or before the specified date amp time indicated in
Section-1 ie DNIT
162 The BSNL may at its discretion extend this deadline for the submission of the bids by
amending the bid documents in accordance with Clause 6 in which case all rights and
obligations of the BSNL and bidders previously subject to the deadline will thereafter be
subject to the deadline as extended
163 The bidder shall submit his bid offer against a set of bid documents purchased by him for all
or some systemservices equipment as per requirement of the Bid Documents He may
include alternate offer if permissible as per the bid However not more than one independent
and complete offer shall be permitted from the bidder
164 Bid must be submitted by the bidder through E-Tendering mode only Manual submission of bid
shall not be needed
17 LATE BIDS
No bid shall be accepted either online by E-Tender Portal or physically in case of manual
bidding process after the specified deadline for submission of bids prescribed by the purchaser
18 MODIFICATION AND WITHDRAWAL OF BIDS
181 The bidder may modify revise or withdraw his bid after submission prior to deadline prescribed
for submission of bid If a bid is withdrawn the same shall be archived unopened in the e-
procurement portal of Bhuj Telecom District
182 The bidderrsquos modification revision or withdrawal shall have to be online and digitally
authenticated as per clause 15
183 Subject to clause 20 no bid shall be modified subsequent to the deadline for submission of bids
19 OPENING OF BIDS BY BSNL
191 The purchaser shall open bids online in the presence of bidders or their authorized representatives
who chose to attend at time specified in Clause 7 of Detailed NIT(Section-1) on due date The
bidderrsquos representatives who are present shall sign in an attendance register Authority letter to
this effect shall be submitted by the bidders before they are allowed to participate in bid opening
(As per Format given in section 2 Part B)
192 A maximum of two representatives for any bidder shall be authorized and permitted to attend
the bid opening
193 (i) The bids will be opened in two stages ie techno-commercial bid shall be opened on the date
of tender opening given in NIT The financial bid will not be opened on the date of opening of
techno commercial bids
The financial bids of those bidders who are approved to be techno commercially compliant by
the competent authority will be opened by TOC in front of techno-commercially eligible
bidders authorized representatives by sending them a suitable notice
(ii) The bidderrsquos names Item name EMD amount amp validity and acceptability Information in
respect of eligible bidders Details of bid modification withdrawal (if any) and such other
details as the purchaser at its discretion may consider appropriate will be made available
online at the time of techno-commercial bid opening
(iii) The bidderrsquos names Name of the Items Quantitiesprices quoted in the bid discount if
offered Taxes amp levies and such other details as the purchaser at its discretion may consider
appropriate will be made available online at the time of financial bid opening
194 The date fixed for opening of bids if subsequently declared as holiday by the BSNL the revised
date of schedule will be notified However in absence of such notification the bids will be
opened in the next working day time and venue remaining unaltered
20 CLARIFICATION OF BIDS
201 To assist in the examination evaluation and comparison of bids the BSNL may at its discretion
Seal amp Signature of Bidder
20
ask the bidder for the clarification of its bid The request for the clarification and the response
shall be in writing However no post bid clarification at the initiative of the bidder shall be
entertained
202 If any of the documents required to be submitted along with the technical bid is found wanting
the offer is liable to be rejected at that stage However the BSNL at its discretion may call for
any clarification regarding the bid document within a stipulated time period The BSNL at itrsquos
discretion may also ask for the submission of any additionalmissing document(s) within a
stipulated time period In such case(s) the bidder shall have to comply the BSNLrsquos requirement
within the specified time In case of non-compliance to such queries the bid will be out rightly
rejected without entertaining further correspondence in this regardrdquo However no post bid
clarification at the initiative of the bidder shall be entertained
21 PRELIMINARY EVALUATION
211 BSNL shall evaluate the bids to determine whether they are complete whether any
computational errors have been made whether required sureties have been furnished whether
the documents have been properly signed and whether the bids are generally in order
212 Arithmetical errors shall be rectified on the following basis If there is a discrepancy between
the unit price and total price that is obtained by multiplying the unit price and quantity the
unit price shall prevail and the total price shall be corrected by the BSNL
213 If there is a discrepancy between words and figures the amount in words shall prevail If the
SupplierBidder does not accept the correction of the errors his bid shall be rejected
214 Prior to the detailed evaluation pursuant to clause 22 the BSNL will determine the substantial
responsiveness of each bid to the Bid documents For purposes of these clauses a substantially
responsive bid is one which conforms to all the terms and conditions of the Bid Documents
without material deviations The BSNLs determination of bids responsiveness is to be based
on the contents of the bid itself without recourse to extrinsic evidence
215 A bid determined as substantially non-responsive will be rejected by the BSNL and shall not
subsequent to the bid opening be made responsive by the bidder by correction of the non-
conformity
216 The BSNL may waive any minor infirmity or non-conformity or irregularity in a bid which
does not constitute a material deviation provided such waiver does not prejudice or affect the
relative ranking of any bidder
22 EVALUATION AND COMPARISON OF SUBSTANTIALLY RESPONSIVE BIDS
221 The Purchaser shall evaluate in detail and compare the bids previously determined to be
substantially responsive pursuant to Clause 21
222 The evaluation will be made on the basis of lowest rate quoted as under Lowest Rate
= (rate quoted for 25AMP Qty +rate quoted for 50AMP 100 AMP Qty + rate
quoted for Control Panel of Power Plant Qty) The bidder who has offered lowest
rate as evaluated above will be treated as L1 bidder 23 CONTACTING THE BSNL
231 Subject to Clause 20 no bidder shall try to influence the BSNL on any matter relating
to its bid from the time of the bid opening till the time the contract is awarded
232 Any effort by a bidder to modify its bid or influence the BSNL in the BSNLs bid evaluation
bid comparison or contract award decisions shall result in the rejection of the bid
24 PLACEMENT OF ORDER
241 The BSNL may consider placement of orders to execute the contract on those bidders whose
offers have been found technically commercially and financially acceptable The BSNL reserves
the right to counter offer price(s) against price(s) quoted by any bidder
The work against the tender is for one yearrsquos requirement and the terms and conditions of
this tender shall be operative for a period of one year from the date of signing of agreement
between the Company and the contractor with an option of extension for a further period
of one year at the same rates terms amp conditions
Seal amp Signature of Bidder
21
Distribution of Work Distribution of quantities for ordering to the selected bidders of a tender
Table 1(A) (Without provisions for MSE Units)
No of Bidders
to be approved
(Col 1)
Quantity allotted to the respective bidder
(Col 2)
L1 L2
One Bidder 100 Nil
Two Bidder 60 40
Table 1(B) (With provisions for MSME Units)
No of Bidders
to be approved
(Col 1)
Quantity allotted to the respective bidder (Col 2)
Qty
Earmarked for MSME
bidder(s)(Col 3)
L1 L2
One Bidder 80 Nil 20
Two Bidder 48 32 20
1) In case L2 and MSE bidder accepts the L1 rate in prescribed time amp do not submit MSD as per
tender terms and conditions the EMD will be forfeited If MSE bidder exceeded more than one than
20 work at L1 rate distributed among them
242 TERMS AND CONDITIONS FOR EDUCATIONAL ORDER
(a) 10 of the estimated quantity of work will be extended to inexperienced contractor for each
Tender
(b) Inexperienced Bidder has to apply separately for each Tender
(c) In case there are more than one bidder work will be distributed into the bidders
(d) The bidder shall not submit financial bid In case if the same is submitted then it will not be opened
(e) BSNL reserves a right to give any area to this bidder including that of other tender in which the
bidder has not participated
(f) The work to the inexperienced is a limited quantity (up to 10) in at a time further work will be
done on the basis of evaluation of field unit Additional quantity of work shall be given to such
contractor only after completion of initial work
(g) The payment for repairing to such contractors shall be based on L1 rates finalized in the tender
The payment will be released only after verification of quantity amp quality done as per the
instruction mentioned in respect of work in the tender
(h) All the other Terms amp conditions will remain the same
25 BSNLS RIGHT TO VARY QUANTITIES AT TIME OF AWARD
(a) BSNL reserves the right to vary up to 25 of the quantity of goods and services specified in
the schedule of requirements without any change in the unit price or other terms and conditions at
the time of award of contract
(b) BSNL also reserves the right for placement of additional order or up to 50 of the
additional quantities of goods and services contained in the running tender contract in the tender
at the same rate or a rate negotiated (downwardly) with the existing venders considering the
reasonability of rates based on prevailing market conditions and the impact of reduction in duties
and taxes etc and supplies to be obtained within delivery period scheduled afresh
No guarantee can be given to actual quantity The quantity mentioned in the tender is
tentative only No claim should entertained for less not allotting the quantum of work for any
reason
(c) In exceptional situation where the requirement is of an emergent nature and it is necessary to
ensure continued supplies from the existing venders the purchaser reserves the right to place
repeat order up to 100 of the quantities of goods and services contained in the running tender
contract at the same rate or a rate negotiated (downwardly) with the existing venders considering
the reasonability of rates based on prevailing market conditions and the impact of reduction in
duties and taxes etc Exceptional situation and emergent nature should be spelt out clearly
detailing the justification as well as benefits accrued out of it and loss incurred in case this
provision is not invoked and approved by the authority competent to accord administrative and
Seal amp Signature of Bidder
22
financial approval for the procurement calculated on the basis of total procurement ie initial and
proposed add-on quantity
26 BSNLS RIGHT TO ACCEPT ANY BID AND TO REJECT ANY OR ALL BIDS
The BSNL reserves the right to accept or reject any bid and to annul the bidding process and
reject all bids at any time prior to award of contract without assigning any reason whatsoever and
without thereby incurring any liability to the affected bidder or bidders on the grounds for the
BSNLs action
27 ISSUE OF ADVANCE WORK ORDER
271 The issue of an Advance Work Order (Letter of Intent) shall constitute the intention of BSNL to
enter into the contract with the bidder
272 The bidder shall within 14 days of issue of an advance work order give his acceptance along with
Performance Security Deposit in conformity with section 7(B) provided with the bid documents
28 SIGNING OF CONTRACT
281 The issue of FAT shall constitute the award of contract on the bidder
282 As soon as the tender is approved by the competent authority the Bid Security deposited by the
successful bidder may be converted into the Performance security deposit which will be held by
the BSNL till the completion of warranty period
29 ANNULMENT OF AWARD
Failure of the successful bidder to comply with the requirement of Clause 27 amp 28 shall
constitute sufficient ground for the annulment of the award and forfeiture of the bid security in
which event the BSNL may make the award to any other bidder at the discretion of BSNL or call
for new bids
30 NA
31 REJECTION OF BIDS
311 While all the conditions specified in the Bid documents are critical and are to be complied special
attention of bidder is invited to the following clauses of the bid documents Non-compliance of any
one of which shall result in outright rejection of the bid
(i) Clause 15 of Section 4 Part A The bids will be recorded returned unopened if covers are not
properly sealed with lsquoPERSONAL SEALrsquo of the bidder
(ii) Clauses 121 122 amp 131 of Section 4 Part A The bids will be rejected at opening stage if Bid
security is not submitted as per Clauses 121 amp 122 and bid validity is less than the period
prescribed in Clause 131 mentioned above
(iii) Clause 2 amp 10 of Section 4 Part A If the eligibility condition as per clause 2 of Section 4 Part
A is not met andor documents prescribed to establish the eligibility as per Clause 10 of
section 4 Part A are not enclosed the bids will be rejected without further evaluation
(iv) Clause 112 of Section 4 Part A NA
(v) Section 5 Part A Commercial conditions Section 5 Part B Special Conditions of Contract
Compliance if given using ambiguous words like ldquoNotedrdquo ldquoUnderstoodrdquo ldquoNoted amp
Understoodrdquo shall not be accepted as complied Mere ldquoCompliedrdquo will also be not sufficient
reference to the enclosed documents showing compliances must be given
(vi) Section 8 Price Schedule Prices are not filled in as prescribed in Financial Bid
(vii) Section 4 Part A clause 93 on discount which is reproduced below
ldquoDiscount if any offered by the bidder shall not be considered unless specifically indicated in
the price schedule Bidders desiring to offer discount shall therefore modify their offer
suitably while quoting and shall quote clearly net price taking all such factors like discount
free supply etc into accountrdquo
312 Before outright rejection of the Bid by Bid-opening team for non-compliance of any of the
provisions mentioned in clause 311(i) 311 (ii) above the bidder company is given
opportunity to explain their position however if the person representing the company is not
satisfied with the decision of the Bid opening team hethey can submit the representation to
Bid opening team immediately but in no case after closing of the tender process with full
justification quoting specifically the violation of tender conditions if any
Seal amp Signature of Bidder
23
313 Bid opening team will not return the bids submitted by the bidders on the date of tender
opening even if it is liable for rejection and will preserve the bids in sealed cover as submitted
by taking signatures of some of the desirous representatives of the participating
biddercompanies present on the occasion
314 The In charge of the Bid opening team will mention the number of bids with name of
company found unsuitable for further processing on the date of tender opening and number of
representations received in Bid opening Minutes and if Bid opening team is satisfied with the
arguments of the biddercompany mentioned in their representation and feel that there is
prima-facie fact for consideration the in charge of the Bid opening team will submit the case
for review to competent authority ie GMTD BHUJ as early as possible preferably on next
working day and decision to this effect should be communicated to the bidder company within
a week positively Bids found liable for rejection and kept preserved on the date of tender
opening will be returned to the bidders after issue of POfinal acceptance of tender against
the instant tender
315 If the reviewing officer finds it fit to open the bid of the petitioner this should be done by
giving three (working) days notice to all the participating bidders to give opportunity to
desirous participants to be present on the occasion
32 ACTION BY PURCHASER AGAINST BIDDER(S) VENDOR(S) IN CASE OF
DEFAULT In case of default by Bidder(s) Vendor(s) such as
a) Does not supply the equipment services in time
b) Equipment Services does not perform satisfactory in the field in accordance with the
specifications
c) Or any other default whose complete list is enclosed in Appendix-1
Purchaser will take action as specified in Appendix-1 of this section
33 DELETED
34 NEAR-RELATIONSHIP CERTIFICATE
341 The bidder should give a certificate that none of his her near relative as defined below is
working in the units where he is going to apply for the tender In case of proprietorship firm
certificate will be given by the proprietor For partnership firm certificate will be given by all
the partners and in case of limited company by all the Directors of the company excluding
Government of India Financial institution nominees and independent non-Official part time
Directors appointed by Govt of India or the Governor of the state and full time Directors of
PSUs both state and central Due to any breach of these conditions by the company or firm or
any other person the tender will be cancelled and Bid Security will be forfeited at any stage
whenever it is noticed and BSNL will not pay any damage to the company or firm or the
concerned person
342 The Company or firm or the person will also be debarred for further participation in the
concerned unit
343 The near relatives for this purpose are defined as-
(a) Members of a Hindu undivided family
(b) They are husband and wife
(c) The one is related to the other in the manner as father mother son(s) amp Sons
wife(daughter in law) Daughter(s) and daughters husband (son in law) brother(s) and
brothers wife sister(s) and sisters husband (brother in law)
344 The format of the certificate is given in Section -2(D)
35 VERIFICATION OF DOCUMENTS AND CERTIFICATES
The bidder will ensure that all the documents and certificates including experience
performance and self certificates submitted by him are correct and genuine before enclosing
them in the bid The onus of proving genuineness of the submitted documents would rest with
the bidder If any document paper certificate submitted by the participant bidder is found
discovered to be false fabricated tempered manipulated either during bid evaluation or
during award of contract or thereafter then the Purchaser will take action as per Clause-1 of
Appendix-1 of this section
Seal amp Signature of Bidder
24
Appendix-1 to Section - 4 (Part-A)
S
No
Defaults of the bidder vendor Action to be taken
A B C
1(a) Submitting fake forged
i) Rejection of tender bid of respective Vendor
ii) Banning of business for 3 years which implies barring
further dealing with the vendor for procurement of Goods amp
Services including participation in future tenders invited by
BSNL for 3 years from date of issue of banning order
iii) Termination Short Closure of POWO if issued This
implies non-acceptance of further supplies work amp services
