Top Banner
Renovation of Building 4950 Fort Stewart, GA
6

Renovation of Building 4950 Fort Stewart, GA. Corridors New HVAC system, drop ceiling, lighting, and textured walls. Before: Exposed block walls, industrial.

Apr 01, 2015

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Renovation of Building 4950 Fort Stewart, GA. Corridors New HVAC system, drop ceiling, lighting, and textured walls. Before: Exposed block walls, industrial.

Renovation of Building 4950 Fort Stewart, GA

Page 2: Renovation of Building 4950 Fort Stewart, GA. Corridors New HVAC system, drop ceiling, lighting, and textured walls. Before: Exposed block walls, industrial.

CorridorsNew HVAC system, drop ceiling, lighting, and textured walls.

Before: Exposed block walls, industrial lighting. No HVAC in corridors. Newly Renovated Corridor

Page 3: Renovation of Building 4950 Fort Stewart, GA. Corridors New HVAC system, drop ceiling, lighting, and textured walls. Before: Exposed block walls, industrial.

StairwellsNew stairwells, railings, and finishes

Professional signage and way-finding plan

BeforeAfter

Page 4: Renovation of Building 4950 Fort Stewart, GA. Corridors New HVAC system, drop ceiling, lighting, and textured walls. Before: Exposed block walls, industrial.

Guestrooms completely renovated to include modern kitchens bathrooms, upgraded HVAC, and finishes.

Before After

Page 5: Renovation of Building 4950 Fort Stewart, GA. Corridors New HVAC system, drop ceiling, lighting, and textured walls. Before: Exposed block walls, industrial.

Newly Renovated Breakfast and Lobby

New automatic entry doors and passenger elevator provide easy

access for guests to the 3-story facility.

Page 6: Renovation of Building 4950 Fort Stewart, GA. Corridors New HVAC system, drop ceiling, lighting, and textured walls. Before: Exposed block walls, industrial.

Project Team

• FMWRC Project Manager – Patti Richardson• FMWRC Contracting Officer – Del Dreano• FMWRC Interior Design – Mary Ann Miller• Ft Stewart Lodging Manager – Connie Parks• Contractor – Stellar Construction, Jacksonville, FL