except to make the already received material work complete
work in hand
a) Bank Instruments with the bid to meet
terms amp condition of tender in respect of
tender fee and or EMD
b) Certificate for claiming exemption in
respect of tender fee and or EMD
c) detection of default at any stage from
receipt of bids till award of APO issue of
POWO
Note 1- However in this case the performance guarantee if alright will not be forfeited
Note 2- Payment for already received supplies completed work shall be made as per terms amp conditions of
PO WO
1(b)
Submitting fake forged documents towards
meeting eligibility criteria such as
experience capability supply proof
registration with GST Income Tax
departments etc and as supporting
documents towards other terms amp conditions
with the bid to meet terms amp condition of
tender
(i) If detection of default is prior to award
of APO
i) Rejection of Bid amp
ii) Forfeiture of EMD
(ii) If detection of default after issue of APO
but before receipt of PG SD (DDBG etc)
i) Cancellation of APO
ii) Rejection of Bid amp
iii) Forfeiture of EMD
(iii) If detection of default after receipt of
PG SD (DDBG etc)
i) Cancellation of APO
ii) Rejection of Bid amp
iii) Forfeiture of PG SD
However on realization of PG SD amount EMD if not
already released shall be returned
(iv) If detection of default after issue of PO
WO
i) Termination Short Closure of POWO and Cancellation
of APO
ii) Rejection of Bid amp
iii) Forfeiture of PG SD
However on realization of PG SD amount EMD if not
released shall be returned
Note 3- However settle bills for the material received in correct quantity and quality if pending items do
not affect working or use of supplied items
Note 4- No further supplies are to be accepted except that required to make the already supplied items
work
Special Note 1- Authority competent to take final decision GMTD Bhuj
2 If vendor or his representative uses violent
coercive means viz Physical Verbal means
to threatens BSNL Executive employees
and or obstruct him from functioning in
discharge of his duties amp responsibilities for
the following
Banning of business for 3 years which implies Barring
further dealing with the vendor for procurement of Goods amp
Services including participation in future tenders invited by
BSNL for 3 years from date of issue of banning order
a) Obstructing functioning of tender opening
executives of BSNL in receipt opening of
tender bids from prospective Bidders
suppliers Contractors
Seal amp Signature of Bidder
25
b) Obstructing Threatening other
prospective bidders ie suppliers
Contractors from entering the tender venue
and or submitting their tender bid freely
Special Note 1- Authority competent to take final decision GMTD Bhuj
3 Non-receipt of acceptance of APO AWO
and SD PG by L-1 bidder within time
period specified in APO AWO
Forfeiture of EMD
Special Note 1- Authority competent to take final decision GMTD Bhuj
41 Failure to supply and or Commission the
equipment and or execution of the work at
all even in extended delivery schedules if
granted against PO WO
i) Termination of PO WO
ii) Under take purchase work at the risk amp cost of
defaulting vendor
iii) Recover the excess charges if incurred from the PG SD
and outstanding bills of the defaulting Vendor
42 Failure to supply and or Commission the
equipment and or execution of the Work in
full even in extended delivery schedules if
granted against PO WO
i) Short Closure of PO WO to the quantity already
received by and or commissioned in BSNL and or in
pipeline provided the same is usable andor the Vendor
promises to make it usable
ii) Under take purchase work for balance quantity at the
risk amp cost of defaulting vendor
iii) Recover the excess charges if incurred from the PG SD
and outstanding bills of the defaulting Vendor
Special Note 1- Authority competent to take final decision for 41 amp 42 by DGM concerned
51 The supplied equipment does not perform
satisfactory in the field in accordance with
the specifications mentioned in the PO
WOContract
i) If the material is not at all acceptable then return the non-
acceptable material (or its part) amp recover its cost if paid
from the os bills PG SD
OR
ii) If the material is inducted in network amp it is not possible
to return it and or material is acceptable with degraded
performance the purchaser may determine the price for
need to be issued in compliant format and timely within the time prescribed under GST law
163 In case of any deficientincompleterejected supply BSNL shall convey the same in a reasonable
time to enable the supplier to issue credit note and take tax adjustment
164 It would be the responsibility of the supplier to declare correct information on invoice and GSTN
viz the amount the place of supply rate of tax etc In case the eligibility of input tax credit is
questioned or denied to BSNL on account of default by the supplier the same would be
recovered by BSNL from the contractor
165 Registered location of the both the parties ie BSNL and contractor should be mentioned in the
agreement with GSTIN No Further supplier should raise invoices at the registered premise of
BSNL for availing of credit and ensure that the place of supply as per GST law is same as
registered premise
166 BSNL could at any time instruct the contractor to raise its invoices at a particular location of
BSNL
Seal amp Signature of Bidder
39
167 It is the responsibility of the supplier to ensure that place of supply and the GSTN of BSNL are
in the same state If for any reason they are not in the same state the contractor shall intimate to
BSNL and give adequate time before raising of the invoice
168 E-waybill number should be mentioned on the invoices
169 contractor shall be responsible for timely issuance and delivery of invoice DN CN to enable
BSNL to claim tax benefit on or before the stipulated time period provided by the GST law
(a) It is the responsibility of the contractor to ensure that outward supply return (GSTR-1) would be
filed correctly If not than cost would be borne by supplier
(b) Reporting of correct outward supply by supplier in the outward return (GSTR-1) is the
responsibility of the supplier In case of mismatch because of contractorrsquos fault prompt
amendments must be made by the supplier else supplier would be required to indemnify BSNL
of the loss of credit due to mis-match The compliances to be adhered by contractor includes
(but is not limited to) the following
(i) Uploading appropriate invoice details on the GSTN within the stipulated time
(ii) Issuing GST compliant invoice CN DN PO issued by BSNL should be referred by
contractor for capturing information on the invoice
(iii) Contractor needs to pay the entire self-assessed tax on timely basis
(iv) Where invoice is not uploaded or incorrect upload of invoice detail of GSTN by supplier
then credit on such invoice will be given provisionally subject to matching So acceptance of
changes made by BSNL on GSTN on account of non-upload or incorrect upload of invoice
details on GSTN is to be submitted by supplier Such changes wrt the mismatch are required
to be accepted by supplier within the time limit prescribed under the GST law It should be
noted that in case supplier does not accept such changes within the time limit prescribed under
GST law the loss of input tax credit (if any) would be recovered from the supplier In case of
mismatch because of Suppliers fault prompt amendments must be made by the supplier else
supplier would be required to indemnify BSNL for the losses of credit and interest paid due to
mismatch
(v) contractor to issue all necessary documentation and perform all necessary compliances for
BSNL to be eligible to claim the input tax credit of GST tax to them In case BSNL is unable to
claim the input tax credit the amount wrt GST charged by the supplier would be recovered
from the supplier
1610 Refer) for clause stating that all the details of supplier (name address GSTN unregistered
supplier place of supply SAC HSN code etc) and other mandatory details shall be mentioned on the
invoice
1611Where the location agreed are more than one state then separate invoice state wise to claim
input tax credit in a particular state (typically happens in a bill to-ship to scenario) shall have to be
submitted
1612 It shall be the responsibility of the supplier to mention State of place of supply of goodsservices
in the invoice issued to BSNL
Seal amp Signature of Bidder
40
SECTION ndash 5 (Part-B)
SPECIAL CONDITIONS OF CONTRACT (SCC)
1 GENERAL
No official of Gazetted rank or other Gazetted officer employed in Engineering or administrative
duties in an Engineering BSNL or any other BSNL of the BSNL is allowed to work as a contractor for
a period of two years after his retirement from BSNL service without the previous permission of
BSNL This contract is liable to be cancelled if either the contractor or any of his employee is found at
any time to be such a person who hadnrsquot obtained the permission of BSNL as aforesaid before
submission of the engagement in the contractorrsquos service as the case may be
2 Material Handed over by The BSNL
21 The contractor shall transport (including loading and unloading) all stores issued to him from
Field Unit Telecom Store to the site of work at his own cost The BSNL shall not pay any
transportation charges to the contractor
22 All materials handed over to the contractor by the BSNL shall remain the absolute property of
BSNL and shall not be removed form site of the work except for use in the work and shall be at all
times open to inspection by the Representative of GMTD BHUJ
23 The contractor shall be responsible for the transportation of store storage and safe custody of all
material supplied to him by the BSNL which in the contractorrsquos custody whether or not installed in
the work The contractor shall satisfy himself regularly the quantity and quality of the materials
supplied to him and he will be responsible for any subsequent deterioration and discrepancy (inclusive
of theft) in the quantity quality the materials
3 LABOUR WELFARE MEASURES AND WORKMAN COMPENSATION
(AS APPLICABLE)
31 Obtaining License before commencement of work
The contractor shall obtain a valid labour license (if applicable) under the Contact Labour (RampA) Act
1919 and the Contract Labour (Regulation and Abolition) Central Rules 1971 before commencement
of the work and continue to have a valid license until the completion of work The contractor shall
also abide by the provisions of the Child Labour (Prohibition and Regulation) Act 1986 Any failure
to fulfill this requirement shall attract the penal provisions of this contract arising out of the resultant
non-execution of work
32 Contractors labour Regulations
321 Working Hours
3211 Normally working hours of an employee should not exceed 9 hours a day The working
day shall be so arranged the inclusive of interval for rest if any it shall not spread over
more than12 hours on any day
3212 When a worker is made to work for more than 9 hours on any day or for more than 48
hours in any week he shall be paid over time for the extra hours put in by him
3213 Every worker shall be given a weekly holiday normally on a Sunday in accordance with
the provisions of minimum Wages (Central Rules 1960 as amended from time to time
irrespective of whether such worker is governed by the Minimum Wages Act or not
3214 Where the minimum wages prescribed by the Government under the Minimum Wages
Act are not inclusive of the wages for the weekly day of rest the worker shall be entitled
to rest day wages at the rate applicable to the next preceding day provided he has
worked under the same contractor for a continuous period of not less than 6 days
3215 Where a contractor is permitted by the Engineer-in-Charge to allowed a worker to work
on a normal weekly holiday he shall grant a substituted holiday to him for the whole day
Seal amp Signature of Bidder
41
on one of the five days immediately before or after the normal weekly holiday and pay
wages to such worker for the work performed on the normal weekly holiday at the
overtime rate
322 Display of Notice Regarding Wages Etc
The contractor shall before he commences his work on contract display and correctly
maintain and continue to display and correctly maintain in a clear and legible condition
in conspicuous places on the work notices in English and in local Indian languages
spoken by the majority of the workers giving the minimum rates of the wages fixed
under Minimum Wages Act the actual wages being paid the hours of work for which
such wage are earned wages periods dates of payments of wages and other relevant
information
323 Payment of Wages
3231 The contractor shall fix wage periods in respect of which wages shall be payable
3232 No wage period shall exceed one month
3233 The wages of every person employed as contract labour in an establishment or by a
contractor where less than one thousand such persons are employed shall be paid before
the expiry of seventh day and in other cases before the expiry of tenth day after the last day
of the wage period in respect of which the wages are payable
3234 Where the employment of any worker is terminated by or on behalf of the contractor the
wages earned by him shall be paid before the expiry of the second working day from the
date on which his employment is terminated
3235 All payment of wages shall be made on a working day at the work premises and during the
working time and on a date notified in advance and in case the work is completed before
the expiry of the wage period final payment shall be made within 48 hours of the last
working day
3236 Wages due to every worker shall be paid to him direct or to other person authorized by him
in this behalf
3237 All wages shall be paid in current coin or currency or in both
3238 Wages shall be paid without any deductions of any kind except those specified by the
Central Government by general or special order in this behalf or permissible under the
Payment of Wages Act 1956
3239 A notice showing the wages period and the place and time of disbursement of wages shall
be displayed at the place of work and a copy sent by the contractor to the Engineer ndashin-
Charge under acknowledgement
32310 It shall be the duty of the contractor to ensure the disbursement of wages in presence of the
site Engineer or any other authorized representative of the Engineer-in-Charge who will be
required to be present at the place and time of the disbursement of wages by the contractor
to workmen
32311 The contractor shall obtain from the site Engineer or any other authorized representative of
the Engineer-in-Charge as the case may be a certificate under his signature at the end of
the entries in the ldquoRegister of Wages ldquo or the ldquoWage-cum-Muster Rollrdquo as the case may
be in the following form -
ldquoCertified that the amount shown in the column Nohelliphelliphelliphelliphas been paid to the
workman concerned in my presence on helliphelliphelliphelliphelliphellip at helliphelliphelliphelliphelliphelliphelliphelliphelliprdquo
32312 Fines and deductions which may be made from wages
A The wages of a worker shall be paid to him without any deduction of any kind except the
following -
a) Fines
(b) Deductions for absence from duty ie from the place or the places where by the terms of
his employment he is required to work The amount of deduction shall be in proportion
to the period for which he was absent
(c) Deductions for damage to or loss of goods expressly entrusted to the employed person
for custody or for loss of money or any other deductions which he is required to
account where such damage or loss is directly attributable to his neglect or default
Seal amp Signature of Bidder
42
(d) Deduction for recovery of advances or for adjustment of over payment of wages
advances granted shall be entered in register
(e) Any other deductions which the Central Government may form time to time allow
B No fines should be imposed on any worker save in respect of such acts and omissions
on his part as have been approved of by the Labour Commissioner
C No fine shall be imposed one worker and no deduction for damage or loss shall be
made from his wages until the worker has been given an opportunity of showing cause
against such fines or deductions
D Every fine shall be deemed to have been imposing on the day of the act or omission in
respect of which it was imposed
524 Labor records 1 The contractor shall maintain a Register of Persons employed on work on contract in
Form XIII of the Contract Labour (RampA) Central Rules 1971
2 The contractor shall maintain a Muster Roll register in respect of all workmen
employed by him on the work under Contract in Form XVI of the CL (RampA) Rules
1971
3 The contractor shall maintain a Wage Register in respect of all workmen employed by
him on the work under contract in From XVII of the CL (RampA) Rules 1971
4 Register of accidents- The contractor shall maintain a register of accidents in such
form as may be convenient at the work place but the same shall include the following
particulars
(a) Full Particulars of the laborers who met with accident
(b) Rate of wages
(c) Sex
(d) Age
(e) Nature of accident and cause of accident
(f) Time and date of accident
(g) Date and time when admitted in hospital
(h) Date of discharge from the hospital
(i) Period of treatment and result of treatment
(j) Percentage of loss of earning capacity and disability as assessed by
Medical officer
(k) Claim required to be paid under Workmenrsquos Compensation Act
(l) Date of payment of compensation
(m) Amount paid with details of the person to whom the same was paid
(n) Authority by whom the compensation was assessed
(o) Remarks
5 The contractor shall maintain a Register of Fines in the Form XII of the CL(RampA)
Rules 1971 the Contractor shall display in a good condition and in a conspicuous
place of work the approved list of acts and commission for which fines can be
imposed
6 The contractor shall maintain a Register of deductions for damage or loss in Form
XX of the CL (RampA) Rules 1971
7 The contractor shall maintain a Register of Advances in Form XXIII of the CL
(RampA) Rules 1971
8 The contractor shall maintain a Register of Overtime in Form XXIII of the CL
(RampA) Rules 1971
9 Attendance card-cum wage slip a The contractor shall issue an Attendance card cum wage slip to each workman
employed by him
b The card shall be valid for each wage period
Seal amp Signature of Bidder
43
c The contractor shall mark the attendance of each workman on the card twice each
day once at the commencement of the day and again after the rest interval before
he actually starts work
d The card shall remain in possession of the worker during the wage period under
reference
e The contractor shall complete the wage slip portion on the reverse of the card at
least a day prior to the disbursement of wages in respect of the wage period under
reference
f The contractor shall obtain the signature or thumb impression of the worker on the
wag slip at the time of disbursement of wages and retain the card with him
10 Employment card The contractor shall issue an Employment Card in the Form XIV of CL (RampA) Central Rules
1971 to each worker within three days of the employment of the worker
11 Service certificate
On termination of employment for any reason whatsoever the contractor shall issue to the
workman whose services have been terminated a Service Certificate in the Form XV of the
CL (RampA) Central Rules 1971
12 Preservation of labour records The labour records and records of Fines and deductions shall be preserved in original for a
period of three years from the date of last entries made in them and shall be made available for
inspection by the Engineer-in-Charge or Labour Officer or any other officers authorized by the
Ministry of Communication in this behalf
13 Power of labour officer to make investigations or enquiry The labour officer or any person authorized by the Central Government on their behalf shall
have power to make enquiries with a view to ascertaining and enforcing due and proper
observance of Fair Wage Clauses and provisions of these Regulations He shall investigate
into any complaint regarding the default made by the contractor in regard to such provision
14 Report of Investigating officer and action thereon The labour Officer or other persons authorized as aforesaid shall submit a report of result of
his investigation or enquiry to the Engineer in-Charge indicating the extent if any to which
the default has been committed with a note that necessary deductions from the contractorrsquos bill
be made and the wages and other dues be paid to the labourers concerned The Engineer in-
Charge shall arrange payments to the labour
concerned within 45 days from the receipt of the report from the Labour Officer or the
authorized officer as the case may be
15 Inspection of Books And slips The contractor shall allow inspection of all the prescribed labour records to any of his workers
or to his agent at a convenient time and place after due notice is received or to the Labour
Officer or any other person authorized by the Central Government on his behalf
16 Submission of Returns The contractor shall submit periodical returns as may be specified form time to time
17 Amendments
The Central Government may from time to time add to or amend the regulations and on any
question as to the applicationinterpretation or effect of those regulations
Contractor must fulfill the terms and condition towards fulfillmentscompliance of the
provision of EPF amp Miscprovision act 1952 amp Employment provident Fund Scheme 1952 in
respect of laborersemployees engaged by the contractor Contractor must submit declaration
form regarding compliance of the condition of EPF act 1952
525 INSURANCE Without limiting any of his other obligations or liabilities the contractor shall at his own
expense take and keep comprehensive insurance including third party risk for the plant
machinery men materials etc brought to the site and for all the work during the execution
The contractor shall also take out workmenrsquos compensations insurance as required by law and
under take to indemnify and keep indemnified the Government from and against all manner of
Seal amp Signature of Bidder
44
claims and demands and losses and damages and cost (including between attorney and client)
charges and expenses that may arise in regard the same or that the Government may suffer or
incur with respect to endor incidental to the same The contractor shall have to furnish
originals and or attested copies as required by the BSNL of the policies of insurance taken
within 15 (fifteen) days of being called upon to do so together with all premium receipts and
other papers related thereto which the BSNL may require
526 COMPLIANCE WITH LAWS AND REGULATION
During the performance of the works the contractor shall at his own cost and initiative
fully comply with all applicable laws of the land and with any and all applicable by-laws
rules regulations and orders and any other provisions having the force of law made or
promulgated or deemed to be made or promulgated by the Government Governmental
agency or BSNL municipal board Government of other regulatory or Authorized body or
persons and shall provide all certificates or compliance therewith as may be required by
such applicable law By-laws Rules Regulations orders and or provisions The
contractor shall assume full responsibility for the payment of all contributions and pay roll
taxes as to its employees servants or agents engaged in the performance of the work
specified in the contractor documents If the contractor shall require any assignee or sub-
contract to comply with the provisions of the clause and in this connection the contractor
agrees as to undertake to save and hold the Government harmless and indemnified from
and against any all penalties actions suits losses and damages claims and demands and
costs (inclusive between attorney and client) charges and expenses whatsoever arising out
or occasioned indirectly or directly by failure of the contractor or any assignee or sub-
contractor to make full and proper compliance with the said by-laws Rules Regulations
laws and Order and provisions as aforesaid
6 TOOLS and PLANTS
The contractor shall provide at his own cost all tools plants appliances implements etc
required for proper execution of works The contractor shall also supply without charge
the requisite number of persons with the means and materials necessary for the purpose of
setting out works counting weighing and assisting the measurements for examination at
any time and from time to time Failing his so doing the same may be provided by the
Engineer-in-charge at the expense of the contractor and the expenses shall be deducted
from any money due to the contractor under this contract or otherwise
As per Para 367 of the recommendationobservation of Tenth Report of parliamentary
standing committee on labour Contractor would provide the same social security to the
labours engaged by him as is available to regular employees
As per Para 368 of the recommendationobservation of Tenth Report of parliamentary
standing committee on labour Contractor shall ensure implementation of equal pay for equal
work and also equal remuneration to men and women
Seal amp Signature of Bidder
45
SECTION ndash 7
PROFORMAS
7 (A) BID SECURITY EMD Guarantee
(To be typed on Rs100- non-judicial stamp paper)
Whereas (hereinafter called the Bidder) has submitted its bid datedfor
the supply of vide Tender Nohelliphelliphelliphelliphelliphelliphelliphellip dated KNOW ALL MEN by
these presents that WE OF having our registered office at
(hereinafter called the Bank) are bound unto Bharat Sanchar Nigam Limited (hereinafter
called the Purchaser) in the sum of Rs for which payment will and truly to be made of
the said Purchaser the Bank binds itself its successors and assigns by these present
THE CONDITIONS of the obligation are
1 If the Bidder withdraws his bid during the period of bid validity specified by the Bidder
on the Bid form or
2 If the Bidder having been notified of the acceptance of his bid by the Purchaser during the
period of bid validity
(a) fails or refuses to execute the Contract if required or
(b) fails or refuses to furnish the Performance Security in accordance with the instructions to
Bidders
We undertake to pay to the Purchaser up to the above amount upon receipt of its first written demand
without the purchaser having to substantiate its demand provided that in its demand the purchaser
will note that the amount claimed by it is due to it owning to the occurrence of one or both of the two
conditions specifying the occurred condition or conditions
This guarantee will remain in force as specified in clauses 12 and 282 of section 4 Part A of the Bid
Document upto and including THIRTY (30) days after the Period of bid validity and any demand in
respect thereof should reach the Bank not later than the specified datedates
Signature of the Bank Authority
Name
Signed in Capacity of
Name amp Signature of witness Full address of Branch
Address of witness Tel No of Branch
Fax No of Branch
Seal amp Signature of Bidder
46
7 (B) PERFORMANCE SECURITY BOND FORM
(To be typed on Rs100- non-judicial stamp paper)
Datedhelliphelliphelliphelliphellip
Sub Performance guarantee
Whereas General Manager Telecom Bhuj Telecom District Bhuj (hereafter referred to as BSNL) has issued an AWO no
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellipDated helliphelliphelliphellip20hellip awarding the work of
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip to Ms
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip(hereafter referred to as ldquoBidderrdquo) and BSNL has asked him to submit a performance guarantee
in favour of AO(Cash) BSNL Oo GMTD BHUJ of Rs helliphelliphelliphelliphelliphellip- (hereafter referred to as ldquoPG Amountrdquo) valid up
to helliphelliphelliphellip20helliphelliphellip (hereafter referred to as ldquoValidity Daterdquo)
Now at the request of the Bidder We helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellipBank
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip Branch having (Address) and Regd
office address as helliphelliphellip helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip (Hereinafter called lsquothe
Bankrdquo) agreed to give this guarantee as hereinafter contained
2 We ldquothe Bankrdquo do hereby undertake and assure to the BSNL that if in the opinion of the BSNL the Bidder has in any way
failed to observe or perform the terms and conditions of the said agreement or has committed any breach of its obligations
there-under the Bank shall on demand and without any objection or demur pay to the BSNL the said sum limited to PG
Amount or such lesser amount as BSNL may demand without requiring BSNL to have recourse to any legal remedy that may
be available to it to compel the Bank to pay the same
3 Any such demand from the BSNL shall be conclusive as regards the liability of Bidder to pay to BSNL or as regards the
amount payable by the Bank under this guarantee The Bank shall not be entitled to withhold payment on the ground that the
Bidder had disputed its liability to pay or has disputed the quantum of the amount or that any arbitration proceeding or legal
proceeding is pending between Bidder and BSNL regarding the claim
4 We the Bank further agree that the guarantee shall come into force from the date of its issue and shall remain in full force
and effect up to its Validity date
5 The Bank further agrees that the BSNL shall have the fullest liberty without the consent of the Bank and without affecting
in any way the obligations hereunder to vary any of the terms and conditions of the said agreement or to extend the time for
performance of the said agreement from any of the powers exercisable by BSNL against the Bidder and to forebear to enforce
any of the terms and conditions relating to the said agreement and the Bank shall not be relieved from its liability by reason
of such failure or extension being granted to Bidder or through any forbearance act or omission on the part of BSNL or any
indulgence by BSNL to Bidder or any other matter or thing whatsoever which under the law relating to sureties would but for
this provision have the effect of relieving or discharging the guarantor
6 Notwithstanding anything herein contained
(a) The liability of the Bank under this guarantee is restricted to the PG Amount and it will remain in force up to its Validity
date
(b) The guarantee shall stand completely discharged and all rights of the BSNL under this Guarantee shall be extinguished if
no claim or demand is made on us in writing on or before its validity date
7 In case BSNL demands for any money under this bank guarantee the same shall be paid through bankerrsquos Cheque in
favour of ldquoAO(Cash) BSNL Oo GMTD BHUJ rdquo payable at Bhuj
8 The Bank guarantees that the below mentioned officer who have signed it on behalf of the Bank have authority to give this
guarantee under its delegated power
Place helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip
Date helliphelliphelliphelliphelliphelliphelliphelliphelliphellip (Signature of the Bank Officer)
Rubber stamp of the bank
Authorized Power of Attorney Number helliphelliphelliphelliphelliphellip
Name of the Bank officer helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip
Having examined the tender documents terms and conditions stipulated therein specifications of work
etc we the under signed offer to execute the repair Works in conformity with the said specifications and
conditions of contract as under
Sl No
ITEM DESCRIPTION
Repair Charges per module inclusive of freight
forwardingpacking amp all taxes amp levies (except GST)
(in Figure)
Unit Rate in Words
Total Cost (unit rate qty)
1 2 3 4 5
1 25 AMP Module
2
50 AMP Module
3 100 AMP Module
4 Control Panel of
Power Plants
25A 50A amp 100A
5 GRAND TOTAL
Note -
1 GST will be payable extra on approved rates 2If our Bid is accepted we shall submit the securities as per the conditions mentioned in the contract
3We agree to abide by this Bid for a period of 180 days from the date of opening of financial bid and it shall
remain binding upon us and may be accepted at any time before the expiry of that period
4 The evaluation will be made on the basis of lowest rate quoted as under Lowest Rate = (rate quoted for 25 AMP Qty + rate quoted for 50 AMP Qty + rate
quoted for 100 AMP Qty + rate quoted for Control Panel of Power Plant AMP Qty)
The bidder who has offered lowest rate as evaluated above will be treated as L1 bidder
Date Signature of Tenderer
Seal amp Signature of Bidder
49
CHECK LIST
Sl No
Description Tender Clause Mode of Submission
1 Tender Fee Section 1 (part A) Para 21 22
Off-line
2 EMD Section 1 (part A) Para 51 52 Off-line 3 Power of Attorney Section 4 (Part A) clause 143 Off-line 4 Latest and Valid MSME NSIC certificate (If Applicable) Off-line 5 Experience Certificate Section 1 (part A)
9 EPF (If applicable) Section 2 Para 3 (a) (i) ON-Line 10 ESIC (If applicable) Section 2 Para 3 (a) (i) ON-Line 11 PAN Card Section 2 Para 3 (a) (i) ON-Line 12 Agency Detail Section 2 (part-A) ON-Line 13 Letter of Authorization Section 2 (part-B) ON-Line 14 Under taking amp
declaration Section 2 (part-C) ON-Line
15 Declaration regarding no relative working in BSNL
Section 2 (part-D) To be submitted by proprietor or separately by each partnerDirector
ON-Line
Seal amp Signature of Bidder
13
e) When the performance tests called for have been successfully carried out the inspector ultimate
Consignee will forthwith issue a Taking Over Certificate The inspectorultimate consignee shall not delay the issue of any Taking Over Certificate ldquo contemplated by this clause on account of minor defects in the module which do not materially affect the commercial use thereof provided that the Contractor shall undertake to make good the same in a time period not exceeding two months The taking Over Certificate shall be issued by the ultimate consignee within six weeks of successful completion of tests
f) After performance test carried out by the concerned SDE of BSNL as per prescribed schedule and repaired modules are found ok in all respect than the repaired modules will be accepted
g) A register is to be maintained at each placelocation mentioning the details of Modules date of Collection and Delivery of Faulty repaired modules replacement of spares amp remark if any and it is to be signed by the controlling officer amp Service engineer
h) Nothing in clause 3 shall in any way release the Contractor from any Warranty or other obligations under this contract
4 SPARES - All the spare of good quality required for repair of modules of SMPS PP are to be supplied by the contractor including major components
5 The contractor shall be responsible for any loss or damages caused to man or machinespartsinstruments during the execution of work and shall replace with an identical new item at his own cost The authorized officerperson of BSNL will have the liberty to check the material and work etchellip provided by the contractor
6 Governing Conditions for RNP (Repair Not Possible) Cases
A module Control panel may be declared RNP only if cost of material to be replaced exceeds five times of approved rate of repair In no case labour cost involved will be considered for deciding RNP A detailed report is to be submitted by contractor to concerned officer in-charge and final decision in this regard will be taken by concerned DGM subjected to maximum permissible RNP as given below
a)25-A module Maximum 10 of total quantity ordered for repair
b) 50-A 100-A Module Maximum 5 of total quantity ordered for repair
c) Control Panel Maximum 10 of total quantity ordered for repair
In case of RNP exceeding permissible limits penalty will be imposed as per para 11 (d) of section-5 (Part-A)
7 WARRANTY - a) Repaired modules are warranted for 3 months from the date of successfully taken over During this
time the contractor has to rectify the module free of cost The contractor shall warrant that repaired module shall be free from all defects and faults in materials used workmanship It becomes necessary for the contractor to replace or renew any defective portion(s) of the module under this clause
b) Replacement under warranty clause shall be made by the contractor free of all charges at site including freight insurance and other incidental charges
c) If any defect is not remedied by the contractor within a reasonable time the BSNL BHUJ may proceed to get the defects remedied from other contractor etc at the contractors risk and expenses but without prejudice to any other rights which the BSNL BHUJ may have against the contractor in respect of such defects
Seal amp Signature of Bidder
14
SECTION- 4 (Part-A)
GENERAL INSTRUCTION TO BIDDERS (GIB)
1 DEFINITIONS
1 BSNL The BSNL means the BSNL Bhuj Telecom Dist under the Ministry of
Communications which invites the tenders on behalf of the General Manager Bhuj Telecom
District Includes executives in the BSNL whatever designations assigned to them from time
to time who may be the in-charge of direction supervision testing acceptance and
maintenance including their successor(s) in the office appearing in various clauses shall be
taken to mean the BSNL Bhuj Telecom District
b The SSA Head means the Head of SSA General Manager Bhuj Telecom District Bhuj and
his successors
c The jurisdiction of the SSA Head The jurisdiction of the SSA Head means Bhuj Telecom
District which coincides geographically with (Revenue District(s))
d Representative of (the SSA Head) Representative of (the SSA Head ) means Officer and
staff for the time being in Bhuj Telecom District deputed by the General Manager Bhuj for
inspecting or supervising the work of testing etc
e Engineer ndash in - charge The Engineer ndash in - charge means the Engineering Officer
nominated by the BSNL to supervise the work under the contract (Minimum Divisional
Engineer level Officer)
f Site Engineer Site Engineer shall mean an SDESDOJTO of the BSNL who may be placed by
the General Manager Bhuj Telecom District Bhuj as in ndash charge of the work at site at any
particular period of time
g AT Unit AT Unit shall mean Acceptance and Testing unit of the BSNL
h AT Officer An officer authorized by General Manger ndash Bhuj Telecom Dist
i Contract The term contract means the documents forming the tender and acceptance
thereof and the formal agreement executed between the competent authority on behalf of the
BSNL and the contractor together with the documents referred to therein including these
conditions the specifications designs drawings and instructions issued from time to time by
the engineer in ndash charge and all these documents taken together shall be deemed to form one
contract and shall be complementary to one another In the contract the following expressions
shall unless the context otherwise requires have the meanings hereby respectively assigned to
them The expression works or work shall unless there be something either in the subject
context repugnant to such construction be construed or taken to mean the works by or by
virtue of the contract contracted to be executed whether temporary or permanent and whether
original altered substituted or additional
j Contractor The contractor shall mean the individual firm or company enlisted or not
enlisted with BSNL Department of Telecom in accordance with procedure for contractor or
registered for carrying out the work of cable laying whether incorporated or not undertaking
the works and shall include the legal personal representative of such individual or the persons
composing such firm or company or the successors of such firm or company and the
permitted assignees of such individual firm or company
k Work The expression lsquoworksrsquo shall unless there be something either in the subject or context
repugnant to such construction be construct and taken to mean the works by or by virtue of the
Seal amp Signature of Bidder
15
contract contracted to be executed whether temporary or permanent and whether original
altered substituted or additional
l Schedule(s) Schedule(s) referred to in these conditions shall mean the relevant schedule(s)
or the standard schedule of rates mentioned in the document
m Site The site shall mean the land or other places on into or through which work is to be
executed under the contract or any adjacent land path or street through which the work is to
be exacted under the contract or any adjacent land path or street which may be allotted or
used for the purpose of carrying out the contract
n Normal time or stipulated time Normal time or stipulated time means time specified in the
ERP PO to complete the work
o Extension of Time Extension of Time means the time granted by the BSNL to complete the
work beyond the normal time or stipulated time
p Exceptional risk Exceptional risks are risk due to war(whether declared or not) invasion act
of foreign enemies hostilities civil war rebellion revolution insurrection military or
usurped power any acts of Government damages from aircraft acts of God such as
earthquake lightening and unprecedented floods and other causes over which the contractor
has no control and the same having been accepted as such by the Accepting Authority or
causes solely due to use or occupation by the government of the part of the work in respect of
which a certificate of completion has been issued
q The ERP PO means the Order placed by the field units on the contractor signed by
the unit incharge r The Contract Rate means the rate payable to the repairer under the work order for
the full and proper performance of its contractual obligations
2 ELIGIBLE BIDDERS Kindly refer to clause 4 of Section ndash 1 Part A ie Detailed NIT
3 COST OF BIDDING
The bidder shall bear all costs associated with the preparation and submission of the bid The
BSNL will in no case be responsible or liable for these costs regardless of the conduct or
outcome of the bidding process
4 BID DOCUMENTS
41 The goods services required to be supplied bidding procedures and contract terms are prescribed
in the Bid Documents The contents of the Bid documents are specified in the covering letter
42 The Bidder is expected to examine all instructions forms terms and specifications in the Bid
Documents Failure to furnish all information required as per the Bid Documents or submission
of bids not substantially responsive to the Bid Documents in every respect will be at the bidders
risk and may result in rejection of the bid
5 CLARIFICATION OF BID DOCUMENTS
51 A prospective bidder requiring any clarification on the Bid Documents shall notify the User in
writing by FAX or by Email of the User as indicated in the invitation of Bid The User shall
respond in writing to any request for the clarification of the Bid Documents which it receives
7days prior to the date of opening of the Tenders Copies of the query (without identifying the
source) and clarifications by the User shall be uploaded on BSNL website as lsquoClarificationsrsquo on
e-procurement portal of Bhuj Telecom District portal clarification shall be available as
lsquoAddendumrsquo for all the prospective bidders who have downloaded the official copy of tender
documents from e-procurement portal of Bhuj Telecom District
Seal amp Signature of Bidder
16
52 Any clarification issued by BSNL in response to query raised by prospective bidders shall form
an integral part of bid documents and it may amount to an amendment of relevant clauses of the
bid documents
6 AMENDMENT OF BID DOCUMENTS
61 The BSNL may for any reason whether at its own initiative or in response to a clarification
requested by a prospective Bidder may modify bid documents by amendments prior to the date
of submission of Bids with due notification to prospective Bidders
62 The amendments shall be notified in writing or by Fax or by Addendum through e-tendering
portal to all prospective bidders on the address intimated at the time of purchase of bid document
from the BSNL and these amendments will be binding on them
63 In order to afford prospective bidders reasonable time in which to take the amendments into
account in preparing their bids the BSNL may at its discretion extend the deadline for the
submission of bids suitably
7 DOCUMENTS COMPRISING THE BID
The bid prepared by the bidder shall comprise the components specified in Section 2 of this
Tender
8 BID FORM
The bidder shall complete the Bid Form and the appropriate Price Schedule furnished in the Bid
Documents as per Section- 8
9 BID PRICES
91 The bidder shall give the total composite price inclusive of all levies and taxes packing
forwarding freight and insurance in case of materials to be supplied and inclusive of all taxes
and levies except GST in case of works to be executed GST will be paid extra as applicable
The contractor shall be responsible for transporting the materials to be supplied by the BSNL
(At the field Unit Telecom Store or otherwise) to execute the work under the contract to site at
histheir own cost The costs of transportation are subsumed in the standard Schedule Rates and
therefore no separate charges are payable on this account The offer shall be firm in Indian
Rupees
92 The price quoted by the bidder shall remain fixed during the entire period of contract and shall
not be subject to variation on any account A bid submitted with an adjustable price quotation
will be treated as non-responsive and rejected
93 Discount if any offered by the bidders shall not be considered unless they are specifically
indicated in the schedule of rates (financial Bid) Bidders desiring to offer discount shall
therefore modify their offers suitable while quoting and shall quote clearly net price taking all
such factors like Discount free supply etc into account
10 DOCUMENTS ESTABLISHING BIDDERS ELIGIBILITY AND QUALIFICATIONS Kindly refer to clause of Section ndash 1 and 2 of this bid
11 NA
12 BID SECURITYEMD
121 The bidder shall furnish as part of its bid a bid security one of the following ways-
(a) Demand Draft Bankerrsquos cheque from a Nationalizedscheduled bank drawn in favour
of AO (Cash) BSNL Oo GMTD Bhuj and payable at Bhuj
(b) Bank GuaranteeFDR from a Nationalizedscheduled bank drawn in favour of AO
(Cash) BSNL Oo GMTD Bhuj which should be valid for 180 days from the tender
opening date
For educational order EMD to be submitted by bidder as 20 of 10 of estimated tender
cost for each case in the form of cash Demand Draft Bankerrsquos cheque Bank guaranteeFDR
issued by a NationalizedScheduled bank drawn in favour of AO (Cash) BSNL Oo GMTD
Bhuj Bank Guarantee should be valid for 180 days from the tender opening date
122 The MSE bidders are exempted from payment of bid security
Seal amp Signature of Bidder
17
a) A proof regarding valid registration with body specified by Ministry of Micro Small
amp Medium Enterprise for the tendered items will have to be attached along with the
bid
b) The enlistment certificate issued by MSME should be valid on the date of opening of
tender
c) MSE unit is required to submit its monthly delivery schedule
d) If a vender registered with body specified by Ministry of Micro Small amp Medium
Enterprise claiming concessional benefits is awarded work by BSNL and
subsequently fails to obey any of the contractual obligations he will be debarred from
any further work contract by BSNL for one year from the date of issue of such order
123 The bid security is required to protect the BSNL against the risk of bidders conduct which would
warrant the bid securityrsquos forfeiture pursuant to para 127
124 A bid not secured in accordance with para 121 amp 122 shall be rejected by the BSNL being non-
responsive at the bid opening stage and archived unopened on e-tender portal for e-tenders
125 The bid security of the unsuccessful bidder will be dischargedreturned as promptly as possible
as but not later than 30 days after the expiry of the period of bid validity prescribed by the
BSNL pursuant to clause 13
126 The successful bidders bid security will be discharged upon the bidders acceptance of the
advance Purchase Order satisfactorily pursuant to clause 27 and furnishing the performance
security
The successful bidders bid security may be converted to Part Performance Security Deposit in
accordance with clause 28
127 The bid security may be forfeited
a) If the bidder withdraws or amends its bid or impairs or derogates from the bid in any
respect during the period of bid validity specified by the bidder in the bid form or
extended subsequently or
b) If the bidder does not accept the APO AWO and or does not submit PBG amp sign the
contract agreement in accordance with clause 28
Note - The bidder shall mean individual company firm or the front bidder and its technology
consortium partner as applicable
13 PERIOD OF VALIDITY OF BIDS
131 Bid shall remain valid for 150 days from the date of bid opening prescribed by the BSNL A bid
valid for a shorter period shall be rejected by the BSNL as non-responsive
132 In exceptional circumstances the BSNL may request the bidders consent for an extension to the
period of bid validity The request and the responses thereto shall be made in writing The bid
security provided under Clause 12 shall also be suitably extended A bidder may refuse the
request without forfeiting his bid security A bidder accepting the request and granting extension
will not be permitted to modify his bid
14 FORMAT AND SIGNING OF BID
141 The bidder shall submit his bid online (in case of e-tendering) amp through sealed envelopes
physically (in case of tenders with manual bidding process) complying all eligibility
conditions other terms and conditions of tender document to be read along with the
clarifications and amendments issued in this respect All the documents must be authenticated
using Digital Signature (DSC) with Class 2 or above (in case of e-tendering) amp by hand
signatures (for manual bidding process) by the authorized person The letter of authorization
shall be indicated by written power-of-attorney accompanying the bid
Note-The BSNL may ask the bidder(s) to supply besides original bid additional copy of bids as
required by him
142 The bid shall contain no interlineations erasures or overwriting except as necessary to correct
errors made by the bidder in which case such corrections shall be signed by the person or persons
signing the bid All pages of the original bid except for un-amended printed literatures shall be
digitally signed by the person or persons signing the bid
143 Power of Attorney
(a) The power of Attorney should be submitted and executed on the non-judicial stamp paper
Seal amp Signature of Bidder
18
of appropriate value as prevailing in the concerned states(s) and the same be attested by a
Notary public or registered before Sub-registrar of the state(s) concerned
(b) The power of Attorney be executed by a person who has been authorized by the Board of
Directors of the bidder in this regard on behalf of the Company institution Body
corporate
(c) In case of the bidder being a firm the said Power of Attorney should be executed by all the
partner(s) in favour of the said Attorney
(d) Attestation of the specimen signatures of authorized signatory by the Companyrsquos firmrsquos
bankers shall be furnished Name designation Phone number mobile number email
address and postal address of the authorized signatory shall be provided
(e) Individual signing the tenders or other documents connected with the contract shall indicate
the full name below the signature and must specify the capacity and authority under which
he signs such documents and shall also submit documentary evidence of his authority in
the form of Power of Attorney
(f) The Power of Attorney is to be submitted in original if it has been issued for the specific
tender enquiry If the power of attorney is issued in general irrespective of tender enquiry
then photocopy duly certified by notary public can also be accepted
(g) In case the representative of bidder company who uploads the document on e-tender portal
using his Digital Signature Certificates (DSC) which is different from the authorized
signatory for the bid (Power of Attorney holder) then the representative who uploads the
documents on e-tender portal using DSC issued in his name shall also be one of the Power
of Attorney holder by the bidder Company in addition to the authorized signatory for the
bid
15 SEALING AND MARKING OF BIDS
The bid shall be submitted online using single stage bidding and Two Envelope Methodology
151 The first envelope (Techno-commercial bid) This envelope shall contain documents of
bidders satisfying the eligibility Technical amp commercial conditions requirements Second
envelope will be named as financial bid containing price Schedule as per section 8 All
documents submitted will also be self attested by the bidder
152 a) The envelopes for Tender Fee EMD shall be addressed AGM (PLG) Oo GMTD
Haripar Road Bhuj - 370001
b) The envelope for Tender Fee EMD shall bear the name of the tender the tender number
and the words DO NOT OPEN BEFORE (due date amp time)
c) The envelopes for Tender Fee EMD shall indicate the name and complete postal address
of the bidder to enable the User to return the bid unopened in case it is declared to be received
late
d) The envelopes for Tender Fee EMD shall should be deposited in the tender box provided
by tendering authority or sent by registered post or delivered in person on above mentioned
address (address is given above) The responsibility for ensuring that the envelopes for Tender
Fee EMD shall are delivered in time would vest with the bidder
e) The envelopes for Tender Fee EMD shall delivered in person registered post on the day of
tender opening shall be delivered upto specified time amp date as stated in NIT to Oo GMTD
Haripar Road Bhuj - 370001 The User shall not be responsible if the envelopes for Tender
Fee EMD shall are delivered elsewhere
f) Venue of Tender Opening
Tender will be opened in Oo GMTD Haripar Road Bhuj - 370001 at specified time amp
date as stated in NIT If due to administrative reason the venue of Bid opening is changed it
will be displayed prominently on the above address
Seal amp Signature of Bidder
19
153 If envelopes are not sealed and marked as required at para 151 and 152 the bid shall be
rejected
16 SUBMISSION OF BIDS
161 Bids must be submitted by the bidders on or before the specified date amp time indicated in
Section-1 ie DNIT
162 The BSNL may at its discretion extend this deadline for the submission of the bids by
amending the bid documents in accordance with Clause 6 in which case all rights and
obligations of the BSNL and bidders previously subject to the deadline will thereafter be
subject to the deadline as extended
163 The bidder shall submit his bid offer against a set of bid documents purchased by him for all
or some systemservices equipment as per requirement of the Bid Documents He may
include alternate offer if permissible as per the bid However not more than one independent
and complete offer shall be permitted from the bidder
164 Bid must be submitted by the bidder through E-Tendering mode only Manual submission of bid
shall not be needed
17 LATE BIDS
No bid shall be accepted either online by E-Tender Portal or physically in case of manual
bidding process after the specified deadline for submission of bids prescribed by the purchaser
18 MODIFICATION AND WITHDRAWAL OF BIDS
181 The bidder may modify revise or withdraw his bid after submission prior to deadline prescribed
for submission of bid If a bid is withdrawn the same shall be archived unopened in the e-
procurement portal of Bhuj Telecom District
182 The bidderrsquos modification revision or withdrawal shall have to be online and digitally
authenticated as per clause 15
183 Subject to clause 20 no bid shall be modified subsequent to the deadline for submission of bids
19 OPENING OF BIDS BY BSNL
191 The purchaser shall open bids online in the presence of bidders or their authorized representatives
who chose to attend at time specified in Clause 7 of Detailed NIT(Section-1) on due date The
bidderrsquos representatives who are present shall sign in an attendance register Authority letter to
this effect shall be submitted by the bidders before they are allowed to participate in bid opening
(As per Format given in section 2 Part B)
192 A maximum of two representatives for any bidder shall be authorized and permitted to attend
the bid opening
193 (i) The bids will be opened in two stages ie techno-commercial bid shall be opened on the date
of tender opening given in NIT The financial bid will not be opened on the date of opening of
techno commercial bids
The financial bids of those bidders who are approved to be techno commercially compliant by
the competent authority will be opened by TOC in front of techno-commercially eligible
bidders authorized representatives by sending them a suitable notice
(ii) The bidderrsquos names Item name EMD amount amp validity and acceptability Information in
respect of eligible bidders Details of bid modification withdrawal (if any) and such other
details as the purchaser at its discretion may consider appropriate will be made available
online at the time of techno-commercial bid opening
(iii) The bidderrsquos names Name of the Items Quantitiesprices quoted in the bid discount if
offered Taxes amp levies and such other details as the purchaser at its discretion may consider
appropriate will be made available online at the time of financial bid opening
194 The date fixed for opening of bids if subsequently declared as holiday by the BSNL the revised
date of schedule will be notified However in absence of such notification the bids will be
opened in the next working day time and venue remaining unaltered
20 CLARIFICATION OF BIDS
201 To assist in the examination evaluation and comparison of bids the BSNL may at its discretion
Seal amp Signature of Bidder
20
ask the bidder for the clarification of its bid The request for the clarification and the response
shall be in writing However no post bid clarification at the initiative of the bidder shall be
entertained
202 If any of the documents required to be submitted along with the technical bid is found wanting
the offer is liable to be rejected at that stage However the BSNL at its discretion may call for
any clarification regarding the bid document within a stipulated time period The BSNL at itrsquos
discretion may also ask for the submission of any additionalmissing document(s) within a
stipulated time period In such case(s) the bidder shall have to comply the BSNLrsquos requirement
within the specified time In case of non-compliance to such queries the bid will be out rightly
rejected without entertaining further correspondence in this regardrdquo However no post bid
clarification at the initiative of the bidder shall be entertained
21 PRELIMINARY EVALUATION
211 BSNL shall evaluate the bids to determine whether they are complete whether any
computational errors have been made whether required sureties have been furnished whether
the documents have been properly signed and whether the bids are generally in order
212 Arithmetical errors shall be rectified on the following basis If there is a discrepancy between
the unit price and total price that is obtained by multiplying the unit price and quantity the
unit price shall prevail and the total price shall be corrected by the BSNL
213 If there is a discrepancy between words and figures the amount in words shall prevail If the
SupplierBidder does not accept the correction of the errors his bid shall be rejected
214 Prior to the detailed evaluation pursuant to clause 22 the BSNL will determine the substantial
responsiveness of each bid to the Bid documents For purposes of these clauses a substantially
responsive bid is one which conforms to all the terms and conditions of the Bid Documents
without material deviations The BSNLs determination of bids responsiveness is to be based
on the contents of the bid itself without recourse to extrinsic evidence
215 A bid determined as substantially non-responsive will be rejected by the BSNL and shall not
subsequent to the bid opening be made responsive by the bidder by correction of the non-
conformity
216 The BSNL may waive any minor infirmity or non-conformity or irregularity in a bid which
does not constitute a material deviation provided such waiver does not prejudice or affect the
relative ranking of any bidder
22 EVALUATION AND COMPARISON OF SUBSTANTIALLY RESPONSIVE BIDS
221 The Purchaser shall evaluate in detail and compare the bids previously determined to be
substantially responsive pursuant to Clause 21
222 The evaluation will be made on the basis of lowest rate quoted as under Lowest Rate
= (rate quoted for 25AMP Qty +rate quoted for 50AMP 100 AMP Qty + rate
quoted for Control Panel of Power Plant Qty) The bidder who has offered lowest
rate as evaluated above will be treated as L1 bidder 23 CONTACTING THE BSNL
231 Subject to Clause 20 no bidder shall try to influence the BSNL on any matter relating
to its bid from the time of the bid opening till the time the contract is awarded
232 Any effort by a bidder to modify its bid or influence the BSNL in the BSNLs bid evaluation
bid comparison or contract award decisions shall result in the rejection of the bid
24 PLACEMENT OF ORDER
241 The BSNL may consider placement of orders to execute the contract on those bidders whose
offers have been found technically commercially and financially acceptable The BSNL reserves
the right to counter offer price(s) against price(s) quoted by any bidder
The work against the tender is for one yearrsquos requirement and the terms and conditions of
this tender shall be operative for a period of one year from the date of signing of agreement
between the Company and the contractor with an option of extension for a further period
of one year at the same rates terms amp conditions
Seal amp Signature of Bidder
21
Distribution of Work Distribution of quantities for ordering to the selected bidders of a tender
Table 1(A) (Without provisions for MSE Units)
No of Bidders
to be approved
(Col 1)
Quantity allotted to the respective bidder
(Col 2)
L1 L2
One Bidder 100 Nil
Two Bidder 60 40
Table 1(B) (With provisions for MSME Units)
No of Bidders
to be approved
(Col 1)
Quantity allotted to the respective bidder (Col 2)
Qty
Earmarked for MSME
bidder(s)(Col 3)
L1 L2
One Bidder 80 Nil 20
Two Bidder 48 32 20
1) In case L2 and MSE bidder accepts the L1 rate in prescribed time amp do not submit MSD as per
tender terms and conditions the EMD will be forfeited If MSE bidder exceeded more than one than
20 work at L1 rate distributed among them
242 TERMS AND CONDITIONS FOR EDUCATIONAL ORDER
(a) 10 of the estimated quantity of work will be extended to inexperienced contractor for each
Tender
(b) Inexperienced Bidder has to apply separately for each Tender
(c) In case there are more than one bidder work will be distributed into the bidders
(d) The bidder shall not submit financial bid In case if the same is submitted then it will not be opened
(e) BSNL reserves a right to give any area to this bidder including that of other tender in which the
bidder has not participated
(f) The work to the inexperienced is a limited quantity (up to 10) in at a time further work will be
done on the basis of evaluation of field unit Additional quantity of work shall be given to such
contractor only after completion of initial work
(g) The payment for repairing to such contractors shall be based on L1 rates finalized in the tender
The payment will be released only after verification of quantity amp quality done as per the
instruction mentioned in respect of work in the tender
(h) All the other Terms amp conditions will remain the same
25 BSNLS RIGHT TO VARY QUANTITIES AT TIME OF AWARD
(a) BSNL reserves the right to vary up to 25 of the quantity of goods and services specified in
the schedule of requirements without any change in the unit price or other terms and conditions at
the time of award of contract
(b) BSNL also reserves the right for placement of additional order or up to 50 of the
additional quantities of goods and services contained in the running tender contract in the tender
at the same rate or a rate negotiated (downwardly) with the existing venders considering the
reasonability of rates based on prevailing market conditions and the impact of reduction in duties
and taxes etc and supplies to be obtained within delivery period scheduled afresh
No guarantee can be given to actual quantity The quantity mentioned in the tender is
tentative only No claim should entertained for less not allotting the quantum of work for any
reason
(c) In exceptional situation where the requirement is of an emergent nature and it is necessary to
ensure continued supplies from the existing venders the purchaser reserves the right to place
repeat order up to 100 of the quantities of goods and services contained in the running tender
contract at the same rate or a rate negotiated (downwardly) with the existing venders considering
the reasonability of rates based on prevailing market conditions and the impact of reduction in
duties and taxes etc Exceptional situation and emergent nature should be spelt out clearly
detailing the justification as well as benefits accrued out of it and loss incurred in case this
provision is not invoked and approved by the authority competent to accord administrative and
Seal amp Signature of Bidder
22
financial approval for the procurement calculated on the basis of total procurement ie initial and
proposed add-on quantity
26 BSNLS RIGHT TO ACCEPT ANY BID AND TO REJECT ANY OR ALL BIDS
The BSNL reserves the right to accept or reject any bid and to annul the bidding process and
reject all bids at any time prior to award of contract without assigning any reason whatsoever and
without thereby incurring any liability to the affected bidder or bidders on the grounds for the
BSNLs action
27 ISSUE OF ADVANCE WORK ORDER
271 The issue of an Advance Work Order (Letter of Intent) shall constitute the intention of BSNL to
enter into the contract with the bidder
272 The bidder shall within 14 days of issue of an advance work order give his acceptance along with
Performance Security Deposit in conformity with section 7(B) provided with the bid documents
28 SIGNING OF CONTRACT
281 The issue of FAT shall constitute the award of contract on the bidder
282 As soon as the tender is approved by the competent authority the Bid Security deposited by the
successful bidder may be converted into the Performance security deposit which will be held by
the BSNL till the completion of warranty period
29 ANNULMENT OF AWARD
Failure of the successful bidder to comply with the requirement of Clause 27 amp 28 shall
constitute sufficient ground for the annulment of the award and forfeiture of the bid security in
which event the BSNL may make the award to any other bidder at the discretion of BSNL or call
for new bids
30 NA
31 REJECTION OF BIDS
311 While all the conditions specified in the Bid documents are critical and are to be complied special
attention of bidder is invited to the following clauses of the bid documents Non-compliance of any
one of which shall result in outright rejection of the bid
(i) Clause 15 of Section 4 Part A The bids will be recorded returned unopened if covers are not
properly sealed with lsquoPERSONAL SEALrsquo of the bidder
(ii) Clauses 121 122 amp 131 of Section 4 Part A The bids will be rejected at opening stage if Bid
security is not submitted as per Clauses 121 amp 122 and bid validity is less than the period
prescribed in Clause 131 mentioned above
(iii) Clause 2 amp 10 of Section 4 Part A If the eligibility condition as per clause 2 of Section 4 Part
A is not met andor documents prescribed to establish the eligibility as per Clause 10 of
section 4 Part A are not enclosed the bids will be rejected without further evaluation
(iv) Clause 112 of Section 4 Part A NA
(v) Section 5 Part A Commercial conditions Section 5 Part B Special Conditions of Contract
Compliance if given using ambiguous words like ldquoNotedrdquo ldquoUnderstoodrdquo ldquoNoted amp
Understoodrdquo shall not be accepted as complied Mere ldquoCompliedrdquo will also be not sufficient
reference to the enclosed documents showing compliances must be given
(vi) Section 8 Price Schedule Prices are not filled in as prescribed in Financial Bid
(vii) Section 4 Part A clause 93 on discount which is reproduced below
ldquoDiscount if any offered by the bidder shall not be considered unless specifically indicated in
the price schedule Bidders desiring to offer discount shall therefore modify their offer
suitably while quoting and shall quote clearly net price taking all such factors like discount
free supply etc into accountrdquo
312 Before outright rejection of the Bid by Bid-opening team for non-compliance of any of the
provisions mentioned in clause 311(i) 311 (ii) above the bidder company is given
opportunity to explain their position however if the person representing the company is not
satisfied with the decision of the Bid opening team hethey can submit the representation to
Bid opening team immediately but in no case after closing of the tender process with full
justification quoting specifically the violation of tender conditions if any
Seal amp Signature of Bidder
23
313 Bid opening team will not return the bids submitted by the bidders on the date of tender
opening even if it is liable for rejection and will preserve the bids in sealed cover as submitted
by taking signatures of some of the desirous representatives of the participating
biddercompanies present on the occasion
314 The In charge of the Bid opening team will mention the number of bids with name of
company found unsuitable for further processing on the date of tender opening and number of
representations received in Bid opening Minutes and if Bid opening team is satisfied with the
arguments of the biddercompany mentioned in their representation and feel that there is
prima-facie fact for consideration the in charge of the Bid opening team will submit the case
for review to competent authority ie GMTD BHUJ as early as possible preferably on next
working day and decision to this effect should be communicated to the bidder company within
a week positively Bids found liable for rejection and kept preserved on the date of tender
opening will be returned to the bidders after issue of POfinal acceptance of tender against
the instant tender
315 If the reviewing officer finds it fit to open the bid of the petitioner this should be done by
giving three (working) days notice to all the participating bidders to give opportunity to
desirous participants to be present on the occasion
32 ACTION BY PURCHASER AGAINST BIDDER(S) VENDOR(S) IN CASE OF
DEFAULT In case of default by Bidder(s) Vendor(s) such as
a) Does not supply the equipment services in time
b) Equipment Services does not perform satisfactory in the field in accordance with the
specifications
c) Or any other default whose complete list is enclosed in Appendix-1
Purchaser will take action as specified in Appendix-1 of this section
33 DELETED
34 NEAR-RELATIONSHIP CERTIFICATE
341 The bidder should give a certificate that none of his her near relative as defined below is
working in the units where he is going to apply for the tender In case of proprietorship firm
certificate will be given by the proprietor For partnership firm certificate will be given by all
the partners and in case of limited company by all the Directors of the company excluding
Government of India Financial institution nominees and independent non-Official part time
Directors appointed by Govt of India or the Governor of the state and full time Directors of
PSUs both state and central Due to any breach of these conditions by the company or firm or
any other person the tender will be cancelled and Bid Security will be forfeited at any stage
whenever it is noticed and BSNL will not pay any damage to the company or firm or the
concerned person
342 The Company or firm or the person will also be debarred for further participation in the
concerned unit
343 The near relatives for this purpose are defined as-
(a) Members of a Hindu undivided family
(b) They are husband and wife
(c) The one is related to the other in the manner as father mother son(s) amp Sons
wife(daughter in law) Daughter(s) and daughters husband (son in law) brother(s) and
brothers wife sister(s) and sisters husband (brother in law)
344 The format of the certificate is given in Section -2(D)
35 VERIFICATION OF DOCUMENTS AND CERTIFICATES
The bidder will ensure that all the documents and certificates including experience
performance and self certificates submitted by him are correct and genuine before enclosing
them in the bid The onus of proving genuineness of the submitted documents would rest with
the bidder If any document paper certificate submitted by the participant bidder is found
discovered to be false fabricated tempered manipulated either during bid evaluation or
during award of contract or thereafter then the Purchaser will take action as per Clause-1 of
Appendix-1 of this section
Seal amp Signature of Bidder
24
Appendix-1 to Section - 4 (Part-A)
S
No
Defaults of the bidder vendor Action to be taken
A B C
1(a) Submitting fake forged
i) Rejection of tender bid of respective Vendor
ii) Banning of business for 3 years which implies barring
further dealing with the vendor for procurement of Goods amp
Services including participation in future tenders invited by
BSNL for 3 years from date of issue of banning order
iii) Termination Short Closure of POWO if issued This
implies non-acceptance of further supplies work amp services
except to make the already received material work complete
work in hand
a) Bank Instruments with the bid to meet
terms amp condition of tender in respect of
tender fee and or EMD
b) Certificate for claiming exemption in
respect of tender fee and or EMD
c) detection of default at any stage from
receipt of bids till award of APO issue of
POWO
Note 1- However in this case the performance guarantee if alright will not be forfeited
Note 2- Payment for already received supplies completed work shall be made as per terms amp conditions of
PO WO
1(b)
Submitting fake forged documents towards
meeting eligibility criteria such as
experience capability supply proof
registration with GST Income Tax
departments etc and as supporting
documents towards other terms amp conditions
with the bid to meet terms amp condition of
tender
(i) If detection of default is prior to award
of APO
i) Rejection of Bid amp
ii) Forfeiture of EMD
(ii) If detection of default after issue of APO
but before receipt of PG SD (DDBG etc)
i) Cancellation of APO
ii) Rejection of Bid amp
iii) Forfeiture of EMD
(iii) If detection of default after receipt of
PG SD (DDBG etc)
i) Cancellation of APO
ii) Rejection of Bid amp
iii) Forfeiture of PG SD
However on realization of PG SD amount EMD if not
already released shall be returned
(iv) If detection of default after issue of PO
WO
i) Termination Short Closure of POWO and Cancellation
of APO
ii) Rejection of Bid amp
iii) Forfeiture of PG SD
However on realization of PG SD amount EMD if not
released shall be returned
Note 3- However settle bills for the material received in correct quantity and quality if pending items do
not affect working or use of supplied items
Note 4- No further supplies are to be accepted except that required to make the already supplied items
work
Special Note 1- Authority competent to take final decision GMTD Bhuj
2 If vendor or his representative uses violent
coercive means viz Physical Verbal means
to threatens BSNL Executive employees
and or obstruct him from functioning in
discharge of his duties amp responsibilities for
the following
Banning of business for 3 years which implies Barring
further dealing with the vendor for procurement of Goods amp
Services including participation in future tenders invited by
BSNL for 3 years from date of issue of banning order
a) Obstructing functioning of tender opening
executives of BSNL in receipt opening of
tender bids from prospective Bidders
suppliers Contractors
Seal amp Signature of Bidder
25
b) Obstructing Threatening other
prospective bidders ie suppliers
Contractors from entering the tender venue
and or submitting their tender bid freely
Special Note 1- Authority competent to take final decision GMTD Bhuj
3 Non-receipt of acceptance of APO AWO
and SD PG by L-1 bidder within time
period specified in APO AWO
Forfeiture of EMD
Special Note 1- Authority competent to take final decision GMTD Bhuj
41 Failure to supply and or Commission the
equipment and or execution of the work at
all even in extended delivery schedules if
granted against PO WO
i) Termination of PO WO
ii) Under take purchase work at the risk amp cost of
defaulting vendor
iii) Recover the excess charges if incurred from the PG SD
and outstanding bills of the defaulting Vendor
42 Failure to supply and or Commission the
equipment and or execution of the Work in
full even in extended delivery schedules if
granted against PO WO
i) Short Closure of PO WO to the quantity already
received by and or commissioned in BSNL and or in
pipeline provided the same is usable andor the Vendor
promises to make it usable
ii) Under take purchase work for balance quantity at the
risk amp cost of defaulting vendor
iii) Recover the excess charges if incurred from the PG SD
and outstanding bills of the defaulting Vendor
Special Note 1- Authority competent to take final decision for 41 amp 42 by DGM concerned
51 The supplied equipment does not perform
satisfactory in the field in accordance with
the specifications mentioned in the PO
WOContract
i) If the material is not at all acceptable then return the non-
acceptable material (or its part) amp recover its cost if paid
from the os bills PG SD
OR
ii) If the material is inducted in network amp it is not possible
to return it and or material is acceptable with degraded
performance the purchaser may determine the price for
need to be issued in compliant format and timely within the time prescribed under GST law
163 In case of any deficientincompleterejected supply BSNL shall convey the same in a reasonable
time to enable the supplier to issue credit note and take tax adjustment
164 It would be the responsibility of the supplier to declare correct information on invoice and GSTN
viz the amount the place of supply rate of tax etc In case the eligibility of input tax credit is
questioned or denied to BSNL on account of default by the supplier the same would be
recovered by BSNL from the contractor
165 Registered location of the both the parties ie BSNL and contractor should be mentioned in the
agreement with GSTIN No Further supplier should raise invoices at the registered premise of
BSNL for availing of credit and ensure that the place of supply as per GST law is same as
registered premise
166 BSNL could at any time instruct the contractor to raise its invoices at a particular location of
BSNL
Seal amp Signature of Bidder
39
167 It is the responsibility of the supplier to ensure that place of supply and the GSTN of BSNL are
in the same state If for any reason they are not in the same state the contractor shall intimate to
BSNL and give adequate time before raising of the invoice
168 E-waybill number should be mentioned on the invoices
169 contractor shall be responsible for timely issuance and delivery of invoice DN CN to enable
BSNL to claim tax benefit on or before the stipulated time period provided by the GST law
(a) It is the responsibility of the contractor to ensure that outward supply return (GSTR-1) would be
filed correctly If not than cost would be borne by supplier
(b) Reporting of correct outward supply by supplier in the outward return (GSTR-1) is the
responsibility of the supplier In case of mismatch because of contractorrsquos fault prompt
amendments must be made by the supplier else supplier would be required to indemnify BSNL
of the loss of credit due to mis-match The compliances to be adhered by contractor includes
(but is not limited to) the following
(i) Uploading appropriate invoice details on the GSTN within the stipulated time
(ii) Issuing GST compliant invoice CN DN PO issued by BSNL should be referred by
contractor for capturing information on the invoice
(iii) Contractor needs to pay the entire self-assessed tax on timely basis
(iv) Where invoice is not uploaded or incorrect upload of invoice detail of GSTN by supplier
then credit on such invoice will be given provisionally subject to matching So acceptance of
changes made by BSNL on GSTN on account of non-upload or incorrect upload of invoice
details on GSTN is to be submitted by supplier Such changes wrt the mismatch are required
to be accepted by supplier within the time limit prescribed under the GST law It should be
noted that in case supplier does not accept such changes within the time limit prescribed under
GST law the loss of input tax credit (if any) would be recovered from the supplier In case of
mismatch because of Suppliers fault prompt amendments must be made by the supplier else
supplier would be required to indemnify BSNL for the losses of credit and interest paid due to
mismatch
(v) contractor to issue all necessary documentation and perform all necessary compliances for
BSNL to be eligible to claim the input tax credit of GST tax to them In case BSNL is unable to
claim the input tax credit the amount wrt GST charged by the supplier would be recovered
from the supplier
1610 Refer) for clause stating that all the details of supplier (name address GSTN unregistered
supplier place of supply SAC HSN code etc) and other mandatory details shall be mentioned on the
invoice
1611Where the location agreed are more than one state then separate invoice state wise to claim
input tax credit in a particular state (typically happens in a bill to-ship to scenario) shall have to be
submitted
1612 It shall be the responsibility of the supplier to mention State of place of supply of goodsservices
in the invoice issued to BSNL
Seal amp Signature of Bidder
40
SECTION ndash 5 (Part-B)
SPECIAL CONDITIONS OF CONTRACT (SCC)
1 GENERAL
No official of Gazetted rank or other Gazetted officer employed in Engineering or administrative
duties in an Engineering BSNL or any other BSNL of the BSNL is allowed to work as a contractor for
a period of two years after his retirement from BSNL service without the previous permission of
BSNL This contract is liable to be cancelled if either the contractor or any of his employee is found at
any time to be such a person who hadnrsquot obtained the permission of BSNL as aforesaid before
submission of the engagement in the contractorrsquos service as the case may be
2 Material Handed over by The BSNL
21 The contractor shall transport (including loading and unloading) all stores issued to him from
Field Unit Telecom Store to the site of work at his own cost The BSNL shall not pay any
transportation charges to the contractor
22 All materials handed over to the contractor by the BSNL shall remain the absolute property of
BSNL and shall not be removed form site of the work except for use in the work and shall be at all
times open to inspection by the Representative of GMTD BHUJ
23 The contractor shall be responsible for the transportation of store storage and safe custody of all
material supplied to him by the BSNL which in the contractorrsquos custody whether or not installed in
the work The contractor shall satisfy himself regularly the quantity and quality of the materials
supplied to him and he will be responsible for any subsequent deterioration and discrepancy (inclusive
of theft) in the quantity quality the materials
3 LABOUR WELFARE MEASURES AND WORKMAN COMPENSATION
(AS APPLICABLE)
31 Obtaining License before commencement of work
The contractor shall obtain a valid labour license (if applicable) under the Contact Labour (RampA) Act
1919 and the Contract Labour (Regulation and Abolition) Central Rules 1971 before commencement
of the work and continue to have a valid license until the completion of work The contractor shall
also abide by the provisions of the Child Labour (Prohibition and Regulation) Act 1986 Any failure
to fulfill this requirement shall attract the penal provisions of this contract arising out of the resultant
non-execution of work
32 Contractors labour Regulations
321 Working Hours
3211 Normally working hours of an employee should not exceed 9 hours a day The working
day shall be so arranged the inclusive of interval for rest if any it shall not spread over
more than12 hours on any day
3212 When a worker is made to work for more than 9 hours on any day or for more than 48
hours in any week he shall be paid over time for the extra hours put in by him
3213 Every worker shall be given a weekly holiday normally on a Sunday in accordance with
the provisions of minimum Wages (Central Rules 1960 as amended from time to time
irrespective of whether such worker is governed by the Minimum Wages Act or not
3214 Where the minimum wages prescribed by the Government under the Minimum Wages
Act are not inclusive of the wages for the weekly day of rest the worker shall be entitled
to rest day wages at the rate applicable to the next preceding day provided he has
worked under the same contractor for a continuous period of not less than 6 days
3215 Where a contractor is permitted by the Engineer-in-Charge to allowed a worker to work
on a normal weekly holiday he shall grant a substituted holiday to him for the whole day
Seal amp Signature of Bidder
41
on one of the five days immediately before or after the normal weekly holiday and pay
wages to such worker for the work performed on the normal weekly holiday at the
overtime rate
322 Display of Notice Regarding Wages Etc
The contractor shall before he commences his work on contract display and correctly
maintain and continue to display and correctly maintain in a clear and legible condition
in conspicuous places on the work notices in English and in local Indian languages
spoken by the majority of the workers giving the minimum rates of the wages fixed
under Minimum Wages Act the actual wages being paid the hours of work for which
such wage are earned wages periods dates of payments of wages and other relevant
information
323 Payment of Wages
3231 The contractor shall fix wage periods in respect of which wages shall be payable
3232 No wage period shall exceed one month
3233 The wages of every person employed as contract labour in an establishment or by a
contractor where less than one thousand such persons are employed shall be paid before
the expiry of seventh day and in other cases before the expiry of tenth day after the last day
of the wage period in respect of which the wages are payable
3234 Where the employment of any worker is terminated by or on behalf of the contractor the
wages earned by him shall be paid before the expiry of the second working day from the
date on which his employment is terminated
3235 All payment of wages shall be made on a working day at the work premises and during the
working time and on a date notified in advance and in case the work is completed before
the expiry of the wage period final payment shall be made within 48 hours of the last
working day
3236 Wages due to every worker shall be paid to him direct or to other person authorized by him
in this behalf
3237 All wages shall be paid in current coin or currency or in both
3238 Wages shall be paid without any deductions of any kind except those specified by the
Central Government by general or special order in this behalf or permissible under the
Payment of Wages Act 1956
3239 A notice showing the wages period and the place and time of disbursement of wages shall
be displayed at the place of work and a copy sent by the contractor to the Engineer ndashin-
Charge under acknowledgement
32310 It shall be the duty of the contractor to ensure the disbursement of wages in presence of the
site Engineer or any other authorized representative of the Engineer-in-Charge who will be
required to be present at the place and time of the disbursement of wages by the contractor
to workmen
32311 The contractor shall obtain from the site Engineer or any other authorized representative of
the Engineer-in-Charge as the case may be a certificate under his signature at the end of
the entries in the ldquoRegister of Wages ldquo or the ldquoWage-cum-Muster Rollrdquo as the case may
be in the following form -
ldquoCertified that the amount shown in the column Nohelliphelliphelliphelliphas been paid to the
workman concerned in my presence on helliphelliphelliphelliphelliphellip at helliphelliphelliphelliphelliphelliphelliphelliphelliprdquo
32312 Fines and deductions which may be made from wages
A The wages of a worker shall be paid to him without any deduction of any kind except the
following -
a) Fines
(b) Deductions for absence from duty ie from the place or the places where by the terms of
his employment he is required to work The amount of deduction shall be in proportion
to the period for which he was absent
(c) Deductions for damage to or loss of goods expressly entrusted to the employed person
for custody or for loss of money or any other deductions which he is required to
account where such damage or loss is directly attributable to his neglect or default
Seal amp Signature of Bidder
42
(d) Deduction for recovery of advances or for adjustment of over payment of wages
advances granted shall be entered in register
(e) Any other deductions which the Central Government may form time to time allow
B No fines should be imposed on any worker save in respect of such acts and omissions
on his part as have been approved of by the Labour Commissioner
C No fine shall be imposed one worker and no deduction for damage or loss shall be
made from his wages until the worker has been given an opportunity of showing cause
against such fines or deductions
D Every fine shall be deemed to have been imposing on the day of the act or omission in
respect of which it was imposed
524 Labor records 1 The contractor shall maintain a Register of Persons employed on work on contract in
Form XIII of the Contract Labour (RampA) Central Rules 1971
2 The contractor shall maintain a Muster Roll register in respect of all workmen
employed by him on the work under Contract in Form XVI of the CL (RampA) Rules
1971
3 The contractor shall maintain a Wage Register in respect of all workmen employed by
him on the work under contract in From XVII of the CL (RampA) Rules 1971
4 Register of accidents- The contractor shall maintain a register of accidents in such
form as may be convenient at the work place but the same shall include the following
particulars
(a) Full Particulars of the laborers who met with accident
(b) Rate of wages
(c) Sex
(d) Age
(e) Nature of accident and cause of accident
(f) Time and date of accident
(g) Date and time when admitted in hospital
(h) Date of discharge from the hospital
(i) Period of treatment and result of treatment
(j) Percentage of loss of earning capacity and disability as assessed by
Medical officer
(k) Claim required to be paid under Workmenrsquos Compensation Act
(l) Date of payment of compensation
(m) Amount paid with details of the person to whom the same was paid
(n) Authority by whom the compensation was assessed
(o) Remarks
5 The contractor shall maintain a Register of Fines in the Form XII of the CL(RampA)
Rules 1971 the Contractor shall display in a good condition and in a conspicuous
place of work the approved list of acts and commission for which fines can be
imposed
6 The contractor shall maintain a Register of deductions for damage or loss in Form
XX of the CL (RampA) Rules 1971
7 The contractor shall maintain a Register of Advances in Form XXIII of the CL
(RampA) Rules 1971
8 The contractor shall maintain a Register of Overtime in Form XXIII of the CL
(RampA) Rules 1971
9 Attendance card-cum wage slip a The contractor shall issue an Attendance card cum wage slip to each workman
employed by him
b The card shall be valid for each wage period
Seal amp Signature of Bidder
43
c The contractor shall mark the attendance of each workman on the card twice each
day once at the commencement of the day and again after the rest interval before
he actually starts work
d The card shall remain in possession of the worker during the wage period under
reference
e The contractor shall complete the wage slip portion on the reverse of the card at
least a day prior to the disbursement of wages in respect of the wage period under
reference
f The contractor shall obtain the signature or thumb impression of the worker on the
wag slip at the time of disbursement of wages and retain the card with him
10 Employment card The contractor shall issue an Employment Card in the Form XIV of CL (RampA) Central Rules
1971 to each worker within three days of the employment of the worker
11 Service certificate
On termination of employment for any reason whatsoever the contractor shall issue to the
workman whose services have been terminated a Service Certificate in the Form XV of the
CL (RampA) Central Rules 1971
12 Preservation of labour records The labour records and records of Fines and deductions shall be preserved in original for a
period of three years from the date of last entries made in them and shall be made available for
inspection by the Engineer-in-Charge or Labour Officer or any other officers authorized by the
Ministry of Communication in this behalf
13 Power of labour officer to make investigations or enquiry The labour officer or any person authorized by the Central Government on their behalf shall
have power to make enquiries with a view to ascertaining and enforcing due and proper
observance of Fair Wage Clauses and provisions of these Regulations He shall investigate
into any complaint regarding the default made by the contractor in regard to such provision
14 Report of Investigating officer and action thereon The labour Officer or other persons authorized as aforesaid shall submit a report of result of
his investigation or enquiry to the Engineer in-Charge indicating the extent if any to which
the default has been committed with a note that necessary deductions from the contractorrsquos bill
be made and the wages and other dues be paid to the labourers concerned The Engineer in-
Charge shall arrange payments to the labour
concerned within 45 days from the receipt of the report from the Labour Officer or the
authorized officer as the case may be
15 Inspection of Books And slips The contractor shall allow inspection of all the prescribed labour records to any of his workers
or to his agent at a convenient time and place after due notice is received or to the Labour
Officer or any other person authorized by the Central Government on his behalf
16 Submission of Returns The contractor shall submit periodical returns as may be specified form time to time
17 Amendments
The Central Government may from time to time add to or amend the regulations and on any
question as to the applicationinterpretation or effect of those regulations
Contractor must fulfill the terms and condition towards fulfillmentscompliance of the
provision of EPF amp Miscprovision act 1952 amp Employment provident Fund Scheme 1952 in
respect of laborersemployees engaged by the contractor Contractor must submit declaration
form regarding compliance of the condition of EPF act 1952
525 INSURANCE Without limiting any of his other obligations or liabilities the contractor shall at his own
expense take and keep comprehensive insurance including third party risk for the plant
machinery men materials etc brought to the site and for all the work during the execution
The contractor shall also take out workmenrsquos compensations insurance as required by law and
under take to indemnify and keep indemnified the Government from and against all manner of
Seal amp Signature of Bidder
44
claims and demands and losses and damages and cost (including between attorney and client)
charges and expenses that may arise in regard the same or that the Government may suffer or
incur with respect to endor incidental to the same The contractor shall have to furnish
originals and or attested copies as required by the BSNL of the policies of insurance taken
within 15 (fifteen) days of being called upon to do so together with all premium receipts and
other papers related thereto which the BSNL may require
526 COMPLIANCE WITH LAWS AND REGULATION
During the performance of the works the contractor shall at his own cost and initiative
fully comply with all applicable laws of the land and with any and all applicable by-laws
rules regulations and orders and any other provisions having the force of law made or
promulgated or deemed to be made or promulgated by the Government Governmental
agency or BSNL municipal board Government of other regulatory or Authorized body or
persons and shall provide all certificates or compliance therewith as may be required by
such applicable law By-laws Rules Regulations orders and or provisions The
contractor shall assume full responsibility for the payment of all contributions and pay roll
taxes as to its employees servants or agents engaged in the performance of the work
specified in the contractor documents If the contractor shall require any assignee or sub-
contract to comply with the provisions of the clause and in this connection the contractor
agrees as to undertake to save and hold the Government harmless and indemnified from
and against any all penalties actions suits losses and damages claims and demands and
costs (inclusive between attorney and client) charges and expenses whatsoever arising out
or occasioned indirectly or directly by failure of the contractor or any assignee or sub-
contractor to make full and proper compliance with the said by-laws Rules Regulations
laws and Order and provisions as aforesaid
6 TOOLS and PLANTS
The contractor shall provide at his own cost all tools plants appliances implements etc
required for proper execution of works The contractor shall also supply without charge
the requisite number of persons with the means and materials necessary for the purpose of
setting out works counting weighing and assisting the measurements for examination at
any time and from time to time Failing his so doing the same may be provided by the
Engineer-in-charge at the expense of the contractor and the expenses shall be deducted
from any money due to the contractor under this contract or otherwise
As per Para 367 of the recommendationobservation of Tenth Report of parliamentary
standing committee on labour Contractor would provide the same social security to the
labours engaged by him as is available to regular employees
As per Para 368 of the recommendationobservation of Tenth Report of parliamentary
standing committee on labour Contractor shall ensure implementation of equal pay for equal
work and also equal remuneration to men and women
Seal amp Signature of Bidder
45
SECTION ndash 7
PROFORMAS
7 (A) BID SECURITY EMD Guarantee
(To be typed on Rs100- non-judicial stamp paper)
Whereas (hereinafter called the Bidder) has submitted its bid datedfor
the supply of vide Tender Nohelliphelliphelliphelliphelliphelliphelliphellip dated KNOW ALL MEN by
these presents that WE OF having our registered office at
(hereinafter called the Bank) are bound unto Bharat Sanchar Nigam Limited (hereinafter
called the Purchaser) in the sum of Rs for which payment will and truly to be made of
the said Purchaser the Bank binds itself its successors and assigns by these present
THE CONDITIONS of the obligation are
1 If the Bidder withdraws his bid during the period of bid validity specified by the Bidder
on the Bid form or
2 If the Bidder having been notified of the acceptance of his bid by the Purchaser during the
period of bid validity
(a) fails or refuses to execute the Contract if required or
(b) fails or refuses to furnish the Performance Security in accordance with the instructions to
Bidders
We undertake to pay to the Purchaser up to the above amount upon receipt of its first written demand
without the purchaser having to substantiate its demand provided that in its demand the purchaser
will note that the amount claimed by it is due to it owning to the occurrence of one or both of the two
conditions specifying the occurred condition or conditions
This guarantee will remain in force as specified in clauses 12 and 282 of section 4 Part A of the Bid
Document upto and including THIRTY (30) days after the Period of bid validity and any demand in
respect thereof should reach the Bank not later than the specified datedates
Signature of the Bank Authority
Name
Signed in Capacity of
Name amp Signature of witness Full address of Branch
Address of witness Tel No of Branch
Fax No of Branch
Seal amp Signature of Bidder
46
7 (B) PERFORMANCE SECURITY BOND FORM
(To be typed on Rs100- non-judicial stamp paper)
Datedhelliphelliphelliphelliphellip
Sub Performance guarantee
Whereas General Manager Telecom Bhuj Telecom District Bhuj (hereafter referred to as BSNL) has issued an AWO no
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellipDated helliphelliphelliphellip20hellip awarding the work of
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip to Ms
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip(hereafter referred to as ldquoBidderrdquo) and BSNL has asked him to submit a performance guarantee
in favour of AO(Cash) BSNL Oo GMTD BHUJ of Rs helliphelliphelliphelliphelliphellip- (hereafter referred to as ldquoPG Amountrdquo) valid up
to helliphelliphelliphellip20helliphelliphellip (hereafter referred to as ldquoValidity Daterdquo)
Now at the request of the Bidder We helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellipBank
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip Branch having (Address) and Regd
office address as helliphelliphellip helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip (Hereinafter called lsquothe
Bankrdquo) agreed to give this guarantee as hereinafter contained
2 We ldquothe Bankrdquo do hereby undertake and assure to the BSNL that if in the opinion of the BSNL the Bidder has in any way
failed to observe or perform the terms and conditions of the said agreement or has committed any breach of its obligations
there-under the Bank shall on demand and without any objection or demur pay to the BSNL the said sum limited to PG
Amount or such lesser amount as BSNL may demand without requiring BSNL to have recourse to any legal remedy that may
be available to it to compel the Bank to pay the same
3 Any such demand from the BSNL shall be conclusive as regards the liability of Bidder to pay to BSNL or as regards the
amount payable by the Bank under this guarantee The Bank shall not be entitled to withhold payment on the ground that the
Bidder had disputed its liability to pay or has disputed the quantum of the amount or that any arbitration proceeding or legal
proceeding is pending between Bidder and BSNL regarding the claim
4 We the Bank further agree that the guarantee shall come into force from the date of its issue and shall remain in full force
and effect up to its Validity date
5 The Bank further agrees that the BSNL shall have the fullest liberty without the consent of the Bank and without affecting
in any way the obligations hereunder to vary any of the terms and conditions of the said agreement or to extend the time for
performance of the said agreement from any of the powers exercisable by BSNL against the Bidder and to forebear to enforce
any of the terms and conditions relating to the said agreement and the Bank shall not be relieved from its liability by reason
of such failure or extension being granted to Bidder or through any forbearance act or omission on the part of BSNL or any
indulgence by BSNL to Bidder or any other matter or thing whatsoever which under the law relating to sureties would but for
this provision have the effect of relieving or discharging the guarantor
6 Notwithstanding anything herein contained
(a) The liability of the Bank under this guarantee is restricted to the PG Amount and it will remain in force up to its Validity
date
(b) The guarantee shall stand completely discharged and all rights of the BSNL under this Guarantee shall be extinguished if
no claim or demand is made on us in writing on or before its validity date
7 In case BSNL demands for any money under this bank guarantee the same shall be paid through bankerrsquos Cheque in
favour of ldquoAO(Cash) BSNL Oo GMTD BHUJ rdquo payable at Bhuj
8 The Bank guarantees that the below mentioned officer who have signed it on behalf of the Bank have authority to give this
guarantee under its delegated power
Place helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip
Date helliphelliphelliphelliphelliphelliphelliphelliphelliphellip (Signature of the Bank Officer)
Rubber stamp of the bank
Authorized Power of Attorney Number helliphelliphelliphelliphelliphellip
Name of the Bank officer helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip
Having examined the tender documents terms and conditions stipulated therein specifications of work
etc we the under signed offer to execute the repair Works in conformity with the said specifications and
conditions of contract as under
Sl No
ITEM DESCRIPTION
Repair Charges per module inclusive of freight
forwardingpacking amp all taxes amp levies (except GST)
(in Figure)
Unit Rate in Words
Total Cost (unit rate qty)
1 2 3 4 5
1 25 AMP Module
2
50 AMP Module
3 100 AMP Module
4 Control Panel of
Power Plants
25A 50A amp 100A
5 GRAND TOTAL
Note -
1 GST will be payable extra on approved rates 2If our Bid is accepted we shall submit the securities as per the conditions mentioned in the contract
3We agree to abide by this Bid for a period of 180 days from the date of opening of financial bid and it shall
remain binding upon us and may be accepted at any time before the expiry of that period
4 The evaluation will be made on the basis of lowest rate quoted as under Lowest Rate = (rate quoted for 25 AMP Qty + rate quoted for 50 AMP Qty + rate
quoted for 100 AMP Qty + rate quoted for Control Panel of Power Plant AMP Qty)
The bidder who has offered lowest rate as evaluated above will be treated as L1 bidder
Date Signature of Tenderer
Seal amp Signature of Bidder
49
CHECK LIST
Sl No
Description Tender Clause Mode of Submission
1 Tender Fee Section 1 (part A) Para 21 22
Off-line
2 EMD Section 1 (part A) Para 51 52 Off-line 3 Power of Attorney Section 4 (Part A) clause 143 Off-line 4 Latest and Valid MSME NSIC certificate (If Applicable) Off-line 5 Experience Certificate Section 1 (part A)
need to be issued in compliant format and timely within the time prescribed under GST law
163 In case of any deficientincompleterejected supply BSNL shall convey the same in a reasonable
time to enable the supplier to issue credit note and take tax adjustment
164 It would be the responsibility of the supplier to declare correct information on invoice and GSTN
viz the amount the place of supply rate of tax etc In case the eligibility of input tax credit is
questioned or denied to BSNL on account of default by the supplier the same would be
recovered by BSNL from the contractor
165 Registered location of the both the parties ie BSNL and contractor should be mentioned in the
agreement with GSTIN No Further supplier should raise invoices at the registered premise of
BSNL for availing of credit and ensure that the place of supply as per GST law is same as
registered premise
166 BSNL could at any time instruct the contractor to raise its invoices at a particular location of
BSNL
Seal amp Signature of Bidder
39
167 It is the responsibility of the supplier to ensure that place of supply and the GSTN of BSNL are
in the same state If for any reason they are not in the same state the contractor shall intimate to
BSNL and give adequate time before raising of the invoice
168 E-waybill number should be mentioned on the invoices
169 contractor shall be responsible for timely issuance and delivery of invoice DN CN to enable
BSNL to claim tax benefit on or before the stipulated time period provided by the GST law
(a) It is the responsibility of the contractor to ensure that outward supply return (GSTR-1) would be
filed correctly If not than cost would be borne by supplier
(b) Reporting of correct outward supply by supplier in the outward return (GSTR-1) is the
responsibility of the supplier In case of mismatch because of contractorrsquos fault prompt
amendments must be made by the supplier else supplier would be required to indemnify BSNL
of the loss of credit due to mis-match The compliances to be adhered by contractor includes
(but is not limited to) the following
(i) Uploading appropriate invoice details on the GSTN within the stipulated time
(ii) Issuing GST compliant invoice CN DN PO issued by BSNL should be referred by
contractor for capturing information on the invoice
(iii) Contractor needs to pay the entire self-assessed tax on timely basis
(iv) Where invoice is not uploaded or incorrect upload of invoice detail of GSTN by supplier
then credit on such invoice will be given provisionally subject to matching So acceptance of
changes made by BSNL on GSTN on account of non-upload or incorrect upload of invoice
details on GSTN is to be submitted by supplier Such changes wrt the mismatch are required
to be accepted by supplier within the time limit prescribed under the GST law It should be
noted that in case supplier does not accept such changes within the time limit prescribed under
GST law the loss of input tax credit (if any) would be recovered from the supplier In case of
mismatch because of Suppliers fault prompt amendments must be made by the supplier else
supplier would be required to indemnify BSNL for the losses of credit and interest paid due to
mismatch
(v) contractor to issue all necessary documentation and perform all necessary compliances for
BSNL to be eligible to claim the input tax credit of GST tax to them In case BSNL is unable to
claim the input tax credit the amount wrt GST charged by the supplier would be recovered
from the supplier
1610 Refer) for clause stating that all the details of supplier (name address GSTN unregistered
supplier place of supply SAC HSN code etc) and other mandatory details shall be mentioned on the
invoice
1611Where the location agreed are more than one state then separate invoice state wise to claim
input tax credit in a particular state (typically happens in a bill to-ship to scenario) shall have to be
submitted
1612 It shall be the responsibility of the supplier to mention State of place of supply of goodsservices
in the invoice issued to BSNL
Seal amp Signature of Bidder
40
SECTION ndash 5 (Part-B)
SPECIAL CONDITIONS OF CONTRACT (SCC)
1 GENERAL
No official of Gazetted rank or other Gazetted officer employed in Engineering or administrative
duties in an Engineering BSNL or any other BSNL of the BSNL is allowed to work as a contractor for
a period of two years after his retirement from BSNL service without the previous permission of
BSNL This contract is liable to be cancelled if either the contractor or any of his employee is found at
any time to be such a person who hadnrsquot obtained the permission of BSNL as aforesaid before
submission of the engagement in the contractorrsquos service as the case may be
2 Material Handed over by The BSNL
21 The contractor shall transport (including loading and unloading) all stores issued to him from
Field Unit Telecom Store to the site of work at his own cost The BSNL shall not pay any
transportation charges to the contractor
22 All materials handed over to the contractor by the BSNL shall remain the absolute property of
BSNL and shall not be removed form site of the work except for use in the work and shall be at all
times open to inspection by the Representative of GMTD BHUJ
23 The contractor shall be responsible for the transportation of store storage and safe custody of all
material supplied to him by the BSNL which in the contractorrsquos custody whether or not installed in
the work The contractor shall satisfy himself regularly the quantity and quality of the materials
supplied to him and he will be responsible for any subsequent deterioration and discrepancy (inclusive
of theft) in the quantity quality the materials
3 LABOUR WELFARE MEASURES AND WORKMAN COMPENSATION
(AS APPLICABLE)
31 Obtaining License before commencement of work
The contractor shall obtain a valid labour license (if applicable) under the Contact Labour (RampA) Act
1919 and the Contract Labour (Regulation and Abolition) Central Rules 1971 before commencement
of the work and continue to have a valid license until the completion of work The contractor shall
also abide by the provisions of the Child Labour (Prohibition and Regulation) Act 1986 Any failure
to fulfill this requirement shall attract the penal provisions of this contract arising out of the resultant
non-execution of work
32 Contractors labour Regulations
321 Working Hours
3211 Normally working hours of an employee should not exceed 9 hours a day The working
day shall be so arranged the inclusive of interval for rest if any it shall not spread over
more than12 hours on any day
3212 When a worker is made to work for more than 9 hours on any day or for more than 48
hours in any week he shall be paid over time for the extra hours put in by him
3213 Every worker shall be given a weekly holiday normally on a Sunday in accordance with
the provisions of minimum Wages (Central Rules 1960 as amended from time to time
irrespective of whether such worker is governed by the Minimum Wages Act or not
3214 Where the minimum wages prescribed by the Government under the Minimum Wages
Act are not inclusive of the wages for the weekly day of rest the worker shall be entitled
to rest day wages at the rate applicable to the next preceding day provided he has
worked under the same contractor for a continuous period of not less than 6 days
3215 Where a contractor is permitted by the Engineer-in-Charge to allowed a worker to work
on a normal weekly holiday he shall grant a substituted holiday to him for the whole day
Seal amp Signature of Bidder
41
on one of the five days immediately before or after the normal weekly holiday and pay
wages to such worker for the work performed on the normal weekly holiday at the
overtime rate
322 Display of Notice Regarding Wages Etc
The contractor shall before he commences his work on contract display and correctly
maintain and continue to display and correctly maintain in a clear and legible condition
in conspicuous places on the work notices in English and in local Indian languages
spoken by the majority of the workers giving the minimum rates of the wages fixed
under Minimum Wages Act the actual wages being paid the hours of work for which
such wage are earned wages periods dates of payments of wages and other relevant
information
323 Payment of Wages
3231 The contractor shall fix wage periods in respect of which wages shall be payable
3232 No wage period shall exceed one month
3233 The wages of every person employed as contract labour in an establishment or by a
contractor where less than one thousand such persons are employed shall be paid before
the expiry of seventh day and in other cases before the expiry of tenth day after the last day
of the wage period in respect of which the wages are payable
3234 Where the employment of any worker is terminated by or on behalf of the contractor the
wages earned by him shall be paid before the expiry of the second working day from the
date on which his employment is terminated
3235 All payment of wages shall be made on a working day at the work premises and during the
working time and on a date notified in advance and in case the work is completed before
the expiry of the wage period final payment shall be made within 48 hours of the last
working day
3236 Wages due to every worker shall be paid to him direct or to other person authorized by him
in this behalf
3237 All wages shall be paid in current coin or currency or in both
3238 Wages shall be paid without any deductions of any kind except those specified by the
Central Government by general or special order in this behalf or permissible under the
Payment of Wages Act 1956
3239 A notice showing the wages period and the place and time of disbursement of wages shall
be displayed at the place of work and a copy sent by the contractor to the Engineer ndashin-
Charge under acknowledgement
32310 It shall be the duty of the contractor to ensure the disbursement of wages in presence of the
site Engineer or any other authorized representative of the Engineer-in-Charge who will be
required to be present at the place and time of the disbursement of wages by the contractor
to workmen
32311 The contractor shall obtain from the site Engineer or any other authorized representative of
the Engineer-in-Charge as the case may be a certificate under his signature at the end of
the entries in the ldquoRegister of Wages ldquo or the ldquoWage-cum-Muster Rollrdquo as the case may
be in the following form -
ldquoCertified that the amount shown in the column Nohelliphelliphelliphelliphas been paid to the
workman concerned in my presence on helliphelliphelliphelliphelliphellip at helliphelliphelliphelliphelliphelliphelliphelliphelliprdquo
32312 Fines and deductions which may be made from wages
A The wages of a worker shall be paid to him without any deduction of any kind except the
following -
a) Fines
(b) Deductions for absence from duty ie from the place or the places where by the terms of
his employment he is required to work The amount of deduction shall be in proportion
to the period for which he was absent
(c) Deductions for damage to or loss of goods expressly entrusted to the employed person
for custody or for loss of money or any other deductions which he is required to
account where such damage or loss is directly attributable to his neglect or default
Seal amp Signature of Bidder
42
(d) Deduction for recovery of advances or for adjustment of over payment of wages
advances granted shall be entered in register
(e) Any other deductions which the Central Government may form time to time allow
B No fines should be imposed on any worker save in respect of such acts and omissions
on his part as have been approved of by the Labour Commissioner
C No fine shall be imposed one worker and no deduction for damage or loss shall be
made from his wages until the worker has been given an opportunity of showing cause
against such fines or deductions
D Every fine shall be deemed to have been imposing on the day of the act or omission in
respect of which it was imposed
524 Labor records 1 The contractor shall maintain a Register of Persons employed on work on contract in
Form XIII of the Contract Labour (RampA) Central Rules 1971
2 The contractor shall maintain a Muster Roll register in respect of all workmen
employed by him on the work under Contract in Form XVI of the CL (RampA) Rules
1971
3 The contractor shall maintain a Wage Register in respect of all workmen employed by
him on the work under contract in From XVII of the CL (RampA) Rules 1971
4 Register of accidents- The contractor shall maintain a register of accidents in such
form as may be convenient at the work place but the same shall include the following
particulars
(a) Full Particulars of the laborers who met with accident
(b) Rate of wages
(c) Sex
(d) Age
(e) Nature of accident and cause of accident
(f) Time and date of accident
(g) Date and time when admitted in hospital
(h) Date of discharge from the hospital
(i) Period of treatment and result of treatment
(j) Percentage of loss of earning capacity and disability as assessed by
Medical officer
(k) Claim required to be paid under Workmenrsquos Compensation Act
(l) Date of payment of compensation
(m) Amount paid with details of the person to whom the same was paid
(n) Authority by whom the compensation was assessed
(o) Remarks
5 The contractor shall maintain a Register of Fines in the Form XII of the CL(RampA)
Rules 1971 the Contractor shall display in a good condition and in a conspicuous
place of work the approved list of acts and commission for which fines can be
imposed
6 The contractor shall maintain a Register of deductions for damage or loss in Form
XX of the CL (RampA) Rules 1971
7 The contractor shall maintain a Register of Advances in Form XXIII of the CL
(RampA) Rules 1971
8 The contractor shall maintain a Register of Overtime in Form XXIII of the CL
(RampA) Rules 1971
9 Attendance card-cum wage slip a The contractor shall issue an Attendance card cum wage slip to each workman
employed by him
b The card shall be valid for each wage period
Seal amp Signature of Bidder
43
c The contractor shall mark the attendance of each workman on the card twice each
day once at the commencement of the day and again after the rest interval before
he actually starts work
d The card shall remain in possession of the worker during the wage period under
reference
e The contractor shall complete the wage slip portion on the reverse of the card at
least a day prior to the disbursement of wages in respect of the wage period under
reference
f The contractor shall obtain the signature or thumb impression of the worker on the
wag slip at the time of disbursement of wages and retain the card with him
10 Employment card The contractor shall issue an Employment Card in the Form XIV of CL (RampA) Central Rules
1971 to each worker within three days of the employment of the worker
11 Service certificate
On termination of employment for any reason whatsoever the contractor shall issue to the
workman whose services have been terminated a Service Certificate in the Form XV of the
CL (RampA) Central Rules 1971
12 Preservation of labour records The labour records and records of Fines and deductions shall be preserved in original for a
period of three years from the date of last entries made in them and shall be made available for
inspection by the Engineer-in-Charge or Labour Officer or any other officers authorized by the
Ministry of Communication in this behalf
13 Power of labour officer to make investigations or enquiry The labour officer or any person authorized by the Central Government on their behalf shall
have power to make enquiries with a view to ascertaining and enforcing due and proper
observance of Fair Wage Clauses and provisions of these Regulations He shall investigate
into any complaint regarding the default made by the contractor in regard to such provision
14 Report of Investigating officer and action thereon The labour Officer or other persons authorized as aforesaid shall submit a report of result of
his investigation or enquiry to the Engineer in-Charge indicating the extent if any to which
the default has been committed with a note that necessary deductions from the contractorrsquos bill
be made and the wages and other dues be paid to the labourers concerned The Engineer in-
Charge shall arrange payments to the labour
concerned within 45 days from the receipt of the report from the Labour Officer or the
authorized officer as the case may be
15 Inspection of Books And slips The contractor shall allow inspection of all the prescribed labour records to any of his workers
or to his agent at a convenient time and place after due notice is received or to the Labour
Officer or any other person authorized by the Central Government on his behalf
16 Submission of Returns The contractor shall submit periodical returns as may be specified form time to time
17 Amendments
The Central Government may from time to time add to or amend the regulations and on any
question as to the applicationinterpretation or effect of those regulations
Contractor must fulfill the terms and condition towards fulfillmentscompliance of the
provision of EPF amp Miscprovision act 1952 amp Employment provident Fund Scheme 1952 in
respect of laborersemployees engaged by the contractor Contractor must submit declaration
form regarding compliance of the condition of EPF act 1952
525 INSURANCE Without limiting any of his other obligations or liabilities the contractor shall at his own
expense take and keep comprehensive insurance including third party risk for the plant
machinery men materials etc brought to the site and for all the work during the execution
The contractor shall also take out workmenrsquos compensations insurance as required by law and
under take to indemnify and keep indemnified the Government from and against all manner of
Seal amp Signature of Bidder
44
claims and demands and losses and damages and cost (including between attorney and client)
charges and expenses that may arise in regard the same or that the Government may suffer or
incur with respect to endor incidental to the same The contractor shall have to furnish
originals and or attested copies as required by the BSNL of the policies of insurance taken
within 15 (fifteen) days of being called upon to do so together with all premium receipts and
other papers related thereto which the BSNL may require
526 COMPLIANCE WITH LAWS AND REGULATION
During the performance of the works the contractor shall at his own cost and initiative
fully comply with all applicable laws of the land and with any and all applicable by-laws
rules regulations and orders and any other provisions having the force of law made or
promulgated or deemed to be made or promulgated by the Government Governmental
agency or BSNL municipal board Government of other regulatory or Authorized body or
persons and shall provide all certificates or compliance therewith as may be required by
such applicable law By-laws Rules Regulations orders and or provisions The
contractor shall assume full responsibility for the payment of all contributions and pay roll
taxes as to its employees servants or agents engaged in the performance of the work
specified in the contractor documents If the contractor shall require any assignee or sub-
contract to comply with the provisions of the clause and in this connection the contractor
agrees as to undertake to save and hold the Government harmless and indemnified from
and against any all penalties actions suits losses and damages claims and demands and
costs (inclusive between attorney and client) charges and expenses whatsoever arising out
or occasioned indirectly or directly by failure of the contractor or any assignee or sub-
contractor to make full and proper compliance with the said by-laws Rules Regulations
laws and Order and provisions as aforesaid
6 TOOLS and PLANTS
The contractor shall provide at his own cost all tools plants appliances implements etc
required for proper execution of works The contractor shall also supply without charge
the requisite number of persons with the means and materials necessary for the purpose of
setting out works counting weighing and assisting the measurements for examination at
any time and from time to time Failing his so doing the same may be provided by the
Engineer-in-charge at the expense of the contractor and the expenses shall be deducted
from any money due to the contractor under this contract or otherwise
As per Para 367 of the recommendationobservation of Tenth Report of parliamentary
standing committee on labour Contractor would provide the same social security to the
labours engaged by him as is available to regular employees
As per Para 368 of the recommendationobservation of Tenth Report of parliamentary
standing committee on labour Contractor shall ensure implementation of equal pay for equal
work and also equal remuneration to men and women
Seal amp Signature of Bidder
45
SECTION ndash 7
PROFORMAS
7 (A) BID SECURITY EMD Guarantee
(To be typed on Rs100- non-judicial stamp paper)
Whereas (hereinafter called the Bidder) has submitted its bid datedfor
the supply of vide Tender Nohelliphelliphelliphelliphelliphelliphelliphellip dated KNOW ALL MEN by
these presents that WE OF having our registered office at
(hereinafter called the Bank) are bound unto Bharat Sanchar Nigam Limited (hereinafter
called the Purchaser) in the sum of Rs for which payment will and truly to be made of
the said Purchaser the Bank binds itself its successors and assigns by these present
THE CONDITIONS of the obligation are
1 If the Bidder withdraws his bid during the period of bid validity specified by the Bidder
on the Bid form or
2 If the Bidder having been notified of the acceptance of his bid by the Purchaser during the
period of bid validity
(a) fails or refuses to execute the Contract if required or
(b) fails or refuses to furnish the Performance Security in accordance with the instructions to
Bidders
We undertake to pay to the Purchaser up to the above amount upon receipt of its first written demand
without the purchaser having to substantiate its demand provided that in its demand the purchaser
will note that the amount claimed by it is due to it owning to the occurrence of one or both of the two
conditions specifying the occurred condition or conditions
This guarantee will remain in force as specified in clauses 12 and 282 of section 4 Part A of the Bid
Document upto and including THIRTY (30) days after the Period of bid validity and any demand in
respect thereof should reach the Bank not later than the specified datedates
Signature of the Bank Authority
Name
Signed in Capacity of
Name amp Signature of witness Full address of Branch
Address of witness Tel No of Branch
Fax No of Branch
Seal amp Signature of Bidder
46
7 (B) PERFORMANCE SECURITY BOND FORM
(To be typed on Rs100- non-judicial stamp paper)
Datedhelliphelliphelliphelliphellip
Sub Performance guarantee
Whereas General Manager Telecom Bhuj Telecom District Bhuj (hereafter referred to as BSNL) has issued an AWO no
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellipDated helliphelliphelliphellip20hellip awarding the work of
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip to Ms
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip(hereafter referred to as ldquoBidderrdquo) and BSNL has asked him to submit a performance guarantee
in favour of AO(Cash) BSNL Oo GMTD BHUJ of Rs helliphelliphelliphelliphelliphellip- (hereafter referred to as ldquoPG Amountrdquo) valid up
to helliphelliphelliphellip20helliphelliphellip (hereafter referred to as ldquoValidity Daterdquo)
Now at the request of the Bidder We helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellipBank
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip Branch having (Address) and Regd
office address as helliphelliphellip helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip (Hereinafter called lsquothe
Bankrdquo) agreed to give this guarantee as hereinafter contained
2 We ldquothe Bankrdquo do hereby undertake and assure to the BSNL that if in the opinion of the BSNL the Bidder has in any way
failed to observe or perform the terms and conditions of the said agreement or has committed any breach of its obligations
there-under the Bank shall on demand and without any objection or demur pay to the BSNL the said sum limited to PG
Amount or such lesser amount as BSNL may demand without requiring BSNL to have recourse to any legal remedy that may
be available to it to compel the Bank to pay the same
3 Any such demand from the BSNL shall be conclusive as regards the liability of Bidder to pay to BSNL or as regards the
amount payable by the Bank under this guarantee The Bank shall not be entitled to withhold payment on the ground that the
Bidder had disputed its liability to pay or has disputed the quantum of the amount or that any arbitration proceeding or legal
proceeding is pending between Bidder and BSNL regarding the claim
4 We the Bank further agree that the guarantee shall come into force from the date of its issue and shall remain in full force
and effect up to its Validity date
5 The Bank further agrees that the BSNL shall have the fullest liberty without the consent of the Bank and without affecting
in any way the obligations hereunder to vary any of the terms and conditions of the said agreement or to extend the time for
performance of the said agreement from any of the powers exercisable by BSNL against the Bidder and to forebear to enforce
any of the terms and conditions relating to the said agreement and the Bank shall not be relieved from its liability by reason
of such failure or extension being granted to Bidder or through any forbearance act or omission on the part of BSNL or any
indulgence by BSNL to Bidder or any other matter or thing whatsoever which under the law relating to sureties would but for
this provision have the effect of relieving or discharging the guarantor
6 Notwithstanding anything herein contained
(a) The liability of the Bank under this guarantee is restricted to the PG Amount and it will remain in force up to its Validity
date
(b) The guarantee shall stand completely discharged and all rights of the BSNL under this Guarantee shall be extinguished if
no claim or demand is made on us in writing on or before its validity date
7 In case BSNL demands for any money under this bank guarantee the same shall be paid through bankerrsquos Cheque in
favour of ldquoAO(Cash) BSNL Oo GMTD BHUJ rdquo payable at Bhuj
8 The Bank guarantees that the below mentioned officer who have signed it on behalf of the Bank have authority to give this
guarantee under its delegated power
Place helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip
Date helliphelliphelliphelliphelliphelliphelliphelliphelliphellip (Signature of the Bank Officer)
Rubber stamp of the bank
Authorized Power of Attorney Number helliphelliphelliphelliphelliphellip
Name of the Bank officer helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip
Having examined the tender documents terms and conditions stipulated therein specifications of work
etc we the under signed offer to execute the repair Works in conformity with the said specifications and
conditions of contract as under
Sl No
ITEM DESCRIPTION
Repair Charges per module inclusive of freight
forwardingpacking amp all taxes amp levies (except GST)
(in Figure)
Unit Rate in Words
Total Cost (unit rate qty)
1 2 3 4 5
1 25 AMP Module
2
50 AMP Module
3 100 AMP Module
4 Control Panel of
Power Plants
25A 50A amp 100A
5 GRAND TOTAL
Note -
1 GST will be payable extra on approved rates 2If our Bid is accepted we shall submit the securities as per the conditions mentioned in the contract
3We agree to abide by this Bid for a period of 180 days from the date of opening of financial bid and it shall
remain binding upon us and may be accepted at any time before the expiry of that period
4 The evaluation will be made on the basis of lowest rate quoted as under Lowest Rate = (rate quoted for 25 AMP Qty + rate quoted for 50 AMP Qty + rate
quoted for 100 AMP Qty + rate quoted for Control Panel of Power Plant AMP Qty)
The bidder who has offered lowest rate as evaluated above will be treated as L1 bidder
Date Signature of Tenderer
Seal amp Signature of Bidder
49
CHECK LIST
Sl No
Description Tender Clause Mode of Submission
1 Tender Fee Section 1 (part A) Para 21 22
Off-line
2 EMD Section 1 (part A) Para 51 52 Off-line 3 Power of Attorney Section 4 (Part A) clause 143 Off-line 4 Latest and Valid MSME NSIC certificate (If Applicable) Off-line 5 Experience Certificate Section 1 (part A)